Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8080649_HISTORICAL FILE_20171023
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0 80\D4° DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS N HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20%'\\U23 YYYYMMDD Energy. Mineral & Land Resources ENVIRONMENTAL QUALITY October 23, 2017 MCB Camp Lejeune Attn: Commanding Officer c/o Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28542 Subject: State Stormwater Management Permit No. SW8 080649 TECOM (AICCSSS) [nterim Facilities-Humvee Garage High Density Wet Pond Project Onslow County Dear Mr. Paul: ROY COOPER Governor MICHAEL S. REGAN Secretory TRACY DAVIS Director The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for the subject project on October 23, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations. This project was originally designed and approved under the regulations set forth in Title 15A NCAC 02H.1000 (1995 Rules) as amended by Session Law (SL) 2006-246 and as subsequently amended on January L 2017 (2017 Rules), as applicable. We are forwarding modified Permit No. SW8 080649 dated October 23, 2017, for the construction, operation and maintenance of the stormwater control measures (SCMs), built - upon areas, as well as the stormwater collection system and/or vegetated conveyance system associated with the subject project. Please add the attached plans to the previously approved plan set. Please replace the previous application (SWU-101 with the attached modified versions. This permit shall be effective from the date of issuance until December 30, 2021 and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the permit conditions regarding the operation and maintenance of the SCMs, stormwater collection system, and/or vegetated conveyances; the limitation of built -upon area; modification of the project:; the procedures for changing ownership of and/or transferring the permit, and the need to renew the permit. Failure to comply with these requirements will result in future compliance problems. The following clarifications, corrections, and modifications are included and covered by this permit: 1. The original permit issued July 22, 2008 approved the construction, operation and maintenance of two wet detention ponds. However, only one set of design information was presented in the permit, the supplements, the operation and maintenance agreement, and the calculations. Additionally, the pond design presented in the supplement and the calculations are not consistent. In comparing the two ponds and their drainage areas approved in 2008, the following differences and similarities are noted: a. Pond 1 has a larger drainage area and more built -upon area which should result in a slightly larger minimum required storage volume. b. the size and shape of the ponds are roughly identical with only subtle differences including bottom surface areas and the forebay position. This is supported by the pond summary table provided on D-4 of the plans approved on July 23, 2008. . With only one set of design information having been provided and the two ponds being roughly identical on the plans, it is assumed that both ponds were based on the same pond design. 2. For Pond 1, this permit is being corrected to maintain the original design found in the calculations as noted on the revised supplement originally provided in 2008. Future modifications to Pond 1 . or its drainage area will need to confirm and permit the as -built condition of Pond 1. A new designer's certification will be required at that time. 3. For Pond 2, this modified permit approves the slightly revised as -built condition. A new designer's certification is required to be submitted upon completion of this modification. State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Wintingtun Regional Office 1127Cardinal Drive Extenvon I Wilmington,NC 28405 9107T167215 - State StOfmWater Petm1INO. SW8 080649 Page 2 of 2 This modification also includes increasing the drainage area and built -upon area to Pond 2 to accommodate an additional building. If any pate, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicator , hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at tvwwlNCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Hall in the Wilmington Regional Office, at (910) 796-7215. Sincere . Q)Ec��U . ,.;Tracy Davis; P.E., Director Division of Energy, Mineral and Land Resources GDS/cash: %Stonnwater\Permits R Projects\2008\080649 HD\2017 10 permit 080649 cc: Kevin Avolis, Avolis Engineering Wilmington Regional Office Stormwater Pile State of NortliCa olina I Envimnmenla] Quality I Energy.kiineimland Land Rcsow-ces NShnington Regional Office 1177 Cardinal Drive Extension I Wilmington. NC 2840.5 9107967215 State Stormwater Management Systems Permit No. SW8 080649 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Commanding General USMC Base c% Mr. Carl Baker TECOM (MCCSSS) Interim Facilities-Humvee Garage Neuse Road, Camp Johnson Area, MCB Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two (2) wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (1995 Rules) as amended by Session Law (SL) 2006-246 and as subsequently amended on January 1, 2017 (2017 Rules); as applicable (collectively, the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit This permit shall be effective from the date of issuance until December 30, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the management and volume of stormwater described in the application and other supporting data. The maximum amount of built - upon area (BLIA) allowed for the entire project is 91,801 square feet. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 this permit. The stormwater control measures labeled Pond 1 and Pond 2 have been designed to handle the runoff from 45.871 and 45,930square feet of built -upon area, respectively. This permit does not provide any allocation of built -upon area for future development. 3. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 4. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 5. A vegetated filter strip is not required for these ponds as they have been designed for a 90% total suspended solids removal efficiency. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 6 State Stormwater Management Systems Permit No. SW8 080649 The following design criteria have been provided in the wet detention ponds and must be maintained at design condition: Pond 1 Pond 2 a. Drainage Area, acres. Onsite, ft2: Offsite, ft2: 2.908 126.1679 0 1.97 85,634 0 b. Total Impervious Surfaces, ft? Onsite, ft2: Offsite. ft2: 45,871 45,871 0 45,930 45,930 0 c. Average Pond Design Depth, feet: 3.0 30 d. TSS Removal Efficiency: 90% 90% e. Design Storm, inches: 1.5 1.5 If, Permanent Pool PP Elevation, FMSL: 17.5 17.5 g. Permitted PP Surface Area, ft2: 10,809' 8,459 h. Temporary Storage Elevation, FMSL: 18.5 18.5 i. Permitted Storage Volume, ft3: 1 12,983- 10,671 j. Predevelopment 1 yr-24 hr. discharge rate, cfs: 3.4 0.34 k. Controlling Orifice, inch to pipe: 2 1.25 I. Orifice Flow Rate, cfs: 0.1 0.03 m. PP Volume, ft3: 28,236' 21,277 n. Forebay Volume, ft3: 1 4,680" 4,519 o. Maximum Fountain Horsepower: n/a n/a p. Receiving Stream/River Basin: Wilson Bay / White Oak q. Stream Index Number: 19-14 r. Classification of Water Body: Sc, HQW, NSW `Based on the original calculations. Any future modifications to Pond 1 or its drainage area will need to confirm and permit the as -built condition of Pond ' If. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 080649 5. The permittee shall submit an annual summary report to the Division of Energy, Mineral and Land Resources of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. Decorative spray fountains will not be allowed in the stormwater treatment system until calculations are provided documenting the permeant pool volume is greater than 30,000 cubic feet. 8. The facilities shall be constructed in accordance with the conditions of this permit, the approved plans and specifications; and other supporting data. 9. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including; but not limited to; those listed below: a. Any revision to any item shown on the approved plans; including the stormwater management measures, built -upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for ten years from the date of the completion of construction. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules; is subject to enforcement action as set forth in NCGS 143, Article 21. 2. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. Page 3 of 6 State Stormwater Management Systems Permit No. SW8 080649 3. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy; Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; C. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121, e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6-07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 4. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 5. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Additional or replacement stormwater management systems shall receive a permit from the Division prior to construction. 6. The permittee grants Division Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until modified, revoked, terminated or renewed. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification; revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit corrected, modified, updated, and re -issued this the 23rd day of October 2017. H CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION i racy uav r.t., uirecror Division of E rgy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Management Systems Permit No. SW8 080649 TECOM (MCCSSS) Interim Facilities-Humvee Garage Stormwater Permit No. SW8 080649 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Management Systems Permit No. SW8 080649 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDEQ-DEMLR Regional Office Page 6 of 6 DEMLR USE ONLY Date R ceived Fee Paid Permit Number--- -� /d 0 Applicable Rules: C Coastal SW - 1995. ❑ Coastal SW - 1008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Construct PEB, Camp Johnson (Construction Contract N40085-17-B-0060) 2. Location of Project (street address): Neuse Road, Camp Johnson Area, MCB Camp Lejeune City:Jacksonville County:Onslow Zip:28547 3. Directions to project (from nearest major intersection): 0.5 miles west of Montford Point Road at Camp Johnson 4. Latitude:34° 44' 01" N Longitude:77° 24' 46" W of the main entrance to the project. ll. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenezoals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 080649 , its issue date (if known) July 22, 2008 , and the status of construction: ❑Not Started ❑Partially Completed' ❑ Completed* 'prouide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits canbe obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No ❑Yes _KE I VE If yes, see S.L. 2012-200, Part VI: hn://portal.ncdenr.org/web/Ir/rules-and-regLilations OCT ' h017 BY: FormSWU-101 Version Oct.31,2013 Page Iof6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/ Organization:Command ing Officer - MCB Camp Leieune North Carolina Signing Official & Title:Thomas Bradshaw, PE -Civil Engineer, Public Works Department b.Contact information for person listed in item 1a above: Street Address: 1005 Michael Road City: Camp Lejeune State: NC Zip: 28547 Mailing Address (if applicable): City: Phone: (910 ) 451-3238 Ext. 3285 Email thornas.bradshaw@usmc.mil Fax: ([910 ) 451-2927 c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Mailing Address (if applicable): City: State: Phone: ( ) Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project Other Contact Person/Organization:Thomas Bradshaw, PE - Civil Engineer, Public Works Department Signing Official & Title:Thomas Bradshaw, PE- Civil Engineer, Public Works Department b. Contact information for person listed in item 3a above: Mailing Address:1005 Michael Road City:Camp Lejeune State:NC Zip:28547 Phone: (910 ) 450-5803 Fax: (910 ) 451-2927 Email:david.towler@usiiic.mil 4. Local jurisdiction for building permits: Point of Contact: Phone k: Form 8 WU-101 Version Oct. 31, 2013 Page 2 of 6 ECEIVER OCT 19 2017 0 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be treated by existing stormwater retention basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 4.87 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Aree:4.87 acres Total project area shall be calculated to exclude the followingg the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Nomml High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHVV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 43.24 % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. Por low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Draina e Area _ Draina a Area _ Receiving Stream Name Wilson Bay Wilson Bay Stream Class * SC; HQW, NSW SC; HQW, NSW Stream Index Number * 19-14 19-14 Total Drainage Area (so 126,679 85,634 On -site Drainage Area (sf) 126,679 85,634 Off -site Drainage Area (so 0 0 Proposed Impervious Area** (so 45,871 45,930 % Impervious Area** total 36.21 53.64 Impervious— Surface Area Draina a Area 1 Draina a Area 2 Draina a Area _ Draina a Area _ On -site Buildings/Lots (so 15,600 15,428 On -site Streets (so On -site Parking (so 28,871 28,942 On -site Sidewalks (so 1,400 1,560 Other on -site (so 0 Future (so Orl I R Off -site (sf) Existing BUA*** (so Total (so: 45 871 45,930 Stream Class and Index Number can be determined at: htty.11�ortal.ncdenr.org/webfwq/ps/atdclassifications " Im ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "* Report only that amount of existing B UA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. Form S W U-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. Projects in Union County: Contact DEMLR Ccniral OJrice staff to check ifthe project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per I5A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from hqp://portaI.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdennorg/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at httl2://portal.ncdenr.org/web/wg/ws/su/maps.) Please indicate that the following required information have been provided by initialin¢ in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http:/ /portal ncdenr org/web/wq/ws/su/statesw/forms_docs. Initia 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants A Form. (if required as per Part VII below) T _ 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $$505 payable to NCDENR. (For an Express review, refer to /.{V http://w-ww.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within lh mile of the site boundary, include the 1h mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. �+ p k. Existing contours, proposed contours, spot elevations, finished floor elevations. �9 1. Details of roads, drainage features, collection systems, and stormwater control measu OCT , 8 a��7 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person w made the determination on the plans. By. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 p. Vegetated buffers (where required). / 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to ver�fij the SHWF prior to submittal, (910) 796-7378.) / 10. A copy of the most current property deed. Deed book: Military Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / /www.secretary.state.nc.us/CorRorations/CSearch.asl2x VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httj2:/Iportal.ncdenr.org/web/ir/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: I. Kevin AvoIis, PE Consulting Firm: Avolis Engineering, PA Mailing Address:P.O. Box 15564 Cily:New Bern State:NC // Zi??p:2825561 Phone: (252 ) 633-0068 Fax: Email:avolisengineerin embargmail.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Infonnation, item la) with (print or hjpe name of organization listed in Contact Information, item ]a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. OCT 18 2017 9Y:® Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agenh (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of stormwater permit. Witness my hand and official seal, SEAL County of personally appeared and acknowledge the due execution of the application for a My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Thomas Bradshaw certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the roved plans, that the required deed restrictions and protective covenants w9 be recorded, and that the sed project complies with the requirements of the applicable stormwater r under 15A NCA H .100 any other applicable state stormwater requirements. Signature: C Date: p f111 / 7 I, a Notary Public for the State of 4�UACounty of �a lyC9�� do hereby certify that V personally appeared before me this day of and acl owledge the d e execution of the application for a stormwater permit. Witness my hand and offici 1 sea R- Nolory Public Onstow County y Commission Expir 05/26/2019 10 CAR0�\+ SEAL My commission expiresoQ44�g ECEIVE OCT 18 2017 BY; Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 ;,,yap: '�.4;"%• . �. •-, 9 i, :atouv 7�oto6^. ,;..Co. wJ�tiir ..".'i d(7Y.3 r•Jh. � ^.flip' 41v' �iG •OS�01' . yi y� '. t. ��r �� ���„� MEMORY TRANSMISSION REPORT TIME :11-02-2017 09:15 FAX NO.1 :9103502004 NAME :Mainfax FILE NO. 554 DATE 11.02 09:12 TO n 919104512927 DOCUMENT PAGES 8 START TIME 11.02 09:12 END TIME 11.02 09:15 PAGES SENT 8 STATUS OK MEMORY TRANSMISSION REPORT TIME :11-02-2017 09:24 FAX NO.1 :9103502004 NAME :Mainfax FILE NO. 555 DATE 11.02 09:12 TO n 912526336507 DOCUMENT PAGES 8 START TIME 11.02 09:15 END TIME 11.02 09:24 PAGES SENT 0 STATUS 0050 Hall, Christine From: Avolis Engineering, P.A.<avolisengineering@embargmail.com> Sent: Monday, October 23, 2017 4:40 PM To: Hall, Christine Subject: [External] Re: SW8 080649 - TECOM Camp Johnson Attachments: Wet Detention Basin Supplement -Construct PEB, Camp Johnson.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Christine: Please find attached the modified supplement for the above referenced project. Thanks and have a great afternoon! Beth Simmons Avolis Engineering, PA 252.633.0068 From: Hall, Christine Sent: Monday, October 23, 2017 2:25 PM To: Avolis Engineering, P.A. ; David Towler ; Thomas Bradshaw Cc: Weaver, Cameron Subject: SW8 080649 - TECOM Camp Johnson Kevin, I have had the chance to look at the modification submitted for Pond 2 of the subject project. There is just two numbers that need to get updated in the supplement to match the proposed conditions: 1. The temporary pool area should be the provided area (11,993 sf) at the temporary pool elevation (next available outlet = 18.5) instead of the minimum required surface area presented (11,362 sf). 2. The drawdown orifice is listed as 1.25" in the talcs and on the plans but is listed as 1.5" in the supplement. Since these are very minor comments, I was hoping this e-mail would be sufficient to get the updated supplement e- mailed to me. If a more formal letter requesting additional information is desired, that can be arranged. In the meantime, I will begin drafting the permit. Please remember that I will be out on vacation starting Wednesday. It'd be great if this could get wrapped up tomorrow. Thanks! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Nothing Compares —,,_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Hall, Christine From: Hall, Christine Sent: Monday, October 23, 2017 10:09 AM To: 'Towler CIV David W' Cc: Bradshaw CIV Thomas C Subject: RE: [External] RE: TECOM - Humvee Garage Thanks David. Since we agree that they ponds look to be nearly identical, I can re -use the design information and original supplements on file for Pond 1. The recent modification submitted by Kevin Avolis uses the as -built condition for Pond 2. Here's the paragraph I've drafted to try to explain this in the permit: The original permit issued July 22, 2008 approved the construction, operation and maintenance of two wet detention ponds. However, only one set of design information was presented in the permit, the supplements, the operation and maintenance agreement, and the calculations. Although there appear to be subtle differences in the bottom surface areas of the two ponds and the forebay entrance location, the size and shape of the ponds are roughly identical. This is supported by the pond summary table provided on D-4 of the plans approved on July 23, 2008. It is assumed that both ponds were based on the same pond design. This modified permit approves the slightly revised as -built condition for Pond 2 and maintains the original design founds e supporting documents for Pond 1. �r I'll get back looking at the requested modification. Thanks again! Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources —State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Towler CIV David W [mailto:david.towler@usmc.mil] Sent: Monday, October 23, 2017 9:09 AM To: Hall, Christine <Christine.Hal I@ncdenr.gov> Cc: Bradshaw CIV Thomas C <thomas.bradshaw@usmc.mil> Subject: [External] RE: TECOM - Humvee Garage CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Christine, I've dug through all of our records and it does indeed look like both ponds are under 1 permit and are identical. I'm sending everything I have, but I'm not sure it is more than you already have in the file. I'm not exactly sure what wem wrong with this package. HUA consultants are no longer around, so if you'd like this package corrected, please let me know. V/r, David Towler, P.E. Public Works Division, Bldg 1005 Michael Rd. Marine Corps Base, Camp Lejeune, INC 28547 Civil Design Branch Phone: (910)451-3238 ext. 3284 david.towler@usmc.mil -----Original Message ----- From: Hall, Christine[mailto:Christine.Hall@ncdenr.gov] Sent: Friday, October 20, 2017 3:35 PM To: Towler CIV David W <david.towler@usmc.mil> Subject: [Non-DoD Source] RE: TECOM - Humvee Garage Could it be that the ponds were designed to be identical? The provided pond info (even ft its inconsistent) would have applied to both pond 1 and 2 individually? These two ponds are very similar in size and shape and the pond summary table on plan sheet D-4 shows no differences between the two. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405 P r Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Hall, Christine Sent: Friday, October 20, 2017 2:37 PM To: David Towler <david.towler@usmc.mil> Subject: TECOM - Humvee Garage David, I'm starting to look at the modification to this project submitted Kevin (SW8 080649) and wondered if you were able to find anything from the original submittal (Construction Contract No. N62470-08-0034). Any calculations / supplements / or 0&M agreements? It does look like this permit is supposed to have 2 ponds (versus a separate permit) and I'd like to get the permit corrected while I'm working on it. Otherwise, I will try to piece mill something based on the limited information found in the file. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources - State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine.hall@ncdenr.gov<mailto:christine.hall@ncdenr.gov> 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. a Q2 - �?//f/ 9, -z OR +\'So .�Z l D ��) )hu) JACKSON —PROJ SITE �03 it Q� D LI C� u Landing OCT 18 2017 300 0 150 300 600 - GRAPHIC SCALE: 1 " = 300' AVOLIS ENGINEERING, P.A. USGS MAP Civil and Environmental Engineering CONSTRUCT CAMP JOHNSON, MCSSS PEB P.O. BOX 15564 NEW BERN, NORTH CAROLINA 28561 MARINE CORPS BASE PHONE: (252) 633-0068 CAMP LEJEUNE, NORTH CAROLINA LICENSE NO. C-0706 AVOLIS ENGINEERING, P.A. CIA and Environmental Engineering P.O. BOX 15564 NEW BERN, NORTH CAROUNA 28561 PHONE: (252) 633-0066 LICENSE NO. C-0706 SITE LOCATION MAP CONSTRUCT CAMP JOHNSON, MCSSS PEB MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA E(CEIVE Stormwater Narrative OCT 18 2017 BY: Construct PEB, Camp Johnson MCB Camp Lejeune, North Carolina Construction Contract No. N40085-17-B-0060 Marine Corps Base Camp Lejeune, North Carolina is proposing to construct a new pre-engineered metal building adjacent to the MCCS facilities located off of Neuse Road in the Camp Johnson area of Marine Corps Base, Camp Lejeune. Specifically, it is proposed that a new 5,348 ft.' classroom building with administrative offices be constructed. The facility will be constructed adjacent to the existing facilities in this area. The existing facilities were constructed in 2009. At the time of construction, a Coastal Stormwater Permit was secured. Stormwater Permit SW8 080649 was issued on July 28, 2008. The Stormwater Permit covered the full extent of construction that exists in this area. All the facilities originally designed were constructed including two stormwater retention basins, one for each drainage basin within the original project. The basins been constructed and an engineer certification for the project was submitted in October 2009. The proposed pre-engineered metal building will be constructed within the within the limits of Drainage Area #2 of the original permit. This drainage boundary is proposed to be expanded slightly in order to encompass the entire scope of new construction. It is proposed that the drainage area be increased in size by 1,915 ft.z It is proposed that all runoff from the new construction be routed to the existing stormwater retention pond constructed associated with Drainage Basin #2. An additional 5,508 ft.Z of new impermeable surfaces will be added to the drainage basin. The percent built -upon resulting from the proposed construction for the drainage basin is 53.64%. As originally designed, Stormwater Retention Basin #2 was constructed with excess capacity; although, no future development was allocated on the project permit. As designed and constructed, the existing stormwater basin will not require any significant modifications in order to treat the additional runoff generated from the additional impermeable surfaces. In excess of the 1.5 inch runoff volume is contained within the existing Stormwater basin. The stormwater basin is not properly sized in accordance with the Stormwater Rules under which it was permitted. The forebay is slightly smaller than the 18% to 22%threshold of the total pond volume. The forebay will be enlarged slightly by this project. Additionally, it is proposed that the orifice diameter on the outlet structure be modified to ensure that stormwater discharge occurs between the two and five day limits established by the Rules. The project drains to Wilson Bay. This water body has a surface water classification of SC, HQW, NSW and a stream index of 19-14. No wetlands exist within the limits of the proposed project. I t �iiuJ.ez,T-.:'l�e.sc.,e,n�o„� r �•..c` �i%�c�f: i�clliaPes O�' � "T'ec�, V1nCCS cw.8�.,- . ati:� C�i}•n,.�o- J�nNso �k�;�...e. e,7ats,raa,:�s . cLvr9 a-cPM,n �alrezfic,�e d►--C� �oc 01) fln f 44 eje.S�,r,� Poq ;FXee35 . Cc-ra- i5f1 Ou r n soy rmevo-k*,- t"-gVe A-0 OCT 18 2017 f BY, Sfa✓i�,,� w��- k� �, � w . %1 w aQ rtt, � �a�, o-,-.� asso� w,7,1v, Ala- !:'sew G ,�� b e, �5 S/• e r Jam` of rct ' vc -4b wi l saw Qay w!n i c.4 o, ka3.. a Avg- G (2 V--VM 414m _ 8 3, r3Li9 .Fr3 `i0/.y2z FYi 4mFr�-- �r�. 2a 7 IMi w,i Mum aAso�j ✓vr un)s S; OS3 Pr3 VaLVvv.g P�v�n&XI 0 l2frn��� 2(1 Sh 7S'/: 4bla Z h sl h�9sg °FS = Y �i -74(wal acu, y me �S Off/ 0 cc�sc�cic/G/ . 40e. > Ail OA- r3, e, 4 Pwt\M%Ao,� aar�,�ev pod 4T� I'l- Pars A -TA iTR -4t4x-e. -6' sq s F IL D till voz, CurAJA A-V L/ -Rdwa V,)w rA -PV� T7b 4 I 24V15A-9 - � � A cal ° t l4 XDt�ae�evt'�2���a� uMyl' dqxj1c( ,� Sysq) Z caas�► Ox 240 J have= .Fi2m vw � A'( 6 A. T"Ies 2��� r� Pbn� PAL = �.. � ►�� x 8s b3 � sF S23 S � P*V,e fie f'Oal.: gq..sgs > ro13zsFIo� 5725YL! ve &Z M4 C*D Ana-4 &70� ku- 571'714 S tiSd' J1i�J�C (��ZSL'� D��,yri I�iv tra �( 24, 30 2D AIAI& BUPA N D S -:'PoZ **P1 6 �} C2L 2-5"61 5-/ 2P141"IAP 0 tL-"v 006. yarn (7A saa 7�r� j C= (2L WOMIAOU'VV j VM elw7o ("14f� vvL[:. rrrOCYrr1�1Zr ..Ss � M2 q1— a. . f Q s '6447 stp =C'j, r t.uy�viGs ��W Sa� �Q' �n�rtodi,�,{RI/� '1ti►?.�1�n�0(( 11 _ ', Aj - - - - - 4 _i s �,,4i:�Q to • �1� °lOt S =-O%OA;1 �ZZsgoQQ)oor 0 J_V�oJ xuS u.�i Spa H j 1 .: n(o ;. t3 ✓ 20 P/� JevF) _rli / zg 4i 7m Fvg 1/�Zrw,=jSCnja �r3 Cy�s IM y F'� ` y 4 t M� vwiuQ � PJY14U i Ala l2:ev,s,b� 7o'2R�.f� �3,as,ai �� .� i•z6� 6q s� ys8�/S,F 3G, Z/� RS63VSF0 omz.. a i� 3►.3 s t 1 A-r, Sb 1 �i3. Z4 �a 6100�5- 40�xov 46(4 —PO use, (2 �-j oR �5 w 'D�„?- "Vatve;:) 7t 9 Co Co Az. Ila, 2',f IrV2, -21 T 3 e4s w a"extr pav4i.. VL wm� Precipitation Frequency Data Server NOAA s 14, Volume 2, Version Locatio me: Tarawa Terrace, North Caro a USA' titude: 34.7339°, Longitude:-77.4138° Elevation: 18.95 ft" source: ESRI Maps -- source: USGS POINT PRECIPITATION FREOUENCY ESTIMATES G.M. Bonin, 0. Martin, B, Lin, T. Parzybok, M.Yeks, and D. Riley NOAA, National Weather Seraw, SiNer Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular Pagel of 4 r' i PDS-based point precipitation frequency estimates with 90% confidence intervals (in inchiii Average recurrence Interval (years) Duration 1 2 0 70 25 ® 100 200 500 1000 5-min 0.490 0.4530532)(0.5-0625 0.577H_667F0.749 0.722 0.600-0.811) 0.8460.823 (0.775-0.914 0.a42-0.99 0.999 0.907-1.08)(0.969-116)(1.10-min 1.07 1.17 1.25 0.782 0.92307 1.20 135 1.47 0.724-0.849 0.8541.00 -1.16 1.10-130 1.23-1.66 1.34-1.59 1.44-1.72 1.541.84 1.65-2.01 1.75-2.15 15-min 0.9065718.06 1.0T16.26 1.25,L46 1.40512.64 1.5771.85 1.70-�2.01 16202.17 1.94'2.33 2.08;2.53 2.19-270 1.34 1.60 7.92 2.20 2.53 2.80 11 3.07 1 3.34 3.71 4.01 30-min (1,24-1.46) 1,48-1.74) (1.77-2.08) (2.02-2.38 2.32-2.73 2.56-3.03 2.79-3.32) (3.02-3.62 3.31-4.02 3.55-4.37) 60-min 1.67 .55-1.82) 2.01 (1.86-2.18) 2.46 (2.27-2.66) 2.86 (2.63-3.10) 3.37 (3.09-3.64) 3.80 (3,47-4.10) 4.23 (3.84-4.58) 4.69 (4.23-5.08) S.32 (4.75-5.77) 5.86 (5.19-6.38) 2-hr 2.03 it 2.46 3.08 3.61 4.43 5.17 b.83ffiE 8.68 .87-2.21) (2.26-2.68) (2.83-3.36) (3.35-3.99) (4.04-4.82) (4.63-5.58) (5.25-6.33 (7.61-9.48)3-hr 2.19 2.65 3.34 3.99 4.90 5.71 6.58 10.22.01-2.40 2.14-2.91 3.06-3,67 3.65-, 4.45-5.36 5.15-6.24 5.89-7.19 1 8-hr 24362.95 2: 5�3.57 3.71-450 443-.39 5.41-6.61 6.607.72 7.0-I8.92 8:930.3 9.65-12.2 10.9-14.1 12-hr 3.80 4.83 5.81 7.20 8.47 9.86 11.4 13.7 15.9 -3.50) (3.44-4.24) (4.36-5.38) (5,23-6.47) (6.42-8.00) (7.50-9.38) (8.65-10.9) i (9.91-12.6) (11.7-15.2) (13.4-17.6) 24-hr 3.59 "(3.29-3. 4.37 b.65 6.75- 8.41 9.85 11.5 13.3 16.0 18.4 (4.00-4.82). (5.17-6.22) (6.15-Z42) (7.59-9.23) (8.82-10.8) (10.2-12.6) (11.6-14.6) (13.7-17.7) (15.5-20.5) 2-0a 2-4.62 4.43 5.06 4.62-5.59 6.36 6.50 5.91-7.18 6.84 7.74 7.01-8.54 8.10 9.62 8.65-10.6 9.99 11.3 10.0-12.4 11.6 13.1 11.8-14.5 13.4 15'2 13.2- 6.8 t5.4 18.3 15.6-04 18.5 1 21.1 6)11 21.1 3-0ay 4.05-4.88 4.90-5.90 6.24-7.53 7.36-8.91 9.01-11.0 10.4-12.8 11.9-14.8 13.5-17.0 15.9-20.5 17.9-23.6 delay 4.68 (4.29-5.14 6.66 519-6.21) 7.19 6.57-7.88) 8.47 7.72-9.2a 10.4 9.36-11.3 12.0 10.7-13.1) 73.7 (12.2-15.1) 15.6 (13.8-17.2 18.6 ) (16.1-0.6 ( 21.2 181-23.7) 5.45 8.25 9.65 11.7 13.4 15.2 17.2 20.1 22.5 7-0ay (5.01-5.94) (6.0 (7.58-8.99) (8.a4-10.5) (10.6-12.7) (12.1-14.6) (13.fi-1fi.6) (15.3-18.6) (17.5-22.1) (19.4-24.9) 10iley 5.64-16.65 6.7El 8.3609.88 9.66-151.4 115 13.7 13.0- 5.6 1d6617.7 163820.0 1 6123.3 2043 6.1 20day 7.60'8.81 9: 5�0.5 11A 12.8 12b 14.6 148617 .3 1858119.5 18.4021.8 02�24.4 226528.0 246831.0 10.0 17.9 14.3 16.2 18.9 21.1 23.2 25.5 28.6 31.1 30-dey (9.37-10.7) (11.1-12.8) (13.4-15.3 15.1-17.4) 17.6-20.3) (ia5-22.6) 21.4-25.0 (23.3-27.5 (258-31.0 (27.8-33.8) 12.5 14.8 17.7 20.0 23.2 25.8 28.5 31.3 35.2 38.2 4b-0ay (11.8-13.5) (13.9-15.9) (16.5-19.0) (18.7-21.5) (21.6-24.9) (23.9-27.8) (26.2-30.7) (28.6-33.8) (31.7-38.1) (34.1-41.7) BOday 15.2 17.9 21.0 23.5 27.0 29.6 32.3 35.1 38.7 41.5 (14.3=16.2)- -(16.8=19.1)' (19.8"22.4) (37.7-45.0) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estlmstes (for a given duration and average recurrence Interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maxsnum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more Information, Back to Too Hydrograph Summary Report I (4 Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume (CUR) Return period (yrs) Inflow hyd(s) Maximum elevation (it) Maximum storage (cuR) Hydrograph description 1 SCS Runoff 2.43 1 722 7,114 1 — — 1-YR,24HR POST DEV 2 Reservoir 0.03 1 1439 1,198 1 1 18.09 5,918 POND Proj. file: 17035 PEB CAM JOH SOF file: NEW, BERNADF TRUn date: 10-17-2017 I 2 - Reservoir -1 Yr - Qp = 0.03 cfs 2.5 2.0 1.5 C3► 1.0 0.5 0.0 0 5 10 15 20 25 Time (hrs) / Hyd. 1 / Hyd. 2 Hydrograph Report Page 1 ' English Hyd. No. 2 POND Hydrograph type = Reservoir Peak discharge = 0.03 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = EXISTING POND Max. Elevation = 18.09 ft Max. Storage = 5,918 cuft smmge malwPon me W u� Total Volume = 1,196 cuff Hydrograph Discharge Table Time Inflow Elevation Clv A. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.80 0.42 17.53 0.00 ----- ----- ----- ----- ----- ----- ----- 0.00 11.90 0.67 17.55 0.00 ----- ----- ----- ----- ----- ----- ----- 0.00 12.00 1.95 17.59 0.00 ----- ----- ----- ----- . ----- ----- ----- 0.00 12.10 1.77 17.67 0.01 ----- ----- ----- ----- ----- ----- ----- 0.01 12.20 1.15 17.72 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.30 0.96 17.76 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.40 0.73 17.79 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.50 0.47 17.81 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.60 0.37 17.82 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.70 0.34 17.84 0.02 ----- ----- ----- ----- ----- ----- - 0.02 12.80 0.31 17.85 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 12.90 0.29 17.86 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.00 0.26 17.87 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.10 0.24 17.87 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.20 0.24 17.88 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.30 0.23 17.89 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.40 0.22 17.90 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.50 0.22 17.90 0.02 -- -- -- - -- - 0.02 13.60 0.21 17.91 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.70 0.20 17.92 0.02 ----- ----- ----- ----- ----- ----- ----- 0.02 13.80 0.20 17.93 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 13.90 0.19 17.93 0.03 ---- ----- ----- ----- ----- ----- ----- 0.03 14.00 0.18 17.94 0.03 ---- ----- ----- ----- ----- ----- - 0.03 14.10 0.18 17.94 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.20 0.17 17.95 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.30 0.17 17.95 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.40 0.16 17.96 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.50 0.16 17.96 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.60 0.16 17.97 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 14.70 0.15 17.97 0.03 ----- ----- ----- ----- -- ----- ----- 0.03 14.80 0.15 17.98 0.03 --- - -- --- - -- - 0.03 14.90 0.15 17.98 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.00 0.14 17.99 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.10 0.14 17.99 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.20 0.13 17.99 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.30 0.13 18.00 0.03 ----- ----- ----- ----- ----- ----- 0.03 Continues on next page POND Hydrograph Discharge Table Page 2 19 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft Cfs Cfs cfs Cfs Cfs Cfs Cfs Cfs cfs 15.40 0.13 18.00 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.50 0.12 18.00 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.60 0.12 18.01 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 15.70 0.11 18.01 0.03 ----- ----- ----- ----- ----- ---- ----- 0.03 15.80 0.11 18.01 0.03 ---- ----- ----- ----- ----- ----- ----- 0.03 15.90 0.11 18.02 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.00 0.10 18.02 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.10 0.10 18.02 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.20 0.10 18.02 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.30 0.10 18.02 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.40 0.09 18.03 0.03 ----- ---- ----- ----- ----- ----- ----- 0.03 16.50 0.09 18.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.60 0.09 18.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.70 0.09 18.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.80 0.09 18.03 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 16.90 0.09 18.04 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.00 0.08 18.04 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.10 0.08 18.04 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.20 0.08 18.04 0.03 ---- ----- ----- ----- ----- ----- ----- 0.03 17.30 0.08 18.04 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.40 0.08 18.04 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.50 0.07 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.60 0.07 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.70 0.07 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.80 0.07 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 17.90 0.07 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.00 0.08 18.05 0.03 ----- ----- ---- ----- ----- ----- ----- 0.03 18.10 0.06 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.20 0.06 18.05 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.30 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.40 0.06 18.06 0.03 ---- ----- ----- ----- ----- ----- ----- 0.03 18.50 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- - 0.03 18.60 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.70 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.80 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 18.90 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.00 0.06 18.06 0.03 ----- ----- ---- ----- ----- ----- ----- 0.03 19.10 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.20 0.06 18.06 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.30 0.06 18.06 0.03 ----- --- ----- ----- ---- ----- ----- 0.03 19.40 0.06 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.50 0.06 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.60 0.06 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.70 0.05. 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.80 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 19.90 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.00 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.10 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.20 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 Continues on next. page... POND Hydrograph Discharge Table Page 3 � )1 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow, (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.30 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.40 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.50 0.05 18.07 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 20.60 0.05 18.07 0.03 ----- ----- ---- ----- ----- ----- ----- 0.03 20.70 0.05 18.08 0.03 ----- ---- ----- ----- ----- ----- ----- 0.03 20.80 '0.05 18.08 0.03 ---- ----- ----- ---- ----- ----- ----- 0.03 20.90 0.05 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 21.00 0.05 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 21.10 0.05 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 21.20 0.05 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 21.30 0.05 18.08 0.03 -- ----- ----- ---- ---- ----- -- 0.03 21.40 0.05 18.08 0.03 ----- ----- ----- ----- ---- ----- ----- 0.03 21.50 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 21.60 0.04 18.08 0.03 ---- ----- ----- --- ----- ----- - 0.03 21.70 0.04 18.08 0.03 ----- ----- ----- ----= ----- ----- ----- 0.03 21.80 0.04 18.08 0.03 ----- ----- ----- ----- ---- ----- ----- 0.03 21.90 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.00 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- - 0.03 22.10 0.04 18.08 0.03 ----- ----- ---- - - - 0.03 22.20 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.30 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.40 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.50 0.04 18.08 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.60 0.04 18.08 0.03 ----- ----- ---- ----- - - 0.03 22.70 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.80 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 22.90 0.04 18.09 0.03 ----- -- ---- ----- ----- ----- - 0.03 23.00 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.10 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.20 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.30 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.40 0.04 18.09 0.03 ---- ----- ----- ----- --- ----- - 0.03 23.50 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.60 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.70 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.80 0.04 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 23.90 0.04 18.09 0.03 ---- ----- ----- ----- ----- ----- --- 0.03 24.00 0.00 18.09 0.03 ----- ----- ----- ----- ----- ----- ----- 0.03 End TR55 Tc Worksheet Hyd. No. 1 1-YR,24HR POST DEVELOPMENT Storm frequency = 1 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 100.0 ft Two-year 24-hr precip. = 4.44 in Land slope = 0.5 % Travel Time ........................................ = 1.8 min Shallow Concentrated Flow Flow length = 25 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 ft/s Travel Time ........................................ = 0.4 min Channel Flow Cross section flow area = 0.0 sqft Wetted perimeter = 0.0 ft Channel slope = 0.5 % Manning's n-value = 0.015 Velocity = 0.00 ft/s Flow length = 0.0 ft Travel Time ........................................ = min Total Travel Time, Tc ........................ = 2.2 min Page 1 ©I Reservoir Report Reservoir No. 1 - EXISTING POND Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation ft ft 0.00 17.50 0.50 18.00 1.00 18.50 1.50 19.00 Contour area Incr. Storage Total storage sqft cuft cult 8,459 0 0 11,116 4,894 4,894 11,993 5,777 10,671 12,764 6,189 16,860 Page 1 English Culvert 1 Orifice Structures (,V Weir Structures ] [C] [D] [A] [B] [C] [D] Rise in = 1.3 0.0 0.0 0.0 Crest Len ft = 6.3 0.0 0.0 0.0 Span in = 1.3 0.0 0.0 0.0 Crest El. ft = 18.50 0.00 0.00 0.00 No. Barrels 0 0 0 Weir Coeff. = 3.00 3.00 0.00 0.00 Invert El. ft = 17.50 0.00 0.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Length ft = 0.1 0.0 0.0 0.0 Multistage = No No No No Slope % = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Cirif. Coeff. = 0.60 0.60 0.60 0.00 Multistage = ----- No No No Tailwater Elevation = 0.00 ft Stage / Storage / Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 0.00 0 17.50 0.00 0.50 4,894 18.00 0.03 1.00 10,671 18.50 0.04 1.50 16,860 19.00 0.05 Mote: All ou to have been analt ed under Inbt and outlet mnb,ol. Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge cfs cfs cfs cfs cfs cfs cfs cfs --- --- --- 0.00 --- --- --- 0.00 - --- 0.00 --- --- --- 0.03 -- --- 0.00 --- --- --- 0,04 --- --- --- 6.66 --- --- --- 6.71 i i For DENR Use ONLY ,IR�] No � Submits,: C— North Carolina Department of Environment and Natural Resources suo�,a NCDENR Request for Express Permit Review FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application acp kage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 826.2964698;alison.davidsonO)ncdenr.gov • Fayetteville or Raleigh Region -David Lee 919-791.4203; daviddeeO,ncdenrgov • Mooresville B Winston Salem Region - Patrick Grogan 704-235.2107 orpatrickgroganoncdenr poy • Washington Region -Lyn Hardison 252-948.3842 or lvn.hardisonOncdenroov • Wilmington Region -Cameron Weaver 910.796-7303orcameron.weaveit2ncelenrgov NOTE.' Project application received after 12 noon will be stamped in the following work day. Project Name: CONSTRUCT CAMP JOHNSON MCCS FEB County: ONSLOW Applicant: COMMANDING OFFICER Company: MCB CAMP LEJEUNE Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28547 Phone: 910-451-2213, Fax: 910-451-2927, Email: NEAL.PAULt?a USMC.MIL Physical Location:NEUSE ROAD CAMP JOHNSON AREA related to this Project SW'__ SW SW NPDES`___ NPDES _ Wo . WQ E&S _ E&S _ Other Project Drains into WILSON BAY waters — Water classification SC, HQW, NSW (for classification see- hffld://portal.ncdenr.org!web "11>slcs(i/classifications) Project Located in WHITE OAK River Basin, Is project draining to class ORW waters? N, within''/, mile and draining to class SA waters Nor within 1 mile and draining to class HOW waters? Y Engineer/Consultant: J. KEVIN AVOLIS, PE Company: AVOLIS ENGINEERING, PA Address: P.O. BOX 15564 City: NEW BERN, State: NC Zip: 28561-_ Phone: 252-633-0068, Fax: _-_- Email: avolisengineering@embargmail.com JUL 3 1 2011 PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE an $_ # JOBS SECTION ONE: REQUESTfNG A SCOPING MEETING ONLY ❑ Seeping Meeting ONLY ❑ DWO, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM A$J YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ IntermitlentlPerennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear it or _acres) El Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Varance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW_ (Provide permit #)] ❑ High Density -Detention Pond _ If Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density-Sio-Retenfion _# Treatment Systems ❑ High Density —SW Wetlands _ It Treatment Systems ❑ High Density -Other _ # Treatment Systems /® MOD:® Major ❑ Minor ElPlan Revision ❑ Redev. Exclusion SW 8080649 (Provide penny#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK # (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scalding and express meeting reyuest) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No DENR use Fee Split for multiple permits: (Check# ) Totai FeeAmounf d SUBMITTAL DATES I Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mal; ❑ Min) S SW (❑ HD, ❑ LD, ❑Gen) $ 401: $ LQS S Stream Deter,..__ $ NCDENR EXPRESS January 2014 Stormwater Narrative Construct PEB, Camp Johnson MC8 Camp Lejeune, North Carolina Construction Contract No. N40085-17-B-0060 Marine Corps Base Camp Lejeune, North Carolina is proposing to construct a new pre-engineered metal building adjacent to the MCCS facilities located off of Neuse Road in the Camp Johnson area of Marine Corps Base, Camp Lejeune. Specifically, it is proposed that a new 5,348 ft.' classroom building with administrative offices be constructed. The facility will be constructed adjacent to the existing facilities in this area. The existing facilities were constructed in 2009. At the time of construction, a Coastal Stormwater Permit was secured. Stormwater Permit SW8 080649 was issued on July 28, 2008. The Stormwater Permit covered the full extent of construction that exists in this area. All the facilities originally designed were constructed including two stormwater retention basins, one for each drainage basin within the original project. The basins been constructed and an engineer certification for the project was submitted in October 2009. The proposed pre-engineered metal building will be constructed within the within the limits of Drainage Area #2 of the original permit. This dlainaee boundary is proposed to be expanded slightly in order to encompass the entire scope of new construction. it is proposed that the drainage area be increased in size by 1,915 ft.' It is proposed that all runoff from the new construction be routed to the existing stormwater retention pond constructed associated with Drainage Basin #2. An additional 5,508 ft.' of new impermeable surfaces will be added to the drainage basin. The percent built -upon resulting from the proposed construction for the drainage basin is 53.64%. As originally designed, Stormwater Retention Basin #2 was constructed with excess capacity; although, no future development was allocated on the project permit. As designed and constructed, the existing Stormwater basin will not require any significant modifications in order to treat the additional runoff generated from the additional impermeable surfaces. In excess of the 1.5 inch runoff volume is contained within the existing Stormwater basin. The stormwater basin is properly sized in accordance with the current Stormwater Rules. It is proposed that the orifice diameter on the outlet structure be modified to ensure that stormwater discharge occurs between the two and five day limits established by the Rules. The project drains to Wilson Bay. This water body has a surface water classification of SC, HOW, NSW and a stream index of 19-14. No wetlands exist within the limits of the proposed project. j....CKSONVIL PROJECTOR 0" SITE 0 V� 4 VVV FLORENCE RD 0�4 mford Landing ON 300 0 150 300 600 GRAPHIC SCALE: 1 300' AVOLIS ENGINEERING, P.A. SITE LOCATION MAP Civil and Environmental Engineering CONSTRUCT PEB CAMP JOHNSON P.O. BOX 15564 NEW BERN. NORTH CAROLINA 28561 MARINE CORPS BASE PHONE: (252) 633-0068 CAMP LEJEUNE, NORTH CAROLINA LICENSE NO. C-0706 ',� � �-oe�s..e,_ I I crx V I � I I I I I a. w�c amrsoxavo � xnnn soma w ww+Wrt. n< o�.c�'sw_ xe,m ra w..w n<war;»,o nmrvmlW V 1 \ 't___ a.�a — z \ - I I art�a� aemnn .vrtuwimnrs.ww,o : r+imn r,.,r amf,m. W s. • urzrcxr,wm __ wwxflrzus ttxls sxmt Cm,.�a.,a fay.. f"Fxt I -^"xx[w n "°\ \ _ ;\\ -'—G' — ' �':2.�_. - _ _--=�,--__—_a =�� - —==7:: e m _ o ..» '- ! Cm9rxn Imfw4�f 1J f1I _ - —.i' £ — I ♦ �I �/ f t � I I � `_ _ I I i II �� wear w.a� � � V � I � A � •� � I I u.w� i rl _ I ILI-- I I V Y "jet III -- I r.;ll �,a� eao-c nsl./ auwc m ra sl slB 4 I 11 \ ______ - I 7 __ ________ _ __I .Mw,e.m wumauumwKuonm �I m,iQe,aowwn,n vmxrem,n +r vu, a r„e ovmi oe w, ra[++•'Bw`aw ,a Iris raid. suss / ------_ ---______�\ i s¢muQ Mara ma mum. nt • � YV IN � I m:w[z mW .I Wn pprs ot4.aimvd"'u<a'� \ / I I I I e,.t rc ra*.a.i a.m .nlm.ra W mwf nlwilp I M, C-3 // — - — - — - — - — - — - — - —___—_—_—_—_—_—__ I STk SOoMIiAlfw�.rs:.�aur'I"'v"':x` ( �IARID:E CORP56ASE CONSTRUCT CAV? OnNSCS Su ^sn un n� rs I(/II4Q Ei::tlILR. Br f1ttlY1. EkYIRFL 4: 1RiiiFaR IK[ML . f.: MS) •a••� �'�. m Weaver, Cameron From: Avolis Engineering, P.A. <avolisengineering@embargmail.com> Sent: Monday,'July 31, 2017 3:27 PM To: Weaver, Cameron Cc: Thomas C Bradshaw Subject: Construct Camp Johnson MCCS PEB Attachments: Stormwater Narrative -Construct Camp Johnson MCCS PEB.pdf; Request for Express Permit Review -Construct Camp Johnson MCCS PEB.pdf; SITE PLAN.pdf; USGS.pdf Good Afternoon Cameron! Please find attached our Request for Express Permit Review for the above referenced project consisting of the following: Request for Express Review Form Stormwater Narrative Site Plan Vicinity Map Thanks and have a great afternoon! Beth Simmons Avolis Engineering, PA 252.633.0068 In r t North Carolina Department of Environmental Quality Pat McCrory Governor September 28, 2015 Mr. Neal Paul, Deputy Public Works Officer MCB Campp LeJeune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: USMC Stormwater Permit Extensions (75 Permits — See Attachment A) Onslow County Dear Mr. Paul: Donald R. van der Vaart Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010, The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. As a result,120 USMC Camp Lejeune permits are impacted. Of the 120 permits, 45 permits have previously been issued extensions and 75 permits have been extended effective today. This is summarized in Attachment A. If you have any questions, need additional copies of the permit or approved plans, please contact Kelly Johnson with DEMLR in the Wilmington Regional Office at (910) 796-7331. Sincerely, 7f Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/kpj: IIIStormwaterlPermits & Pro ectsl Each permit file cc: Ic ae ayor, ayor vraemai only, michael.c.taylor5@usmc.mil) Wilmington Regional 0 ice Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 / Fax: (910) 350-2004 • Internet: http://portal.ncdenr.org/web/Ir/ An Equal Opportunity 1 Affirmative Action Employer —Made in part by recycled paper Attachment A - USMC Projects - Permit Extensions - 9/29/15 1 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Permit Number Permit Version ... Original. Issued - Issued Date Expiration Date New Expiration Date Comments SW8000401 2 05-16-2000 10-13-2009 05-16-2020 05-16-2024 Extended 9/29/15 SW8010420 1.4 07-03-2001 11-07-2005 11-07-2015 11-07-2019 Extended 9/29/15 SW8011222 2 06-06-2002 12-28-2011 06-06-2022 06-06-2026 Extended 9/29/15 SW8030406 1 06-26-2003 06-26-2003 06-26-2013 1 06-26-2017 Extended 9/29/15 SW8030913 1.3 11-18-2003 06-24-2010 09-21-2019 09-21-2023 Extended 9/29/15 SW8040912 1 01-23-2006 01-23-2006 01-23-2016 01-23-2020 Extended 9/29/15 SW8050817 1.1 09-29-2005 12-18-2008 09-29-2015 09.29-2019 Extended 9/29/15 SW8050830 1.1 05-04-2006 06-02-2011 05-04-2016 05.04-2020 Extended 9/29/15 SW8050925 1 03-13-2006 03-13-2006 03-13-2016 03-13-2020 Extended 9/29/15 SW8051018 1.2 12-13-2005 07-30-2009 12-13-2015 12-13-2019 Extended 9/29/15 SW8051065 1 03-14-2006 03-14-2006 03-14-2016 03-14-2020 Extended 9/29/15 SW8060110 1 02-02-2006 02-02-2006 02-02-2016 02-02-2020 Extended 9/29/15 SW8060137 1 03-03-2006 03-03-2006 03-03-2016 03-03-2020 Extended 9/29/15 SW8060147 1 07-13-2010 07-13-2010 07-13-2020 12-31-2021 Extended 9/29/15 SW8060309 1 05-01-2006 05-01-2006 05-01-2016 05-01-2020 Extended 9/29/15 SW8060323 1.2 04-10-2006 10-18-2010 04-10-2016 04-10-2020 Extended 9/29/15 SW8070108 1.2 03-21-2007 01-04-2011 08-19-2019 08-19-2023 Extended 9/29/15 SW8070239 1 03-28-2008 03-28-2008 03-28-2018 12-30-2021 Extended 9/29/15 SW8070708 1 07-16-2007 07-16-2007 07-16-2017 07-16-2021 Extended 9/29/15 SW8070831 1 07-11-2008 07-11-2008 07-11-2018 12-30-2021 Extended 9/29/15 SW8070925 1 10-10-2007 10-10-2007 10-10-2017 10-10-2021 Extended 9/29/15 SW8071034 1.1 12-13-2008 09-23-2010 12-13-2017 03-22-2019 Extended 9/29/15 SW8080126 1 02-06-2008 02-06-2008 02-06-2018 12-31-2021 Extended 9/29/15 SW8080510 1 05-30-2008 05-30-2008 05-30-2018 12-30-2021 Extended 9/29/15 SW8080521 1 06-03-2008 06-03-2008 06-03-2018 12-30-2021 Extended 9/29/15 SW8080522 1.1 06-17-2008 08-11-2011 06-17-2018 11-06-2018 Extended 9/29/15 SW8080649 1 07-23-2008 07-23-2008 07-23-2018 12-30-2021 Extended 9/29/15 SW8080653 1 11-19-2008 11-19-2008 11-19-2018 12-30-2021 Extended 9/29/15 1of5 Attachment A - USMC Proierts - Permit Fxtentiont - 9/79/1 S 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Pe►mit Numbe► Permit Version Original Issued Date Issued Date IExpiration Date New Expiration Date Comments SW8080714 1 07-21-2008 07-21-2008 07-21-2018 12-30-2021 Extended 9/29/15 SW8080715 1 08-01-2008 08-01-2008 08-01-2018 12-30-2021 Extended 9/29/15 SW8080728 1 07-28-2008 07-28-2008 07-28-2018 12-30-2021 Extended 9/29/15 SW8080734 1 08-15-2008 09-15-2008 09-15-2018 12-30-2021 Extended 9/29/15 SW8080927 1 10-21-2008 10-21-2008 10-21-2018 12-30-2021 Extended 9/29/15 SW8080931 1.1 10-09-2008 09-27-2011 10-09-2018 01-12-2019 Extended 9/29/15 SW8080932 1 10-17-2008 10-17-2008 10-17-2018 12-30-2021 Extended 9/29/15 SW8080933 1 10-20-2008 10-20-2008 10-20-2018 12-30-2021 Extended 9/29/15 SW8080936 1 11-03-2008 11-03-2008 11-03-2018 12-30-2021 Extended 9/29/15 SW8080944 1 11-21-2008 11-21-2008 11-24-2018 01-02-2022 Extended 9/29/15 SW8080945 1A 11-06-2008 11-17-2011 11-06-2018 12-20-2018 Extended 9/29/15 SW8080950 1 12-03-2008 12-03-2008 12-03-2018 12-30-2021 Extended 9/29/15 SW8081016 1A 12-03-2008 02-16-2011 12-03-2018 10-17-2019 Extended 9/29/15 SW8081113 1 04-08-2009 04-08-2009 04-08-2019 12-30-2021 Extended 9/29/15 SW8090108 1 04-20-2009 04-20-2009 04-20-2019 12-30.2021 Extended 9/29/15 SW8090116 1 03-18-2009 03-18-2009 03-18-2019 12-30-2021 Extended 9/29/15 SW8090117 1 03-13-2009 03-13-2009 03-13-2019 12-30-2021 Extended 9/29/15 SW8090330 1 04-23-2009 04-23-2009 04-23-2019 12.30-2021 Extended 9/29/15 SW8090407 1 05-12-2009 05-12-2009 05-12-2019 12-30-2021 Extended 9/29/15 SW8090412 1 07-07-2009 07-07-2009 07-07-2019 12-30-2021 Extended 9/29/15 SW8090517 1.1 08-31-2009 08-26-2011 08-31-2019 01-05-2020 Extended 9/29/15 SW8090625 1 07-28-2009 07-28-2009 07-28-2019 12-30-2021 Extended 9/29/15 SW8090632 1 07-02-2009 07-02-2009 07-02-2019 12-30-2021 Extended 9/29/15 SW8090710 1 11-16-2009 11-16-2009 11-16-2019 12-30-2021 Extended 9/29/15 SW8090714 1 09-15-2009 09-15-2009 09-15-2019 12-30-2021 Extended 9/29/15 SW8090810 1 09-04-2009 09-04-2009 09-04-2019 12-30-2021 Extended 9/29/15 SW8090814 1 10-26-2009 10-26-2009 10-26-2019 1230-2021 Extended 9/29/15 SW8090912 1 10-06-2009 10-06-2009 10-06-2019 1 12-30-2021 Extended 9/29/15 2of5 Attachment A - USMC Prnierts - Permit Fxtensinns - 9/29/1 S 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 2 3 4 5 6 7 N Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date - Comments SW8090913 1 10-01-2009 10-01-2009 10-02-2019 12-31.2021 Extended 9/29/15 SW8090918 1 12-01-2009 12-01-2009 12-01-2019 12-30-2021 Extended 9/29/15 SW8091109 1 01-15-2010 01-15-2010 01-15-2020 12-30-2021 Extended 9/29/15 SW8091111 1.1 05-07-2010 03-17-2011 05-07-2020 02-20-2021 Extended 9/29/15 SW8100214 1 05-07-2010 05-07-2010 05-04-2020 12-28-2021 Extended 9/29/15 SW8101106 1 12-09-2010 12-09-2010 12-09-2020 12-31-2021 Extended 9/29/15 SW8921101 1.1 12-16-1992 01-17-2007 01-17-2017 01-17-2021 Extended 9/29/15 SW8950708 2 01-08-1996 02-18-2008 02-18-2018 02-18-2022 Extended 9/29/15 SW8950710 2 10-19-1995 02-19-2008 02-19-2018 02-19-2022 Extended 9/29/15 SW8960103 2 03-07-1996 07-08-2008 07-08-2018 07-08-2022 Extended 9/29/15 SW8960509 2 11-04-1996 06-03-2008 06-03-2018 06-03-2022 Extended 9129/15 SW8970205 2 09-02-1997 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970219 2 10-23-1997 04-14-2010 10-23-2017 10-23-2021 Extended 9/29/15 SW8970408 2 05-15-1997 03-12-2008 03-12-2018 03-12-2022 Extended 9/29/15 SW8970618 1.2 01-28-1998 06-17-2010 09-15-2019 09-15-2023 Extended 9/29/15 SW8970847 2 01-28-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970927 2 06-25-1998 03-07-2008 - 03-07-2018 03-07-2022 Extended 9/29/15 SW8990624 2 10-22-1999 10-09-2009 10-22-2019 10-22-2023 Extended 9/29/15 SW8990848 2 11-01-1999 10-09-2009 11-01-2019 11-01-2023 Extended 9/29/15 SW8010431 1.1 08-08-2001 01-10-2005 01-10-2015 01-10-2019 Previously Extended SW8010640 2 09-18-2001 02-02-2011 09-18-2025 09-18-2029 Previously Extended SW8010817 1.1 03-21-2002 12-16-2002 12-16-2012 12-16.2016 Previously Extended SW8011202 1 06-17-2002' 06-17-2002 06-17-2012 06-17-2016 Previously Extended SW8020113 1.1 06-28-2002 08-20-2009 06-28-2012 06-28-2016 Previously Extended SW8020319 1.1 07-26-2002 11-18-2011 11-18-2021 11-18-2025 Previously Extended SW8020320 1 06-28-2002 06-28-2002 06-28-2012 06-28-2016 Previously Extended SW8020504 1 08-12-2002 08-12-2002 08-12-2012 08-12-2016 Previously Extended SW8020611 1 08-16-2002 08-16-2002 08-16-2012 1 08-16-2018 Previously Extended 3 of 5 Attachmpnt A - IKMC Prniprtc - Permit Fvtpncinnc - Q/)Q/1 S 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 .26 27 28 29 30 31 32 33 34 35 36 37 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8020612 1 08-16-2002 08-16-2002 08-16-2012 08-16-2016 Previously Extended SW8020725 1 11-05-2002 11-05-2002 11-05-2012 11-05-2016 Previously Extended SW8020911 1 12-13-2002 12-13-2002 12-13-2012 12-13-2016 Previously Extended SW8030720 1.3 12-12-2003 12-20-2010 01-26-2015 01-26-2019 Previously Extended SW8060832 1.1 10-06-2006_ 02-16-2007 10-06-2016 10-06-2020 Previously Extended SW8070847 2.1 01-24-2008 12-16-2011 07-11-2018 07-26-2018 Previously Extended SW8070926 1.4 11-16-2007 12-22-2011 11-16-2017 11-16-2021 Previously Extended SW8071213 1 01-28-2008 01-28-2008 01-28-2018 12-31-2021 Previously Extended SW8080206 1 03-13-2008 03-13-2008 03-13-2018 12-30-2021 Previously Extended SW8080301 1.1 04-29-2008 12-11-2008 04-29-2019 05-18-2022 Previously Extended SW8080313 1 04-29-2008 04-29-2008 04-29-2018 12-30-2021 Previously Extended SW8080740 1.1 08-22-2008 12-11-2009 08-22-2018 09-10-2020 Previously Extended SW8080813 1.1 09-25-2008 07-08-2011 09-25-2018 03-20-2019 Previously Extended SW8080907 1.1 10-08-2008 04-07-2010 10-08-2018 07-02-2020 Previously Extended SW8081007 1 12-12-2008 12-12-2008 12-12-2018 12-30-2021 Previously Extended SW8081015 1.2 01-21-2009 04-01-2011 01-20-2019 10-21-2019 Previously Extended SW8081202 1.1 03-06-2009 08-04-2011 03-06-2019 08-02-2019 Previously Extended SW8090630 1.3 02-08-2010 06-01-2011 02-08-2020 09-08-2020 Previously Extended SW8090815 1.1 02-01-2010 04-11-2011 02-01-2020 10-22-2020 Previously Extended SW8090901 1.1 12-14-2009 03-24-2011 12-14-2019 09-21-2020 Previously Extended SW8090925 1.1 10-16-2009 02-01-2011 02-01-2021 12-31-2021 Previously Extended SW8091108 1.1 08-27-2010 10-04-2011 08-27-2020 11-23-2020 Previously Extended SW8091113 1 04-13-2010 04-13-2010 04-14-2020 01-01.2022 Previously Extended SW8100406 1 06-28-2010 06-28-2010 06-28-2020 12-31-2021 Previously Extended SW8100502 1 09-27-2010 09-27-2010 09-27-2020 12-31-2021 Previously Extended SW8100701 1 09-30-2010 09-30-2010 09-30-2020 12-31-2021 Previously Extended SW8960117 2 08-06-1996 02-19-2008 02-19-2018 02-19-2022 Previously Extended SW8960329 2.1 07-09-1996 07-09-2010 02-20-2018 02-20-2022 Previously Extended 4of5 Attachment A - USMC Projects - Permit Extensions - 9/29/15 38 39 40 41 42 43 44 45 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8960501 1.1 09-18-1996 12-08-2004 12-08-2014 12-08-2018 Previously Extended SW8960815 2 10-29-1996 07-14-2008 07-14-2018 07-14-2022 Previously Extended SW8961204 2 06-30-1997 06-20-2008 06-20-2018 06-20-2022 Previously Extended SW8970136 2 02-10-1997 07-08-2008 07-08-2018 07-08-2022 Previously Extended SW8980204 1.1 10-02-1998 07-06-2005 07-06-2015 .07-06-2019 Previously Extended SW8980401 2 10-28-1998 06-03-2008 06-03-2018 06-03-2022 Previously Extended SW8990850 2.1 02-03-2000 12-09-2011 02-03-2020 02-03-2024 Previously Extended SW8991135 1 2 08-09-2000 10-28-2009 08-09-2023 08-09-2027 Previously Extended 5of5