Loading...
HomeMy WebLinkAboutSW8090528_CURRENT PERMIT_20210623STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Oowsz'f DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 207-10�023 YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI secremry BRIAN WRENN Dtrecrar June 23, 2021 NORTH CAROLINA Fnvhonmental Quality Duke Energy Progress, LLC Attn: John Krakuszeski, Brunswick Site Vice President C/O: Jay Ratcliff, Plant Manager 8470 River Road Southport, NC 28461 Subject: Permit Renewal State Stormwater Management Permit No. SW8 090528 Brunswick Unit 1- Capacitor Bank Brunswick County Dear Mr. Ratcliff: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years extension. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on June 17, 2021. The Division is hereby notifying you that permit SW8 090528 has been renewed on June 23, 2021, and shall be effective until December 30, 2029, which includes all available extensions. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on July 23, 2009 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. ®� �Z� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 roam w+ouw. �� �+� 910.796.7215 (� Dewberry' Virginia Russell, El :ivil Designer 2301 Rexwoods Drive Suite 200 Raleigh, NC 27607-3366 919 881 9939 919 881 9923 fax fvrussell®dewberry.com Dewbeny 8 Davis, Inc. www.dowberry.com Ri State Stormwater Permit No. SW8 090528 Page 2 of 2 If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, 144 ,Z�; Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Attachment C — Permitting History Renewal Application Documents DES/arcs: \\\Stormwater\Permits &. Projects\2009\090528 HD\2021 06 permit 090528 cc: NCDEQ-DEMLR Wilmington Regional Office North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 amwa u ^s^.rwm+.vmome.� 910.796.7215 State Stormwater Management Systems Permit No. SW8 090528 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Duke Energy Progress, LLC Brunswick Unit 1- Capacitor Bank 8470 River Road SE, Southport, Brunswick County FOR THE construction, operation and maintenance of one sand filter in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.9 of this permit. The stormwater control has been designed to handle the runoff from 34,848 square feet of impervious area. Other incidental impervious area (4,792 square feet) has been approved for the driveway access and will be treated through grassed swales. 3. A vegetated filter has been waived for this sand filter since it has been designed to handle twice the design storm as detailed in Section 1.8 on page 2. 4. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 090528 The project shall maintain a 50' wide buffer measured from the normal pool of impoundments, the banks of rivers and streams and the mean high water line of tidal waters. All runoff being directed into wetlands shall flow into and through those wetlands at a non - erosive velocity. The following design elements have been approved for this sand filter stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: Onsite, ft': Offsite, ftz: b. Total Impervious Surfaces, ftZ: c. Design Storm, inches: d. Sediment Chamber Depth, ft.: e. Sand Chamber Depth (weir to bottom) ft: f. Filter Media Depth, ft.: g. Sediment Chamber Bottom Elev. fmsl: h. Sand Chamber Bottom Elev., fmsl: i. Sediment Chamber Surface Area, ftZ: j. Sand Chamber Surface Area, ftz: k. Weir Elevation, fmsl: I. Max. Head on Filter (weir to top of sand) ft: M. Permitted Storage Volume, ft': n. Orifice Diameter, inches: o. Time to Draw Down, hours: p. Seasonal High Water Table, FMSL: q. Receiving Stream / River Basin: r. Stream Index Number: S. Classification of Water Body: 11. SCHEDULE OF COMPLIANCE 1.2 52,272 0 34,848 3.0 3.15 3.15 2.0 20.15 20.15 2,250 4,500 23.3 1.30' 8,775 6 " 0 11.4 18.15 Nancy's Creek / Cape Fear 18-88-1-3 "Sc, HQW, Sw" 1. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area. 2. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 4. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 5. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 090528 6. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of filter media, bypass structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 7. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 8. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. 9. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 10. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 11. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 090528 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed 'Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; G. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission, however, these actions do not stay any permit conditions. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Page 4 of 5 State Stormwater Management Systems Permit No. SW8 090528 Permit renewed, updated and reissued this the 23rd day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION aj�tt:...4 944 Brian Wrenn, Uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Brunswick Unitl- Capacitor Bank Permit No. SW8 090528 Approval Date Permit Action BIMS Version Description of the Changes 7/23/2009 Original Approval 10 6/23/2021 Renewal 2.0 Permit Number. �oqic'Sa�� (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement Progress Energy Carolinas will keep a maintenance record on this BMP. This I JUN 2 - 2009 maintenance record will be kept in a log in a known set location. Any deficient BMPJ. elements noted in the inspection will be corrected, repaired or replaced in a time manner. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded, if needed, to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired in a timely manner. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-1-evel Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 i F BMP element. Potentialproblem: How I will remediate thee roblem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then establish a ground cover. bypassed it. Trees or shrubs have begun Remove them to grow on the swale or just downslo a of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of (if applicable). approximately three to twelve inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re- establish a ground cover. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and re- establish vegetation. Nuisance vegetation is Remove nuisance vegetation by best choking out desirable species. means. Herbicides, approved for aquatic use and applied by or under the direct supervision of a certified applicator, may be used. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Numher:�-�C ,60cIJ 5 �O JUN 2 -, 2W (to be provided Gy DWQ) ;:`Z:_----- 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 14-unSWlc K /Vut, I BMP drainage area number: iJI Print name(:: r 1�\AJA rr-o L ..t W, "S, S�' Title: ILK G-eAerd t' cocs-ei Address: Ny 97AJ , 5ou4Lpo� �J c >284 G I Note: The legally responsible party should not be it homeowners association unless more than 50% of the lots have been sold and it resident of the subdivision has been named the president. 1, 9. Notary Public for the State of &9-/// CA/OGi'Nq County of !3 UASIt/r l.� do hereby certify that EacuQeD 4 lJi 1 TP, personally appeared before me this day of // SUNG aooy , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, NOTqf?-y PUBS IC SEAL My commission expires ;�>OIJ Form SWU401-Level Spreader, Filler Strip, Restored Riparian Buller O&M-Rev.3 Page 3 of 3 1Q,bOJ,J ,JUN ?, 2009 Permit Number: �!�KOC305 )` 0 (to be provided by DWQ) Drainage Area Number: lter Operation and Maintenance Agreement Progress Energy Carolinas will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced in a timely manner. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after vacuuming. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as (if applicable) pavement surface. soon as possible. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to sand filter erosive gullies have formed. remove the gully, and then re- establish a ground cover. Vegetation is too short or too Maintain grass at a height of long. approximately three to twelve inches. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure of the sediment off -site. The structure is damaged. Make any necessary repairs or replace the structure. The pretreatment area Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection as needed to prevent future erosion problems. Weeds are present. Remove the weeds, by best means. Herbicides, approved for aquatic use and applied by or under the direct supervision of a certified applicator, may be used. Form SW401-Sand Filter O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate the roblem: The filter bed and Water is ponding on the Check to see if the collector system underdrain collection surface for more than 24 is clogged and flush if necessary. If system hours after a storm. water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. The outflow spillway arted Shrubs or tr;occurred Remove shrubs and trees. and pipe to ow on tment. The outflowgged. Provide additional erosion protection as needed to prevent future erosion problems. The outflowma ed. Repair or replace the pipe. The receiving water Erosion or oof Contact the NC Division of Water damage havat the Quality 401 Oversight Unit at 919- outlet.733-1786. L11N 2 Form SW401-Sand Filter O&M-Rev.3 Page 2 of 3 JUN 2 7.002 1 acknowledge and agree by my signature below that Pertnit Number:_ �V Z US a- O (to be provided by DWQ) 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project natne: Drun5wic,,L Nuc l-e BMP drainage area number: '-'j Print name: Z�I>w^eo L_ WILL—S �1 Title: P1&,k Gevieyyj IlavtgCei Address: 87 N, Soup{-I..�ov� n1C 4(o/ Date: l'e _ //. 0 9 Note: The legally responsible party should not be a homeowners associalion unless more Ihm 50°k, of the lots have been sold and a resident of the subdivision has been ntuned the president. I, L/JVDA��%/Jf E�L /NS1ON/ /Y-a Notary Public for the State of A164111 C A�0(A'n/A County of 612/L 1✓ do hereby certify that 4J/&St 32. personally appeared before me this day of Ty Ve , a1x) , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, oPN`tELviy��`•. � NOTARY Z alp PUBLIC 2 G �CK COJ SEAL My commission expires Form SW401-Sand Filler O&M-Rev.3 Page 3 of la-al-3 DEMLR USE ONLY Date Received Fee Paid Permit Number NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: Brunswick Steam Electric Plant 2. Project name: Unit 1 Capacitor Bank 3. Project street address: 8470 River Road, SE City: Southport County: Brunswick ZIP: 28461 4. What, if any, changes have been made to the project as permitted? No change / standard renewal If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/enerqv- mi neral- land- resou rces/energv-m ineral-la nd-ru I es/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/enerqv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Duke Enerjzy Progress, LLC 2. Signing Official's Name: Jay Ratliff 3. Signing Official's Title: Plant Manager 4. Mailing Address: 8470 River Road City: Southport State: NC ZIP: 28461 5. Street Address: 8470 River Road City: Southport State: NC ZIP: 28461 Phone: (9110) 832-3059 Email: Jay.Ralllft' o duke-energy.com �, ,�. r r r r.► !r'. l►d p Brr '; JUN 11 2b21 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: �lN 1. A permit application processing fee of $505.00 payable to NCDEQ. t/ 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of thefollowing: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. NA 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. �i✓ 4. O&M Agreements, Please selectone: ® I have a copy of the current recorded O&M Agreement for all SCMs, and l will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. CA/ 5. Designer Certifications, Please selectone: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. CA 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. CV 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). to a^ , f io 19 2021 BY: Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION 4 ,1 k4r4Pj- G the person legally responsible for the permit, certify that I have a copy ofthe Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: NOTARIZATION: &/1yl--20Z1 I, L W 4.) C�/// NG To N a Notary Public for the State of ,U027W eV2eL1NR —,County of do hereby certify that Eow � l :37AY) 44T)Y'zi=- ate • personally appeared before me this the A/ day of Tlltt/G 20-A and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Duru:�tr: 0O2 N. ELV," Notary Signatures v NOTARY My commission xpires O PUBLIC Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 N NCDENR n n_ 1 7 tabs STORMWATER MANAGEMENT PERMfftAP,PLICATION F_ ORM 401 CERTIFICATION APPLICATION'FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! PROJECT INFORMATION miecf name Rnmswick Nunlear Plant Unit 1 Canarifnr Rank Installation Contact name Phone number Date Drainage area number a Type of BMP Drawdown flow from the BMP For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak Flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak Flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer "Y" to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? a 919-546-7457 June 10, 2009 D Sand Filter Do not complete this section of the worksheet. h2 Do not complete this section of the worksheet. It Do not complete this section of the wodksheet. % Do not complete this section of the worksheet. Do not complete this section of the worksheet. cfs Do trot complete this section of the worl. min in/hr Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below N (Y or N) N/A 0.00 It * Filter strip removed per 0.00 It comments from scoping meeting. 0.00 ft 0.00 It 0.00 fmsl 0.00 fmsl #DIVI01 % #DIV/01 N (Y or N) OK sq ft #DIV/01 fucfs N (Y or N) N (Y or N) Y (Y or N) 0.18 cfs N (Y or N) No forebay is needed. A bypass device must be provided. #DIV/0! Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and If. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material CEI_V_ 15.00 ft kVALUE! N (vorN) ,II IL I 7 2009 BY•_ N (YorN) Do not complete this section of th !feet—*=a>n=Y=underdlain N (YorN) Do not complete this section of the worksheet. flow enters the Do not complete this section of the worksheet. level spreader 0.00 ft Do not complete this section of the worksheet. therefore no 0.00 If Do not complete this section of the worksheet. by-pass is needed. 0.00 R Do not complete this section of the worksheet. 0.00 ft Do not complete this section of the worksheet. 0.00 cfs Do not complete this section of the worksheet. RIPRAP Do not complete this section of the worksheet. y ______-___- M M 1 li 1 Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Pagel Plan I ; Initials Sheet No. 1:V 1. Plans (1"- 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROVE, and - Boundaries of drainage easement. V C 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), Q High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. r 1 C —� 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and 0 1 /r - Downslope filter fabric. 4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present. I� 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (08M) agreement. 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of i to NCDENR JUL 17 2009 I:� 45. 2o, w/r,q OIli t STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)l LPROJECTINFORMATION Project name Brunswick Nuclear Plant Unit 1 Capacitor Bank Installation Contact name Mr. Steve Cahoon Phone number 919-546-7457 Date July 14, 2009 Drainage area number C For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak Pow from the 1 inlhr storm Time of concentration Rainfall intensity, 10-yr storm Peak Flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer "Y'to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design Pow Is a bypass device provided? Grass Waterway from drainage area C 0.00 cfs 16,988.00 fi' 0.00 It 0.00 % 0.25 0.10 cfs 10.00 min 8.04 inlhr 0.78 CIS N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below. N (Y or N) NIA 0.00 it * Filter strip removed per 0.00 R comments from seeping meeting. 0.00 h 0.00 ft 0.00 fmsl 0.00 frost #DIi % #DIVIe! N (Y or N) OK 0.10 sq It OK #DIV/01 fycfs N (Y or N) Y (Y or N) N (Y or N) 0.80 cfs N (YorN) A bypass device is not needed. #DIVlcl Form SW401-Level Spreader, Filter Strip, Restored Riparian BuRer-Rev.S Parts I. and IL Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material I W 50.00 It 9Dlvml N (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. It Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet W w M Level spreader added for enhanced erosion control only. Therefore no by-pass channel has been provided. ,CEIVED JUL 1 7 2009 BY: Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Pans I. and II. Design Summary, page 2 of 2 III:REQUIRED ITEMS CHECKLIST' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1:'V �2_ I'n — 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. C-1 2. Plan details (1" = 30' or larger) for the level spreader showing: C— L� Forebay (if applicable), Q High flow bypass system, l One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. RECr JUN 2 ; 200' BY: — — -- C —� 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. f V I � 4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present. I� 5. A construction sequence that shows how the level spreader will be protected from sediment until the �Q entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. I n 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Permit Numbers y'� /'-� y (to be provided by DWO) �C'i'C V O2Op W ATE.q Sul_ 1 7 2009 I NCDENR STORMWATER MIANAGEM:N.T_P-ERMITAPPLICATION FORM o��s 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section III) and the I&M Agreement (Section IV) I. PROJECT INFORMATION Project name Brunswick Nuclear Plant Unit 1 Capacitor Bank Installation Contact name Mr. Steve Cahoon Phone number 919-546-7457 Dale July 14, 2009 Drainage area number D II. DESIGN INFORMATION Site Characteristics Drainage area (AD) 52,272.00 ftZ OK Impervious area 34,848.00 ft' % Impervious (IA) 66.7% % Design rainfall depth (Ro) I in Peak Flow Calculations 1-yr, 24-hr runoff depth 4.08 in 1-yr, 24-hr intensity 0.17 inlhr Pre -development 1-yr, 24-hr runoff 1.30 ft'/sec Post -development 1-yr, 24-hr runoff 4.80 ft'/sec Pre/Post 1-yr, 24-hr peak control 3.50 f lsec Storage Volume Design volume (WOV) 8,494.00 ft' Adjusted water quality volume (WOVAa) 6,370.50 ft' OK Volume contained in the sedimentation basin and on top of the sand filter 8,775.00 Maximum head on the sedimentation basin and sand filter h Max depth allowable ( MaeFilter) 1.30ft Insufficient depth. Average head on the sedimentation basin and sand filter (hA) 0.65 It OK based on constraints. Runoff Coefficient (Rv) 0.65 (unitless) Type of Sand Filter Open sand filter? y Y or N If this is an open sand filter: The clearance between the bottom of the sand 2.00 ft filter and the SHWT (dSHWT) Closed/pre-cast sand filter? in Y or N If this is a closed sand filter: The clearance between the bottom of the sand N/A ft filter and the SHWT (d SHWT) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground NIA ft structure (dse,e,) Form SW 401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 1 or 3 Permit Number_S� (to be provided by DWO) Sedimentation Basin JUL 1 7 2009 Surface area of sedimentation basin (A �Y. Sand Filter Surface area of sand filter (AF) Depth of the sand media filter bed (dF) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line Flow -splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Is the BMP located at least 100111 from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Wsed)? What is the depth of sand over the outlet pipe? Figure 1: Open Sand Filter OK. Meets minimum, but may need to be increased to 2,250.00 ffz contain the required volume if error under Storage Volume section. OK. Meets minimum, but may need to be increased to 4,500.00 flz contain the required volume if error under Storage Volume section. 2.00 It 3.50 ffi 11.40hours OK. Submit drainage calculations. 0.48 days N Y or N Excess volume must bypass cell. " see note below N Y or N Insufficient flow splitter. N Y or N Excess volume must pass through filter. 0.00 n Y Y or N OK Y YorN OK Y YorN OK Y Y or N OK Y YorN OK Nediumntal1°O Saud Piker l'Fill Oh:n9 . is L:uuLn' j nr Fl+r\ Flow � 1 Weili �u11 et Pipe 15.00 ft OK 1.30 ft OK •• Noce: System designed as online: 2x required treatment volume is provided. 1=- fl I l- Ir i dSHWf iu-Biro Soil E 3cnsoual.k: Hieb ll-:der Treble w','d Form SW401 Sand Filter-Rev.3 Parts I and II. Project Design Summary, Page 2 of 3 Figure 2; Closed Sand Filter Permit Numk>4�Wp�'�A (to be provided by DWO) O'Cdaud Ww Wale. Scdi,uculati,�,� iF . (6 ch'N I Hurry C"'lleett'l Q.g.cv. Dehm) cr Chmc' Sand IOnticl Pipe ...... ds a7pecv .......... .......... I hp. (IF 1 7 1009 LBY:- -J Form SW401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 3 of 3 Permit No. `�6o")"? S-)L8 (to be provided by DWQ) mease malcate the page or plan sneer numoers wnere the supporting aocumentatlon can oe touna. An Incomplete suommai package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials fi X. I✓� =7. Pagel Plan Sheet No. 3 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, C-8 Lp. Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), and Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media - Connection between the sedimentation chamber and the sand filter chamber, - SHWT level(s) - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 5. Supporting calculations (including drainage calculations) 6. Signed and notarized operation and maintenance (0&M) agreement 7. A copy of the deed restrictions (if required). Form SW401-Sand Filtar-Rev.3 Part III. Pane 1 of 1 Brunswick Nuclear Plant — Unit 1 Capacitor Bank Installation Stormwater Permit Certification NCDENR DWQ Permit No. SW8 090528 Designer Certification I, F. Virginia Russell, as a duly registered Professional Engineer in the state of North Carolina, having been authorized to observe (periodically, weekly, fall time), the construction of the project Brunswick Nuclear Plant— Unit 1 Capacitor Bank Installation for Progress Energy Carolinas. Inc. hereby state that, to the best of my abilities, due care and diligence was used in the observation of project construction such that the construction was observed to be built with substantial compliance and intent of the approved plans and specifications. Certification Requirements: No. Requirement Met Y NJ Comments 1 The drainage area to the system contains Y None. approximately the permitted acreage. 2 The drainage area to the system contains no Y None. more than the permitted amount of built - upon area. 3 All the built -upon area associated with the Y None. project is graded such that the runoff drains to the system. 4 All roof drains are located such that the N/A There are no roof drains associated runoff is directed to the system. with the project. 5 The sand filter elevations are per the Y None. approved plans. 6 The sand filter is located per the approved Y None. plan. 7 A trash rack is provided on the outlet/bypass N/A There is no trash rack required for structure. this project. 8 For open bottom sand filters, all slopes are In process Permanent vegetation (grass) has grassed with permanent vegetation. been established in all areas. Permanent vegetation on the forebay slopes is sparse but slopes are stable and well maintained. 9 Vegetated slopes are no steeper than 3:1 Y None. 10 The inlets are located per the approved N/A There are no inlets associated with plans and do not cause short circuiting of this project. the system. 11 The permitted amounts of surface area Y None. and/or volume have been provided. 12 Required drawdown devices are correctly Y None. sized and located per the approved plans. 13 All permitted design depths are provided. Y None. 14 All required parts of the system are Y None. provided, such as vegetated shelf, a forebay, and a vegetated filter. MAY 2 8 2010 v. �� Q Brunswick Nuclear Plant — Unit 1 Capacitor Bank Installation Stormwater Permit Certification NCDENR DWQ Permit No. SW8 090528 15 The permitted dimensions of the system are Y None. provided, per the approved plan. Noted Deviations from the Approved Plans and Specifications: 0G1T; Signature:��icG1 r.�c2J Registration Number: 0 5 av Date: TIa. 7 0 \\\�\.�N�CAR F6S8 0 2109���_ /��ii��RG� •IAd1.RUs��\�� ��llltillhl���� Rril C v�) VEIL) MAY 2 8 Z010 BY: