Loading...
HomeMy WebLinkAboutSW8080823_HISTORICAL FILE_20081013STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWS U 8 O $ 23 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 00 s l o t$ YYYYMMDD Crystal Coast Engineering, PA 3817-3 Freedom Way Hubert, N.C. 28539 Tel, (910) 325-0006 Fax: (910) 325-0060 Email: crystalcoasteng@bizec.a.com gZF'CEIVEID October 6, 2008 OCT 0 9 2008 Mr. Steve G. Pusey BY: N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 Re: Stormwater Project No. SW8 080823 Ken and Lisa Shipp — Site Improvements Carteret County Dear Mr. Pusey We are in receipt of your Request for Additional Information (RFI) dated September 26, 2008 for the referenced project. We provide the following information to allow you to continue the stormwater review: 1. Infiltration Trench Supplements for both systems have been revised to show the correct top elevation for the infiltration devices and trench. 2. Revised detail of the Infiltration Trench to reference the top elevation of the trench. 3. Revised the Infiltration Trench Detail and added a 6" layer of #57 Stone under infiltration devices. 4. Revised the Stormwater, Grading and Drainage Plan and Detail sheet and added an extra feet to the storage basin depth for sediment storage. 5. Completed the Infiltration Trench/Storage Basin system O&M Agreement you provided. We are hopeful that this response addresses all concerns and that the permit can be issued in the near future. Should you have questions or additional concerns, please feel free to contact me. Yours truly, Pascal G. Pandos CRYSTAL COAST NGINEERING Cc: Ken and Lisa Shipp Re: Ken and 1, Shipp Stormwater SW8 080823 i Subject: Re: Ken and Lisa Shipp Stormwater SW8 080823 From: Steve Pusey <Steven.Pusey@ncmail.net> Date: Fri, 03 Oct 2008 14:10:41 -0400 To: David Newsom <crystalcoasteng@bizec.rr.com> CC: "'Pascal G. Pandosy"' <pascalcce@bizec.rr.com>, 'Linda Lewis' <Linda.Lewis@ncmail.net>, Ed Beck <Ed.Beck@ncmail.net> David, As requested, we will waive the requirement to fill out a Wet Detention Pond Supplement. Mainly, what I need is more information about storage volume in this pond. Is your storage volume calculation based on storage in the infiltration basin (infiltrator units) or the storage pond? There may be an error in your storage calculation using a depth of 2 feet. According to your plans, the depth of the infiltration basin (infiltrator units) is 1.43 feet, not including the washed rock. Please explain or give me a call to discuss. The "hybrid" Infiltration Trench / Storage Basin System O&M Agreement has been tailored to fit this application. Please advise which specific elements of this Agreement you disagree with and we will consider them. We, essentially, just added a storage pond section to the Infiltration Trench O&M Manual. The main reason for this "hybrid" O&M Manual is to ensure that, in addition to the trench, the storage pond is maintained properly. Steve David Newsom wrote: Steve The "hybrid" Infiltration Trench/Storage Basin System O&M Agreement you emailed us doesn't really lend itself to this application. Why can we not just use the same forms (Supplements & O&M Agreements) as we have done on COUNTLESS other similar (almost identical) systems? In addition, I fail to see the purpose of filling out a Wet Detention Pond Supplement in this instance. We are not building a Wet Detention Pond, rather we are building a basin holding pond to temporarily store stormwater. We are not seeking any pollution removal credits in this basin, therefore, question the need for the supplement. Please consider and advise. -----Original Message ----- From: Steve Posey[mailto:Steven.Pusey@ncmail.netl Sent: Friday, October 03, 2008 10:04 AM To: David Newsom Cc: 'Pascal G. Pandosy'; Linda Lewis Subject: Re: Ken and Lisa Shipp Stormwater SW8 080823 The BMP calls for washed gravel as the fill material. We will approve Class 57 Stone or similar. of 3 10/3/2008 3:57 PM Re: Ken and Lta Shipp Stormwater SW8 080823 Concerning the O&M Agreement, please reference the attached document for your use on this project. Regards, Steve Pusey David Newsom wrote: Steve, We have done numerous almost identical designs using infiltrator units with Select Fill. This has never been a permitting problem in the past. -----Original Message ----- From: Pascal G. Pandosy [mailto:pascalcce@bizec.rr.com] Sent: Thursday, October 02, 2008 2:11 PM To: David Newsom Subject: FW: Ken and Lisa Shipp Stormwater SW8 080823 From: Pascal G. Pandosy [mailto:pascalcce@bizec.rr.com] Sent: Thursday, October 02, 2008 1:58 PM To: 'steven.pusey@ncmail.net' Subject: Ken and Lisa Shipp Stormwater SW8 080823 Mr. Pusey, We received your letter of comments dated September 26, 2008 for the referenced project and would like for you to be more specific as to what type of fill material is required for the infiltration trench. Please note that many of our projects have been submitted and accepted in the past with the same indication on the infiltration bed detail (select fill material). Also, could you email us an unprotected wet detention pond O&M agreement word document to help us with the elaboration of a wet storage basin O&M agreement ? Again, we have submitted projects with the same type of BMP design in the past. Those projects have been accepted without any of the recommendations cited above for a storage basin. Please confirm, for future reference, that those forms will have to be included in the stormwater permitting package. Thank you. Pascal Pandosy Crystal Coast Engineering, PA 910-325-0006 Steve Pusey Environmental Engineer 2 of 3 10/3/2008 3:57 PM Ken and Lisa Shipp, Owners 283 Pearson Circle Newport, NC 28570 Subject: Request for Additional Stormwater Project No "Site Improvements" Carteret County Dear Mr. & Mrs. Shipp: Michael F. Easley, Governor William G Ross Jr., Secretary North Carolina Department of Environment and Natural Resources September 26, 2008 Information SW8 080823 Coleen H. Sullins Director Division of Water Quality The Wilmington Regional Office received a State Stormwater Management Permit Application for "Site Improvements" on August 20, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: CA. Please revise Supplement sheet page 2 elevation and top elevation for the basin elevation references top of trench. to state the proper storage/overflow and trenches, respectively. Note that top 2. On your plan details, in reference to the infiltration trench volume, please designate the "select fill material' as the type of gravel required for an infiltration trench. Also, please note the "top of trench" elevation on the detail. 3. Using the Wet Detention Pond O&M as a template, please develop and submit a signed O&M Agreement for the wet storage basin. 4. Please fill out a Wet Detention Pond Supplement form with information pertaining to the wet storage basin. Fill out as much as you with all applicable information. ✓5. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 10, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. NorlhCarolina Aaturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Intemet w ncwaterquality ore Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper Ken & Lisa Shipp September 26, 2008 Stormwater Application No. SW8 080823 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at steven.pusey@ncmail.net. Sincerely, StevePu Environmental Engineer ENB/sgp: S:\WQS\STORMWATER\ADDINFO\2008\080823.sep08 CC: David K. Newsom, PE - Crystal Coast Engineering, PA Steve Pusey Wilmington Regional Office Page 2 of 2 A Crystal Coast Engineering, PA 3817-3 Freedom Way Hubert, N.C. 28539 Tel: (910) 325-0006 Fax: (910)325-0060 I (� Email crystalcoasteng@bizec n.com August 11, 2008 �} Ms. Linda Lewis N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 Re: Ken and Lisa Shipp Site Improvements Carteret County Dear Ms. Lewis, We are in receipt of your email of August 8, 2008 for the referenced project. We provide the following information to allow you to continue the stormwater review (item numbers correspond to your email): 1. Completed Level Spreader, Filter Strip and Buffer Supplement Form SW401 2. Labeled Proposed Infiltration Trenches on plans as requested. 3. Revised Vegetated Filter Strip Detail as requested. 4. We decided to keep the current design to comply with the 2 ac.in requirement. We are hopeful that this response addresses all concerns and that the permit can be issued in the near future. Should you have questions or additional concerns, please feel free to -contact me. --\ / AUG 2 0 2008 David wsom, PE lay CRYSTAL COAST ENGINE ERI G. PA ---- --- Ken & Lisa Shipp Site i Subject: Ken & Lisa Shipp Site From: Linda Lewis <linda.lewis@ncmai1.net> Date: Fri, 08 Aug 2008 09:02:28 -0400 To: Dave Newsom <crystalcoasteng@bizec.rr.com> Dave The Division received an incomplete stormwater permit application for the subject project on July 31, 2008. Please address the following in order to accept the application for review: 1. A complete Filter Strip, Buffer and Level Spreader supplement form. The O&M was provided, but not the supplement that goes with it. 2. Please label the infiltration trenches on the plans. 3. Please revise the vegetated filter strip detail to specify the bottom width. Additionally, please remember that a filter is not a ditch and it should not have the same cross-section as a ditch would. A filter is wide and flat. 4. The infiltration trenches are located immediately adjacent the storage basin and have the same bottom elevation as the storage basin. why not simply remove the clay liner from the storage basin and use it as an infiltration basin? Linda 8/8/2008 9:03 AM 3817-3 Freedom Way Hubert, N.C. 28539 �5 Tel: (910) 325-0006 Fax. (910) 325-0060 I To: Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Rsc Ken & Lisa Shipp Site Improvements From: Jeanie for David K. Newsom Date: July 28, 2008 ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle -4-% Attached: -,I" " One (1) copy Narrative One (1) original and One (1) copy Stormwater Permit Application One (1) original Infiltration Trench Supplement (System #1) P One (1) original Infiltration Trench Supplement (System #2) One (1) copy Design Calculations One (1) copy Filter Strip / Level Spreader O&M Agreement One (1) copy DWQ Infiltration System Investigation Request Form One (1) copy Soils Report Two (2) (partial) sets of plans (Stormwater Plan & Details Sheet) One (1) check in the amount of $505 Comments: Submitted for review and, if acceptabl`e, approval. q •rQ� UvlQ- cvy D-(LvJAArc�bo� , 1YZ✓ick I IC.�Ih ¢.ViGt1fC f�r b�, 57 e„r, s C,Ac r'% �- IJ Y rs 1 A).eC "N<j Stormwater Treatment & Erosion Control Narrative Proposed Site Improvements— Ken and Lisa Shipp Property Ken and Lisa Shipp propose to construct three (3) commercial facilities and site improvements with access streets, parking spaces and an RV/Boat storage area on a 3.925 acres tract located off of NC 24 in Carteret County. The site is less than 0.5 miles (but greater than 575') off of Broad Creek (SA;HQW) in the White Oak Basin. The proposed development is high density (BUA = 61.32%); therefore, stormwater treatment facilities are required. Existing site topography is generally flat/gently sloping (0 -6%) towards the West. Soils are generally medium to fine sands. Because the site is located close to class SA waters, an infiltration system is required. Due to site topography, groundwater conditions, and setback requirements it is necessary to collect the first 1.5" of stormwater in a storage system consisting of a storage basin. Collected stormwater will be pumped from the storage system to two infiltration beds located at the southwestern corner of the site. Stormwater in excess of the first 1.5" will bypass the storage system and be discharged to a vegetated filter. Proposed erosion sedimentation control measures include temporary construction entrance, silt fence, and inlet protection for all drop inlets. During construction, the infiltration basin will be used as a temporary sediment basin. The proposed basin contains adequate storage to accommodate sediment generated from the project area based on 1,800 CF/acre requirements. 3/7 rs t > - �, 1 -•�.'�./` '� 4 � r"' b T ,,Ijr�a� ' y 'a ��'.'_ � ""y'� � ". �. � �r• _ � Broad Creek Flre � Jf��ir ✓ 4 � It. r � �' ' t� �,' s A ,\ t-INKen&Lisa ^ so z 1-� DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Complete and email this form to Vincent.Lewis@ncmail.net. If there are mop than 7 areas to be tested, attach a second sheet.o Q ,1 State Soil Scientist Confirmation Visit date/time: Project Name: Ken and Lisa Shipp Site Improvements County: Carteret Street Address: NC HWY 24 - across Broad & Gales Creek Fire Dpt. Directions from the nearest intersection of two major roads: -400 feet West of Hwy 24 and NC 1124 intersection, in Broad Creek >1 acre being disturbed? ®YES ❑NO CAMA Major required? DYES ®NO Consultant Name: David K. Newsom Phone: (910)-325-0006 Consultant Firm Name: Crystal Coast Engineering, PA Bore Number 1 2 3 4 5 6 7 a Existing Ground Elevation b Proposed Bottom Elevation c Difference a minus b d Add 2 ft. Min. Bore Depth) e Hardpan Depth? f A rox: Elev. Of SHWT Max. lowest bottom elev. h Infiltration Rate OK? i Confirmation of SHWT For projects requiring more than 5 hand borings, manpower or equipment to conduct the excavation must be provided by the consultant. *State Soil Scientist Use ONLY Comments J cl' reh kjv- sla Required Attachments: 1. Legible vicinity map. 2. Complete Soils Report. 3. PDF formatted site plan with the boring locations to be tested. Site plans should be emailed or hand -delivered only. Illegible faxed maps will not be accepted. All proposed infiltration areas and existing, active utility lines located Kithin the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the ppposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and maketc}� the suitability of the site to meet the infiltration design requirements andffd assumes no liability should the system fail. S:\WQS\STORMWATER\FORMS\infiltration site visit RevisdUbAd 2008 DWQ PBOJ # r�svpPaa.a��••e.e 110a .exae 1n am ti I q •=•up � i a.. 1 s s a Gg9g A fl ----- 1 1 V /� lit ,I 1 II � _I 11 b I C•li ! I ` °Rill l? it t , 1qt 6 I j I I 1+1 ' "m, a� L 2 !� p g E � mmagn mrnK sh n,w Ken & Lisa Shipp CrvStal [oast enolneenno P.A. K° Property Development C m i usli aw ` I L f n,/ Design Calculations Infiltration System Ken and Lisa Shipp Property in Broad Creek July 22, 2008 (Revised 7/28/08) 1. Project Description The project consists of a construction of three commercial facilities and site improvements on a 3.925 acres tract located on Hwy 24 in Carteret County, North Carolina. Construction will include access streets and associated parking for commercial use. Design Requirements Project will be designed in accordance with NC Administrative Code Section 15A NCAC 2111000 — Stormwater Management (hereinafter "Regulations". This site is in the category of "development activities within coastal counties within one-half mile of and draining to SA water". Due to density, the project is considered "high density development". In accordance with Section .1105(2)(b) of the Regulations, an infiltration system designed to accommodate 1-1/2" of rainfall will be required. Furthermore, runoff in excess of the design volume must flow overland through a vegetative filter. 2. Impervious Surface Areas Existing Buildings (to remain) 7,236 sf Sidewalks (to remain) 1,098 sf Subtotal 8,334 sf Proposed Buildings 17,000 sf Streets/Parking 61,616 sf Sidewalks 5,650 sf Subtotal 84,266 sf Other Boat/RV Storage area 12,240 sf TOTAL 104,840 sf Total Drainage Area = 170,972sf (3.925 ac) Percent Impervious 3. Design Volume = 104,840 sf / 170,972 sf = 61.32% In accordance with Section .1008(c)(1), the required design volume is computed as follows: Using Schuler "Simple Method": r. Rv = 0.05 + 0.009(1) where I = Percent Impervious (62.58%) = 0.602 in/in Design Volume = Design Rainfall (1.5") x Rv x Drainage Area = 1.5" x 0.602 x 170,972 sf = 154,387 in-sf or 12,865 cf 4. Storage Volume The infiltration basin is sized to accommodate in excess of 12,865 cf. Using average end method, actual basin volume is: Elev Area 24.50 5,865 26.50 7.785 5. Infiltration Area Avg. Incr. Area Depth Volume 6,825 2.00 13,650 cf 13,650 cf Infiltration area is sized to accommodate actual storage volume (13,650 cf) pumped down in 5.0 days. Required infiltration rate (and associated stormwater pumping rate) is computed as follows: Infiltration (Pump) Rate = 13,650 cf / (5.0 day x 24 hr/day) = I I3.75cf/hr (14.22 gpm) Stormwater Pump Station shall be designed and adjusted to deliver 14.22 gpm to the infiltration system which is sited upland from the Storage Area in order to comply with required separations from SH WT. The Soil and Site Evaluation Report (copy attached) indicates that existing soils are clean, well graded, and coarse to medium sands with hydraulic conductivities ranging from 10 in/hr. Assuming conservatively that existing soils have a minimum hydraulic conductivity of 6.0 in/hr, required infiltration area is computed as follows: Req'd Infiltration Area = 113.75 cf/hr / (6.0 in/hr / 12 in/ft) = 227.50 sf Use forty (16) standard "Infiltrator" units which will provide approx.284 sf surface area. M r 'v Design Calculations Stormwater Pump Station for G` Ken and Lisa Shipp Site Improvements /yW located is gal lI i/ Carteret County, North Carolina f//"� l/ 1. Project Description The stormwater treatment system is serving the Ken and Lisa Shipp Site Improvements and will require a small pumping system to deliver stormwater from the storage area to the infiltration bed. 2. Pipe Effective Lengths 2" PumD Station Pioin Actual Length = 8 No. Fitting Tyne L/D L Total I gate valve 35 5.8 5.8 1 check valve 135 22.5 22.5 2 90 bend 20 3.3 6_6 Fitting/Valve Length = 34.9 Total Effective Length = 42.9' 2" Forcemain Pipe Actual Length = 150' No. Fitting Tyne L/D L Total 1 90 degree bend 20 3.3 3.3 0 45 degree bend 10 1.7 0.0 0 22.5 degree bend 5 0.8 0_0 FittingfValve Length 3.3 Total Effective Length = 153.3' 3. Pumo Selection & Operating Conditions Pump Selection — Myers S33 w/ Integral Float Operating Conditions: 32 GPM @ 7' TDH — See attached spreadsheet Throttle pump in field to deliver approx. 15 gpm. Forcemain/Pump System Model Enter data in shaded areas. Project: By: Date: Pump OH Elevation: . Ej�:kV Forcemain High Point-. Forcemaln Discharge Elevation: Pipe 11 Plpe C Dlamehr Actual Equiv. Effective Section Mahrlal (Inches) Length Length Length Section ..: 42.9 Section 2 Section 3 0 Section 6 : _'GC >'-f_>'[:':i:� `.`sJ3=:'Z`il [ Z:_;: 0 Flow Rate Interval Head loss calculated using Hazen -Williams equation H r = .2083(l 00IC) " u (Q i as /D r 11ssl where Hr - friction loss in fV100 0 - flow In gpm D - diameter in inches Pump Rah (gpm) Section t Hr Velocity Section 2 Hf Velocity Section 3 Hr Val, My Section 4 Ht Velocity Total Fdctlon Lozz static Xaad TDH n 0 000 000 000 000 000 0,00 000 000 000 128 128 2 001 0.20 003 020 000 082 000 082 004 128 132 4 003 041 010 041 000 163 0.00 163 013 128 141 6 006 0,61 0.22 061 000 245 000 245 028 1.28 156 8 010 082 037 082 000 327 000 327 047 128 175 10 0 15 1 02 055 1.02 000 409 000 409 071 1 28 1 99 12 022 1 23 078 1 23 000 4 90 000 490 0.99 1 28 2 27 14 029 1 43 1 03 1 43 000 572 000 572 1 32 1 28 2.60 16 0.37 1.63 1 32 1 63 000 654 000 654 1 69 1.28 2.97 18 0.46 1.84 1 64 1 84 000 736 000 7 36 2 10 1 28 338 20 056 2.04 2.00 2.04 000 8 17 000 8 17 255 1 28 383 22 0.67 2.25 238 2.25 000 8 99 000 899 3.05 1 28 433 24 0.78 2.45 280 2.45 000 9 81 000 981 358 1 28 486 26 0.91 2.66 3.24 2.66 000 1063 000 10 63 4 15 1 28 543 28 1.04 286 3 72 2.86 000 11 44 000 11 44 4 76 1 28 604 30 1.18 307 4.22 3.07 000 1226 000 1226 541 1.28 669 32 1 33 327 4.76 3 27 000 1308 000 1308 609 1 28 737 34 1.49 347 533 347 000 1390 000 1390 682 1 28 8 10 36 1 66 368 5 92 368 000 1471 000 14 71 758 1 28 886 38 1.83 388 654 388 000 1553 0 00 1553 837 1 28 965 40 201 409 719 409 000 1635 000 1635 921 128 1049 42 2 20 4 29 7 87 429 000 17.17 000 17.17 1008 1 28 11 36 44 2 40 450 8 58 450 000 17.98 000 1 T98 1098 1 28 12 26 46 261 470 932 470 000 1880 000 1880 1192 1.28 1320 48 2 82 490 1008 490 000 1962 000 1962 12 90 1 28 14 18 50 304 5 11 1087 5 11 000 20.44 000 20A4 1391 1.28 15 19 SYSTEM CURVE VS. PUMP CURVE 30.00 25.00 20.00 a 15.00 . 10.00 5.00 0.00 - 0 4 8 12 16 20 24 28 32 36 40 44 48 PUMP RATE (GPM) TDH (ft) -PUMP Simplified Routing Procedure Protect Ken 8 -Lisa Shipp Site Improvements to years storm Date: 17/17/2008 - 1 Increment r---7l minutes (Must be < 10 minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min (days) cfs c(Cf c(Cf 01 Elevation cfs) (cfs) (cfs) (cfs)1�1 0 00 0.00 0.00 0 0.00 24.50 0.00 000 0.00 0.00 0 1 00 0.42 2516 25 0.01 24.51 0.00 0.00 0.00 0.00 0 2 0.0 1.64 98.34 124 0.03 24.53 0.00 0.00 0.00 0.00 0 3 00 355 212 82 336 0.07 24.57 0.00 0.00 0.00 000 0 4 0.0 5.97 358.12 694 0.13 24.63 0.00 0.00 0.00 0.00 0 5 0.0 868 520.89 1215 0.21 24.71 0.00 0.00 000 000 0 6 0.0 11.44 686.22 1902 0.32 24.82 0.00 0.00 0.00 0.00 0 7 0.0 1398 838.95 2741 0.46 24.96 0.00 0.00 000 000 0 8 0.0 16.08 965.07 3706 0.60 25.10 0.00 0.00 0.00 0.00 0 9 0.0 1755 1053.01 4759 0.76 25.26 0.00 0.00 003 0.03 2 10 0.0 1825 1094.71 5851 0.92 25.42 0.00 0.00 0.03 003 2 11 0.0 18.11 1086.35 6936 1.08 25.58 0.00 0.00 0.03 0.03 2 12 0.0 17 14 1028.69 7962 1.23 25.73 0.00 0.00 0.03 003 2 13 0.0 15.46 927.73 8888 1.36 25.86 0.00 0.00 0.03 0.03 2 14 0.0 1363 818.02 9704 1.47 25.97 0.00 0.00 003 003 2 15 0.0 12.02 721.30 10423 1.57 2607 0.00 0.00 0.03 0.03 2 16 0.0 10.60 636.00 11057 1.66 26.16 0.00 0.00 0.03 003 2 17 0.0 9.35 560.80 11616 1.74 2624 0.00 0.00 0.03 003 2 18 0.0 8.24 49448 12109 1.81 26.31 0.00 0.00 0.03 0.03 2 19 00 7.27 43601 12543 1.87 26.37 0.00 0.00 0.03 003 2 20 0.0 6.41 38446 12925 1.92 2642 0.00 0.00 0.03 0.03 2 21 00 5.65 338.99 13262 1.97 26.47 0.00 0.00 0.03 003 2 22 00 4.98 29891 13559 201 2651 000 001 0.03 005 3 23 0.0 4.39 263.56 13820 2.05 2655 0.00 0.16 0.03 0.19 12 24 00 3.87 23240 14041 2.08 26.58 000 034 0.03 038 23 25 0.0 3.42 20492 14223 2 10 26.60 000 0.53 0.03 0.56 34 26 0.0 3.01 180.69 14370 2.12 26.62 0.00 070 0.03 0.73 44 27 0.0 2.66 159.32 14485 2 14 2664 000 084 0.03 0.87 52 28 0.0 2.34 140.48 14573 2.15 26.65 0.00 0.95 0.03 0.98 59 29 0.0 2 06 123.87 14638 2.16 26.66 000 1.04 0.03 1.07 64 30 00 1.82 109.22 14683 2.16 26.66 0.00 1.10 0.03 1.13 68 31 00 1 61 96.31 14712 2.17 26.67 000 1.14 0.03 1.17 70 32 0.0 1.42 8492 14726 2.17 26.67 0.00 1.16 0.03 1.19 72 33 00 1 25 74.88 14729 2.17 26.67 000 1.16 003 1.20 72 34 0.0 1.10 6602 14724 2.17 26.67 0.00 1.16 0.03 1.19 71 35 00 0.97 58.22 14710 2.17 26.67 0.00 1.14 0.03 1.17 70 36 0.0 0.86 51 33 14692 2.16 26.66 0.00 1.11 003 1.14 69 37 0.0 0.75 45.26 14668 2.16 26.66 0.00 1.08 0.03 1.11 67 38 0.0 0.67 39.91 14641 2.16 26.66 0.00 1.04 003 1.08 65 39 0.0 0.59 35 19 14612 2.15 26.65 000 1.00 0.03 1.04 62 40 0.0 0.52 31.03 14581 2.15 26.65 0.00 0.96 003 0.99 60 41 0.0 046 27.36 14549 2.14 2664 0.00 0.92 003 0.95 57 42 00 0.40 24.13 14516 2.14 26.64 0.00 0.88 0.03 0.91 55 43 00 035 21.27 14482 214 2664 0.00 0.83 003 0.87 52 44 0.0 0.31 18.76 14449 2.13 26.63 0.00 0.79 0.03 0.83 50 45 00 0.28 16.54 14416 2.13 26.63 0.00 0.75 003 079 47 46 0.0 0.24 14.58 14383 2 12 2662 0.00 0.71 0.03 0.75 45 47 00 0.21 12.86 14352 2.12 26.62 0.00 0.67 0.03 071 42 48 0.0 0.19 11.34 14320 2 11 26.61 0.00 0.64 003 0.67 40 49 0.0 0.17 10.00 14290 2.11 26.61 0.00 0.60 0.03 064 38 50 0.0 0.15 8.82 14261 2.11 26.61 0.00 057 0.03 0.60 36 51 0.0 013 7.77 14232 2.10 26.60 0.00 0.54 0.03 0.57 34 52 0.0 0.11 6.85 14205 2.10 26.60 0.00 051 0.03 054 33 53 0.0 0 10 604 14178 2.09 26.59 000 048 0.03 0.51 31 54 00 0.09 5.33 14153 2.09 26.59 0.00 0.45 0.03 049 29 55 0.0 0.08 4.70 14128 209 26.59 000 0.43 003 0.46 28 56 0.0 0.07 4 14 14104 2.08 26.58 0.00 0.41 0.03 044 26 57 0.0 0.06 3.65 14082 208 26.58 000 0.38 003 0.42 25 58 0.0 0.05 322 14060 2.08 2658 0.00 0.36 0.03 0.40 24 59 0.0 0.05 2.84 14039 2 08 26.58 000 0.34 0.03 0.38 23 60 0.0 0.04 2.50 14019 2.07 2657 000 0.32 0.03 0.36 21 61 0.0 004 2.21 14000 2.07 26.57 0.00 0.31 0.03 0.34 20 62 00 003 1.95 13981 2.07 2657 0.00 0.29 003 0.32 19 63 00 0.03 1.72 13963 2.06 26.56 0.00 0.27 0.03 0.31 18 64 00 0.03 1 51 13946 2.06 26.56 0.00 0.26 003 0.29 18 65 0.0 0.02 1.33 13930 2.06 26.56 0.00 0.25 0.03 0.28 17 66 00 0.02 1 18 13915 2.06 26.56 0.00 023 0.03 0.27 16 67 0.0 0.02 1.04 13900 206 26.56 0.00 0.22 0.03 0.25 15 68 0.0 002 0.92 13885 205 26.55 000 021 0.03 0.24 15 69 0.0 0.01 0.81 13872 2.05 2655 0.00 0.20 0.03 023 14 70 0.0 001 0.71 13858 2 05 26.55 000 0.19 003 0.22 13 Increment F-,711minutes (Must be < 10 minutes) Orifice Weir Pump Total Total Time Time Inflow(cfs) Inflow Stored Volume Stage Water Surface Outflow Outflow Outflow Outflow Outflow min (days) cfs cut LGD. (n� Elevation cfs) (cfs) (cfs cfs Lcf1 71 0.0 001 0.63 13846 2.05 26.55 0.00 0.18 0.03 0.21 13 72 01 0.01 0.55 13833 205 26.55 000 0.17 003 0.20 12 73 0.1 001 0.49 13822 2.05 26.55 000 0.16 0.03 0.19 12 74 0.1 0.01 0.43 13811 2 04 26.54 0.00 0.15 0.03 0.19 11 75 01 0.01 0.38 13800 2 04 26.54 000 0 14 0.03 0.18 11 76 0.1 0.01 0.33 13789 2.04 2654 0.00 0.14 0.03 0.17 10 77 01 0.00 0.29 13779 2 04 2654 0.00 0.13 0.03 0 16 10 78 0.1 0.00 026 13770 2.04 26.54 0.00 0 12 0.03 0.16 9 79 0.1 0.00 0.23 13761 2.04 2654 0.00 0.12 0.03 0.15 9 80 0.1 000 0.20 13752 2.04 26.54 0.00 0.11 003 0.15 9 81 0.1 0.00 018 13743 2.03 26.53 0.00 0.11 0.03 0.14 8 82 0 1 0.00 0.16 13735 2.03 26.53 0.00 0.10 003 0 14 8 83 0.1 000 014 13727 2.03 26.53 0.00 0.10 0.03 0.13 8 84 0.1 0.00 012 13719 203 26.53 0.00 0.09 003 0.13 8 85 01 000 0.11 13712 2.03 26.53 0.00 0.09 003 0.12 7 86 0.1 0.00 0.10 13705 203 26.53 0.00 0.08 0.03 0.12 7 87 0.1 0.00 0.08 13698 203 26.53 0.00 0.08 0.03 0.11 7 88 0.1 000 0.07 13691 2.03 26.53 0.00 0.08 0.03 0.11 7 89 0.1 0.00 0.07 13685 2.03 2653 000 0.07 0.03 0.11 6 90 0.1 0.00 0.06 13678 2.03 26.53 0.00 0.07 0.03 0.10 6 91 0.1 0.00 0.05 13672 2.02 2652 0.00 0.07 0.03 0.10 6 92 0.1 0.00 0.04 13666 2.02 2652 000 0.06 0.03 0.10 6 93 0.1 0.00 004 13661 2.02 26.52 0.00 0.06 0.03 0.09 6 94 01 000 0.03 13655 2.02 26.52 000 0.06 0.03 0.09 5 95 0.1 000 0.03 13650 2.02 26.52 0.00 0.05 0.03 0.09 5 96 0.1 0.00 0.03 13645 2.02 26.52 0.00 0.05 0.03 0.08 5 97 01 000 0.02 13640 2.02 26.52 0.00 005 003 008 5 98 0.1 0.00 0.02 13635 202 26.52 0.00 0.05 0.03 0.08 5 99 0.1 0.00 0.02 13630 2.02 26.52 0.00 004 003 008 5 100 0.1 0.00 0.02 13625 202 26.52 0.00 004 0.03 0.07 4 101 0.1 0.00 0.01 13621 2.02 26.52 0.00 0.04 003 007 4 102 01 000 0.01 13617 2.02 26.52 0.00 0.04 0.03 0.07 4 103 0.1 0.00 0.01 13612 2.02 26.52 0.00 0.04 0.03 007 4 104 01 000 0.01 13608 2.02 26.52 0.00 0.03 0.03 0.07 4 105 0.1 000 001 13604 2.02 26.52 0.00 0.03 0.03 0.07 4 106 0.1 0.00 0.01 13600 2.01 26.51 000 0.03 0.03 0.06 4 107 0.1 0.00 0.01 13597 2.01 26.51 0.00 0.03 0.03 0.06 4 108 0.1 0.00 001 13593 2.01 2651 000 0.03 0.03 0.06 4 109 0.1 0.00 0.01 13589 2.01 26.51 0.00 0.03 0.03 0.06 4 110 0.1 0.00 0.00 13586 2.01 26.51 0.00 0.02 0.03 0.06 3 111 0.1 0.00 0.00 13582 201 26.51 0.00 0.02 0.03 0.06 3 112 0.1 000 0.00 13579 2.01 26.51 0.00 002 0.03 0.06 3 113 01 0.00 000 13575 2 01 26.51 0.00 0.02 0.03 0.05 3 114 0.1 0.00 0.00 13572 2.01 26.51 0.00 0.02 0.03 0.05 3 115 0.1 0.00 000 13569 2 01 26.51 0.00 002 0.03 005 3 116 0.1 0.00 0.00 13566 2.01 2651 000 0.02 0.03 005 3 117 0.1 0.00 0.00 13563 2.01 26.51 0.00 0.02 003 0.05 3 118 0.1 000 0.00 13560 2.01 26.51 000 0.02 0.03 005 3 119 0.1 0.00 0.00 13557 2.01 26.51 0.00 0.01 003 0.05 3 120 01 000 0.00 13554 201 26.51 000 0.01 0.03 005 3 Inflow Hydrograph C= 0.65 Length W'shed=l 800�feet (Using Malcolm Step Function) I = I 7.171in/hr Height W'shed= j 41feet A= ( 3.9251ac Time Flow (Q) (min) (cfs) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 0.00 0.42 1.64 3.55 5.97 8.68 11.44 13.98 16.08 17.55 18.25 18.11 17.14 15.46 13.63 12.02 10.60 9.35 8.24 7.27 6.41 5.65 4.98 4.39 3.87 3.42 3.01 2.66 2.34 2.06 1.82 1.61 1.42 1 25 1.10 0.97 0.86 0.75 0.67 0.59 0.52 0.46 0.40 0.35 0.31 0.28 0.24 0.21 Qpeak tp = 18.3 cfs 10 minutes Page 1 of 3 tc= 10 minutes Inflow Hydrograph C= 0.651 (Using Malcolm Step Function) I = I. 7.171in/hr A= 1 3 9251ac Qpeak 18.3 cfs tp = 10 minutes Time Flow (Q) (min) (cfs) 48 0.19 49 0.17 50 0.15 51 0.13 52 0.11 53 0.10 54 0.09 55 0.08 56 0.07 57 0.06 58 0.05 59 0.05 60 0.04 61 0.04 62 0.03 63 0.03 64 0.03 65 0.02 66 0.02 67 0.02 68 0.02 69 0.01 70 0.01 71 0.01 72 0.01 73 0.01 74 0.01 75 0.01 76 0.01 77 0.00 78 0.00 79 0.00 80 0.00 81 0.00 82 0.00 83 0.00 84 0.00 85 0.00 86 0.00 87 0.00 88 0.00 89 0.00 90 0.00 91 0.00 92 0.00 93 0.00 94 0.00 95 0.00 96 0.00 Page 2 of 3 Length W'shed=(- 8001feet Height W'shed= I 41feet tc= 10 minutes Inflow Hydrograph C= 0.65 (Using Malcolm Step Function) I = 7.171 in/hr A= i 3.9251ac Qpeak 18.3 cfs tp = 10 minutes Time Flow (Q) (min) (cfs) 97 0.00 98 0.00 99 0.00 100 0.00 101 0.00 102 0.00 103 0.00 104 0.00 105 0.00 106 0.00 107 0.00 108 0.00 109 0.00 110 0.00 111 0.00 112 0.00 113 0.00 114 0.00 115 0.00 116 0.00 117 0.00 118 0.00 119 0.00 120 0.00 Length W'shed=l- 800 feet Height W'shed= 1 _ 41feet tc= 10 minutes Page 3 of 3 Accum Z Volume Stage In S In Z 0 0 3047.25 0.5j8.021995 -0.693147 632725 1; 8.752621 - 0 9847 1 5i 9.194922 0.'4054651 13613.75 2 i 9�518836 0.6931472 -89524 25 -24 5 #NUM! #NUM! -89524 25 -24.5 #NUM! #NUMi b = 1.0776782 Ks = 6392.3239 Zest Comment Contour at Normal Pond (wet pond) or Basin Bottom (infiltration) 0.502853 0.99055 1.493206 2,016759 #NUM! #NUMi Contour at Berm Top )Regression Analysis Y Data Range Regression Analysis X Data Range SUMMARY OUTPUT Regression Statistics Multiple R 0.9999019 R Square 0 9998038 Adjusted R 0.9997057 Standard E 0.0111151 Observatio 4 ANOVA of SS MS F Significance F Regressior 1 1.259188 1.259187999 10192.05825 9.81012E-05 Residual 2 0.000247 0.000123546 Total 3 1.259435 Coefficientstandard Em t Stat P-value Lower 95% Upper 95%.ower 95 0°ripper 95 0% Intercept 8 7628532 0 005662 154Z681862 4.17481 E-07 8.738491856 8 787214 8.738492 8 787214 X Variable 1,0776782 0.010675 100.9557242 9 81012E-05 1.031748351 1.123608 1.031748 1.123608 Page 1 of 1 Ken and Lisa Shipp Site Improvements 10 yrs Routing 20.00 18.00 16.00 14.00 12.00 in ; �i/ 1073-1 Gregory Fork Road Richlands, NC 28574 Phone (910)324-2892 Fax (910) 324-6162 _ _ILIgMansoil@yahoo_Call) December 15, 2007 Crystal Coast Engineering Freedom Way Hubert, NC 28539 Ref: Shipp Propefty Dear Mr. Newsom, A site evaluation was conducted on a tract of land located on Hwy 24 in the Broad Creek area of Carteret County. The current laws and rules of NC were used as a guide for this evaluation. Enclosed is a map that denotes the various soils and their suitability for on -site wastewater systems. The map is broken down into two categories: Soil 1: This soil was found to be unsuitable for on -site wastewater systems, was covered with buildings and or parking areas, or may contain jurisdictional features. Soil 2: These soils had a Sand to Loamy Sand texture with a wetness condition between 24" and 48" below the surface. The LTAR would range from .8 gpd to 1.0 gpd. These soils would range in trench bottoms from 12" to 24". A small portion of the property was found to be low, and may be an isolated wetland pocket. The area does not appear to be associated with any jurisdictional feature, and will probably not be jurisdictional. Soils located on the property were found to be suitable for an LPP waste water system (as well as conventional and advanced treatment) with an expected LTAR of .5 gpd. A daily design flow of 2880 gallons per day was used which would require 14-82' LPP lines. The repair area would require the same system with dimensions of 70'x82'. Several monitoring wells on the site would have to be abandoned by a licensed well driller, prior to a permit for installation. The system and collection system will have to be designed by a licensed engineer. If any restaurant usage is required it is recommended to place a separate septic tank, pump tank, and grease trap at the vicinity. Elevation shots were not taken, and a detailed topo map is suggested prior to submittal to the health department. The southwest comer of the property was evaluated for stomp water infiltration, and was found to be suitable. The soils were found to be Sand with a 48" water table. The saturated hydraulic conductivity of the site was found to be greater than 10" per hour. See attached soil boring descriptions. All permits will be issued by the local health department and or the state, and are subject to all rules of the county and state. The findings are based on the conditions of the site at the time of evaluation, and any alterations may adversely impact the results. All data was collected with GPS with accuracy of approx 2'. This information can be sent to your surveyor via e-mail. If you have any questions please feel free to contact me at 910-330-2784. Thank You. Sincerely, R. Haywood Pittman [I Licensed Soil Scientist /1- I r-67 AUGER BORINGS OF SHIPP PROPERTY BROAD CREEK BORING 1 DEPTH TEXTURE STRUCTURE MINERALOGY MATRIX MOTTLES WETNESS 0-12" LS GR NS NE 2 5Y8/1 12-48" SL GR NS- NE 2.5Y8/1 >48" KSAT COULD NOT MAINTAIN HEAD ESTIMATED AT>10" PER HOUR BORING 2 DEPTH TEXTURE STRUCTURE MINERALOGY MATRIX MOTTLES MOTTLES MOTTLES 0-12" LS GR NS NE 2.5Y8/1 1248" SL GR NS NE 2.5Y8/1 >48" KSAT COULD NOT MAINTAIN HEAD ESTIMATED AT >10" PER HOUR la-1.Fo7