Loading...
HomeMy WebLinkAboutSW8080728_HISTORICAL FILE_20080728STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 U 8 O-12g DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Zoos O'128 YYYYMMDD Michael F. Easley, Governor William G. Ross Jr., Secretary rNorth Carolina Department of Environment and Natural Resources 1 �C Coleco H. Sullins Director Division of Water Qua] ity July 28, 2008 Commanding Officer USMC Base Camp Lejeune c/o Mr. Carl Baker USMC Base Camp Lejeune 1005 Michael Road Camp Lejeune, NC 28547 Subject: State Stormwater Permit No. SW8 080728 TECOM (SIO) Interim Facilities, MCB, CLNC — Camp Geiger High Density Commercial Wet Pond Project Onslow, County Dear Mr. Baker: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for TECOM (SIO) Interim Facilities, MCB,CLNC — Camp Geiger on July 22, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 080728 dated July 28, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until July 25, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Malcolm Boney, or me at (910) 796-7215. Sin13 cer Edward Beck Regional Supervisor Surface Water Protection Section ENB/ mb: S:\WQS\STORMWATER\PERMIT\080728 cc: Frank Wanko- Hobbs, Upchurch and Assoc. P.A. Onslow County Building Inspections Malcolm Boney, NCDENR Wilmington Regional Office Central Files NoyhCarolina North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwaterqualitvore Fm (910)350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10 % Post Consumer Paper State Stormwater Management Systems Permit No. SW8 080728 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Carl Baker, Deputy Public Works Officer Officer USMC Base Camp Lejeune TECOM (SIO) Interim Facilities, MCB, CLNC — Camp Geiger Off Hoover Road Jacksonville, NC in Onslow County FOR THE construction, operation and maintenance of 1 wet detention pond(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 28, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 68,971.14 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 on page 3 of this permit, and per approved plans. The built -upon area for the future development is limited to 0 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 080728 The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSI : g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour, cfs: k. Post development 1 year 24 hour, cfs: I. Controlling Orifice: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower, HP o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 99,608.62 99,608.62 0 68,971.14 68,971.14 0 1.5 3.07 90 15 10,505 15,151 16 4.4 9.6 2" O pipe 6,460 1f/6 Edwards Creek / White Oak 19-13 "SC, HOW, NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 080728 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/6 horsepower. 8. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 14. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 080728 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 080728 Permit issued this the 28th day of July 2008. NORTH C OLINA ENVIR MENTAL MANAGEMENT COMMISSION (or Cole . Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 r DWQ USE ONLY Date Received I Fee Paid Permit Number a O - W 3 3�o Cs�a State of North Carolina Department of Environment and Natural Resources A� Division of Water QualityIL STORMWATER MANAGEMENT PERMIT APPLICATION O ' 2 2 2008 This fond may be photocopied for use as an original By I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Commanding Officer USMC Base Camp Lejeune 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl Baker, Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: City:Camp Lejeune State:NC Zip:28547 Phone: (910 ) 451-2326 Fax: 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): TECOM (SOI) Interim Facilities, MCB, CLNC - Camp Geiger 5. Location of Project (street address): Located on an unnamed road off of Hoover Road City: Jacksonville County:Onslow Zip: 6. Directions to project (from nearest major intersection): +/- 0.5 miles West of the intersection of Montford Landing Rd. and Hoover Road. 7. Latitude:34° 44' 06" N Longitude:77° 27' 24" W of project 8. Contact person who can answer questions about the project: NameTrank Wanko Telephone Number: (910 ) 692-5616 Email:fwaiiko@hobbsupchurch.com IL PERMIT INFORMATION: 1. Specify whether project is (check one): /1 ❑Renewal ❑Modification Form SWU-101 Version03.27.08 Page I of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit and its issue date (if 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit []Universal SN 4. Additional Project Requirements (check applicable blanks; information on required state per obtained by contacting the Customer Service Center at1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDLS Ill. PROJECT INFORMATION 1. In the space provided below, summarize how stornnvater will be treated. Also attach a deta (one to two pages) describing stormwater management for the project . Stormwater from the project area will be conveyed to and treated in a storm water management pond. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. "Total Property Area: N/A acres 4. Total Wetlands Area: 0 acres 5. "100' Wide Strip of Wetland Area: N/A acres (not applicable if no uretlmuis ecist on site) 6. Total Project Area**:4.34 acres 7. Project Built Upon Area:36.5"1 % 8. I-Iow many drainage areas does the project have?l 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 - Receiving Stream Name Edwards Creek Stream Class & Index No. C, NSW Total Drainage Area (sf) 99608.62 On -site Drainage Area (so 99608.62 Off -site Drainage Area (so 0 Existing Impervious* Area (sf) 1 19109.44 Proposed Impervious*Area (so 68971.14 Impervious* Area (total) 6924 Impervious` Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 41460.83 On -site Streets (so On -site Parking (sf) 20455.38 On -site Sidewalks (sf) 7054.93 Other on -site (st) Off -site (sf) Total (sf): 68971.14 impervious area is defined as the built upon nren including, but not limited to, buildings, rands, parking nrens, sidewalks, gravel areas, etc. **Total project area shall be calculated based our the current policy regarding inclnsimr ofioetlands in the built upon nren percentage calculation. This is the area used to calculate percent project built upon nren (BUA). Forni SWU-101 Version 03.27.08 Page 2 of4 10. How was the off -site impervious area listed above derived M IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS '� C One of the following deed restrictions and protective covenants are required to be recorded for all sub ivisio»s, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table li. ing a cli I�I number, size and the allowable built -upon area for each lot must be provided as an attachment. Forn can be t— downloaded from ham://l12o.enr.statencus/su/bmp forms.htm - deed restrictions. o 0o hi Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below most be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from htto://h2o.enr.state.nc.us/su/bmp forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration "I'wrich Form SW40"1-Biorctention Cell Form SW40"1-1-evel Spreader Form SW40"1-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement LAN' Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration'I'rench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand FilterSupplcment Permeable Pavement Supplement Form SWU-101 Version 03.27.08 page 3 of 4 VL. SUBMItiTTAL RE41J>`3IREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DW ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the ;.j interactive online map at httl)7//h2o.enr.state.iic.us/su/msi maos.htm) d 1. :Please indicate that you have provided the following required information by initialing in the space provided i next to each item. Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (Express: S4,000 for HD, $2,000 for LD) payable, to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy, of any applicable soils report •, Two'copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North. arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor eleva...,,,. - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) niti is � �R VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Hobbs Upchurch and Assoc. P.A. Mailing Address:300 S.W. Broad St. City:Southern Pines State:NC Zip:28387 Phone: 9( 10 ) 694 5616 VIII. APPLICANT'S CERTIFICATION Fax: (910 ) 692-7342 I, (print or type name of person listed in General Information, item 2) Carl Baker Deputy Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cov nts will be corded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000 Signature: Date: Form SWU-101 Version 03.27.08 Page 4 of 4 Re: Camp Lejeune - Camp Geiger - SW8 080728 Subject: Re: Camp Lejeune - Camp Geiger - SW8 080728 From: Christine Nelson <Christine.Nelson@ncmail.net> Date: Wed, 14 Jan 2009 15:51:53 -0500 To: Frank Wanko <FWanko@hobbsupchurch.com> Frank, Thanks for getting me the permit number. I talked to Linda re # 2 below. The use of a liner appears to be some what site specific. If the SHWT is more than 2 ft below the bottom of the storage basin, then a liner is not necessarily needed (any escaping water will be effectively treated by infiltration). However, if the SHWT is greater than 2 ft below the bottom of the storage basin, then some sort of liner is required. As I mentioned to Mr.Upchurch on the phone, the type of baffle isn't something we typically look at. We leave that up to the BPJ of the design engineer. If you are just proposing material changes, than a modification isn't necessary. However, I would recommend submitting a plan revision (free in the Regular program). If the BMP design (vol, elevations, etc) or the amt of BUA/drainage area is changing, then a modification will be needed. Let me know if you have additional questions. Christine Frank Wanko wrote: Christine, We permitted a few months ago a high density permit for Camp Geiger one of the TECOM SOI Temporary Facilities. There was a collection area for the stormwater and we were pumping it to a stormwater pond. We would like to change a couple of items and need to know if it would require a modification to the permit. 1. Change the baffles in the pond from the pilings to a PVC bulkhead system. 2. Remove the concrete liner in the collection area and just use a stabilized bottom and sides. If you need any other information please call me at your earliest convenience. Thank -You, Frank Wanko,Project Designer Hobbs,Upchurch & Associates, P.A. 300 S.W. Broad St. Southern Pines, NC 28387 Tel: 910-692-5616 Fax:910-692-7342 E-Mail: fwanko(r�,hobbsupchurch.com Upon opening this file or any attachments, you agree to the following disclaimer: The coordinate data provided within this file has been prepared for the owner and is furnished for general information only. While this information is believed to be reliable, llobbs, Upchurch & Associates, P.A. (HUA) cannot assure the accuracy and thus is not responsible for the accuracy of work based upon this data. The user of this data is advised to obtain independent verification of the accuracy of the data provided before applying it to arty purpose. Use without such independent verification will be at said user's sole risk. The user hereby waives any claim against HUA and to defend indermury and holds IIUA harmless from any claim or liabilityfor injury or loss allegedly arising from the use of data provided by HUA. The user further agrees to compensate I/UA for anytime spent or expenses incurred by 1 of 1/14/20093:52 PM RE: Camp Lejeune - Camp Geiger 1 Subject: RE: Camp Lejeune - Camp Geiger From: "Frank Wanko" <FWanko@hobbsupchurch.com> Date: Tue, 13 Jan 2009 15:48:34 -0500 To: "Christine Nelson" <Christine.Nelson@ncmai1.net> Christine, Thanks for getting back to me. I found the permit and the number is SW8 080728 "TECOM SOI Interim Facilities, MCB, CLNC — Camp Geiger". also saw that Malcolm's name was at the bottom and I don't think you had worked on it. If this has to go to Malcolm can you please pass it on to him and let me know. Again, thanks for the help. Frank Wanko,Project Designer Hobbs,Upchurch & Associates, P.A. 300 S.W. Broad St. Southern Pines, NC 28387 Tel: 910-692-5616 Fax: 910-692-7342 E-Mail: fwanko(@hobbsupchurch.com From: Christine Nelson[mailto:Christine.Nelson@ncmail.net] Sent: Tuesday, January 13, 2009 3:40 PM To: Frank Wanko Subject: Re: Camp Lejeune - Camp Geiger Frank, Can you provide a permit number? I found several permits with TECOM SOI listed in the project name, but none completely matched what you provided below. I would like to see the plans before I comment on the items you have listed. Thanks, Christine Frank Wanko wrote: Christine, We permitted a few months ago a high density permit for Camp Geiger one of the TECOM SOI Temporary Facilities. There was a collection area for the stormwater and we were pumping it to a stormwater pond. We would like to change a couple of items and need to know if it would require a modification to the permit. 1. Change the baffles in the pond from the pilings to a PVC bulkhead system. 2. Remove the concrete liner in the collection area and just use a stabilized bottom and sides. If you need any other information please call me at your earliest convenience. Thank -You, Frank Wanko,Project Designer Hobbs,Upchurch & Associates, P.A. I of 2 1/14/2009 3:52 PM Water Quality (WQ) Riser: 71JL `Pond #1 TV, I) Determine remp. pool cohunc and depth r, 2 l 2008 2) Interpolate the average surface area of the temp. pool volume. Temporary Pool Volume: 15,151 c.f Desired Drawdown rime: 3.6 dacs Number of Holes: l Diameter of Holes: 2 in :Area of hole. 3.14 in^2 = o.02 ft^2 Orifice Cocf£: 0.60 WQ Pool Depth: I ft WQ Pool Area: 16610 Pool) (Consider the side slopes and use the average area between WQ Pool and Norm. Desired Drawdown time (thin): 5112 OutfioW value at'"desircd (cfs): 0.000 Drawdown Curve Data Height over l.:hange in Change in Lime Time C/L of hole. Outflow Volume Height New 1 Icight (days) (thin) (ft) (cfs) (co (ft) (ft) 0.00 0 1 0.105 95 0.006 0.994 0.01 15 0.994 0.105 94 0.000 o.989 0.02 30 0.989 0.104 94 0.006 0.983 0.03 45 0.983 0.104 94 0.006 0.977 0.04 60 0.977 0.104 93 o.000 0.972 0,05 75 0.972 0.104 93 0.006 0.966 0.06 90 0.966 0.103 93 0.006 0.96o 0.07 105 0.960 0.103 93 o.o06 0.955 o.08 120 o.955 0.103 92 0.006 0.949 0.09 1.15 0,949 0.102 92 0.006 11.94-4 1).l0 150 0.944 0.102 92 0.006 0.938 ().11 165 0.938 0.102 92 0.006 o.933 0.13 180 o.9 33 101 9l 0.005 0.927 o.14 195 0.927 0.l01 91 0.005 0.922 0.15 210 0.922 101 91 0,005 0.916 0.16 225 o.91 G U. I () l 91 0.005 0.911 o.17 240 o.911 0.100 90 0.005 0.905 0.18 255 0.905 I1.100 90 o.005 0.900 0.19 270 0.900 U.100 90 0.005 0.895 0.20 285 0.895 0.099 89 0.005 0.889 0.21 3011 0.889 0.099 89 0.005 0.884 0.22 315 0.884 0.099 89 0.005 0.879 0.23 330 0.879 0.098 89 0.005 0.873 TECOM:(SOI) INTERIM FACILITIES, =- "MCB, CLNC - CAMP GEIGER DA 1 - Routing Table (using HRM s "Chainsaws method) -dc. ',_ - -". _-.. Pontl #9 Roubn'.- Op(t"s)=`I 14 (10-yrdata) TP Ciro)= 50 '.cT(mm)- 5 Suggested Time Increment(TpA(i)-� -cT(min)=� 31 . =-•Selected Timelncfement Ks = =26741 F.^Regression Coefficients from ; -"- b' = - 2 45 - - - $la e-Storm a Plot Ref. Ele. =, 91'' - (Bottom of permanent poop = ` Results: Max. Outflow.. 12' - cis Max. Water Surf. Ele. 16.80 it Max. Stage: 7.80 It Max. Storage r 40668 cu.ft. StructureData ' Riser.- �•- :. ' 1':. Barrel - Eme m encv Weir: 24 - Da:in 15 '`Cw=r 3.0 16.00 "Imrert ft` 14.00 . Ele` ft -- 16.50 MCd 3.30 :Cd. 0.60 Len lft(ft). 10 0.60 - - --`Weir, Equation: ,. ' O = Cw1L'H 312 Onfice Equation _ 'Q-.�Cc*A*(2*q*tiYfl121 Cd Onfice.Coeff : Cw=1. Weir Coeff. - WQ Riser Consideration:. ` WO ele.., ." 0 WOflow:.,. 0 it- -- cfs Inflow from offshe pum ping: add 01 =.1 0.0 `cis: -, -add 02 = I 0.0 'cfs;• ..._ ... ,. ;;, , Routing.Table:..., :, -a , _ ,-. .,.-:- , .,. :, _-.. ,< Computed Outflow Data:' 11.1r:. •-Time R.O.'Inflow Total Inflow - Sloa e " Wtr Surf. Ele Stage ' Outflow WO riser outflow Riser Riser Barrel - Control. Emerg. Spillway -(min) (cfs) - (cfs), (cf) _ ft)",i'- (it)_ (cfs) ` (weir) - (orifice) .,0 .-0 0"' 15151 16.00 700 0` ­0 =0 _.0 7_- 0 0 - -. 3 ' 0 0.,- - : 15151, 14.21 -. _ 5.21 " 0 - -0 - - 0 - ,' 0, 0 ' - -- 0 _ . - 0 6 ._.: 1- .:_: 1.., ., c.'15174 :. -•-'1421-:.. - .5.211, ,. 0-.. .... 0. ,- -•-0 0 0„n. 0 __.0 ;.. _ 9 -; 1.. .. -.1 .: 15267 ,- 14.23 5.23 :. , - 0' ` 0 „ 0 0 .. D . - 0-- 0. "12'- '2' ::.2- 15472 14.26: - 5.26 0.-:-. '0 0 0 .0...-.. 0. 0--' - ^-15 - 3: ..3 -'. 15830 ._-14.30' 5.301. 0.'-- -• 0:. 0.: 0 i.,_: 0- 0 718 ,'4 4 - 16373' 14.38-.. : 5.38 • ; 0 --. 0 -0 - : ...0 1.. - 0. _. 0 .." 21 _' -51.. 5<,..�,..17130'- -14.48 :- 5.48• :'0.. .: 0 ,'. .''.0 .- 0 : '..'..1 0- 24' ;. 7_- .-...:-7. ,.. .. 18119-.. 14.61 1 5.61-- 0 ". 0 ...-.0 .:: 0;' _. 2_.. 0. sic - 0.::-s:. 27.. •8. 8 •" 19353 1436 .5.76 '' 0 ' ._ 0 _. 0 _ p. ' 2 0 0. -30 , .10 -10 ... 20832 - 14.93. 5.93 0 � - 0. . -0 ._ - 0.. - 3 -.- 0 _ 0 ".33- -:. 11 .11` 22551 .15.13 6.13 _.-0'- '-�..0 ''-0 0, 4'° _0 -' 0 3 ... .. 36- - :=12= '. -':12 `- 24495 - 1.. 15.34.- 6.34' +.. .0 +: - 0. -� 0: i-'0= - 5-� d 0'" 0 -. 39 r .13'.- .;. 13.., ,. 26641, ., 1 15.56."' ..6.56' ... 0 .:_, ,: •0" -_ 0: `,',0 .,.6, ,, 0.,.` ..-- 0. .._: -'42 ... 14. `14 -::28957... 15.79_".' -- 6.79 :" 0 ; _. 0 ">i0: •0 .. 6... ...0, - ... 0 ... 45 '-'14' -' -14- .-31408 - 16.02. 7.02- 0 : :. ` .0 _'0. " 2 - 7 0-" 0 � 48 '14 ' 14 .. _ 33947 16.25. -7.25 - 1_ , - 0 - r -_i. "8 8' - • i' _ - 0 . -. -:51 `14 -' 14< 36311--.- 16A5' 7.45 ='•-.-- 3• ;. 0- 3 - 10 - 8. -3 _ 0 54 .. - .d•� 14 v, -:14 _ i 38344 `1662 '... - 7.62 .+. „6 .. 0- 5 :- 12: 8 :: .5 : ' _.- 1- 57 ' -.14" 14' 1 39776" 1673.i `.. 7.73 " 10 "'0" i -6" •":'413 .: 9- ``-r6: e.....: ,. 3:'. 60 �..-63__ 1"' 13--". ..:13. .- -40467- _. 16.79'. 7.79 --12 0- _`7- _A3 '.. 9= :.'7. r° _.5' ; ._ .12- '-'12-. -.-40668�,. 16.80 7.80 1•..12 `" 0. <.7 14.- .9- 7= --.... 5 66 -'it 11 40597.• .' 16.80' '.-7.80" '_12 .: :,.0` 7....- 13... 9 -7. 5 ' -10., c '. ,:,10,-- ', ':^' 40401':.. -16.78"'. 7.78 , -..-.12 0 .. 7 ` . 13 9 '7 ..:. . 4 '472. '._t 9 =, : `r9--'. ,. 40159 .7• 1676`: -'.7.76: '•, 11 '= -"0- .,7, J43, 9t, "7..-: '4 .. .r.`75- - 9 .I ..9' ``39905- 16.74". •. 7.74"' . .10 ... ,_."r0- ,'.. 7:-,. ; - 13' ' .9' 7__ 4 '78 ...- .8 .. 8 39652 -16.72 `.- Z72+- '9.- : ..0 6 13 9 6-1 3 81 _ _ .: 8 - -8 -' 39406 = . .16.70" - 7.70 > . -" 9 -J 0 6 - -13. 9 : 6. 3 _. ^� ..84 ,. .. : 7 .,- 7-.. 39169- 16.68 - ,. 7.68'.." ,. 8 .A---0' -. 6 - -:13-: - 8 fi- 87 -6 -`6 .':-„ .,'38942 : . 16.66 w.... . 7.66 s e, '8 .-. ,A '" 0 .....:.---. 6 c: 121 ..h.. ,8 , .. 6' ,...2 ::... :. > 90 :'.� 6 :.e 6'". _-.•38724- s--1fi 65. .. .:7.65 `. ^7 .. _'0.*.. :^`XS° .. s...=12: ', cg .. :4-5 :. ,.2.„.... • .:93 S , ,. 5 38574 16.63.. 7.63' '7.. ,.`. '.-p _.5. ., ..-`.12'- ..8• 'r "5. ' - • 1:• .• "'. 96 " =-5 ". 5 t.'. :. 98313 " : _ t6.61:.-. f 7:61 ., :' 6 ...• -"'0% .5. - r.. 12 ". 8• 5. . -99'. ;.- t5 [..--. .., 5" - 38120 - 116.60.7' .. 7.60--- 6':'==. ...0 5'- - 12-,- 8 '5=- - ,.1'. '': 102 .....-: _q ..... ',. «'4:--'37933'-"'1658 :..--::...7.58 +' .. , 5.nL. t0�' `6' i:.,.d2'n..-': t$ ,-,1_-e'.. TECOM (SOI) INTERIM FACILITIES, MCB, CLNC - CAMP GEIGER Pond - #1 Routing 16- _ —o— Inflow --a- Outflow 14 -� —: (10-yr data) 12 10 ` n_iwr i - .w � . v m 4 2. '. 1 Lam_ 0 0 20 40 60 80 100 120 Time (min) 110Z 9 ti inr TECOM (SOI) INTERIM FACILITIES, MCB, CLNC - CAMP GEIGER DA 1 y Pond #f Routing Runoff Volume Estimate (SCS Curve Number Method) r `Drainage -Area (ac) - - I 2.29 acres �. CN., 85 SCS Curve Number +' C-L_0.7 �Rat'I Coeff(0.02tN 1) 1000 S 1 76 , S = 10 , CN (P-- 0 2,S)^244- s £y _1,0.yr -..".25-yr._ 100- r: R.O. (in) = 720. R.O. (in) _ - -8.34 R.O: (in) = ' 10.12 R.O. (cf) = 59,772 R.O. (cf) _. 69,234 R.O. (cf).= 84,040 ;,Runoff from 1.5"-+Precipitation, :, r-DA{ac) 22866993 in76:': RO:"(iri) 045'V. R:O. from 1.5" of Rainfall (cf) = 3751 --� ime of. Concentration and:lntensity Derivations .= t =' J. K (L^3/H)^0.385 Kirpich s Equation:- Tc - -, , �.; 128 400 HydraulcLength.of"watershed:(ft) o " Fi 5Elevation dill along; L e(ft) Multiplier.for flaw, path conditions �(see.HRM.supp.'p2 4) - Tc - 4 26 min: g & h are regression coeff g i.,l (from HRM p'2-6) ` listed'in.H,RM h +,T e' supplement p. 53';` T = Tc 10-yr 25-yr 1 00-r P (m) - 9.02 P (in) =j 10.19 :P (m) 12.01 sal in/hr9 2 I, in1hr), z 10.19.�, _ :f(in/hr9 12:01 Peak' Flow (Rational Method) Q (cfs) 14 Q,(cfs) 16 Q (cfs) 19 .Tp'(min). �: " -> 49.6 Tp'{min)`- 50.9 - Tp (min) '- 52.4 TECOM (SOI) INTERIM FACILITIES, MCB, CLNC - CAMP GEIGER - , Perm. 2 -Temp. Widtfi • ,Overall Accum Vol 'Accum "Vol .y Accum Vol- .Length.:'. .�Elevation + L - W.' Area-. Acres Incl. Vol., 3�51 F ft. 4 ft. .- ft"2 - ' fl^3 - ` fM3' _ . �ft^3 - .fl"3 ` - Side Slope- Reference Item 16 20400 ":68:00. 13,872< -.' .0.32� 6,734`.' 44,919 - ^12,627a: 3:1 Top of temporary ool 15.5 �201.00 6500. -13;065� 0:3 3" 84 � ,5,893 10 :1 Top of 10:1 Shelf 15 `191.00- 55.00 '10,505 - 0.24 � 4,663 - . 32;292 :32,292 -0: r= -. 10 :1 Top of ermanent storage 14.5181.0045 00 - .=8;145 0.19. - �• 3,905 <. 27,629 27;629 `.'- = 3 :1 Bottom of 10:1 shelf 14 17800 42.00` :'. 7,476 ,:- 0:17 £�� 6.834 • "23724 23�724 3 :1 13 172.00- " -.36.00 6,192 0.,14 -• 5,586'- ' 16,890 • •' '16,890 �. - � 3 :1 12 166.00 -� 30 00 4;980 . �0:11 -- . A,410 11•,304 '11;304 3 :1 11 � 160.00 ' .r: 24 00 2 ..3;840� "0.09 ' • 3,306 e ' 6;894 - 6;894 . r ' ``::: 3 :1 10 ->154.00 - • 18.00 2,772 - 0.06 c" " 2,274 % ^3,588 - 3,588 - -.. ' i. 3 :1 9 5 148.00>... •12 00 V761 0.04 > . ' 1f314:-'' - .1,314 .= 1,21W - 3 :1 8 : 142.00' ' %6 00 852" •� 0.02 0'. - r0 3 :1 Bottom of permanent storage 7 r 136 00' �.- i00 0 '0.00 -- r<. " . ". _ B Ott Pond Sediment Storage' '.Forebay it ,_ ,.• �_,-' Overall Accum Vol .Peim°,", Adcum,.\iov q Temp. . Accum�Vol Len th aWidiK 9 ".� Elevation L - W " .Area , 'Acres ' Incr. Vol: 21:1 + ' •. ft"3- • k"3. ft^3'` 11 Side. Slope "Reference Item ,- . . ,'-ft"3-'. 16 70.00 35,00 - 2;450 0.06 .` ' 2,248 8,708 •' 2,24l 2:1 Top of Foreba 15 66.00 3100 --2,046. 0.05 1,860 �_. 6,460 "646YO - ..'0- := 2:1 Weir Elevation 62.00 14 1,504 4;600 .4,6003, 2:114 13 58.00 -23.00 -1,334'-:0.03 1,180 3,096 3;096 2:1 12 54:00- :19.00' 1,uf;.. 0.02 888'. 1,916 •1,916 2:1 11 5000. =15.00; .- 750 '. 0.02-, 628"1k 1;028 .:11028 ., •" 2:1 10 4s oo' =.11:00= 506_ 0.01 '400- "' 4017. •400'"s 2:1 9 42.00 ,7.00 294 ; ." 0.01 0: ;. 0 0 e 2 :1 Bottom of Foreba 8 '�-'- 38.00 3.00 ' _4xl 0.00 5 ° - '�'•"- ' ' Bottomof - - Foreba -,Sediment Stora e ' .s � 4 �i£ a $.� _ f ✓ �t `vim atY4'� I. 3a - � t, 4 A'�" A.v M1t:ty-'I..e, '• HOBBS, UPCHURCI(& ASSOC/AYES COA'.SIiLT/A'G EA'CG\'EEftS P.O. BOX 1737 300 SOUTH WEST BROAD STREET SOUTHERN PINES. NORTH CAROLINA 29387 PHONE: I-(910)-692-5616 FAX: 1-(910)-692-7342 To: NCDENR Storn,watcr Express Permit 127 Cardinal Dr. Extension Wilmington. NC 23405 The Following Item(s) : O Shop Drawings O Prints O Copy of Letter O Change Order LETTER OF TRANSMIT] AL Dane: 7/9/2008 lJob No. CL0804 Attn. vlalcolm Duna Ref: TECOM SOP Interim Facility Camp Geiger We are sending you O Attached O Under separate cover VI O Samples ✓U(ati, � ��08 Copies Date Project No. Description 2 Plans. permitting tbmu and talcs These are l7ansmitted as Checked Below : For Approval O Approved as Submitted O Resubmit lbr Approval O For Your Use O Approved as Noted O Submit for Distribution O As Requested O Retumcd for Corrections O Return Comwted Prints O For Review and Comment O O Prints Returned Alter Loan to Us Remarks: I've corrected the plans ;md talcs its we discussed in the meeling, please call if you have any farther questions or comments. \T�hhaaankk--You. Copylb: Signcd: Frank Wanko, Project Designer _ ,a. `L'r'i$c�y alro e nM.--r p., -. Sediment Ta N! I }°-r w6 rf N -at -, 4� .kjy i,�- .lone, '_IIIIB Project Name HUA Project No. "1'1?COM Ism) INTERIN1 FACILITIES, C1,0804 \ICB,CLNC-G\..\IPGI{IGER Calculated1 llohhe, Upchurch &. .crnriotcti, A. i. Location FU1 Consulting Engineer:c Camp I-cieune, North Carolina Checked By t l• 2 Storm Design: 10 Year V� Objective: Design a Temporary Sediment Trap for erosion control Determine the weir length, capacity & freeboard of the sediment trap Solution - Qp: Use the calculated Time of Concentration and the Rational Method to determine the peak Inflow from the design storm. Input Output L = 325 ft. H„ = 6 ft. •Assume Tc = 3.12 minutes Calculating 'C' Turf % Pave % C 0.31 0.69 0.71 Calculating'Q, C I A Qi, = 15.70 cfs 0.71 9.60 2.29 SA: Determine minimum Surface Area based upon 25YR Storm Input Output C I A 0.71 9.60 2.29 Qp = 15.70 cfs X 435 Minimum Surface Area = 6828 sf Lw: Use Trial & Error with Weir Length (Lw) & Driving Head (H) to make Qw >= Qp Input Output Cw = 3.00 Lw = 8.00 ft. Q, = 15.70 cfs H = 0.78 ft. Qw = 16, 37 cfs Freeboard = 0.73 ft, ns: Input Output A.dislub = 2.29 Volume 3600 cf/acre Required Volume = 8244 of Terminology- Cw= Weir Coefficient Lw = Weir Length, (ft.) H = Driving Head, (ft.) Op = Peak Inflow, (cfs) Qw = Peak Discharge, (cfs) A.dislurb = Disturbed Area, (acres) Freeboard = Freeboard of Weir, (ft,) Cap.-R. = Required Trap Capacity, (of) Cap.-D. = Design Trap Capacity, (cf) S-Trap.H = Sediment Trap Height, (ft.) S-Trap.D = Sediment Trap Depth, (ft.) L = Watershed Hydraulic Length, (ft) Hv = Watershed Vertical Relief, (ft) a = Statistical Rainfall Variable b = Statistical Rainfall Variable A = Watershed Area, (acres) C = Rational Runoff Coefficient To = Time of Concentration I = Rainfall Intensity, (in./hr.) S-Trap W = Sediment Trap Width, (fl.) S-Trap.L = Sediment Trap Length, (ft.) z DESIGN STORM: MAXIMUM Slope Condition ;TYPE: Stress: PROJECT NAME PROJECT NO TECOM (SOO INTERIM FACILITIES, CL0804 It & Associates. A.A. MICE, CLNC - CAMP GEIGER BY Consulting Engineers LOCATION FDW Camn 1 pipunn Nnnh Carolina CHECKED BY Determine the MAXIMUM velocity, V, through the TYPICAL SECTION Use Trial & Error to make the flow depth, d, result with Q = Q10 10-YEAR Qio=CIA oio: 9.6 cis The velocity of the water entering a maintained veg Swale must be <5 ills d = 1.000 FT A = 4.20 FTA2 P = 7.52 FT n = 0.030 (DEHNR, 1993) R = 0.56 B = 1.2 FT Q = 10.0 CFS Z = 3 :1 V= 2.38 FPS S = 0.0050 FT/FT W = 7.20 FT LINING EM S&M SEED & MULCH T=YDS EM EXCELSIOR MAT T= 0.31 Lb/SF SM SYNTHETIC MAT RR RIPRAP (A,B,1,2) RM REVETMENT Q= Peak Discharge, (CFS) A = Cross -Sectional Area of Flow, P = Wetted Perimeter of the Flow, (FT) d = Maximum Depth of Water, (FT) R = Hydraulic Radius, (FT) V = Trial Velocity, (FPS) S = Slope of the Channel, (FT/FT) n = Manning's 'n" Coefficient Q = Trial Discharge, (CFS) B = Bottom Width of Channel, (FT) W = Top Width of Water in Channel, Z = Side Slope of Channel (Z:1) T= Shear Stress in Lb/SF Y= Wt of Water(62.4 Ib/cf) D= Depth Of Flow S= Slope Of Swale ED DIMENSIONS: Mlni Depth 1.00 FT Bottom Width Max. Sl0 oe Side Slo es.` 3:1 LiningEM REFERENCES: (DEHNR, 1988: DEHNR, 1993) Stormwater Management Narrativ ��C 2220 48 Marine Corp Base - Camp Lejeune y' TECOM (SOI) INTERIM FACILITIES, MCB, CL� CAMP GEIGER Onslow County, NC June 31 2008 General Information 1. Name of Project: 2. T1sCOdl (SOI) Inloinr 1'acililies, AIC13, 0_1 vlC - Camp Cei,er 3. Street Address, City, County: "A"S/reel, Camp byeune AVIC13, Jacksorn)ille, NC 4. Geographic Coordinates: 34.73N 77.15W 5. Acres in Tract: 3.3 acres 6. Acres Being Disturbed: 3.3 acres 7. Acres in Wetlands: 0 acres (Wetlands must be delineated & Sign -Off obtained from USACOE) (Proposed Wctland Impacts Require Permits from Corps & DWQ) 8. Ownership Information From NC Secretary of State Web Site: z larzue Corps 13ase, Camp l�jerore 9. Description of Development Proposal: The pzrrpo.ar a/lhis projeel it to corrs/rxfc/ in/erirrr in eltpporl lheSthool o/ li /irnoy al Camp I_xjerrne i14CI3. The pr jec/ prrrpose.r to cons/rxtellire bnllding.r, a small parking area, dderva/k and other miscellauaon.r irnperrion� areu �: 7"lie proposed prolitc/ e�eks In cone/runt a total n% approximalely 1.3d acres o/impermou.r area. 10. Description of Adjacent Land Uses: (Jrbcom, Den.,uly DenrJoped 11. Description of Existing Site & Topography: Plal, will) neirurrzal existing imperiinnr areur.. 12. Previous or Existing Permits: N/,,,] 13. Tax parcel ID Number: N/A 14. Pre-1988 Built Upon Area, If Applicable: N111 15. Discuss Phasing of the Project & Stormwater Facilities: 1'rojoc7 t:r proposed to be c'mulrucled iu a .Tingle phare 16. Discuss Proposed Waste Water Treatment & Water Supply: I haslcrYahr "hreaUuen! and II'/ales Supply .stroll be provided by exi.+/ing nearby rnam.r. 17. Identify Historic Sites & Projects Being Funded With Public Monies: A�oue 18. Disclose Any/All Non -Compliance Issues with DENR Agencies: None Stormwater Nafrative Page 142 Stormwater Information 1. River Basin: IVliile Oak 2. Stream Classification: i. Name: Edwards Creek- Index No.: 19-13 Class: SC,4-1011'/,-NSIV Dist. from Site: 500 ft. ii. Name: Index No.: Class: Dist. from Site: ft. iii. Name. Index No.: Class: Dist. from Site: ft. 3. Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stormwater or NPDES Phase II, Address Vested Rights When Applicable; Identify Pockets of High Density: 1-ligh Densily. Alililag, Slale Slonvwaler 4. Proposed Total % Impervious Surface: OP.24% 5. Number of Proposed Treatment Measures, Type(s) of Collection System: 1-ligh Density, Single It%l Delenlion Pond wilh oier%low into exisRng storm drain dileh.. G. Will All Built Upon Area Be Collected: YG;S 7. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer: N/A 8. Discuss Coastal Management AEC's When Applicable: AVA 9. Discuss Off -Site Runoff: O(/-si/e ivvo(% IGrongb /Ge �irr�iosed rys/cm nrzl/ be viinbvi�ed. � l r/ iiccid orco.r are %la/ and sanding wiFb e.%i.ilin,g sloovwaler velwoiks to Carry �)#-.iile lows. 10. Discuss Whether Road Construction Across Other property Is Necessary To Access This Project: lenu to the propei9y willbe nia arlljaeevl pared roadh. 11. If An On -Site Evaluation Of The Soils Hits Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc., and Include Date Of Site Evaluation (This Is Required For Infiltration Projects): On-Sile Einalnalion hai been (wilpleled and npa> is eueln.ied. Additional Comments 1 cording to 11ISG.1amp, I& Glue line .ilremv a 500 fiel from 1A, prolircY ule, Gal .4m inn Vl� )alion and .vane), sholus lGal 1hir Marl nl the Glue -line is enclosed in a alliva lGron;h the developed ai-ea. Stormwater Narrative Page 2 of 2 Stormwater Management Narrative TECONI (NICCSSS) Interim Facilities, NICB, CLNC USNIC Base Camp Lejeune Onslow Countv, NC Junen ZOU8 General Information 1. Name of Project: I'I"COM (IICCSSS) Inlerim 1'otililies, AIC13, CI_;N(: 2. Street Address, City, County: ll'n ,V1og1;:id / /. Kd card I-loorar kd, Carup I-lrjernre t41C13,)ut,(. oi1w1le, NC 3. Geographic Coordinates:-)4.73N 77.4 /W 4. Acres in Tract: 4.3 acres 5. Acres Being Disturbed: 4.95 acres 6. Acres in Wetlands: 0 acres (Wetlands must be delineated & Sign -Off obtained from USACOE) (Proposed Wetland Impacts Require Permits from Corps & DWQ) 7. Ownership Information From NC Secretary of State Web Site: .lariat' Cops 13a.1e, Ccunp L joune 8. Description of Development Proposal: The putpoir o% lbis projecl is to enn.rhvd inlerinr /ih:ililier /bra ill lbe Aloq iml P/. area of l e hare. The pr'o�ti/ prnparer /o tons/rvtl hvo garage bnildirrg,r, Earn' ✓cu�roorn building. and rr parkil zg arra. 9. Description of Adjacent Land Uses: Alodervle Oer�eloprnenl, I19ooded 10. Description of Existing Site & Topography: II%nded, Genlly .Sloping /ou tads an rnuuued I ib. to I Vilrorr 13ay. 11. Previous or Existing Permits: ;N/A 12. Tax parcel ID Number: rN/.-1 13. Pre-1988 Built Upon Area, If Applicable: 14. Discuss Phasing of the Project & Stormwater Facilities: Prrrj tl i.r propo ed /o bd ton4ruclyd ill phrtre 15. Discuss Proposed Waste Water Treatment & Water Supply: 11- a.c/% ur6;r'1 irelunwl uu! 11ir/er Supple ;bell be prnrid,ei Gp r. 'i.dirr, uearbp mourn: 16. Identify Historic Sites & Projects Being Funded With Public Monies: .A'one 17. Disclose Any/All Non -Compliance Issues with DENR Agencies: Moue Stormwater Narrative Page I of 2 Stormwater Information 1. River Basin: II%laile Oak 2. Stream Classification: i. Name: Ihilrou 13ap Index No.: 19-14 Class: SC;!\.111%;1IQII%'Dist. from Site: 700 fr. ii. Name: Index No.: Class: Dist. from Site: ft. iii. Name. Index No.: Class: Dist. from Site: fr. 3. Identify Whether the Stormwater Design is High Density or Low Density, Commercial or Residential, State Stonnwater or NPDES Phase II, Address Vested Rights When Applicable; Identify Pockets of High Density: High Densily. Y 4&1ary, Shale S7ornnaaler 4. Proposed Total'% Impervious Surface: -41.01 % 5. Number of Proposed Treatment Measures, Type(s) of Collection System: 1-1igh Dentin,, Tivo Sloarnwaler Xlanagement Ponds di.alaaagh{g into exi.digg dileh".1. 6. Will All Built Upon Area Be Collected: � rs 7. Identify Whether or Not the Project Has Buffer Requirements & Whether or Not Development Is Proposed Within A Buffer: N%: 1 8. Discuss Coastal Management AEC's When Applicable: NIA 9. Discuss Off -Site Runoff: Oj/-.rhe aam(� neill un! pa.x lbmugb lGa proposed 1UW 10. Discuss Whether Road Construction Across Other property Is Necessary To Access This Project: A ttesr to the property evill he via arl aavif /paved road.. 11. If An On -Site Evaluation Of The Soils Has Been Done, Discuss Infiltration Rates, Seasonal High Water Table, etc., and Include Date Of Site Evaluation (This Is Required For Infiltration Projects): On-St7e L''ralualion Gut been nmrpkled and ropod it ena'ln.rrd. Additional Comments Stormwater N:urati�e Page 2 ot'2 e ' LG LAND iMANA(3ENII:NT GROUP i :c. Em-hoomentol Consultants Mav 8. 2008 .Iel'f Thompson I lohhs. Upchurch & Associates PA PO Box 1400 14978 I.IS I Ivy 17, Suite 5 1l:mlpstead. NC 28443 Reference: Camp Geiger Stonmvater Project: Jacksonville NC Dear Mr. Thompson: Land Management Group, Inc. recently evaluated the above referenced site between Church Street and A Street for the purpose of quantifying the depth to the seasonal high water table for a proposed storm water infiltration basin. This investigation looked at the property approximately 60 feet north of the drainage feature and approximately 120 feet south of the drainage feature 1 offer the following comments. The soils at this site are mapped as Goldsboro as referenced by the USDA-NRCS. Soil Survey Manual for Onslow County. This soil series typically consists of well drained to moderately well drained tine loamy soils. The seasonal high water table is normally evident by observation of redoximorphic features suggesting past conditions of saturation and reduction. Six soil borings were perfornied down to 4 feet in the proposed infiltration basin area. The site was determined to not be a typical Goldsboro soil but was actually an old flood plain of a creel: that has recently been filled and channeled during the course of development of the Marine base. "['here was evidence of ns much as 18" of man made fill in places and other locations showed evidence of being pushed and pulled with heavy equipment in the past. The contemporary redoximorphic featttt'CS were ohscrved bctwf n 12" and 20" within the soil profile indicating a shallow depth to the seasonal high kvit V� table. Furthermore, the surficial soil horizons (sandy, coarse loamy and tine loanry. oils) were underlain by a nlnssivc clay layer at depth that may impair infiltration and will JUL 2 2 2008 rciluire lower infiltration rates. By. In sununarv. the north side of the drain should be excluded from consideration ❑s a storm—_" water infiltration basin due to fill and shallow water tables. The soils that begin approximately 60 to 7.5 feet to the south of the drain, extending uphill to 120 feet from the drain just barely meet the minimum criteria for use as a stormwater infiltration basin. A basin in this area would need to be based upon a 12" depth to the seasonal high water table and would therefore he an elevated infiltration basin. For design purposes, I would recommend using a 2 in/hr infiltration rate for these soil types. Please do not hesitate to contact me if you have any questions with this report ort if you want me to return to the vaww.lrngrcup.net � info inigroup.net ^ Phone: 910.452.0001 ^ Fax: 910.452.0060 3305 Wrightsville Ave., Suite 15, V'Jilmington, NO 23,403 - P.O. Box 2522, Wilmington, MC 28402 site to evaluate any specific basin location. I may be reached at 910-452-0001, 910-471- 0777 or at jwilliamsin�lmeroup.net . Sincerely, .lohn P Williams, General Manager NC Licensed Soil Scientist #1113 SC Professional Soil Classifier 458 JUL 2 2 2000