HomeMy WebLinkAboutSW8080715_CURRENT PERMIT_20210603STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 020115
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
202\ Olo 03
YYYYMMDD
ROY COOPER
Governor
DIONNE DELLFGATTI
Secretary
BRUIN WRENN
Director
June 3, 2021
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Fm!r n ntal Quality
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 080715
MCB Academic Instruction Facility
Ouslow County
Dear Mr. Paul:
Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality
(DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will
remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit
will now reference DEMLR as the Division responsible for issuance of the permit.
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 080715 has been renewed
on June 3, 2021, and shall be effective until December 30, 2029. For your records, please find enclosed a renewed,
updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please
note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of
the previous terms to provide you with a better understanding of your obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit. The plans originally approved on August 1, 2008 will remain in
full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
(�-"'e!�f
N
..moo. Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
leEft ER O%M North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
wmx ouw
910,796.7215
i 7
Enclosures:
DES/ams:
cc:
Attachment C — Permitting History
Renewal Application Documents
\\\Stormwater\Permits & Projects\2008\080715 HD\2021 06 permit 080715
NCDEQ-DEMLR Wilmington Regional Office
State Stormwater Permit No. SW8 080715
Page 2 of 2
110 ®VM �,� North Carolina Department of Environmental Quality I Division of Energy. Mmeral and Land Resources
Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405
wmry vaouK.
y.--- •• a� a+. 910.796.7215
State Stormwater Management Systems
Permit No. SW8 080715
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Marine Corps Base, Camp Lejeune
Academic Instruction Facility, Camp Geiger
C Street, Camp Geiger, Onslow County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data as
attached and on file with and approved by the Division of Energy, Mineral and Land Resources
(the "Division" or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until December 30, 2029, and shall be
subject to the following specified conditions and limitations:
1. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit. The stormwater control has been
designed to handle the runoff from 158,307 square feet of impervious area.
The tract will be limited to the amount of built -upon area indicated on page 2 of this
permit, and per approved plans.
All stormwater collection and treatment systems must be located in either dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
The runoff from all built -upon area within the permitted drainage area of this project must
be directed into the permitted stormwater control system.
Page 1 of 6
State Storrnwater Management Systems
Permit No. SW8 080715
6. The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
a.
Drainage Area, acres:
7
Onsite, ft2:
304,718
Offsite, ft2:
None
b.
Total Impervious Surfaces, ft2:
158.307
c.
Design Storm, inches:
1.5
d.
Pond Depth, feet:
5/3.31 average
e.
TSS removal efficiency:
90
f.
Permanent Pool Elevation, FMSL:
12
g.
Permanent Pool Surface Area, ft2:
29,886
h.
Permitted Storage Volume, ft3:
35,583
i.
Temporary Storage Elevation, FMSL:
13
J.
Controlling Orifice:
2.5"0 pipe
k.
Permitted Forebay Volume, ft3:
19,166
I.
Fountain Horsepower, HP
1/3
m.
Receiving Stream/River Basin:
New River / White Oak
n.
Stream Index Number:
19-31
o.
Classification of Water Body:
"SC"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
Page 2 of 6
Slate Stormwater Management Systems
Permit No. SW8 080715
3. The permittee shall at all time provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The approved
Operation and Maintenance Plan must be followed in its entirety and maintenance must
occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
c. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
q. Access to the outlet structure must be available at all times.
Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
5. Decorative spray fountains are allowed in the pond, subject to the following criteria:
a. The minimum permanent pool volume is 30,000 cubic feet.
b. The fountain must draw its water from less than 2' below the permanent pool
surface.
C. Separated units, where the nozzle, pump and intake are connected by tubing,
may be used only if they draw water from the surface in the deepest part of the
pond.
d. The fountain may not be placed into the forebay.
e. The falling water from the fountain must be centered in the main pond, away from
the shoreline.
f. The maximum horsepower for a fountain in this pond is 1/3 horsepower.
6. The facilities shall be constructed, operated and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division.
Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications, and
other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be required for
those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be restored to
design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate easements at all
times.
Page 3 of 6
State Stormwater Management Systems
Permit No. SW8 080715
1 & No person or entity, including the permittee, shall alter any component shown in the
approved plans and specifications. Prior to the construction of any modification to the
approved plans, the permittee shall submit to the Director, and shall have received
approval for modified plans, specifications, and calculations including, but not limited to,
those listed below. For changes to the project or SCM that impact the certifications, a
new or updated certification (s), as applicable, will be required and a copy must be
submitted to the appropriate DEQ regional office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size
including the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of
the project and/or property area as reported in the approved plans and
specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not
included in the approved plans and specifications.
g. Other modifications as determined by the Director.
11. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
12. Prior to transfer of the permit, a file review and site inspection will be conducted by
Division personnel to ensure the permit conditions have been met and that the project
and the on -site stormwater system complies with the permit conditions. Any items not in
compliance must be repaired, replaced restored, or resolved prior to the transfer.
Records of maintenance activities performed to date may be requested.
III. GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to
enforcement procedures as set forth in NCGS 143 Article 21.
The issuance of this permit does not preclude the permittee from complying with and
obtaining any other permits or approvals that are required for this development to take
place, as required by any statutes, rules, regulations, or ordinances, which may be
imposed by any other Local, State or Federal government agency having jurisdiction.
Any activities undertaken at this site that cause a water quality violation or undertaken
prior to receipt of the necessary permits or approvals to do so are considered violations
of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-
215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as
the construction of additional or replacement on -site stormwater systems. These
additional or replacement measures shall receive a permit from the Division prior to
construction.
Page 4 of 6
State Stormwater Management Systems
Permit No. SW8 080715
Permit Transfer: This permit is not transferable to any person or entity except after
notice to and approval by the Director. The permittee shall submit a completed and
signed "Permit Transfer Application Form" (available on the Division website)
accompanied by the required fee and supporting documentation as listed on the form, to
the Division at least 60 days prior to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case
of an individual lot sale that is made subject to the recorded deed restrictions and
protective covenants,
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-
05 or NCGS 57D-6-07 and 08;
C. Bankruptcy,
d. Foreclosure, subject to the requirements of Session Law 2013-121;
Current Permittee Name or Address Changes: The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project,
C. A mailing address change of the permittee;
The permittee is responsible for compliance with all terms and conditions of this permit
until the Division approves the transfer request. Neither the sale of the project, in whole
or in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the permit.
The permittee grants Division Staff permission to enter the property during normal
business hours to inspect all components of the permitted project.
The permit issued shall continue in force and effect until the permittee files a request
with the Division for a permit modification, transfer, renewal, or rescission; however,
these actions do not stay any permit conditions.
Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference
and are enforceable parts of the permit. A copy of this permit, application, supplements,
operation and maintenance agreement, and approved plans and specifications shall be
maintained on file by the permittee.
10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
11. The issuance of this permit does not prohibit the Director from reopening and modifying
the permit, revoking and reissuing the permit, or terminating the permit for cause as
allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and
NCGS 143-215.1 et.al.
12. A permit renewal request must be submitted at least 180 days prior to the expiration
date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Page 5 of 6
State Stormwater Management Systems
Permit No. SW8 080715
Permit renewed, updated, and reissued this the 3rd day of June 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Cr t l.�6l li . ?�C' C
unan r� endrector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 6 of 6
Attachment C - Permitting History
Academic Instruction Facility Camp Geiger
Permit No. SW8 080715
Approval
Date
Permit
Action
BIMS
Version
Description of the Changes
8/1/2008
Original
Approval
1.0
6/3/2021
Renewal
2.0
Permit Number:.
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one): JAL 2 g 'I n
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one): '_
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.3
Page 1 of 4
Permit Number: 1:5b 3 60K0 3
(to be provided by DWQ)
Drainage Area Number:
The inlet device: pipe or I The pipe is clogged.
swale
The forebay
The main treatment area
The pipe is cracked or
otherwise damaged.
Erosion is occurring in the
swale.
Sediment has accumulated to
a depth greater than the
original design depth for
sediment storage.
has
Weeds are present.
Best professional practices
show that pruning is needed
to maintain optimal plant
health.
Plants are dead, diseased or
dying.
Weeds are present
Sediment has accumulated to
a depth greater than the
original design sediment
storage depth.
Algal growth covers over
50%, of the area.
Cattails, phragmites or other
invasive plants cover 50% of
the basin surface.
How I will remediate the
Unclog the pipe. Dis
sediment off -site.
Replace the pipe.
Regrade the swale if rjYxIiazy4ow—
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Prune according to best professional
practices
Determine the source of the
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Consult a professional to remove
and control the algal growth.
Remove the plants by wiping them
with pesticide (do not spray).
i
u
Form SW401-Wet Detention Basin O&M-Rev.3
Page 2 of 4
Permit Number: 1:56.Y�07 _c 0 7%)
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 5.0 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 5.0 feet in the forebay,
shall be removed.
Sediment Removal
Bottom
7.00
---------------
FOREBAY
BASIN DIAGRAM
(fill in the blanks)
kft Min.
Sediment
Storage
X,__.
segiiLn6nt5 CO
ju
Permanent Pool Elevation 12.00
Sediment Removal Elevation 7.00
-----------------------------------------
Bottom Elevation
MAIN POND
1-ft n
Sedimer
Storage
Form SW40I-Wet Detention Basin O&M-Rev.3 Page 3 of 4
Permit Number: St,,kJ
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Academic Instruction Facility, Camp Geiger
BMP drainage area number:
Print name:Carl H. Baker
Title:Public Works Director, MCB Camp Lejeune
Address:1005 Michael Road, Camp Lejeune, NC 28547
Date:1 1,a r — t% 19
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _ ?c /a—S//44,W , a Notary Public for the State of
County of (ail1/ , do hereby certify that
i personally appeared before me this oZqf
day of c>74o f , and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
MICE A EONNEM
NotOry Public
Ombw County
Eros Of NOdh Carolina
Commlplon Eitptra Oct 23. 2010
SEAL
My commission expires o:�? /1V o70/d
Form SW40I-Wet Detention Basin O&M-Rev.3 Page 4 of 4
Courwlpafau E 0—Ita Oct 32' 3010
94018 04 Nouv C0MING
Ou%om Conu{A
gp{wA bnOlIC
VTICE V 20MOR1E
I
Permit No. S� 6 i0--7/_)
(to be provided by DWQ)
OF W A TFq
NCDENR
' STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
Project name
Contact person
Phone number
Date
Drainage area number
Site Characteristics
Drainage area
Impervious area
% impervious
Design rainfall depth
Storage Volume: Non•SRWaters
Minimum volume required
Volume provided
Storage Volume: SRWaters
1-yr, 24-hr runoff depth
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak Bow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak Flow control
Basin Elevations
Basin bottom elevation
Sediment cleanout elevation
Bottom of shelf elevation
Permanent pool elevation
SHWTelevation .
Top of shelf elevation
Temporary pool elevation
158;307.00 fe
51.95 %
r+150 =,�:in
'„135;58300 ?';$ffa
� In
ff,
n3
ff'
'! ff'
�.0g flt
3:P: - 12.00,JjX A ft
1240 fl
a12:50,3 ff
RECEIVED
Jul. L s 2008
Forth SW401-Wet Detention Basin-Rev.4, Parts I. & 11. Design Summary, Page 1 of 2
Permit No.
W U '
(to be provided by DO
Volume and Surface Area Calculations
SA/DA ratio
�urface area at the bottom of shelf
olume at the bottom of shelf
Permanent pool, surface area required
Permanent pool, surface area provided
Permanent pool volume
Average depth for SA/DA tables
Surface area at the top of shelf
Volume at the lop of shelf
Forebay volume
Forebay % of permanent pool volume
Temporary pool, surface area provided
Drawdown Calculations
Treatment volume drawdown time
Treatment volume discharge rate
Pre -development 1-yr, 24-hrdischarge
Post -development 1-yr, 24-hr discharge
Additional Information
Diameter of orifice
Design TSS removal
Basin side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to width ratio
Trash rack for overflow & orifice?
_ Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies
19.35 %
.:39,285 00 "I' fe
'days
.ti 0.08 J; ft'/s
in
o�
1
1
ft
(Y or N)
It
(Y or N)
(Y or N)
(Y or N)
OK
OK
OK
OK
OK
OK
OK
OK
OK
Too short, increase ratio to at least 3:1
OK
OK
OK
Design must be based on 90% TSS removal
Need a recorded drainage easement
OK
RFCF:IVFD
JUL 2 8 Z008
Fonn SW401-Wet Detention Baum-Rev.d Parts I. & II. Design Summary, Page 2 of 2
DEMLH USE ONLY
Date f3eceiyed
IFee
Paid
Permit Number
t7 1 a!
I :1�,ulFtda-7B
Sa =
SW8
OE0 /5
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER: nIECEIVE
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 18(
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 080715
2. Project name: Academic Instruction Facility, Camp Geiger High Density Project
3. Project street address:
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 fora Major
Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/energv-
mineral-land-resources/energy-mineral-land-rules/stormwate r-prog ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https:Hdeg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City: State: ZIP
6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil
—CEFlaV rz *-
MAY 17 2021
Stormwater Permit Renewal Form Page 1 of 3 1 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
HEB 1. A permit application processing fee of $505.00 payable to NCDEQ.
HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
HEB 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
HEB 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
MAY 17 2011
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
I, Z64r� A. U1 061�r , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. ormation provided on this permit renewal application is, to the best of my
knowledge, cc d c plete.
Signature: Date: )
NOTARIZATION:
I, w VV ` lU� a Notary Public for the State of
—County of 01� o"4 , do hereby certify
that — I4kjJ a LoJ der personally appeared before me
this the day of 1 1 1AI , 20�, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Seal) 'S" • ........
;�4: .Q(pRY
2
Notary Signatur . S^L� O��G
_' : Off•. pU .:•C�'•.'
My commission expires c �Lo4 2,a
MAY 1 2021
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8 080715
Academic Instruction Facility, Camp Geiger
Stormwater Permit No. SW8 080715
Onslow County
Designer's Certification
1, 14erl K SAyer , as a duly registered Erwnuaf
in the State of North Carolina, having been authorized to observe (periodically*»may!
) the construction of the project,
(Project)
for ClUl- $Aloe IIMC8 CAMP L�MdAW (Project Owner) hereby state that, to .the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted (deviations from approved plans and specification: 11
�. OCitirz oo� G�tyo-��eT cen4�TUG'ltd � t�•8 �c�gi9nr� @ G�wt = 12.0 1
2. �nciwn 6�x "Aad -6 oAe-4 pope. 64wwn c.or i-rol s+rv4ura os./d cennee,"
4,o euW-aA' culve-A .
"L•+ SEAL
Signature IY.� 0ppn,�nrrr,
o•` tSN CART
Registration Number l9�Jp9 _:'�a{'oEESSIo
Date dwil 24, 2o/o SEAL
19459
MAY 17 2021
Page 6 of 7 By
�_ rF
State Stour -water Management Systems
Permit No. SW8 080715
Certification Requirements:
The drainage area to the system contains approximately the permitted
acreage.
'R 1u5. 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
fN_3. All the built -upon area associated with the project is graded such that the
runoff drains to, the system.
W_ 4. All roof drains are located such that the runoff is directed into the system.
_5. The outlet/bypass structure, elevations are per the approved plan.
&�-.6. The outlet structure is located per the approved plans.
24��7. Trash rack is provided on the outlet/bypass structure.
J&- 8. All slopes are grassed with permanent vegetation.
2Jt��9. Vegetated slopes are no steeper than 3:1.
-_10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
00- 11. The permitted amounts of surface area and/or volurne have been
provided.
VN15�- 12. Required drawdown devices are correctly sized per the'approved plans.
�13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
)0'1�1 The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Onslow County Building Inspections
AIAY > > 2021 l�
Page 7 of 7