HomeMy WebLinkAboutSW8090528_CURRENT PERMIT_20210623STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 Oowsz'f
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
207-10�023
YYYYMMDD
ROY COOPER
Governor
DIONNE DELLI-GATTI
secremry
BRIAN WRENN
Dtrecrar
June 23, 2021
NORTH CAROLINA
Fnvhonmental Quality
Duke Energy Progress, LLC
Attn: John Krakuszeski, Brunswick Site Vice President
C/O: Jay Ratcliff, Plant Manager
8470 River Road
Southport, NC 28461
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 090528
Brunswick Unit 1- Capacitor Bank
Brunswick County
Dear Mr. Ratcliff:
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit
will now reference DEMLR as the Division responsible for issuance of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued
by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current
and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any
stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On
August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years
extension.
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on June 17, 2021. The Division is hereby notifying you that permit SW8 090528 has been renewed
on June 23, 2021, and shall be effective until December 30, 2029, which includes all available extensions. For your
records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please
keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new
or different terms; it merely restates some of the previous terms to provide you with a better understanding of your
obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on July 23, 2009 will remain in full
force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
®� �Z� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
roam w+ouw.
�� �+� 910.796.7215
(� Dewberry' Virginia Russell, El
:ivil Designer
2301 Rexwoods Drive
Suite 200
Raleigh, NC 27607-3366
919 881 9939
919 881 9923 fax
fvrussell®dewberry.com
Dewbeny 8 Davis, Inc. www.dowberry.com
Ri State Stormwater Permit No. SW8 090528
Page 2 of 2
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
144
,Z�; Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/arcs: \\\Stormwater\Permits &. Projects\2009\090528 HD\2021 06 permit 090528
cc: NCDEQ-DEMLR Wilmington Regional Office
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
amwa u
^s^.rwm+.vmome.� 910.796.7215
State Stormwater Management Systems
Permit No. SW8 090528
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Duke Energy Progress, LLC
Brunswick Unit 1- Capacitor Bank
8470 River Road SE, Southport, Brunswick County
FOR THE
construction, operation and maintenance of one sand filter in compliance with Session Law 2008-211
and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other supporting data as
attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the
"Division" or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until December 30, 2029 and shall be subject
to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.9 of this permit. The stormwater control has been designed to handle
the runoff from 34,848 square feet of impervious area. Other incidental impervious area
(4,792 square feet) has been approved for the driveway access and will be treated through
grassed swales.
3. A vegetated filter has been waived for this sand filter since it has been designed to handle
twice the design storm as detailed in Section 1.8 on page 2.
4. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
5. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
6. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
Page 1 of 5
State Stormwater Management Systems
Permit No. SW8 090528
The project shall maintain a 50' wide buffer measured from the normal pool of impoundments,
the banks of rivers and streams and the mean high water line of tidal waters.
All runoff being directed into wetlands shall flow into and through those wetlands at a non -
erosive velocity.
The following design elements have been approved for this sand filter stormwater facility, and
must be provided in the system at all times.
a. Drainage Area, acres:
Onsite, ft':
Offsite, ftz:
b. Total Impervious Surfaces, ftZ:
c. Design Storm, inches:
d. Sediment Chamber Depth, ft.:
e. Sand Chamber Depth (weir to bottom) ft:
f. Filter Media Depth, ft.:
g. Sediment Chamber Bottom Elev. fmsl:
h. Sand Chamber Bottom Elev., fmsl:
i. Sediment Chamber Surface Area, ftZ:
j. Sand Chamber Surface Area, ftz:
k. Weir Elevation, fmsl:
I. Max. Head on Filter (weir to top of sand) ft:
M. Permitted Storage Volume, ft':
n. Orifice Diameter, inches:
o. Time to Draw Down, hours:
p. Seasonal High Water Table, FMSL:
q. Receiving Stream / River Basin:
r. Stream Index Number:
S. Classification of Water Body:
11. SCHEDULE OF COMPLIANCE
1.2
52,272
0
34,848
3.0
3.15
3.15
2.0
20.15
20.15
2,250
4,500
23.3
1.30'
8,775
6 " 0
11.4
18.15
Nancy's Creek / Cape Fear
18-88-1-3
"Sc, HQW, Sw"
1. The permittee is responsible for verifying that the proposed built -upon area for the entire
project does not exceed the allowable built -upon area.
2. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
3. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
4. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately. Infiltration systems should not be used as erosion control
devices, due to the potential clogging. If the stormwater system was used as an Erosion
Control device, it must be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8 090528
6. The permittee shall at all times provide the operation and maintenance necessary to assure
that all components of the permitted stormwater system function at the design condition. The
approved Operation and Maintenance Plan must be followed in its entirety and maintenance
must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of filter media, bypass structures, orifice, catch basins
and piping.
g. Access to all components of the system must be available at all times.
7. Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
8. Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
9. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
10. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick,
stone, slate, coquina and parking areas, but does not include raised, open wood decking, or
the water surface of swimming pools.
11. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
c. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
III. GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
Page 3 of 5
State Stormwater Management Systems
Permit No. SW8 090528
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as
required by any statutes, rules, regulations, or ordinances, which may be imposed by any
other Local, State or Federal government agency having jurisdiction. Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to
enforcement procedures pursuant to NCGS 143-215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems. These additional or
replacement measures shall receive a permit from the Division prior to construction.
4. Permit Transfer: This permit is not transferable to any person or entity except after notice to
and approval by the Director. The permittee shall submit a completed and signed 'Permit
Transfer Application Form" (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form, to the Division at least 60 days prior
to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants;
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08;
G. Bankruptcy;
d. Foreclosure, subject to the requirements of Session Law 2013-121;
Current Permittee Name or Address Changes: The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project;
C. A mailing address change of the permittee;
The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request. Neither the sale of the project, in whole or in part,
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit.
The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission, however, these actions do
not stay any permit conditions.
Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of this permit, application, supplements, operation
and maintenance agreement, and approved plans and specifications shall be maintained on
file by the permittee.
10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
11. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
12. A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit. The renewal request must include the appropriate application, documentation and
the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Page 4 of 5
State Stormwater Management Systems
Permit No. SW8 090528
Permit renewed, updated and reissued this the 23rd day of June 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
aj�tt:...4 944
Brian Wrenn, Uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 5 of 5
Attachment C - Permitting History
Brunswick Unitl- Capacitor Bank
Permit No. SW8 090528
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
7/23/2009
Original
Approval
10
6/23/2021
Renewal
2.0
Permit Number. �oqic'Sa��
(to be provided by DWQ)
Drainage Area Number:
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
Progress Energy Carolinas will keep a maintenance record on this BMP. This I JUN 2 - 2009
maintenance record will be kept in a log in a known set location. Any deficient BMPJ.
elements noted in the inspection will be corrected, repaired or replaced in a time
manner. These deficiencies can affect the integrity of structures, safety of the public, and
the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
— Once a year, the filter strip will be reseeded, if needed, to maintain a dense
growth of vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC,1993). Forested filter strips do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired in a timely manner.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire filter strip
Trash/debris is present.
Remove the trash/debris.
system
The flow splitter device
The flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sediment off -site.
The flow splitter device is
Make any necessary repairs or
damaged.
replace if damage is too large for
repair.
Form SWU401-1-evel Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3
i
F
BMP element.
Potentialproblem:
How I will remediate thee roblem:
The swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level lip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the level lip, and
shows stormwater has
then establish a ground cover.
bypassed it.
Trees or shrubs have begun
Remove them
to grow on the swale or just
downslo a of the level lip.
The bypass channel
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rolling
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
(if applicable).
approximately three to twelve
inches.
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then re-
establish a ground cover.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and re-
establish vegetation.
Nuisance vegetation is
Remove nuisance vegetation by best
choking out desirable species.
means. Herbicides, approved for
aquatic use and applied by or under
the direct supervision of a certified
applicator, may be used.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
401 Oversight Unit at 919-733-1786.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3
Permit Numher:�-�C ,60cIJ 5 �O
JUN 2 -, 2W
(to be provided Gy DWQ)
;:`Z:_-----
1 acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. 1 agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: 14-unSWlc K /Vut, I
BMP drainage area number: iJI
Print name(:: r 1�\AJA rr-o L ..t W, "S, S�'
Title: ILK G-eAerd t' cocs-ei
Address: Ny 97AJ , 5ou4Lpo� �J c >284 G I
Note: The legally responsible party should not be it homeowners association unless more than 50% of
the lots have been sold and it resident of the subdivision has been named the president.
1, 9. Notary Public for the State of
&9-/// CA/OGi'Nq County of !3 UASIt/r l.� do hereby certify that
EacuQeD 4 lJi 1 TP, personally appeared before me this
day of // SUNG aooy , and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements.
Witness my hand and official seal,
NOTqf?-y
PUBS IC
SEAL
My commission expires ;�>OIJ
Form SWU401-Level Spreader, Filler Strip, Restored Riparian Buller O&M-Rev.3 Page 3 of 3
1Q,bOJ,J
,JUN ?, 2009 Permit Number: �!�KOC305 )` 0
(to be provided by DWQ)
Drainage Area Number:
lter Operation and Maintenance Agreement
Progress Energy Carolinas will keep a maintenance record on this BMP. This maintenance
record will be kept in a log in a known set location. Any deficient BMP elements noted in
the inspection will be corrected, repaired or replaced in a timely manner. These
deficiencies can affect the integrity of structures, safety of the public, and the removal
efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
sand filter.
— Once a year, sand media will be skimmed.
— The sand filter media will be replaced whenever it fails to function properly after
vacuuming.
The sand filter will be inspected quarterly and within 24 hours after every storm event
greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be
repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The adjacent pavement
Sediment is present on the
Sweep or vacuum the sediment as
(if applicable)
pavement surface.
soon as possible.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
sand filter
erosive gullies have formed.
remove the gully, and then re-
establish a ground cover.
Vegetation is too short or too
Maintain grass at a height of
long.
approximately three to twelve
inches.
The flow diversion
The structure is clogged.
Unclog the conveyance and dispose
structure
of the sediment off -site.
The structure is damaged.
Make any necessary repairs or
replace the structure.
The pretreatment area
Sediment has accumulated to
Search for the source of the
a depth of greater than six
sediment and remedy the problem if
inches.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection as needed to prevent
future erosion problems.
Weeds are present.
Remove the weeds, by best means.
Herbicides, approved for aquatic
use and applied by or under the
direct supervision of a certified
applicator, may be used.
Form SW401-Sand Filter O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate the roblem:
The filter bed and
Water is ponding on the
Check to see if the collector system
underdrain collection
surface for more than 24
is clogged and flush if necessary. If
system
hours after a storm.
water still ponds, remove the top
few inches of filter bed media and
replace. If water still ponds, then
consult an expert.
The outflow spillway
arted
Shrubs or tr;occurred
Remove shrubs and trees.
and pipe
to ow on tment.
The outflowgged.
Provide additional erosion
protection as needed to prevent
future erosion problems.
The outflowma ed.
Repair or replace the pipe.
The receiving water
Erosion or oof
Contact the NC Division of Water
damage havat the
Quality 401 Oversight Unit at 919-
outlet.733-1786.
L11N 2
Form SW401-Sand Filter O&M-Rev.3 Page 2 of 3
JUN 2 7.002
1 acknowledge and agree by my signature below that
Pertnit Number:_ �V Z US a- O
(to be provided by DWQ)
1 am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project natne: Drun5wic,,L Nuc l-e
BMP drainage area number: '-'j
Print name: Z�I>w^eo L_ WILL—S �1
Title: P1&,k Gevieyyj IlavtgCei
Address: 87 N, Soup{-I..�ov� n1C 4(o/
Date: l'e _ //. 0 9
Note: The legally responsible party should not be a homeowners associalion unless more Ihm 50°k, of
the lots have been sold and a resident of the subdivision has been ntuned the president.
I, L/JVDA��%/Jf E�L /NS1ON/ /Y-a Notary Public for the State of
A164111 C A�0(A'n/A County of 612/L 1✓ do hereby certify that
4J/&St 32. personally appeared before me this
day of Ty Ve , a1x) , and acknowledge the due execution of the
forgoing sand filter maintenance requirements. Witness my hand and official seal,
oPN`tELviy��`•.
� NOTARY Z
alp PUBLIC 2
G
�CK COJ
SEAL
My commission expires
Form SW401-Sand Filler O&M-Rev.3 Page 3 of
la-al-3
DEMLR USE ONLY
Date Received Fee Paid Permit Number
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: Brunswick Steam Electric Plant
2. Project name: Unit 1 Capacitor Bank
3. Project street address: 8470 River Road, SE
City: Southport County: Brunswick ZIP: 28461
4. What, if any, changes have been made to the project as permitted? No change / standard renewal
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/enerqv-
mi neral- land- resou rces/energv-m ineral-la nd-ru I es/stormwater-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/enerqv-mineral-land-
resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: Duke Enerjzy Progress, LLC
2. Signing Official's Name: Jay Ratliff
3. Signing Official's Title: Plant Manager
4. Mailing Address: 8470 River Road
City: Southport State: NC ZIP: 28461
5. Street Address: 8470 River Road
City: Southport State: NC ZIP: 28461
Phone: (9110) 832-3059 Email: Jay.Ralllft' o duke-energy.com
�, ,�. r r r r.►
!r'. l►d p Brr
'; JUN 11 2b21
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
�lN 1. A permit application processing fee of $505.00 payable to NCDEQ.
t/ 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of thefollowing:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company(LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
NA 3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
�i✓ 4. O&M Agreements, Please selectone:
® I have a copy of the current recorded O&M Agreement for all SCMs, and l will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
CA/ 5. Designer Certifications, Please selectone:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
CA 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of
a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
CV 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
to a^ ,
f io 19 2021
BY:
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
4 ,1 k4r4Pj- G the person legally responsible for the permit, certify that I have
a copy ofthe Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct and complete.
Signature:
NOTARIZATION:
&/1yl--20Z1
I, L W 4.) C�/// NG To N a Notary Public for the State of
,U027W eV2eL1NR —,County of do hereby certify that
Eow � l :37AY) 44T)Y'zi=- ate • personally appeared before
me this the A/ day of Tlltt/G 20-A and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal) Duru:�tr:
0O2 N. ELV,"
Notary Signatures v NOTARY
My commission xpires O PUBLIC
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
N
NCDENR n n_ 1 7 tabs
STORMWATER MANAGEMENT PERMfftAP,PLICATION F_ ORM
401 CERTIFICATION APPLICATION'FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely filled out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)!
PROJECT INFORMATION
miecf name Rnmswick Nunlear Plant Unit 1 Canarifnr Rank Installation
Contact name
Phone number
Date
Drainage area number
a
Type of BMP
Drawdown flow from the BMP
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak Flow from the 1 in/hr storm
Time of concentration
Rainfall intensity, 10-yr storm
Peak Flow from the 10-yr storm
Where Does the Level Spreader Discharge?
To a grassed bioretention cell?
To a mulched bioretention cell?
To a wetland?
To a filter strip or riparian buffer?
Other (specify)
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass
Width of dense ground cover
Width of wooded vegetation
Total width
Elevation at downslope base of level lip
Elevation at top of bank of the receiving water
Slope (from level lip to to top of bank)
Are any draws present?
Level Spreader Design
Forebay surface area
Feet of level lip needed per cfs
Answer "Y" to one of the following:
Length based on the 1 inlhr storm?
Length based on the 10-yr storm?
Length based on the BMP discharge rate?
Design flow
Is a bypass device provided?
a
919-546-7457
June 10, 2009
D
Sand Filter
Do not complete this section of the worksheet.
h2 Do not complete this section of the worksheet.
It Do not complete this section of the wodksheet.
% Do not complete this section of the worksheet.
Do not complete this section of the worksheet.
cfs Do trot complete this section of the worl.
min
in/hr Do not complete this section of the worksheet.
cfs Do not complete this section of the worksheet.
N (Y or N)
N (Y or N)
Y (Y or N) Please complete filter strip characterization below
N (Y or N)
N/A
0.00 It * Filter strip removed per
0.00 It comments from scoping meeting.
0.00 ft
0.00 It
0.00 fmsl
0.00 fmsl
#DIVI01 % #DIV/01
N (Y or N) OK
sq ft
#DIV/01 fucfs
N (Y or N)
N (Y or N)
Y (Y or N)
0.18 cfs
N (Y or N)
No forebay is needed.
A bypass device must be provided.
#DIV/0!
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and If. Design Summary, page 1 of 2
Length of the level lip
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
M
B
W
y
Peak velocity in the channel during the 10-yr storm
Channel lining material
CEI_V_
15.00
ft
kVALUE!
N
(vorN)
,II IL I 7 2009
BY•_
N
(YorN)
Do not complete this section of th !feet—*=a>n=Y=underdlain
N
(YorN)
Do not complete this section of the worksheet. flow enters the
Do not complete this section of the worksheet. level spreader
0.00
ft
Do not complete this section of the worksheet. therefore no
0.00
If
Do not complete this section of the worksheet. by-pass is needed.
0.00
R
Do not complete this section of the worksheet.
0.00
ft
Do not complete this section of the worksheet.
0.00
cfs
Do not complete this section of the worksheet.
RIPRAP
Do not complete this section of the worksheet.
y
______-___-
M M
1 li 1
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan I ;
Initials Sheet No.
1:V 1. Plans (1"- 50' or larger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Forebay (if applicable),
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROVE, and
- Boundaries of drainage easement.
V C 2. Plan details (1" = 30' or larger) for the level spreader showing:
Forebay (if applicable),
Q High flow bypass system,
One foot topo lines between the level lip and top of stream bank,
Proposed drainage easement, and
Design at ultimate build -out.
r 1
C —�
3. Section view of the level spreader (1" = 20' or larger) showing:
- Underdrain system (if applicable),
- Level lip,
- Upslope channel, and
0
1 /r
- Downslope filter fabric.
4. A
date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present.
I�
5. A construction sequence that shows how the level spreader will be protected from sediment until the
entire drainage area is stabilized.
6. The supporting calculations.
7. A copy of the signed and notarized operation and maintenance (08M) agreement.
8. A copy of the deed restrictions (if required).
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of i
to
NCDENR
JUL 17 2009
I:�
45.
2o, w/r,q
OIli t
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT
This form must be completely filled out, printed and submitted.
DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)l
LPROJECTINFORMATION
Project name Brunswick Nuclear Plant Unit 1 Capacitor Bank Installation
Contact name Mr. Steve Cahoon
Phone number 919-546-7457
Date July 14, 2009
Drainage area number C
For Level Spreaders Receiving Flow From a BMP
Type of BMP
Drawdown flow from the BMP
For Level Spreaders Receiving Flow from the Drainage Area
Drainage area
Impervious surface area
Percent impervious
Rational C coefficient
Peak Pow from the 1 inlhr storm
Time of concentration
Rainfall intensity, 10-yr storm
Peak Flow from the 10-yr storm
Where Does the Level Spreader Discharge?
To a grassed bioretention cell?
To a mulched bioretention cell?
To a wetland?
To a filter strip or riparian buffer?
Other (specify)
Filter Strip or Riparian Buffer Characterization (if applicable)
Width of grass
Width of dense ground cover
Width of wooded vegetation
Total width
Elevation at downslope base of level lip
Elevation at top of bank of the receiving water
Slope (from level lip to to top of bank)
Are any draws present?
Level Spreader Design
Forebay surface area
Feet of level lip needed per cfs
Answer "Y'to one of the following:
Length based on the 1 inlhr storm?
Length based on the 10-yr storm?
Length based on the BMP discharge rate?
Design Pow
Is a bypass device provided?
Grass Waterway from drainage area C
0.00 cfs
16,988.00 fi'
0.00
It
0.00
%
0.25
0.10
cfs
10.00
min
8.04
inlhr
0.78
CIS
N (Y or N)
N (Y or N)
Y (Y or N) Please complete filter strip characterization below.
N (Y or N)
NIA
0.00
it * Filter strip removed per
0.00
R comments from seeping meeting.
0.00
h
0.00
ft
0.00
fmsl
0.00
frost
#DIi
% #DIVIe!
N
(Y or N) OK
0.10 sq It OK
#DIV/01 fycfs
N
(Y or N)
Y
(Y or N)
N
(Y or N)
0.80
cfs
N
(YorN)
A bypass device is not needed.
#DIVlcl
Form SW401-Level Spreader, Filter Strip, Restored Riparian BuRer-Rev.S Parts I. and IL Design Summary, page 1 of 2
Length of the level lip
Are level spreaders in series?
Bypass Channel Design (if applicable)
Does the bypass discharge through a wetland?
Does the channel enter the stream at an angle?
Dimensions of the channel (see diagram below):
M
B
W
y
Peak velocity in the channel during the 10-yr storm
Channel lining material
I
W
50.00 It 9Dlvml
N (Y or N)
(Y or N) Do not complete this section of the worksheet.
(Y or N) Do not complete this section of the worksheet.
Do not complete this section of the worksheet.
ft Do not complete this section of the worksheet.
It Do not complete this section of the worksheet.
ft Do not complete this section of the worksheet.
ft Do not complete this section of the worksheet.
cfs Do not complete this section of the worksheet.
Do not complete this section of the worksheet
W
w
M
Level spreader
added for enhanced
erosion control
only. Therefore
no by-pass channel
has been provided.
,CEIVED
JUL 1 7 2009
BY:
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Pans I. and II. Design Summary, page 2 of 2
III:REQUIRED ITEMS CHECKLIST'
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
1:'V �2_ I'n — 1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Forebay (if applicable),
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW), and
Boundaries of drainage easement.
C-1 2. Plan details (1" = 30' or larger) for the level spreader showing:
C— L� Forebay (if applicable),
Q High flow bypass system,
l One foot topo lines between the level lip and top of stream bank,
Proposed drainage easement, and
Design at ultimate build -out.
RECr
JUN 2 ; 200'
BY: — — --
C —�
3. Section view of the level spreader (1" = 20' or larger) showing:
- Underdrain system (if applicable),
- Level lip,
- Upslope channel, and
- Downslope filter fabric.
f V
I �
4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present.
I� 5. A construction sequence that shows how the level spreader will be protected from sediment until the
�Q entire drainage area is stabilized.
6. The supporting calculations.
7. A copy of the signed and notarized operation and maintenance (0&M) agreement.
I n 8. A copy of the deed restrictions (if required).
Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1
Permit Numbers
y'� /'-� y (to be provided by DWO)
�C'i'C V O2Op W ATE.q
Sul_ 1 7 2009 I
NCDENR STORMWATER MIANAGEM:N.T_P-ERMITAPPLICATION FORM o��s
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV)
I. PROJECT INFORMATION
Project name Brunswick Nuclear Plant Unit 1 Capacitor Bank Installation
Contact name Mr. Steve Cahoon
Phone number 919-546-7457
Dale July 14, 2009
Drainage area number D
II. DESIGN INFORMATION
Site Characteristics
Drainage area (AD)
52,272.00 ftZ OK
Impervious area
34,848.00 ft'
% Impervious (IA)
66.7% %
Design rainfall depth (Ro)
I in
Peak Flow Calculations
1-yr, 24-hr runoff depth
4.08 in
1-yr, 24-hr intensity
0.17 inlhr
Pre -development 1-yr, 24-hr runoff
1.30 ft'/sec
Post -development 1-yr, 24-hr runoff
4.80 ft'/sec
Pre/Post 1-yr, 24-hr peak control
3.50 f lsec
Storage Volume
Design volume (WOV) 8,494.00 ft'
Adjusted water quality volume (WOVAa) 6,370.50 ft' OK
Volume contained in the sedimentation basin and on top of the sand filter 8,775.00
Maximum head on the sedimentation basin and sand filter h Max depth allowable
( MaeFilter) 1.30ft Insufficient depth. Average head on the sedimentation basin and sand filter (hA) 0.65 It OK based on constraints.
Runoff Coefficient (Rv) 0.65 (unitless)
Type of Sand Filter
Open sand filter? y Y or N
If this is an open sand filter: The clearance between the bottom of the sand 2.00 ft
filter and the SHWT (dSHWT)
Closed/pre-cast sand filter? in Y or N
If this is a closed sand filter: The clearance between the bottom of the sand N/A ft
filter and the SHWT (d SHWT)
If this is a closed, underground closed sand filter: The clearance between
the surface of the sand filter and the bottom of the roof of the underground NIA ft
structure (dse,e,)
Form SW 401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 1 or 3
Permit Number_S�
(to be provided by DWO)
Sedimentation Basin JUL 1 7 2009
Surface area of sedimentation basin (A �Y.
Sand Filter
Surface area of sand filter (AF)
Depth of the sand media filter bed (dF)
Coefficient of permeability for the sand filter (k)
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line Flow -splitting device used?
Does volume in excess of the design volume flow evenly distributed through a
vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
Is the BMP located at least 100111 from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamber/forebay (Wsed)?
What is the depth of sand over the outlet pipe?
Figure 1: Open Sand Filter
OK. Meets minimum, but may need to be increased to
2,250.00 ffz contain the required volume if error under Storage
Volume section.
OK. Meets minimum, but may need to be increased to
4,500.00
flz
contain the required volume if error under Storage
Volume section.
2.00 It
3.50 ffi
11.40hours
OK. Submit drainage calculations.
0.48 days
N
Y or N
Excess volume must bypass cell. " see note below
N
Y or N
Insufficient flow splitter.
N
Y or N
Excess volume must pass through filter.
0.00 n
Y
Y or N
OK
Y
YorN
OK
Y
YorN
OK
Y
Y or N
OK
Y
YorN
OK
Nediumntal1°O Saud Piker
l'Fill Oh:n9 . is L:uuLn'
j nr Fl+r\
Flow � 1 Weili �u11 et Pipe
15.00 ft OK
1.30 ft OK
•• Noce: System designed as
online: 2x required
treatment volume is
provided.
1=- fl I l- Ir i dSHWf
iu-Biro Soil E 3cnsoual.k: Hieb ll-:der Treble
w','d
Form SW401 Sand Filter-Rev.3 Parts I and II. Project Design Summary, Page 2 of 3
Figure 2; Closed Sand Filter
Permit Numk>4�Wp�'�A
(to be provided by DWO)
O'Cdaud
Ww
Wale.
Scdi,uculati,�,� iF
. (6 ch'N I
Hurry
C"'lleett'l
Q.g.cv. Dehm)
cr Chmc'
Sand
IOnticl Pipe
...... ds
a7pecv
.......... ..........
I
hp.
(IF
1 7 1009
LBY:- -J
Form SW401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 3 of 3
Permit No. `�6o")"? S-)L8
(to be provided by DWQ)
mease malcate the page or plan sneer numoers wnere the supporting aocumentatlon can oe touna. An Incomplete suommai
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the
agent may initial below. If a requirement has not been met, attach justification.
Initials
fi X.
I✓�
=7.
Pagel Plan
Sheet No.
3 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
- Flow splitting device,
C-8
Lp.
Proposed drainage easement and public right of way (ROW),
Design at ultimate build -out,
Off -site drainage (if applicable), and
Boundaries of drainage easement.
2. Plan details (1" = 50' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
- Flow splitting device,
- Proposed drainage easement and public right of way (ROW),
- Design at ultimate build -out,
- Off -site drainage (if applicable), and
- Boundaries of drainage easement.
3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media
- Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level(s)
- Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable)
4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
5. Supporting calculations (including drainage calculations)
6. Signed and notarized operation and maintenance (0&M) agreement
7. A copy of the deed restrictions (if required).
Form SW401-Sand Filtar-Rev.3 Part III. Pane 1 of 1
Brunswick Nuclear Plant — Unit 1 Capacitor Bank Installation
Stormwater Permit Certification
NCDENR DWQ Permit No. SW8 090528
Designer Certification
I, F. Virginia Russell, as a duly registered Professional Engineer in the state of North Carolina, having
been authorized to observe (periodically, weekly, fall time), the construction of the project Brunswick
Nuclear Plant— Unit 1 Capacitor Bank Installation for Progress Energy Carolinas. Inc. hereby state that,
to the best of my abilities, due care and diligence was used in the observation of project construction
such that the construction was observed to be built with substantial compliance and intent of the
approved plans and specifications.
Certification Requirements:
No.
Requirement
Met Y NJ
Comments
1
The drainage area to the system contains
Y
None.
approximately the permitted acreage.
2
The drainage area to the system contains no
Y
None.
more than the permitted amount of built -
upon area.
3
All the built -upon area associated with the
Y
None.
project is graded such that the runoff drains
to the system.
4
All roof drains are located such that the
N/A
There are no roof drains associated
runoff is directed to the system.
with the project.
5
The sand filter elevations are per the
Y
None.
approved plans.
6
The sand filter is located per the approved
Y
None.
plan.
7
A trash rack is provided on the outlet/bypass
N/A
There is no trash rack required for
structure.
this project.
8
For open bottom sand filters, all slopes are
In process
Permanent vegetation (grass) has
grassed with permanent vegetation.
been established in all areas.
Permanent vegetation on the forebay
slopes is sparse but slopes are stable
and well maintained.
9
Vegetated slopes are no steeper than 3:1
Y
None.
10
The inlets are located per the approved
N/A
There are no inlets associated with
plans and do not cause short circuiting of
this project.
the system.
11
The permitted amounts of surface area
Y
None.
and/or volume have been provided.
12
Required drawdown devices are correctly
Y
None.
sized and located per the approved plans.
13
All permitted design depths are provided.
Y
None.
14
All required parts of the system are
Y
None.
provided, such as vegetated shelf, a forebay,
and a vegetated filter.
MAY 2 8 2010
v. �� Q
Brunswick Nuclear Plant — Unit 1 Capacitor Bank Installation
Stormwater Permit Certification
NCDENR DWQ Permit No. SW8 090528
15
The permitted dimensions of the system are
Y
None.
provided, per the approved plan.
Noted Deviations from the Approved Plans and Specifications:
0G1T;
Signature:��icG1 r.�c2J
Registration Number: 0 5 av
Date: TIa. 7 0
\\\�\.�N�CAR
F6S8
0 2109���_
/��ii��RG� •IAd1.RUs��\��
��llltillhl����
Rril C v�) VEIL)
MAY 2 8 Z010
BY: