Loading...
HomeMy WebLinkAboutSW8090625_APPROVED PLANS_20090728STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 ('FWU 25 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 1p�012� YYYYMMDD qs Ym oAccaovE POINT 6,. Nel�1 N (bmhrt W/n1Y i Nvtl®1p6' Baiwi 1 Sy.�NY NprcY ` 'VYa ^ N 0 Mva aq L f v®Yi p xarm CAMP LEJUENE saam� w�me J }L ti �xn r� raR ty 5 0 10 15 20 my N9 ma � SCALE IN MILES VICINITY MAP - CAMP LEIEUNE, N.C. N017,^NMENTAL SION 4TY IZED WASHRACK LOCATION MAP - U. S. MARINE CORPS BASE - CAMP LEIEUNE, N.C. UTILIZING RECYCLED WAS H WAT E R 100% SUBMITTAL SHT DESCRIPTION DRAWING INDEX G-1 COVER G-2 SHEET INDEX LEGEND & NOTES C-1 EXISTING CONDITIONS C-2 PROPOSED LAYOUT C-3 PROPOSED SITE DIMENSIONS C-4 PROPOSED GRADING, STORMWATER & EROSION CONTROL C-5 PROPOSED INFILTRATION BASINS C-6 PROPOSED PIPING PLAN C-7 HYDRAULIC PROFILE C-8 FLOOR PLAN C-9 GRIT CHAMBER PLAN C-10 LONGITUDINAL SECTION S-1 SPECIFICATIONS S-2 SPECIAL INSPECTIONS S-3 FOUNDATION PLAN S-4 STRUCTURAL DETAILS E-1 I ELECTRICAL LEGEND, RISER DIAGRAM, & SCHEDULES E-2 ELECTRICAL SITE PLAN E-3 ELECTRICAL POWER, LIGHTING PLAN, & SCHEDULE E-4 ELECTRICAL DETAILS D-1 PUMP STATION DETAILS D-2 PUMP -WELL ROOM DETAILS D-3 WATER DETAILS D-4 WATER DETAILS EC-1 EROSION CONTROL DETAILS SYMBOL LEGEND T TELEPHONE PEDESTAL RBI WATER METER BENCHMARK O ELECTRIC BOX —� SIGN 0 OUTDOOR UGHT(POLE) L� POWER ROLE&ANCHOR (D EXISTING MONUMENT -o—o—u—o— SILT FENCE O EXISTING IRON ROD HEIR) —m—m— OMITS OF DIMRBANCE _ TREE/BUSH OEXISTING SEWER MANHOLE • PROPOSED SEWER MANHOLE EXISTING WATER VALVE PROPOSED WATER VALVE /X EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT v- C EXISTING PIPE 1 PROPOSED PIPE ----- EXISTINGWATERUNE PROPOSED WATER LINE — • —' — EXISTING CHAIN LINK FENCE — • — ` — PROPOSED CHAIN LINK FENCE —--s----- EXISTING SANITARY SEWER mvvvwr� EXISTING WOODSUNE BOUNDARY CENTERLINE RIGHT OF WAY (ROM .a UNDERGROUND FIBEROPTIC LINE �a UNDERGROUND UHHUHY LINE DRIVEWAY/ROAD PATCH HORSESHOE INLET PROTECTION EXISTING CONCRETE AREA * ROCK CHECK DAM EXISTING GRAVEL AREA DH.P.(DIP) - DUCTILE IRON PIPE S/S - STAINLESS STEEL B.F.P. (BFP) - BACK FLOW PREVENTER R.PI.(RPZ) - REDUCED PRESSURE ZONE TYP. - TYPICAL d:w:- 1R�Cii3? 1.)THE CONTRACTOR SHALL CONTACT THE POWER CO., GAS CO., AND TELEPHONE CO. FOR THE EXACT LOCATION OF ALL UNDERGROUND MAINS, CABLES, OR LINES BEFORE CONSTRUCTION BEGINS. EXISTING UTILITIES SHOWN ON THESE PLANS ARE TAKEN FROM VARIOUS SOURCES AND THE CONTRACTOR SHALL SATISFY HIMSELF OF THE ACCURACY. 2.)PIPE SEPARATION: THE FOLLOWING MINIMUM PIPE SEPARATION WILL BE MAINTAINED: 24 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SANITARY SEWER AND STORM SEWERS, 18 INCHES VERTICAL SEPARATION BETWEEN CROSSING OF SEWER (INCLUDING FORCE MAINS) AND WATER MAINS, AND 10 FEET HORIZONTAL SEPARATION BETWEEN SANITARY SEWER (INCLUDING FORCE MAINS) AND WATER MAINS. IF THESE SEPARATIONS CANNOT BE MAINTAINED, DUCTILE IRON PIPE WILL BE USED 10 FEET EITHER SIDE OF CROSSING AND ALONG ENTIRE LENGTH OF LINE LESS THAN 10 HORIZONTAL FEET FROM WATER MAINS. WHENEVER A WATER MAIN CROSSES UNDER A SEWER LINE BOTH LINES SHALL BE DUCTILE IRON PIPE 10 FEET EACH SIDE OF CROSSING. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE ENGINEER IN THE FIELD BEFORE PAYMENT WILL BE MADE AT DUCTILE IRON PRICES. 3.)THE RIGHT-OF-WAY OR SHOWN TEMPORARY CONSTRUCTION EASEMENT SHALL DICTATE THE LIMITS OF CONSTRUCTION. 4.)THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE ADJUSTMENT OF EXISTING UTILITIES, INCLUDING POWER POLES. 5.)THE CONTRACTOR SHALL REMOVE AND REPLACE ANY EXISTING CULVERTS AND HEADWALLS, AS REQUIRED FOR THE CONSTRUCTION OF THE PROJECT. 6.)IF EXISTING STORMWATER CONVEYANCE STRUCTURES (i.e., CULVERTS & SEWERS) ARE DISTURBED OR BREACHED IN ANY WAY, ADDITIONAL SEDIMENT CONTROL MEASURES MUST BE TAKEN TO PREVENT SEDIMENT -LADEN RUNOFF FROM LEAVING THE CONSTRUCTION AREA. iafyxtlI�IRii? 1.)NO POTABLE WATER OR WASTEWATER FACILITIES ARE PROPOSED FOR THIS PROJECT. RAW (UNTREATED) WATER WILL BE AVAILABLE ONCE THE CONTRACTOR MAKES TAP IN ACCORDANCE WITH PLANS, ALTHOUGH AVAILABLE PRESSURES MAY FLUCTUATE.. 1007. SUBMITTAL GRAPHIC SCAIR 30 0 1' 30 60 120 I _ ( IN PKET ) EXISTINGTANKTRAIL (FROM G.IS.) NOTE: THE PROPERTY BOUNDARY SHWM ON THIS SHEET IS NOT THE SAMEAS THE PRO= BOUNDARYSHOWN ON SUBSEQUENTSHEETS RAW WATER SUPPLYWEIL EXISTING! xj/ 3 -C, I SNEADS FERRY RD. II _ II �RS�ESS 100% SUBMITTAL J (TYPJ 0 Hobbs, Upchurch & Associates, P.A. NJ mn R asrma vd. Mi1 c-1 ,I— MI, sb11K NOTE: THEREARENOWETIANDS �✓® Jf LOOATEDW IN THE BOUNDARIES CENTRALIZED WASHRACK ppyM x OF THIS PROJECT. UTILIZING RECYLED WASHWATER 03�3 EXISTING CONDITIONS _ Anww®Pnnan ape mm am! w 11N%rr o wAwacoaA�wxo xn SEnL _ J6£ =;,,gFy._-...�o�?..�-f IF 80W aA�,whamro ogre co�neaxnlxo x�ooas-oro-ana 09-0064 affT a of w i �I t i < n t r a l� I •��� �� S29a46'48"E 94.12' I �- p�' PROJECT BOUNDARY o O STORMATER PERMITpG NG 5 S29'46'48"E 150.18, - - - J_ �- GRAPHIC SCALN: 20 0 10 20 40 BO t _ v � t ... it S FILTER/NMP ,.? "ROOF OVERHANG PROPOSED WASH RACK i i CIFAR WELL I \ smEWAu i o i <ONLREIE 'CONO2FiE GRIT CHAMBER ✓9 s ti — ACCESS —J SETRING dS[RS ------- --- STAB 10, WE 1 .- WASH RACK -� ROLLEDCUR@ITYP.) S,TOACk� w --—w----- w — — ___� RAW WATER I - W -- — _STANDARD CURB(m.) SO'BCKIARD".) SUPPLY WFO_ -w- ---- ---- - C_w -- f w,- I-- -w -- -w-- --- w- S29°46'48"E SNEADS FERRY RD. i O SUBMITTAL r 2900'� - --_ 45.00' -I5.00' ' --- 45.00' _- W 1 r-------1 o SIDEWAIX e N O 1 PROPOSED I FILTEWRIM I I O —STANDARD NRB O N N ROOM I (lW, z.00�... L-------J ------------ -1 L- ROOF OVERHANG r 1 I 1 WASH RACK _ CLEARROLLED v i ERR WWELL CURB ROLLED CURB PARAPET INLET---\ O SIDEWAU( GRIT 1; CHAMBER ^ O t & l FLAT ; SLOPE52O 52 iE i SEA NNG \ I L CONCRETE \ o SIDEWAD( O CONCRETE ACCF55 — -� PARAPET INIETSLAB ACCESS S�IAO - ROLLED CDRB ROLLED MRB WASH RACK -- ROLLED CURB (rrvJ LU RAW WATER LHE 2.00' O - W —STANDARD CURB�. 10-DOLLARD (rwJ O _ CD W koZOOy _ ia: LLLJJJ QjO� z ___.W—_. D_-_I -_W_--____W_ _1W O POWER POLE (� I (TO BE REMOVED & RELOCATED) S29046'48"E SNEADS FERRY RD, GRAPIIIC SCALE ID D 5 10 2D 10 ( 1x een'1' 1 \N _ — W 335.84' 1007, SUBMITTAL NJ Hobbs, Upchurch & Associates, P.A. C-3 LLaz i. L-064 Ilet /9f01 NF131i - % (9101 ffi116 �✓ED � CENTRALIZED WASHRACK UTILIZING RECYLED WASHWATER PROPOSED SITE DIMENSIONS SEAL '' 33762 ,��NE p.Frot BUBi®BM1 �OROIOO DAIS SIZE Fi o00E NO. x CM&Yf1011O eAIIFACIOR(ro MBE ooNBTncaxTx xa 110sascr9m AB eFE< 09-0064 �FLLTER/RIMF'ROCM J �I t I RROROSED O 1 f I 12 L> 1 I t PROPo4D L__ z` J CIFMWELL 2 O 1 w -m. � 1 sz. 1 0 1 WNCRETEJ O 7 ACCE4 � 2.aQ �BNO b'I CONDIF WGft C- (SHE DETAIL) g Op FJ 1 SIOEWAIX M�49A ® �Z i9 i29 WASH RACY 240 f vIxwn _ _ _ _ .o �'� GRR CNAMBERB �.� e�l-v SEiipNG L44lN5 -SIDE4ASIr "AO WASH RACK STAN.. (IW.) Ci 1 OI _ IIMRS 1 <^ I )I RSANCEMR) 0 1 r—ROOF OWRHMG I O 1 LCONCRETE _. �� J ACC I 1C0' WHIFF SETBACK sua RrsN ` 1 J cl ROLLE9CRO(FP.) 0�... Q 10' BU IMD (tW.) 1 1 EON vn coNC ErEwEIRs ( oea.Q t j C - _ _._ ___ _. _. ,• ,_. Cyr- uR3NEwnv S29°46'48"E lw Ir lfi• cvwERr mz LE w• cuvER 335.84' @.45 k SIME �.95%AOK SNEADS FERRY RD. ENTRaxcE J ACEMR LIMITS OF DISTURBANCE- 1.97AC. GRAPHIC SCALE 20 G 10 20 40 SO w ART ) 1007o SUBMITTAL Hobbs, Upchurch & AssodoWs, RA •war H.. nim en-mz - rs rnm resin DlaMx ,. CENTRALIZED WASHRACK cica� - UTILIZING RECYLED WASHWATER asm® e PROPOSED GRACING, SWIM, EROSION CONTROL �E�IOR APPEQ®PWOgi qCG W�TE � CCOE L91f 1p. ILUFM OMY�ION0. F 80091 60004294 BA>lFscramro GATE MI81x OOlnB xn xeousosor4ae _M BBEC. 09-008t... s 5 w u I;y 138' (D THTESHS 1 (SEE THLS SHOT) BOTTOM ELEV 2 INFILTRATION BASIN 1 I IIr------ 1 r I I I I "T7 n �- I I I II m I I II I I I II I r — L---- J IL ----- J GRAPTTTC SCALE [ w eEex i DRAINAGE SWAIE CD E (SEET SODDED WITH BASIN /1 DATA CENTIPEDE GRASS TO a IN /2 DATA TOP D . 31.0' 3 TOP OF BANK 3 TOP ELEV. 27.0' i_ 11ti�1 4' 1� r STRG ELEV. M MIN L SB2C ELEV. 25.1' i-I CLEAN EIIN ELEV. 28.0 rr BASIN BOTTOM BEM ELEV. 23.5' SHWT ELWV 25J5' 2' MIN. SyyR 1' MIN. UNDISTURED IN -SITU SOIL SHWT ELEV. 20.50' TYPICAL INFILTRATION BASIN: CROSS-SECTION NO SCALE NOTE: BASIN TO BE CLEANED OUT OF ALL ACCUMULATED SEDIMENT. ONCE SITE IS FULLY STABILIZED. NOTE: WEIR STRUCTURE TO BE CONCRETE WEIR STRUCTURE 1 CONCRETE W THE DIMENSIONS NO SCALE SHOWN. ALL THICKNESS DIMENSIONS SHALL BE 6 INCHES. SIDESLOPES SHALL BE 3: 1. SEED AND MULCH IN ACCORDANCE WITH SEEDING SCHEDULE B TYPICAL DRAINAGE SWALE NO SCALE BOTTOM DI 2 GRAPHIC SCALE 0 0 10 20 40 E WEIR STRUCTURE TO BE STRUCTED FROM 3000PS1 CRETE WITH THE DIMENSIONS AWN. ALL THICKNESS ENSIONS SHALL BE 6 INCHES. 'SLOPES SHALL BE 3:1 CONCRETE WEIR STRUCTURE 2 NO SCALE 100% SUBMITTAL HoW, Upchurch & Assoda w, RA NJ ues R c-Rysy m.. MN aixiz - rs (nN msiyw DEPf OF yIAN INVpKpiApCllIBASE B�BpNa�l9�q� MA NE COS urrM ,. CENTRALIZED WASHRACK IaD - UTILIZING RECYLED WASHWATER a eBT®B6 - PROPOSED INFILTRATION BASINS _[n; = IAf101@lIYDCR tlOG WlE � CIitE OBlf M0. xNYFACDENYlI10 ND. 7` F 80091 60004295 9 ,I.• �'a'v N-0064 ssr T cF r CONTROL STONE - I'-6" MIIV T 2 11 t� FLOW \-4STRUCTURAL NOTE STONE 1. STRUCTURAL STONE SHALL BE CROSS SECTION CLASS "B" STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE HIS CR TRO STONE. 2. OUTLETS TO BE PLACED AT LOW POINTS ALONG SILT FENCE. WIN S, TEENCE FRONT NEW TEMPORARY STONE OUTLET DETAIL �' NOT TO SG1LE B' MAX STD STRENGTH FABRIC WITH WIRE FENCE 6 MA(. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE STEEL M T WIRE FENCE, EXTEND TO BOTTOM OF TRENCH FILTER FABRIC PIASTIC OR WIRE TIES ADD 12" OF 45 OR 457 STONE IF RUN-OFF FLOWS PARAUELTQ TOE OFFENCE BACKFILL TRENCH AND COMPACTTHOROUGHLY INSTALLATION & MAINTENANCE NOTES: -TIT _$ MIN. GROUND 1. REMOVE ANY SEDIMENT GREATER THAN 12" DEEP. REPAIR jl ANY DAMAGE OR UNDERMINING IMMEDIATELY. rI 2. STONE OUTLET TO BE ADDED AT LOW POINTS IN SILT FENCE, SEE DETAIL 3. CONTRACTORS OPT10N TO USE AT TOE OF SLOPES ADJACENT TO PAVEMENT TO PROTECT PAVED SURFACES. 4° MIN. 4. FABRIC SHALL BE INSTALLED ON THE UPSLOPE SIDE OF THE WIRE FENCING. TEMPORARY SEDIMENT FENCE DETAIL � NOT TO SCALE CHANNEL LEVEL SPREADER UP FLDW PAT SPREADER DETAIL YPi�ifiir CONSTRUCTION SPECIFICATION MATERIALS: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120' F. 2. INSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 3. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. 3" NYER OF S5> STONE RIPARIAN MITER FOR FILTER STRIP 3 FT WIDE STRIP OF FILTER FABRIC 1. OBTAIN EROSION CONTROL PERMIT AND ALL OTHER APPLICABLE PERMITS PRIOR TO ANY LAND DISTURBING ACTIVITY. 2. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH THE OWNER, ALL CONTRACTORS FOR LAND DISTURBANCE AND/OR EROSION CONTROL AND EROSION CONTROL AUTHORITY PERSONNEL TO DISCUSS THE PROJECT AND THE EROSION CONTROL PLAN. 3. INSTALL CONSTRUCTION ENTRANCE AND SILT FENCE AT THE LOCATIONS SHOWN ON THE CLEARING AND GRUBBING EROSION CONTROL PLANS. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSTATED PRIOR TO ANY LAND DISTURBING ACTIVITY. THE MEASURES SHALL REMAIN IN PLACE UNTIL CONSTRUCTION OF THE PHASE IS NO LONGER POSSIBLE WITHOUT REMOVAL OF THE MEASURES AND ALL POSSIBLE EARTHWORK IS STABILIZED AROUND THE PHASE SUCH AS ROADWAY, GRASSED AREAS, ETC. 4. CONSTRUCT INFILTRATION BASINS AND SWALES FOR USE AS SEDIMENT COLLECTION DEVICES DURING CONSTRUCTION. 5, BEGIN CLEARING AND GRUBBING OPERATIONS 5. MAINTAIN EROSION CONTROL DEVICES PER SPECIFICATIONS AND AFTER EVERY RUNOFF PRODUCING RAINFALL. 6. AT COMPLETION OF CONSTRUCTION OR ANY PHASE OF GRADING, ESTABLISH VEGETATION IN COMPLIANCE WITH NCDENR EROSION CONTROL REGULATIONS AND THESE PLANS. 7. REMOVE ALL TEMPORARY MEASURES, CLEAN OUT THE INFILTRATION BASINS OF ANY ACCUMULATED SEDIMENT AND AFTER SITE IS PERMANENTLY STABILIZED CONSTRUCT FINAL INFILTRATION BASINS AS SHOWN ON THE RESPECTIVE DETAIL. NOTES PURSUANT TO G.S. 133-A57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETANEO BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. MATERIALS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND u " OTHER OBJECTIONABLE MATERIAL AND PROPERLYh'� GRADE IT 2. PLACE THE 2"-3" COARSE - AGGREGATE TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND GQI� / SMOOTH IT. 1 G flf'� owe` 3. PROVIDE DRAINAGE TO CARRY WATER TO A �` SEDIMENT TRAP OR OTHER MAINTENANCE: SUITABLE OUTLET. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE 4. USE GEOTEXTLE FABRICS. CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC NOTE: TOP DRESSING WITH 2-INCH STONE. A CONSTRUCTION ENTRANCE SHALL BE AFTER EACH RAINFALL, INSPECT THE CONDITION OF CONSTRUCTED AT ALL POINTS OF INGRESS AND THE ENTRANCE. IMMEDIATELY REMOVE ALL EGRESS TO THE SITE FROM PUBLIC ROAD. OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. LENGTH OF FILTER STRIP IT TO 130' DEPENDING ON THE LENGT LEVEL SPREADER NEEDED HANDLE THE 9I11W REINFORCED0iANNEL I FVFI SPRFADFF TEMPORARY( NOT TO SCALE `#52 STONE ON FABRIC FILTER STRIP DETAIL DQRE RECEIVING STREAM, CONVEYANCE OR WETLAND FILTER STRIP DIMENSIONS LENGTH (FT) WIDTH (FT) SLOPE (FT/FT) LEVEL SPREADER LIP ELEVATION (FU DRANAGEARF91 1 30 30 00027 28.11 DRAINAGE AREA2 1 63 30 0.03 23.W I SEEDING SCHEDULE PROJECT LOCATION DESCRIPTION: REGION: LOWER COASTAL PLAN LAND USE: LOW MAINTENANCE FOR OCCASIONAL VEHICULAR TRAFFIC SOIL CHARACTERISTICS: WELL TO HIGHLY DRAINED SOIL WITH LOW WATER HOLDING CAPACRIES GRASSING SPECIFICATIONS NOTE TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN ONE WEEK AND SUBJECT TO FURTHER DISTURBANCE. PERMANENT SEED MIX SHALL BE CHECKED FOR ADEQUACY ON JULY 15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. TEMPORARY WINTER/EARLY SPRING SEED MIX SPECIES RATE (LB./ACRE) DEC 1 - APR. 15 RYE (GRAIN) ............................. ............. 120 KOBE LESPEDEZA..................... ...............50 TEMPORARY SUMMER SEED MIX SPECIES RATE (LB,/ACRE) APR. 15 - AUG. 15 GERMAN MILLET 40 TEMPORARY FALL SEED MIX SPECIES RATE (LB./ACRE) AUG. 15 - DEC. 30 WE (GRAN) 120 SOIL AMENDMENTS [FOR TEMPORARY SEEDING] FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 75D-1000 LB/ACRE 10-10-10 FERTWZER. NOTE: TEMPORARY GRASS TO BE FOLLOWED BY PERMANENT SEED MIX PERMANENT SEED MIX SPECIES RATE LB./ACRE) APR. 1 - JULY 15 RYE (GRAIN) ....._............ _ ........ SERICEA UESA............. ............. 15 COMMON BERMUDAGRASS........... ..__... 25 GERMAN MILLET .......................... .............1010 SOIL AMENDMENTS (PERMANENT SEEDING] TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER APPLY FERTILIZER (10-10-10) AT A RATE OF SOO LB/ACRE APPLY LIME (GROUND AGRICULTURAL UMESTONE) AT A RATE OF 3,D00 LB/ACRE MULCH (FLAT AND LOW -SLOPE AREAS) APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE MULCH (DRAINAGE DITCH) USE A ROLLED EROSION CONTROL PRODUCT TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON THE CHANNEL SIDE SLOPES ABOVE THIS HEIGHT AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB/ACRE GRAIN STRAW, AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. WATER MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED). MAINTENANCE: FOR No. 5CP REFERTIUZE THE FOLLOWING APRIL WITH 50 LB/ACRE NITROGEN. REPEAT AS GROWTH REQUIRES. MAY BE MOWED ONLY ONCE A YEAR. RESEED, FERTIUZE AND MULCH DAMAGED AREAS IMMEDIATELY, SEED BED PREPARATION 1. RIP THE ENTIRE AREA TO 6" OEM. 2. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 3. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE IN ACCORDANCE WITH SEEDING SCHEDULE" AND MIX WITH SOIL 4. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 5. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. SEED ACCORDING TO "SEEDING SCHEDULE." 6. MULCH IN ACCORDANCE WITH "SEEDING SCHEDULE` IMMEDIATELY AFTER SEEDING. 7. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE "SEEDING SCHEDULE". MAKE NECESSARY REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE, OR THE DAMAGED AREA SHALL BE REESTABLISHED FOLLOWING THE ORIGINAL LIME, FERTILIZER, AND SEEDING REQUIREMENTS. 1007, SUBMITTAL J Hobbs, Upchurch & Associates, RA EC-1 lam+ c ecF n.,. rnm a�u,z Fe mm sn« CENTRALIZED WASHRACK UTILIZING RECYLED WASHWATER EROSION CONTROL DETAILS '09-0064 Ia+ffT . c b