HomeMy WebLinkAboutSW8090528_HISTORICAL FILE_20210623STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 00JO529
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
202.kW 23
YYYYMMDD
Burd, Tina J
From:
Burd, Tina J
Sent:
Friday, June 18, 2021 3:33 PM
To:
jay.ratliff@duke-energy.com
Subject:
SW8 090528 - Brunswick Steam Electric Plant
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on June 17, 2021. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
I
Entail correspondence to and from this address is subject to the
North Carolina Public Records taw and may be disclosed to third parties
-
Website: htto://deg,nc.gov/about/divisions/energV-mineral-land-resourcesZstormwater
Based on the current guidance to minimize the spread of COVID-ni, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered
shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.
Non -Transfer Application Completeness Review Checklist - Short Version '1
Project Name: JJY-�MSW\(J`l, J(A Date Delivered to WIRO:
Project County/Location: BIMS Received/Accepted Date:
Permit Action: New ❑Not located in the ETJ of the following deligated and
functioning programs:
BIMS Acknowledged Date 1: 10
New Permit #':
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville
Pend: Su
Major Mod/ Minor enewal Rxisting Permit #:
v
Expriation Date :
Permit Type: HD / LD / LID Overall / HD &LD Combo
General Permit / Offsite / Exempt
Development Type: Commercial / Residential / Other
Subdivided?: Subdivision or Single Lot
Rule(s): n2017 Coastal r12008 Coastal
Coastal
Phase 11 "Universal "1988 Coastal
Permittee Type & Documents Needed:
"Property Owner(s) FiPurchaser
F—liViable? F IViable?
Deed Elurchase Aamt
Not Subdivided: Deed
Subdivision: Common Area Deed
Paperwork
F-1$505 (within 6mo) Check#(s):
(1 new form or for older forms: 1 original per SCM)
Report (Infil or PP)
lations (signed/sealed)
=_d Restrictions, if subdivided
ject Narrative
3S Map (or on file?) Subject to SA?: Y / N
"Plans (2 Sets)
F-1PE Certification
Electronic Copies
nEasements, Recorded (2017 Rules)
F—]Offsite to SW8:
E]Is Lot ID'ed in Master Permit?
OHOA =Developer
Viable? =Viable?
F-1No Fee
Subject to ORW?: Y / N
NOTES:
[Enter BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates.
31f w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
EMAILED ENGINEER DATE:
REVIEWER NAME:
Comments:
Minutes
G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist 20200131
DUKE
ENERGY®
Serial: RA 21-0186
Ms. Georgette Scott, Environmental Program Supervisor
NC DEQ DEMLR — Wilmington Regional Office
Coastal Stormwater Permitting Section
127 Cardinal Drive Extension
Wilmington, NC 28405
Subject: Brunswick Steam Electric Plant (BSEP)
Coastal Stormwater Permit No. SW8-090528
Unit 1 Capacitor Bank Stormwater System
Permit Renewal Application
Brunswick County
Dear Ms. Scott:
Brunswick Nuclear Plant
P.O. Box 10429
Southport, NC 28461
RECEIVED
JUN 17 ZOZI
NCDEQ
WILMINGTON RO
State Stormwater Permit No. SW8-090528 for the Brunswick Steam Electric Plant expires on
December 30, 2021 (administratively extended). Duke Energy Progress, LLC hereby requests
that Permit No. SW8-090528 for the facility be reissued. Enclosed is the State Stormwater
Permit Renewal Application Form and required documents, including a check made payable to
NC DEQ for $505.00 (See Enclosure 1, Item 1).
With reissuance of the permit, Duke,Energy Progress, LLC requests the following:
Corporate Name Update
The current Corporate name is Duke Energy Progress, LLC and it is requested that all permit
documents and State Stormwater Permit related electronic datasets be updated to reflect'this
name.
If you have any questions regarding the enclosed information, please contact Mr. Chuck Nelson
at (910) 832-3600.
I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance, with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Sincerely,
Jay Ratliff
Plant Manager
Brunswick Steam Electric Plant
Duke Energy Progress, LLC
To
17 2021 9
BY:------
1�
NC DEQ/DWR/WQ Permitting Section
Page 2 of 2
Enclosure 1: State Stormwater Permit SW8-090528 Renewal Application Package
cc: Mr. Chuck Nelson
Mr. Drew Petrusic
Mr. Don Safrit
August 5, 2020
Wastewater Branch
Water Quality Permitting Section
Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: Delegation of Signature Authority
BRUNSWICK STEAM ELECTRIC PLANT
NPDES Permit Number NC0007064
To Whom It May Concern:
By notice of this letter, I hereby delegate signatory authority to each of the following individuals for all
permit applications, discharge monitoring reports, and other information relating to the operations at
the subject facility as required by all applicable federal, state, and local environmental agencies
specifically with the requirements for signatory authority as specified in 15A NCAC 2B.0506.
Individual 41
Individual !i7
Name, ,
Jay Ratliff
S
Title:
Plant Manager
�_
Mailing Address:
8470 River Rd., Southport, Nc 28461
i
Physical Address:
(jdierey).
NA
Email Address:
1�y.Ratliff@duke-energy.com
1
Office'Ption_e:
910 - 832 - 3480
Mobile Phone:
864 - 653 - 0372
if you have any questions regarding this letter, please feel free to contact me at 910-832-3698 or
John.KrakuszcskiC,duke-energy.com.
QSincerely,
T�
John Krakuszeski ^ --
Brunswick Site Vice President -.a its e,_
8470 River Rd., Southport, Nc, 28461 JUN 2U21 / t
John.Krakuszeski,aDuke-Energy.Com
910-832-3698 P�
910-515-5899 BY—�
cc: Wilmington Regional Office, Water Quality Permitting Section
0
2301 Rexwoods Drive 919.881.9939
Suite 200 919.8819923 tax
Raleigh, NC 27607 www.dewbemy. com
May 27, 2010
Ms. Christine Nelson
Environmental Engineer 1'
Division of Water Quality
Wilmington Regional Office /\
127 Cardinal Drive Extension
Wilmington NC, 28401
Reference: NCDENR Stormwater Permit Certification
Brunswick Nuclear Plant — Unit 1 Capacitor Rank Installation
Southport, Brunswick County, North Carolina
Dewberry Project No. 50017875
Dear Ms. Nelson:
Enclosed is a Stormwater Certification for the Progress Energy Carolinas, Inc. Brunswick Nuclear Plant
Unit I Capacitor Bank Installation (Permit No. SW8090528).
Should you have any questions or need any additional information, please feel free to contact me via
phone at (919) 881-9939.
Sincerely,
Dewberry & Davis, Inc.
Virginia Russell, PE, LEER AP
Project Engineer
cc: Sarah Puffer PE — Progress Energy
P:A50017875VAdn1ACorrespondenceALetters\2010.05.27 - NCDENR DWQ Stormwaler Cot I i tication.docx
Dewberry & Davis, Inc.
fffc 1vL
MAY 2 8 2010
BY: �wQ-