Loading...
HomeMy WebLinkAboutSW8080908_HISTORICAL FILE_20210809STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0900108 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS Q HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oz\ 080n YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Thursday, August 5, 2021 12 22 PM To: georgia008@mac.com; Ginger Turner Subject: SW8 080908 - Island Harbor Marina The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 4, 2021. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email cortespondence, to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties Website: http;f[deg nc Roy/about/divisions/enerw-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-t9, the Department of Environmental Quality has adjusted operations to Protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the Public during this challenging time. Non-TranSfer Application Completeness Review Checklist - Short Version Project Name: (s li%.A 4" A o MaeI b A Project County/Location: � j�'($ �T /E/y(C/GQC t7 l s t•-'-- Permit Action: New Not located in the ETJ of the following deligated and functioning programs: Date Delivered to WIRO: 4 G Z BIMS Received/Accepted Date. O BIMS Acknowledged Datel: New Permit #2: NHC Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mo enewal Permit Type: < LID / LID Overall / HD &LD Combo General Permit / Offsite / Exempt Development Type Comm Resident / Other Subdivided?: Rule(s): Subdivision Coastal Permittee Type & Documents Needed: Property Owner(s) Purchaser Viable2 Viable? Deed Not Subdivided Common Area Deed Coastal 1 11995 Coastal 1988 Coastal Lessee Agmt I 1 1Lease Paperwork lzgpphcation ®Fee: f33$505 (within 5mo) Check#(s): `y t o nSupplements (1 new form or for older forms: 1 original per SCM) FJO&Mt Soils Report (lnfil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative FIUSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Plans (2 Sets) PE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: IEnter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. 3If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: REVIEWER NAME: AS4 Le Existing Permit #: SAS 4:5$4t,(baj ExpnationDate 3 1.1Z13/.oZ4 FlOffsite to SWB: r_1Is Lot ID'ed in Master Permit? =HOA =Viable? Minutes IDNo Fee Y / N =Developer =Viable? Comments: I • `M)AGErk PiS G1/fTi� r G:WQ\\\Reference Lmrary\Procedures\Checklists\Completeness Review Checklist 20200131 To: NCDEQ 127 Cardinal Dr Ext Wilmington, NC 28405 WE ARE SENDING YOU: EGEQ E All 0 4 I'll THE CULLIPHER GROUP, P.A. ENGINEERING & SURVEYING SERVICES HESTRON PLAZA TWO 151-A NC HWY 24 MOREHEAD CITY, NC 28557 P:(252) 773-0090 F:(252) 773-0243 LEER OF TRANSMITTAL DATE 8/2/2021 JOB NO. PM1630 Island Harbor Marina ATTENTION Re SW8 080908 RENEWAL COPIES DATE NO. DESCRIPTION 1 Original Renewal Form 1 Application Fee $505 1 LLC Documentation THESE ARE TRANSMITTED as checked below: ❑ For approval []Resubmit copies for approval ❑ For your use []Submit copies for distribution ❑ As requested ®For review and comment ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US Please let me know if you have questions or comments. 252-499-2166 COPY TO SIGNED Ginger Y. Turner, PE a LIMITED LIABILITY COMPANY ANNUAL 1012017 NAME OF LIMITED LIABILITY COMPANY: MARITIME SIBLINGS, LLC SECRETARY OF STATE ID NUMBER: 1051596 STATE OF FORMATION: NC REPORT FOR THE CALENDAR YEAR: 2021 SECTION A: 1. NAME OF REGISTERED AGENT: R AndrPw Harris 2. SIGNATURE OF THE NEW REGISTERED AGENT: SOSID: 1051596 Date Filed: 3/24/2021 Elaine F. Marshall North Carolina Secretary of State CA2021 083 02891 SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 1912 Eastchester Drive 1912 Eastchester Drive High Point, NC 27265-3501 Guilford High Point, NC 27265-3501 Guilford SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Marina RllcinPsc 2. PRINCIPAL OFFICE PHONE NUMBER: (252) 354-2373 4. PRINCIPAL OFFICE STREET ADDRESS 9100 Emerald Drive 3. PRINCIPAL OFFICE EMAIL Privacy Redaction 5. PRINCIPAL OFFICE MAILING ADDRESS E .. PO Box 4549 Emerald Isle, NC 28594-2419 Carteret Emerald Isle, NC 28594-4549 Carteret 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: COMPANY OFFICIALS (Enter additional company officials in Section E.) NAME: Robin R Herring TITLE: Manager ADDRESS: PO Box 4549 Emerald Isle, NC 28594 Carteret NAME: Georgia Ricks TITLE: Manager ADDRESS: PO Box 4549 NAME: Rhett H Ricks TITLE: Manager ADDRESS: PO Box 4549 Emerald Isle, NC 28594 Carteret Emerald Isle, NC 28594 Carteret D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. 3.11-e SI ATURE DATE or e.be�Za�dy a Comp y O cciial listed under Section C of This form. --T` Print or Type Name of Company Official Print or y e Title of Company Official SUBMIT THIS ANNUAL REPORT WITH THE REQUIRED FILING FEE OF $200 MAIL TO: Secretary of State, Business Registration Division, Past Office Box 29525. Raleigh, NC 2762"525 ROY COOPER Gavmtar DIONNE DEW-GATTI Se(a v-7 BRIAN WRENN July 15, 2021 Maritime Siblings, LLC Arm: Robin R. Herring, Manager P.O. Box 4549 Emerald Isle, NC 28594 NORTH CAROLINA EM&=meAW Qualrry Subject: Stormwater Permit Renewal Request State Stormwater Management Permit No. SW8 080908 Island Harbor Marina Carteret County Dear Mr. Herring: State Stormwater Management Permit #SW8 080908 for the subject project expired on April 28, 2021. This is a reminder that permit renewal applications are due 180 days prior to their expiration per 15A NCAC 2H.1045(3). North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. Please submit a complete permit renewal form along with a $505.00 fee and other submittal requirements within 30 days. The permit renewal form can be found on our website at: httos://deq.nc.gov/about/divisions/energ1y- mineral-and-land-resources/stormwater/stormwater-Dro>2ram/Dost-construction-2. Also, it was noted in the file review mat a oesigner's certrticauol required by the permit has not been was constructed in accordance with the approved plans as e include this with your application. A review of the North Carolina Secretary of State corporation's database revealed that this corporation has a new point of contact. Please submit a completed Permit Information Update Form to correct your contact information which is available on the website provided above. If you have any questions regarding this matter, please contact Ashley Smith at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, Cam— 11�4 ,� Brian Wrenn, Director Division of Energy, Mineral and Land Resources DES/ams: \\\Stortnwater\Permits & Projects\2008\080908 HD\2021 07 req_ren 080908 cc: Andrew R. Harris, Registered Agent; Maritime Siblings, LLC; 1912 Eastchester Drive; High Point NC 27265 Wilmington Regional Office File J North Carolina Department of Environmental Quality I Division of Energy, Anal and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension J Wilmington. North Carolina 28405 ^+�rmur_r� 910.796.7Z15 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name MARITIME SIBLINGS, LLC Information Sosld: 1051596 Status: Current -Active O Date Formed: 7/1/2008 Citizenship: Domestic Annual Report Due Date: April 15th Currentgnnual. Report Status: Registered Agent: Harris, R. Andrew Addresses Reg Office Reg Mailing Principal Office 1912 Eastchester Drive 1912 Eastchester Drive 9100 Emerald Drive High Point, NC 27265-3501 High Point, NC 27265-3501 Emerald Isle, NC 28594-2419 Mailing PO Box 4549 Emerald Isle, NC 28594-4549 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager Robin R Herring PO Box 4549 Emerald Isle NC 28594 Manager Georgia Ricks PO Box 4549 Emerald Isle NC 28594 Manager Rhett H Ricks PO Box 4549 Emerald Isle NC 28594 NCDENR ,rN rtfl Carolina 0,e!:,ariment of Environment and Natural Resources Division of Coastal iblanagement Beverly Eaves Perdue James K Gragson Dee Freeman Governor Director Secretary July 30, 2009' AUG o 3 2009 MEMORANDUM: v 'Linda Lewis i/ l�� (����/� Division of Water Quality— Stormwater W O� IA � Z l FROM: 1 Doug Huggett 21 / / Major Permits Processing Coordinator �5t SUBJECT: CAMA/DREDGE & FILL Permit Application Review AIJ t% Applicant: Maritime Siblings, LLC (Island Harbor Marina) 0� t C� ,•'� 'U� Project Location: The project site is located at 510 W. Marina Drive, Emerald Isle, Carteret County. Proposed Project: The applicant is proposing to redevelop an existing marina which would consist of a 65 slip docking facility, a 270 slip dry storage (with travel lift) a ship store, restaurant, bathhouse, maintenance facility, eight elevated wooden parking lots, low pressure sewage treatment, 315' of bulkhead and the excavation of 17,050 yd of bottom. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 08/20/2009. If you have any questions regarding the proposed project, please contact Barry Guthrie at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: —k— This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended_ changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. IOU �?a � 61'— 69 One No 28557--3421 n •ru An'Equal Opportunry 1 AlLrmalrve Action Employer NDrth('aro tna Naturally /i Major Permit Fee Schedule Circle One DCM % DWQ % Development Type Fee. (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or excavation of any wetlands or open water areas: $250 100% ($250) 0% ($0) II. Public or commercial development that does not involve ' the filling or"excavation of any wetlands or open water areas: $400 100% ($400) 0% ($0) III. For development that involves the filling and/or excavation or up to 1 acre of wetlands and/or open - water areas, determine If A.S. C, - - or D below applies: - III(A). Private, non-commercial development, if General Water _ Quality Certification No. 3490 See attached) can be'applied: $250 100% ($250) , 0% ($0) III(S). Public or commercial .. development, if General Water " Quality Certificatlon No. 3490 (See attached) can be applied, $400 100% ($400) 0% ($0) III(C): If General" Water Quality, Certification No. 3490 (see' attached) could be applied, but- DCM staff determined that " additional review and written DWQ concurrence is needed , because of concerns related to water quality or aquatic life: $400 60% ($240) ' 40% ($160) III(D). If General Water Quality: Certification No. 3490 (see - attached) cannot be applied: • $400 60% ($240) - 40% ($160) " IV. Development that Involves the " filling and/or excavation of more - " than one acre of wetlands and/ - open water areas: - ti �$475 60% ($285) 40% ($190) Check #Projec I �, Amount r Name 1M Q.L.� nt (J,�a..,d t-�YRbOL � ��� ►t DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Maritime Siblings, LLC. 2. LOCATION OF PROJECT SITE: 510 West Marina Drive adjacent to the Bogue Sound on the north side of Emerald Isle at the location of the existing Island Harbor Marina, Emerald Isle, NC Photo Index - 2006: 38-8067 grid (F4-5 G4-5) 2000: 38-476 grid (F4-5 G4-5) State Plane Coordinates - X: 340228.775 Y: 2587555.258 Rover # JJ0721 I OA LAT 34040.137N LON 77002.763W 3. INVESTIGATION TYPE: CAMA, D&F 4. INVESTIGATIVE PROCEDURE:Dates of Site Visit— 10/16/08, 5/6/09, 7/l/09 Was Applicant Present —Yes, No, No 5. PROCESSING PROCEDURE: Application Received — 4/28/09 cc: 7/9/09 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Emerald Isle Land Classification from LUP —Conservation (B) AEC(s) Involved: Estuarine Shoreline (ORW), Estuarine Waters, Public Trust Area (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing —Septic Planned — Low pressure (F) Type of Structures: Existing — 133 slip marina, ship store, boat ramp, asphalt and gravel impervious surfaces, and 16 mobile homes on high ground. Planned — 65 slip marina with new docking facility, 270 slip dry storage facility (with travel lift), ship store, locker room, restaurant, boat maintenance department with associated apparatus. (G) Estimated Annual Rate of Erosion: N/A Source — N/A HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Highground Disturbance N/A 326,700 ft2 Disturbed N/A (B) Open Water 168,383 ft2 N/A 19,469 ft2 shaded 168,300 ft2 incorp. (C) Coastal Wetlands N/A N/A N/A (D) Total Area Disturbed: 489,900 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA-ORW Open: No PROJECT SUMMARY: The applicant is proposing to redevelop an existing marina in the Town of Emerald Isle. The redevelopment would consist of a 65 slip docking facility, a 270 slip dry storage (with travel lift), a ship store, restaurant, bathhouse, maintenance facility, eight elevated wooden parking lots, low pressure sewage treatment, 315' of bulkhead, and the excavation of 17,050 yd' of bottom. 9. NARRATIVE DESCRIPTION: Maritime Siblings, LLC.'s project is located on the northern side of Emerald Isle and western end of Bogue Banks. The project site is found by turning south onto Hwy. 58 at the Hwy. 24 and 58 intersection in Cape Carteret. After crossing the Emerald Isle Bridge continue for approximately 1.5 miles and turn north onto Mangrove Dr. and then an immediate left onto Old Ferry Road.. Continue approximately 0.3 miles and turn right onto Marina Drive. The site is currently known and operated as Island Harbor Manna. The subject project would take place on a single 7.6 acre parcel and ranges from +3 ft. to +25 ft. in elevation above NHW. The project area is cleared and maintained; vegetation consists of native grasses and sparse trees. Presently, the parcel consists of an existing 133-slip public commercial marina with associated boat ramp, and 16 mobile homes. The marina incorporates approximately 129,200 ft' of public trust waters. Currently the marina utilizes an existing asphalt drive and gravel parking facilities. The existing manna and mobiles homes utilize an onsite septic system. Existing impervious on the tract is 43.1 %. Adjacent land uses consists of single and multi -family residential and a mobile home park. The undeveloped portion of shoreline contains fringes of coastal and Section 404 Wetlands. None of these wetlands are within the limits of disturbance for the redevelopment of the marina. The width of Bogue Sound at this point is 1.06 miles. The subaqueous substrate is predominately sand the entirety of the shoreline with the exception of the previously excavated areas which are fine silt. The Division of Water Quality classifies this area of Bogue Sound as SA-ORW waters. This area is not a Primary Nursery Area. This portion of Bogue Sound is closed to harvesting of shellfish. The entire parcel is located within the 575' Estuarine Shore AEC adjacent to ORW and therefore is classified in the Emerald Isle LUP as Conservation. 10. PROJECT DESCRIPTION: The applicant is proposing redevelop an existing 133 slip manna on approximately 7.6 acres of highground with 896 ft. of shoreline. 7.5 acres of highground are proposed to be disturbed during the redevelopment process in which a new marina would be constructed with an associated bulkhead for shoreline stabilization, subaqueous and terrestrial excavations, as well as a 270 slip dry stack facility with associated marine accommodations. Proposed excavation totals 17,050 yd3 with 7,810 yd' being considered new excavation. The portions of new excavation are extensions of the existing basin, and cover 60,237 ft' of undisturbed bottom. Existing water depths in these sections range from -1.4 to -2.2' NLW. Proposed depths, post excavation, are -6.0' NLW. 9,240 yd' would be excavated as maintenance of the existing marina, which connects to an existing ferry channel with waters depths of -6.4' NLW. 108,146 ft' of previously disturbed bottom would be excavated during this project. A total of 168,383 ft' of bottom would be excavated during the marina redevelopment. Excavation would be carried out by bucket and barge, offloaded onsite, and relocated to a preapproved offsite location. There are sparse areas of SAVs on site with none found in the areas to be excavated at the time of site visits. The applicant proposes 315' of vinyl or concrete bulkhead to be constructed below NHW at a maximum of 2' waterward of the existing bulkhead, directly adjacent to the existing marina and boat ramp. No wetlands or SAVS are located within this area to be incorporated by shoreline stabilization measures. A new 65 slip floating docking facility incorporating 168,300 ft2 of public trust and estuarine waters consisting of the following configuration is also proposed: • Floating Dock #1- Western structure at site of existing boat ramp. Extends waterward 273' by means of a 273' x 8' pier. At the terminus, a 328' x 9.83' platform extends perpendicularly westward to the access, providing 19 slips with nine 29' x 4.5' finger piers and one 30.40' x 6.17' finger pier. Also proposed on floating dock #1 are gasoline /diesel fueling dispensers and a sewer pumpout center, located on a 12'x13' platform. Dock #1 provides 19 slips with 10 associated mooring pilings and extends 282' waterward of NHW. The structure is 51.32' from the western riparian line. • Floating Dock #2- Central structure extends waterward 260.17' from NHW by means of a 9.83' wide access pier. At the terminus, a 50.33' x 8' platform extends perpendicularly eastward. Two 50' x 6.17' finger piers extend perpendicularly northward, providing two slips. Along the eastern side of the access pier are four 39' x 4.5' finger piers providing 10 slips with 6 associated mooring pilings. Dock #2 has 12 slips total and extends a maximum of 330' water -ward of NHW. • Floating Dock #3- Eastern structure extends out 285.27' by means of a 9.83' wide access pier. At the terminus is a 93.33' x 8' "T" with two 50' x 6.17' and one 50' x 5' finger piers extending perpendicularly northward providing four slips. On the west side of the access pier are five 39' x 4.5' finger piers providing access for 12 slips. On the east side are four 34' x 4.5'and two 25' x 4.5' finger piers providing access for 13 slips with 15 associated mooring pilings. Dock #3 provides 29 slips and extends a maximum of 345' waterward of the NHW. This structure would be a minimum of 129.52' from the eastern riparian line. • Floating Dock #4- Is positioned along the proposed bulkhead between dock #2 and #3. A total of 154.86' x 8' and utilizing two 39' x 4.5' finger piers. Dock #4 would provide five slips with 3 associated mooring pilings. The 50' wide area between docks #1 and #2 is designated as the staging area for the proposed travel lift. This would be located in the area of the existing commercial public boat ramp, which would be removed to accommodate this amenity. Other activities in the redevelopment would consist of: A restaurant with dimensions of 50' x 70' with an attached 70' x 20' wood deck approximately 50' landward of NHW, ship store with dimensions of 30' x 120' a minimum of 120' landward of NHW, 270 slip dry storage (4 levels in height) with dimensions of 270' x 208' x 50' a minimum of 70' landward of NHW, associated travel lift and 11,500 ft2 concrete pad extending to the bulkhead in the location of the existing boat ramp, a 50' x 30' bathhouse, vessel maintenance facility, eight elevated wooden parking lots of various dimensions providing 194 parking places, low pressure wastewater treatment, and three stormwater treatment basins covering 12,130 ft2, 3,725 ft2, and 1,285 ft2 collectively. Basin #1 (12,130 ft2) would be located at a minimum of 64' landward of NHW or 34' landward of the 30' buffer. Basin #2 (3,725 ft2) would be located at a minimum of 50' landward of NHW or 20' landward of the 30' buffer. Basin #3 would be located a minimum of 90' landward of NHW of 60' landward of the 30' buffer. Two retaining walls are also included in the upland development at 190' and 78' in length and 1.5' in height. The 198' retaining wall would be located on the west side of the property, and used to stabilize the area around the proposed parking spaces. The other wall would be located on the east side of the property, near stormwater basin #3 and used to stabilize parking and basin #3. Underground fuel (gasoline and diesel) tanks are also proposed to service the marina and would be located 480' landward of NHW. Also, 516' of wooden sidewalk of 5 and 10' widths are proposed. The entire 7.6 acre tract is within the 575' Estuarine Shoreline AEC adjacent to ORW. Proposed disturbances and impervious calculations Within AEC Within 30' buffer •-_%,Imp ervious Pre- • 43.1%, 26.3% development • % Impervious Post- • 42.78% • 6.1% Subaqueous Excavation Calculations 0 •. Maintenance e-9240 • 108,146 • New -Excavation • 7810 • 60,237 • TOTAL • 17,050 • 168,383 The Sedimentation and Erosion control plan for this project was permitted by the NC Division of Land Quality, on 8/5/08 and is referred to as #Carte-2009-006. The Stormwater plan was permitted as redevelopment by the NC Division of Water Quality on 8/18/08 and is referred to as #SW8 080908. 11. ANTICIPATED IMPACTS: The proposed marina redevelopment would result in 326,700 ft2 of upland disturbance to occur. To aide in the reduction of both frequency and magnitude of sediments being introduced into adjacent waters as a result of the upland disturbance, silt fences would be used throughout the site and a temporary dike would be constructed, parallel to the shoreline, to contain any sedimentation or erosion problems. The amount of impervious surface on the 7.6 acre tract would be decreased by 0.32 %. Total impervious surface within the AEC would be 42.78% and total for the tract would be 42.78% since the tract lies within the 575' AEC. The amount of impervious surface within the 30' buffer would also be reduced by 75 %, going from 6,770 ftz to 1,700 ftz. With properly engineered stormwater basins, very little new stormwater would be expected to have an adverse impact on the adjacent ORW waters. Also, all parking is to be elevated wooden structures, aiding in reducing runoff of pollutants into nearby waters. One new impact would be the proposed new excavation of 60,237 ftz of shallow bottom; the bottom characteristics in this area are fine sand. The proposal calls for 108,146 ftz of shallow bottom to be excavated for maintenance. All excavation is proposed to -6.0' NLW. The proposed excavations are part of and connect to an existing historic ferry channel connecting Island Harbor Marina to the AIWW requiring the removal of 17,050 yd3 of material from the system and relocated to an offsite spoil disposal area. This area has been previously disturbed and the bottom consists of fine silt and mud. This excavation would result in a temporary turbidity spike in the waters around the disturbance. The site is located about 3 miles from Bogue Inlet to the west. With the proximately to the inlet, the site experiences a relatively high velocity tidal current, and as such any turbidity would be expected to be quickly dissipated. The proposed docking facilities would incorporate 168,300 ffz of public trust waters, increasing the amount of incorporated waters by approximately 30% over the previous marina. The marina currently has 133 slips and the proposed redevelopment would harbor 65 slips, resulting in a 51 % reduction in total wetslips. 315' of shoreline would also be stabilized with a bulkhead system. The proposed bulkhead would be positioned 2' waterward of an existing bulkhead thereby requiring approximately 825 ft2 of open water to be filled. Highground disturbance for the installation of the bulkhead system is included in the 7.5 acres on overall disturbance. This area is void of wetlands and SAVs. Also of concern would be the proposed vessel maintenance facility. Vessel maintenance could cause the introduction of numerous harmful substances into nearby waters, which should be addressed with the proposed catch basin used to funnel pollutants away from the shoreline. Another concern is the sewage pumpout and vessel fueling stations located along the docking facility. It is possible to have sewage or fuel spills due to equipment failure or user accidents causing the spillage of petroleum products or raw sewage to the adjacent ORW waters. This should be addressed by current USCG standards for fueling and pumpout facilities. No coastal marsh or Section 404 Wetlands would be filled or excavated during this project. A local concern has arisen during the comment section for this project. Island Harbor Marina has been a fixture of the community for decades and houses the only commercial public boat ramp on Emerald Isle. The ramp would be lost during the redevelopment of the marina, therefore eliminating commercial public boating access for the Town of Emerald Isle. fi _ ii3r 1+ti/_3aacF: �i i..i: ig eii?'��..�)d/iJ� DOM MP4 APPLICATION for il Major Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT . i. , Primary Applicantl Landowner Information Business Name Maritime Siblings, Llc Project Name (if applicable) Island Harbor Marina Applicant 1: First Name Rhett MI Last Name Ricks Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box 4549 City Emerald Isle State NC ZIP 28594 Country Phone No. 252 - 354 - 2373 ext. FAX No. - - Street Address (if different from above) City State ZIP Email Rhett Ricks [rhettricks@mac.com] lnformation, ti 2`flAge iVContractor, Ye` Business Name Stroud Engineering, P.A. Agent/ Contractor 1: First Name MI Last Name Ronald D. Cullipher Agent/ Contractor 2: First Name MI Last Name Ginger Y. Turner Mailing Address City State 151-A Hwy 24 Morehead City NC ZIP Phone No. 1 7ext. Phone No. 2 28557 252-247-7479 252-756. 9352 ext. 234 FAX No Contractor # 252 247 4098 Street Address (if different from above) City State ZIP Email Ron Cullipher - rcullipher@stroudengineer.com Ginger Turner - gturner@stroudengineer.com aan -v+-. qq !K1'JF �•xu'l l J <Form continues on back; " �y 7777 Q.}x ;L! N.cnq 252.808-2808 1-888.4RCOAST .. www.nccoastalmanagement. net, .. Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 510 W. Marina Drive Subdivision Name City State Zip NA Emerald Isle INC 28594 - Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 354 - 2373 ext. N/A, I , a. In which INC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Bogue Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural [-]Manmade ❑Unknown Bogue Sound a. Is proposed work within city limits or planning jurisdiction? I. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Emerald Isle 4.:Site Description,.-_,,' a. Total length of shoreline on the tract (ft.) b Size of entire tract (sq.ft.) r l � ^` � �`1•< V F' 896 ft 332,410 sf c Size of individual lot(s) d. Approximate elevation of tract atiove NHW (riolmal Bigh,i49 er) or N/A, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3'-25' ®NHW or ❑NWL ,,i�--`` �wq e. Vegetation on tract µ grassed with sparse trees f. Man-made features and uses now on tract existing marina and mobile home park g. Identify and describe the existing land uses adiacen to the proposed project site. single and multi -family residential, mobile home park h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? MV - Marina Village (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ONO ❑NA National Register listed or eligible property? <Form continues on next page> 11 rig 252-808.2808 .. 1.888-4111COA5T .. www.nccoastaimanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No u Are there coastal wetlands on the site? ®Yes. ,❑No''' (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Ye z❑No (Attach documentation, if available) ' n. Describe existing wastewater treatment facilities. onsite septic system q!yare,, * 4 7 o. Describe existing drinking water supply source. public water provided by Bogue Banks Water Corporation p. Describe existing storm water management or treatment systems. sheet flow through mobile home park toward Bogue Sound 5:-Activities and Impacts a. " Will the project be for commercial, public, orprivateuse? ®Commercial ❑Public/Govemment ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Provide a dry stack marina, docking facility and amenities c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. , dragline , excavator, barge, pile driving equipment,dump trucks to be stored within the work area or on high ground owned by the applicants d. List all development activities you propose. Dry stack boat storage building with added amenties including bath house, ship store, maintenance, restaurant and marina Construction of parking for patrons and ramp for boat travel lift Stormwater infiltration basin construciton e. Are the proposed activities maintenance of an existing project, new work, or both? Both; redevelop existing marina f. What is the approximate total disturbed land area resulting from the proposed project? — 7.5 ❑Sq Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The existing stormwater receives no treatment, only overland sheet flow. The current approved stormwater plan provides three infiltration basins for the 2" runoff as well as infiltrating the lyr 24hr storm without discharging to Bogue Sound. Only minimal surfaces not capable of being directed to an infiltration basin sheet flow toward Bogue Sound i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes ®No []NA If yes, attach a mitigation proposal. <Form continues on back> 252.808-2808 .. 1.888-4RCOAST .. www.nccoastaimanagement.net Form DCM MP-1 (Page 4 of 4)? APPLICATION for l Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following iteini below, -,if applicable, must be submitted'in order for the application package to be complete. Items (a) — (t) are always applicable to any ma/ordevetopriienea p/icatidn. Please consult the application instruction booklet on how to propedy prepare the required items below. a. A project narrative b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Holly Ann Corporation, - - ' ' _ `.' -, .-_, _+ - Phone No. 252-354-9307,. _ =Address 8108 Sound Drive, Emerald Isle, NC 28594 Name Seaside Siblings, LLC Phone No. 252-254-2373 Address P.O. Box 4549, Emerald Isle, NC 28594 Name }2, - _ " "1`>Phone No. 'Address. 4' g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Land Quality #Carte-2009-0W 8/5/08 State Stonnwater #SW8 080908; 8/18/08 Emerald Isle SW Permit -no number; 1/26/09 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ~7: Certification and Permission to Enteron,Land. •,;_ :: °-�_ .,; ';;-"�:.-_<,- �`..:�-_. _; y.._ _ - _ I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify hat thip information provided in this application is truthful to the best of my knowledge. Date 2 Print Name ( Signature � Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252.808-2808 .. 1-688.4RCOA5T .. www.neecastaimanagement.net Form DCM MP-2 1 rtl,v •$ 'i 01. i;JT (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all�thec sections of.th`e gJbint§ Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline (NLW or NWL stabilization Length NA NA -296' NA NA NA NA Width NA NA -565' NA NA NA NA Avg. Existing NA NA --3.25'NLW NA i.;,�,,.-,:•=.t.;�;=. „;; NAv,_ ;:..�, ' Y,_... NA =ryr NA Depth �;F, Final ProjectNA NA NA 6'NLW NA NA Depth a Amount of material to be excavated from below NHW or NWL in cubic yards. 17,050 cy below NLW c. (i) Does the area to be excavated include coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ENone (ii) Describe the purpose of the excavation in these areas: to provide for boat mooning and operational depths of boats expected to be in the twenty to fifty foot range 2. a DISPOSAG-'OF EXCAVATED'MATERIAL:v;-�v a. Location of disposal area. ^ offsite to be determined by dredging contractor in coordination with CAMA officials c. (i) Do you claim title to disposal area? []Yes KNo '*NA Y� (ii) If no, attach a letter granting permission from the owner e. (i) Does the disposal area include any coastal wetlandstmarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ENone (ii) Describe the purpose of disposal in these areas: unknown b. Type of material to be excavated. silty sand d. High -ground excavation in cubic yards —2.1,000 cy total high ground excavation b. Dimensions of disposal area. to be determined in coordination with CAMA officials d. (i) Will a disposal ar a be available for future maintenance? ❑Yes OQNo IMNAR>/�.//p; (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ENA (ii) If yes, how much water area is affected? • 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanamoment.net revised: 12/26/06 Form PDCM MP-2 (Excavation .and Pill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 - Structures) a. Type of shoreline stabilization: b. Length: 315 ft ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: -1.4' NHW e. Type of stabilization material: sheetpile Width: 12" J. Maximum distance waterward of NHW or NWL: 2' NHW f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ®NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfll 825 sf Riprap _ sandy Breakwater/Sill_ Other_ L Source of fill material. i cut material from onsiterea s_ 4:ri'OTHER`F/L'C'ACTIVITIES ; _;.> -sec k ,� This section not applicable kK 2.H .i 0., st Y •�1- 1 4 ,z(Excluding:Shoreline Stabr6zahonf ,' i M .� h k ���... 4 j ', l ,i C �y s}mi,�9 5.gb u•... v.�.n ., - 3,. a. 1:... ���.�u ._?,�..,.�t-, �... _t..n5-• a. (i) Will fill material be brought to the site? ❑Yes ®No ❑NA b. (i) Will fill material be placed in coastal wetlands/mar'sh (CW),' -" If yes, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the (ii) Amount of material to be placed in the water NA number of square feet affected. (iii) Dimensions of fill area NA ❑CW ❑SAV ❑SB _ (iv) Purpose of fill ❑WL ®None NA (ii) Describe the purpose of the fill in these areas: NA a. How will excavated or fill material be kept on site and erosion controlled? sift fence installation and earthen dike during upland construction c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. What type of construction equipment will be used (e.g., dragline backhoe, or hydraulic dredge)? dragline, excavator, barge, pile driving equipment, dump trucks d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. ter; .. , `•t^r Maritime Siblings; LLC Go Rhett Ricks r- q nt Name" - .r rr Date-1 . In � - _ s _ - , Island Harbor Manna- ' Apphcant Signature Protect Name 252-808-2808 :: 1.888-4RCOAST :: www.nccoastatmanaUement.net revised: 12/26/06 IC' Form DCM MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND"DEVELOPMENT a. Type and number of buildings,.facilities, units or structures b. Number of lots or parcels. proposed. 1 dry stack storage building with appendages for ships store, maintenance and bathing facilities, 65 slip marina, restaurant C. Density (give the number of residential units and the units per d. Size of area to be graded, filled, or disturbed including roads, acre). ditches, etc. N/A; no residential units proposed 7.5 acres e. If the proposed project will disturb more than one acre of land, the I. List the materials (such as marl, paver stone, asphalt, or concrete) Division of Land Resources must receive an erosion and to be used for impervious surfaces. sedimentation control plan at least 30 days before land -disturbing asphalt and concrete activity begins. (i) If applicable, has a sedimentation and erosion control plan been .- submitted to the Division of Land Resources? ®Yes ❑No ❑NA (ii) If yes, list the date submitted: 7/29/08 g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also be covered by impervious and/or built -upon surfaces, such as require a Stormwater Certification. pavement, building, rooftops, or to be used for vehicular driveways (I) Has a site development plan been submitted to the Division of or parking. Water Duality for review? 42.78% ®Yes ❑No ❑NA 1. Give the percentage of the entire tract to be covered by impervious (ii) If yes, list the date submitted: 9/9/08 and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 42.78% j. Describe proposed method of sewage disposal. k. Have the facilities described in Item (i) received state or local onsite low pressure system approval? ®Yes ❑No ❑NA If yes, attach appropriate documentation. I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater state (e.g., surface runoff, sanitary wastewater, industriall design? commercial effluent, "wash down" and residential discharges). ❑Yes ®No ❑NA The current approved stormwater plan provides three If yes, attach appropriate documentation. infiltration basins for the 2" runoff as well as infiltrating the 1yr 24hr storm without discharge to Bogue Sound; no other discharges proposed 252-808-28082 :: 1.888-4RCOAST :: www.ncconstalmanagement.net revised: 12/26/06 Forms 3DCM idle-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g , well, community, public system, etc) Public System - Bogue Banks Water Corporation o. When was the lot(s) platted and recorded? September 30 2008 n. (i) Will water be impounded?,,, Yes ❑No> ®NA, -j , 15i'i#Jl 4J9%a"-� filly �J�L l (ii) If yes, how many acres? � p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA 252.808.2808 :: 1-888-4RCOAST :: www.nceoastalmanaeement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. A.4DOCK/NG FACILITY/MARINA CHARACTERISTICS ,' `:' ` :=:'' ", ' ❑This section not applicable, a. (i) Is the docking facilityimarina: l .. - b. (i) Will the facility be open to the general public? ®Commercial ❑Public/Government ❑Private/Community ❑Yes ®No c. (q Dock(s) and/or pier(s) (ii) Number 4 (iii) Length D1-252 97" 20' D2-229 17''31' D3-234 5" 31` 26 77' 24' D4-109 16' 45.7' (iv) Width D11-8'8' D2-9 83'' 12e D3-9 83'' 8'' 8'' 14 17' (v) Floating ®Yes ❑No •�/l,�-/ e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number 4 (iii) Length D1-328 5" D2-50 33' D3-93 33' (ni) Width D1-9 83'' 13' D2-8' D3-8' (v) Floating ®Yes ONO Note: Roofed areas are calculated from drfpline dimensions. g. (p Number of slips proposed (ii) Number of slips existing 13 3 -'M slips to be removed Y-rx- 7 (2-Yo 9 I. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k. Typical boat length: 0'-5 ' d. (1) Are Finger Piers included? ®Yes []No If yes: (ii) Number 33 (iii) Length 24 5'- 25' ' 29'' 30 4' 34' '39' 750'' 50' IN) Width 6 17'' 4 5'' 4 5'' 6 17" 451 4 5'' 5'' 6.17' (v) Floating ®Yes ❑No f. (i) Are Boatlifts included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ® Full service, including travel lift and/or rail, repair or maintenance service ® Dockage, fuel, and marine supplies ❑ Dockage (vet slips") only, number of slips: 21 Dry storage; number of boats 270 ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: Restaurant and ship store j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). personal recreation boats I. (1) Will the facility be open to the general public? 252-808-2808 :: 1-888-4RCOAST :: www nccoastal management. n et revised: 12/27/06 Fer1'n OCM MP-4 (Structures, Page 2 of 4) m. (i) Will the facility have he pilings? []Yes ®No ®Yes ❑No (ii) If yes number of tie pilings? 34 2.. DOCKING FACILITY/MARINA OPERATIONS . ❑This -section not applicahle, a. Check each of the following sanitary facilities that will be included in the proposed project. ® Office Toilets ® Toilets for patrons; Number: 2 toilets/sinks/showers per gender; Location: lockeroom proposed in appendage of dry stack building footprint ® Showers ® Boatholding tank pumpout; Give type and location: fixed pumpout near slips 14 and 15 b. Describe treatment type and disposal location for all sanitary wastewater. on site low pressure sewer system c. Describe the disposal of solid waste, fish offal and trash. dumpsters provided onsite d. How will overboard discharge of sewage from boats be controlled? no discharge" requirements in leasing agreement, signage and boatholding pumpout facility provided e. (i) Give the location and number of "No Sewage Discharge' signs proposed. one at the end of each dock (4 total) (ii) Give the location and number of "Pumpout Available" signs proposed. one at the end of each dock on same post as "no sewage discharge" signage (4 total) f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. underground fuel tanks, closed containers, drums or tanks labled "used oil"and are stored inside the portion of dry stack building designated for maintenance g Where will residue from vessel maintenance be disposed of? used oil hauled to a permitted facility for recycling or proper disposal h. Give the number of channel markers and "No Wake" signs proposed. 32no wake" signs . i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. located adjacent to slip 19 and providing spill response kit j. What will be the marina policy on overnight and live -aboard dockage? , none allowed, included in leasing agreement k. Describe design measures that promote boat basin flushing? proposed dredge depth does not exceed depth of connecting waters 252-808.2808 :: 1.888-4111COAST :: www.nccoastalmanaaement. net revised: '12127/06 Form DCM MP-4 (Structures, Page 3 of 4) I. If this project is an expansion of an existing marina, what types of services are currently provided? upgrade of existing marina; currently providing boat storage, dockage, maintenance and repair shop, ship store m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ONO o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL _ ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ONO If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. a. (i) Is the boathouse structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community (ii) Number (iii) Length (iv) Width _ Note: Roofed areas are calculated from dripline dimensions. a. (i) Number (ii) Length (iii) Width a. Length 0 c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands ..#• .._5::.+[.V'='_4'fis'v-,za i:1�= - }, 9`� - „S'S� �.1 �' ��: �ni.� :�S�i .-.r....1.ln. ;,. - This section note 'licable' 6. MOORING:PILINGS'aiid BUOYS ® P? ; _. a. Is the structure(s): ❑Commercial ❑PublidGovernment ❑Private/Community c Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. b. Number d. Description of buoy (color, inscription, size, anchor, etc ) 252.808-2808 :: t-888-4RCOAST :: www.nccoastalmana ement.net revised: 12/27106 Forest DCM MP-4 (Structures, Page 4 of 4) e. Arc of the swing _ 7. GENERAL a. Proximity of stmcture(s) to adjacent riparian property Imes b. Proximity of structure(s) to adjacent docking facilities. west - 52' east - 130' approximately 75' Note: For buoy or mooring piling, use arc of swing including length ofvessel. c. Width of water body 1.06 +/- miles e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. a. Give complete description: d. Water depth at waterward end of structure at NLW or NWL -6.0 NLW .'v— �❑This ectio 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagerrent.net revised: 12/27/06 Narrative Island Harbor Marina April 23, 2009 Owner: Maritime Siblings LLC Rhett Ricks P.O. Box 4549 Emerald Isle, NC 28594 Engineer: Stroud Engineering, P.A. 151-A Hwy 24 Morehead City, NC 28557 (252) 247-7479 Ext. 224 Island Harbor Marina, an existing marina and mobile home park, is being proposed as commercial marina with amenities for their customers. The property is located at 510 West Marina Drive (off NC Hwy 58), Emerald Isle, Carteret County (P.I.N. 5384.20.80.0196) approximately three (3) miles southeast of the intersection of NC Highways 24 and 58. The parcel is zoned MV, marina village, and is within the jurisdiction of Emerald Isle. This tract of land comprises 7.6 acres and is located within the White Oak River Basin. It has been evaluated by the Army Corps of Engineers and determined the presence of a wetland fringe along parts of the shoreline as depicted on the plans. The site is presently serviced by Bogue Banks Water Corporation for domestic water supply and an on -site septic system is proposed on -site to handle the sewer. j 33 The existing marina has approximately one „andFe ; wet slips. The proposed demolition and reconstruction/reconfiguration of the marina will reduce this number to sixty-five (65) floating slips. Boat Sip Summary Dods# Sip Length Number 1 30' 19 2 50' 2 49 9 3 50' 5 49 12 35' 9 25' 4 4 40' 5 Total Mixed 65 Island Harbor Marina PM 1630 The protect also proposes the construction of a two -hundred -seventy (270) slip dry V' + storage facility with appendages serving the needs of the marina. The appendages Fr q, include a ship store, patron's locker room with bathing facilities and boat maintenance department. A restaurant is also proposed for the development and is sited at the.north east corner of the property. Fuel and sewer pump -out facilities a'6 'located'on°Floating' Dock #1. Appropriate emergency spill kits are to be provided as well. Dredging is required for the functionality of the marina. A dredging limit as delineated by Tere Barrett of the NC Division of Coastal Management and surveyed by Stroud Engineering is shown on the attached drawings. All proposed dredging has been contained within the allowable area and excavated to a matching depth of the connecting water. The site presently drains north into Bogue Sound, which is Class "SA-ORW", Stream Index # 20-36-(0.5). The site has been submitted and permitted as a Redevelopment State Stormwater (SW8 080908) project, with impervious areas totaling less than the existing coverage of the tract. The existing impervious area for the site is 43.10% and the proposed impervious area for the project, including the existing to remain, is 42.78%. Since the tract is adjacent to outstanding resource waters, the requirements of the 575' Area of Environmental Concern and 30' CAMA buffer are applicable. Some of the existing impervious will be removed from the 30' buffer and only water dependant structures are proposed as being reconstructed within the buffer. There are three infiltration basins proposed within this redevelopment plan as being graded to hold and infiltrate the runoff from the drainage area. These BMP's are proposed to reduce the stormwater runoff from impervious surfaces draining into Bogue Sound, while satisfying the NC Division of Marine Fisheries. The site is proposed at 8.42% with the construction of these infiltration areas. The impervious area treated by these infiltration areas decreases the runoff by 35% from the current site conditions. This plan provides greater stormwater control than what currently exists and has been designed for a 2" rain, exceeding the 1.5" NCDENR requirement. Level spreaders are also proposed to aid in diffuse flow of excess stormwater providing further treatment through the grassed buffer. Page 2 of 2 CLIENT: ENGINEER: INDEX OF DRAWINGS MARITIME SIBLINGS, LLC C/O GEORGIA MURRAY P.O. BOX 4549 EMERALD ISLE, NC 28594 252-354-2373 LEGEND AC - ACRE ^\ CLOG - BUILDING CIF - CUBIC FEET CH. CHORD CL - CENTERLINE OR ORIVE EL - ELEVATION EIP - E%ISTING IRON PIPE ER - E%STING IRON ROD EIS - EXISTING IRON STARE EDP - EDGE OF PAVEMENT EX - E%ISTING FE - FIN]SHED ELEVATION FF - FINISHED FLOOR FT FEET INV - INVERT LB - POUND LF - LINEAR FEET MA% - MAXI MUN MIN - MINIMUM N/F - NON OR FORMERLY NHW - NORMAL NIGH WATER NI. 11 NORMAL LOW WATER HIS - NOT TO SCALE MP - OVERHEAD POWER e OWD - WEN WWD DECK PIN - PROPERTY IDENTIFICATION NUMBER R RADIUS RCP - REINFORCED CONCRETE PIPE ROW - RIGHT -OF -MAY RM - RETAINING MALL SF - SQUARE FEET SIP - SET IRON PIPE S]R - SET IRON ROD TRT'0 - TREATED TST - TEMPORARY SEDIMENT TRAP TYP - TYPICAL —X— SILT FENCE ® MOOD PARKING/SIDEWALK MEn ANDS \ / COASTAL WETLANDS DRAINAGE ARROWS -MC-- EXISTING CONTOURS PROPOSED CONTOURS & POWER POLE/UTILITY POLE DREDGE AREA SHEET #1 OF 12 PROJECT #: PM1630 DESIGN FILE #: PM1630 CONSTRUCTION.DGN n STROUD ENGINEERING, P.A. 151-A HIGHWAY 24 MOREHEAD CITY NC 28557 252-247-7479 +b %S .• �o; �FEssioti•�'.y SEAL ' 13343 ".9p•�.c� Nay �/� �'80Din p"� VICINITY MAP SCALE: NOT TO SCALE N ROGUE SOUND SHEET 1 TITLE PAGE SHEET 2 EXISTING CONDITIONS SHEET 3 SITE PLAN SHEET 4 NEW DOCK SITE PLAN SHEET 5 GRADING & STORMWATER MANAGEMENT PLAN SHEET 5A LIMITS OF GRADING/EXCAVATION SHEET 6 STORMWATER DATA SHEET 7 DREDGING PLAN SHEET 8 DREDGING CROSS SECTIONS SHEET 9 CROSS SECTIONS & DETAILS SHEET 10 EROSION CONTROL PLAN SHEET 11 DETAILS SHEET 12 DETAILS RONALD D. CULLIPHER P.E. REV I5I DNS: TILE PAGE ISLAND HARBOR MARI CLIENT: MARITIME SIBLINGS LLC ROC C/O GEORGIA MJRRAY ADDRESS: P.O. BOX 4549 DRAWN; EMERALD ISLE. NC 28594 GYT PHONE: 252-354-2373 Rnr - - I A STROM) ENGINB.BEING, P.A. HHA HIGHWAY 24 MOREHEAD CITY, N.C. 28557 (252)E47-7479 11 B30 CONSTRUCTION.dgn 6/18/2009 9:09:53 AM_ 1 ) �1U\O\\,h\\► 1 1 I • \„\\►„r.- � �u1►.dam irm�im�1►►►��r� . . • C 9. �1e}F 71 0 A a Q ah } Cis �,. .�• - r� •• x��,i�,x. i t�'i=v�Ut�'��1;3;i�,r,`� +y�.G`T `sE � � '6-';'ri3Pmry'.`� sA'7Ar�n}� , > � .. � �` ` n�• ,4iP i •c'yi i"l ,�Tf{•7•1i1, -i.. t<aC,}. tR1S �a fy >��, fit, �at. T 1i�v. fr,h i�����}� `hn r .' �{1 ��. FI+•.a �7 j' si �i-C ZiA�<••'Yy� 7*'�'bij*`s"khrPl ' -0 �T.*'b � �• \. _ f � .s �' •T't ,?••,. .. `..S' r-�. y1.�� � /� ? Zi,�t, 3 aat)iam`"Y `ae`1S! Zltv''%li••51�i47<ii "�, ,� `fi.( `, � b. < T���i��.'E"-"h tf'T1. jS,vyrA*r v,+!I ,��`�r; v. t`},j.s`±�»��� • • },rt C�:iinjt� t`s p,L-T"'P1 ,•^�1 ,Aj �a� ;-•e {Yl� i3�`•F,�'-•[,'o1}t`a�ll>Zi � a 4rr� i, iY��` � St+,j ��,7� E,�.yaa• •4a y`t'KS • d'`C4�A"��72•N. E\. 1` `Tr� • • i , ,-+ N..^ rt':f SV) .iT .JJ�44 f , • • bia yyl1� FSY��R � - , , -M4,f ,�, ,`, ,R �iTl� V� , , Eli li[T/L�l `l t'•C Ri..f t'F �tt� " TC Y� iltf wi iLi �S"✓w' ` Al`p, !,h rl r�i�tlhl,.Jvi `l'fyi`� J� �F�T+ � .l•.0 ,f} • ,, •,•Yj, w"tw c ,,� �'41v 7is, a,t`�, 4 v !� L''YP�i',?, �.:... �ShGILh7-�h. �Ay,✓f9, .T. `e7 }`-r7 •-r7 •e7 yyy-et'3r},�l -rl •elj b7 S Z- ,•'h li•. � ie^+,1 _p�1+•.s, �`'t'IE: F W.l.:�r�-• " � �. �3ti�.%�Y•.�%Sih}L,�iO�ip�,it ,J�F.i.l,�sl � ,r4i i r+, w, `r r-P �`•� l' r '� fff 9e i>•c.v r7 '(.: 1C{{..3 `rit:�Y;i` �� ,. F - 1 -Y7T ..i7 4L7 40 b 1iz }'-r9 �• -Y7•T yl t+4 +47 47 •4•. �, C yes ,rr39-x�' �Y ♦./�d/AF,V/f,./��)F,.J��Sn7� r.`/4rA mF r , .ry�,A • • t, , i ,w..JE , JJ , „.Ji „ • s EYs/�'i�'1"7A,'�'✓�'i�i •'�i ,rJ pv if !' ,ti. ,U'LY�it 'Y�, �`Y(t, -0�, • 'Y �3�,^Y�.�,�.�,�.,��,•�r�,.ss�„�4�rrY�,.��.�%... �t F, `ram - 7 `-YI.,ti-Y ,ti-.7=,t-,J `•w7 `QRrX•y,� a.s.- } B•�•l,•' ,Z�tw,7i�.wj� Lw��J( Ss.J�7T ,r.V• l<• if ,� ay W 9t T • . aN, tv c 1 • / 1 • 1 1. 1 CH. CHORD CL - CENTERLINE OR DRIVE EL - ELEVATION E- EXISTING IRON PIPE EIIP R - EKISTINL IflON ROD CIS - EYI ST ONO IRON STAKE EOP - EDGE OF PAVELE A EX - EX Is IND FE - FINISHED ELEVATION FF - FINISHED FLOOR FT - FEET INV - INVERT L9 - POUND LF - LINEAR FEET MAY - WRINUA YIN - YI NI WY N/F - HER OR FORYERL7 NNR - NORMAL HIGH EATER NTS - NOT 70 SCALE DHP - OVERHEAD POWER ORD - OPEN WOOD DECK PIN - PNDPERir IDENTIFICATION RUNNER R - RADIUS RCP - REINFORCED CONCRETE PIPE RON - RIGHT -CIF -RAT RW - RETAIN ONO WALL SF - SWARE FEET SIP - SET IRON PIPE SIR - SET IRON ROD TWO - TREATED TST - TEYPORART SEDIMENT TRAP TYP - 7VPICAL — X — SILT FENCE ® WDOD PARXING/SIDEVALK WETLANDS COASTAL WETLANDS DRAINAGE ARROWS --15-- EXISTING CONTOURS —TO— PROPOSED CONTOURS ROWER POLE/UTILITT PGLE SHEET 92 OF 12 PROJECT 9: PM1630 DESIGN FILE Us PM1630 CONSTRUCTION.DGN TOTAL EY6TNf. DUIORMS (SF) EIOSTNG PARNWG.DRNES,ASPHALT. SIGIEBCGNCRETE NALXS G5FT 03M 10,66541 5151 28 31 21313 M76 693 72 966 06 762 83 W 12 low (IN, 79 259 20 392 BD 582 G9 27853 658 32 W 92 t000D 2430 42M 1,35825 9153 29,=40 111355 5,51931 290 GO 1L 11371 fits 0D IN 59 10004 128 89 THIS 10 640 52 2H 00 259 35 7" 45 80565 34 44 736 t6 847AT 31521 1115 G2 4788X 1,098 01 2 13 84 6G 65 88 1062 6W 96 7079 28,43047 102 O9 805 AO fii B16 344D 272 64 147401 57 n 1,38158 S 19,292.45 12397178 TRACTAREA= TOTAL /MPERVIOU5 = EX. %RYIPERVIOUS = 332,40993 SF 143,264.23 43.10% KVLV �1 REV IS IDNS: D. BY DATE ESCRIPTION 1 GYi 6/17/09 CAW CO:"NTS EXISTING CONDITIONS ISLAND HARBOR MARIEMERALD ISLE. CARTERET COUNTY. NORTH CA CLIENT: MARITIME SIBLINGS. LLC E C/O GEORGIA MURRAY + ADDRESS: P.D. BOX 4549 DR EMERALD ISLE. NC 26594 PHONE: 252-354-2373 H A BID ENGINRRRING,P.A, De 160 NICH•AY 24 0"BAD CITY. N.C. E8667 1252) 247.7479 CONSTRUCTIONAgn 6/18/2009 9:00-57 21 22 '- • ti IS 19.20 11 12 13 11 S 16 2 7 B y f0 • 6 5 2 3 4 2 0 2 C1 PROPOSED MARINA o BOGUS SOUND (SA -ORW) r O SEE SHEET 4 OF 12 0 FOR ENLARGED VIEv z 0 «1NNW 404 WE71ANO5/� n • 1 \MAW � NAMR16'" M6 ���/IL`� I!!•�� 11 ��/II�L�� 11► LEGEND AO - ACRE SLOG - BUILDING CF - CUBIC FEET ON CHORD CL - CENTERLINE OR DR[VE EL - ELEVATION EIP - EXISTING IRON PIPE EIR - EXIST I NO HOWROD EIS - EXISTING IRON STAKE EDP - EDGE OF PAVEMENT EX - EXISTING rE - FINISHED ELEVATION iF - FIHI SHED FLOW FT - FEET INV - INVERT LB - POUND LF - LINEAR FEET WN - WXtMIM MIN - MINIMUM 1/1 - NOW W FORWRLY NNW - NORMAL HIGH WATER NLW - NORMAL LOW WATER HIS - NOT TO SCALE GNP - OVERHEAD POWER OWD - OPEN WOOD BECK PIN - PROPERTY IDENTIFICATION NUMBER 9 RADIUS RCP - REINFORCED CONCRETE PIPE ROW - RIGNT-OF-WAY RW - RETAINING WALL SF - SOUARE FEET SIP - SET IRON PIPE SIR - SET IRON ROD TRT'O - TREATED TST - TEMPORARY SEDIMENT TRAP TYP - TYPICAL SHEET 43 OF 12 PROJECT #: PM1630 DESIGN FILE U: PM1630 CONSTRUCTION.DGN -X- SILT FENCE OWOOD PARKINO/SIDEWALK WETLANDS W COASTAL WETLANDS DRAINAGE ARROWS --t5-- EXISTING CONTOURS -10- PROPOSED CONTOURS POWER POLE/UTILITY PULE 49 SOI' I 51 52 53 4B 3 59 47 55 4 46 25 56 45 57 26 44 58 27 PROPOSED MAR I NA 43 59 28 42 60 29 O 41 61 30 A 40 62 A 63 31 C 39 64 38 65 " 3T• • 32 11 33 • AW '. � rWA 35 36 "A" TO "B" ALONG NORMAL HIGH WATER LINE OF BOGUE SOUND COURSE BEARING DISTANCE e 15B E 2S 721rUp E 54 4 30.4E L4 85 1 32 H US N 7 57 43 E O BB SVTB )440 N E T 91, J1 4 32 3 E 2 - 6 20D E D299 1 E e ]30 29 E 9 S E 19. 9 J HjT712 N e9]249 E 833 5 E 13 485e 36 E 2 N 459 0 E 1 1 14 2 S 545 14 E 7254 N35E7B2JOB N 12- W W A. L23 N 5S2 4 E 27.42 L N IT 51 E 23 94 L 7 N BO' W E 17 B1 78 3B 40 E 4, t L29 N 42.39 5e E 13. 4 LSO N 9' 250 E 22. 9 1 N 92B 46 E 3>84 -IS2 N SIZ 5 E 2900 N RB'R2 W Ie BB V 9 BB'3B 13 E 24 29 N 35Y 3J E 2563 LJB N )3'1 4 E le.BB L3 N BIOS 27.0e [Lvessmo!s-sue u11 CL PAVEMENT CURVE DATA GE OF LENGTH - 13.25 O- RABIES . 201.40 CH LENGTH 13T5.25 25 CN. BEARING. N09.01'90"N / LENGTH O 2 20011.46 RADIUS ' CH.LENGTH 142.75 CH. BEARING. N13. 56'14"E LENGTH © 198.06 UNPSTEPS i�gN RADIUS .267. 48 CH. LENGTH 193.57 CH.BEARING. N13•0011011E LENGTH O - 250.20 w RADIUS v 333.48 1 CH.BEARING - N1S'51'2>"E W6¢ RADIUSS Q o 50 '^ w 3.00 CH.LENGTH 5.51 CH.BEARING = N31•22'22"E LENGTH © . 77.74 RADIUS TH =53. GO E 7.96 CH. BEARING., N13.37'30"E S .yp•9x SOUND DRIVE �SO R��'W)r 7�fJi4-I SITE DATA TRACT AREA = 332.409.93 �F (7.631AC) (ENTIRE TRACT WITHIN 575 AEC) UPLANDS = 324.270 SF (7.444AC) WETLANDS - 8,139 SF (0.187AC) % WETLANDS - 2.45% EXISTING LAND USE = MOBILE HOME PARK/MARINA FLOOD ZONES = RE ELB, SHADED X AND X AICUZ = CUZ1 PROPOSED PARKING SPACES = 258 NOTES: 1. ALL RADII ARE 5' UNLESS NOTED OTHERWISE. w.WW. CAR -"'• O . � 'SSIO�. I op REVISIONS: 4;O 9 i D. BY DATE ' _ e • Q SEAL 1 YT 6/ti/09 CANA 1 • 1T •' .FA.7.7'W`A y'�`'' ''°"G•"•�' SITE PLAN '� ISLAND HARBOR MARINA EMERALD ISLE. CARTERET COUNTY. NORTH CAROL ESIC CLIENT: MARITIME SIBLINGS, LLC C/O GEORGIA MURRAY P.O. BOXD RDI ADDRESS: ISLE. NC NC 28594 GY ONALD D. CULLIPHE P.E. PHONE: 252-354-2373 DD 5 9TAOUD ENGRgRERING, P.A. 161A NICNW AY 24 llOREN6AD CITY, N.C. 26557 (2521247-7479 CLYMIENTS 1 FLOATING DOCK 1 328 • `'' RINA SIGNAGE EEDETAIL THIS 1 I I II •P �I1��, 1 • 8 y 10 <�• 6 7 5 1 2 3 4 27.39' 21.39' A.5_ MARINA SIGNAGE- SEE DETAIL THIS SHEET REMOTE STATION GAS DISPENSER WITH DUAL REEL, \ IESEL DISPENSER ITH DUAL REELS NONE,% :1 BOGUS SOUND (SA-ORW) BOAT SLIP SUMMARY MMARY DOCK tt 7 SLIP LENGTH 30' NUMBER 19 DOCK tt 1 ' WIDTH 9.83, 50' 2 13' 2 40' g 2 MDOCK/PIER 8' 50' 5 3 8' 40' 12 UMMARY 3 35' 9 DOCK tt WIDTH 25' 4 ' 81 4 40' 5 20 8 TOTAL MIXED 65 2 229.17' 9.83' FINGER PIER SUMMARY 31' 12 NUMBER SLIP LENGTH SLIP WIDTH 3 234.5' 9.83' 1 24.5' 6.17' 31' 8" 2 25' 4.5 26.77' 8' 9 29' 4.5 24' 14.17' 1 30.4' 6.17' 4 109. 16 8" 4 34' 4.5' 45.7' 1 8' 11 39' 4.5' .—NNW I SHEET ++4 OF 12 PROJECT a: PM1630 DESIGN FILE V: PM1630 CONSTRUCTION. GN BULKHEAI BUFFER-i' ' i _.._ .�• . 100 i�����as:������:,� A TING MARINA z FDO SIGNAGE FLOATING DOCK 2 3B I 1 38' MARINA 6, S I GNAGE 6.17 i•, 3�,Ai ? I I ` 19 • 51 52y w I 19' 19' M 49 50'' N O _ • L.nY 20 21 0 _'a I u 11 vP'�9•.�• 111 111 a "s'4�`ev. _`} 1 (/3 Y 48 OR 4 Q 47 39' .� 22 TYP a NO � ILA I m Z 39,23 N n 55 W N WAKE 1� I� 0 TYP 46 ZONE "D I 2:r 24 w 56 NO SEWER h z a DISCHPAGE 1 • n 45 1 57 M' PUMPOUT I 1 Q • AVAILABLE Z 25 44 58 I I v I 26 I I w a N a TOP ('Y, 43 $9 -it FLOATING 1 DOCK ^' �, • 19.5' �1 . I rO — 27 7yP �1 42 lip MARINA SIGNAGE I I 0 28 w I I n SCALE: NOT. O SCALE I I Z >D s n v-' 41 61 m 1 a P I 9 29 Z 40 30 a 39 �. • 64 i 38 37• A. y ISH CLEANING •I� i,.„`+ �'• STATION ANGWAY ,.4 .` `� '•L• �. 1 ANGW 32 17' 17 33 34 35 6 �'•� �.. r$° PROPOSED REVISIONS: •Q.. 1 ° BULKHEAD �•���•°, 1 a. BY GATE ESCRIP710N •° O= \ . 1 CYi 6/17/09 AMA COMMENTS '♦ PROPOSED MARINA SITE PLAN NG BOAT AM ISLAND HARBOR ♦��N cFkR LNG B�OTBEAREMOVEDI MARINA P ••• 4 EMERALD ISLE. CARTERET COUNTY. NORTH CAROL INA =O�oFgSS CLIENT: MARITIME SIBLINGS. LLC ERIOGEO: i Q. •y C/O GEORGIA MURRAY i Q . P.O. BOX 4549 DRAWN! SEAL _ : * ADDRESS: EMERALD ISLE. NC 28594 GYT • 13343 PHONE: 252-354-2373 H K �� flDC p-• F �v A Y ROC ��L •• ooYGIN` ° ' ((�y S STRDUD ENGINEERING, P.A. DATE: 1\Q°A4RS I +e1A HIGNWAY 244/23/09 °1`252E247-7479 Y. H.C. 285e> 1ALD D. CULLIPHE P.E. +-= so' I 1 1 y I\\\\\\\\ INpy I I I y o ..vl \ 1 1'i I I I \\ -�i I `�T'', I I I I •I � I / III + 1 t'1•� - I d I ' I ' ... r / I / / / , ` � I\ \ \ \ Y\" ` � � - _. - - _'• - ' ' - ' - ' I I III � 1 - _ I / �� .r \ "� \ aa. /•r it I ' c SEE SHEET 7 OF 12 FDR , , - " ,ROGUE 50 . o T l :. \ %\ \ r ,NCOENR BORES ENLARGED VIEW OF (SA -OR o ..I , r l Id\ EL,5.2 MARINA DREDGING _ . / 40 WAR TABLE DATE: B/25/OB ' _ - - _ /' } - •b , .o.� .o.o wm w o � 11 { �." / I 1 1 I % � / ,-.. I , / � � I I ,i s'.�• •^� .°., w° muI/A1 I _,I 1.-.I. � \ y Z // I / r , , '...!'.. •.-.-.r:,i: •' w o r NN-W .mr" .et. �Y.•-'._W� .\- .'•�. 'I \I\ \F;'-', ,' I"_ % �• ., i,,S;..ol" /Xy' \•\ '\.. •� \\ 1 1 BASIN rR DRA•XX� 1 I Y w:~�, `.•':4: R`''a.y-=;.A` , Y:.f / '.1 I \ . - THTO l eL �, I/' �11x••• r ara u.o.aX /_ ..1., / •\ �e,� .u`�rlia/ �•__ - — -'" —..- _{rip"- I• Yw Maw s1'-_-`. __ a;;EN at J I 3H WILD'H4 �// i. / / 11 !•� $!1 / iG AI D INFIL1RArlml Y M,-6i��- `63•-fig• /, / b ' ._,�.0 11 / (1 _ _ -7 VA ;' ; .7 � �OpglNllq °, oni��.iai --- M� i 5 j11j111AI p5 1�AhVAp<• VY �v�� �'�%- i,/ '%i:,: /' �/, ((( -. � _ A ���r �yy Illl/_ f`t+• III\\\` \I I1,\}"h•: /.'w- —/ ;�I ���i//;/,�'� a' / �\ \ mW ¢�u.a � 11/ / _ -\o"I1 I`\\� / \IC•b`4��.. / _ -`�_ % .'!. � xd ,!' / 1�`. •` ,I —� ;o`er`\'/ ./'// DDNA� it %/ 1y a�/gyp i 0 I I 1 BULKHEA SOpNp [)RIVE i E. P-K flail � `L / A,R 11.0 e x. - ram` \ I.w SEE SHEET 6 OF 12 FOR"�d iY-�I( II' A 3 •, AS•i6M5 1•^ \r E P-K Had j yam` ;.:R'' (50•ROW) STORMWATER DATA VE IRI ; = � $0UN0 D LEGEND SILT FENCE AC - ACRE ® WOW PARK ING/SIDEWALK �*+elltl �sE,N �l��.v�,"..a l.J�J 1'11;•,r 6lS BLOC - BUILDING CF - CUBIC FEET - I CH. - CHORD yG WETLANDS BO 40 0 60 160 CL - CENTERLINE DR - DRIVE Lltj COASTAL WETLANDS EL - ELEVATION EIP - EXISTING IRON PIPE DRAINAGE ARROWS SCALE: 1°= BO' EIR - EXIST INC IRON ROD EIS - EXISTINC IRON STAKE -I5-- EXISTING CONTOURS EDP - EDGE OF PAVEMENT REVISIONS: EX - EXISTING FE - FINISHED ELEVATION —to— PROPOSED CONTOURS G. BY DATE SCRIPTION FF - FINISHED FLOOR ® POWER POLE/UTILITY POLE FT - FEET INV - INVERT ��� AA'(H Cq%� ��j 1 YT 6/77/09 CAfl4 CDlWfN75 L1.F - LINEAR FEET `�UND\� Oc- •``.•F•�•p••((•��•'0///��10/ MAX - MAXIMUM `� �••("GVAi/O ••`"//,I, MIN MIN IMAM Q. Z �'9 - GRADING A. STORMWATER MANAGEMENT PLAN N/F - NOW OR FORMERLY HIS - NOT TO SCALE ,� Q S�� r_ Z. ISLAND HARBOR ONP - GIVE HEAD POWER MARINA CAD - OPEN WOOD DECK • 13343 � J` PIN - PROPERTY IDENTIFICATION NUMBER �e w``fFt�ll R - RADIUS • w EMERALD ISLE. CARTERET COUNTY. NORTH CAROLINA RCP - REINFORCED CONCRETE PIPE O ROW - flII T-OP-WAY ' j-�• IJG.1 ESP, ••c`(V �'•� CLIENT: MARITIME SIBLINGS, LLC ER CNE RW - flETAINING WALL �, 5'♦ eA• N •••• ,\ C/0 GEOflGIA MURRAY SF - SOLAR E FEET ••'A ``j `° \Q a7 ADDRESS: P.G. BOX 4549 RAWNt SIP - SET IRON PIPE •p%• „1 L .ly EMERALD ISLE, NC 28594 GYT SIR SET TRT'D - TREATED PHONE: ROD Yl yy IH_„"4y."• yi PHONE: 252-354-2313 RDC TST TEMPORARY SEDIMENT TRAP TYP - TYPICAL -NNW - NORMAL HIGH WATER q //J� /I� "ROUD ENGINEERING, P.A. RDC SHEET a5 OF 12 �I , y,rJ\,p-y�yp I 1 I� �• IBIAMOR HIGHWAY za DATE: PROJECT N: PMI630 Vim= -"`bb------- I �'V- H32)247D CITY, N.C. 28607 4/23/09 DESIGN FILE #I PM1630 CONSTRUCTION.OGN Ro ALD D. CULLIPHEI P.E. IeeBl eaT-TavB 1"= 80' 41630 CONSTRUCTION dgn 6/182009 9 10:37 AM -- _ =- STORMWATER DATA TRACTAREA= 332,409.93 SF 7.6311 AC NTIRE TRACT WITHIN 575AEC UPLANDS = 324270 SF 7 4442 AC WETLANDS = 8,139 SF 0.186E AC % WETLANDS = 2.45% PROJECTTYPE= REDEVELOPMENT RECENING STREAM = BOGUE SOUND STREAM CLASS; INDEX= SA/ORW,20a6 . EXSTING IMPERVIOUS TO REMAIN = 1,868 SF PROPOSED IMPERVIOUS BUILDINGS= 64,625 SF PARKING= 61,828 SF CONCRETE BOAT RAMP = 11,599 SF MISCELLANEOUS = 2,300 SF TOTAL = 140,352 SF TOTAL IMPERVIOUS = SF TOTAL %IMPERVIOUS = DESIGN STORM = INCHESBMP 142232 BASIN NO.1 AREA AT TOP EL 6.6 FT2AREA AT BOTTOM EL 5.5 FT'2DEPTH FT VOLUME 12,498 FT' --m IMPERVIOUS BUILDING = 42,019 FT2 DRAINAGE AREA = 102,544 SF PARKING= 18,796 F72 %IMPERVIOUS= 5931% TOTAL = 60,815 FT2 Rv= 0.05+,009 %IMP = 0.58 REQUIRED VOLUME _ (7112) x DA x R, = 9,977 Fla INFILTRATION RATE= 6 IWHR DRAWDOWN= 1.88 HOURS VOLUME PROVIDED= 12,498 FT2 BMP BASIN NO.2 L 8.0 AREM52 3,725 FY2 AREA AL &0 1,925 FT2 PTH 3 FT s UME 8.475 FT2 — - - IMPERVIOUS G = 22,880 FT2 DRAINAGE AREA = 97,562 SF G= 27,129 FT2 %IMPERVIOUS= 5182% LK= 544 FT2 Rv= 0.05+.009%IMP)= 052 AL= 50,553 FT2 REQUIRED VOLUME _ (Y11 8,396 FT- INFILTRATION RATE= 6VOLUME PROVIDED=8,475 FT3 BMP BASIN NO.3 AREA AT TOP EL60 1.285 FT2 AREA AT BOTTOM EL5.0 670 FT2 DEPTH 1 FT - VOLUME 978 FT2 IMPERVIOUS PARKING = 2,875 FT2 DRAINAGE AREA - 14,300 SF EXISTING OFFSITE = 2,654 FT2 %IMPERVIOUS = 38.66% TOTAL = 5,529 FT2 Rv= 0.05-,009(%IMP) = 040 REQUIRED VOLUME _ (r112)x D1 x Rv = 949 FT' INFILTRATION RAZE= 6 IWHR DRAWDOWN= 2,83 IHOURS VOLUME PROVIDED= 978 FT3 PROPOSED IMPERVIOUS TREATED= 114,243 FT2 PROPOSED IMPERVIOUS NOT TREATED = 27,977 FT2 %IMPERVIOUS NOT TREATED= 842% I(A CA%���0 0: �FESS�O�•t'(y'S S L ; SHEET a6 OF 12 PROJECT a: PM1630 DESIGN FILE a: PM1630 CONSTRUCTION.DGN rp.RO ALD D. CULLI ", 1 I \ IMITS OF PROPOSE) Z jr� i•V * 2.5' IMI75 OF PROPOSED `\S\ r\ �_6, q-• _ _ _ - , DREDGING OREDGIr/.i 1 b� lJ REDGE LIMITS AS DETERMINED BY +-2.2' +--•' \ —'/ %�" ' \ i \ �' I ! 1 I TERE BARRETT OF NC DIVISION OF /y I '�• 1 2 COASTAL MANAGEMENT `-2'6•�' IA. •\ / 1`,C �- _ , ��I� 7 y Tc � I � I }2. 0' /C X y, LEGEND DREDGE AREA .5' i' / • \ \ 'I' O r \ a. \ / s I I 1/ I CONCRETE AIL WETLANDS COASTAL WETLANDS _5-- EXISTING CONTOURS / 4 X/ I \ ',/.� �' k - I' \ a t ' 8 i -C _ _ / % "\ \I �I 4 __5_ PROPOSED CONTOURS Q) ram' - � X � \ _ �,•�� 'p v' / 2.1 2• REVIOUS DREDGE LIMITS AS r0. 7' _al "+ \ ' , , , \ DETERM INEO BY TERE BARRETT D -0 e' \ ;l _ \ , , \ , \ OF Nl-DIVISION OF COASTAL \ \'1 / -MANAGEMENT AND SURVEYED BY STROUD ENGINEERING, P.A. 2• aC. o' %gyp \ / \\/, `.1 y. Y / i• �• 3 K. o' +0 0' -9. o' C 1 I / 1 / 1 \' \1 / \ +-5 ' Ti i. / l •\/•/ ' '� l',::'v +-0. 3' +C.O' Lys✓` -- --- \N;?,• N�'+'� � 1 \ \ - � I . 1 \ . r ..�.•�. �2'.. �, REVISIONS: -0=-d@:8' �r•?� �••�• 1 \ Xr ' g' \ `\ 5�� -�� �a. BY DATE ESCRIPTION -+2Ttl e•... •..-.. Fyn.%�'I- %, '•' ._. _.\\-/ e'\ \ \ \ �k- .3•r r \ \\t -_ - - 1 GT 6/1 T/09 CAW C018ENTS r- �^' JFF \ •� - \ ' TGH-GROUND -AVAT ION �_0�-' MP0 \ •\ .' / FOR A'P'O BULKHEAD / •GP A \ A. / _ _ INSTALLATION / •�•'�• � ••'�` • o' . �` \ ' � `••` t•-m - � ; /' DREDGING PLAN •� -� •� PCK 1 ••�,� •°.._,. ••. , ,���,,,h; _'-----.,, ISLAN HARBOR - - ; �' ,��'P'�„ . •..qo' . E MARINA �' - - 0 •�i EMERALD ISLE. CARTERET COUNTY. NORTH CAROLINA �,`y�_�'./ / I ' %" ' /'• /' � / :����QQO�ESS�O 9.�j9 s. S CLIENT: MARITIME SIBLINIA G Y LLC ERDC D: SEAL• ADDRESS: P.D. ROX 4549 DRAWN: LM r i EMERALD ISLE. NO 28594 GYT � j3� • •,• PHONE: 252-354-2373 RDC 50 25 0 50 100 tl�iO9 G/NEEP' �W �� ,� %\ g STROIJD ENGINEERING. P.A. RDC SHEET v7 OF 12 •�i rJ a •• • \2 �Ae GkD'.Lh(.db�l l/- �qNIGRMAY u DATE: oI ^ , > I1) HOeeNSID CITY. N.C. 28567 9/23/09 PROJECT Jf: PM1630 SCALE: 1"= 50 0• vV`' ♦� — -- —^� 05MZ47-7478 DESIGN FILE U: PM1630 CONSTRUCTION. DON '24jIIUa9I•p4j R ALD D. CULLIPHE P.E. +'= 50' PM1630 CONSTRUCTION.don 6/1812009 9:10'55 AM -6 _7 -8 Y Y Y 2 NORMAL HIGH WATER .. ,_, ., ., ., .,_,_ _, ., ., ., SECTION. D-D.--�.... __ .._. _...... 0 NORMAL LOW WATER..... . _ _ .. . .. _ . _ . _ .. .... _ . . ... ... L ........ 0 _1 . .. ......:.. .. .......................... .... ... ...- ... ... -1 _2 ..... -...; _.. . ISTING'GRADE. - ... ..... ..... ..... .... _2 ,�................... . -.- .. : ..��7. - V .� - 3 3 ME -510:5 a vm�� "ll -T .f 'n MWomiio019VIMm�UP: 7 SHEET #8 OF 12 PROJECT x: PM1630 DESIGN FILE k: PM1630 CONSTRUCTION.DGN NORMAL HIGH WATER DREDGE VOLUME = 17,050 CY AVERAGE DEPTH DREDGED = 2.75 T"X DREDGE AREA 50 25 0 SD 100 HORIZONTAL SCALE: ,"= 50' VERTICAL SCALE: I - 3' .•``� GARO �•�••, 'O 9S y a c� CC e 9C aC':yGIN��QNQ��? 4 �•��i Ji�i ii454i R ALD D. ....\ ..--'.............. ......-.. CONNECTING WATE x� ELEVATION 0� COMI.ENTS CLIENT: MARITIME SIBLINGS. LLC vcomrvc�. C/0 GEORGIA HURRAY RDC ADDRESS: P.O. BOX 4549 DRAWN: EMERALD ISLE. NO 28594 1 GYT PHONE: 252-354-2373 F77 3 STROUD ENGINEERING. P.A. RI �� P.E. I� ��_ 6 1(OBEHBADWCITY. N.C. 28557 M5M 247-7479 DI 4 A I I 1630 CONSTRUCTIONAcIn 6118120099:11:01 AM ROOF 30 ___-_-- _r_-=__ -__-__ _ _EXLSTJ NO -GRADE_ ___-_. -_---_-_--�_-__-_- ------------- 25 - 25 __I______ ------- _OPOSE __ 0:t,@T____________ _____ ________________ 20 __________________ ___ MEO .4T;K3 NG Z0731 STAINING===___-_______���_-__ 15 _________y( C____ 10___________________ 5____I--- pR�TfD-- TBERS— O_____________________ ------ _____________------ ___ W RED FLOATING DOCK SCALE: NOT TO SCALE /B' GALVANIZED ROD ONCRETE CAP GROUND SURFACE CONCRETE DEADMAN '--PROPOSED BULKHEAD CONCRETE OR VINYL SHEET PILE - - NORMAL HIGH WATER BACKFILL BETWEEN EXISTIN A PROPOSED BULKHEADS NORMAL LOW WATER- _ EXISTING W - - - - - - - BULKHEAD APPROXIMATELY 2 BULKHEAD SCALE: NOT TO SCALE ISHEET #9 OF 12 PROJECT a: PM1630 ncclru cn c #c PM1630 CONSTRUCTION. DGN ______________v pT 1014 WALr---8 -FDR=GRADC MFFQiNC_ _ _ C --___ _ RARK ING-/E] P i SHED=FLU awl- �__�____ -- n n �. ----------- c -__-___ __ ________ ____ ____ ______ __ ______ _ DNCREIE=RbMP______________ _____--- --- --- ____________ HEST -Pi L-E ______ BTJLKRE __--_�Z—___ ____-_ 2 (NHW) IN�GRADt=______ _ _ _ LOAT 5 EMPLO SECTION A -A VERTICAL SCALE: 1'= 20' HORIZONTAL SCALE: 1'- 5D' yP IL w� r n•.• a. : � u .. � - ,.... �II�I�I����I�I��:I��������I���II����I�����II�����IhL'� ! F Uc n FOUNDATION. DESIGN BY OTHERS SECTION B-B VERTICAL SCALE: 1 20' HORIZONTAL SCALE: 1'= 20' ALD 25 20 15 10 5 2 (NHW) 0 (NLW) I InA6/17/09 ICAMA CMAENTS I CROSS SECTIONS 8 DETAILS ISLAND INHARBOR I CLIENT: MARITIME SIBLINGS. LLC pOC .� C/O GEORGIA MURRAY ADDRESS: P.D. BOX 4549 RAWN: EMERALD ISLE. NC 20594 GYT PHONE: 252-354-2373 1 Rnn g STROTJ ) ENGIINEEWNO. P.A. D mtA D xlcCT u MCITY. N.C. 25657 .z5Z 5a 247-z4T-Tava DM1630 CONSTRUCTION.dcn 6/1812009 9:11:05 AM MEASURES O 4..i NOTES 1. PERSON RESPONSIBLE FOR LAND DISTURBING ACTIVITY: MARINA SIBLINGS. LLC '- EORGIA MU P.D.GBOX I549 RRAT ? EMERALD ISLE. NC 28594 252-354-2373 �'!-' '\ BOCUE SOUNq >+ 2• EXCESS MATERIAL REMOVED FROM SITE MIST W HAULED TO A PERMITTED SITE. - ' MAINTENANCE PLAN S AIL BE CHECKED 1.ALL EROSION AND SEDIMENT CONTROL FOR STABILITY AND EFFECTIVE OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL EVENT OR AT LEAST ONCE A WEEK. REPAIRS REWIRED SHALL BE COMPLETED IMMEOtATELY TO THE DIMENSION AND FILING IONS INDICATED ON THE PLAN. 1° I / / \ I i / • / r Y "> 2. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SEDIMENT FENCING MIEN IT BECOMES 0.5 FEET DEEP AT THE FENCE. THE FENCE SHALL BE ,��,.',.'_,'.' _•'' - REPLACED (M REPAIRED AS NECESSARY TO MAINTAIN BARRIER. 'd'0 A I 1, 1 1 INS / / i �f/ % uL �'- -_• , 3.ALL SEEDED AREAS SHALL BE FERTILIZED. RESEEDED AND MULCHED 1 a I 1 1\ \\ '' °•-r x', ,/ / ' �� L?%y`Ag7 'M*i''" AS NECESSARY ACCORDING TO THE CONTRACT DOCUMENTS TO „•.�(AW /'O'� \ \ �, ! '1 ♦ f.YDID ESTABLISH AND WINTAIN A DENSE VEGETATIVE COVER. v�.__. ••jy(� 404 OPERANDS/ �.. .' J��+: LxF•� ma`s - 1 1 I11 _f • i / y�':. "'•' x'r:s' .P_ xa' ' I COASTAL MARSH Lt _ I\ / r .. L?4 7✓ `I S�iPhs a _'," { �rz � �y �„� ,: 1 \ � i\ \ ..3• del, �� ' �- .f.i ;' ° '{...^ „lu- y.-' .._ .' :-' 'mow � \ � •.• • /` '�\ , � _ � _ - M •eatii'P-C _l¢. � / _ �-i�_- / _ III T) � � _ V.L. K, +-•• SIL FENCE. ' •p�.4ty .v,ke;; t .�� � �T \' '�/�- I w ., I"`y.,FT,• �_- � tt . LR., +<♦ ��~.:�``•y,j�; i�v' 'y�r r..2s / - '��":'.' '�= %� (� \ 6 I o._ - III, �I P aqi i>�='xR`r."-;�'•.':R� F�R✓ Y•, � ..• �. �\ � \ I t 1�F�'`" ;-s ,+�_1 1V- -- }' ;.ti°. x§y��- •'/.'. I Irf sEDIMxr --i,-_-,= ' I 1 .. �. ^•�' _ /_I Sib CE 1 •�Y. �F - /--l'" " _ - - / A, - �,; 6- i / 1 < 1 •F�Illfl///, __� \\\�\, Y Y`\ �, �,/♦ / .` ice:-, 'I WIP ad v \ \ \ \\\ n R'\ �� ,7{z�- _ _ Y •I /� \1 �•+ \I T�l/�/ �j •�� xa:=SAND DISTURBANCE ♦1F/ /i/ /h \ /I 1 \\\ 3_`�� \y/ %/ • // --'�� �� LIMITS. 7AC (50'ROW) _ SOUND ORO 1 z E P-K $PUNIlk) 1 / -- N roe 'xp,'Tj, 1�1 1'1 �. CONSTRUCTION SEQUENCE \. �qy } __K Noil 1. INf TIATE OEMLIiION PHASE ` ti / L A. INSTALL SILT FENCE WHERE SHOW. c j i0 N 50'ROW) S. REMOVE STRUCTURES MALE PROTECTING BUILDINGS TO REMAIN. 9 .u� ._�no.NO C. REMOVE IWERYI OIS SURFACES WITHIN IOW IVIWLL AREAS. Ir 'r FIR '�' D. REMOVE E%ISTING UTILITIES LI REWIRED WITH PRIOR NOTIFICATION TO UTILITY COMPANY. " 2. INSTALL STONE CONSTRUCTION ENTRANCE AS SHOW ON THE PLANS. LEGEND 3 MASSTRUCT GRACING THEASIM. KE AND BASINS W2 AND M3 PRIM TO y1 AA u �''�_�� {•.5 �. AC - ACRE 4. SEED AND INSTALL EXCELSIOR BLANKET ON SLOPES O DIKE. 1 § f 5 BLDG - BUILDING GI - CUBIC FEET S. INITIATE MASS GRADIXD OF THE SITE. CH. - CHOW —y— SILT FENCE CL - CENTERLINE 6. CONSTRUCT BULKHEAD AT SOUTH WEST CORNER OF PROJECT ONCE AREA DR - DRIVE WOOD PARKING/SIDEWALK IS EXCAVATED TO APPROXIMATE GRADE M THE HIGHER SIDE OF WALL. EL - ELEVATION i. COIiSTRUCT BASIN =1 ONCE AREA IS BRONONT TO APPROXIMATE GRACE -EDP - EXISTING IRON PIPE OF SAID BASIN. EIR - EXISTING IRON ROD � WETLANDS EIS - EXISTING IRON STAKE 1 . B. SEED ALL AREAS DISTURBED. EXCEPT BUILDING PAD. WITHIN 14 CALENDAR em - EDGE OF-1 PAVEMENT COASTAL WETLANDS DAYS O LAND DISTURBANCE. EX - EXISTING FE - FINISHED ELEVATION DRAINAGE ARROWS S. BEGIN BUILDING CONSTRUCTION. FF - FINISHED FLUOR FT - FEET - -,5- - EXISTING CONTOURS 10. INSTALL REMAINING UTILITIES. INV - INVERT LB - PWNO —NBA PROPOSED COtt0UR5 11. CONSTRUCT PARKING LOTS, INCLUDING NEW PARKING 00 SIDEWALKS. REVISIONS: LF - LINEAR FEET, PAVE AREAS WERE SHOW ON PLANS. a m[ RLVIPrn NO - MAXIMUM s. POWER PRE/UTILITY POLE 12. INSTALL FINAL LANDSCAPING. REMOVE ANY ACCUMILATEO SEW MENT FROM MIN - MINIMUM INFILTRATION AREAS AND RETURN BASIN TO PROPOSED ELEVATION AS N/F - NOW OR FORMERLY INDICATED ON THE PLANS. NTS - NOT TO SCALE ONP - OVERHEAD POWER on - OPEN MOOD DECK PIN - PROPERTY IDENTIFICATION NUMBER ROW - R11NT-0FEMAY�RETE PIPE ,�� T II/P 40 0 BO 160 EROSION CONTROL PLAN ISLAND HARBOR RW - RETAINING MALL . �,o?•s�.� y' MARINA SF - $WARE FEET �� SIP - SET IRON PIPE �� PrPOF ESSf .r/,� EMERALD ISLE. CARTERET COUNTY. NORTH CAROLINA SIR - SET IRON ROD TRT'D - TREATED : •Q 0� 2 . CLIENT:, DESIGNED: TST - TEMPORARY SEDIMENT TRAP p� • '%P C/OI GEOR SIBLINGS. LLC HOC TYP - TYPICAL V C 70 C/0 GEORC IA MURRAY ADDRESS: r• r P.O. BOX 4549 DRAWN: FIN. - NORMAL HIGH HATER 3'I • e EMERALD ISLE. NC 28594 GYT „. 7 •. PHONE: 252-354-2373 ROC ♦ . lNFEPe a' �U�LLIPHB A 9TRDIID ENGmEERINO, P.A. RDC SHEET #10 OF 12 `Jp %1.: • rW bcqMOO RIOHIIAY 24DATPROJECT u:PM1630AMBIYY V4:"y /(203)0a9 9470Y. N.C. 2GBBV 4/23/09 DESIGN FILE 9: PM1630 CONSTRUCTION.DGN R NALD DP.E. 1 "= 6o' Dx20 PARKING STALL I 2X TRT'O DECKING SCREWED TO JOISTS FOR REMOVAL. REPAIR AND MAINTENANCE 'D JOIST W 12' O.C. '❑ SUPPORT BASE W 4.5' O.C. OF PAVEMENT A PLAN VIEW ELEVATED WOOD PARKING DETAIL 2X8 BAND 2XB BAND 2X WOOD DECKING PAVEMENT SECTION 5/6' REBAR 24" LONG DRIVEN INTO THE GROUND FINAL SOIL GRADE TRT'D 6X6 SECTION A -A ELEVATED WOOD PARKING SECTION SCALE: NOT TO SCALE STONE CONSTRUCTION ENTRANCE SCALE: NOT TO SCALE SEE PLAN FOI PIPE DIAMETI 6' (2) 24' PRECAST JUNCTION BOX SCALEr NOT TO SCALE VIEW PLAN VIEW ANr ID R-1642. SECTION VIEW CATCH BASIN WITH SEDIMENT STORAGE SCALE: NOT TO SCALE SEED PER SCHEDULE 3�VAfl IES IfiIT15TA�`.�F EC :IN:1, )' 1.0'- PAVEMENT SECTION SCALE: NOT TO SCALE CONCRETE VALLEY GUTTER SCALE: NOT TO SCALE R12 6" 12" R3' RV 12" 18 3000 PSI CONCRETE 18" SPILL CURB AND GUTTER SCALE: NOT TO SCALE TEMPORARY DIKE EXCELSIOR CONTROL BLANKET NO NON -FILLED SIOE NOTE: ONCE AREA FILLED IS STABILIZED, TOP OF DIKE TO BE GRADED TO FINISHED GRACES SHOWN ON PLANS TEMPORARY DIKE SECTION A -A SCALE: NOT TO SCALE 10' MAX. WITH WIRE 6' WAX WITHOUT WIRE FILTER FABRIC NCD T 1056 TYPE 3. CLASS B COMPIU EBOFEULL 170 '; NOTES: 1. USE WIRE A MINIMUM OF 32" IN WIDTH, AND A MINIMUM OF 6 LINE WIRES WITH 12' STAY SPACING. 2. USE FILTER FABRIC A MINIMUM OF 36' 1N WIDTH AND FASTEN ADEOUATELY TO THE WIRES. 3. PROVIDE S' STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. ION SILT FENCE DETAIL SCALE: NOT TO SCALE a i ' T FENCE r"SAq.A;d� �6G,9 , I''A, 4„i�:dfi1'1 SHEET AI OF 12 PROJECT #: PM1630 DESIGN FILE R: PM1630 CONSTRUCT] 11630 CONSTRUCTION dq0 6/182009 9'1118 D_ . CULLIP R P I O I I 1 1 1 1 1 1 1 1 G 1 BOTTOM ELEVATION 5.5 ' 1 SHWT 2.25 q by 1 1 ` CLEAN OUT / 1 BENCH MARK / 1 (SEE DETAIL ,♦ THIS SHEET, 1 • 1 I 1 1 1 1 1 1 1 1 1 1 1 1 O \ 2O - - 1 N74'06'44"E INFILTRATION BASIN #1 SCALE: 1"= 80' / - `♦ CURVE DATA LENGTH 1 = 21.61 O ♦ 56"E O RADIUS = 26.00 = 79. 21 q 1 0 CH.LENGTH CH. BEARING = S59.22'52"W 1 LENGTH O = 20.71 28.00 RADIUS = CH.LENGTH = 18.81 CLEAN OUT ARING = N30°3l'OB"W / BENCH MARKCH.BE (SEE DETAIL aRADIUS LENGTH 3 16.83 TN IS SHEET, 28.00 CH.LENGTH 15.83 ATION 5.0 �N C STORAGE/BYPASS CH.BEARING = N46°1109"E rp ELEVATION 8.25 LENGTH25.22 RADIUS = 26.00 CH.LENGTH = 21.45 CH. BEARING= S43.4B'51"E 0 BEGINNING CURVE DATA LENGTH = 13.88 RADIUS 0 n 20.00 CH.LENGTH = 13.60 CH.BEARING- S54.13'54'W LENGTHRADIUS O = 10.7.00 CH. LENGTH 15.58 CH. BEARING- N54`41'58'W LENGTH O n 13.T2 RADIUS = 10.00 CH.LENGTH - 12.67 CH.BEARING - N35°47'13'E LENGTH 24.31 RADIUSO10. CH.LENGTH = 18.75 CH.BEARING- S35°16'55'E LENGTH = 15.71 RADIUS ®n 20.00 CH.LENGTH = 15.31 CH.BEARING n S11.51'04'W ••.SbB_ENfi{[7E_•�1�.Efi•3Rf P, WIN)TM•, •.'.•.'.'_••' 1'-#57 STONE 'LACED ON 'ILTER FABRIC A mi #3 1" WEEP HOLE. 5" FROM TOP B 3'O.C.TYPICAL SECTION A -A SECTION B-B LEVEL SPREADER SCALE: NOT TO SCALE BASIN BOTTOM EL SHWTEL WSHWT AS DETERMINED BY NCDENR INFILTRATION BASIN 1 SCALE: NOT TO SCALE BASIN 1 10' HDPE MANIFOLD BASIN 2 12' HDPE MANIFOLD BASIN 1 18'% 8' TEE W 6. 0' O.C. BASIN 2 12'% 8' TEE R 6.0' O.C. 0:T CLASS A RIPRAP APRON LENGTH 4' APRON WIDTH a SEE PLAN BASIN 1 18' HDPE THICKNESS - 1' BASIN 2 12' HDPE B"TEES_ BOTTOM ELEVATION FLOW SPREADER?, . SCALE: NOT TO SCALEy ^� EEi i' :II.ilP? 7. 2. '.00" INFILTRATION BASIN #2 13.50 SPILL CURB N80°36'56'E C6.5 ..�.,.. . FE6.0 C6. IL WE FE6.0 FLUME i v� TOP OF WALL T.0 INV5.9 0 TOP OF WALL 7.5 >9 D Wor a i OUT m i m BENCH MARK ��a o THIS SHEET) ry OF WALL 1.0 TOP OF WALL INFILTRATION BASIN #3 SCALE: i = 80 BASIN BOTTOM EL SHWTOEL 3 5.00 3.10 5.00 2.00 WSHWT AS DETERMINED BY NCDENR INFILTRATION BASIN 2 & 3 SCALE: NOT TO SCALE CATE BENCHMARK APPROXIMATELY THE CENTER OF EACH BASIN 4"x 4"x 6'TREATED POST PERMANENTLY AND CLEARLY MARK DST AT CLEANOUT ELEVATION BASIN BOTTOM EL CLEAN OUT EL 1 5.50 5.77 2 5.00 5.75 3 5.00 5.25 INFILTRATION BASIN CLEANOUT BENCHMARK SCALE: NOT TO SCALE ISLAND HARBOR MARI SHEET #12 OF 12 PROJECT #: PM1630 Iq pJ KyF#,fie, ,r�a4Q'�,,� DESIGN FILE #: PM1630 CONSTRUCTION. DON 9A*� U +CS. J� PM1630 CONSTRUCTION.dgn 6118/20099:11:26 AM ., ------ - - -------------' "--------- "--