Loading...
HomeMy WebLinkAboutSW8090814_HISTORICAL FILE_20091026P STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0010 8\`A DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 10001 10 1l0 YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director October 26, 2009 Carl Baker, Deputy Public Works Officer Commanding Officer, US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28542 Subject: State Stormwater Management Permit No. SW8 090814 MCAS Dining Facility P-620, formerly AS 4012 High Density Wet Detention Pond Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a Stormwater Management Permit Application for MCAS Dining Facility P-620 on September 16, 2009 with additional information submitted on October 5, October 16 and October 23, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW8090814 dated October 26, 2009, for the construction of the subject project. This permit shall be effective from the date of issuance until October 26, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance and Reporting requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions please contact M.J. Naugle, or me at (910) 796-7215. Sincerely, G "Georgette Scott Stormwater Supervisor Division of Water Quality GDSI mjn: S:\WQS\STORMWATER\PERMIT\090814 oct09 cc: Matt Brewer, PE, Bennett, Brewer & Associates, LLC 301-687-0494, fax: 0495 Wilmington Regional Office Central Files M.J. Naugle Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-20041 Customer Service: 1-877-623-6748 NOrthCarolina Internet: www.nctmaterquality.org Naturally atu a `1-i(ll y An Equal Opportunity\ Affirmative Action Employer !L State Stormwater Management Systems Permit No. SW8 090814 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding Officer and US MCB Camp Lejeune MCAS Dining Facility P-620 Douglas and Schmidt Roads, Camp Lejeune, Jacksonville, Onslow County FOR THE Construction, operation and maintenance of one (1) wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 26, 2009, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 63,684 square feet of impervious area. 3. A portion of the built -upon area covered by this permit is excluded from State Stormwater permitting requirements as set forth in the redevelopment exclusion Section 2. (d)(3) of Session Law 2008-211, effective October 1, 2008, and the stormwater rules under Title 15A NCAC 2H.1000, as amended. This determination is based on the following: 1) The project had a total of 92,310 square feet of existing built -upon area and proposes to remove and replace with a total BUA of 122,975 square feet. After adjusting for the use of 28,345 square feet of permeable pavement, the net total of BUA on the site is 105,968 square feet. The net gain of BUA is 13,658 square feet. At a minimum, this net gain in impervious area must be treated in the proposed BMP; 2) The project proposes to treat 63,684 square feet of proposed built -upon area in the wet detention pond, which provides better protection of surface waters than the existing stormwater control, which is direct runoff to stormwater outlets with no treatment. 4. A 50-foot wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 090814 5. In addition to the impervious area treated in the wet pond, there is an additional 23,493 and 4,328 and 5,710 and 6,055 and 1,402 and 2,738 and 8,172 square feet of impervious area in drainage areas 2 through 8, respectively. This BUA is treated to the maximum extent practicable with permeable pavement. The project is the redevelopment of an existing dining facility and parking lot not covered by an existing stormwater permit. 6. The wet detention pond must be operated with a 30 foot vegetated area designed to pass the 10 year storm in a diffuse, non -erosive manner. This vegetated area is located across Douglas Road from the permit area. 7. The tract will be limited to the amount of built -upon area indicated in Sections 1.2, 1.3 and 1,10 of this permit, and per approved plans. There is no future BUA approved. Any additional BUA requires approval of a modification to this permit prior to construction. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. The runoff from all built -upon area within the permitted drainage area number one (1) of this project must be directed into the permitted stormwater control system. 10. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ftZ: Offsite, ftZ: b. Total Impervious Surfaces, ft2: Onsite, ftZ: Offsite, ftZ: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ftZ: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. discharge rate, cfs: k. Controlling Orifice: I. Orifice flow rate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 2.1 90,715 none 63,684 63,684 none 1.5 3 85% 20 6,161 8,585 20.9 1.36 1.5"0 pipe 0.032 2,668 N/A (PPV <30000 cf) Southwest Creek / White Oak 19-17-(6.5) "C;HWQ,NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 090814 4. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 5. No decorative spray fountains will be allowed in the stormwater treatment system. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 10: The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 090814 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change Form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit remains in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 090814 11. The permittee shall submit a permit renewal request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the twenty-sixth day of October 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION P Jor olee . Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 090814 MCAS Dining Facility P-620 Stormwater Permit No. SW8 090814 Onslow County Designer's Certification I, , as a duly registered North Carolina, having been authorized to observe construction of the project, (Project) Page 1 of 2 in the State of (periodically/ weekly/ full time) the for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No. SW8 090814 Page 2 of 2 Certification Requirements: The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required draw down devices are correctly sized and located per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. 16. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office David Towler, Camp Lejeune Page 8 of 8 .,... ,,...,., ...-:- ;DWQUSE ONLY .. .. ... Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): MCAS Dining Facility P-620 2. Location of Project (street address): City:Camp Leleune County:Omlow Zip:28542 3. Directions to project (from nearest major intersection): From the intersection of US Route 17 and State Route 24 go south on US Route 17 approximately 1.8 miles exiting on left to Douglas Road. Travel 1.4 miles to the intersection of Douglas Road and Schmidt Street. i 4. Latitude:34° 42' 48" i Longitude:77° 2T " W of the main entrance to the project. 1 if. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed` ❑ Completed' 'provide a designer's certification Specify the type of project (check one): ❑Low Density []High Density ❑Drains to an Offsfte Stormwater System ®Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 5.3 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit OCT 2 2 2009 Form SWU-101 Version 073uly2009 Page 1 of 6 lo-lln-o9 A� '0to00• '�D9159 -"`DWQUSEONLY ..-.. .....,.. Date Received Fee Paid Permit Number -ILo-o 52 656 1 su3b D o Applicable Rules: ❑ Coastal SW -1995 V1 Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW /ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: .State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): MCAS Dining Facility P-620 2. Location of Project (street address): City:C mp Lejeune County:Onslow Zip28542 3. Directions to project (from nearest major intersection): From the intersection of US Route 17 and State Route 24 go south on US Route 17 approximately 1.8 miles exiting on left to Douglas Road. Travel 1.4 mules to the intersection of Douglas Road and Schmidt Street. 4. Latitude:34° 42' 53" N Longitude:77° 27' 27" W of the main entrance to the project. it. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed" "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ,High Density ❑Drains to an Offsite Stormwater System ®Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 5.3 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: oCT 2 b 2009 Form SWU-101 Version 07July2009 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Commanding Officer. US MCB Camp Lejeune Signing Official & Title:Carl Baker. Deputy Public Works Officer b.Contact information for person listed in item la above: Street Address:Bldg 1005 Michael Road City:Camp Ldeune State:NC Zip:28542 Mailing Address (if applicable):Bldg 1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Phone: 1910 ) 451-2213 Fax: (910 ) 451-2927 Email:carl.h.baker@usmc mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee` (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser" (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Same as above Signing Official & b.Contact information for person listed in item 2a above: Street Address: Mailing Address (if applicable): Phone: State: Fax:1 ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b.Contact information for person listed in item 3a above: Mailing Address: Phone: 4. Local jurisdiction for building permits: State: Zip: Fax: ( ) Point of Contact: Phone #: Form SWU-101 Version 07July2009 Page 2 of 6 IV.. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater management will be accomplished through a variety of methods including wet detention pond, vegetated swales and sheet flow through vegetated areas. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: I b.Identify the regulation(s) the project has been designed in accordance with: I ACT 16 2009 - ❑ Coastal SW —1995 ❑ Ph II — Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 5.3 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area*:5.3 acres ' Total project area shall be calculated to exclude the followin mthe normal pool of imppounded structures, the area between the banks of streams and rivers, the area below the the High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have?6 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. fool) Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name Southwest creek Southwest Creek Southwest Creek Southwest Creek Stream Class * C;HQW,NSW C;HQW,NSW C;HQW,NSW C;HQW,NSW Stream Index Number * 19-17-(6.5) 19-17-(6.5) 19-17-(6.5) 19-17-(6.5) Total Drainage Area (sf) 90715 43781 20263 22832 On -site Drainage Area (sf) 90715 38121 18480 20104 Off -site Drainage Area (sf) 0 5660 1783 2728 Proposed Impervious Area** (so 63684 23493 4328 5710 % Impervious Area** (total) 76 54 22 25 Impervious' Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Oh -site Buildings/Lots (sf) 30426 0 0 0 On -site Streets (so 0 0 0 0 On -site Parking (so 31952 17653 678 1578 On -site Sidewalks (so 1306 180 1867 1404 Other on -site (so 0 0 0 0 Future (so 0 0 0 0 Off -site (so 0 5660 1783 2728 Existing BUA*** (sf) 0 0 0 0 Total (so: 63684 23493 4328 5710 * Stream Class and Index Number can be determined at: http://h2o.enr.state.nc.uslbims/rfportsZreportsWB.html *" Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version 07July2009 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. n/a no off -site impervious Protects In Union County: Contact DWQ Central Officestaff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttr>://h2o.enr.state.ne.us/su/bmo forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2g.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office maybe found by locatin .. .._..�, _ ..._ a _ .g .. _. project on the iiiteraclrve online iriap at h(ip://ki2o:enrstate.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 5 iy$ 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants 3 u-3 Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed. signed and dated) and O&M G A(_6 agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to StuS hip://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor s" the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the 8 k,6 receiving stream drains to class SA waters within'/: mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations. Sw3 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: SlUS a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded 0 structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. LU j. Site Layout with all BUA identified and dimensioned. m > c k. Existing contours, proposed contours, spot elevations, finished floor elevations. N 1. Details of roads, drainage features, collection systems, and stormwater control measures. a co m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a W qualified person. Provide documentation of qualifications and identify the person who w made the determination on the plans. U U') n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). W p. Vegetated buffers (where required). Q Form SWU-101 Version 07July2009 Page 4 of 6 d 3 0 'o a: IL 10 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify 503 elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPS, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N /A Page No: N/A 5" 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC 5t[ IS Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://wwwsecretarystatencus/Corporations/CSearch.as x VII., DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective —cbve'nants are required to be recorded prior to the sale of any lot. If lot sizes'vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIll., CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Steven K. Bennett Consulting Firm: Bennett, Brewer & Associates. LLC Mailing Address:23 East Main Street - Suite 200 City:Frostburg Phone: (301 ) 687-0494 Email:bennett brewerQyahoo.com State:Md Zip:21532 Fax: (301 ) 687-0495 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) . certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or hype name of organization listed in Contact Information, item IN to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. DECEIVED IIlIIInnSS�� SEP 16 2009 DWO Form SWU-101 Version 077uly2009 Page 5 of 6 PROJ S As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that County of personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) Carl Baker, DMuht Public Works Officer certify that the information included on this perm t application form is, to the best of my knowledge, correct and that the project will be constricted in conformance with the approved plans, that the required deed restrictions and protective covenants wi a recorded, and that the proposed project complies with the requirements of the applicable sto wter rule nde 5A NCAC 2H .1000, SL 2006-246 (Ph.11— Post Construction)orSL 2008-211. Signatunnre: Date: a Not Public for th Stlattee of County of CLVJ'5 �fLf.� do hereby certify that LZ ►- ' P len personally appeared before me this 1Q day of --24 and acknowledge thh ue execution of the application for a stormwater permit. Witness my hand and official seal, i //. AUCti A SOUNM Win I pum orolov Couegy slob of "on cam Form SWU-101 Version 071uly2009 SEAL My comnssion expires -1 ��.,Z�J/o SEP 16 2009 II�II Page 6 of 6 DWQ PROJ 4 Loadine Dock Basin Information Drainage Area 5 Drainage Area 6 Drainage Area 7 Drainage Area 8 Receiving Stream Name Southwest creek Southwest creek Southwest Creek Stream Class * C;HQW,NSW C;HQW,NSW C;HQW,NSW Stream Index Number * 19-17-(6.5) 19-17-(6.5) 19-17-(6.5) Total Drainage Area (sf) 20814 17726 8663 8172 On -site Drainage Area (sf) 19401 17726 8663 8172 Off -site Drainage Area (sf) 1413 0 0 0 Proposed Impervious Area** (sf) 6055 1402 2738 8172 % Impervious Area** (total) 29 8 32 100 Impervious** Surface Area Drainage Area Drainage Area Drainage Area Drainage Area On -site Buildings/Lots (so 0 0 0 0 On -site Streets (so 0 0 0 0 On -site Parkin (sf) 4211 19 1993 4859 On -site Sidewalks (so 431 1383 745 3313 Other on -site (sf) 0 0 0 0 Future (so 0 0 0 0 Off -site (so 1413 0 0 0 Existing BUA*** (so 0 0 0 0 Total (sf): 6055 1402 2738 8172 Ypc(?OSeD\ r?7j,- c 1 2- C) P�mEc��E Q° �p�•1C ft�Et� 1 q2 /uv ti DEcE ED OCT 16 2009 DW Q PROJ4 i FOR: NCDENR TRANSACTION REPORT 910 350 2004 P. 01 OCT-26-2009 MON 01:21 PM I � SEND DATE 'START RECEIVER TX TIME PAGES TYPE NOTE M# DP OCT-26 01:20 PM 919104512927 1'34" 9 FAX TX OK 036 TOTAL 1M 34S PAGES; 9 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor Dee Freeman, Secretary FAX COVER SHEET Date: To: l �+ CO: FAX #: a to l "2`l Z7 No. Of Pages: (excluding cover) 8 From: T�..cr 2�sscu CO: NC DENR FAX#: 910-350-2004 127 Cardinal Drive Exteni An Wilmington, N.C. I 8405- adve Actlon Telephone(910)Employer fi 7"15 Fax (910) 350.1004 qil I OPP h P. 01 K TRANSACTION REPORT OCT-26-2009 MON 01:23 PM FOR: NCDENR 910 350 2004 SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP _ W OCT-26 01:22 PM 913016870495 j 1'21" 9 FAX TX OK 037 I W TOTAL 1M 21S PAGES: 9 i gXttCIKX<��Ytl<�Yt��gX<��Xit<�Y{t:�gXttCXM�C�>YX<X�NX<I<�gtC�gX;�lKgtC�gX<�CIKXit(��tC�lKgMc�XtC�XffitC�����lK���gr<tC��XtX<�C��g�tC��KXtC�IKX��rt State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office . Beverly Eaves Perdue, Governor Dee Freeman, Secretary I I FAX COVER SHEET Date: 10 — 2 6-'09: No, Of Pages: (ex eluding cover) 8 1 To: Sic- From: T rs, rs ssc CO: CO: NC DENR FAX #:. -� - o 5 FAX#: 910-350-2004 REMARKS• r^ uCo- C)� `, t 127 Cardinal Drive Extension, Wilmington, N.C. 29405.3845 Telephone (910) 796-7215 Fax (910) 350.2004 An Equal Opportunity Affirmative Action Employer N N Steven K. Bennett Bennett, Brewer & Associates, LLC P.E. 23 East Main Street, Suite 200 Frostburg, Maryland 21532 www.bbasurvey.com bennett-brewer@yahoo.com . Phone (301)687-0494 bba Fax (3011687-0495 Matthew S. Brewer Bennett, Brewer & Associates, LLC R.L.S. 23 East Main Street, Suite 200 Frostburg, Maryland 21532 www.bbasurvey.com matt. brewer@bbasurvey. c om Phone (301)687-0494 bba Fax (301)687-0495 W C O e e � O �� �� WET DETENTION POND ANALYSIS FILENAME: S:IWOSI TORMWATERIEXCELSPREADSHEETSIPOND1090814 octal) PROJECT IN SWB 090814 ad09 REVIEWER'. al PROJECT NAME: dining facility P620 cocas Original Run Date: sep09 Note- User input boxes are shaded in blue. Last Madified: 26-01 Pond 1 Recall Stream'. sw creek Classification: OIHOW NSW Index Number: 19-17-(65) Onsite DA, at= 90715.00 Offsite DA, sf = 0,00 Total Drainage Arai 90715.00 Total Drainage Area,ar 2,08 Built -Upon Area ' BuildingsAots, at- 30426. Do ' SVe"a"arking, sf= 31952.00 wa Sidelk/Concrete, sf= 1306.00 Other, at= Chain, at= Total Built -upon Area: 63684.00 BUA. sf DA, sf Design Storm, inches Rv #DIVl0i Volume required, cl D Minimum Surface Area %impervious 70.20% Avg. Design Depth. ft. 3.0 TSS (85% or 90%)'. 85 SAIDA ratio 6.02% PP Surface Area req. 1 5458 Pone 1 Wiatin 112 mile SR? Y or n 1yr 24hr Rainfall Depot, 3.8 iRv 0050 Posy Rv 0.682 1 yr 24 hr Pref Volume, c 1436 1 yr 24 hr Posy Volume, 1958E Top of Sediment Area, sl 2601. W Bottom of shell Bev. Fm 1950 Bottom of shelf Are., 51. 4468.00 Permanent Pool EI.V= 20. DO Porte Pool Area, 7196 Top of shelf elev= 2050 Top of shelf area= 10185 Temp, Pool Elevation= 20.90 Temp. Pool Area= 11013 Temp Vol. Prov, of = 8585 Average Depth = Forebay Volumo Permanent Pool Vol.= 15287 Rem. Forebay Volume= 3057 Prov. Forebay Volume: 2668 Percent=(22>%�18) 17% Max. Pump HP NIA Pond 1 rawdown OnOcehVe'r Avg. Head, it = 0.28 Average Flow 02, of. 0.045 Average Flow Q5, cis 0.01B Q2 Area, sq. in. = 2.533 Q5 Area, sq. in. = 1.013 No. of Onfices 1 Orifice Diameter, in = 1.50 Onfice Area, sq, in. = 1.767 Weir Height, inches= Weir Length, inches= Mir C= pDIVy01 Weir U, eff. length= -0.056 An Ceuta Rewrote, Q, 0.031 Runoff Coefficient Cc 0.500 1 yr 24 hr rainfall depth, i 3,80 1 m 24 hr Intensity, I, ill 0.158 1 yr 24 OPresQ9 05 Avg OnfircerOow0K Drawdown, days= 1 2.17 overwrite the pro Rv value for sites with existing BUA. overwrite the predevelopment mnoff Cc value if needed. if the project drains to non -SR waters, look up the rainfall depth in the NOAA charts. BENNETT, BREWER & ASSOCIATES n 23 EAST MAIN STREET, SUITE 200 ar Ica or7 7G Gv]�Gulo�aa FROSTBURG, MD 21532 0 e e (301)687-0494 NC DENR Express Permitting NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 RE: JOB NO 10-21-09 2009018 New River MICAS Dining Facility P-620 WE ARE SENDING YOU ® Attached ❑ Under a separate cover via the following items: ❑ Shop drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy letter ❑ Change order ❑ COPIES. DATE NO,-, :, ,". ': .. DESCRIPTION 1 10-21-09 1 BMP Draina a Areas THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ For our use ElA roved as noted ❑ As re uested ❑ Returned for corrections ® For review and comment ❑ ❑ FOR BIDS DUE❑ ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS U UE C E I V E__ OCT 2 2 2009 own Suj 8 09081(Z- SIGN If enclosures are not as noted, kindly notify us at once. Naugle, Ma [;V From: Matt Brewer [Matt@bbasurvey.com] Sent: Wednesday, October 21, 2009 3:35 PM To: Naugle, Mary Cc: Steve Bennett Subject: RE: Camp Lejeune Dining Facility P620 Mary Jean, The RFP for this project states there is no contamination on -site as part of the standard disclosure. Thanks. Matthew S. Brewer, RLS Partner BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matt.brewera, bbas u rvey. corn From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, October 21, 2009 2:53 PM To: Matt Brewer; Towler CIV David W Subject: FW: Camp Lejeune Dining Facility P620 Is there any groundwater contamination in the area of the dining facility ? Mary Jean Naugle NC DENR Express Permitting NC Di vision of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mare.nauale@ncdenr.aov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, October 21, 2009 2:51 PM To: Henderson, Ginny; Reed, Bruce Subject: Camp Lejeune Dining Facility P620 Ginny or Bruce; I have a stormwater application to demo and construct a new dining facility and parking lot. They are proposing a foundation drain that will discharge from the site through an untreated stormwater outlet. Charlie mentioned that I should check with you to see if there is contamination in that area or any other concerns. [6 inch perforated into a 15 inch outlet.) Please let me know if I should let Camp Lejeune, David towler, or the engineer, Matt Brewer, know to contact you. BENNETT, BREWER & ASSOCIATES SUDS O(�O4?,L 4' 23 EAST MAIN STREET, SUITE 200 Phn L� ,4k FROSTBURG, MD 21532 ff�NQ OO L9 p � t GYMOYMP, (301) 687-0494 NC DENR Express Permitting NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 10-15-09 2009018 ATTENTION Mary Jean Naugle RE: New River MCAS Dining Facility P-620 WE ARE SENDING YOU ® Attached ❑ Under a separate cover via the following items: ❑ Shop drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy letter ❑ Change order ❑ ,a..COP,IES;; , ..;,DATES.,, 'ENO ' r,. '. < .. ,'DESCRIPTION 3 10-15-09 1 Stormwater Package Book 3 10-15-09 37 Stormwater Package (Drawings) 1 10-15-09 1 Check #9187 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ® For review and comment ❑ ❑ FOR BIDS DUE❑ ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS (�E C E I V ED ►On0( CC 16 2009 DWQ PROJ # SIGNED: if enclosures are not as noted, kindly notify us at once. 09187 15ENNT TT.. BREWER & ASSOCIATES, LLC MANUFACTURERS & TRADERS TRUST COMPANY SURVEYORS • ENGINEERS • PLANNERS FROSTBURG, MD 21532 23 East Main Street, Suite 200 60-295/313 Frostburg, Maryland 21532 Phone 301-687-0494 •Fax 301-687-0495 PAY TO THE NCDENR ORDER OF 10/15/2009 $ —1,000.00 One Thousand and 00/100,,;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,«.,,,,.,.,.,.,,,..,,,,,,,,..,,,.,,, DOLLARS 8 NCDENR MEMO New River - P-620 ■■' ■ ■■ SENNETT BREWER & ASSOCIATES, LLC / SURVEYORS' ENGINEERS " PLANNERS NCDENR 10/15/2009 09187 1,000.00 F CJW O 5uj'o ogoe)[+ American Trust Check New River - P-620 1,000.00 Naugle, Mary From: Matt Brewer [Matt@bbasurvey.com] Sent: Friday, October 16, 2009 11:17 AM To: Naugle, Mary Cc: Steve Bennett, Towler CIV David W Subject: New River Dining P620 Attachments: Drainage Areas.doc; Revised SWM Narrative for Enlisted Dining Facility.doc, New River SWM PtP Response.doc Mary Jean, I hope this finds you well. This morning you have or will receive the revised swm package for the above referenced project. I believe we have addressed your concerns stated in the 10/05/09 Request for Additional Information, and our subsequent conversations. For clarity, I have attached: 1. A point to point response to the Request for Additional Information. 2. A revised Narrative with supporting calculations. 3. A Drainage Area summary with the cover types and permeable pavement credits. (These also appear on the Drainage Area Map in the comp package) Thank you for your consideration. Please call with any questions. Matthew S: Brewer, RLS Partner BENNETT. BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matt. b rewera bbasu rvey.com AREA #1 GRASS: 19,597 S.F. BUILDING (ROOF): 30,426 S.F. NON POROUS CONC. PAVING: 0 S.F. POROUS CONC. PAVING: 3,264 S.F. (1,958 S. F. GRASS) (1,306 S.F. CONC.) NON POROUS PARKING: 28,301 S.F. POROUS PARKING: 9,127 S.F. (5,476 S.F. GRASS) (3,651 S.F. PARKING) EXIST. PAVEMENT (OFF SITE): 0 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 27,031 S.F. BUILDING (ROOF): 30,426 S.F. NON POROUS CONC. PAVING: 1,306 S.F. NON POROUS PARKING: 31,952 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. AREA 09 GRASS: 16,411 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 0 S.F. POROUS CONC. PAVING: 450 S.F. (270 S.F. GRASS) (180 S.F. CONC.) NON POROUS PARKING: 15,248 S.F. POROUS PARKING: 6,012 S.F. (3,607 S.F. GRASS) (2,405 S.F. PARKING) EXIST. PAVEMENT (OFF -SITE): 5,660 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 20,288 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 180 S.F. NON POROUS PARKING: 17,653 S.F. EXIST. PAVEMENT (OFF SITE): 5,660 S.F. 6 2009 OCT 1 AREA #3 I' GRASS: 12,832 SQ. FT. BUILDING (ROOF): 0 SQ. FT. NON POROUS CONC.PAVING: 0 SQ. FT. POROUS CONC. PAVING: 4,668 SQ. FT. (2,801 S.F. GRASS) (1,867 S.F. CONC.) NON POROUS PARKING: 476 SQ. FT. POROUS PARKING: 504 SQ. FT. (302 S.F. GRASS) (202 S.F. PARKING) EXIST. PAVEMENT (OFF -SITE): 1,783 SQ. FT. PERVIOUS PAVEMENT CREDIT GRASS: 15,935 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 1,867 S.F. NON POROUS PARKING: 678 S.F. EXIST. PAVEMENT (OFF SITE): 1,783 S.F. AREA #4 GRASS: 15,404 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 259 S.F. (GENERATOR / TRANSFORMER PAD) POROUS CONC. PAVING: 2,863 S.F. (1,718 S.F. GRASS) (1,145 S.F. CONC.) NON POROUS PARKING: 1,578 S.F. POROUS PARKING: 0 S.F. EXIST. PAVEMENT (OFF -SITE): 2,728 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 17,122 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 1,404 S.F. NON POROUS PARKING: 1,578 S.F. EXIST. PAVEMENT (OFF SITE): 2,728 S.F. AREA #5 GRASS: 14,759 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 431 S.F. (DUMPSTER PAD) POROUS CONC. PAVING: 0 S.F. NON POROUS PARKING: 4,211 S.F. POROUS PARKING: 0 S.F. EXIST. PAVEMENT (OFF -SITE): 1,413 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 14,759 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVINGA31 S.F. OCT 19 2009 I NON POROUS PARKING: 4,211 S.F. EXIST. PAVEMENT (OFF SITE): 1,413 S.F. AREA #6 GRASS: 15,450 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 800 S.F. (NEW CHILLER PAD) POROUS CONC. PAVING: 1,457 S.F. (874 S.F. GRASS) (583 S.F. CONC.) NON POROUS PARKING: 19 S.F. POROUS PARKING: 0 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 16,324 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 1,383 S.F. NON POROUS PARKING: 19 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. ARFA #7 GRASS: 5,925 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 745 S.F. (EX. CHILLER PAD) POROUS CONC. SIDEWALK: 0 S.F. NON POROUS PARKING: 1,993 S.F. POROUS PARKING: 0 S.F. EXIST. PAVEMENT (OFF -SITE): 0 S.F. PERVIOUS PAVEMENT CREDIT GRASS: 5,925 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 745 S.F. NON POROUS PARKING: 1,993 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. LOADING DOCK AREA GRASS: 0 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 3,313 S.F. POROUS CONC. SIDEWALK: 0 S.F. NON POROUS PARKING: 4,859 S.F. POROUS PARKING: 0 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. OCT 16 2009 PERVIOUS PAVEMENT CREDIT GRASS: 0 S.F. BUILDING (ROOF): 0 S.F. NON POROUS CONC. PAVING: 3,313 S.F. NON POROUS PARKING: 4,859 S.F. EXIST. PAVEMENT (OFF SITE): 0 S.F. OCT 16 2009 Ad info request 10/09. Demonstrate that the proposed stormwater control, describe proposed SW control, provides equal protection of surface waters as the existing stormwater control, which is describe the existing SW control. At present, the existing dining facility, associated parking, and other site features have no stormwater management of any kind. The existing site (prior to demolition) contains 2.11 acres of impervious surfaces within the project area. (See Attachment E) The proposed dining facility has 1.47 acres of impervious area and 0.698 acres of permeable pavement with six (6) inches of washed stone. The net result being 1.47 + (0.698 x 0.40) + 0.698 (Building) _ 2.45 acres of proposed impervious area. This reveals a net increase of 0.34 acres or 14,810 square feet of additional impervious area. (See Attachment E) The pond has been redesigned to include a large portion of the parking lot and all of the new building roof area. The impervious area treated by the pond is 63,684 square feet or 1.46 acres. The proposed stormwater management system (pond) will treat over four times the amount of increased impervious area (1.46/0.34 = 4.3) Given that there are no stormwater management controls in place today, the proposed system will provide more than equal protection of surface waters as the existing stormwater control. OCT 16 2009 Enlisted Dining Facility P-620 MCAS New River — Onslow County Jacksonville, NC The new dining facility is located at the intersection of Douglas Road and Schmidt Street on the Marine Corps Air Station New River. The project boundary for the site is 5:3 acres in size of which most will be disturbed during construction. The project will construct a new dining facility just north of the existing dining facility. After construction of the new building is complete, demolition of the existing building will begin. Upon completion of demolition, a new parking lot will be constructed over the site of the old mess hall. There are no wetlands on site — currently the entire site is maintained by station mowing operations. Sanitary sewer and potable water are available on site. New service tie-ins only will be required. The site has no historic significance. There are no known non-compliance issues. Stormwater from the site ultimately outlets to Southwest Creek which is classified as Aquatic Life, Secondary Recreation, Fres; High Quality Waters, Nutrient Sensitive Waters (C;HQW,NSW). The index number is 19-17-(6.5) (See Attachment A-1 & A-2) The ultimate build out of the site is calculated to be 46% impervious which indicates a High Density Commercial requirement for stormwater design. A variety of BMP's have been identified to collect and treat stormwater runoff for the entire post development BUA. These include grass lined swales, pervious pavement, sheet flow across vegetated areas, and a wet detention pond. Specifically, each area and BMP is identified on the drainage map in Attachment B. When considering the overall site, the total increase in post -development BUA is approximately 14,810 SF which nearly meets the standards for "re -development". Given the existing site has no appreciable stormwater quantity or quality management of any kind, the design proposed herein represents a substantial improvement. Essentially, the proposed design treats significantly more BUA than what is being treated today. We are not in close proximity to state waters; therefore, buffer areas are not required. There are no off -site waters entering our site (beyond the adjacent road system), and no roadway construction is proposed. The design parameters for the wet detention pond have been established based on correspondence and direction from NCDENR and the Owner (government). The rain harvester originally proposed has been removed, and the roof area is now treated in the pond. The use of permeable pavement has been employed to the greatest extent possible and as directed by the Owner. OCT 16 2009 Step one — determine seasonal high water table elevation The Geotechnical report (Attachment Q has indicated shallow clay type soils in the location of the pond which produced a perched ground water condition. Specifically, the Geotechnical report indicates the clay barrier at the location of the pond approximately 18" below existing grade. The report further indicates seasonal high water to be approximately one foot above that level. The SHWT was determined as follows: 1) Average existing grade elevation at pond = 21.0+/- 2) Approximate top of clay barrier = 19.50+/- 3) Seasonal high water table 19.5 + 1.0 = 20.5+/- 4) *"Cop of permanent pool elevation to be 6" above or below SHWT — for purposes of this design the top permanent pool elevation shall be set at 20.0 Step two — determine surface area of permanent pool Total DA to Pond = 90715 SF or 2.08 Acres 7i�0 Total Impervious Area to Pond = 63684 SF or 1.46 Acres �U Total Surface Area of Permanent Pool = 7196 SF or 0.165 Acres % of impervious cover = 1.46/ (1.46 — 0.165) = 76.0% Surface area to drainage area ratio = 6.8 (See table 10.2 Attachment D) Required Minimum Surface area = 6.8 / 100 * 2.08 acres = 0.141 acres = 6,161 sf Actual Surface Area = 7196 SF Step three — determine depth of permanent pool Option 2 — da, = [0.25 x (I + ABot shelt/APerniment Pool).I + [(ABot shelf+ AB.[ Pond/2) x (D/ ABot Shelf)] Area Permanent Pool = 7196 SF Area Bottom of Pond = 2601 SF Area Bottom of Vegetated Shelf= 4468 SF Depth = Bottom Shelf Elev (19.50) — Bottom Pond Elev (16.0) = 3.5 d„v = [0.25 x (l + 4468/7196)] + [(4468 + 2601 /2) x (3.5/4468)] d;,,, = 3.18 FOR PURPOSES OF THIS DESIGN USE MINIMUM REQ'D. DEPTH OF 3.0 FEET OCT 16 2009 Step four — determine volume of temporary pool 1.5 inches over entire watershed to Pond = 2.08 Acres or 90715 Square Feet Rv = 0.05 + (0.9)(Ia) Rv = 0.05 + (0.9)(0.76) Rv = 0.734 V = 3630 (Rd) (Rv) (A) V = 3630 (1.5") (0.734) (2.08) V = 8313 CF Entire Site 1 Year 24 Flour Pre Development Volume 2.11 Acres Impervious/5.3 Total Acres = 40% Impervious Rv = 0.05 + (0.9)(Ia) Rv = 0.05 + (0.9)(0.40) Rv = 0.410 V = 3630 (Rd) (Rv) (A) V = 3630 (3.8") (0.410) (5.30) V = 29974 CF Entire Site 1 Year 24 Hour Post Development Volume 2.45 Acres Impervious/5.3 Total Acres = 46% Impervious Rv = 0.05 + (0.9)(1a) Rv = 0.05 + (0.9)(0.46) Rv = 0.464 V = 3630 (Rd) (Rv) (A) V = 3630 (3.8") (0.464) (5.30) V = 33922 CF FOR PURPOSES OF THIS DESIGN USE 8,313 CF FOR MINIMUM TEMPORARY POOL VOLUME. . o Volume above permanent pool to elevation 20.9 — C,585F for purposes of this design set top of temporary pool elevation at 20.9 ocT 16 2009 Step five — determine outlet size to release temporary pool in 2 to 5 days. **Set average head for orifice at 1/3 temporary pool depth or 0.30 feet. Set 1.50 inch diameter orifice at invert elevation 20.0 (Top of permanent pool) Q=CA(2gh) 5 = 0.6(0.0123sf)(2*32.2*0.30) 5 = 0.032 cfs 0.032 cfs = temporary pool volume / draw down time in seconds 0.032 cfs = 8,585 cf / draw downtime in seconds = 268,281 sec. = 74.52 hours = 3.1 days Step six — determine discharge for flood volume (100 year storm) thru outlet Set top of concrete riser at top of temporary pool elevation at 21.0 Q = CLI-l" C = 3.1 L = length of weir = 8 ft H = Head above riser crest *** Structure will safely pass 100 Year Storm (See TR-20 routing computations attachment F) Erosion and sediment control will be accomplished during both phases of the project thru a variety of measures. These practices will include sediment fences, sediment traps, stabilized construction entrances and various inlet protection devices. Strict adherence to the temporary and permanent seeding guidelines will be required at all times. All swales have been designed to convey the 25 year storm at non -erosive velocities considering an n value of 0.02 (See Attachment G). The required earthwork is minimal, which in conjunction with the flat topography should not generate any unforeseen sediment or erosion control issues. OCT 16 20 Ad info request 10/09. Demonstrate that the proposed stormwater control, describe proposed SW control, provides equal protection of surface waters as the existing stormwater control, which is describe the existing SW control. At present, the existing dining facility, associated parking, and other site features have no stormwater management of any kind. The existing site (prior to demolition) contains 2.11 acres of impervious surfaces within the project area. (See Attachment E) The proposed dining facility has 1.47 acres of impervious area and 0.698 acres of permeable pavement with six (6) inches of washed stone. The net result being 1.47 + (0.698 x 0.40) + 0.698 (Building) _ 2.45 acres of proposed impervious area. This reveals a net increase of 0.34 acres or 14,810 square feet of additional impervious area. (See Attachment E) The pond has been re -designed to include a large portion of the parking lot and all of the new building roof area. The impervious area treated by the pond is 63,684 square feet or 1.46 acres. The proposed stormwater management system (pond) will treat over four times the amount of increased impervious area (1.46/0.34 = 4.3) Given that there are no stormwater management controls in place today, the proposed system will provide more than equal protection of surface waters as the existing stormwater control. cc, 16 20 �1! 111 1{I! /Z 1.i C. �� I/ �I �' �� 1 �l�)1 �lyy�)1 /•�i �I��'. tt �4 c �� - ..v. E�� �q`q rra''•�•':� ram'° � � / '�. �' �` �1. 1�_ 1 ''7' C� .,� , • .��� �� wail a .... AS i l Ne (`E..Y_ �7 • ' S . ,sue J\ � „ �`y" /� j� i k n r \l /--�j USGS 7.5 QUAD JACKSONVILLE SOUTH / NORTH CAROLINA —--o`Paladise�arklsub'dnlslon),Id�� � ' �— ;_ .a t.� _- '—.— v Counw/ Recreatwn Park NC1 — LL �. 1 •V r is J .—� - - lsuCtla iv�,��, �r'e s ..:i ! '•. �l t�r •.! l� ' - IIfa R !•'l�'fnf( ,p �.l II1 1 r\� • Sir r� ! (, 7, } ( `vim 'ta' t tqlr�- f� 1� ®.i 1 v^`ACJf.l%=-,z^.•S� h a �n111 g�N �-c Stick Creek a ,fX y,I it /��4Y . � r✓�r'E �` `' ,s� i� ,r`' n �I � ���'I 0 9s0 25545 �y� �, ', fAccutcheon NC Field f� % 1: tIS �Talik'Creek �1 c\ \ (Cc.j�� 'w Z� ( a%� �("• v!� - — Peters Point Field G '2 .� �n N (}(t� I• Y (�J•1D' / /J.'/yx1 /C•ri�ra^ys� i $• \`S6�r�it v ✓,r;`� Zrr; �'Y IA { M I ��° J<,iJ� � �•.� 7 A� J y'••, '�'_ xI r is Y; � I ,�7 �{' d � ?/vnC ' I' j y2y i�{/I f�'. l..—.4y0 I = // / I � ,,,,. a,C, \'.• (/ 4 iy h:l��-�I-^-��� / n yf f t�:?• 't i �. Jel 'l� 1j t� •4 � up� 1 '�x ' � � � V�\ �IICI�. 4 / -� a•� 1pi I ,��,`,7 }. fit!~'��.�;�', \,`_' Y �\ _a^ � .� . �•`F�! )� y=� p ( � C��. ,-,(r(.' �:•L � . i� V. ,�°�C r``� ,�-' �i.tl�l.� t;i r`� I , -ti 6�M1�Jf r o'C� `fit`\ iy\.•�� .Y- �:� '� \., . J,Y�� r . `• ` yg 1 f .. _1 -� d=1__ _. - . �r {`� - l�• J -' ol'S r\`1J ;'\.., v Yol M ♦Yxe q�'' DESCRIPTION DESIGN K8 PROJECT N0.2L'Oi018 DATE: 0fl2L03 TFDRM SM ON24IDD PROJECT: L!CAS DINING FALRITY PJuO MCASNEWRVVER JACKSOWALLE. NORTH CAROUNA APPROVED TO -SON N E; SHEET TITLE •'`- --" '" 0 2000 40D0 REVISION USGS- JACKSOWILLE SOUTH ftEVISKJN • Y Y ' Y ' .. GRAPHIC SCALE - 2009 APPROVAL SAUER•INC, 11223 PHILLIPS PKNN DR. EAST DaiNlu�il OM PLATE �-�-.-,...�..ap•' L:1h11u'..1L: • JACKSONVILLE, FLORIDA32256 PuF created with pdfFactory Pro trial version www.pdffactory.com TABLE OF CONTENTS Vicinity Map FIRM Floodplain Map Narrative and Basis of Design Attachment A — Watershed Data Attachment B — BMP Drainage Computations Attachment C — Geotechnical Report Attachment D — Table 10-2 Attachment E — Site Hydrologic Computations Attachment F — TR20 Storm Routing Attachment G — Sediment Control Drainage Computations GAR I OCT 16 Zoos Appendix A — Stormwater Management Permit Application Form Appendix B — Financial Responsibility/Ownership Form — Express Permitting Option Appendix C — Wet Detention Basin Supplement and Checklist Appendix D — Wet Detention Basin Operations and Maintenance Agreement NC DENR - DIVISON OF WATER QUALITY .0312 WHITE OAR RIVER BASIN Aame of Stream Description Class Date Index No. Horse Swamp From source to Little C,NSW 08/01/91 19-16-2-1 Northeast Creek Rocky Run From source to Little C;NSW 08/01/91 19-16-2-2 Northeast Creek Poplar Creek From source to Little C;NSW 08/01/91 19-16-2-3 Northeast Creek - Mott Creek From source to Northeast C;NSw 00/01/91 19-16-3 Creek Northeast Creek From N. C.-Hwy.24 to SC;HQW,NSW 08/01/91 19-16-(3.5) downstream aide of mouth of - ScalesCreek Scales Creek From source to Northeast SCGHQW,NSW 08/01/91 19-16-4 Creek Northeast Creek From the downstream aide of SC{NSW 08/01/91 19-16-(4.5) mouth of Scales Creek to New River Southwest Creek From source to Mill Run C;NSW 08/01/91 19-17-(0.5) Catherine Lake Creek From Catherine Lake to C;NSW 08/01/91 19-17-1 Southeast Creek Catherine Lake Entire Lake B;NSW 08/61/91 19-17-1-1 Deep Run From source to Southwest C;NSW 08/01/91 19-17-2 Creek Harris Creek From source to Southwest C;NSW 08/01/91 19-17-3 Creek Haws Run From source to Southwest C;NSW 08/01/91 19-17-4 Creek Tank Creek From source to Southwest C,NSW 08/01/91 19-17-5 Creek Hicks Run (Hickory Run) From source to Southwest C,NSW 08/01/91 19-17-6 Creek Southwest Creek From Mill Run to.New River C;HQW,NSW 08/01/91 19-17-;(6.51 Mill Run From source to Southwest SC,NSW 08/01/91 19-17-7 Creek Morgan Bay Entire Bay SC,NSW 08/01/91 19-10 Lewis Creek From source to New River SC,HQW,NSW 08/01/91 19-19 Wallace Creek From source to New River SB;NSW 08/01/91 19-20 Bearhead Creek From source to Wallace Creek SB;NSW 08/01/91 19-30-1 Beaverdam Creek From source to Wallace Creek SB;NSW 08/61/91 19-20-2 Town Creek From source to New River SC,HQW,NSW 00/01/91 19-21 Parnell Bay Entire Bay SC,NSW 08/01/91 19-22 Co9dels Creek (Coglln Creek) From source to New River SC,NSW '08/01/91 19-23 Frenche Creek From source to New River SC;NSW 08/01/91 19-24 Jumping.Run From source to Frenche Creek SC;NSW 08/01/91 1944-1 CowheadXreek From source to Frenche Creek SC;NSW 08/01/91 19-24-2 Duck Creek From source to New River SC;NSW 08/01/91 19-25 Whitehurst Creek From source to New River SC,HQW,NSW 08/01/91 19-26 2B .0300 Page 2 of 16 2009-08-22 07:18:50 NC DENR - DIVISON OF WATER QUALITY STREAM CLASSIFICATION DESCRIPTIONS .lass Description B primary Recreation, Fresh Water C ,Aquatic Life, Secondary Recreation, Free CA Critical Area FWS Future Water Supply Waters HOW High Quality Waters N/A Not Applicable/Out of State ,NSW Nutrient Sensitive Waters ORW Outstanding Resource Waters SA Market 'Shellfishing, Salt Water GB Primary Recreation, Salt Water SC Aquatic Life, Secondary Recreation, Salt Sw Swamp Waters Tr Trout Waters WS-I Water Supply I -- Natural WS-II Water Supply II -- Undeveloped WS-III Water Supply III •- Moderately Developed WS-IV Water Supply IV -- Highly Developed WS-V Water Supply V -- Upstream 2B .0300 FZ9-dT A11110tld'JNINI0031SfiN3 9 � iid $ ��Fi t�dt��rrvu�in �xw� ourc3awovasaunr�.a nnvH ��I� � Ir � — - FAFh2tfA- iVLFwens iHV1s e lHH3lVNI I i gg5 yyyy 4 sK� ! Mi fi=1n yqyq y9 g§4 Yg go R= = �¢ NY3 gg�w ::994�g 555 e3 ` 24 Af a [ 4 99 iflf ; Mrg J as g fir. f 3 Gia9.�� O f i j MCAS Dining Facility P-620 MCAS New River dacrcsonwue, rvu Flow to Area 2 Grass = 16247 sf = 0.3730 ac "C" Area weighted Sidewalk = 632 sf = 0.0145 ac 1.00 0.635 0.63 Pavement = 27007 sf = 0.6200 ac 0.35 0.373 0.13 total 43886 sf 1.0075 ac Total 1.007 0.77 C = weighted total / total area = 0.759 Intensity Q=CIA 1 5.447 1cfs V. Area weighted 1.00 0.35 Total C = weighted total / total Intensity = Q=CIA = 0.164 0.16 0.11 0.27 = cfs 1 0.301 0.465 area 7.120 1.920 V. Area weighted 1.00 0.35 Total C = weighted total / total Intensity = Q=CIA = 0.169 0.17 0.13 0.30 = cfs 1 0.361 0.530 area 7.120 2.103 'C' 1.00 0.35 Total C = weighted total / total Intensity = Q=CIA = Area 0.372 weighted 0.37 0.17 0.54 = cfs 1 0,492 0.864 area 7.120 3.877 0.580 0.557 0.630 Grass = 13102 sf = 0.3008 ac Sidewalk = 4397 sf = 0.1009 ac Pavement = 2763 sf = 0.0634 ac total 20262 sf 0.4652 ac Grass = 15743 sf = 0.3614 ac Sidewalk = 3053 sf = 0.0701 ac Pavement = 4306 sf = 0.0989 ac total 23102 sf 0.5303 ac Grass = 21430 sf = 0.4920 ac Sidewalk = 1332 sf = 0.0306 ac Pavement = 14889 sf = 0.3418 ac total 37651 sf 0.8643 ac Flow to Area 6 Grass = 16024 sf = 0.3679 ac "C" Area weighted Sidewalk = 1903 sf = 0.0437 ac 1.00 0.047 0.05 Pavement = 166 sf = 0.0038 ac 0.35 1 0.368 0.13 total 18093 sf 0.4154 ac Total 0.415 0.18 C = weighted total / total area = 0.424 Intensity = 7.120 Q=CIA = 1.255 cfs E C E 0 V OCT 16 2009 D PROJ # DWQ r o'ect'Na'rne;; '-`,`: - MCAS Dinin Facility P-620 B ; = %. _ SKB Onslow, Date:-' . 9/4/2009 t BasintNumtiei ', ' Cle"eked:': i,Ditcf%ID,Nunitiec D-2 Stormwater 10 yr Date;_ A _ . Existingi.::: X New, = . " na sis, Ma'nnin '',Rou ti'n`ess Goefficienty n _'; 0.240 ! . unitfess Invert if strearn;�';" 20.50 (_ fG_ Invert;.D`owristieam? :. 19.190 ft; i .; Length: 350 i ft; Ch'dhnel.Slopel- "0d0037," :". 1..ft11f; ---- owe•: - 5.447 i cis; L'efttSideslo e- 4.00 ; HL':_i 1.00 VI" Ri"lili'Sideslc e` `' 4.00 ( H .:: 1.00 V,_` '. Bottorn.Width`.` "`" , 4.00 ;. _;ft" To ,Widih; Cross Sectional l6w:Area'IS l8; - fl, r_ .Wetted Perimeter ._ 1'6.46,' ft) H &ziulic)RadlUsi ._ '0.92211 _ +_ _ 'ft _ Vel6cit 036, — ft/s:. -- I. 0107,' ;__ uriitle- -.,, _f;low;Type; .. "_ ' f Subcritical'FIOW,, ( c E B V I� ocr 16 2009 D PROJ g _ DWQ Ditch - New River-2 -storm 9/9/2009 (Fio ectlNam'e:%.: •; ; ^'': MCAS DiningFacilityP-620 B`;?;"': SKB Onslow Date::. 9l4/2009 2:Ba`sin;Number;f '. CRecked3"' Ditch.ID;Nurritieii; `, . D-3 Stormwater 10 yr Analysis-,--, Ezistingl" X INew. - Manning]Ro`u`f ness9Coefficient n '::_`: 0.240 C.unitless;' Invert,W st eami = _ "_' - 20.60 ;: ft1 lhve IDownsGearrit 16.400 (. i ,ft; .. L'erigtti 139 ( .,fv Channel;Slope, " ' " :0:0151 ft/ftj.:' ! Flow}° - - - :..--- - - - _,-- -. _-f-,. L' 1.920 f - cfsi Left.Sideslo ef. . _ 4.00 Hi:. ;., I.00 I vl. Ri'fitiSideslo a 4.00 j.. .Hi :' 1.00 -_V> Batt6rTfYvidthj --- ---:` ;' - 4.00 r _--"ff,-- .- a.( _ _ De "th:oY;F,lowl .. - C. _ .. -0:65/. ,. :.TopVidtfil vf1'. C ois;S'ectional;Flow:Area,- . _ ` 426 - i ft;'_ -, VMted,Perimet`er,' i, 9:331 ft?_' H' dfaulic Radius- i :0:4562;; ft? ft/s,_ '," _:F:roudd Number Fi; - PIT unitless:. ' Fl6w,T9 : _; Su6ciiti6l low__• f1E C E I N ED ►Unu� OCT 16 2009 DWQ PROJ # Ditch - New River-3 -storm 9/9/2009 i W6 ect,Name'. "' MCAS Dining Facilit P-620 B- r° : •` -' SKB !,Location Onslow Date..' . 9/4/2009 Checked::.; MitcWIDI'Numbefi;_.'; D-0 Stormwater 10 r Date:` J;Anal sis 3. " . Existing! X INe7vs Manning;Rou hnes-s Coefficie`nti n I ' 0.240 ! unitles' Inveit;U'"slteam?...._' 19.55 110 InveitwJDownstieani;-;� _ 18.400 [ fti ' L'en •thy. :. 230 r .. ftt _.. p10050_ 1 ft/ft)•. 1.605 cfs .; L&V,,Sideslo e', : 4.00 }.;H( j 1.00 b), Ribfit!Sideslo e`, . ' 4.00 }ii 1,00 V` . Bbtt6rn9jV ViUth .: 0.00 i .. •fty' ft 9;281 :. ft.. i . ;: CF ss Sd6tib __I:F,low;Afea, 538i .. !" .,fL' -,VJetteil P erlendt`er, 9 56,- � _ -.:- ' ft; H�drriaulid.Rd& ; .0?5625 :... M _ , r. Veloclt r :.. _ 030; ._ ; ft/s) "FCoVde;NUmbec Fi ;_ :. _ - 0:07r" { unitless; ' ;FlovvlTYPe .SGScriRalFlow;.- !' (�E C E V V ED IunSU OCT 16 2009 DW Q PROJ # Ditch - New River-4 -storm 9/9/2009 i'RFoIRI: Name '-` MCAS Dining Facility P-620 B';j , ';"�._. F SKB :Location <, "' _ Onslow Date:, ' ". 9/4/2009 j Basin?Number: Checked:' �Ditch'03NumtSec D-5 Stormwater 10 yr ;Analysis , Ezistingl,,.s ' + ' ,W X New! Mannin ,Rot: hness Coefficient` n j : 0.240 22.50 Inveit?,Downst eaml 21.210 145 Chaniie1lSlo a ,.' ' . ;c0.0089;,. I 3.877 "cfs' Left?Sideslo a '-''• _ 4.00 H'. L00 j vy .. R@W(Sideslo e, 4.00 H .1 1.00 Bottorn;Wtdth, 0.00 ff , Y45i 1. ft 1P59` ft?. - � Lr � ': `:Wetted;Penmeter,"" - 11�95' _: . � 'fE• a ": tH dr'aulic Ratlius `_. _ ; 0'7028;,:'`. ftr.. Veloclt _ A 46 'ftls) " ,'-..F.roud&'Nu i r: Fr' -., '. { . ;'0F10;. unitle"ssz' F;l w.TT pe•._ : '' Sub6riti64Fl4w. ! �E C E , V ED ��^(u OCT 16 2009 DW Q PROJ # Ditch - New River-5 -storm 9/9/2009 j�E C E I N ED �unSu OCT 16 2009 DWO PROJ 8 Ditch - New River-6 -storm 9/9/2009 GET Geote0nical •.Environmental . Testing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNCIAL ENGINEERING SERVICES P-620 Enlisted Dining Hall Camp LeJeune, North Carolina G E T PROJECT NO: EC08-266G September 24, 2008 Prepared for C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2207 Hampton Boulevard Norfork, Virginia 23517 ATTN: MR. Allan Bamforth, P.E. Prepared by GET Solutions, Inc. ECEIVED [� OCT 16 2009 PROD # DWQ 504 E. Elizabeth Street Ste. 2, Elizabeth City, NC 27909 ♦ Phone 252-335-9765 ♦ Fax 252-335-9766 info@getsolutionsinc.com September 24, 2008 TO: C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2207 Hampton Blvd. Norfolk, VA 23517 Attn: Mr. Allan Bamforth, P.E. RE: Preliminary Report of Subsurface Investigation and Geotechnical Engineering Enlisted Dining Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G Dear Mr. Bamforth: In compliance with your instructions, we have completed our Geotechnical Engineering Services for the referenced project to be submitted as preliminary design information. The results of this study, together with our recommendations, are presented in this report. Additional subsurface exploration and Geotechnical Engineering services are likely to be required once the building and site layout have been established. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. "1116, Respectfully Submitted, •.•`•�HCARO*'ro � G E T Solutions, Inc. ±C•��4oE�55/O,yl�9 ��•y SEAL 034336 Gerald W. Stalls Jr., P.E. '4�`9' �HGINE��' Senior NC Reg. #t034336ect 1neer„S ��4 •�`•'• ..r-A• ��-...� : ��N •CARS(""'': Camille A. Kaftan, P.E. 2;QQ 1T v Principal Engineer AL NC Reg. # 14103 - 014103 Copies: (4) Client "4 ' r I... Nt 504 East Elizabeth Street; Suite 2 • Elizabeth City, NC 27909 • Phone: (252)335-9765 • Pax: (252)335-9766 info@gctsolutionsine.com TABLE OF CONTENTS 1.0 PROJECT INFORMATION...................................................................................1 1.1 Project Authorization..............................................................................1 1.2 Project Description.................................................................................1 1.3 Purpose and Scope of Services............................................................1 2,0 FIELD AND LABORATORY PROCEDURES.......................................................3 2.1 Field Exploration.................................................................................... 3 2.2 Laboratory Testing.................................................................................4 3.0 SITE AND SUBSURFACE CONDITIONS............................................................5 3.1 Site Location and Description................................................................ 5 3.2 Subsurface Soil Conditions....................................................................6 3.3 Groundwater Information.......................................................................7 4.0 EVALUATION AND RECOMMENDATIONS........................................................7 4.1 Clearing and Grading.............................................................................7 4.2 Subgrade Preparation............................................................................9 4.3 Structural Fill and Placement.................................................................9 4.4 Building Foundation Design Recommendations..................................10 4.5 Foundation Excavations......................................................................11 4.6 Building Foundation Settlements.........................................................11 4.7 Seismic Design Recommendations.....................................................11 4.8 Building Floor Slabs.............................................................................12 4.9 Pavements...........................................................................................12 5.0 CONSTRUCTION CONSIDERATIONS..............................................................14 5.1 Drainage and Groundwater Concerns.................................................14 5.2 Site Utility Installation...........................................................................15 5.3 Additional Geotechnical Investigation..................................................15 5.4 Excavations.........................................................................................16 6.0 REPORT LIMITATIONS.....................................................................................16 APPENDIX I - BORING LOCATION SKETCH APPENDIX II - BORING LOGS APPENDIX III - GENERALIZED SOIL PROFILE APPENDIX IV — SUMMARY OF CBR TEST DATA APPENDIX V — CLASSIFICATION SYSTEM FOR SOILRCL2RNTPN7 E D OCT 16 2009 DWO PROJ # Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 1.0 PROJECT INFORMATION 1.1 Project Authorization: G E T Solutions, Inc. has completed our preliminary Geotechnical Engineering study for the proposed Enlisted Dinning Hall — P620 project located in Camp LeJeune, North Carolina. Authorization to proceed with the services was received from Mr. Allan Bamforth with C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 1.2 Project Description: The proposed development at this site is planned to consist of building a single story structure, new parking lot, as well as other site infrastructure components. The building will have a plan area of approximately 31,000 square feet and a first floor finished elevation located slightly above the existing site grade elevations. Accordingly, cut and/or fill operations are not expected to exceed about 2 feet in order to establish the design grade elevations. It is expected that the structure will be of CMU load bearing wall and/or structural steel frame design. The maximum wall and column foundation loads associated with the structures are not expected to exceed 4 kips per linear foot and 100 kips, respectively. The first floor is anticipated to be a slab -on -grade design with floor loads expected to be on the order of about 150 PSF. If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. 1.3 Purpose and Scope of Services: The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: 1. General assessment of the soils revealed by the borings performed at the proposed development. Solutions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall —P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills, surficial/subsurface organics, or expansive soils. 3. Soil subgrade preparation, including stripping, grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 5. Seismic site classification provided based on the results of 60-foot deep SPT borings, our experience in the project area, and the requirements provided in the North Carolina State Building Code (2006 International Building Code with North Carolina Amendments) section 1615.1; Table 1615.1.1. 6. Feasibility of utilizing a shallow foundation system for support of the proposed building. Preliminary design parameters required for the foundation systems, including foundation sizes, allowable bearing pressures, foundation levels, and expected total and differential settlements. 7. Typical pavement sections recommendations based on the results of five (5) borings performed to a depth ranging from 8 to 10 feet, the results of five (5) CBR tests, as well as our experience with similar soil conditions. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or conditions are strictly for the information of the client. Prior to development of this site, an environmental assessment is advisable. E C E 8 V ED Iu�,6S OCT 16 2009 DWQ PROJ # GET Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration: In order to explore the general subsurface soil types and to aid in developing associated foundation, pavement, and storm water design parameters, six (6) 10- to 60-foot deep Standard Penetration Test (SPT) borings (designated as B-1 through B-3 and CBR-3 through CBR-5) and two (2) 10-foot deep hand auger borings (designated as CBR-1 and CBR-2) were drilled by G E T Solutions, Inc. within the proposed construction areas. The SPT borings were performed utilizing mud -rotary drilling techniques with a CME 55 ATV -mounted drill rig. Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to a depth of 10 feet and at 5-foot intervals thereafter to the boring termination depth ranging from 10 to 60 feet. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30-inch long split -spoon sampler. The samplerwas driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. The results of the borings are presented in Appendix II (Boring Logs) and Appendix III (Generalized Soil Profile) of this report, which corroborate the stratigraphy depicted by the original study. Additionally, a CBR bulk soil sample was collected from each of the borings noted as CBR- 1 through CBR-5. These samples were returned to our Elizabeth City laboratory for natural moisture, full sieve, Atterberg Limits, Standard Proctor, and CBR analysis. The boring schedule noting the SPT and hand auger boring depths and locations is presented in Table I on the following page. Solurions. Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G ;l Table I — Boring Schedule Boring Boring Depth Boring Location Number feet Approximately 25' East of Schmidt Street & 50' North B-1 60 of Existing Parking Lot Approximately 40' West & 10' North of the Southwest B-2 30 Corner of AS4006 B-3 60 Southeast Corner of Existing Parking Lot Approximately 25' East & 25' South of the Southeast CBR-1 10 Corner of AS4012 Approximately 25' East & 30' North of the Northeast CBR-2 10 Corner of AS4012 Approximately 90' East of Schmidt Street & 180' CBR-3 10 North of Existing Parking Lot Approximately 55' West & 20' South of the Northwest CBR-4 10 Corner of AS4004 Approximately 120' West & 15' North of the CBR-5 10 Northwest Corner of AS4004 The SPT and hand auger boring locations were established by C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. and were identified in the field by G E T Solutions Inc. personnel by measuring from existing landmarks. The approximate boring locations are shown on the "Boring Location Plan" attached to this report (Appendix I, Figure 1). This plan was developed based on the site plan provided to G E T Solutions, Inc. by C. Allan Bamforth, Jr., Engineer -Surveyor, Ltd. 2.2 Laboratory Testing: Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled, and transferred to our Elizabeth City laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of four (4) representative split spoon soil samples were selected and subjected to natural moisture, 4200 sieve wash, and Atterberg Limits testing and analysis in order to corroborate the visual classification of the granular soils. These test results are tabulated on the following page and are also presented on the "Log of Boring" sheets (Appendix II). Solurions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G Table II - Laboratory Test Results Boring No. Depth (Ft) Natural Moisture Content 4200 Sieve N LL/PL/PI Classification B-1 4-6 33.5 30.4 NT Sc B-2 2-4 42.2 81.1 95/25/70 CH B-2 18-20 32.3 64.2 43/18/25 CL B-3 14-15 36.6 63.6 43/17/26 CL NT=Not Tested 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description: The project site is located along the east side of Schmidt Street in the Camp LeJeune military facility in North Carolina. At the time of our field investigation services, the property was generally observed to consist of a combination of grass areas, an existing basketball court, and an existing building (AS4012) with its associated asphalt paved parking lot. Based on a visual observation the site appeared to be relatively level with less than 1-foot change in elevation in 50 feet. As an exception, an existing drainage ditch was located north of the existing parking lot and was visually estimated to range in depth and width from 2 to 3 feet and 3 to 4 feet, respectively. The northernmost site boundary consists of an existing parking lot followed by an existing structure. The westernmost boundary consists of Schmidt Street followed by existing structures. The southernmost boundary consists of a combination of Douglas Road with an existing parking lot beyond. The easternmost boundary a combination of existing structures (AS4004, AS4006, and AS4007), grass covered areas, and an existing parking lot. Solurions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 3.2 Subsurface Soil Conditions: 9/24/08 Topsoil ranging in thickness from about 2 to 10 inches was recovered at the boring locations. As an exception, the Topsoil encountered at the location of borings B-1 and CBR-3 was noted to extend to a depth of 4 feet and 2 feet, respectively. Beneath the surficial TOPSOIL the subsurface soils encountered at the boring locations were consistent at the boring locations, to their explored depths, and consisted of very loose to medium dense SAND (SP, SP-SM, SM, SC-SM, SC) with varying amounts of silt and clay. Shallow subsurface deposits of CLAY (CL, CH) were encountered at the locations of borings B-2, B-3 and CBR-1 through CBR-5. These cohesive soil deposits were encountered at depths ranging from about 1.5 to 4 feet below existing grades and extended to depths ranging from 3.5 feet to the CBR4 boring termination depth of 10 feet. Additionally, deeper subsurface deposits of CLAY (CL, CH) were encountered at the location of borings B-2 and B-3 at depths extending from 14 to 30 feet below existing site grade elevations. The subsurface cohesive soils encountered at the location of boring CBR-4 were noted to contain varying amounts of organics and/or partially decayed roots at a depth ranging from 6 to 8 feet below existing site grade elevations. A brief description of the natural subsurface soil conditions encountered at the SPT boring locations is tabulated below: Table III — Subsurface Soil Summary AVERAGE RANGES OF DEPTH (Feet) STRATUM DESCRIPTION SPT(') N- VALUES Borings: B-1 through B-3 and CBR-1 through CBR-5 0 to 0.3 TOPSOIL; Borings B-1 through B-3, CBR-1, CBR-2, CBR-4, and CBR-5 0 to 3.0 Topsoil; Boring B-1 and CBR-3 only 0.3 to 60 1 SAND (SP, SP-SM, SM, SC) with varying W O.H.IZI to 31 amounts of silt and clay 2.9 to 7 II CLAY (CL, CH) with varying amounts of sand; 2 to 12 Borings B-2, B-3, CBR-1 through CBR-5 only 6 to 8 III CLAY (CH) with 1-inch lenses of Black Silt with 4 organics; CBR-4 only 18 to 23 IV CLAY (CL, CH); Boring B-2 and B-3, 1 14 to 28 respective) 28 to 30 V CLAY (CL); Boring B-2 only 2 Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot Note (2) W.O.H. = Weight Of Hammer 6 i Solurions. Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration included in Appendix II (Boring Logs) and in Appendix III (Generalized Soil Profile) should be reviewed forspecific information as to individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual. 3.3 Groundwater Information: At the time of our field drilling activities, the groundwater table level was found to occur at depths ranging from about 5 to 8 feet below the existing site grade elevations. However, the groundwater levels are anticipated to be affected by perched water conditions above a restrictive horizon (CLAY; CL, CH) encountered at the locations of borings B-2, B-3, and CBRA through CBR-5 at depths ranging from 1.5 to 4 feet below existing grades. This is particularly anticipated to occur during periods of heavy precipitation and/or during the wet season. In order to more accurately determine the groundwater level a series of groundwater monitoring wells should be installed and subsequent 24 to 48 hour recordings should be performed. Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains, and areas of covered soil (paved parking lots, side walks, etc.). It is estimated normal seasonal high groundwater level will fluctuate within 1 to 2 feet above the current levels. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on this project, if needed. 4.0 EVALUATION AND RECOMMENDATIONS 4.1 Clearing and Grading: The proposed construction areas should be cleared by means of removing the existing structure as well as their associated foundations and utilities, vegetation, trees, associated root mat, topsoil, and asphalt pavement materials. The removal of the foundation members and/or existing underground utilities associated with the existing structure may require an excavation depth of about 2 feet below existing grades. Solutions, Inc Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall —P620 Camp LeJeune, North Carolina GET Project No: EC08-266G The necessary cut depth to remove the topsoil from within the grass covered areas is anticipated to range from about 10 inches to 4 feet as indicated by the soils encountered at the boring locations. This cut is expected to be deeper in isolated areas to remove deeper deposits of organic soils, which may become evident during the clearing. The construction areas, which encroach on the existing drainage ditches and/or canals, should be "de -mucked" to remove very soft soils and alluvial deposits. Based on our experience with similar soils conditions, the cut required to "de -muck" the soils in the base and sides of the ditches is estimated to range from 12 to 24 inches. Clean topsoil should be stockpiled for later use in landscaped areas. The subsurface soils recovered at the boring locations typically contained appreciable amounts of fines (SM, SC, CH). Also, the current (natural) moisture contents of the surface soils at the explored locations were estimated to be near or in excess of their optimum moisture. Accordingly, combinations of excess surface moisture from precipitation ponding on the site and the construction traffic, including heavy compaction equipment, may create pumping and general deterioration of the bearing capabilities of the surface soils. Therefore, undercutting to remove very soft soils may be required. The extent of the undercut will be determined in the field during construction, based on the outcome of the field testing procedures (subgrade proofroll). Furthermore, inherently wet subgrade soils combined with potential poor site drainage make this site particularly susceptible to subgrade deterioration. Thus, grading should be performed during a dry season if at all possible. This should minimize these potential problems, although they may not be eliminated. The project's budget should include an allowance for subgrade improvements (undercut and backfill with structural fill orAggregate Base Course material). Control of surface water is very important to the successful completion of the proposed construction. The contractor should plan his grading activities to control surface water and minimize erosion of exposed cut or fill material. This may include constructing temporary berms, ditches, flumes and/or slope drains to intercept runoff and discharge it in a controlled fashion, while complying with state and local regulations. The project's budget should include an allowance for subgrade improvements (undercut and backfill with structural fill). It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed building area. OCT 16 2009 s GET DW Q PROJ # _ Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall —P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 4.2 Subgrade Preparation: Following the clearing operation and prior to site grading or any fill placement, the subgrade soils should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of soft material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over the construction areas (where possible), with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. The shallow subsurface soils encountered at the location of boring CBR-4 were noted to contain organics extending from a depth of 6 to 8 feet below the existing site grade elevations. Accordingly, the use of Geotextile Geofabric and/or biaxial Geogrid will be warranted in order to aid in minimizing the impact of post construction settlements. Following the proofroll and approval by the engineer, it is recommended that, within the construction areas, natural soils below stripped grade should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum drydensity (ASTM D1557), as tested to a depth of 12-inches, where possible. This densification will require the use of a large vibratory roller. 4.3 Structural Fill and Placement: Following the proper compaction and approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SM, SW, GP, GW), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. Solurions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of GET Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. 4.4 Preliminary Building Foundation Design Recommendations: Provided that the previously recommended earthwork construction procedures are properly performed and based on the previously noted anticipated loading conditions, the building can be supported by shallow spread footings bearing over firm natural soil or well - compacted structural fill material. The footings can be designed using a net allowable soil pressure of up to 1500 pounds per square foot (psf). In using net pressures, the weight of the footings and backfill over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. In order to develop the recommended bearing capacity, the base of the footings should have an embedment of at least 24 inches beneath finished grades, and wall footings should have a minimum width of 24 inches. In addition, isolated square pier footings, if used, are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 24-inch footing embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. 1 Solutions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 4.5 Foundation Excavations: Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing and floor slab areas be compacted using hand operated mechanical tampers, to a dry density of at least 95% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately re -compacted. In addition to compaction testing, hand auger borings with Dynamic Cone Penetrometer (DCP) testing should be performed within the base of the foundation excavations to ensure that the footing bearing soils are suitable for foundation support. Soils exposed in the bases of all satisfactory and remedied foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. 4.6 Preliminary Building Foundation Settlements: It is estimated that, with proper site preparation (as previously presented), the maximum resulting total settlement of the proposed building foundations should be up to 1-inch. The maximum differential settlement magnitude is expected to be about '/z-inch between adjacent footings (wall footings and column footings of widely varying loading conditions). The settlements were estimated on the basis of the results of the field penetration tests. Careful field control will contribute substantially towards minimizing the settlements. 4.7 Seismic Design Recommendations: It is noted that, in accordance with the NC Building Code; Chapter 16, this site is classified as a site Class E, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the completed 60-foot deep SPT borings as well as our experience with SPT borings and CPT soundings with shear wave velocity testing performed within the vicinity of this project site. In order to substantiate the site classification provided above a 100-foot deep CPT boring and soil shear wave velocity testing with liquefaction potential analysis should be performed. G E T Solutions, Inc. would be pleased to provide these services should they be determined necessary. Solutions. Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 4.8 Building Floor Slabs: The floor slabs may be constructed as slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that all ground floor slabs be directly supported by at least a 4-inch layer of relatively clean, compacted, poorly graded sand (SIP) or gravel (GP) with less than 5 percent passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. The slabs can be designed with the use of a subgrade modulus on the order of about 125 psi/in for compacted structural fill. It is recommended that all ground floor slabs be "floating" if no turn down slab/foundation system is implemented. That is, generally ground supported and not rigidly connected to .walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential movements between the slab and the foundation. It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the potential for floor dampness, which can affect the performance of glued tile and carpet. Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or other considerations require greater vapor resistance protection, consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.9 Pavements: The California Bearing Ratio (CBR) test results indicated soaked CBR values ranging from 13.4 to 16.6, having an average of 15.3. The average soaked CBR value was multiplied by a factor of two-thirds to determine a pavement design CBR value. The two-thirds factor provides the necessary safety margins to compensate for some non -uniformity of the soil. Therefore, a CBR value of 10.2 should be used in designing the pavement sections. A summary of the CBR test results and the moisture density relationship curves (Proctors) is provided in Appendix IV. The shallow subsurface soils encountered at the location of boring CBR-4 were noted to contain organics extending from a depth of 6 to 8 feet below the existing site grade elevations. Accordingly, the subgrade evaluation performed within the vicinity of boring CBR-4 and the associated recommendations may include subgrade improvements, such as the use of Geotextile Geofabric and/or biaxial Geogrid. This may be recommended in order aid in minimizing post construction settlements. This should be more accurately determined in the field during construction procedures. Solutions. Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G Based on our experience with similar soil conditions, the following minimum pavement sections are typically used in this area: I. Light Duty Pavement: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer. Compacted to at least 95% of the Modified Proctor (ASTM D 1557). AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". Compacted to at least 95% of the Modified Proctor (ASTM D 1557). ASPHALT SURFACE: Minimum 2.0 inches of Asphalt Concrete, NCDOT Type S-9.5B. II. Heavy Duty Pavement: Flexible Pavement SUBGRADE: Stable and approved by the Geotechnical Engineer. Compacted to at least 95% of the Modified Proctor (ASTM D 1557). AGGREGATE BASE: Minimum 8.0 inches of Aggregate Base Material, size NCDOT Type "A". Compacted to at least 95% of the Modified Proctor (ASTM D 1557). ASPHALT BASE: Minimum 3.0 inches of Asphalt Concrete, NCDOTType 119.0B. ASPHALT SURFACE: Minimum 2 inches of Asphalt Concrete, NCDOT Type S-9.5B. Solutions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G In preparation for a stable subgrade support for the pavement section, the following construction steps are recommended: 1. Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. 2. If excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer to 10 to 12 inches and/or the use of a Geotextile fabric (such as Mirafi 500x or equivalent). These alternates are to be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at the time. Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The previous sections represent minimum thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: Groundwater levels are expected to interfere with excavations that extend below a depth of approximately 5 to 8 feet below existing grades. Dewatering to a depth of about 5 to 8 feet can most likely be accomplished by pumping from sumps. However, dewaterng belowthe groundwater water levels may require well pointing. Due to the potential for perched ground water levels (as noted on the previous page and in Section 3.3 of this report), it is recommended that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. Solutions. Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 924/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 5.2 Site Utility Installation The base of the utility trenches should be observed by a qualified inspector prior to the pipe and structure placement to verify the suitability of the bearing soils. Based on the results of our field exploration program it is expected thatthe utilities and structures located at depths greater than about 4 feet below current grades will bear in wet loose granular and/or soft cohesive soils. In these instances the bearing soils will likely require some stabilization to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (No. 57 stone). In addition depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. The resulting excavations should be backfilled with structural fill, as described in Section 4.3 of this report. 5.3 Additional Geotechnical Investigation A comprehensive geotechnical investigation is recommended once the final layout (structure footprint and design grades), structural characteristics, and the structural loads are determined. The subsurface data documented during this feasibility study can be incorporated within the final geotechnical investigation. Specifically, it is recommended to perform additional SPT borings and/or DMT Soundings within the limits of the proposed building area along with a comprehensive laboratory testing program. Furthermore, consolidation testing of Shelby Tube Samples may be required in order to effectively evaluate the site for settlement. In addition, it is recommended to perform CBR testswithin the pavement areas to confirm the preliminary design CBR values presented herein. The frequency of tests should be developed based on the final design scheme. Deep foundation design may be required to support a 3-story structure or a 2-story structure with column loads in excess of about 150 kips. The necessity of a deep foundation design should be substantiated once the additional Geotechnical Engineering services, as noted above, are completed. Solutions, Inc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 924/08 Enlisted Dinning Hall —P620 Camp LeJeune, North Carolina GET Project No: EC08-266G After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of C. Allan Bamforth, Jr. Engineer -Surveyor, Ltd. as well as their consultants for the specific application to the Proposed Enlisted Dinning Hall P-620 project located within the Camp LeJeune military facility in North Carolina. Solufions, lnc. Preliminary Report of Subsurface Investigation and Geotechnical Engineering 9/24/08 Enlisted Dinning Hall — P620 Camp LeJeune, North Carolina GET Project No: EC08-266G 5.4 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. Solurions.lnc. . APPENDICES BORING LOCATION PLAN BORING LOGS III. GENERALIZED SOIL PROFILE IV. SUMMARY OF CBR TEST DATA V. CLASSIFICATION SYSTEM FOR SOIL EXPLORATION SCHMIDT STREET B-1 CBR-S f� AS4012 �V CBR-3 A C3 B-2 Q CBR-4 J B-3 ��WYY l7 o WWW CBR-1 CBR-2 AS4006 AS4004 AS4007 Name, LEGEND GET ENLISTED ENLISTED DINING HALL - P620 [AMP LEJEUNE NORTH CAROLINA —APPROXIMATE BORING LOCATIONS Project No., EC08-266G Dram Bys APL :A...a.c...�...., Data 8/29/08 ngure No., 1 —APPROXIMATE LIMITS OF BUILDABLE AREA BORING LOCATION PLAN SCALE, NOT TO SCALE GET PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan Bamforth, Jr. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-266G -�"— Go�rtli�al•[.WwmmW •1WIq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER,I Fishburne Drilling Inc. TI LOGGED By: TIP. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-14-08 B-1 DEPTH TO WATER - INITIAL": S 5' AFTER 24 HOURS: ?F _ CAVING> L C J W2 o. m o E a y o Description u a (7 N a d n Z a> n a m n ; irr m c, m 2 Z\ o R TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 d 48-inches of TOPSOIL ... ..� 3 2 2 2 WOH WOH WOH .. ... Q ............. .... .. F....... W... 6 Gray, moist to wet, Clayey SAND (SC), very loose Wet from 5-feet .....! 3 as i WOH 1 t 2 ..:...:...:...:...:...:...:... Gray -Tan, wet, poorly graded fine to medium SAND (SP) to poorly' graded fine to medium SAND (SP-SM) with silt, loose Gray, wet, Silty fine SAND (SM), loose to medium dense `': g f r.r.[1: ;;,:;r 4 ss as 4 4 5 4 s 6 8 10 ... ::...:...:...:...:...:... '...:...:... :. ..:...: ...: ...:...:...:...:...:...: 0 6 4 ::::: 14 .:...:...:...:...: .. .:... ..:...:...:...:...:...:... 6 ss y 10 5 6 1 Gray, wet, Silty fine SAND (SM) with partially decayed root fragments, very loose i i i i i 7 1 3 1 4 ..:...:...:...:...:...:... 0 W. . ..:...:...:. ..:...:.......:... ...:...:...: ................... - 8 ss WOH WOH WOH 5 5 24. Light Gray, wet, Silty fine SAND (SM) with Cemented Sand and Marine Shell Fragments, medium dense j 13 ..:...:...:...:...:...:... 2 Gray, wet, Silty fine SAND (SM), very loose to medium dense 9 ss 56 9 30 10 7 ..... 10 ss 15 20 26 . 35 1 1 Notes: W. O. H. = Weight of Hammer SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial amurldwaterreadinct may not be indicative of the static WOH - Weiaht of Hammer PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586 GET ���•r++p+•TMar. BORING LOG B-1 PROJECT: P-620 Enlisted Dining Hall PROJECT NO.: EC08-266G CLIENT: C.Allan Jr. mp LeJeune, North Carolina PROJECT LOCATION:ION: Camp L LOCATION: See Attached Boring Location Plan ELEVATION: DRILLER: Fishbume Drilling Inc. LOGGED BY: P. Lankford, DRILLING METHOD: Mud Rotary (Wash) DATE: 7-14-08 DEPTH TO - WATER> INITIAL: S 5. AFTER 24 HOURS: 2- CAVING> S o m W 5 o-Q? E _ a v ° ` Description 2 c c� a ll vE� z a n a n ~ w - `O m a 2 Z oo " \ TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 40 48 Light Gray, wet, Silty fine SAND (SM) with Cemented Sand and Marine Shell Fragments, dense 11 ss 0 2 6 31' 23 17 12 .:...:...:...:...:...:...:... -' ' . to 12 ss 1 3 4 45 :: ': ;': ': 13 as a t5 to 15 is 50 53 Light Gray, wet, Clayey SAND (SC) to Silty, Clayey SAND (SC-SM) with trace Cemented Sand and Marine Shell Fragments, medium dense 5 Gray, wet, Silty fine SAND (SM), medium dense 1a ss o is 15 55 15 ss 7 a 9 fi0 Boring terminated a160 ft. 65 22 70 Notes: W. 0. H. = Weight of Hammer SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. 6 c GET PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan Bamforth Jr. PROJECT LOCATION: Camp LeJeune North Carolina PROJECT NO.: EC08-266G —'—' - co�.r•c•.�W•mwr BORING LOG BORING.LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: DRILLER?'Fishburne Drilling Inc. ( T LOGGED BY: TP. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 B-2 DEPTH TO WATER - INITIAL`: § 6' AFTER 24 HOURS: a CAVING> L c c m wQ a v E a m a Description 0 E U�� a o to z a o to �- 01 r� ~ 3 tD m a d m Z o u v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 o 0 15 6 1.1 2-inches of TOPSOIL l:::: 1 ss e c .:...:...:...:...:. . . : 95 ' .:...:...:... :I...:...:...:... Dark Gray, moist, Silty fine SAND ISM), medium dense Mottled Gray -Reddish Tan, moist, Fat CLAY (CH), medium stiff 2 ss 3 3 4 Tan -Gray, moist, Clayey SAND (SC), very loose.-. .. ... .. . .. ... 3 s 1 2 .:...:...:...:I...:...:...:... 1 ..... .... ..... I.. .........:... 2 ray, wet, poorly graded fine to medium SAND (SP) to poorly grade fine to medium SAND (SP-SM) with silt, medium dense �!, f f n: n: or.tr. ra:E .a:ril 4 ss 17 _ .........:... C ........ .............. :.. .: ..�:...:...:...:... 9 0 r(t Gray, wet, Clayey SAND (SC), very loose o I. 15 I Light Gray, wet, Lean Sandy CLAY (CL), very soft 7 ss u 0 1 34.2 ...:...:...:...:...:...:...:... 6 20 2 Tan, wet, poorly graded fine to coarse SAND (SP), loose 8 3 6 g :...:...:...:...:...:...:... 28 Gray -Tan, wet, Lean CLAY (CL), very soft 9 ss 2 ..[...[...[_.t_.[...;...t... ..:...:...:...:...:...:...:... Boring terminated at 30 ff. 0 ............................... 35 ..:...:...:. ..:. .. :...: ...:... Notes: W. O. H. = Weight of Hammer SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan BaJr. PROJECT LOCATION:N: Camp LeJeune, North Carolina PROJECT NO.: EC08-266G ® �•E••�-.��a•�r*r BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: i BORING LOG DRILLER: Fishbume Drilling Inc., LOGGED BY: P. Lankford, 1 DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 B-3 DEPTH TO WATER - INITIAL': 4 6' AFTER 24 HOURS: a CAVING> L > y w w' v o E w o D2SCflptlOrl m t7 Z m E$ � E N o m a > Z\ u TUzE EST RESULTS Plastic Limit F-I Liquid Limit Moisture Content -• N-Value- a 10 20 30 40 50 60 70 4-inches of TOPSOIL a axC ( 1 ss s 7 5 22 g 5-.....-..:...:-. a 16 ...:...:...:...:...:... :...:...:...:...:...:...:... . . . . . . . . . . ..:...:...:...:...:...:... ............. ............. ' ...f... f.........f... ...:...:...:...:...:...:...:... Tan -Brown, moist, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND (SP-SM) with silt, medium dense 2 4 a 4 z Mottled Gray -Reddish Tan, moist, Sandy Fat CLAY (CH), stiff' .:.:.._ 3 as 3 3 3 Gray, moist to wet, Clayey SAND (SC), loose Wet from 6-feet :4 4 Ss S 6 e Gray -Tan, wet, poorly graded fine to medium SAND (SP-SM) with sil to Silty fine SAND(SM), medium dense ..... 5 ss a a tt to Gray -Tan, wet, poorly graded fine to medium SAND (Sp) to poorly graded fine to medium SAND (SP-SM) with silt, medium dense .4i i. q:C[r ri: n: 413 Dark Gray, wet, Silty fine SAND ISM) with trace organics, very loose Eli i ...... 6 3 t . 15 Gray -Brown, wet, Sandy Lean CLAY (CL) with trace organics, very soft 8 Mottled Gray -Reddish Tan, wet, Fat CLAY (CH), very soft to medium stiff With trace partially decayed root fragments from 18 to 23-feet 7 ss a 1 0 1 _:...:...:...[...[...t...:... : .............................. With sand from 23-feet 5 .:...:...:...:...:...:...:... 8 as t s 5 25 g ..:...:...: .. .:... :...: ...:... 2 Gray -Tan, wet, Silty fine SAND (SM), very loose ' It 0 a ............................... WOH ...:...:...:...:...:...:...:... 10 SS woH O ...:...:...:...:...:...:...: 35 1 1 Notes: W. O. H. = Weight of Hammer SS = Split Spoon Sample ST= Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, m GET Goxn.4m:uwA,,.�m.>rm� BORING LOG B-3 PROJECT: P-620 Enlisted Dining Hall PROJECT NO.: EC08-266G CLIENT: C. Allan Bamforth, Jr. PROJECT LOCATION: Camp LeJeune, North Carolina LOCATION: See Attached Boring Location Plan ELEVATION: DRILLER: Fishburne Drilling Inc. LOGGED BY: i P. Lankford, Err DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 DEPTH TO - WATER> INITIAL: s 6' AFTER 24 HOURS: g CAVING> L c c io > y W a d w m o E a 0 w m o Description a 0 y o. 6 E Z rn a o E 8 m 6 o. °' E N 3 tD o y m n m# Z oo v TEST RESULTS Plastic Limit F-I Liquid Limit Moisture Content - • I Value - 10 20 30 40 50 60 70 1 40 11 ss o 1 2 26 19 15 ..... ........ ................... . 14 - ..... 12 ss 1 4 Light Gray, wet, Silty fine SAND (SM) with Cemented Sand and Marine Shell Fragments, medium dense € € 13 ss 5 13 19 14 16 50 5 Gray -Tan, wet, Silty fine SAND (SM), medium dense : 7 6 15 5 . .... . .... 18 sa 15 ss 9 a 11 Boring terminated at 60 ft. 70 22 Notes: W. 0. H. = Weight of Hammer SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET ® ��>m1•E+mm�•>a�. BORING LOG CB -1 PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan BaJr. PROJECT LOCATION:N: Ca Camp LeJeune, North Carolina PROJECT NO.: EC08-266G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: _ J. Meads LOGGED BY: P. Lankford, I DRILLING DRILLING METHOD: Hand Auger DATE: 7-2-08 DEPTH TO WATER - INITIAL': S 7.5' AFTER 24 HOURS: a _ CAVING> L c > r j W m w l] E m �i D Description a 0rn E Z E >> M 8W E y o m a j Z o a v TEST RESULTS Plastic Limit F-I Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 2A 2-inches of TOPSOIL ............................... ...................:...:...:... ...:...:...:... t...:...:...: _. ...:...:...:.. ' . ... .............. ........ ... .. ...:... :...:. ..:...:..........30 . ... .. ... .. ............... ..... Tan -Gray, moist, Clayey SAND (SC) Tan -Brown, moist, Lean CLAY (CL) 3.5 Mottled Gray -Reddish Tan, moist, Clayey SAND (SC) Reddish Tan, moist, poody graded fine to medium SAND (SP-SM) with silt to Silty fine SAND (ISM) Z. Gray and wet from 7.5-feet !+ (+• x ,,,., I. .air. i:rri 10 a Boring terminated at 10 ft. 15 6 g 2 0 35 Notes: W. O. H. = Weight of Hammer SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS =Bulk Sample *The initial aroundwater readino may not be indicative of the static oroundwater level. W PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. m GET "—" - Gvra,av,•c.aim,,.,�w•»>�a BORING LOG GBR-2 PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan Bamforth, Jr. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-266G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: DRILLER: JiMeads ( S LOGGEDBY: 7 PJ Lankford, EIT DRILLING METHOD: Hand Auger DATE: 7-2-08 IDEPTH TO WATER - INITIAL*: 4i; 7.5 AFTER 24 HOURS: CAVING> 1 c is > y W n d d w o E❑ 5 w d ,� Description a d.2 a d E z rn a> E$ ' a °1 E (nH tO o m a A z u e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 0 0 10-inches of TOPSOIL ............................... ...:...:............:...:... ...:...:...:...:...:...:...: ... ........................... ...: ...:... :... :. .. :...:...:... ...:...:...:...:.. .:...:...:... . ......... .. ............ ..... .. Tan -Gray, moist, Clayey SAND (SC) Tan, moist, Fat CLAY (CH) with trace sand, 4 Tan, moist, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND ISM) Gray from 5.5-feet Wet from 7.5-feet .. i i i z 5 0 4 Boring terminated at 10 ft. 15 a 5 30 10 35 Notes: W. O. H. = Weight of Hammer SS = Split Spoon LleST =Shelby Tubple HA = Hand AugepleBS =Bulk Sampl *The initial aro,", r readino may not be indicative of the static oroundwater level W(H PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET ® �w^^ti1•E• ^�^W.n." BORING LOG CBR-3 PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan BaJr. PROJECT LOCATION:N: Ca Came LeJeune North Carolina PROJECT NO.: EC08-266G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: _ DRILLER: Fishburne Drilling Inc. LOGGED BY: P. Lankford, I DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 IDEPTH TO WATER - INITIAL": s3 8' AFTER 24 HOURS: T• _ CAVING> L o zi "m > y W L o. v w y o E n m m 2 o Description u n m d a d E Z m E> N v n 01 E M tO o -y i5 a N m � Z oo v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content- • N-Value - 10 20 30 40 50 60 70 o 0 10 5 4 5 5 34, 24-inches of TOPSOIL ... .,� �.. 1 ss 3 5 5 7 ........................... . ��..:...:...:...: .... . .:...:...:...:...:...:...:... .:..................:... .:...:...:...:...:...:...:... ....... ......... .:...:...:... :.. . ..... ...... ...... ............. ...:...:...:...:...:...:...:. .. . ..... ............. ..... .. ... .. Mottled Gray -Reddish Tan, moist, Clayey SAND (SC) with silt, loose::: 4 Mottled Gray -Reddish Tan, moist to wet, Fat CLAY (CH), soft to medium stiff Wet from 8-feet Gray, wet, Silty fine SAND (SM), loose . .. ... .'..'..'. 3 as ss 22 a 3 2 z z 4 as 1 s 3 as z 2 10 4 Boring terminated at 10 ft. 15 6 g 5 30 10 35 Notes: W. O. H. = Weight of Hammer SS = Split Spoon sample ST =Shelby Tube Sample HA =Hand Auger Sample BS = Bulk Sample PAGE 1 o/ 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. m GET cW.a�1•c,:1�.�.,ga•�a BORING LOG CB -4 PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan Bamforth, Jr. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-266G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: DRILLER:' Fishburne Drilling Inc. T LOGGED BY: T P' Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 IDEPTH TO WATER - INITIAL`: s 8' AFTER 24 HOURS: -T _ CAVING> L o m Wo n E n v Q ,� Description n c2 y n d rn z n rn 0 y °' rn F- 3 0 m n m m` Z o \ TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 37 12 4 4 5 p, 2-inches of TOPSOIL 1 ss 23 20 1 �7 :. .. :...:...:... " . . . . . . . . ..........:...:...:...:... - . . . . . . . . . . .:...:...:...:...:...:...:... ...:. ...:.,.:_._....: _.: _.:... . ................ .. ............ Tan -Brown, moist, Silty fine SAND ISM) with crushed concrete fragments (Uncontrolled Fill), dense ::.::r ...... ::: "' 2 6 6 2 Mottled Gray -Reddish Tan, moist, Clayey fine SAND (SC), medium:: dense 5 3 ss 2 2 2 Mottled Gray -Reddish Tan, moist, Fat CLAY (CH) with sand, soft Mottled Gray -Reddish Tan, moist, Fat CLAY (CH) with 1-inch lenses of Black Silt with organics, soft 8- Mottled Gray -Reddish Tan, wet, Fat CLAY (CH) mixed with sand, medium stiff : _ -= or 4 5 ss z z 2 1 z 3 2 10 4 Boring terminated at 10 ft. - 15 0 a 2 10 35 Notes: W. O. H. = Weight of Hammer SS = Split Spoon Sample ST =Shelby Tube Sample HA =Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET �o.eNn,•c..a.�m.mam BORING LOG CBR-5 PROJECT: P-620 Enlisted Dining Hall CLIENT: C. Allan Bamforth, Jr. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC08-266G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: _ DRILLER: Fishburne Drilling Inc. LOGGED BY: P. Lankford, I DRILLING METHOD: Mud Rotary (Wash) DATE: 7-15-08 DEPTH TO WATER - INITIAL': g 8' AFTER 24 HOURS: a CAVING> L c zi io WEn n a D E n d D ,E Description o. 17 a o z �- > y n m ti~ fO m a m Z\ o u TEST RESULTS Plastic Limit F-I Liquid Limit Moisture Content- • N-Value- 10203040506070 a 0 13 5 2 3 3 6. 5-inches of TOPSOIL ',", ..... 1 ss 5—:--'•i a 6 ...................:... .:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... ..:...:...:...:...:...:...:... ..:...:...:...:...:...:...:.. ..:..................: .............................. _:...:...:...:...: W. . ... .. ............ ........... .. ...: .. .:...:... :...:...:......30 Dark Brown -Tan, moist, Clayey fine SAND (SC), medium dense Mottled Gray -Reddish Tan, moist, Fat CLAY (CH), very soft to medium stiff 8 Gray, wet, Clayey SAND (SC), very loose ... ... ...... 2 ss 3 z z 5 3 1 t 1 4 5 ss 1 1 2 1 z 1 2 to. a Boring terminated at 10 ft. ..... 15 6 0 6 25 3 Notes: W. 0. H. = Weight of Hammer SS = split Spoon sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial WOH - Weiaht of Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. Symbol Description Strata symbols Topsoil t Clayey Sand Poorly graded Sand with Silt Silty Sand Silty Clayey Sand Fat Clay Lean Clay Poorly graded Sand Silty Sand 3 with Uncontrolled Fill Fat Clay with organics Misc. Symbols a Water table during drilling (Notes• 1. Exploratory borings were drilled on 7-15-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and -commendations in this report. 5. Results of tests conducted on samples recovered are reported on the logs. a 15 22 H NM-33.5 WOH T C< <5 C5 5 8 1_5 9 10 Q- .1 XCV' _ _ _ 5 3 NM=@.2 ,32LL-95 i :1.Y1. 1 2 _ 76 99 0 —1_1 — IS •1 C.Cf a 95WOH L 5 a 4WpN 3 2 3 J 9] 911 63 _t_f_NM=38.9 I �1'..Cf LL=<J 1 1 3 1 1 0 NM=32.3 1 0 LL=43 1 0 1 0 JO WOH WON WOH 5 561 ' --0-9 ] 3 a 1 —1_1 1 2 3 5 0 —1-0 3p 1 11 1620 WOH WOH WOH 11 10 0 11 .ram 01 45 23 31 _ t_1 n OS _ C 14 15 1313 19 15 13 14 610 1315 16 1115 6p i6 9_9 —9l 0.11 60 )5 )5 90 90 strata symbols ® Fat Clay Topsoil El ® Lean Clay GET Solutions, Inc. Clayey Sand' Poody gradetl Sand GENERALIZED SOIL PROFILE I>71, Poody graded Sand + - SCALE DRAWN BY/APPROVED BY DATE DRAWN +zor With silt SCALE ]' 51 CIS9/25/200R ME Silty sand P-620 Enlisted Dining Hall Silty Clayey Sand FIGURE NUMBER PROJECT NO. EC08-266G Symbol Description KEY TO SYMBOLS Strata symbols Topsoil Clayey Sand Poorly graded Sand with Silt Silty Sand Silty Clayey Sand 0 Fat Clay Lean Clay Poorly graded Sand Misc. Symbols s Water table during drilling Notes: 1. Exploratory borings were drilled on 7-15-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on the logs. 0 C- C -3 C J C -5 0 NM•5.5 JJ J J J J. JJJ 2326 JJJ 57 LL_26 JJJ 1111 JJJ 6 6 NM=6.6 s. J J JJJ 1'J�i'u LL-U NM•10.9 J ✓ J _ �-28 LL=24 2 JJJ - - - -2-2-NM3101 -]-6 -3 �2 3 3 LL-33 6 6 2 2 22 22 11 _ 6 '[ fj-1- _ -2 -r - 6 _ -1 1 d 33 _ 22 21 a' a :6: _'r i 2< 32 12 •I � I: V V 1 0 0 12 12 Strata symbols Silty Sand Topsoil Silty Sand with Uncontrolled Fill GET Solutions, Inc. Clayey Sand Fat Clay GENERALIZED SOIL PROFILE ® with organics SCALE: DRAWN BY/APPROVED BY DATE DRAWN Lean Clay ® SCALE'. I- _2' GS 9/25/2008 Poorly graded Sand P-620 Enlisted Dining Hall with Sill Fat clay FIGURE NUMBER ® PROJECT NO. EC08-266G Symbol Description Strata svmbols Topsoil Clayey Sand Lean Clay Poorly graded Sand with Silt Fat Clay Silty Sand .96aSilty Sand e7e�du6 qwith Uncontrolled Fill Fat Clay with organics Misc. Symbols a Water table during drilling 1 Notes 1. Exploratory borings were drilled on 7-15-08 using a 4-inch diameter continuous flight power auger. 2. No free water was encountered at the time of drilling or when re -checked the following day. 3. Boring locations were taped from existing features and elevations extrapolated from the final design schematic plan. 4. These logs are subject to the limitations, conclusions, and recommendations in this report. 5. Results of tests conducted on samples recovered are reported on the logs. SUMMARY OF CBR TEST DATA Sample CBR-1 CBR-2 CBR-3 CBR-4 CBR-5 Number Sample Depth 0.2- to 1-to 2- to 1- to 0.5- to (ft.) 1.5-feet 2-feet 3.5-feet 2.5-feet 2-feet Unified ?Soil Classification SC Sc SC $C SC Symbol AASHTO Classification A-4(1) A-6(3) A-2-6(1) A-2-4(0) A-6(2) Symbol Natural Moisture 5.5 10.9 1 b.1 4.7 6.8 Content Atterberg Limits 26/16/9 28/13/16 33/18/15 24/16/8 34/15/19 LL/PL/PI % Passing 42.8 45.6 35.2 33.1 37.3 #200 Sieve Maximum Dry Density, pcf 112.3 118.3 109.6 116.4 115.4 Optimum Moisture % 13.7 12.5 15.0 13.2 13.1 Soaked CBR 14.3 15.7 16.6 16.4 13.4 Value Unsoaked CBR 21.5 20.2 17.8 22.8 21.7 Value Resiliency 2.5 2.5 2.5 3.0 3.0 Factor Swell % 1 0.02 0.04 1 0.13 1 0.02 0.09 Project: P-620 Enlisted Dining Hall Project No EC08-266G Client: C. Allan Bamforth Jr. Date: Auoust 25. 2008 ME NMMMMMMMMMWMMMMMMM P-620 Dining Hall - CBR-1 250 200 150 �N a N N d N lob 50 0.000 0.050 0.100 0.150 0.200 .0.250 0.300 0.350 Penetration MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 129 124 —� 119 U a N C N 114 ZAV for Sp.G. _ — 2.65 109 104 6 8 10 12 14 16 18 Watercontent, % Test specification: VTM-1 Standard Elev/ Depth Classification Nat. Moist. Sp.G. LL PI %.> No.4 %< No.200 USCS AASHTO Lto 2 feet SC A-6(3) 10.9 28 16 0.0 45.6 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 118.3 pcf Optimum moisture =.12.5 °/a Tan -Gray Clayey SAND (SC) Project No. EC08-266G Client: C. Allan Bamforth, Jr. Project: P-620 Enlisted Dining Hall o Location: CBR-2 Remarks: CBR #2 Soaked CBR Value= 15.7 Resiliency Factor = 2.5 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. P-620 Dining Hall - CBR-2 250 200 150 Qi a N W m N 100 50 0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 Penetration MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 109 I 107 U a i^. y °� ---- ZAVfor Sp.G.= r 2.65 o —t � 105 103 101 91 11 13 15 17 19 21 Water content, % Test specification: VTM-1 Standard Elev/ Depth Classification. Nat. Moist. Sp.G. LL PI %> No.4 %< No.200 USCS AASHTO 2 to f feet SC A-2-6(l) 10.1 33 15 0.0 35.2 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = ] 09.6 pcf Optimum moisture = 15.0 % Mottled Gray -Reddish Tan Clayey SAND (SC) Project No. EC08-266G Client: C. Allan Bamforth, Jr. Project: P-620 Enlisted Dining Hall o Location: CBR-3 Remarks: CBR #3 Soaked CBR Value = 16.6 Resiliency Factor = 2.5 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. 300 260 200 C C. N 150 m 100 50 P-620 Dining. Hall - CBR-3 0.050 0.100 0.150 0.200 0.250, 0.300 0.350 Penetration MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) r1s I _ I 117 - I ' I� I y 915 U i N01 C I. I I Q 113 I I 111 ZAV for _ Sp.G. 109 2.65 7 9 11 13 15 17 19 Water content, % Test specification: VTM-t Standard Elev/ Depth Classification Nat. Moist. Sp.G. LL PI %> No.4 %< No.200 USCS AASHTO I to 2.5 feet SC A-2-4(0) 4.7 24 8 0.2 33.1 TEST RESULTS MATERIAL DESCRIPTION Maximum drydensity = 116.4 pcf Optimum moisture = 13.2 % Mottled Gray -Reddish Tan Clayey.SAND (SC) Project No. EC08.266G Client: C. Allan Bamfonh, Jr. Project: P-620 Enlisted Dining Hall c Location: CBR-4 Remarks: CBR #4 Soaked CBR Value = 16A Resiliency. Factor=_3.0 Figure MOISTURE DENSITY RELATIONSHIP �CURVE) p(PROCTOR GET SOLUTIONS, IONS INC. 350 300 250 200 N a N N d 150 100 50 0 0.000 P-620 Dining Hall- CBR-4 0.050 0.100 0.150 0.200 0.250 0.300 0.350 Penetration MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) 118 116 — — I I 114 I D_ I z a I - 112 I - - - I \-11 — ZAV for Sp.G. = 108 _ 2.65 8 10 12 14 16 18 20 Water content, % Test specification: VTM-.l Standard Elev1 Depth Classification Nat. Moist: Sp.G. LL PI %> No.4 %< No.200 USCS AASHTO 0.5 to 2 feet .SC A-6(2) 6.8 34 19 0.0 37.3 TEST RESULTS MATERIAL DESCRIPTION Maximum. dry density = 115.4 pcf Optimum moisture = 13.1 % Dark Brown -Tan Clayey SAND (SC) Project No. EC08-266G Client: C: Allan Bantforth, it. Project: P-620 Enlisted Dining Hall o 'Location: CBR-5 Remarks: CBR #5 Soaked CBR Value = 13.4 Resiliency Factor'=-3.0 Figure MOISTURE DENSITY RELATIONSHIP (PROCTOR CURVE) GET SOLUTIONS INC. P-620 Dining Hall - CBR-5 250 200 150 .y a w N N N 100 50 0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 .Penetration GET G,vnd,ntrcl . Explmnmm W . IWMp Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757)564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252) 335-9765 Standard Penetration Test (SPTI N-value Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) Relative Densiry Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense 11 to 30 blows/ft. Dense 31 to 50 blows/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse i to 3 inch diameter Medium t/n to 1 inch diameter Fine t/c to 1/2 inch diameter Sand Coarse 2.00 mm tot/a inch (diameter of pencil lead) Medium 0.42 to 2.00 mm (diameter of broom straw) Fine 0.074 to 0.42 mm (diameter of human hair) Silt 0.002 to 0.074 mm (cannot we particles) CLASSIFICATION SYMBOLS (ASTM D 2487 and D 2488) Coarse Grained Soils More than 50% retained on No. 200 sieve GW - Well -graded Gravel GP - Poorly graded Gravel GW-GM - Well -graded Gravel w/Silt GW-GC - Well -graded Gravel w/Clay GP -GM - Poorly graded Gravel w/Silt GP -GC - Poorly graded Gravel w/Clay GM - Silty Gravel GC - Clayey Gravel GC -GM - Silty, Clayey Gravel SW - Well -graded Sand SP - Poorly graded Sand SW-SM - Well -graded Sand w/Silt SW -SC - Well -graded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand SC-SM - Silty, Clayey Sand Fine -Grained Soils 50%or more passes the No. 200 sieve CL - Lean Clay CL-ML - Silty Clay ML - Silt OL - Organic Clay/Silt Liquid Limit 50%or greater CH - Fat Clay MH - Elastic Silt OH - Organic Clay/Silt Hiably Organic Soils PT - Peat COHESIVE SOILS (CLAY, SILT and Combinations) Consistency Very Soft 2 blows/ft. or less Soft 3 to 4 blows/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. Hard 31 blows/ft. or more Relative Proportions Descriptive Term Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readings Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP, SW,SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring dual symbols Plasticity Chart 60 50 WW1 40 S 30 20 q 10 K 0 ®N®®■■■■.M NEENEEMONE ®.®®®®, - t s ®■®,�N�■®®■® EM19®./�Itl 0NEE® s LIQUID UMrr (LL) I%) Page 1 of 1 GET Revision 12/12107 NCDENR Stormwater BMP Manual Chapter Revised 06-16-09 Aren,jwt =Surface area at permanent pool level, including forebay (f t2) Atvr pmd =Surface area at the bottom of the pond (ft2) (excludes the sediment cleanout depth) Depth = Distance between the bottom of the shelf and the pond bottom (ft) (excludes the sediment clearroutdepth) Example: • Surface area at permanent pool: 10,000 ft2, including forebay Surface area at bottom of shelf: 8,000 ft2, including forebay • Surface area at bottom of pond: 2,000 ft2 • Depth: 4.5 ft Average Depth, d•� =.25 x (1 + (8000/10,000)) + ((8000 + 2000)/2) x 4.5) / 8000 = 3.26 ft Therefore use 3.0 to enter the SA/DA table. (To avoid multiple interpolations, please round the average depth down to the nearest 0.5'.) Table 10-1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Maintain and Piedmont Reeions. Adauted from Driscoll.1996 Percent Impervious Cover 3.0 4.0 Permanent Pool Average Depth (ft) 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.89 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.46 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Table 10-2 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency hi the Coastal Region, Adapted from Driscoll,1986 Percent hnpervious Cover 3.0 3.5 - 4.0 Permanent Pool Average Depth (ft) 4.5 5.0 5.5 6.0 6.5 7.0 7.5' 10% 0.9 0.8 0.7 0.6 0.5 0 0 0 0 0 20% 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30% 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40% 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50% 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.6 1.6 70% 6.0 5.2 4.5 4.1 3.7 3.3 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 2.3 160% 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 Wet Detention Basin E C E& V E 2007 OCT 16 2009 DWQ PROJ 0 t I1Vld 3szzE valaold 3lllnNos�ovr 1SV3 10 AMSid Sd11I[Hd EZZIt M=„L' 11vos OIHdVN°J ON ON OAM1O'1NIM9N vaO ONI d30VS IVAOdddV dVIN 311S 1N3WdOl3A30-3 d Nolsln3a 04Z DU 0 311I1 133HS NOISIn38 . • • NOISIn3a VNIIOaVO H1aON 3111ANOSNOVf 83Al8 MIN SVON 03AOaddV A 11l0Vd ONINIO OZ9d 103f08d 601EZIL0 MO NMV60 60talLO 31V0 I at0600Z ON 1031`08d aAs NOIS30 (OV —/+ 6L i)—/+B*gLI'KI, :V3dv snOIA83d NOI1d[aDS30 ___..__. __...�_._............ ... (DV —/+ tl'Z) —/+ 4'O l£'Z6 :V38V SnOIA}J3d V41 -%rv�C oV3ONV82inisio jo V38V wioi — �l� I 0 �I / q\\\}\\\ 1 ({ r; ! ;\ ) ( o in \ 0 \\ , TNII co \ z I i ! | c{\{}) \\\IMZ \\ \\�\�\ >} © ,. � f � � RUNOFF CURVE NUMBER COMPUTATION Project NEW RIVER DINING P620 User: MSB County ONSLOW State: NC Checked: _ Subtitle: PRE DEVELOPMENT DRAINAGE TOTAL SITE Subarea : PRE COVER DESCRIPTION ---------------------------------------- FULLY DEVELOPED URBAN AREAS (Vag Estab ) Open space (Lawns,parks etc.) Good condition; grass cover > 75% Impervious Areas Paved parking lots, roofs, driveways Total Area (by Hydrologic Soil Group) Version 2.00 Date: Date: ----------------------------------- Hydrologic Soil Group A B C D Acres (CN) ----------------------------------- - 2.83(61) - - - 2.47(98) - - 5.3 ______-_______________________________________________________ SUBAREA: PRE TOTAL DRAINAGE AREA: 5.3 Acres WEIGHTED CURVE NUMBER: 78* _______________________________________________________________________________ * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project NEW RIVER DINING 2620 User: MSB Date: County ONSLOW State: NC Checked: Date: Subtitle: PRE DEVELOPMENT DRAINAGE TOTAL SITE Data: Drainage Area 5.3 * Acres Runoff Curve Number 78 Time of Concentration: 0.10 Hours Rainfall Type III Pond and Swamp Area NONE --------------- __------------------ _____ _______________________ I Storm Number 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 ---------------------- ------ I------ I ------ I ------ I------ I______ I ------ I 1 Frequency (yrs) 1 1 2 1 5 1 10 1 25 1 50 1 100 1 I I I I I I I I I 124-Hr Rainfall (in) 1 3.80 1 4.62 1 5.98 1 7.12 8.81 1 10.3 1 11. 1 I I I I I I I I I I Ia/P Ratio 0.15 1 0.12 0.09 1 0.08 0.06 1 0.05 1 0.05 1 I I I I I I I I I Used 1 0.15 1 0.12 1 0.10 10.10 1 0.10 1 0.10 1 0.10 1 I I I I I I I I I I Runoff (in) 1 1.73 1 2.39 1 3.56 1 4.58 1 6.14 1 7.55 1 8.22 1 I I I I I I I I I 1 Unit Peak Discharge 11.010 11.023 11.034 11.034 11.034 11.034 11.034 1 (cfs/acre/in) I I I I I I I I I 1 Pond and Swamp Factor[ 1.00 1 1.00 1 1.00 1 1.00 11.00 1 1.00 1 1.00 1 0.0% Ponds Used I I I I I I I 1---------------------- 1------ 1------ I ------ I ------ I ------ I ------ I ------ I I Peak Discharge (cfs) 9 1 13 1 20 1 25 1 34 1 41 1 45 1 * - Value(s) provided from TR-55 system routines OCT 16 2009 DWQ PROJ k RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project New River Dining P620 User: MSB Date: County Onslow State: NC Checked: Date: Subtitle:,POST DEVELOPMENT DRAINAGE TO POND Subarea : POND _____________________________________________________________ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - 0.62(61) - - Impervious Areas Paved parking lots, roofs, driveways - 1.46(98) - - Total Area (by Hydrologic Soil Group) 2.08 _______________________________________________________________________________ SUBAREA: POND TOTAL DRAINAGE AREA: 2.08 Acres WEIGHTED CURVE NUMBER: 87* _______________________________________________________________________________ ' - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project New River Dining 2620 User: MSB Date: County Onslow State: NC Checked: Date: Subtitle: POST DEVELOPMENT DRAINAGE TO POND Data: Drainage Area 2.08 ' Acres Runoff Curve Number 87 - Time of Concentration: 0.10 Hours Rainfall Type III Pond and Swamp Area NONE --------------- 1'Storm Number 12 3 956 7 ---------------------- 1______________________1------ 1------ 1------ 1------ 1------ 1------ 1______I Frequency (yrs) 1 2 5 1 10 25 50 100 I I I I I I I I I 124-Hr Rainfall (in) 1 3.80 1 4.62 1 5.98 1 7.12 1 8.81 1 10.3 111.9 1 I I I I I I I I I Ia/P Ratio 0.08 0.06 i 0.05 0.04 0.03 0.03 0.03 1 I I I I I I I I I Used 1 0.10 10.10 0.10 0.10 0.10 0.10 0.10 I I I I I I I I I 1 Runoff (in) 2.45 13.21 1 4.50 15.60 1 7.24 1 8.70 110.28 1 I I I I I I I I I 1 Unit Peak Discharge 11.034 11.034 11.034 11.034 11.034 11.034 11.034 1 (cfs/acre/in) I I I I I I I I I 1 Pond and Swamp Factorl 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1 0.0% Ponds Used I I I I I I I I I-------------------- ----- ------ ------ ----- ----- ----- I ---- -- I I Peak Discharge (cfs) 5 1 7 1 10 12 16 19 22 I ------------------------------------------- - Value(s) provided from TR-55 system routines RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project NEW RIVER DINING P620 User: MSB Date: County ONSLOW State: NO Checked: Date: Subtitle: POST DEVELOPMENT DRAINAGE REMAINDER (NOT DRAINING TO POND) Subarea : REM _______________________________________ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ______________________________________________________________ FULLY DEVELOPED URBAN AREAS (Vag Ester.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% - 2.29(61) - - Impervious Areas Paved parking lots, roofs, driveways - 0.99(98) - - Total Area (by Hydrologic Soil Group) 3.28 ------------------------------------------------------------------------------- SUBAREA: REM TOTAL DRAINAGE AREA: 3.28 Acres WEIGHTED CURVE NUMBER: 72* ------------------------------------------------------------------------------- - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project NEW RIVER DINING P620 User: MSB Date: County ONSLOW State: NO Checked: Date: Subtitle: POST DEVELOPMENT DRAINAGE REMAINDER (NOT DRAINING TO POND) Data: Drainage Area 3.28 * Acres Runoff Curve Number 72 Time of Concentration: 0.10 Hours Rainfall Type III Pond and Swamp Area NONE I Storm Number 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 I ------ I ------ I ------ I ------ I------ I______ I ------ I Frequency (yrs) 1 1 2 1 5 1 10 1 25 1 50 1 200 I I I I I I I I I 124-Hr Rainfall (in) 3.80 4.62 5.98 7.12 8.81 10.3 11. I I I I I I I I I I Ia/P Ratio 0.20 0.17 0.13 1 0.11 1 0.09 1 0.08 1 0.07 1 I I I I I I I I I Used 0.20 1 0.17 1 0.13 1 0.11 1 0.10 1 0.10 1 0.10 1 I I I I I I I I I I Runoff (in) 1.32 1 1.91 1 2.98 1 3.93 1 5.41 1 6.76 1 7.41 1 I I I I I I I I I 1 Unit Peak Discharge 10.981 I1.000 11.019 11.030 11.034 11.034 11.034 1 (cfs/acre/in) I I I I I I I I I I I I 1 Pond and Swamp Factor[ 1.00 1 1.00 1.00 1 1.00 11.00 1 1.00 1 1.00 1 0.0% Ponds Used I I I I I I I -------------------- ----- ------ ------ I ----- I ---- I ------ I ------ I I Peak Discharge (cfs) 4 1 6 1 10 1 13 1 18 1 23 1 25 I _________________________________________________________________________ * - Value(s) provided from TR-55 system routines Precipitation Frequency Data Server Page 1 of 3 POINT PRECIPITATION rcm W FREQUENCY ESTIMATES FROM NOAA ATLAS 14 North Carolina 34.929 N 76.396 w 0 feet from'PredpitadomFrequeney Alas ofthe UnitN States' NOAA Ades 14, volume 2, version 3 G.M. Boutin, D. Mart , B. Lin, T. P.ybok, NLYeku, end D. Riley NOAA, \adoan Weather Senice, Sd,er Spring Ma,land. 2004 These pre6ppa:'en frequency estmaten are based on a pi&k Maton ssft AM Is the Aterage RecunerKe Interval. please finer to IAMAM 14 DonnlM For more Wormatoa LATE: Famarng faces estmates new zero to appear as rem. Upper bound of the 90% confidence interval Precipitation Frequency Estimates (inches) (years m n m n min m n mn hold hr 10 6' hr 11 hr 21 h8 day day Ina' d 0 de d� d 0 �1 0.55 0.87 1.09 1.49 1.86 2.29 2.52 3.09 3.67 4.25 5.00 5.57 6.48 7.20 9.55 [IT6-21 14.33 17.17 00.64 1.02 L29 1.78 2.23 2.78 3.04 3.73 4.44 5.17 6.06 6.75 7.81 8.63 11.38 13.82 16,98 20.28 0 0.73 Ej Efl 2.I I 2.71 3 46 3.81 4.69 5.59 6.68 7.79 8.60 1 9.82 10.69 13.87 5.65 2029. 23.96 IO I OF831 1.32 1.68 2A3 3.16 4.10 4.56 5.62 6J5 7.94 9.27 10.12 IIA7 12.40 15.88 18.91 23,03 26.91 25 0.93 1.49 L89 2.79 3.72 4.94 5.56 6.66 8.31 9.80 IIAS 12.34 13.65 14.84 18.74 22.01 26.86 30.98 50 1.02 1.63 2.06 3.10 4.20 5.70 6.47 8.03 9.75 11.38 13.36 14.23 15.84 16.87 21.09 24.48 30.03 34.22 100 LIO 1.76 2.22 7.40 4.68 6A9 7.44 9.25 IL32 13J5 IA52 16.29 18.01 19.05 23.59 27.05 33.35 37.57 200 500 1.19 1.30 1.89 2.06 2.38 2.59 3.70 4.12 5.20 5.90 7,33 8.55 6.51 10.08 I0.61 12.60 13.08 15.68 15.12 18.14 17.95 21.68 18.58 22.02 20.38 23.85 2t.44 24.93 26.26 30.11 29.75 33.49 36.89 41.93 41.02 45.77 1000 L40 2.20 2.76 4.47 6.53 9.65 IL54 14.47 18.11 20.72 23.02 25.29 26.90 27.90 33.29 36.50 46.04 49.S1 'The upper bound of 1ha corMenos Interval at 90a%certdence kvel Is the veua ehch 5%of the a mu'a'ed euzrtfe ve'ves for a cites hencencv we ereafer ihm "These pfedp;1j0on eegvenq estma'es we based on a okzI durxton eed4a ARI Is dre Aserege Raunence Interval. Fzase refer b lAMAes 14 Ducunent for more Informa;on. NOTE: Fmmaffing presents enmabs neu zero to eppea as zero. " Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARV" 5 l 15 30 60 120 3 6 12 24 F]F48 4 7 10 20 30 45 60 (years) min min min mio mio min hr hr hr hr hr (Ifl)' dAy d8)' dA)' dA)' dA)' dfl)' 0.46 0.73 0.91 1.25 1.56 1.90 2.05 2.47 2.90 3.45 3.98 4.52 5.34 6.00 8.12 10.04 12.43 14.97 0.54 0.66 1.08 1.50 1,88 2.30 2.48 2.99 3.52 4.20 4.83 5.48 6.43 7.18 9.69 I-93 HEI 17.69 0.62 0.99 1.25 1.78 2.28 2.86 3.I0 3.74 4.42 5.42 6.19 6.97 8FO-8-1 8.89 11.77 14.35 17.56 20.90 IO 0.70 l.11 1.41 2.04 2.66 3.39 3.70 4.47 5.32 6.43 7.33 8.17 9.41 f0.28 13.47 16.26 19.88 23.44 25 0.78 L24 1.58 2.34 3.11 4.08 4.50 5.45 6.S1 7.89 9,02 9.88 11.28 I2.25 15.80 18.86 23.11 26.86 50 0.85 1.35 1.72 2.58 3.50 4.68 5.21 6.33 7.60 9.12 10.45 11.31 12.83 13.83 17.67 20.90 25.71 29.51 100 0.92 1.46 1,84 2.82 3.88 5.30 5.96 7.25 8.74 10.45 12.03 12.83 14,44 15.48 19.60 22.93 26.33 32.19 200 0.98 1.55 Efl 3.05 [.2fl Efl 6.76 8.26 10.01 11.86 13.74 14.44 16.14 17.23 21.60 25.00 3103 3483 4.81 6.84 7.90 9.67 11.80 13.91 16.23 16.76 18.52 19.64 24.30 27.73 34.66 3- 500 1.06 1.67 2.I0 3.35 1000 1.13 1.77 2.23 3.60 5.26 7.64 6.92 10.95 13A4 15.64 18.72 18.85 20.48 21.59 26.45 29.84 37.47 40.88 ' Tha bwer booed olde ron5dexa InYrcal as 9GAcanadzcce level is the vateehtn sx ns Ra. cnwar.e.a.w. van.a w. a.. a.,,....,, v. f... n.,, http://hdsc.nws.noaa.gov/cgi-binlhdsclbui ldout.perl?type=pf&units=us&series=pd&statena... 9/6/2009 WinTR-20: Version 1.0 MCAS Dining Facility P-620 SUB -AREA: Basin 1 R1 `REAM REACH: R1 outlet STORM ANALYSIS: 100 yr 0. 11 0 0 .01 0 0.0033 87. .10 Pond-01 11.9 Type III 2 4.62 STRUCTURE RATING: Pond-01 21.00 21.00 0.0 0.0 21.25 3.361 0.0660 21.50 9.056 0.1352 21.75 16.421 0.2070 22.00 25.135 0.2815 GLOBAL OUTPUT: 1 .5 0.1 YYNYY YYNYYN R ECIEIVED OCT 16 2009 DWQ PROJ # MICAS Dining Facility P-620 Area or Drainage ----------- Peak Flow by Storm ---- Reach Area Alternate 100 yr Identifier (sq mi) (cfs) (cfs) (cfs) (cfs) (cfs) sin 1 0.330E-02 20.3 0.330E-02 20.3 DOWNSTREAM 17.0 OUTLET 0.330E-02 17.0 WinTR-20 Version 1.0 Page 3 10/15/2009 16:55 nE C IE 9 V ED OCT 16 2009 DWO PROJ # WAS Dining Facility P-620 Area or Drainage Rain Gage Runoff ------------ Peak Flow ----------- Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) 0.003 Downstream 10.275 21.77 12.16 17.02 5158.34 Line Start Time ------------ Flow Values @ time increment of 0.100 hr (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.600 0.5 0.5 0.6 0.6 0.6 0.6 0.7 9.300 0.7 0.7 0.8 0.8 0.8 0.8 0.9 10.000 0.9 0.9 1.0 1.0 1.1 1.1 1.2 10.700 1.2 1.3 1.4 1.4 1.5 1.6 1.7 11.400 1.9 2.1 2.4 3.1 4.6 6.6 10.2 12.100 15.6 16.2 12.9 10.0 7.7 5.8 4.3 12.800 3.4 3.0 2.7 2.4 2.2 2.0 1.9 13.500 1.8 1.7 1.6 1.5 1.5 1.4 1.4 14.200 1.3 1.3 1.2 1.2 1.1 1.1 1.1 14.900 1.1 1.0 1.0 1.0 0.9 0.9 0.9 15.600 0.9 0.8 0.8 0.8 0.7 0.7 0.7 16.300 0.7 0.6 0.6 0.6 0.6 0.6 0.6 17.000 0.6 0.6 0.5 0.5 0.5 0.5 Area or Drainage Rain Gage Runoff ------------ Peak Flow ----------- Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) OUTLET 0.003 10.275 12.16 17.02 5158.34 Line Fart Time ------------ Flow Values @ time increment of 0.100 hr--------- (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.600 0.5 0.5 0.6 0.6 0.6 0.6 0.7 9.300 0.7 0.7 0.8 0.8 0.8 0.8 0.9 10.000 0.9 0.9 1.0 1.0 1.1 1.1 1.2 10.700 1.2 1.3 1.4 1.4 1.5 1.6 1.7 11.400 1.9 2.1 2.4 3.1 4.6 6.6 10.2 12.100 15.6 16.2 12.9 10.0 7.7 5.8 4.3 12.800 3.4 3.0 2.7 2.4 2.2 2.0 1.9 13.500 1.8 1.7 1.6 1.5 1.5 1.4 1.4 14.200 1.3 1.3 1.2 1.2 1.1 1.1 1.1 14.900 1.1 1.0 1.0 1.0 0.9 0.9 0.9 15.600 0.9 0.8 0.8 0.8 0.7 0.7 0.7 16.300 0.7 0.6 0.6 0.6 0.6 0.6 0.6 17.000 0.6 0.6 0.5 0.5 0.5 0.5 WinTR-20 Version 1.0 Page 2 10/15/2009 16:55 �ECE9�fE OCT 16 2009 D PROJ # DWQ MCAS Dining Facility P-620 Name of printed page file: C:\new river 5.out STORM 100 yr I ea or Drainage Rain Gage Runoff ------------ Peak Flow ----------- Reach Area ID or Amount Elevation Time Rate Rate Identifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) Basin 1 0.003 10.277 12.11 20.25 6137.36 Line Start Time ------------ Flow Values @ time increment of 0.100 hr--------- (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.400 0.5 0.5 0.6 0.6 0.6 0.7 0.7 9.100 0.7 0.7 0.8 0.8 0.8 0.9 0.9 9.800 0.9 1.0 1.0 1.0 1.1 1.1 1.2 10.500 1.3 1.3 1.4 1.4 1.5 1.6 1.7 11.20& 1.9 2.1 2.3 2.5 3.5 5.3 7.4 11.900 9.6 17.8 20.2 12.8 9.0 6.7 4.6 12.600 3.1 2.7 2.4 2.2 2.0 1.8 1.7 13.300 1.7 1.6 1.6 1.5 1.4 1.4 1.3 14.000 1.3 1.2 1.2 1.2 1.1 1.1 1.1 14.700 1.0 1.0 1.0 1.0 0.9 0.9 0.9 15.400 0.8 0.8 0.8 0.8 0.7 0.7 0.7 16.100 0.6 0.6 0.6 0.6 0.6 0.6 0.6 16.800 0.6 0.5 0.5 0.5 0.5 Area or Drainage Rain Gage Runoff ------------ Peak Flow ----------- Reach Area ID or Amount Elevation Time Rate Rate -�ntifier (sq mi) Location (in) (ft) (hr) (cfs) (csm) R1 0.003 Upstream 10.277 12.11 20.25 6137.36 Line Start Time ------------ Flow Values @ time increment of 0.100 hr--------- (hr) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 8.400 0.5 0.5 0.6 0.6 0.6 0.7 0.7 9.100 0.7 0.7 0.8 0.8 0.8 0.9 0.9 9.800 0.9 1.0 1.0 1.0 1.1 1.1 1.2 10.500 1.3 1.3 1.4 1.4 1.5 1.6 1.7 11.200 1.9 2.1 2.3 2.5 3.5 5.3 7.4 11.900 9.6 17.8 20.2 12.8 9.0 6.7 4.6 12.600 3.1 2.7 2.4 2.2 2.0 1.8 1.7 13.300 1.7 1.6 1.6 1.5 1.4 1.4 1.3 14.000 1.3 1.2 1.2 1.2 1.1 1.1 1.1 14.700 1.0 1.0 1.0 1.0 0.9 0.9 0.9 15.400 0.8 0.8 0.8 0.8 0.7 0.7 0.7 16.100 0.6 0.6 0.6 0.6 0.6 0.6 0.6 16.800 0.6 0.5 0.5 0.5 0.5 WinTR-20 Version 1.0 Page 1 10/15/2009 16:55 n ECEIVED lu^� OCT 16 2009 DWO PROJ # 11 m -" I •• �•�.• i W p S W 3NNNM dn8 i (OZ9'd) ALIIIOVJ ONIN10431SI1N3 � - - �� e2 { ¢.� �urvuvam-auvwwoo exweaxroxa saunnvd rnvu g �' "—y' 60; vZlW -1VL11W0f1S lF1b'1S A1ifH3 3VNb p e 4v� 3 r x Y t YY Hs 1 fir-_. 2ggy � 33 Y Y 6 y �g_y3yc y`Yp' G s 4 3 i yLid[3 1€H %1 �J OCT g =, Yil Sing MCAS Dinkp Facility P-620 WAS New River Jacksonville, NC T. Area weighted 1.00 FUMU1 0.00 0.35 1 1.410 0.49 Total 1.410 0.49 C • weighted total / total area Intensity 8. 10 Q=CIA = ds "C" Area weighted 1.00 FW.1Wj 0.13 0.35 1 0,877 0.31 Total 1.007 0.44 C • weighted total / total area = Intensity = 810 Q=CtA • ds "C" Area weighted I M 0.04 0.35 1 0.563 0.20 Total 0.804 0.24 C = weighted total I total area = Intensity = 8.810 Q=CIA • da "C.. Area weighted 1.W F—oW3---1 0.06 0.35 1 0.667 0.23 Total 0.730 0.30 C - weighted total I total area = Intensity • 8.810 Q=CIA = cts "C" Area weighted 1.W FMY1 0.03 0.35 1 0.445 0.16 Total 0,477 0.19 C - weighted total / total area Intensity • 8.810 Q-CIA ds "C" Area weighted 1.00 000 0.35 1 0.631 0.19 Total 0.531 0.19 C - weighted total / total was Intensity a 8.810 Q=CIA = ds Sediment trap size - Area (ac)' 3600 Area ac A'38W d 0.350 Sediment trap size - Area (sc)' 3600 Area sc A' 3600 ®d 0.434 Sediment trap size - Area (ac)' 3600 Area ac A' 3600 ®d 0.394 Sediment trap size • Area (ac)' 3600 Area ac A' 3600 ®ct 0.406 Sediment trap size =Area (sc)' 3600 Area = sc A' 3600 ©d 0.394 Sediment trap size - Area (sc)' 3600 Area so A' 3600 = ®d 0.350 Prol4d Name: MCAS MIN Facility P-620 SKS Location: Onslow 1Date: 9/4/2009 Beain Number. A Checked: tch Number D-1 Date: Manning RouCoefficient n 0.020 1 unwess Invert Upstream 21.50 ft invert,Downstream 20.600 It ih 160 ft Channel slope Rift Flow 4.348 Cfs Left Sidoslope 4.00 H 1.00 V Right Sides a 4.00 H 1.00 V BottomWidth 4.00 ft Depth of Flow 0.36 ft— Top Width 6.86 ft Cros"ectional. Flow Area 1.94 ft Wetted Perimeter 6.94 ft H draulic Radius 0,2791 ft Velocl 2.24 ftls roude Number r 0.74 unitiess FIOWTYPS I Subcrit cal Flow i � ff .�4 1 �tft fir: cry. i.)y'yLy Ditch - New River-1 9/6/2009 ProJact Name: WAS Dining Facility P-620 [Sy-, SKB Location: Onstow !Date- 9/412009 Basin Number: a;dcad-: Ditch ID Number. D-2 Marml g Roughness Coefficient (n) 0.020 tle" Invert Upstream 20.60 It Invert, Downstream 19.190 It PS —nol 350 It Slope 0.0037 Wit Flow 3.850 CIS Left Sideslope 4.00 H 1.00 v Ftlght SIdeslope 4.00 H 1.00 v Bottom Width 4.00 ft Depth of Flow 036 ft To Width 6.69 It Cross -Sectional Flow Area 1.97 fte Wetted Perimeter 6.98 ft Hyclraoujloloc Illodlus 0.2821 It IM Frouds Number (Fr) 0.64 77un =Iss Flow Type Submitical Flow Ditch - New River-2 WS/2009 Narnw. MCAS Dining Facility P-620 BY: I MIB� EPE*ct it LocoWn: Onslow Date: 9/412009 70 Basin Number Chocked: Itch ID Number,D-3 Date: I m wom Manning Ro2oness Cosffk4ont n 0.020 Unloose Invert, Upstrom 20.50 It Invert, Downstream 18.400 ft Le th 139 It ha I Soo 0.0161 tuft HOW 2.097 cfa Left Sideslops 4.00 H 1 1.00 IV Right t ldeaI M 1 4.00 H I 140 1 V BOROM Width 4.00 1 ft Depth of Flow 0.17 ft TOP Width 5.39 It Cross -Sectional Flow Area 0.81 w— Wetted Parknoter 5.43 It Hydraulic Radius 0,1499 It Velocity 2.58 IN— Froude Number (Fr) 1.17 HOW Type Supmritical Flow I T DVvc- 114( Ditch - Now River-3 9/6/2009 : WAS DininFacili P-620 SKS EdNam on: Onslow Date: 9/4/2009 Number: Q"ad:tD Number. D 4 ts: Monrdng RoughnessCoefficient n 0.020 unitless Invert Upstroom 19.65 ft Invert Downstream 18.400 t L , th 230 ft Channel S 0.0050 ft/ft Flow 2.612 1 de Left Sideslo 4.00 H 1.00 V RiahtSidesl 4.00 H 1.00 V Bottom VVIdth 0.00 ft Depth of Flow US ft Top Width 4.39 ft Cross -Sectional Flow Area 1.20 ft Wetted Perimeter 4.$2 ft H draulio Radius 0.26$9 ft Veloc 2.17 We Froude Number r 0.73 un ss Flow Type Subcritical Flow Ditch - New River4l 9/6/2009 ProjeName: MCAS Dinin Facil P-620 SKB location: Onslow Date; 9/4/2009 Basin'Number. Checked: tch ID Numb: D-5 Date: t.1R],'IIti�� U ��' Manning 'R hness Coetkient n 0.020 unittess Inve treem 22.50 ft Invert Downetreem 21.210 ft le thnne 146 ft Chal S 0.0089 1.654 cis esb E 4,00 H L00 V kbel 4.00 H 1.00 V Width 0.00 ft Depth of Flow 0.41 ft Top Width 332 ft Cross -Sections] Flow Area 0.69 ft WettedPedmeter 3.42 ft Hydraulic Radius 0.2011 It Velocity 2.41 ills Fronde Number Fr 0.93 less un Mt Type I SubcritU Flow Ditch • New River-5 9/6/2009 PM[setNorm: MCAS Dint Facili P-620 B . SKB Location: Onslow Date: 9/4/2009 n Number Chacked: toh7b r. D-6 Date: Manning ass CosMolenC n 0.020 unWess Invert, 'U strarm 22.69 ft InvertDownstraam 20.790 ft Le th 190 Ilt Channel slope 0.0100 Flow 1.637 Cfs Left Sild"We 4.00 H 1.00 v Right Sideslope 4.00 H 1 1.00 1 v d Bottom Width 4.00 ft Depth of Flow 0.17 It Top Width 3.33 ft Gross -Sectional Flow Area 0.79 Wetted Perimeter 5.40 ft Hydradic Radius 0.1468 ft vellootly 2.07 ftls Froude Number Fr 0.9$ un ss ROW Type suberit cal Flow Ditch - New River-6 9/6/2009 FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT EXPRESS PERMITTING OPTION 08012007 No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.G. Department of Environment and Natural Resources. (Please type or print and, if the question Is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name MCAS Dining Facility P-620 2. Location of land -disturbing activity: County Onsiow City or Township Camp Lefeune Highway/Street Douglas Street Latitude 34d42m48sN Longitude 72d27m22sW 3. Approximate date land -disturbing activity will commence: 9-30-09 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Commercial 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 5.3 6. Amount of fee enclosed: $ 390 . The Express Permitting application fee is a dual charge. The normal fee of $65.00 per acre is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee Is a fixed $2,000.00 (Example: 9 acres total is $2,585). NOTE: Both fees are rounded up to the next whole acre and need to be paid by separate checks to NCDENR. 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name David Towler E-mail Address david.towlerOusmc.mil Telephone (910) 451-3238 ext 3284 Cell # (910) 330-0970 Fax # (910) 451-2927 9. Landowner(s) of Record (attach accompanied page to list additional owners): Commanding Officer, USMCB Camp Lefeune (910) 451-2213 (910) 451-2927 Name Telephone Fax Number Bldg 1005 Michael Road Bldg 1005 Michael Road Current Mailing Address Current Street Address Camp Lefeune NC 28542 Camp Leieune NC 28542 City State Zip City State Zip 10. Deed Book No. N/A Page No. N/A Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Carl Baker Name Bldg 1005 Michael Road Current Mailing Address cart. h. bakerca)usmc. mil E-mail Address Bldg 1005 Michael Road Current Street Address Camp Lefeune NC 28542 Camp Lefeune NC 28542 City State Zip City State Zip Telephone (910) 451-2213 Fax Number (910) 451-2927 2. (a) If the Financially Responsible Party Is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address City State Zip Telephone E-mail Address Current Street Address City State Zip Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: NIA Name of Registered Agent Current Mailing Address City State Zip Telephone E-mail Address Current Street Address City State Fax Number (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: Bennett. Brewer R Associates, LLC Engineering Firm or other consultant Steve Bennett Individual contact person (type or print) bennett brewerf7oyahoo.com E-mail Address 301-687-0494 301-687-0495 Telephone Fax Number The above information Is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in - fact, or If not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Carl Baker Type or print name Signature Deputy Public Works Officer Title or Authority Date a Notary Public of the County of State of North Carolina, hereby certify that appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, this day of Notary Seal r� My commission expires Permit No. (to be provided by DWQ) III, REQUIREalTEMSCHECKLISfi Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project, Initial in the space provided to Indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 5 "L!S CG-101 1. Plans (I' - 50' or larger) of the entire site showing: - Design at ultimate build -out, - OH -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. t CS-104 2. Partial plan (V = 30' or larger) and details for the wet detention basin showing: CS-1o5 Outlet structure with Uash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. S C CS-104 3. Section view of the wet detention basin (1' = 20' or larger) showing: CS -105 - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - inlet and outlet structures. _`' 14-r5 CS-105 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. f"V 6 CS-104 5. A table of elevations, areas, incremental volumes 8 accumulated volumes for overall pond and for frebay, to vedly volume provided. sK13 CG-101 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Sie.js Report 7. The supporting calculations. 5YQ5 NIA 8. A copy of the signed and notarized operation and maintenance (08M) agreement. src/3 WA 9. A copy of the deed restrictions (if required). 5k�A Attachment C 10, A soils report that Is based upon an actual Geld Investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. F - Form SW401-Wet Detention Basin-Rev.7-8r13109 Part ill. Required Items Checkiist, Pagel of Permit Number: (to be provided by DLVQ) Drainage Area Number:_ _ Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (conunonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the problem: The entire BMP Trash/debris is present Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. I approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 ?rw C- i Page l of 4 Permit Number: (fo be provided by DB'Q) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The Inlet device: pipe or swale The pipe is clogged. _ Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or _ Replace the pipe, otherwise damaged. Erosion is occurring in the swale. Regrade the swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future Problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or _ - the BMP. Erosionhas occurred. — -- Provide additional erosion protection such as reinforced turf matting or riprap if needed to revent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on The vegetated shelf _ Best professional practices show that pruning is needed the plants rather thmvn spraying. Prune according to best professional practices to maintain optimal plant health, Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary, Weeds are present Remove the weeds, preferably by hand, If pesticide is used, wipe it on The main treatment area Sediment has accumulated to the plants rather than spray ng. Search for the source of the a depth greater than the original design sediment storage depth. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or _ the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other invasive plants cover 50% of Remove the plants by wiping them with pesticide (do not spray). the basin surface, Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 -.vj C' Permit Number:_ (to be provided by DTVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:MCAS Dining Faciltiy P-620 BMP drainage area number: Print name:Carl Baker Title:Denuty Public Works Officer Address:Bldg. 1005 Michael Road Camp Lejune, NC 28542 Date: �%' a'•-�J`% Note: The legally responsible party should not be a ho nco�vners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. h �c Z 0'r' �c a Notary Public for the State of County of do hereby certify that personally appeared before me this z� day of 6� and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, MICE A IONNETTE Notary ►ubft Oralow County State of North Carolina SEAL My commission expires Fonn SW401-Wet Detention Basin O&M-RevA Page 4 of 4 MCAS DINING FACILITY P-620 MCAS NEW RIVER, JACKSONVILLE NORTH CAROLINA, ONSIk s--' USGS 7.5 QUAD JACKSONVILLE SOUTH / NORTH CAROLINA ------ Paradise Park (subdivision) IBC - hrT 0 t xv County Recreation Park NC o. 1, ,1 . 0`:i- horn C 49 1 411M�1111 9 n T Stick Creek i5ic, 4 F W1 gg 9'0 26545 FA c cheon F e'ld NC-, C PCAS N- Y" Ott ON J. a lank Creek, t"J", Y" TG pe s PointFteld G ",zit IN V, Y Nj Y #Ik el *Ificl,s Run' t 2 01 7 -,—.,77777 Ali.. 11 1)Z4 N, It CA, N. -Ilk :It A X I L 4 DESCRIPTION DESIGNSKE PROJECT NO. 200MIDATE OE24U9 DRAWN Sm 08`24W PROJECT. MICAS DINING FAC11YrYP-620 P:R:O�VED MICAS NEW RIVER E "Sictl REVSION JACKSONVILLE, NORTH CAROLINA F bba - SHEET TITLE 0 2000 4000 REVISION - REVISION — LISGS - JACKSONVILLE SOUTH Sumps Engirec-rs Plxnefs APPROVAL _ SAUER, INC DRAAIN(W0tVG U 11223 PHILLIPS PKWY DR EAST JACKSONVILLE, FL RIDA32256 PI -ATE I PDF created with pdfFactory Pro trial version www.2difactory.com O o N iL' 0 z Z � O Z � 2a xi LA. W Z 3 Z • O� C V � �'j ZW WATEST pow 5074 t f� q o z� 6 N ftw q y x Z s O N I x -1 7 L48J if � N9N1 i — 71Y9S 911(dMiI9 N IUt OLI W 9R o 0 sm-0-I0KWpN Y w a rWLLYOT(JLL ff wtK1 ow 1M NIVIS 09Rx VNIYIYYi /iI.tlQV i m JPA.G y CD mr A fill munens isvis Aiem 1-04 717 w W u r;rx .a�o.a'na.w.w' LT) if Intl r61[V IR ants � L� A -tea a �o r°y0a Lmi_ CI0 R zK i NC DENR - DIVISON OF WATER QUALITY .0312 WHITE OAK RIVER BASIN RFCFIV]ED SEP 16 2009 2 .0300 BY: Class .Jame of Stream Description Class Date Index No. Horse Swamp From source to Little C;NSW 08/01/91 19-16-2-1 Northeast Creek Rocky Run From source to Little C;NSW 08/01/91 19-16-2-2 Northeast Creek Poplar Creek From source to Little C;NSW 08/01/91 19-16-2-3 Northeast Creek Mott Creek From source to Northeast C;NSW 08/01/91 19-16-3 Creek Northeast Creek From N. C. Hwy.24 to SC;HQW,NSW 08/01/91 19-16-(3.5) downstream side of mouth of Scales Creek Scales Creek From source to Northeast SC;HQW,NSW 08/01/91 19-16-4 Creek Northeast Creek From the downstream side of SC;NSW 08/01/91 19-16-(4.5) mouth of Scales Creek to - New River Southwest Creek From source to Mill Run C;NSW 08/01/91 19-17-(0.5) Catherine Lake Creek From Catherine Lake to C;NSW 08/01/91 19-17-1 Southeast Creek Catherine Lake Entire Lake B;NSW 08/01/91 19-17-1-1 Deep Run From source to Southwest C;NSW 08/01/91 19-17-2 Creek Harris Creek From source to Southwest C;NSW 08/01/91 19-17-3 Creek Haws Run From source to Southwest C;NSW 08/01/91 19-17-4 Creek Tank Creek From source to Southwest C;NSW 08/01/91 19-17-5 Creek Hicks Run (Hickory Run) From source to Southwest C;NSW 08/01/91 19-17-6 Creek Southwest Creek From Mill Run to New River C;HQW,NSW 08/01/91 19-17-(6.5) Mill Run From source to Southwest SC;NSW 08/01/91 19-17-7 Creek Morgan Bay Entire Bay SC;NSW 08/01/91 19-18 Lewis Creek From source to New River SC;HQW,NSW 08/01/91 19-19 Wallace Creek From source to New River SB;NSW 08/01/91 19-20 Bearhead Creek From source to Wallace Creek SB; NSW 08/01/91 19-20-1 Beaverdam Creek From source to Wallace Creek SB;NSW 08/01/91 19-20-2 Town Creek From source to New River SC;HQW,NSW 08/01/91 19-21 Farnell Bay Entire Bay SC;NSW 08/01/91 19-22 Cogdels Creek (Coglin Creek) From source to New River SC;NSW 08/01/91 19-23 Frenchs Creek From source to New River SC; NSW 08/01/91 19-24 Jumping Run From source to Frenchs Creek SC;NSW 08/01/91 19-24-1 Cowhead Creek From source to Frenchs Creek SC;NSW OB/01/91 19-24-2 Duck Creek From source to New River SC;NSW 08/01/91 19-25 Whitehurst Creek From source to New River SC;HQW,NSW 08/01/91 19-26 Page 2 of 16 2009-08-22 07:18:50 NC DENR - DIVISON OF WATER QUALITY STREAM CLASSIFICATION DESCRIPTIONS :lass Description B Primary Recreation, Fresh Water C Aquatic Life, Secondary Recreation, Fres CA Critical Area FWS Future Water Supply Waters HQW High Quality Waters N/A Not Applicable/Out of State 'NSW Nutrient Sensitive Waters ORW Outstanding Resource Waters SA Market Shellfishing, Salt Water SB Primary Recreation, Salt Water SC Aquatic Life, Secondary Recreation, Salt Sw Swamp Waters Tr Trout Waters WS-I Water Supply I -- Natural WS-II Water Supply II -- Undeveloped WS-III Water Supply III -- Moderately Developed WS-IV Water Supply IV -- Highly Developed WS-V Water Supply V -- Upstream 2B .0300 RECEIVE SEP 1 6 2009 BY: Naugle, Mary From: Towler CIV David W [david.towler@usmc.mil] Sent: Monday, September 21, 2009 11:14 AM To: Naugle, Mary Subject: MCAS Dining Facility P620 Permeable Pavement O&M Attachments: MCASDiningFacPermPaveO&M.pdf Mary Jean, Attached is a scanned copy of the 0&M for the Permeable Pavement used at the MCAS Dining Facility P620. I will bring the original to you on Wednesday since I have 2 meetings that day. V/ r, David Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steve Bennett [mailto:Steve@bbasurvey.com] Sent: Thursday, September 03, 2009 4:58 PM To: Naugle, Mary Cc: david.towler@usmc.mil; Matt.Brewer@bbasurvey.com Subject: MCAS Dining Facility P-620 - New River Mary Jean, I downloaded this from the web. It appears that we can specify using the National Ready Mix Concrete Associations specification. I don't know if this is what you had in mind, if not, can you please give me direction to the information you were speaking of? I have also included a scan from our soil consultants report discussing SHWT — will this suffice for your review? Again, thanks for taking of your time to assist us. Ivr Steve Bennett Design Structural Hydrological Construction Inspection and Maintenance Pervious Pavement Design Hydrological Design Considerations Structural Design Considerations Two factors determine the design thickness of pervious pavements: the hydraulic properties, such as permeability and volume of voids, and the mechanical properties, such as strength and stiffness. Pervious concrete used in pavement systems must be designed to support the intended traffic load and contribute positively to the site -specific stormwater management strategy. The designer selects the appropriate material properties, the appropriate pavement thickness, and other characteristics needed to meet the hydrological requirements and anticipated traffic loads simultaneously. Separate analyses are required for both the hydraulic and the structural requirements, and the larger of the two values for pavement thickness will determine the final design thickness. Specification Guidance Recommendations and specifications for pervious concrete have been prepared by the National Ready Mixed Concrete Association (NRMCA 2004b), the Florida Concrete and Products Association (FCPA 2001), the Georgia Concrete and Products Association (GCPA 1997), and the' Pacific Southwest Concrete Alliance (PSCA 2004). ACI Committee 522 is actively preparing a comprehensive document on the use of pervious concrete. ConcreteAnswers for Architects, Engineers and Developers: Concrete Answers.orc ConcreteParkine.ore GreenConcrete.info Concrete Buildings.ora SelfConsolidatino Concrete.oro FlowableFill.orc GreenRoof roos.ora oncrete 4NO'toulcr itoff - 44 �� {���{ For DENR Usey��NL-1� F - ` " Reviewer'. r `�J } , ��,�'�;'� North Carolina Department of Environment and q (I � Submit. �- � Natural Resources NCDENR Request for Express Permit Review Q o-/)0arn Time. I V. 1 EDO) I1 r Confirm: FILL-IN all the information below and CHECK the Pem it(sJ you are requesting for express review. FAX or Email the completed form to Expres Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(aDncmail.net • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee(a)ncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(a)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or Ivn.hardison(o)ncmail.net • Wilmington Region -Janet Russell910.350-2004 or janet.russell(dncmail.net NOTE. Project application received after 12 noon will be stamped in the following work day Project Name: ENLISTED DINING FACILITY County: ONSLOW Applicant: COMMANDING OFFICER Company: MARINE CORPS AIR STATION Address: City: _, State: _ Zip: Phone: _ _ _, Fax: _ _- Email: @ Permits of request SW SW SW SW SW tl._ I- C',Frio,�-A-k 00 3wk(.e owes 007 Cl1c�dGUs 7 Physical Location:_ DLA? *(T& Project Drains into SOUTHWEST CREEK waters -Water classification C:HOW.NSW (for classification see- pt�%UJ hffp://h 2o.en r. state. nc. u sfbim s/reports/reports W B. htm I ) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within Y2 mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? Y Engineer/Consultant: STEVEN K. BENNETT Company: BENNETT, BREWER & ASSOCIATES. LLC R E O D Address: 23 EAST MAIN - SUITE 200 City: FROSTBURG, State: MD Zip: 21532-_ Phone: 301-687-0494, Fax: 301-687-0495, Email: BENNETT BREWER@YAHOO.COM AUG 2 5 2009 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ® Scoping Meeting ONLY ® DWQ, ❑ DCM, ® DLR, ❑ OTHER: _ Rt4o DA PROJ OWQ # SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ IntermittenUPerennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ff or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems ❑ High Density -Infiltration #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems /❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 5_3 acres to be disturbed.(CK # (for DENR use)) ❑ Other (Provide permit #) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopino and express meeting reauest Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No rrrxrtrtrtxxxxxrxxxxr•rrrrrrrrrtxrtxxxxxxxxxxrrrxxxxrrrrrrrxrFor DENR use Only,•xxxrrrrxxxxrrrxxxrrsrrrrrrxrtrtxxxxxxrtxxxxxxxxx xxxxsxxrrxxsxx Fee Split for multiple permits: (Check# 1 Total FeeAmount S SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Mal; ❑ Min) $ SW (❑ HD, ❑ LID, ❑ Gen) $ 401: $ LOS $ Stream Deter,_ $ NCDENR EXPRESS March 2009 Enlisted Dining Facility MCAS New River — Onslow County Jacksonville, NC The new dining facility is located at the intersection of Douglas Road and Schmidt Street on the Marine Corps Air Station New River. The project boundary for the site is 5.3 acres in size of which most will be disturbed during construction. The project will construct anew dining facility just north of the existing dining facility. Once construction of the new building is complete, demolition of the existing building will begin. After demolition, a new parking lot will be constructed over the site of the old mess hall. There are no wetlands on site — currently the entire site is maintained by station mowing operations. Erosion and sediment control will be accomplished during both phases of the project. The majority of the site stormwater will be collected and conveyed in vegetated swales to the existing site drainage swale. The remainder will be collected in storm inlets and conveyed by storm drain piping. A new detention pond will be constructed on the southeast end of the site. Sanitary sewer and potable water are available on site. New service tie-ins only will be required. The site has no historic significance. There are no know non-compliance issues. The stormwater from the site outlets to Southwest Creek which is classified as Aquatic Life, Secondary Recreation, Fres; High Quality Waters, Nutrient Sensitive Waters (C;HQW,NSW). The index number is 19-17-(6.5). The design contains 56% imperviousness which indicates a High Density Commercial requirement for stormwater design. Currently the site is designed with two BMP's (grassed lined swales & a detention basin). The entire built upon area will be collected and treated. We are not in close proximity to state waters, therefore, we will not have any buffer areas. There are no off -site waters entering our site. There will be no roadway construction across our site. Soils testing has identified the site as having a perched water table, which limits may limit infiltration. Pin —'Paradise Park division), CzN1 I r�2 j I , ow County Recreation Park NC z • Straw -torn C IC_ It .4 ------------- - 196 4�0 T 4 I In 1 1 L an 910 28545 [Accutcheon Field. -Mb N��, '% litlic'AS cr-wk Tank Creek NC 741 Peters Point Field Gli .10 Y 0 , N 4 -4 it OZHICI(S FI P4G- 7'� 7 U r < Y _10 I >Jy i 44." It A, =FWI1711 AUG 2 5 2009 DESCRIPTION DESIGN SK13 PROJECT NO. �18 DATE 08/24M _DR-AM SM 08I24M PROJECT. P620 DINING FACIUTY MCAS NEW RIVER JACKSONMLILE, NORTH CAROUNA APPROVED REVISION DWO REVISION SHEET TITLE USGS - JACKSONVILLE SOUTH PROJ # � 0 2000 4000 REVISION Surveyors Engineers Plonners APPROVAL SAUER, INC 11223 PH ILLI PS PKWY DR EAST I DRAWING USO NO GRAPHIC SCALE - 1 2000' PLATE I JACKSONVILLE, FLORIDA=% F-ui­- creates wim pats-actory f-ro trial version Russell, Janet To: Cc: Subject: Attachments August 26, 2009 Steve: Steve@bbasurvey.com Towler CIV David W Enlisted Dining Facility Stormwater At Camp Lejeune 2.doc The Express Stormwater & Erosion Control Scope Meeting has been scheduled with Mary Jean Naugle and Rhonda Hall on Wednesday, September 2, 2009 at 11:00 AM here in the Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, INC 28405. Please review the attachment, "Stormwater @ Camp Lejeune". Note that the new stormwater application on the bmp web site should now be used for new stormwater projects. Also, open the checklist on the bmp web site and review those requirements. Let me know if you have problems. *Please respond to this email to reserve and confirm the meeting time and date. Thanks, Janet Janet M. Russell Express Coordinator 910 796-7421 NOTE: change in email address: janet.russell@ncdenr.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lewis, Linda Sent: Friday, October 23, 2009 4:28 PM To: Matt Brewer (matt. brewer@bbasurvey.com) Cc: Mary Naugle Subject: MCAS P-620 Dining Facility SW8 090814 Matt: I'm reviewing the permit that Mary Jean wrote for this project. I have a few concerns, and because Mary Jean is out this afternoon, I thought I would simply email you myself to save some time. In reviewing the calculations the reported permanent pool volume, temporary pool volume and forebay volume cannot be substantiated. In the BMP checklist available from the website, a table of elevations, areas, incremental volumes and accumulated volumes in the pond (including the forebay) and in the Y�forebay alone, is requested as part of the calculations to assist the Division in verifying that the design meets the minimums. Simply reporting what's been provided, such as 8585 cubic feet at elevation 20.9 © is not sufficient because this information is already on the supplement form. Your calculations are the Q� place to present all of the assumptions, design info, formulas, etc., that you used to derive the values you have written on the supplement form. Please provide this table in support of the specified volumes above. The calculation of the percent impervious of the site is incorrect. The pond's surface area is not considered as built -upon area, but should be included as part of the drainage area. If the 2.08 acre reported drainage area does not include the pond's surface area, please correct and recalculate the n1� percent impervious, the Rv value, the required minimum volume and the orifice drawdown time. The _�I P reported amount of impervious surface within the drainage area of the pond is 1.46 acres, so the U� percent impervious is going to be 1.46 divided by whatever the drainage area turns out to be. Please don't forget to sign, seal and date the revised calculations. Since this is an Express permit, please submit the requested information by Friday, October 30, 2009. Thank you. Linda Please note my new email address is Linda.Lewis@ncdenr.00v Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Naugle, Ma From: Dana Kennell (dana@bbasurvey.com] Sent: Friday, October 23, 2009 1:51 PM To: david.towler@usmc.mil; Naugle, Mary Subject: New River Dining P620 Attachments: SWMPermitApplication.pdf Folks, I'm sorry for the confusion. I'm coming in at the tail end of this, but I gather the original problem began with a typo, making the 77 degrees west longitude a 72, causing that point to fall out in the ocean. As for the confusion today, in the email we received: Matt; Please verify the latitude and longitude on the application, page 1, section 1(4). David Towler said that it might be 43-42- 51N and 72-27-26W. Thank you! Mary Jean Naugle NC DENR Express Permitting NC Division of Woter Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart. naugle 0ncdenr. QoV It appears that some numbers were transposed, creating a lat. and long. that fell in New Hampshire, but not knowing that, she just saw that the numbers she had were nowhere near what we had. I updated the lat. and long. On the coversheet to be sure it falls right in the middle of the site. Please use the attached cover sheet, and once again, I'm so sorry for the confusion, and I hope this clears everything up. Please feel free to contact me if there is a further problem with this. Have a great weekend! Dana Kennell CADD Technician BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 dana kennell0bbasurvey.com J Naugle, Mary From: Matt Brewer [Matt@bbasurvey.com] Sent: Thursday, October 22, 2009 3:04 PM To: Naugle, Mary Cc: Steve Bennett Subject: New River Dining P620 Attachments: Wet Basin Supp.pdf; Application PG 1.pdf; Perm Pav Supp.pdf Mary Jean, Please find attached the requested information. Please call if you need anything else. Thank you again for your patience and consideration. Matt; Thank you for submitting the updated drainage area delineation plan [minimum 2 sets]. Please verify the following: 1. Please update the permeable pavement supplement for the areas in accordance with the updated drainage area plan. I cannot get the values for permeable pavement to total the values on the supplements that were provided on September 16, 2009. Please find the revised permeable pavement supplements attached. 2. Please fill in the peak flow calculations on the pond supplement. You provided some of the information on the pond calc standardized form, but we also need the information on the pond supplement. Please find the revisec pond supplement attached. 3. Please include the area for the sediment cleanout area on the 2"" page of the pond supplement in the top section III under Surface Areas, item 5. You reported 16. And that is the elevation. The area appears to be 2601 sf from the calc sheet. Please find the revised pond supplement attached. 4. Please verify if the paving on CS-504 routed toward the stairs is porous concrete ? the plan labels it as "PCC" / and refers to detail 2 on CS-501 which does not have porous concrete. This area is subject to heavy truck T ,( loading and is not porous concrete. It is also not counted as part of the permeable pavement credit. �lnf5. 1 Did you update the application section 1.4 for the latitude and longitude. The values given are in the ocean. I think it is 34-42-51 N and 72-27-26 W. Please find the revised application sheet attached. (I was subconsciously wishing I was on a cruise) __I�1 )F17 6. Since the building drain is discharged off -site to a stormwater outlet without treatment, have you contacted the groundwater group to verify there is no groundwater contamination in the area. The RFP for this project states there is no contamination on -site as part of the standard disclosure. Please submit information within 24 hours to allow the express review to continue. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Caramal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 , 910-350-2004 fax OCT 2 2 2009 C90glq- mart'. naugleCMncdenr. go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Matthew S. Brewer, RLS Partner BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matt.brewer(� bbas u rvey.com From: Kristie Bloskey Sent: Thursday, October 22, 2009 2:49 PM To: matt.brewer@bbasurvey.com Subject: new river Kristie Bloskey Administrative Assistant BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 kri sti e. b los key[c0 bbasu rvey.co m I OCT 2 2 2009 Naugle, Mary From: Naugle, Mary -Sent: Thursday, October 22, 2009 9:34 AM To: Matt Brewer Cc: Towler CIV David W Subject: SW8 090814 Camp Lejeune Dining Facility P620 Ad info request Matt; Regarding item 1 for the permeable pavement and the amount of bua represented on the application and other documents... Did you account for the bua that is permeable pavement in the manner described below ? The values on drainage area tables to add up to the amount represented on the application bua table in section IV. (10) or on the supplements for permeable pavement. We need to see the amount of bua in a drainage area and then see the amount of bua that is permeable pavement and also the resulting bua included in the totals after the permeable pavement credit is taken. Please note that the supplements for the permeable pavement were not included with the October 16, 2009 submittal. Thank you, Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax Inary.naugle@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Lewis,Linda Sent: Wednesday, October 21, 2009 5:21 PM To: Naugle, Mary Subject: FW: SW8 090814 Camp Lejeune Dining Facility P620 When accounting for permeable pavement, I would take the amount calculated on the supplement form as the "resulting BUA counted as impervious", and transfer this number to the application form as "Other BUA". That way, there won't be any confusion because permeable pavement is credited as partially pervious. Only the actual BUA needs to be counted on the application form. Example - If the project proposes 10,000 sf of permeable pavement, and 40% of it is credited as managed grass, then only 6,000 sf gets reported on the SWU-101 form in the "Other BUA" or "sidewalk" box. Linda Please note my new email address is Linda.Lewis@ncdenr.gov Linda Lewis Program Manager NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, October 21, 2009 3:22 PM To: Matt Brewer Cc: Towler CIV David W Subject: SW8 090814 Camp Lejeune Dining Facility P620 Matt; Thank you for submitting the updated drainage area delineation plan [minimum 2 sets]. Please verify the following: 1. Please update the permeable pavement supplement for the areas in accordance with the updated drainage area plan. I cannot get the values for permeable pavement to total the values on the supplements that were provided on September 16, 2009. 2. Please fill in the peak flow calculations on the pond supplement. You provided some of the information on the pond calc standardized form, but we also need the information on the pond supplement. 3. Please include the area for the sediment cleanout area on the 2ntl page of the pond supplement in the top section III under Surface Areas, item 5. You reported 16. And that is the elevation. The area appears to be 2601 sf from the calc sheet. 4. Please verify if the paving on CS-504 routed toward the stairs is porous concrete ? the plan labels it as "PCC" and refers to detail 2 on CS-501 which does not have porous concrete. 5. Did you update the application section 1.4 for the latitude and longitude. The values given are in the ocean. I think it is 34-42-51 N and 72-27-26 W. 6. Since the building drain is discharged off -site to a stormwater outlet without treatment, have you contacted the groundwater group to verify there is no groundwater contamination in the area. Please submit information within 24 hours to allow the express review to continue. Thank you, Mary Jean Naugle NCDENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax maryna&y1e@ncdenr.gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Naugle, Mary From: Scott, Georgette Sent: Thursday, October 22, 2009 8:19 AM To: Naugle, Mary Cc: Lewis, Linda Subject: RE: SW8 090814 Camp Lejeune Dining Facility P620 Thank you for the update. If I am not in please have Rick sign. Georgette Scott Stornmiter Progrizm Supemsor State Slontnnlcr Pmgnm C Division or %Valor Quality Ill Cardinal Drive Pal. Wilmington, \C 2840.5 Phonc (910) 796-733.5 Fax (910) 350-2001 Email correspondence to and from this address may be subject to the \onh Carolina Public Records I. o and may be disclosed to third panics. From: Naugle, Mary Sent: Wednesday, October 21, 2009 4:06 PM To: Scott, Georgette Cc: Lewis,Linda Subject; FW: SW8 090814 Camp Lejeune Dining Facility P620 G; We are close on this express one. I gave the draft to Linda. I have the correct information from the consultant, it just isn't on the right forms. For example, the pre/post values are not on the supplement, but they are on a vale sheet. Another example is that he gave me the permeable pavement square feet on the drainage delineation plan, but not on the supplement. The review is done and we can issue. I expect him to reply to the ad info [3rd one, but I needed to move ahead] tomorrow by e-mail about the same time that Linda gets a chance to do her review. I just wanted to let you know! Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary, naugle@ncdenr, gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, October 21, 2009 3:22 PM To: Matt Brewer Cc: Towler CIV David W Subject; SW8 090814 Camp Lejeune Dining Facility P620 Matt; Thank you for submitting the updated drainage area delineation plan [minimum 2 sets]. Please verify the following: 1. Please update the permeable pavement supplement for the areas in accordance with the updated drainage area plan. I cannot get the values for permeable pavement to total the values on the supplements that were provided on September 16, 2009. 2. Please fill in the peak flow calculations on the pond supplement. You provided some of the information on the pond calc standardized form, but we also need the information on the pond supplement. 3. Please include the area for the sediment cleanout area on the 2nd page of the pond supplement in the top section III under Surface Areas, item 5. You reported 16. And that is the elevation. The area appears to be 2601 sf from the calc sheet. 4. Please verify if the paving on CS-504 routed toward the stairs is porous concrete ? the plan labels it as "PCC" and refers to detail 2 on CS-501 which does not have porous concrete. 5. Did you update the application section 1.4 for the latitude and longitude. The values given are in the ocean. I think it is 34-42-51 N and 72-27-26 W. 6. Since the building drain is discharged off -site to a stormwater outlet without treatment, have you contacted the groundwater group to verify there is no groundwater contamination in the area. Please submit information within 24 hours to allow the express review to continue. Thank you, Mary Jean Naugle NC DENIR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar x nugle @ncdenr. go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Matt Brewer (mailto:Matt@bbasurvey.com] Sent: Wednesday, October 21, 2009 2:34 PM To: Naugle, Mary Cc: Steve Bennett Subject: FW: BMP Map - New River Mary Jean, Sorry for the mix up. I have attached a pdf file of the drainage area map. We have also sent a full size ('D' size) copy to you by FED EX for your use. Thank you for your consideration. Please call if I can be of any further assistance Thank you. Matthew S. Brewer, RLS Partner BENNETT, BREWER &ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matt.brewer(@bbasurvey.com From: Scott Minnick Sent: Wednesday, October 21, 2009 2:29 PM To: Matt Brewer Subject: BMP Map - New River Scott Minnick CADD Technician BENNETT, BREWER &ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 s cott. m i n n i c k0 b b a s u rvey.co m Naugle, Mary From: Naugle, Mary Sent: Wednesday, October 21, 2009 3:22 PM To: Matt Brewer Cc: TowlerCIV David W Subject: SW8 090814 Camp Lejeune Dining Facility P620 Matt; Thank you for submitting the updated drainage area delineation plan [minimum 2 sets]. Please verify the following: 1. Please update the permeable pavement supplement for the areas in accordance with the updated drainage area plan. I cannot get the values for permeable pavement to total the values on the supplements that were provided on September 16, 2009. 2. Please fill in the peak flow calculations on the pond supplement. You provided some of the information on the pond calc standardized form, but we also need the information on the pond supplement. 3. Please include the area for the sediment cleanout area on the 2nd page of the pond supplement in the top section III under Surface Areas, item 5. You reported 16. And that is the elevation. The area appears to be 2601 sf from the calc sheet. 4. Please verify if the paving on CS-504 routed toward the stairs is porous concrete ? the plan labels it as "PCC" and refers to detail 2 on CS-501 which does not have porous concrete. 5. Did you update the application section 1.4 for the latitude and longitude. The values given are in the ocean. I think it is 34-42-51 N and 72-27-26 W. 6. Since the building drain is discharged off -site to a stormwater outlet without treatment, have you contacted the groundwater group to verify there is no groundwater contamination in the area. Please submit information within 24 hours to allow the express review to continue. Thank you, Mary Jean Naugle NCDENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax marynauale@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Matt Brewer [mailto:Matt@bbasurvey.com] Sent: Wednesday, October 21, 2009 2:34 PM To: Naugle, Mary Cc: Steve Bennett Subject: FW: BMP Map - New River Mary Jean, Sorry for the mix up. I have attached a pdf file of the drainage area map. We have also sent a full size ('D' size) copy to you by FED EX for your use. Thank you for your consideration. Please call if I can be of any further assistance. Thank you. Matthew S. Brewer, RLS Partner BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matt. b rewern-bbasu rvey.co m From: Scott Minnick Sent: Wednesday, October 21, 2009 2:29 PM To: Matt Brewer Subject: BMP Map - New River Scott Minnick CADD Technician BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 scomminnickC@bbasurvey.com From: Matt Brewer [mailto:Matt@bbasurvey.com] Sent: Wednesday, October 21, 2009 2:34 PM To: Naugle, Mary Cc: Steve Bennett Subject: FW: BMP Map - New River Mary Jean, Sorry for the mix up. I have attached a pdf file of the drainage area map. We have also sent a full size ('D' size) copy to you by FED EX for your use. Thank you for your consideration. Please call if I can be of any further assistance. Thank you. Matthew S. Brewer, RLS Partner BENNETT. BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 mattbrewer@bbasurvey.com From: Scott Minnick Sent: Wednesday, October 21, 2009 2:29 PM To: Matt Brewer Subject: BMP Map - New River Scott Minnick CADD Technician BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 Scott. mi nn i ck(o)bbasu rvey.co m I . _ /lam V O�OV��-• I N)CM 'FAcCJCA w <30 1, d �-O PD N c). QE1i u CF P V �-, PCQb i�b& DIN(N(., PK67 PEw/ r' StormwaterPermit No. Page 1 of 2 Wet Pond Standardized Calculation Format Attach signed sealed and dated calculations, which show assumptions, methods, and equations used to address each of the following items: ❑ Phase II Post Construction ® Receiving Stream Classification _NON SA- ® 2008 Coastal Rules If SA, is the project within '/2 mile? ❑ Y ❑ N DDRAINAGE AREA (for Pond # 1 Onsite _2.08_ acres 90715 square feet Offsite _ _0_ acres 0 square feet Total Drainage Area 2.08 acres 90715 square feet g a O A drainage area delineation map showing the onsite and offsite drainage areas is required. '\1 O' v IMPERVIOUS AREA (BUA) Total onsite _1.46_ acres 63684_ square feet 1 Total offsite _0 acres 0 square feet Total BUA _1.46 acres 63684_ square feet MINIMUM PERMANENT POOL SURFACE AREA Percent impervious, 1_76 % Average Pond Depth 3.18 feet (Use one of two available methods to determine avg. depth) @TSS Chart ® 85% ❑ 90% (2)SA/DA ratio _6.8 % Minimum Required Surface Area at the Permanent Pool Elev. 6161 sq. ft. QUse correct SAIDA tables in the BMP Manual at the calculated average depth, rounded to the nearest 0.5 foot. The calculated average depth must be 3 feet or greater. @Use of the 85% chart will require a vegetated filter strip and level spreader at the outlet. MINIMUM REQUIRED TEMPORARY POOL VOLUME (Based on Schueler's method from Chapter 3 in the BMP manual) Rv Pre= .05 + .009 ( I ) = 0.41 _ Rv Post= .05 + .009 ( 1) _ .05 (based on 0% impervious) Design Storm (SA waters) N/A_ inches 1.5" Design Storm volume 8313_ cubic feet (The design storm for non -SA waters is 1.5) 1 year 24 hour precipitation depth 3.80— inches (from IvoAA chart) 1 year 24 hour predevelopment volume _29974_ cubic feet (use Simple Method) 1 year 24 hour post -development volume _33922_ cubic feet (use Simple Method) ®Minimum Volume to Store _8313_ cubic feet ® (For SA waters, use the 1 yr. 24 hr. volume difference for Phase 11 Post -Construction cruse the greater of 1.5" or the 1 yr. 24 hr pre/post volume difference for 2008 coastal rules. For non -SA waters, use 1.5) PROVIDED TOTAL POND AREAS AND VOLUMES includes foreba Elevation Area Inc. Volume Total Acc. Volume Temp. Pool Volume Feet S . Ft. CF CF CF Bottom (top of sediment storage) 16.0 2601 0 0 @ Top Wall 19.5 3057 9902 9902 Low Shelf PP — 6" 19.5 —4468 0 9902 Permanent Pool 20.0 7196 2916 12818 0 Hi h Shelf PP + 6" 20.5 10185 4345 17163 4345 Tem ora Pool 20.9 11013 4240 21403 8585 @ > Temporary Pool 21.0 11219 1 1112 22515 1 9697 (Volumes are obtained by averaging the surface areas and multiplying by the distance between them.) Required minimum volume is provided at elevation 20.9 fmsl Temporary Pool Elevation Reported on Supplement _20.9fmsl (must be equal to or higher than above) Slormwater Permit No. S.r�TSOgy �/� Page 2 of 2 FOREBAY VOLUME Permanent Pool Volume 12818 cubic feet (This should be the "Total Acc. Volume" value from the table above at the permanent pool elevation. ) 18% Target Volume _2307_ cf 22%Target Volume2820_ cf (multiply the permanent pool volume by 18% and 22% and enter these values above) Provided Forebay Surface Areas & Volume: Elevation Surface Area Inc.Volume Acc. Volume fmsl Sq. ft. Cubic feet Cubic feet Bottom 16.0 455 0 0 19.5 683 1991 1991 19.5 998 0 1991 @ Perm Pool 20.0 1711 677 2668 (Volumes are obtained by averaging the surface areas and multiplying by the distance between them.) Volume provided in the forebay 2668_ cubic feet ORIFICE SIZING ® Square or Round Orifice ❑ Rectangular Weir ❑ V-notch Weir OStandard Orifice Equation Q = C a (2 g H)12, where = 32.2 ft/sec2 Rectangular Sharp -Crested Weir Equation Q = C L HW V-Notch Sharp -Crested Weir Equation Q = C Hw tan (6Y2) Target Flowrate for 2 days (172,800 seconds in 2 days) Target Flowrate for 5 days (432,000 seconds in 5 days) Permanent Pool Elevation, PPE Temporary Pool Elevation, TPE (as reported on supplement) Total Head (TPE minus PPE) H = One-third (1/3) of the Total Head 0.0488 cfs 0.0195 cfs 20.0 fmsl 20.9 fmsl 0.90 feet 0.30 feet Round/Square Rectangular Weir V-notch Weir Coefficient of Discharge (C) 0.6 Proposed Round Orifice Diameter, in. 1.5 Proposed Square Orifice Dimensions, in. Proposed Orifice Area, sq. in. 1.77 Number of End Contractions Proposed Weir Effective Length, L Notch Angle, 6, degrees Proposed Average Flowrate. cfs Must fall between the target Flowrates 0.032 For 2008 and Phase II Post -construction projects Pre -development peak flow rate for the 1 year 24 hour storm 1.36 cfs (Peak flow occurs at the time of concentration, tc. Enter the NOAA Frequency Estimate chart using tc as the storm duration to find peak intensity, 1, for the 1 year storm and substitute into the Rational Isequation. The orifice flowrate must be less than the pre -development peak flow for the 1 year 24 hour storm.) E Q=CIA C=(2.11)(0.96)+(3.19)(.22)/5.3 tunas Q=(0.515)(0.5)(5.3) - C=0.515 Q=1.36 C E 1 V EI OCT 16 Zoos PROJ # DWQ 46L) O o — Naugle, Mary From: Naugle, Mary Sent: Tuesday, October 13. 2009 2:51 PM To: Matt Brewer Cc: Steve Bennett; Towler CIV David W Subject: SW8 090814 RE: New River Dining P-620 This project is approved for a second time extension to submit additional information until Monday October 19, 2009. I do not understand the question about wet pond form. The forms are at the website below: http://h2o.enr.state.nc.us/su/bmp forms.htm. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mars nougle @ncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Matt Brewer (mailto Sent: Monday, October 12, To: Naugle, Mary Cc: Steve Bennett Subject: New River Dining Mary Jean, Matt@bbasurvey.com] 2009 10:24 AM P-620 This office was directed Friday afternoon at 3:50 PM by LT JG Sonny Rowland to remove the rain harvester from the project and also gave permission to reduce the parking to increase the pond area. In light of these changes, we respectfully request additional time to resubmit this design. Also, the Wet Pond Form that you sent previously is denoted as Page 1 of 3 and 2 of 3, but there are only 2 pages. Is there third page or just a typo? Thank you for your consideration throughout this process. Matthew S. Brewer, RLS Partner BENNETT, BREWER & ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301)687-0495 matt.brewerebbasurvey corn :t A r I '�`t130 b� 2 tots y Iv Naugle, Mary at rspk I A,Fro : Naugle, Mary Sent: Tuesday, October06, 2009 1:02 PM 1°l1Z`�A�f To: Matt Brewer; Towler CIV David W C0TlIIfIF� Cc: Steve Bennett L m(A) T FkFem mv5 Subject: RE: SW8 090814 Dining Facility P620- Ad Info Requested 9/30/09 and Revised 10/5/09 Matt; You are approved for an extension on the permit SW8 090814 until Wednesday October 14, 2009, to submit the additional information requested. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar .naugle@ncdenr,9ov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Matt Brewer [mailto:Matt@bbasurvey.com] Sent: Tuesday, October 06, 2009 12:15 PM To: Naugle, Mary; Towler CIV David W Cc: Steve Bennett Subject: RE: SW8 090814 Dining Facility P620- Ad Info Request - Revised 10/5/09 Mary Jean, We are working to resolve the issues outlined in the Request for Additional Information dated October 5, 2009. Resolution to these matters will require careful coordination of various project elements. We hereby respectfully request an extension for resubmission. We are waiting for direction on issues that will impact our response. I will contact you no later than Thursday to confirm a resubmittal date. Thank you for your consideration. Matthew S. Brewer, RLS Partner BENNETT, BREWER &ASSOCIATES 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 matcbrewer(d)bbasurvey corn From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Monday, October 05, 2009 11:59 AM To: Naugle, Mary; Towler CIV David W Cc: Steve Bennett; Matt Brewer Subject; SW8 090814 Dining Facility P620- Ad Info Request - Revised 10/5/09 David and Steve; I revised the ad info for item 12 as requested by David. [attached] Please call me if we need to better clarify anything. Send a request for extension to submit if you need it. Mary Jean Naugle NC DENR Express Permitting NC Division. of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax many. naugle @ncdenr.go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, September 30, 2009 3:29 PM To: Naugle, Mary; Towler CIV David W' Cc: 'Steve Bennett'; 'Matt.Brewer@bbasurvey.com' Subject: RE: SW8 090814 Dining Facility P620- Ad Info Request Attached is the pond calc worksheet referred to at the end of item 5. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 284O5 910-796-7215 910-796-7303 910-350-2004 fax mare. naugle @ncdenr, ao v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, September 30, 2009 2:37 PM To: Towler CIV David W' Cc: Steve Bennett; 'Matt.Brewer@bbasurvey.com' Subject: SW8 090814 Dining Facility P620- Ad Info Request David; Please find the additional Information request attached. Mary Jean Naugle NC DENR Express Permitting NCDivision of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marxnaugle@ncdenr.aov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. No virus found in this incoming message. Checked by AVG - www.avcl.com Version: 8.5.420 / Virus Database: 270.14.3/2414 - Release Date: 10/05/09 06:19:00 Naugle, Mary From: Naugle, Mary Sent: Monday, October 05, 2009 11:59 AM To: Naugle, Mary; Towler CIV David W Cc: Steve Bennett; Matt. Brewer@bbasurvey.com Subject: SW8 090814 Dining Facility P620- Ad Info Request - Revised 10/5/09 Attachments: 090814 oct09.doc David and Steve; I revised the ad info for item 12 as requested by David. [attached] Please call me if we need to better clarify anything. Send a request for extension to submit if you need it. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marv.nauale@ncdenr.aov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, September 30, 2009 3:29 PM To: Naugle, Mary; 'Towler CIV David W' Cc: 'Steve Bennett'; 'Matt.Brewer@bbasurvey.com' Subject: RE: SW8 090814 Dining Facility P620- Ad Info Request Attached is the pond calc worksheet referred to at the end of item 5. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marxnauale@ncdenr gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 5 Sol -7 c( (le r 0 10 �i d C�'lLtl'i } to — D Year Thursday, Aug 6, 2009 1 'Naugle, Mary From: Naugle, Mary Sent: Thursday, October 01, 2009 3:47 PM To: Lewis, Linda Subject: sw8 090914 ad info Linda SW8 0900814 Camp Lejeune Dining Facility I went over the ad info items with David Towler today and he wants me to ask you about these items: • This is a project where they are rebuilding and adding 40,000 sf of new bua. • So it did not qualify for redevelopment. there are much better stormwater controls. • They are restricted on all sides by existing bua and roads and made the pond as big as land allowed. • They can treat 30,000 sf of the re -built building in the rain harvester. [they will correct the sizing in the ad info]. • They can treat about 40,000 of the parking area in the pond. About %2 of the parking is not treated. The small outer strip of parking proposes permeable pavement. They don't feel they can put permeable pavement over the entire parking area to reduce bua to the pond. • Other bua on property for sidewalks, patio, and personnel traffic is permeable pavement. • They don't have options to treat the loading area on the north. Permeable pavement is expensive to install and even more difficult to maintain in heavy traffic areas. Can we let them go without treatment on the part of the parking area that cannot be routed to the pond and they don't see as feasible to install permeable pavement on the parking area since it is hard to maintain with the "12-15,000 q trucks that are driving by soldiers" said David Towler? A separate question is can they route the water that does not go to rain harvester or permeable pavement to the pond, even though the pond is not sized for it. They think it is better to have a little treatment than none. I can't get them to understand when they overload the pond that it won't perform for the bua that it was sized for. File is on your chair. Thankyou Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax marx naugle @ncdenr. go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. .t, From: Scott, Georgette Sent: Wednesday, September 30, 2009 2:45 PM To: Naugle, Mary; Lewis,Linda Subject: RE: ad info fee There are some minor changes but I also see a lot of recalcs. Please request $1000.00 Also in your first paragraph is a typo. I think you wanted to say "thick strip of permeable pavement" instead of "thing" Ceorgelte Scutt Strmmetler Prolnam Supmcisor State slot 'nnruter Program NC Divisiuu of water Quality 127 Cardinal Dtivc Est. Wilmington, NC 2840.5 Phone (910) 796-7335 Ias (910) 350-2004 Email mtrespuulenm to clod fmnr Ibis address nary be Subject to the North Cxmlin:r Public Records lary and may be disclosed to third parties From: Naugle, Mary Sent: Wednesday, September 30, 2009 2:31 PM To: Scott, Georgette; Lewis,Linda Subject: ad info fee Express ad info with fee = should it be $500 or $1000??? 5:\wqs\stormwater\adinfo\2009/090814 sep09 The file is on Linda's chair. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar .naugle@ncdenn000v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Naugle, Mary From: Naugle, Mary Sent: Wednesday, September 30, 2009 3:29 PM To: Naugle, Mary; Towler CIV David W Cc: Steve Bennett, Matt. Brewer@bbasurvey.com Subject: RE: SW8 090814 Dining Facility P620- Ad Info Request Attachments: Wet Pond Standardized Calculation Format.doc Attached is the pond calc worksheet referred to at the end of item 5. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart. naugle @ncdenr. qo v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, September 30, 2009 2:37 PM To: 'Towler CIV David W' Cc: Steve Bennett; 'Matt.Brewer@bbasurvey.com' Subject: SW8 090814 Dining Facility P620- Ad Info Request David; Please find the additional Information request attached. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fox marx naugle@ncdenr. gov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Naugle, Mary From: Scott, Georgette Sent: Wednesday, September 30, 2009 2:45 PM To: Naugle, Mary, Lewis,Linda Subject: RE: ad info fee There are some minor changes but I also see a lot of recalcs. Please request $1000.00 Also in your first paragraph is a typo. I think you wanted to say "thick strip of permeable pavement" instead of "thing". Georgelm Scott Slorni aler Prolmuu Supcicisor Stale Slot ni'mer program NC Division ol'watcr Quality 127 Canlioal Drina Exl. Wilinitipm, NC 2840.5 I'hone (910) 796-733.5 Fax (910) 350-2004 Email correspondence to and rrom Ihis address may be subject to the Nonb Carolina Public Records Uw and may be disclosed to third panics. From: Naugle, Mary Sent: Wednesday, September 30, 2009 2:31 PM To: Scott, Georgette; Lewis,Linda Subject: ad info fee Express ad info with fee = should it be $500 or $1000??? S:\wqs\stormwater\adinfo\2009/090814 sep09 The file is on Linda's chair. Mary Jean Naugle NC DEAN Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary naugle@ncdenr. go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Hall, Rhonda From: Towler CIV David W [david.towler@usmc.mill Sent: Tuesday, September 29, 2009 1:43 PM To: Hall, Rhonda Subject: RE: MCAS Dining Facility P-620 Ronda, What they have is incorrect. It should be: 34 deg 42" 51" N 77 deg 27' 26" W Can you make this change or should I contact the engineer and have them do it? Thanks, David -----Original Message ----- From: Hall, Rhonda [mailto:rhonda.hall@ncdenr.gov] Sent: Monday, September 28, 2009 15:53 To: Towler CIV David W Subject: MCAS Dining Facility P-620 David, Please verify the Latitude and Longitude for the MCAS Dining Facility P-620. The FRO indicates that the latitude is 34.7133 and the longitude is -72.45611. Rhonda Hall Assistant Regional Engineer �rJ Land Quality Section, Wilmington Office D �� Ph# (910) 796-7312 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 kfr- U 02k� �� o I 1 SOO�` 1 I iQ Gr'�/ � �l ��n✓ / �'ii�'�� "1'L�jGJ' Yn,�;i•-�'r7. �'�"v� Q ��i �vJPo�v Ot ����►y os�h ' �'� ��8� rv�s,l cjj zoo l� G"V i ca �� �� Permit No. tro oe provided Dy Ow(g) T OLOWA�� F W A 1'F,,, NCDENR y y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET/DETENTION BASIN SUPPLEMENT /This form must be filled put, printed and submitted. The Required Items Checklist Pad III) must be printed, filled out and submitted along with all of the required mkirmation. I.RPRCOECT.ANFORKATION k'i' -__ -''. `. c.r.' $:y"a�.`1 ._.'Tx`.; *lT :.l''.s%t.. ``�s^�t' '-?.4#`e' '%,.3i. '3km .;..=WM�."-et€c�iF4:r u; F` 4 Project name Summemouse on Everett Bay Contact person ,.. Carl C. Huddles PE Phone number 252-633-2424 Date 3wup09 Drainage area number Twining Rose :!p�iq,tfj.'yiQ;'� Drainage area Impervious area, pa %impervious Design rainfall depth Storage Volume: h Minimum volume net Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre-developmeat 1-yr. 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1 yr 24hr storm peak flax required? 1yr. 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 20r peak Ilm Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shed elevation Bottom of 10ft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment deanoul, bottom elevation Sediment storage provided Is there additional volume stored above the stale -required temp. pool? Elevation of the top of the additional volume Forth SW401-Wet Datentlon Basin-Rev.6-M009 --:1,862,029 fl 794,607. fir 42.67 % "1.O:in ')103,000gti (, 197.291;ft' to is 0 as `0.35:(unitle --...0.54. (umtle: . `-5.95linlhr 90.E fl'Isec 134.81 f1'lsec 44.81 fY'lsec OK OK volume provided is equal to or in excess of volume required. 15.00'. 00 sl Data not needed for calculation option #1, but OK if provided. >09 fmsl .00 trial Data not needed for calculadon option #1, but OK if provided. 1.75it ;`.(Y or N) final Pans I, a tl. Design Summary, Page 1 of 2 g S 0 6 2009 to �cx � --q-d < La"t a aoX�o �. c�►oi �ti� \-)v �� 0 cs' I2 VA o s��.o� a,�, Pe�'mt,,i" 1�e�-�'�d`�.�.j ✓G- r ,✓,� ✓ -goo , J Jo ,,, ° ., n P Qj u� 6 1loiQs - c✓ c U- roz e;Cc -co-3 to G CC a sc���► + ��'l �0 ' 61 7 State of No Department of Enviroam Division CA STORMWATER WET A complete stormwater mI supplement for each basin, structure details. I. PROJECT INFORMA Project Name: on Contact Person: Carl C. Huddle, PE For projects with multiple basins, specify PermitNo. QOCUsU f ("to be provided by D WQ) 1 Carolina t and Natural Resources ter Quality PERMIT APPLICATION FORM DN BASIN SUPPLEMENT photoeapied for use as an original plan submittal includes an application form, a wet detention bas<n culations, and plans and specifications showing all basin and outlet elevations Basin Bottom Elevation 9.00 g, Permanent Pool Elevation 15.00 g, Temporary Pool Elevation 16.00 g, Phone Number: ( 252 ) 633-2424 w_ orksheet applies to: Twining Rose bPAtlfAQ AR.1A1 tJC.3 (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 191,639.00 sq. ft. (water surface area at the or face elevation) Drainage Area 48.27 ac. (on -.site and off -site drain oe to the basin) Impervious Area 18.13 ac. (on -site and off -site drayage to the basin) volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA1 Diameter of Orifice Design Rainfall Design TSS Removal 1 Form SUw-102 Rev 3.99 873,166.00 cu. ft. 197,291.00 cu. ft. 171,835.00 eu.'l, 2.0 4.0 in. 1.0 in. 90 % (combined voluitrie of main basin and forebay) (volume detaA ed above the permanent pool) lapproxim ely 20% of total volume) (Sur(bce area to drainage area ratio from DWQ table) (2 0 5 day temporary pool draw -down required) Page I of 4 85% A115 9 6 Z009 A� \,-) ,z f�AeL, ?M67lCAvc PAD �5 We-P-- J�>12A4C-1 N6E - 4ee-A- Enlisted Dining Fac MCAS New River — 0 Jacksonville, The new dining facility is located at the int Street on the Marine Corps Air Station New 1 5.3 acres in size of which most will be disturl construct a new dining facility just north of tl construction of the new building is complete, begin. Upon completion of demolition, a nev site of the old mess hall. There are no wetlan maintained by station mowing operations. RECFTVE -620 SEP 16 2009 County BY: rs9btion of Douglas Road and Schmidt iv r. The project boundary for the site is during construction. The project will existing dining facility. After lemolition of the existing building will parking lot will be constructed over the s on site — currently the entire site is Sanitary sewer and potable water are av 'ilable on site. New service tie-ins only will be required. The site has no historic significance. There are no known non-compliance i sues. Stormwater from the site ultimately o tlets to Southwest Creek which is classified as Aquatic Life, Secondary Recreation, Fre ; High Quality Waters, Nutrient Sensitive Waters (C;HQW,NSW). The index nu ber is 19-17-(6.5) (See Attachment A-1 & A-2) The ultimate build out of the site is c culated to be 56% impervious which indicates a High Density Commercial requirement or stormwater design. A variety of BMP's have been identified to collect and treat stortr water runoff for the entire post development BUA. These include grass lined swales pervious pavement, rainwater harvesting, sheet flow across vegetated areas, and a wet d tention pond. Specifically: a 2.350 acres treated by gr s lined swale (see attachment B) 0.282 acres treated by p( ious pavement 0.712 acres treated by rai water harvesting system 0.864 acres treated by sheAt flow across a vegetated area 1.277 acres treated by wet Oetention pond We are not in close proximity to state waters, therefore, buffer areas are not required. There are no off -site waters entering our sit , and no roadway construction is proposed. A scoping session was attended on Sept!, 2009 by Mary Jean Naugle, Janet Russell, Rhonda Hall, David Towler, Matt Brewer an Steve Bennett. The design parameters for the wet detention pond established at that mee ing were as follows: a) Maximize the vegetated area along the a sterly edge of the proposed parking lot to make the structure as large as feasibly ossible. b) Temporary pool volume will be sized to m nage the greater of either: R E C E 1 11 E D SEP 1 6 2009 DWQ PROJ # Nau From: Matt Brewer [Matt@bbas WNW Sent: Wednesday, September : Cc: NorMPn9P9W6UQtt>,VSR>��,4Yi�, P9@Q49914n�tural Resources Cc Subject: MCAS Dining Fa(Di6ZJ oastal Management Atlav" s Perdue Stormwater narrative for gg[N@(t Fl@cility.doc Dee Freeman Governor Ms. Naugle, Director Secretary Thank you for taking time to meet with me last Friday. A revised package of plans and computations has been sent to you via UPS for delivery today. Based on our discussion, please note the following changes: I . Increase pervious concrete on the site to the greatest extent possible. In addition to the patio and portions of the parking lot, ALL of the new or impacted pedestrian sidewalk areas on the site have been changed to porous concrete. See various site plans. 2. Include the porous concrete as a separate BMP. The soil conditions have been evaluated and deemed acceptable for this purpose. In areas where till is required, a sandy, structural fill will be imported meeting the infiltration rate requirements of 2.0 inches per hour. For simplicity, a separate "Permeable Pavement Supplement" has been prepared for the parking; patio, and sidewalk areas. These new supplements are located in the front pocket of the computation booklet. 3. Provide typical cross section details for the sidewalk, patio, and parking areas. Typical cross sections are provided on Sheet CS-503. 4. Provide a schematic detail of the rain harvester system. A schematic detail has been provided on Sheet CU-503. The design requires a 10,000 gallon storage capacity. The pump system will be coordinated with the mechanical engineer for connection to the building plumbing system. '['he contractor shall have the right to select a different manufacturer provided the required system components remain the same. 5. Provide a typical detail for the proposed grass swales. A typical cross section for the swales has been provided. See Detail 5, Sheet CU-500. 01. Further delineate cover types in each drainage area. Each sub -drainage area has been broken down to indicate the various cover types. See revised BMP Drainage Area Map in Attachment `B'. C J Correct drainage area limits to Loading Dock. The small drainage area to the trench inlet at the loading dock has been revised to show this area outfalls to the existing storm drain system. See revised BMP Drainage Area Map in Attachment'B'. 127 Cardinal Drive Ext., Wilmington, NC 28405 One Phone: 910-796-7215 1 FAX: 910-395-3964 Internet: www.nccoastalmayagement.net NorthiCaroltna An Equal Opportunity 1 Affirmative Action Employer ;Vat L ally I 8. Provide permanent inflow protection for the near Sediment -traps 3 and 4. Permanent Inflow protection has been indicated 9. Evaluate feet. Nrov e the 1 minum average depth o1' 3 tl Natural esources Division of Coastal Management G�1c�tefrlKLV�%ii tSrs(e$� e provided, structural suppeIRTt RAVe required to increase the depth ancQft&eeman se NOWthe pond. Gabion retaining walls and gradiQrP lions have been added which allow the folioC®�ary Increase the depth of the narrow portion of the pond to a permanent pool depth of 3 feet with an additional 1.0 foot of sediment storage below. Increase the depth of the main pond to a permanent pool depth of 4 feet with an additional 1.0 foot of sediment storage below. • Increase the width of the vegetated shelf to 6 leet. The Express Permit Option Application is located in the front of the computation booklet. Please note that the booklet marked "Original" contains the documents with original signatures. David Towler will provide the signed O&M Agreement for the Permeable Pavement today. Please replace the narrative in the booklet with the revised narrative attached to this e-mail. -thank you for your consideration. Please call with q Matthew S. Brewer, RLS Partner BEN N171-l. BRL'WIR & ASSOGATlS 23 East Main Street, Suite 200 Frostburg, Maryland 21532 Phone (301) 687-0494 Fax (301) 687-0495 mact.brevver bbasurvey com 127 Cardinal Drive Ext, Wilmington, NC 28405 Phone: 910-796-72151 FAX'. 910-395-3964 Internet: www.nccoastalmayagement.net NorthCarolina An Equal Opportunity 1 Afinmative Action Employer - itiLPI11'i i i o �✓��,v� �; ��R-o�..�-d avL � � � -Swage. of Q� - MA ✓ �� V�� �41�� — mP��C rc�� �e.4�rtC�L s�ACEc�m�T�1oNs o na fit" ..QlX- Enlisted AlLA P-620 MCAS NevinCounty North Carolina DepartmWoPEYjOroiilllient and Natural Resources Division of Coastal Management Beverly EaveTpi;tl dining facility is located allj e 1�§WdAW of Douglas Road and Schmidt Dee Freeman Governor Street on the Marine Corps Air Station NexDiky&r. The project boundary for the site is Secretary 5.3 acres in size of which most will be disturbed during construction. The project will construct a new dining facility just north of the existing dining facility. After construction of the new building is complete, demolition of the existing building will begin. Upon completion of demolition, a new parking lot will be constructed over the site of the old mess hall. 'There are no wetlands on site — currently the entire site is maintained by station mowing operations. Sanitary sewer and potable water are available on site. New service tie-ups only will be required. The site has no historic significance. There are no known non-compliance issues. Stornlwater from the site ultimately outlets to Southwest Creek which is classified as Aquatic Life, Secondary Recreation, Fres; High Quality Waters, Nutrient Sensitive Waters (C;FIQW,NSW). The index number is 19-17-(6.5) (See Attachment A-1 & A-2) The ultimate build out of the site is calculated to be 56% impervious which indicates a High Density Commercial requirement for stormwater design. A variety of BMP's have been identified to collect and treat stormwater runoff for the entire post development 13UA. These include grass lined swales, pervious pavement, rainwater harvesting, sheet flow across vegetated areas, and a wet detention pond. Specifically: 2.350 acres treated by grass lined Swale (see Attachment B) 0.1 15 acres treated by permeable pavement (Porous Concrete Patio) 0.322 acres treated by permeable pavement (Porous Concrete Sidewalk) 0.160 acres treated by permeable pavement (Porous Concrete Parking) 0.712 acres treated by rainwater harvesting system (New Building) 0.364 acres treated by sheet flow across a vegetated area 1.277 acres treated by wet detention pond Total Site Area 5.30 Acres When considering the overall site, the total increase in post -development BUA (excluding the building which drains to the Rain Harvester) is approximately 7,000 SF which nearly meets the standards for "re -development". Given the existing site has no appreciable stormwater quantity or quality management of any kind, the design proposed herein represents a substantial improvement. Essentially, the proposed design treats significantly more BUA than what is being treated today. 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: wwwnccoastalmanagementnet An Equal Oppodumly 1 Affirmative Action Employer NorthCarolina Naturally 0A NC®ENR North Carolina Department of Environment and Natural Resources We are not in close proximitp)Wsy tt��falt"6Re�Rfter areas are not required. Beverly Ealk"9610 offsite waters entering oyarr&HaT�eW6oadway construction is proposed. Dee Freeman Governor Director Secretary A scoping session was attended on Sept 9, 2009 by Mary .lean Naugle, Janet Russell, Rhonda Hall, David Towler, Matt Brewer and Steve Bennett. The design parameters for the wet detention pond established at that meeting were as follows: a) Maximize the vegetated area along the easterly edge of the proposed parking lot to make the structure as large as feasibly possible. b) Temporary pool volume will be sized to manage the greater of either: i) 1-1/2 inch over the impervious area draining to the pond ii) Attenuation of the 10 yr post development storm to the pre development rate. c) Permanent pool volume to be designed per standard practice. d) Maximize the use of pervious pavement in the parking lot to the greatest extent practical. Step one — determine seasonal high water table elevation The Geotechnical report (Attachment Q has indicated shallow clay type soils in the location of the pond which produced a perched ground water condition. Specifically, the Geotechnical report indicates the clay barrier at the location of the pond approximately 18" below existing grade. The report further indicates seasonal high water to be approximately one foot above that level. The SHWT was determined as follows: 1) Average existing grade elevation at pond = 21.0+/- 2) Approximate top of clay barrier = 19.50+/- 3) Seasonal high water table 19.5 + 1.0 = 20.5+/- 4) *"fop of permanent pool elevation to be 6" above or below SH WT — for purposes of this design the top permanent pool elevation shall be set at 20.0 Step two — determine surface area of permanent pool percent of impervious cover = 1.010 acres of impervious area / 1.270 acres of total area = 79.0% Surface area to drainage area ratio = 6.8 (See table 10.2 Attachment D) Required Surface area = 6.8 / 100 * 1.270 acres = 0.08636 acres = 3,762 sf 127 Cardinal Drive Ext., Wilmington, INC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www nccoastalmanagementnet An Equal Omonumly 1 AfOrmalive Action Employer NorthCarolina Nawrally I ' jStep three— determine depth of permanent pool Option 1 — d�,. = vol permanent pool / area permanent pool = 6,093cf / 3,766sf = 1.62 ft Check volume Rv = 0.05 + 0.009 1 Rv = 0.05 + 0.009 (79.0) Rv = 0.766 WQv = 1 inch (Rv) (DA) WQv=(1)(0.766)/12(1.270) = 3531cf Check depth 3531/3762 = 0.93ft therefore okay FOR PURPOSES OF THIS DESIGN USE MINIMUM REQ'D. DEPTH OF 3.0 FEET Step four — determine volume of temporary pool 1.5 inches over impervious area = 0.125ft * 43,996 ft = 5,499cf 10 year storm attenuation volume = 4,966cf (see attachment E) FOR PURPOSES OF THIS DESIGN USE 5,499cf FOR MINIMUM TEMPORARY POOL VOLUME. Volume above permanent pool to elevation 21.0 = 5,583 cf— for purposes of this design set top of temporary pool elevation at 21.0 Step five — determine outlet size to release temporary pool in 2 to 5 days. **Set average head for orifice at 1 /3 temporary pool depth or 0.33 feet. Set 1.25 inch diameter orifice at invert elevation 20.0 (Top of permanent pool) Q=CA(2gh)' = 0.6(0.00852sf)(2*32.2*0.33).' = 0.0235cfs 0.0235cfs = temporary pool volume / draw down time in seconds 0.0235cfs = 5,730cf / draw down time in seconds = 243,144 sec. = 67.54 hours = 2.8days i Step six — determine discharge for flood volume (100 year storm) thru outlet Set top of concrete riser at top of temporary pool elevation at 21.0 Q = CLH3/2 C = 3.1 L = length of weir = 8 ft H = Head above riser crest (See TR-20 routing computations attachment F) Erosion and sediment control will be accomplished during both phases of the project thru a variety of measures. These practices will include sediment fences, sediment traps. stabilized construction entrances and various inlet protection devices. Strict adherence to the temporary and permanent seeding guidelines will be required at all times. All swales have been designed to convey the 25 year storm at non -erosive velocities considering an n value of 0.02 (See Attachment G). The required carthwork is minimal, which in conjunction with the flat topography should not generate any unforeseen sediment or erosion control issues. Naugle, Mary From: Naugle, Mary Sent: Tuesday, September 08, 2009 11:16 AM To: Naugle, Mary; Steve Bennett; bennett_brewer@yahoo.com Cc: david.towler@usmc.mil; Matt. Brewer@bbasurvey.com Subject: SW8 090814 MCAS Dining Facility P-620 - New River -state stormwater Steve; Below are some of the items we discussed at the scope meeting on 9/2/09 for this state stormwater application: 1. Existing BUA is less than the proposed. 2. Stormwater runoff from the rebuilt dining facility [roof runoff] will be collected for rain harvesting. 3. The south side of half of the loading dock will be routed to existing collection due to elevation and site restraints for truck access. 4. The north side of the loading dock will be routed to vegetated areas on the north side and will maximize use of the vegetated areas for sheet flow runoff. 5. The front patios of dining facility will drain in a sheet flow manner to the north and south vegetated areas. Permeable pavement will be used for this bua to the maximum extent practical. 6. The majority of the parking area will be treated based on space on the east for wet pond treatment. The wet pond will be extended to use the vegetated area on the east side of parking area. 7. Other perimeter parking areas will utilize permeable pavement on the front half of parking spaces with pavers. 8. Parking lot islands will be changed to grassed areas to minimize bua and maximize vegetation. 9. Design storm is 1 %: inch and WQV will include pre/post with pre basis on existing site bua. 2008 rule. 2008- 211.2(b)(3)(b) (3) & ...4(c). 10. Swales and bmps will include temporary sediment traps for sediment, erosion and control. 11. Swales will be flat as possible to promote infiltration on site. 12. One drainage area plan will delineate drainage areas to each bmp and include bearings and distances for the permit lines. Please use the application review checklists and forms on the website for state stormwater applications found at this link: htto://h2o.enr.state.nc.us/su/bma forms.htm. Please note there are bmp sections for rainwater harvesting, permeable pavement, wet pond, etc... as well as the supplements and operation and maintenance agreements for each type of bmp requesting stormwater treatment. Please use the rule, bmp, application forms, and checklists on the web to complete the application forms and plans. Please let me know if you need other information to complete the application. The submittal meeting is scheduled for Friday, 9/4/09 at 9:30 a.m. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fox mart' naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Friday, September 04, 2009 9:26 AM To: 'Steve Bennett' Cc: david.towler@usmc.mil; Matt.Brewer@bbasurvey.com Subject: MCAS Dining Facility P-620 - New River -state stormwater Steve; 1. Permeable pavement. To receive credit BUA reductions with permeable pavement, the material, soils, infiltration rate, and SHWT must meet the conditions in the BMP section 18, supplements, etc... The material that you sent appears to be porous concrete and it is allowed in the bmp. The bmp is found at this website, as well as the forms, 0&M, etc...: http://h2o.enr.state.nc.Us/su/bmp forms.htm. The runoff from walkways should either be routed to vegetated areas in a sheet flow manner and/or permeable pavement used on this project to the maximum extent practical. The parking areas in the front portion of each parking space is more of a square type brick with opening inside. It is described and pictured in the BMP figure 18.1. 2. SHWT The soil report that you attached discussed the SHWT in section 3.3 the second paragraph. It appears to be an estimate of SHWT elevations relative to perched soils at the boring locations. The boring was only attached for CBR-1 at the proposed pond location. The boring B-1 in the area of the patio for the dining facility or borings for the locations of the sidewalks were not attached. The recommendation in the report is to make the determination at the time of construction, which is after the design phase. The seasonal high water table is based on soil conditions and the historical colorings of soil strata in the areas of proposed stormwater bmps. The SHWT is made by soil scientist and this appears to be a geo tech report. If you have further questions regarding the SHWT determinations, you may contact the Division's soil scientist, Vincent Lewis, at 910-796- 7378 [office] or you may have a better chance of reaching him in the field on his cell phone at 910-389-4358. Since this project is rebuilding existing facilities, the permit will be a hybrid that includes many types of stormwater treatment to maximize water quality treatment and keep the water on site where possible within the constraints of the project area. If the SHWT and/or soil conditions do not meet the requirements of the BMP the credit for BLIA reduction is not included in the permit, but the use of permeable pavement [porous concrete for walkways and pavers for front portion of parking spaces] will provide water quality benefit for the site in addition to the proposed rain water harvesting from the building and wet pond treatment for a majority of the parking lot. Please let me know if you need more information to complete the application. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary. naugle@ncdenr go v Iki� %�,�• - f,7 h C . n � clg o� 31i{-ae bls�ya� OUA mkaMLC L E) v V -4c'e-YJ POA LO f `.� S Cej Vo-q �ea� 1a0� � a0 VwJ� ✓✓ �� t ftj.,", akjq --