Loading...
HomeMy WebLinkAboutSW8090528_HISTORICAL FILE_20210623STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 00JO529 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 202.kW 23 YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Friday, June 18, 2021 3:33 PM To: jay.ratliff@duke-energy.com Subject: SW8 090528 - Brunswick Steam Electric Plant The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on June 17, 2021. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 I Entail correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties - Website: htto://deg,nc.gov/about/divisions/energV-mineral-land-resourcesZstormwater Based on the current guidance to minimize the spread of COVID-ni, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Non -Transfer Application Completeness Review Checklist - Short Version '1 Project Name: JJY-�MSW\(J`l, J(A Date Delivered to WIRO: Project County/Location: BIMS Received/Accepted Date: Permit Action: New ❑Not located in the ETJ of the following deligated and functioning programs: BIMS Acknowledged Date 1: 10 New Permit #': NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Su Major Mod/ Minor enewal Rxisting Permit #: v Expriation Date : Permit Type: HD / LD / LID Overall / HD &LD Combo General Permit / Offsite / Exempt Development Type: Commercial / Residential / Other Subdivided?: Subdivision or Single Lot Rule(s): n2017 Coastal r12008 Coastal Coastal Phase 11 "Universal "1988 Coastal Permittee Type & Documents Needed: "Property Owner(s) FiPurchaser F—liViable? F IViable? Deed Elurchase Aamt Not Subdivided: Deed Subdivision: Common Area Deed Paperwork F-1$505 (within 6mo) Check#(s): (1 new form or for older forms: 1 original per SCM) Report (Infil or PP) lations (signed/sealed) =_d Restrictions, if subdivided ject Narrative 3S Map (or on file?) Subject to SA?: Y / N "Plans (2 Sets) F-1PE Certification Electronic Copies nEasements, Recorded (2017 Rules) F—]Offsite to SW8: E]Is Lot ID'ed in Master Permit? OHOA =Developer Viable? =Viable? F-1No Fee Subject to ORW?: Y / N NOTES: [Enter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. 31f w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: REVIEWER NAME: Comments: Minutes G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist 20200131 DUKE ENERGY® Serial: RA 21-0186 Ms. Georgette Scott, Environmental Program Supervisor NC DEQ DEMLR — Wilmington Regional Office Coastal Stormwater Permitting Section 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Brunswick Steam Electric Plant (BSEP) Coastal Stormwater Permit No. SW8-090528 Unit 1 Capacitor Bank Stormwater System Permit Renewal Application Brunswick County Dear Ms. Scott: Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461 RECEIVED JUN 17 ZOZI NCDEQ WILMINGTON RO State Stormwater Permit No. SW8-090528 for the Brunswick Steam Electric Plant expires on December 30, 2021 (administratively extended). Duke Energy Progress, LLC hereby requests that Permit No. SW8-090528 for the facility be reissued. Enclosed is the State Stormwater Permit Renewal Application Form and required documents, including a check made payable to NC DEQ for $505.00 (See Enclosure 1, Item 1). With reissuance of the permit, Duke,Energy Progress, LLC requests the following: Corporate Name Update The current Corporate name is Duke Energy Progress, LLC and it is requested that all permit documents and State Stormwater Permit related electronic datasets be updated to reflect'this name. If you have any questions regarding the enclosed information, please contact Mr. Chuck Nelson at (910) 832-3600. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance, with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Jay Ratliff Plant Manager Brunswick Steam Electric Plant Duke Energy Progress, LLC To 17 2021 9 BY:------ 1� NC DEQ/DWR/WQ Permitting Section Page 2 of 2 Enclosure 1: State Stormwater Permit SW8-090528 Renewal Application Package cc: Mr. Chuck Nelson Mr. Drew Petrusic Mr. Don Safrit August 5, 2020 Wastewater Branch Water Quality Permitting Section Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Delegation of Signature Authority BRUNSWICK STEAM ELECTRIC PLANT NPDES Permit Number NC0007064 To Whom It May Concern: By notice of this letter, I hereby delegate signatory authority to each of the following individuals for all permit applications, discharge monitoring reports, and other information relating to the operations at the subject facility as required by all applicable federal, state, and local environmental agencies specifically with the requirements for signatory authority as specified in 15A NCAC 2B.0506. Individual 41 Individual !i7 Name, , Jay Ratliff S Title: Plant Manager �_ Mailing Address: 8470 River Rd., Southport, Nc 28461 i Physical Address: (jdierey). NA Email Address: 1�y.Ratliff@duke-energy.com 1 Office'Ption_e: 910 - 832 - 3480 Mobile Phone: 864 - 653 - 0372 if you have any questions regarding this letter, please feel free to contact me at 910-832-3698 or John.KrakuszcskiC,duke-energy.com. QSincerely, T� John Krakuszeski ^ -- Brunswick Site Vice President -.a its e,_ 8470 River Rd., Southport, Nc, 28461 JUN 2U21 / t John.Krakuszeski,aDuke-Energy.Com 910-832-3698 P� 910-515-5899 BY—� cc: Wilmington Regional Office, Water Quality Permitting Section 0 2301 Rexwoods Drive 919.881.9939 Suite 200 919.8819923 tax Raleigh, NC 27607 www.dewbemy. com May 27, 2010 Ms. Christine Nelson Environmental Engineer 1' Division of Water Quality Wilmington Regional Office /\ 127 Cardinal Drive Extension Wilmington NC, 28401 Reference: NCDENR Stormwater Permit Certification Brunswick Nuclear Plant — Unit 1 Capacitor Rank Installation Southport, Brunswick County, North Carolina Dewberry Project No. 50017875 Dear Ms. Nelson: Enclosed is a Stormwater Certification for the Progress Energy Carolinas, Inc. Brunswick Nuclear Plant Unit I Capacitor Bank Installation (Permit No. SW8090528). Should you have any questions or need any additional information, please feel free to contact me via phone at (919) 881-9939. Sincerely, Dewberry & Davis, Inc. Virginia Russell, PE, LEER AP Project Engineer cc: Sarah Puffer PE — Progress Energy P:A50017875VAdn1ACorrespondenceALetters\2010.05.27 - NCDENR DWQ Stormwaler Cot I i tication.docx Dewberry & Davis, Inc. fffc 1vL MAY 2 8 2010 BY: �wQ-