Loading...
HomeMy WebLinkAboutSW8080521_HISTORICAL FILE_20210601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 O8p 52\ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS Lri HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 202\ Olt 01 YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Wednesday, May 26, 2021 9:18 AM To: Barraco CIV Talia M; heather.blackwell@usmc.mil Subject: SW8 080521 - USMCB Second Reconnaissance Battalion The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on May 17, 2021. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 ----------------- Inc iry Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Based on the current guidance to minimize the spread of COVID-ug, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ-office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Non -Transfer Application Completeness Review Checklist - Short Version Project Name: h/$Ad3 —SE(00O TATTA10)Date Delivered to WIRO: 5110/Z02I Project County/Location: OA)S LUJ %MCR BIMS Received/Accepted Date: S j 7..pZj BIMS Acknowledged Datet: Permit Action: New r Not located in the ETl of the following deligated and New Permit #': functioning programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Cnsl: Jacksonville Pend: Surf City Major Mod / Minor Mod Renewal Permit Type: HD D / LD Overall / HD &LD Combo General Permit / Offsite / Exempt Development Type: Commercial / Residential / Other k1L. j3 S C47 Subdivided?: Subdivision or Single LOIi Rule(s): u2017 Coastal �2008 Coastal "1995 Coastal Phase II Universal t 11988 Coastal Permittee Type & Documents Needed: Property Owner(s) MPurchaser Viable? =Viable? Deed Purchase Agmt =Not Subdivided: Deed Subdivision: Common Area Deed Existing Permit#: Jr Gib (*052—j Expriation Date 3: ( 2d '30.12p Z_ ( F-10ffsite to SWB: Ells Lot ID'ed in Master Permit? Lessee =HOA Viable? Viable? Lease =Electioi Paperwork application ee: F--1$505 (within 5mo) Check#(s): Supplement' (1 new form or for older forms: 1 original per SCM) FIO&M' Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided' Project Narrative FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Plans (2 Sets) �PE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. 3if w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: ASt L E,1 0No Fee Y/N Minutes =Developer =Viable? G:WQ\\\Reference Libra ry\Praced ures\Checklists\Compl eten ess Review Checklist 20200131 a R � m r Lo SWP121 SWP122x 3 \ ri SW Pl x '♦O y Q no s �N x. sf SWPiLi / SWP41 `� 0.fl e A, 5 cuN c� enm ma�ovomi sionnr�>: swmieu CWNCLSlo ale"MyS 91 ex �x �x k # `fir{ North Carolina Department of Environmental Quality Pat McCrory Governor September 28, 2015 Mr. Neal Paul, Deputy Public Works Officer MCB Camp Lejeune Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: USMC Stormwater Permit Extensions (75 Permits — See Attachment A) Onslow County Dear Mr. Paul: Donald R. van der Vaart Secretary On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010, The law extends the effective period of any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to four (4) years. As a result, 120 USMC Camp Lejeune permits are impacted. Of the 120 permits, 45 permits have previously been issued extensions and 75 permits have been extended effective today. This is summarized in Attachment A. If you have any questions, need additional copies of the permit or approved plans, please contact Kelly Johnson with DEMLR in the Wilmington Regional Office at (910) 796-7331. Sincerely _ goz Tracy Davis, P.E., Director Division of Energy, Mineral and Land Resources GDS/kpj: 111StormwaterlPermits & Pro ectsl Each permit file cc: Michael Taylor, I ay or via emailonly, michael.c.taylor5@usmc.mil) Wilmington Regional 0 ice Stormwater File Division of Energy, Mineral, and Land Resources Land Quality Section — Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 / Fax: (910) 350-2004 • Internet: http://portal.ncdenr.org/webllr/ An Equal Opportunity 1 Affirmative Action Employer - Made m part by recycled paper Attachment A - USMC Proiects - Permit Extensions - 9/29/15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Permit Number Permit Version Original. IssuedDate Issued Date Expiration Date New Expiration Date - Comments SW8000401 2 05-16-2000 10-13-2009 05-16-2020 05-16-2024 Extended 9129/15 SW8010420 1.4 07-03-2001 11-07-2005 11-07-2015 11-07-2019 Extended 9/29/15 SW8011222 2 06-06-2002 12-28-2011 06-06-2022 06-06-2026 Extended 9/29/15 SW8030406 1 06-26-2003 06-26-2003 06-26-2013 1 06-26-2017 Extended 9/29/15 SW8030913 1.3 11-18-2003 06-24-2010 09-21-2019 09-21-2023 Extended 9/29/15 SW8040912 1 01-23-2006 01-23-2006 01-23-2016 01-23-2020 Extended 9/29/15 SW8050817 1.1 09-29-2005 12-18-2008 09-29-2015 09-29-2019 Extended 9/29/15 SW8050830 1A 05-04-2006 06-02-2011 05-04-2016 05-04-2020 Extended 9/29/15 SW8050925 1 03-13-2006 03-13-2006 03-13-2016 03-13-2020 Extended 9/29/15 SW8051018 1.2 12-13-2005 07-30-2009 12-13-2015 12-13-2019 Extended 9/29/15 SW8051065 1 03-14-2006 03-14-2006 03-14-2016 03-14-2020 Extended 9/29/15 SW8060110 1 02-02-2006 02-02-2006 02-02-2016 02-02-2020 Extended 9/29/15 SW8060137 1 03-03-2006 03-03-2006 03-03-2016 03-03-2020 Extended 9/29/15 SW8060147 1 07-13-2010 07-13-2010 07-13-2020 12-31-2021 Extended 9/29/15 SW8060309 1 05-01-2006 05-01-2006 05-01-2016 05-01-2020 Extended 9/29/15 SW8060323 1.2 04-10-2006 10-18-2010 04-10-2016 04-10-2020 Extended 9/29/15 SW8070108 1.2 03-21-2007 01-04-2011 08-19-2019 08-19-2023 Extended 9/29/15 SW8070239 1 03-28-2008 03-28-2008 03-28-2018 12-30.2021 Extended 9/29/15 SW8070708 1 07-16-2007 07-16-2007 07-16-2017 07-16-2021 Extended 9/29/15 SW8070831 1 07-11-2008 07-11-2008 07-11-2018 12-30-2021 Extended 9/29115 SW8070925 - 1 10-10-2007 10-10-2007 10-10-2017 10-10-2021 Extended 9/29/15 SW8071034 1.1 12-13-2008 09-23-2010 12-13-2017 03-22-2019 Extended 9/29/15 SW8080126 1 02-06-2008 02-06-2008 02-06-2018 12-31-2021 Extended 9/29/15 SW8080510 1 05-30-2008 05-30-2008 05-30-2018 12-30-2021 Extended 9/29/15 SW8080521 1 06-03-2008 06-03-2008 06-03-2018 12-30-2021 Extended 9/29/15 SW8080522 1A 06-17-2008 08-11-2011 06-17-2018 11-06-2018 Extended 9/29/15 SW8080649 1 07-23-2008 07-23-2008 07-23-2018 12-30-2021 Extended 9/29/15 SW8080653 1 11-19-2008 11-19-2008 11-19-2018 12-30-2021 Extended 9/29/15 Iof5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Permit Number Permit Version Original, Issued Date Issued Date ExpirationNew Date Expiration Date Comments SW8080714 1 07-21-2008 07-21-2008 07-21-2018 12.30-2021 Extended 9/29/15 SW8080715 1 08-01-2008 08-01-2008 08-01-2018 12-30-2021 Extended 9/29/15 SW8080728 1 07-28-2008 07-28-2008 07-28-2018 12-30-2021 Extended 9/29/15 SW8080734 1 08-15-2008 09-15-2008 09-15-2018 12-30-2021 Extended 9/29/15 SW8080927 1 10-21-2008 10-21-2008 10-21-2018 12-30-2021 Extended 9/29/15 SW8080931 1.1 10-09-2008 09-27-2011 10-09-2018 01-12-2019 Extended 9/29/15 SW8080932 1 10-17-2008 10-17-2008 10-17-2018 12-30-2021 Extended 9/29/15 SW8080933 1 10-20-2008 10-20-2008 10-20-2018 12-30-2021 Extended 9/29/15 SW8080936 1 11-03-2008 11-03-2008 11-03-2018 1230-2021 Extended 9/29/15 SW8080944 1 11-21-2008 11-21-2008 11-24-2018 01-02-2022 Extended 9/29/15 SW8080945 1.1 11-06-2008 11-17-2011 11-06-2018 12-20-2018 Extended 9/29/15 SW8080950 1 12-03-2008 12-03-2008 12-03-2018 12-30-2021 Extended 9/29/15 SW8081016 1.1 12-03-2008 02-16-2011 12-03-2018 10-17-2019 Extended 9/29/15 SW8081113 1 04-08-2009 04-08-2009 04-08-2019 12-30-2021 Extended 9/29/15 SW8090108 1 04-20-2009 04-20-2009 04-20-2019 12-30-2021 Extended 9/29/15 SW8090116 1 03-18-2009 03-18-2009 03-18-2019 12-30-2021 Extended 9/29/15 SW8090117 1 03-13-2009 03-13-2009 03-13-2019 12-30-2021 Extended 9/29/15 SW8090330 1 04-23-2009 04-23-2009 04-23-2019 12-30-2021 Extended 9/29/15 SW8090407 1 05-12-2009 05-12-2009 05-12-2019 12-30-2021 Extended 9/29/15 SW8090412 1 07-07-2009 07-07-2009 07-07-2019 12-30-2021 Extended 9/29/15 . SW8090517 1.1 08-31-2009 08-26-2011 08-31-2019 01-05-2020 Extended 9129/15 SW8090625 1 07-28-2009 07-28-2009 07-28-2019 12-30-2021 Extended 9/29/15 SW8090632 1 07-02-2009 07-02-2009 07-02-2019 12-30-2021 Extended 9/29/15 SW8090710 1 11-16-2009 11-16-2009 11-16-2019 12-30-2021 Extended 9/29/15 SW8090714 1 09-15-2009 09-15-2009 09-15-2019 12-30-2021 Extended 9/29/15 SW8090810 1 09-04-2009 09-04-2009 09-04-2019 1 12-30-2021 Extended 9/29115 SW8090814 1 10-26-2009 10-26-2009 0-26-2019 i 12-30-2021 Extended 9/29/15 SW8090912 1 10-06-2009 10-06-2009 10-06-2019 12-30-2021 Extended 9/29/15 2of5 Attachment A - USMC Proiects - Permit Extensions - 9/29/15 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 1 2 3 4 5 6 7 8 9 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8090913 1 10-01-2009 10-01-2009 10-02-2019 12-31-2021 Extended 9/29/15 SW8090918 1 12-01-2009 12-01-2009 12-01-2019 12-30-2021 Extended 9/29/15 SW8091109 1 01-15-2010 01-15-2010 01-15-2020 12-30-2021 Extended 9/29/15 SW8091111 1.1 05-07-2010 03-17-2011 05-07-2020 02-20-2021 Extended 9/29/15 SW8100214 1 05-07-2010 05-07-2010 05-04-2020 12-28-2021 Extended 9/29/15 SW8101106 1 12-09-2010 12-09-2010 12-09-2020 12-31-2021 Extended 9/29/15 SW8921101 1.1 12-16-1992 01-17-2007 01-17-2017 01-17-2021 Extended 9/29/15 SW8950708 2 01-08-1996 02-18-2008 02-18-2018 02-18-2022 Extended 9/29/15 SW8950710 2 10-19-1995 02-19-2008 02-19-2018 02-19-2022 Extended 9/29/15 SW8960103 2 03-07-1996 07-08-2008 07-08-2018 07.08-2022 Extended 9/29/15 SW8960509 2 11-04-1996 06-03-2008 06-03-2018 06-03-2022 Extended 9/29/15 SW8970205 2 09-02-1997 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970219 2 10-23-1997 04-14-2010 10-23-2017 10-23-2021 Extended 9/29/15 SW8970408 2 05-15-1997 03-12-2008 03-12-2018 03-12.2022 Extended 9/29/15 SW8970618 1.2 01-28-1998 06-17-2010 09-15-2019 09-15-2023 Extended 9/29/15 SW8970847 2 01-28-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8970927 2 06-25-1998 03-07-2008 03-07-2018 03-07-2022 Extended 9/29/15 SW8990624 2 10-22-1999 10-09-2009 10-22-2019 10-22-2023 Extended 9/29/15 SW8990848 2 11-01-1999 10-09-2009 11-01-2019 11-01-2023 Extended 9/29/15 SW8010431 1.1 08-08-2001 01-10-2005 01-10-2015 01.10-2019 Previously Extended SW8010640 2 09-18-2001 02-02-2011 09-18-2025 09-18-2029 Previously Extended SW8010817 1.1 03-21-2002 12-16-2002 12-16-2012 12-16-2016 Previously Extended SW8011202 1 06-17-2002 06-17-2002 06-17-2012 06-17-2016 Previously Extended SW8020113 1.1 06-28-2002 08-20-2009 j 06-28-2012 06-28-2016 Previously Extended SW8020319 1.1 07-26-2002 11-18-2011 11-18-2021 11-18-2025 Previously Extended SW8020320 1 06-28-2002 06-28-2002 06-28-2012 06-28-2016 Previously Extended SW8020504 1 08-12-2002 08-12-2002 08-12-2012 08-12-2016 Previously Extended SW8020611 1 08-16-2002 08-16-2002 08-16-2012 08-16-2016 Previously Extended 3of5 Attach mPnt A -I KMr Drniartc - Porm it Fvtoncinnc - O/)Oh 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Permit Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8020612 1 08-16-2002 08-16-2002 08-16-2012 08-16-2016 Previously Extended SW8020725 - 1 11-05-2002 11-05-2002 11-05-2012 11-05-2016 Previously Extended SW8020911 1 12-13-2002 12-13-2002 12-13-2012 12-13-2016 Previously Extended SW8030720 1.3 12-12-2003 12-20-2010 01-26-2015 01.26-2019 Previously Extended SW8060832 1.1 10-06-2006 02-16-2007 10-06-2016 10-06-2020 Previously Extended SW8070847 2.1 01-24-2008 12-16-2011 07-11-2018 07-26-2018 Previously Extended SW8070926 1.4 11-16-2007 12-22-2011 11-16-2017 11-16-2021 Previously Extended SW8071213 1 01-28-2008 01-28-2008 01-28-2018 12-31-2021 Previously Extended SW8080206 1 03-13-2008 03-13-2008 03-13-2018 12-30-2021 Previously Extended SW8080301 1.1 04-29-2008 12-11-2008 04-29-2019 05-18-2022 Previously Extended SW8080313 1 04-29-2008 04-29-2008 04-29-2018 12-30-2021 Previously Extended SW8080740 1.1 08-22-2008 12-11-2009 08-22-2018 09-10-2020 Previously Extended SW8080813 1.1 09-25-2008 07-08-2011 09-25-2018 03-20-2019 Previously Extended SW8080907 1.1 10-08-2008 04-07-2010 10-08-2018 07-02-2020 Previously Extended SW8081007 1 12-12-2008 12-12-2008 12-12-2018 12-30-2021 Previously Extended SW8081015 1.2 01-21-2009 04-01-2011 01-20-2019 10-21-2019 Previously Extended SW8081202 1.1 03-06-2009 08-04-2011 03-06-2019 08-02-2019 Previously Extended SW8090630 1.3 02-08-2010 06-01-2011 02-08-2020 09-08-2020 Previously Extended SW8090815 1.1 02-01-2010 04-11-2011 02-01-2020 10-22-2020 Previously Extended SW8090901 1.1 12-14-2009 03-24-2011 12-14-2019 09-21-2020 Previously Extended SW8090925 1.1 10-16-2009 02-01-2011 02-01-2021 12-31-2021 Previously Extended SW8091108 1.1 08-27-2010 10-04-2011 08-27-2020 11-23-2020 Previously Extended SW8091113 1 04-13-2010 04-13-2010 04-14-2020 01-01-2022 Previously Extended SW8100406 1 06-28-2010 06-28-2010 06-28-2020 12-31-2021 Previously Extended SW8100502 1 09-27-2010 09-27-2010 09-27-2020 12-31-2021 Previously Extended SW8100701 1 09-30-2010 09-30-2010 09-30-2020 12-31-2021 Previously Extended SW8960117 2 08-06-1996 02-19-2008 02-19-2018 02-19-2022 Previously Extended SW8960329 2.1 07-09-1996 07-09-2010 02-20-2018 02-20-2022 Previously Extended 4of5 38 39 40 41 42 43 m 45 Attachment A - USMC Projects - Permit Extensions - 9/29/15 Perot Number Permit Version Original Issued Date Issued Date Expiration Date New Expiration Date Comments SW8960501 1.1 09-18-1996 12-08-2004 12-08-2014 12-08-2018 Previously Extended SW8960815 2 10-29-1996 07-14-2008 07-14-2018 07-14-2022 Previously Extended SW8961204 2 06-30-1997 06-20-2008 06-20-2018 06-20-2022 Previously Extended SW8970136 2 02-10-1997 07-08-2008 07-08-2018 07-08-2022 Previously Extended SW8980204 1.1 10-02-1998 07-06-2005 07-06-2015 07-06-2019 Previously Extended SW8980401 2 10-28-1998 06-03-2008 06-03-2018 06-03-2022 Previously Extended SW8990850 2.1 02-03-2000 12-09-2011 02-03-2020 02-03-2024 Previously Extended SW8991135 2 08-09-2000 10-28-2009 08-09-2023 08-09-2027 Previously Extended 5of5 Lewis,Linda From: Lewis, Linda Sent: Friday, January 08, 2010 8:23 AM To: 'Bryan Dick (bryan.dick@earthtech.com)' Subject: PE Certification for Recon Battalion SW8 080521 Contacts: Bryan Dick Bryan: On November 30, 2009, the Division received a Designer's Certification for the subject project from Ken Lacy, PE, who I am assuming works for EarthTech. The certification is a little confusing because in the "noted deviations" section of the form, it only refers to attached revised drainage drawings. The drawings are much too small to be able to read or understand clearly what deviations have occurred. We will need a written out list of the specifics of what has changed. Some deviations may require a permit modification, but without knowing exactly what the deviations are, we can't tell. Thank you for your attention to this matter. Linda Please note my new email address is Linda.Lewis@ncdenr.aov Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. F0FoS2/ AMENDMENT OF SOUCITATIONNOEIMCATION OF CONTRACT I. CONTRACTIDCODE PAGEOF PAGES 1 3 2. AMENDMENIUMODI4CATION NO. 3. EFFECTIVE DATE 4. REQUISITTON/PURCHASE REQ. NO. _ 5. PROJECTNOMspPlieshlc) 03 26-Mar-2009 ACOR734M 6. ISSUED BY CODE INIM 7.ADMITISTEREDBY Motherthwitem(i) CODE NAYFAC MID ATLANTIC - See Poem 6 OFFICER NCRA(1(lEOF CONSTRUCTION MARINE CORPS NSTAt1ATCN3 FAST 1005MCHAELROM AMP L&JE1NE NC 21150- 4t 8. NAME AND ADDRESS OF CONTRACTOR (No., Bred, County, State and Zip Code) 9A. AMENDMENT OF SDLIC717ATION NO. JOsCE&ASBOCIATESCONSMUCTCN NC MNYA POBORI POBDTT 9B. DATED (SEE ITEM 11) NEwPORT NC 29610 X IOA MOD. OF CONTRACr/ORDER NO. N40085-07-D•1808.OD49 X 108. DATED (SEE ITEM 13) 25,Aa►2008 CODE 1TFPo IFAC11TYCDDE II. THIS ITEM ONLY APPLIES TO AMENDMEN'SOF SOLICITATIONS The above anointed solicitation is mended m at lsnh in Item 14. The hour and time spedied for aaipt ofOaf ❑is Wended, Elisnot extended. Oei trust wknowledge mceipt ofthis standout pnorto the hour ad date speciaed in (he mlicitatlon or in amended by one ofthe bllowing nobods: (a) By wopldiag Item g and 15. and returning ofthe a®dmam; (b) By acknowledging nedpt ofthis woudomt on each copy ofthe oar sub ritted; _copies or (c) By scpante Idtaor tdegramwldchinduda a reEsma to the solicitation and wordsmn nunbas, FAILURE OFYOUR ACKNOWLEDOMENTTO BE RECEIVED ATTHE PLACE DESIGNATED MR THE RBt:IIPT'OFOPPBRS PRIOR TOTHE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER Ifby vinue ofthis mendnmt you desire to change an oRralmdy subedtted, such change say be made by telegram Inner, Provided each telegnmor Iota makes heb to the solicitation and this a®damt, and is received prior to theopening hourand due spoiled. 12. ACCOUNTING AND APPROPRIATION DATA (If required) See Schedule 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF OONTRACTSrORDERS IT MODIFIES THE ODNTRACTAORDER NO. ASDESCRIBED IN ITEM 14. -„ A. THIS CHANCE ORDER IS ISSUED PURSUANT TO: (SImify authority) THE CHANCES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM IOA. IK„) B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (mach as changes in paying office, appropriation date, tic.) SET FORTH IN ITEM 14,PURSUANT TO THE AUTHORITY OF FAR 43.103(B). X C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR QauBe 52.243.4, atengess D. OTHER (Specify type of motlifcation and authority) E. IMPORTANT: Contractor is not, ❑X is rtgired to sign this doorman and return I copiea to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Orpn'ized by UCF x ion headngs, inclufing snlicitation/mnlract dbjad meter where feasible.) Modification Control Norther: aloWkI9082127 Racon Platoon hlerim FBcNtles (OB0031) DSON CONTINUED I7s1: Mchael W Carr. Darrel L Coster Travelers Oasualy & Surety Co. of Anwica One Tow or Square, Hartford Cr 06183 Ea M Tech 701 Corporate Cantor Drive, SLO 475, Raleigh NO 27607 grep.w addm0ear8dech.com Esapt as provided level n, all tend and conditions ofthe dawmnt attend in Joun9A or IOA, as hemo6m changed, remains unchanged and in bll bra and elect. 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) TNERGAM. CRUMP/CONIWLT SPECMIIST TEL (M*I-2W EXT= EMAL Iaraamarperaayrdl 15B. CONTRACTOR/OFFEROR 15C DATE SIGNED 168. UNITED STATFSOF AMERICA 16C. DATE SIGNED BY 27-Mar-2009 (Signature of person authorized to sift) (Signature of Contracting Officer) EXCEPTION TO SF 30 30-105-04 STANDARD FORM 30 (Rev. 1"3) APPROVED BY OIRM 11-84 Premenbed by (SA FAR (48 CFR) 53.243 ANUMNO NP OF 8OIJC1TATION/MODMCAnON OF CONTRACT 1'ODxiRM.Tm� PAt18oP PAGO . J 2.AN-OKWOMMODYWATM NO. m1mM DATE 2&MI4= 4.89601m11[M TUltCHAM1G3%M& ACOOmm I.FROmCTNO4lr"Ok 4 6. 06Um BY ODDS MINE 7.AD1QUF!l! mBY Room Om Nm6) ODa NORM MDXnA1ID OFFCM M � P camBmwION SN IIRIn (f 1t18 oapvsxasrimnapmtwt7 1®t8011A<1101D O/I/lER1 mcmw1t1 8. NA8B AND ADF3 =OF oOM ACPUR (No.. Bttml. Cbot7. &Aft =dZlp C)de) 9A. ANOOMOAMIT OPSOUCTFATION.M. 9& DATED (SHE ]TM 11) MHMNIWIO POMM NNFm "CM5O X P110�607-01Y06401B TAR�tiO. X to& DATED (8ffi IP®1 13) 4b,1BF = CODE FO 11.THI MSM(DLYAPPLMTOAB A'8OPmuaTATIOM mmemhrmrWWaermmltdrrmObYol4. 7Mhowmd dmt/poldtrdyt af06 �hrmld �r.aamdea. O!r oat odooeladp model oftwe mdmt plor to 1b hmv rd dmt grlad b Oo mI W utlm a m mwmied b7 an MM DDONrB mdhmt: WBymgYbgll�Imd lS, and tomwlq mplsaMoemdoml;OlBl dmmhlgbg mldq oAW madortmeo0 oegehbaRrmldnad; a W B/ ammo Wwattoyrdl3 hdeb�tohramlLmBdlmrwed mmtaetmot6r. PAR.U�t)PYOURAl7QlOwL�1f10 RBGWY®ATTI® MCEmnaltATEDFOB7imMMPIOPOMUMDR10r,MMtMAND DA79WOMMMAYMMTM RMBCWN OPYDUROMM Irby IlmleetW7 mlmdmt7m dmlmmdm pm e6dr0'weehld.wmdmW mO he mtohy tdgYmwletto; 1mrNd re hdyl�w Imm e� mrmm m tho )eRdNdae and dto mrdewl. and r mdwd 9dw m ho � hom otl dm s7adhtd. 12. AODOUHfDUAND APPRM40ATMN DATA (It mq*4 EBR Odwdda 13. T169ITEM APPIJWGWY TO MODUgCATMM(IFCDMRACr8DFMM fr MODEi88THE OoRrRAC[AIMNO. A90B9NIFIND IN ITEM 14. A TW QIAMW OD81t MFBD PURSUANT TR (wiry mthaky) THB OWAM MT FORTH IN ITEM 14 ARE MADE IN THE CUNTRACr OROBRND. DI IT M to& & TIM ABOVE NUAERRI® 0014fRACTMOM ISMODUM TO R®iPCf THE AUMDMSrMTIWCHAN=(such ad—pe in pryW ofRm, Wrapistim dRe. to.) SBf FORTH IN IT r 14. reUR W f TOTHE Atn'FIDRfl'Y OFFAR 43.1 C TMSSLVVLMWUWAL ACEEMI NT FBENrMMUM PUIWAKr TO AU HON]TY OP. X FARMMRMKDWWB A OTI®t (*ocjf� type of moAlmAjoo andmthndly) &DAPORTANT: Mueaor ❑ boot. a btwphedtodpthh& mWmdralm I mpb to toe kmbS CBS= 14. DONSM'f ION OF AMMMU ir/MODIRCATICN MMm and Iq DO' omtbe 6sAnµ kandei wbdu oouw l Nowd mite whore (mtb.) . MoM the Ombol Iftft t bWVmOB2127 Flom RM= IelelhnFmMn(O=M) DBON CONiri!® or1: Ma1rt walr. OBltt � tLolr Tmvdrs Owu* 8 &K* Om d Amwba Ow TWw 84m. Holard Cr0B183 MM 71:h Tot owpma O ft Oka, EBM47B1 Adigh NO2M w%wOft OemBtlmflnoln Bmvt m Ferldodhae.oll mim ad mmtltlem odlhedooemtrokmmd bOr9A or 10A.0 htmohtedlm8e6mmbo m hw4w and IN fall Dmmdmad. 15A. NAMR AND TITLE OPS CM(Type or pdot) 16A. NAM�IJIU1jRLE1)F,(>p FPACTImoFAOO((Typs or print) �liNTgA M. �HUIYII Robert E. Bittner, Jr. Vice Presid 15K ISC DATE SKMED 1611. ATffi 16C DATE 9OJED 3/27/99 ;IV(SWIomorONwsaWOffhm) 3 d7d9 (Bimmofpma to ) WOCurrmmToaFju 30-105-04 3PANDARD FMM 30 (Ray. 10-93) APPROVED BY OMM 1-84 Pt'miled by 08A PAR (48 CM 53243 N40085-07-D-1908 0D4903 Page 2 of 3 SECTION SF 30 BLOCK 14 CONTINUATION PAGE SUMMARY OF CHANGES Acceptance of this modification by the contractor constitutes an accord and satisfaction and represents payment in full for both time and money for any and all costs, impact effect, and for delays and disruptions arising out of, or incidental to, the work as heroin revised. The contractor shall accomplish the changes as follows: PCO # 03 Revise storm water management and erosion control per A/E guidance. See attached A/E correspondence and revised drawing sheets: C-2, C-3, C-4, & C-7. TIME: 30 calendar days All other terms and conditions remain unchanged. SEE ATTACHED CONSENT OF SURETY. SECTION A - SOLICITATION/CONTRACT FORM The total cost of this contract was increased by $75,907.00 from $1,494,001.00 to $1,559,908.00. SECTION B - SUPPLIES OR SERVICES AND PRICES CLIN 0002 The pricing detail quantity has increased by 75,907.00 from 1,484,001.00 to 1,559,908.00. The total cost of this line item has increased by $75,907.00 from $1,484,001.00 to $1,559,908.00. SECTION F - DELIVERIES OR PERFORMANCE The following Delivery Schedule item for CLIN 0002 has been changed from To: DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC 05-APR-2009 1,484,001 N/A FOB: Destination DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC N40085-07-D-1908 004903 Page 3 of 3 05-MAY-2009 1,559,908 N/A FOB: Destination SEMON G - CONTRACT' ADMINISTRATION DATA Accounting and Appropriation Summary for the Payment Office As a result of this modification, the total forded amount for this document was increased by $75,907.00 from $1,494,001.00 to $1,559,908.00. SUBCLIN 000201: AA: 17 07081206 25710323 05205 0 068732 2A 071908 AA00L0017587 (CM, ) was increased by $75,907.00 from $1,484,001.00 to $1,559,908.00 (End of Summary of Changes) Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST From: Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST Sent: Monday, December 22, 2008 8:59 AM To: 'Randy Dodge' Cc: Coster, Daniel CIV NAVFAC Atlantic, ROICC JAXNCA Subject: FW: RECON comments Attachments: RFP 22DEC08.pdf; Level Spreader Revisions.pdf iee, be, RFP 22DECO8.pdf Level Spreader (42 KB) Revisions.pdf (... Randy, Please find attached the A/E's guidance wart to the concerned Fri.'s. A formal RFP is also attached. We welcome your response. Let me know if you have any questions or concerns. V/R, Michael W. Carr LT, CEC, USN Project Engineer OICC Marine Corps Installations East ------------------------------------------ (910) 451-2581 ext 5274 DSN 451-2581 ext5274 michael.w.carr@navy.mil -----Original Message ----- From: Jenkins, Bill (mailto:Bill.Jenkins@aecom.com] Sent: Friday, December 19, 2008 17:20 To: Marshburn CIV Brian R; Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST Cc: Burnet, Gil Subject: RECON comments Brian and Mike: Response to comments as noted below and revised plan attached 1. Provide/ or modify existing valve box for access to the existing Blow off Valve in the new parking area adjacent to Courthouse Road, detail pending. RESPONSE: We have determined that top of the box can be raised to match the pavement elevations. A separate detail will be provided. 2. Modify existing propane tank concrete slab so that rain water will not gather and stand on it, detail pending. RESPONSE: Remove existing tank, overlay the existing concrete pad with a 3" to 4" concrete overlay, matching the elevations of existing and proposed asphalt paving and slope to provide positive drainage. Replace tank and extend propane lines, if needed. 3. Provide the additional work indicated on the "Permit' set of C-Sheets. C-Sheets to be modified as discussed to salvage as much of the work placed per the "Contract" set of drawings as practical. Modifications discussed are: a. Rock/ Clay lined drainage swales from concrete flumes to splitter boxes, detail pending. RESPONSE: modify existing "V" ditch from the concrete flume to the flow splitter box with a 2' wide base ditch and line with permanent soil reinforced matting (per NCDOT spec's) or rip rap and filter fabric. Place rip rap and filter fabric at the outlet of the concrete flume (see attached plans for locations and details) b. Remove and provide redesigned splitter boxes, detail pending. RESPONSE: Given that the flow splitter boxes were not built to the permitted elevations and must be removed, we have provided in the attached plan sheets details for revised splitter boxes that should provide additional function than the original details. c. Modify placed concrete level splitters, detail pending. RESPONSE: The inlet side of the level spreader shall have a saw -cut section with elevations to match the' V" ditch entering the level spreader. The saw cut section will have a I'wide opening with 4:1 side slopes. The bottom of the 1" wide area should be a minimum of 6" below the ditch elevation to allow rip rap and filter fabric to be placed at the invert. In addition, a saw cut 1' by 2' rectangle shall be made in the bottom of the level spreader to allow for drainage. The locations of the saw cut hole should be approximately 5' from each end and then 25' on center throughout the length of the level spreader. Class 57 stone shall be placed in the holes to allow for drainage. See the attached details. d. Rock check dams to be modified to remain, detail pending. RESPONSE: The rock check dams are for erosion control during construction. The majority of the site is already finished and seeded. At this time the rock check dams are not needed. Additional comments: 1. The "v" ditches from the flow splitters to the level spreaders can remain. The contractor shall verify that the ditches provide positive slope 2. I believe a question was raised about providing information about a proposed propane tank for the PEB. Electric unit heaters are shown in the plans and a propane tank is not required for the PEB. 3. The "V" ditch at the PEB site to the splitter box can remain. Please don't hesitate to call if you have any questions or need additional information. If needed, we can be on site when the first splitter box is built to review and see if it is being built correctly. Bill Jenkins, PE, RLA EARTH TECH / AECOM 701 Corporate Center Drive Suite 475 Raleigh, NC 27607 Telephone:919.854.6228 Fax: 919.854.6259 Mobile: 919.623.0276 email: bill.jenkins@aecom.com . ILL a To-...E no.. T. TIT EDIT IT .....sT .......a.J 71 ITI ..Qm� T. ,� EE.a III a. WTw $ .... .. __ T.Ta�ss..r.i ""OT1 AID zTuin'E ,.. BEET.0 TE..ITa. ..ru.Tay`a'w.°E5wS0"i.�.:.v"...°IT"E"rTle �`In,T.. "uo `a°u �l _ : TTLIIL Owa.a Uvu .�o'.e".T°a."':T. Ems. T...I'T M T&MY 1Ta"°"'w� ,:.n 1T Eo-T+ i.e ,,.1 .n _ �..Et a`:.➢`.T.nOu TIT sm.nuc ..w . uEz.1 OR .'EDw z w�0"uE .":.IaaOF 1 e o IO I: `mim .. .. . "uo°"`:u,IALI 1. .T..`..`m:.. o To OF.E.�.•'c "EWE T6TT u. � :I�RE' W.TT.LWYME"�T s' 1"'I a OISI-TTTIT. "T.awe :m TTI.:u...w I—T a.am �i IT 'ter- __ ,'•, ___ TO IT IT IT V. I IV I IT COW ur IT IF I IT i� mrve:uav�a i W 7 " a EarthTech ;; „ ,,.,, C-2 °MARINE CORPS BASE RECON PLATOON _ INTERIM FACILITIES AT COURTHOUSE BAY -7- TYPICAL SECTION- COURTHOUSE ROAD PARKNG LOT SITE PLAN 'It'v 71 A. 7 j: GRADING PLAN ig) EarthTech .... .... C .-3 - I MARINE CORPS BASE CR� RECON PLATOON INTERIM FACILITIES AT COURTHOUSE BAY 80091 n�M —RHnYF'8�L°Ml.� BOLLARDyOETAIL o, d&rot .UNL OF BUILDING MRON XX�vy[ ' GRNss swALF DBtuL GRAPHIC SCALES o o m a eo 0 DETAIL OF INFILTRATION BASIN /�,1 .1. SECTION A -A INFILTRATION BASIN emit r�.vei� PLAN oav no.. oaf wu1 SECTION E-E - INLET . Mram DETAIL OF BYPASS FLOW OUTLET LEVEL SPREADER MtS SECTION VIEW OF EXISTING LEVEL SPREADER --- --- ---- ------ -- ---- — SECTION B-BB wuwm win PLAN VIEW OF EXISTING LEVELSPREADER (BOTTOM ONLY SHOWN) FLOW SPLITTER NARRATIVE INFILTRATION BASIN TABLES roarrouttnawwu By a..u... 2 3 l 5 6 7 2, 1,l (ft) 11.75 11.75 11,50 low low 17.36 15.30 ln.n ON t. B.,n (9) l050 10.25 lum 9.00 1 C WmrGast Ebwllon(ft) ii.w 11.. li.m 10,00 0 Bypass Flow OUM lmn (ft) 10.70 10.70 li'm 9.50 I ig) EarthTech joe... .... C-7 11 I I MARINE CORPS BASE 11 80091 REPORT NUMBER H18M3R51 OBLIGATION AUTHORITY (OA) REQUEST PAGE : 1 SUBMITTED BY MICHAEL CARR ATLANTICE3 AS OF: 25 FEB 09 ROLE CODE WC: ACICL _________________________________ _____________________________________________ TIME : 08:26:58 USER CODE G STD DOC NO: N4008507DI908 DO: 0049 MOD/AMD: PC: 000003 OPT: FUND USAGE: 344409 ACT DOC NO 0708MCN1206MAJ DESCRIPTION: REVISE STORM WATER MANAGEMENT AND EROSION CONTROL REASON CODE: DSGN -CA REQUEST 102419 REQUESTOR: M CARR CA DESC ACRN APPROPRIATION SBHD O/C BUCON S/A AAA T/T PAA COST CODE ____ _____________ REQUEST AMOUNT ____ ____ _____ ___ ______ ___ ______ ____________ AA 17 07081206 2571 0323 05205 0 068732 2A 071908 AAOOL0017587 $ _________ 75, 907.00 SIOH AMOUNT: $ 4,327.00 APPROVALS: USER CODE WC ROLE APPROVAL STATUS COMMENTS APPROVER NAME DATE G ABMCI APV M LAEELLE 09/02/20 G LFM10 APV L HARRIS 09/02/20 G LFM10 APV F ANNUNZIATA 09/02/23 FINAL APPROVER . NOTES: (NOTEBOOK) _________ ____ _ANT CG_ROT __,.&84-9-06.27-_ _ ___ _... ._ FUNDS REQ $75,907.00 CONTRACT # 07-1908 T.O 0049; RECON PLTN INTM FAC PROJECT-4 LE-15-P1229 THE PROPOSED CHANGE IS PROPERLY WITH -IN CONTRACT. SCOPE AND REQUIRED TO COMPLETE THE CONTRACT AS ORIGINALLY AWARDED. FUNDING FOR THI CHANGE IS PROPERLY CHARGEABLE TO THE APPROPRIATION AND YEAR ORIGINALLY FINANCING THE AWARD. MNT-OA-COM-RQT 09FEB20 12:04 NLDMXL JUST: PROVISIONS WERE DESIGN INTO PROJECT THAT SHOULD HAVE SATISFIED THE STATE WATER CONTROL BOARD, HOWEVER, AFTER REVIEW OF DESIGN SYSTEM, STATE REQUIRES ADDITIONAL WORK TO SATISFY PERMIT REQUIREMENTS MNT-OA-COM-RQT 09FEB20 13:51 NLDLOH---------_______ JUSTIFICATION APPROVED BY S BEALE 2-20-09 ILCH) - ASSOCIATED FUNDING DETAIL - WORK AUTH FUND FUND CUST JOB JO WORK EXP F/ HNIS ACRN PKG/ITEM NUM AUTH ID TYP NUM ACRN ORDER ACRN CENTER ELE SF CAT ____ __________ ______ ____________________ ___ ______ ____ ______ ____ ______ AA 21043/1 17587 M670011229 ALL 63423 ___ __ ---- ••• E N D O F R E P O R T •*`