HomeMy WebLinkAboutSW8080908_CURRENT PERMIT_20210809STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 Qg0�t08
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
7_0 21 0 R o
YYYYMMDD
ROY COOPER
Governor
EL[ZABETH S. BISER
Secretary
BRIAN WRENN
Director
August 9, 2021
NORTH CAROLINA
Environmental Quality
Maritime Siblings, LLC
Attn: Georgia Ricks, Manager
P.O. Box 4549
Emerald Isle, NC 28594
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 080908
Island Harbor Marina
Carteret County
Dear Ms. Ricks
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit
will now reference DEMLR as the Division responsible for issuance of the permit.
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacted any development approval issued
by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current
and valid at any point between January 1, 2008, and December 31, 2010. The law extended the effective period of any
stormwater permit that was set to expire during this time frame to three (3) years from its current expiration date. On
August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for a total of four (4) years
extension.
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on August 4, 2021. The Division is hereby notifying you that permit SW8 080908 has been renewed
on August 9, 2021, and shall be effective until April 28, 2021, which includes all available extensions. For your
records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application Please
keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new
or different terms; it merely restates some of the previous terms to provide you with a better understanding of your
obligations under the permit
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit The plans originally approved on September 18, 2008 and most
recently revised on May 22, 2009, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
®� North Carolina Department of Environmental Quality I Division of Energy, Mneral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
rvamNr�...
910.7%.7215
State Stormwater Permit No. SW8 080908
Page 2 of 2
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment A — Designer's Certification Form
Attachment C — Permitting History
Renewal Application Documents
DES/ams: \\\Stormwater\Permits & Projects\2008\080908 HD\2021 08 permit 080908
CC' NCDEQ-DENILR Wilmington Regional Office
-ww — North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Wflmmgton Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405
910.796.7215
r
State Stormwater Management Systems
Permit No. SW8 080908
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY REDEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Maritime Siblings, LLC
Island Harbor Marina
510 West Marina Drive, Emerald Isle, Carteret County
FOR THE
construction, operation and maintenance of three (3) infiltration basins in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved
stormwater management plans and specifications and other supporting data as attached and on file
with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until April 28, 2029, and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 1 of this permit. The stormwater control has been designed
to handle the runoff from 116,897 square feet of impervious area. An additional 27,979 square
feet of BUA is permitted in other areas of this redevelopment project
3. This basin must be operated with a 50 foot vegetated filter
4. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and
per approved plans. There is no built -upon area allocated for the future development. Any
additional BUA requires a permit modification.
5. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans
6. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system
Pagel of 6
State Stormwater Management Systems
Permit No SW8 080908
The following design criteria have been permitted for the infiltration system and must be
provided and maintained at design condition:
Design Criteria
Basin #1
Basin #2
Basin #3
Other Area
a. Drainage Area: acres
-Onsde,ft2:
-Offsite,
236
102,544
0
224
92,804
4,758
0.33
11,646
2,654
125,416
b Total Impervious Surfaces, ft2
60,815
50,553
5,529
27,979
c. Design Storm, in.
1.5
1 5
1 5
d. Basin Depth, ft:
1.5
3 25
1.5
e Bottom Elev., FMSL.
55
5
5
f Bottom Surface Area, ft2:
10,593
1,925
978
g. Bypass Weir Elevation, FMSL
66
8
6
h. Permitted Storage Volume, ft3.
12,498
8,475
978
i Type of Soil
Duckston
Duckston
Duckston
j. Expected Infiltration Rate, in/hr:
6
6
6
k. Seasonal High Water Table, FMSL
2.23
3.06
1 96
I. Draw Down Time, hrs
2
9
3
m. Receiving Stream / River Basin
Bogue Sound/ White Oak
n Stream Index Number
20-36-(0 5)
o Water Body Classification
"SA:ORW' (within 575)
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
the permitted stormwater system functions at the design condition. The approved Operation
and Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled Inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d Immediate repair of eroded areas
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader,
catch basins, piping and vegetated filter
g. A clear access path to the bypass structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR The records will Indicate the date, activity, name of person
performing the work and what actions were taken.
5. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
Page 2 of 6
State Stormwater Management Systems
Permit No. SW8 080908
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations
8 Access to the stormwater facilities shall be maintained via appropriate easements at all times.
9. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made
10. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b Redesign or addition to the approved amount of BUA or to the drainage area
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director
11 Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
III. GENERAL CONDITIONS
1 Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as
required by any statutes, rules, regulations, or ordinances, which may be imposed by any
other Local, State or Federal government agency having jurisdiction. Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to
enforcement procedures pursuant to NCGS 143-215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems. These additional or
replacement measures shall receive a permit from the Division prior to construction.
Page 3 of 6
State Stormwater Management Systems
Permit No. SWS 080908
Permit Transfer: This permit is not transferable to any person or entity except after notice to
and approval by the Director. The permittee shall submit a completed and signed "Permit
Transfer Application Form" (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form, to the Division at least 60 days prior
to any one or more of the following events:
a. The sale or conveyance of the protect area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants,
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08,
C. Bankruptcy,
d. Foreclosure, subject to the requirements of Session Law 2013-121,
5. Current Permittee Name or Address Changes. The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project;
C. A mailing address change of the permittee;
6. The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request. Neither the sale of the project, in whole or in part,
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit.
7. The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
8. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission; however, these actions do
not stay any permit conditions.
9 Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of this permit, application, supplements, operation
and maintenance agreement, and approved plans and specifications shall be maintained on
file by the permittee
Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
10. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
11. A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit. The renewal request must include the appropriate application, documentation and
the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit renewed, updated and reissued this the 9th day of August 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
lam 2
.77 rian vvrenn,Director'
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 4 of 6
State Stormwater Management Systems
Permit No SW8 080908
Island Harbor Marina
Stormwater Permit No. SW8 080908
Carteret County
Attachment A
Designer's Certification
I, , as a duly registered in the State of North
Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for (Project Owner) hereby state that, to the best of my
abilities, due care and diligence was used in the observation of the project construction such that the
construction was observed to be built within substantial compliance and intent of the approved plans
and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 5 of 6
State Stormwater Management Systems
Permit No. SW8 080908
Certification Requirements:
1 The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -
upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains
to the system.
4. All roof drains are located such that the runoff is directed into the system
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting of the
system.
11. The permitted amounts of surface area and/or volume have been provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
ccNCDEQ-DEMLR Wilmington Regional Office
Page 6 of 6
Attachment C - Permitting History
Island Harbor Marina
Permit No. SW8 080908
Approval
Date
Permit
Action
B[14 S
Version
Description of the Changes
9/18/2008
Original
Approval
10
Removal of a building previously permitted as
"existing" BUA. Reduction in the size of the boat ramp.
Reallocation of impervious area from Number 1 and
Number 2 above to other uses as documented in
Revision 4 of Sheet 5 (revision date 4/22/09). The
5/22/2009
Revised
1.1
permitted impervious amounts are: a.Existing
impervious to remain: 1,868sf b.Proposed:
i.Buildings: 64,625 sf
ii.Parking: 61,828 sf
iii.Concrete boat ramp: 11,599 sf
iv.Miscellaneous 2,300 sf
c.Total impervious:142,220 sf
8/9/2021
Renewal
2.0
Permit Number: � V—'( ono )� �
(to be provided by OWQ)
Drainage Area Number: 1
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
Provide additional erosion
riprap is displaced.
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area
A visible layer of sediment
Search for the source of the
has accumulated.
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Water is standing more than
Replace the top few inches of filter
5 days after a storm event.
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Weeds and noxious plants are
Remove the plants by hand or by
growing in the main
wiping them with pesticide (do not
treatment area.
spray).
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment.
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3
Permit Number:!EA,L} �oBa 5�z d
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Island Harbor Marina
BMP drainage area number:
Print name: Maritime Siblings, LLC c/o Georgia Murray
Title: Manager
Address: P.O. Box 4549 Emerald Isle, NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
JCVJ-�-7 LU kd /_I- c, County of KW do hereby certify that
62ea,.- 4 t K // r /� V personally appeared before me this I c�
day of T_J[� 6 (j and acknowledge the due execution of the
maintenance requirements. Witness my hand and official seal,
ROBERT W.DAVY
NOTARY PUBLIC
CARTERET COUNTY. N.C.
Ry Commis Expim
SEAL
My commission expires O ( —2-S
Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3
Permit Number.
(to be provided by DWQ)
Drainage Area Number: Z
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
Provide additional erosion
riprap is displaced.
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area
A visible layer of sediment
Search for the source of the
has accumulated.
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Water is standing more than
Replace the top few inches of filter
5 days after a storm event.
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Weeds and noxious plants are
Remove the plants by hand or by
growing in the main
wiping them with pesticide (do not
treatment area.
spray).
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment.
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Island Harbor Marina
BMP drainage area number:
Print name: Maritime Siblings, LLC c/o Georgia Murray
Title: Manager
Address: P.O. Box 4549 Emerald Isle, NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
� D4 u7e , a Notary Public for the State of
County of' ( Q r/7c po c'i , do hereby certify that
LK ocsesk /04 V try personally appeared before me this L1'
day of , and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
un R08ERTW: DAVY
NOTARY PUBLIC
s CARTERET COUNTY, N.C.
' �'�� Mu rnmm,ccnn FYoiia
SEAL
My commission expires 6.26 6
Form SW40 I -Infiltration Basin O&M-Rev.3 Page 3 of 3
Permit Number: 4s u, N yo w +goy
(to be provided by DWQ)
Drainage Area Number: 3
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 Page l of 3
The forebay
treatment area
The outlet device
Potential problem:
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
Erosion has occurred or
riprap is displaced.
Weeds are present.
A visible layer of
has accumulated.
Water is standing more IN
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to grow on the embankment.
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Clogging has occurred
The outlet device is damaged
water Erosion or other signs of
damage have occurred at the
outlet.
How I will remediate the problem:
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
wiping them with pesticide (do not
Remove shrubs or trees
Make all needed repairs.
Clean out the outlet device. Dispose
of the sediment off -site.
Repair or replace the outlet device.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3
Page 2 of 3
Permit Number: S1
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Projec[ name: Island Harbor Marina
BMP drainage area number:
Print name: Maritime Siblings. LLC c/o Georgia Murray
Address: P.O. Box 4549 Emerald Isle, NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
/4 Vy , a Notary Public for the State of
L r , County of do hereby certify that
1r4zv-C, r der V v -" personally appeared before me this
is —
day of O , and acknowledge the due execution of the
J
forgoing infiltration b§asin-maintenance requirements. Witness my hand and official seal,
08�
R08ERT W. DAW WITNESS
NOTARY PUBLIC
CARTERET COUNTY, N.C.
My Commission Elves
SEAL C
My commission expires d ( Z C. — O
Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3
Permit Number: e
(to be provided by DWQ)
Drainage Area Number: —
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
— Once a year, the filter strip will be reseeded to maintain a dense growth of
vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC,1993). Forested filter strips do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire filter strip
Trash/debris is present.
Remove the trash/debris.
system
The flow splitter device
The flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sediment off -site.
The flow splitter device is
Make any necessary repairs or
damaged.
replace if damage is too large for
repair.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level lip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the level lip, and
shows stormwater has
then plant a ground cover and
bypassed it.
water until it is established. Provide
lime and a one-time fertilizer
application.
Trees or shrubs have begun
Remove them.
to grow on the swale or just
downslo e of the level lip.
The bypass channel
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rolling
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
if applicable).
approximately three to six inches.
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary. Provide lime and a one-
time fertilizer application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application.
Nuisance vegetation is
Remove vegetation by hand if
choking out desirable species.
possible. If pesticide is used, do not
allow it to get into the receiving
water.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
401 Oversight Unit at 919-733-1786.
Form SWU401-level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3
Permit Number: ()S� 6 0 CD loy
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Island Harbor Marina
BMP drainage area number:
Print name: Maritime Siblings, LLC C/O Georfzia Murray
Address: P.O. Box 4549 Emerald Isle, NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
kb;-4' ifekd_t i.. , County of C CBV -Q P-ol— , do hereby certify that
-cv " t' 1V ` , VL l personally appeared before me this
day of � 1 O do� , and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements.
Witness
ROBERT W. DAVY —
NOTARY PUBLIC
CARTERET COUNTY, N.C.
SEAL
WITNESS
My commission expires
Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3
Permit Number.
(to be provided by DWQ)
Drainage Area Number:_
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the fflter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
— Once a year, the filter strip will be reseeded to maintain a dense growth of
vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC, 1993). Forested filter strips do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire filter strip
Trash/debris is present.
Remove the trash/debris.
system
The flow splitter device
The flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sediment off -site.
The flow splitter device is
Make any necessary repairs or
damaged.
replace if damage is too large for
repair.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level lip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the level lip, and
shows stormwater has
then plant a ground cover and
bypassed it.
water until it is established. Provide
lime and a one-time fertilizer
application.
Trees or shrubs have begun
Remove them.
to grow on the swale or just
downslo e of the level lip.
The bypass channel
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rolling
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
if applicable).
approximately three to six inches.
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary. Provide lime and a one-
time fertilizer application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application.
Nuisance vegetation is
Remove vegetation by hand if
choking out desirable species.
possible. If pesticide is used, do not
allow it to get into the receiving
water.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
1 401 Oversight Unit at 919-733-1786.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3
Permit Number: S
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Island Harbor Marina
BMP drainage area number:
Print name: Maritime Siblings, LLC C/O Georgia Murrav
Title: Manager
Address: P.O. Box 4549 Emerald Isle. NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
bt p i Cc, &-dL Ina, , County of C,Q (4pv!!:± , do hereby certify that
irt,l personally appeared before me this (3r
day of A u ' , and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements.
WitnPC�handficial seal,
0
ROBERT w.DAVY
NOTARY PUBLIC
NCAR.7ERET COUNTY, N.C.
VMy c mimmn Expma
SEAL s
My commission expires ( e12 6
0
Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3
Permit Number:�'�,(�����
(to be provided by DWQ)
Drainage Area Number:
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
— Once a year, the filter strip will be reseeded to maintain a dense growth of
vegetation
— Stable groundcover will be maintained in the drainage area to reduce the
sediment load to the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings
harvested to promote the growth of thick vegetation with optimum pollutant
removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and
may be allowed to grow as tall as 12 inches depending on aesthetic requirements
(NIPC,1993). Forested filter strips do not require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and time will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours
after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County).
Records of operation and maintenance will be kept in a known set location and will be
available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire filter strip
Trash/debris is present.
Remove the trash/debris.
system
The flow splitter device
The Flow splitter device is
Unclog the conveyance and dispose
(if applicable)
clogged.
of any sediment off -site.
The flow splitter device is
Make any necessary repairs or
damaged.
replace if damage is too large for
repair.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate theproblem:
The swale and the level
The swale is clogged with
Remove the sediment and dispose
lip
sediment.
of it off -site.
The level lip is cracked,
Repair or replace lip.
settled, undercut, eroded or
otherwise damaged.
There is erosion around the
Regrade the soil to create a berm
end of the level spreader that
that is higher than the level lip, and
shows stormwater has
then plant a ground cover and
bypassed it.
water until it is established. Provide
lime and a one-time fertilizer
application.
Trees or shrubs have begun
Remove them.
to grow on the swale or just
downslo e of the level lip.
The bypass channel
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then
reestablish proper erosion control.
Turf reinforcement is
Study the site to see if a larger
damaged or ripap is rolling
bypass channel is needed (enlarge if
downhill.
necessary). After this, reestablish
the erosion control material.
The filter strip
Grass is too short or too long
Maintain grass at a height of
if applicable).
approximately three to six inches.
Areas of bare soil and/or
Regrade the soil if necessary to
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Sediment is building up on
Remove the sediment and
the filter strip.
restabilize the soil with vegetation if
necessary. Provide lime and a one-
time fertilizer application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application.
Nuisance vegetation is
Remove vegetation by hand if
choking out desirable species.
possible. If pesticide is used, do not
allow it to get into the receiving
water.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality local Regional Office, or the
outlet.
401 Oversight Unit at 919-733-1786.
Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3
Permit Number: :5 (,kd �90 �6 S U b
(to be provided by DWQ)
acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Island Harbor Marina
6MP drainage area number:
Print name: Maritime Siblings. LLC c/o Georgia Murray
Title: Manager
Address: P.O. Box 4549 Emerald Isle. NC 28594
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
a Notary Public for the State of
O 64.C, Cr,, (,�d[r �County of Ow Nf,-2 k -ctado hereby certify that
6r. /%1 rtyt�, personally appeared before me this L
day of 0 and acknowledge the due execution of the
forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements.
Witness my hand and official seal,
ROBERT W. DAyy
NOTARY PUBLtC
CARTERET COUNTY, N.C.
My Cmmmw Em
SEAL
My commission expires Q L �z C G
WITNESS
Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3
DEMLR USE ONLY
Date Re 'rve
Fee Paid
Permit Number
o -
5,U osa er
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H 1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 080908
2. Project name: Island Harbor Marina
3. Project street address: 510 Marina Drive
City: Emerald Isle
County: Carteret
4. What, if any, changes have been made to the project as permitted? None, not constructed
ZIP : 28594
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https:/Ideg.nc.gov/about/divisions/energy-
mineral-land-resources/energy-mineral-la nd-rules/stormwater-program/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/aboutidivisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1 Current Permit Holder's Company Name/Organization: Maritime
2. Signing Official's Name: Georgia Ricks
3. Signing Official's Title: _
4. Mailing Address. PO B
City Emerald Isle
5. Street Address:
City:
6. Phone: 2( 52 ) 354-2373
LLC
NC ZIP 28594
State: ZIP
Email: georgia0089mac.com
AUG 0 4 20
BY:_
21 ,t .
A 2021 II
BY:
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
G R 1. A permit application processing fee of $505.00 payable to NCDEQ.
G R 2 One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation —a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act,"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee,
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
N/A 3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
G R 4. O&M Agreements, Please select one:
0 I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keeo this on file with the permit; or project not constructed therefore O&M not recorded
El do not have a copy of the current recorded O&M Agreement for all SCMs and am
- requesting a copy be sent to me I agree to keep this on file with the permit
G R 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
[El The project has not yet been built.
N/A 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
G R 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
httos://www.sosne.gov/online services/search/bv title/ Business Registration
AUG 0 Y 2021
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
Georgia Ricks, Manager , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs,yy,rr ownership. All information provided on this permit renewal application is, to t e best of my
knowledge, 6rrect and complete.
Signat Date: 7/7 Z
N
that 1--1C L
(Nbta04j$swqe
► & pueuc
5. L. et,yyprN , a Notary Public for the State of
2ALL714Ka— , County of ' ( O14Gt , do hereby certify
✓~ 1_ . L-�t--�-S personally appeared before me
day of V U uY 20r, and acknowledge the due
3 instrument Witness my hand and official seal,
My commissionexpires_ O� D a 3
AUG 00 2021
BY: L
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
Permit No. 5/,L) n6 0 01(7 z
Ito be provided by Dwol
1' gep4 WATey c
NA STORMWATER MANAGEMENT PERMIT APPLICATION FORM oE
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
Contact Person
Phone Number
Date
Drainage Area Number
GINGERTURNER
252-756-9352 X234
Ii..,DESIGN,INFORMATION•. .,a: C :. Z,»-, -, iP.,
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
Peak Flow Calculations
1-yr, 24-hr runoff depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Pre/Post 1-yr, 24-hr peak Flow control
Storage Volume: Non -SR Waters
Minimum design volume required
Design volume provided
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Basin Design Parameters
Drawdown time
Basin side slopes
Basin bottom elevation
Storage elevation
Storage SA
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom SA
102,544.00 ft
60,815.00 ft�
0.59 %
2.00 in
in/hr
ft'Isec
ft'/sec
ft'Isec
9,894.00 ft'
12,498.00 ft'
In
it,
ft3
it,
ft3
DUCKSTON/TORHUNTA
6.00 inthr
2.23 fmsl
A202y
OK for non -SR waters
i'
0.08
days
300
:1
5.50
fmsl
6.60
fmsl
12,130A0
i?
7.00
fmsl
145.00 it
95.00 it
10,593.00 ftz
OK
OK
OK
su 1 2 IV
Fonn SW401-Infittrabon Basin-Rev.2 Pans DA1 I & 11 Design Summary. Page 1 of 2
Permit No.:aI LI d M �O
(to be provided by DWO)
Additional Information
Total runoff volume captured by basin
2.73
ac-in
Maximum of 2 acre -inches allowed iREbEv�tiD�u�ui�
Length of vegetative filter for overflow
45.00
it
OK
Distance to structure
25.00
ft
OK
Distance from surface waters
50.00
ft
OK
Distance from water supply wells)
N/A
ft
OK
Separation from impervious soil layer
NIA
ft
OK
1-ft soil above shwt (R�1)L'V&1.P1Pui�lT
Naturally occuring soil above shwl
0.75
ft
Minimum of atleast of naturally occuring
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Pretreatment device provided
Y
Storage within proposed catch basin
SEP � 2 2p06
Form SW401-Infiftmbon Basin-Rev.2 Parts DA1 I & 11 Design Summary, Page 2 of 2
"W
Permit No. S10�ro ko —Ci
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. if a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
cve ,cI1 Dt
1. Plans IT' - 50' or larger) of the entire site showing:
�. f)iei-3 - Design at ultimate build -out,
v �w - Off -site drainage (if applicable),
SIt - Delineated drainage basins (include Rational C coefficient per basin),
45 il e_& b
N/A
N 1A
5, hea T'2
Shea �--
yti2.c.'� 3�r�
Sh ecT 2
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,*
- Maintenance access/ ed'�-e✓nerd"
- Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
Y1 C
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Suet} 34 5
Bypass structure,
Shed 2,
Maintenance access) C&x ivkev i-
Sh? L+'5
Basin bottom dimensions,
-5
Basin cross-section with benchmark for sediment cleanout,
N/A
Flow distribution detail for inflow,4=
Si,tc ( S
- Vegetated filter, and
- Pretreatment device.
RtX
SiA C J b
3. Section view of the infiltration basin (1" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
?1 ;1�
` h eti
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
2i:Z .
II
f�} FQG�L2C1
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
7. The supporting calculations.
u•�
A tJD Cht�1
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
r Z WA A 9. A copy of the deed restrictions (if required).
� ���e�T l�� 1'�v��o�Yt'�.ttit � ptrol�cli)�1 i►�caiw�c✓� �-iti-}-I.1e� Ylrvaxlrtnurvt
Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Pan DA'I III Req'd Items Checklist, Page 1 of 1
Permit No. sf1'9�t SCr c�4�Y
(to be provided by DWO)
• ,/, O20F yt ATpgOG
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information
1' PROJECTINFORMATION.: - r -..,;>as rg:;i: ,;::, ,•.. r i tYz' t1',: ;z`- ..
Project Name ISLAND HARBOR MARINA
Contact Person GINGER TURNER
Phone Number 252-756-9352 X234
Date
Drainage Area Number
H.. DESIGN iINFORMATION :uci=, �-
Site Characteristics
Drainage area
97,562.00
ft'
Impervious area
50,553.00
It'
Percent impervious
0.52
%
Design rainfall depth
2.00
in
Peak Flow Calculations
1-yr, 24-hr runoff depth
in
1-yr, 24-hr intensity
infhr
Pre -development 1-yr, 24-hr runoff volume
ft3/sec
Post -development 1-yr, 24-hr runoff volume
ft3/sec
Pre/Post 1-yr, 24-hr peak Flow control
ft3/sec
Storage Volume: Non -SR Waters
Minimum design volume required
8,396.00
ft3
Design volume provided
8,475.00
ft3 OK for non -SR waters
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth
in
Pre -development 1-yr, 24-hr runoff
ft3
Post -development 1-yr, 24-hr runoff
ft3
Minimum volume required
ft3
Volume provided
ft3
Soils Report Summary
Soil type
DUCKSTON!TORHUNTA
Infiltration rate
6.00
in/hr
SHWT elevation
3.06
fmsl
Basin Design Parameters
Drawdown time
0.36
days
OK
Basin side slopes
Basin bottom elevation
3.00
5.00
:1
fins[
OK
Raise basin bottom, Must be at least 2-ft above SHWT (WDEVi WAM
Storage elevation
800
fmsl
Storage SA
3,725.00
ftz
Top elevation
8.25
fmsl
Basin Bottom Dimensions
Basin length
48.00
ft
R�(rFi T—
Basin width
40.00
ft
Bottom SA
1,925.00
ft2
:'
BY:_,�_
Form SW401-Infiltration Basin-Rev.2 Parts DA7 I a 11 Design Summary, Page 1 of 2
Permit No. S03�SGI�U ?U v
(to be provided by DWD)
Add' Information
Total runoff volume captured by basin
2.31
ac-in
Maximum of 2 acre -inches allowed (RFDFV V-U)F e taF
Length of vegetative filter for overflow
35.00
ft
OK
Distance to structure
0.00
ft
Too close to structure, must be minimum of 15-ft downgradient(REDe�"nj
Fl, VAS 7C lo.Zi
Distance from surface waters
5000
If
OK
Distance from water supply well(s)
N/A
If
OK
Separation from impervious soil layer
N/A
It
OK
Naturally occuring soil above shwt
3.75
ft
OK
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Pretreatment device provided
_ Y
Storage provided in proposed catch basin
SEp 12 200�
Form SW401-Infilbabon Basin-Rev.2 Parts DA1 1 & 11 Design Summary, Page 2 of 2
Permit No. �()8
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
w1? 1.
Plans 11" - 50' or larger) of the entire site showing:
�t�cxi 3
- Design at ultimate build -out,
cve r .c l l D A ftikc�
- Off -site drainage (if applicable),
S'C`"t 3
- Delineated drainage basins (include Rational C coefficient per basin),
si2z i S
-Basindimensions,
N/A
liIA
-Pretreatmentsystem,:K
Shtti 'Z
- High flow bypass system,*
-Maintenance accessed xYKettiT
Sne t.i -'2-
- Proposed drainage easement and public right of way (ROW),
Sr 2.� t oaf
- Overflow device, and
rc
SYte.r_� 3h 5
sr�er i 5
N/A
5r,tc.i- S
cis �shz��3
121:C- F�+(LGG'`eL�
- Boundaries of drainage easement.
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
- Bypass structure,
- Maintenance access] clux-r"C-V'i
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,k-
- Vegetated filter, and
- Pretreatment device.-{e
3. Section view of the infiltration basin (1" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
6. A construction sequence that shows how the infittration basin will be protected from sediment until the
entire drainage area is stabilized.
7. The supporting calculations.
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
_ A 9. A copy of the deed restrictions (if required).
Form SW401-infiltration Basin-Rev.2 Page f of 1 Part DA1 In Reci'd Items Checklist, Page 1 of 1
Permit No. W n d 0 U �i 6
(fo be Provided by DWQ)
0Q W ATBH
o�
C
! STORMWATER MANAGEMENT PERMIT APPLICATION FORM o�
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
Contact Person
Phone Number
Date
Drainage Area Number
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
Peak Flow Calculations
1-yr, 24-hr runoff depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Pre/Post 1-yr, 24-hr peak flow control
Storage Volume: Non -SR Waters
Minimum design volume required
Design volume provided
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Basin Design Parameters
Drawdown time
Basin side slopes
Basin bottom elevation
Storage elevation
Storage SA
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom SA
14,300.00 fe
5,529.00 ftz
0.39 %
2.00 in
in
inlhr
ft3/sec
ft3/sec
ft3/sec
949.00
ft3
978.00
ft3
in
ft3
ft3
ft3
ft3
DUCKSTON/TORHUNTA
6.00
in/hr
1.96
fmsl
0.12 days
3.00
:1
5.00
fmsl
6.00
first
1,285.00
f?
650
fmsl
89.00 If
750.00 It
978.00 fe
OK for non -SR waters
o�.aq�•
WOK
OK
OK
Form SW401-Infiltration Basin-Rev.2 Parts I & ll Design Summary, Page 1 of 2
Permit No.
fto be provded by DWD)
Additional Information
Total runoff volume captured by basin
0.26
ac-in
OK
Length of vegetative filter for overflow
24.00
ft
Filter is too short, must be> 30-ft (F?CnAeVeloPn-e#1f
Distance to structure
75.00
ft
OK
Distance from surface waters
80.00
ft
OK
Distance from water supply well(s)
N/A
ft
OK
Separation from impervious soil layer
N/A
ft
OK
Naturally occuring soil above shwt
3.33
It
OK
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Pretreatment device provided
N/A
Form SW401-Infiltrabon Basin -Rev 2 Parts 1 a 11 Design Summary, Page 2 of 2
Permit No.
(to be provided by DWQ)
III; REQUIREDITEMS'6HECf<LIST p�:x:gi =' ,': g:.u' 7 ;_;=3 'w•..:x ,. .. ,' •v;
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
W
1. Plans (1"- 50' or larger) of the entire site showing:
>heek 3
- Design at ultimate build -out,
cve r `c t 1 -I-'> A Nkc` F
- Off -site drainage (if applicable),
stACC.t 3
_ Delineated drainage basins (include Rational C coefficient per basin),
Syhecj'g
- Basindimensions,
µ/A
-Pretreatmentsystem,.K
�rte/AZ
- High Now bypass system,*
Maintenance accessed rIII eKT
She Ct Proposed drainage easement and public right of way (ROW),
Sr�ct "ram - Overflow device, and
SheEr "L Boundaries of drainage easement.
Y.IC
Site.ti 3d S
SiN 4 Z.
Sy\Lei �
N/A
SFtitet 5
(UY�
?i sly z
ei:2 A�a'J
»_
AtGG1t�l
r iz
/A
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
- Bypass structure,
- Maintenance access ect!�"ev't
- Basin bottom dimensions,
- Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.f:
3. Section view of the infiltration basin (1" = 20' or larger) showing:
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
6. A construction sequence that shows how the infiltration basin will be protected from sediment until the
entire drainage area is stabilized.
7. The supporting calculations.
8. A copy of the signed and notarized operation and maintenance (0&M) agreement
9. A copy of the deed restrictions (if required).
t�t'o act 1,51`�r�e��lo�111�tti1 ��wy�cLi �� i� '-b+ke- Ikak)RAVV1rn
Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part DA1 III Req'd Items Checklist, Page 1 of 1