HomeMy WebLinkAboutSW8080521_HISTORICAL FILE_20210601STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 O8p 52\
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
Lri HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
202\ Olt 01
YYYYMMDD
Burd, Tina J
From:
Burd, Tina J
Sent:
Wednesday, May 26, 2021 9:18 AM
To:
Barraco CIV Talia M; heather.blackwell@usmc.mil
Subject:
SW8 080521 - USMCB Second Reconnaissance Battalion
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on May 17, 2021. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
-----------------
Inc iry
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Based on the current guidance to minimize the spread of COVID-ug, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered
shifts. To accommodate these staffing changes, all DEQ-office locations are limiting public access to appointments only. Please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.
Non -Transfer Application Completeness Review Checklist - Short Version
Project Name: h/$Ad3 —SE(00O TATTA10)Date Delivered to WIRO: 5110/Z02I
Project County/Location: OA)S LUJ %MCR BIMS Received/Accepted Date: S j 7..pZj
BIMS Acknowledged Datet:
Permit Action: New r
Not located in the ETl of the following deligated and New Permit #':
functioning programs:
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Cnsl: Jacksonville
Pend: Surf City
Major Mod / Minor Mod Renewal
Permit Type: HD D / LD Overall / HD &LD Combo
General Permit / Offsite / Exempt
Development Type: Commercial / Residential / Other k1L. j3 S C47
Subdivided?: Subdivision or Single LOIi
Rule(s): u2017 Coastal �2008 Coastal "1995 Coastal
Phase II Universal t 11988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) MPurchaser
Viable? =Viable?
Deed Purchase Agmt
=Not Subdivided: Deed
Subdivision: Common Area Deed
Existing Permit#: Jr Gib (*052—j
Expriation Date 3: ( 2d '30.12p Z_ (
F-10ffsite to SWB:
Ells Lot ID'ed in Master Permit?
Lessee =HOA
Viable? Viable?
Lease =Electioi
Paperwork
application
ee: F--1$505 (within 5mo) Check#(s):
Supplement' (1 new form or for older forms: 1 original per SCM)
FIO&M'
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided'
Project Narrative
FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?:
Plans (2 Sets)
�PE Certification
Electronic Copies
Easements, Recorded (2017 Rules)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates.
3if w/in 6 months and they are requesting a mod, STOP. Needs a renewal first.
EMAILED ENGINEER DATE: Comments:
REVIEWER NAME: ASt L E,1
0No Fee
Y/N
Minutes
=Developer
=Viable?
G:WQ\\\Reference Libra ry\Praced ures\Checklists\Compl eten ess Review Checklist 20200131
a R
� m
r
Lo
SWP121
SWP122x
3 \
ri
SW Pl
x '♦O y Q
no s �N
x.
sf
SWPiLi /
SWP41 `� 0.fl
e A,
5
cuN c� enm ma�ovomi sionnr�>:
swmieu
CWNCLSlo ale"MyS 91 ex
�x �x
k
# `fir{
North Carolina Department of Environmental Quality
Pat McCrory
Governor
September 28, 2015
Mr. Neal Paul, Deputy Public Works Officer
MCB Camp Lejeune
Building 1005 Michael Road
Camp Lejeune, NC 28547
Subject: USMC Stormwater Permit Extensions (75 Permits — See Attachment A)
Onslow County
Dear Mr. Paul:
Donald R. van der Vaart
Secretary
On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by
the Division of Energy, Mineral and Land Resources under Article 21 of Chapter 143 of the General Statutes, which is
current and valid at any point between January 1, 2008, and December 31, 2010, The law extends the effective period of
any stormwater permit that was set to expire during this time frame up to three (3) years from its current expiration date.
On August 2, 2010, the Governor signed Session Law 2010-177, which granted an extra year for an extension of up to
four (4) years.
As a result, 120 USMC Camp Lejeune permits are impacted. Of the 120 permits, 45 permits have previously been
issued extensions and 75 permits have been extended effective today. This is summarized in Attachment A.
If you have any questions, need additional copies of the permit or approved plans, please contact Kelly Johnson with
DEMLR in the Wilmington Regional Office at (910) 796-7331.
Sincerely _
goz Tracy Davis, P.E., Director
Division of Energy, Mineral and Land Resources
GDS/kpj: 111StormwaterlPermits & Pro ectsl Each permit file
cc: Michael Taylor, I ay or via emailonly, michael.c.taylor5@usmc.mil)
Wilmington Regional 0 ice Stormwater File
Division of Energy, Mineral, and Land Resources
Land Quality Section — Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405
(910) 796-7215 / Fax: (910) 350-2004 • Internet: http://portal.ncdenr.org/webllr/
An Equal Opportunity 1 Affirmative Action Employer - Made m part by recycled paper
Attachment A - USMC Proiects - Permit Extensions - 9/29/15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Permit Number
Permit
Version
Original.
IssuedDate
Issued Date
Expiration
Date
New Expiration Date
-
Comments
SW8000401
2
05-16-2000
10-13-2009
05-16-2020
05-16-2024
Extended 9129/15
SW8010420
1.4
07-03-2001
11-07-2005
11-07-2015
11-07-2019
Extended 9/29/15
SW8011222
2
06-06-2002
12-28-2011
06-06-2022
06-06-2026
Extended 9/29/15
SW8030406
1
06-26-2003
06-26-2003
06-26-2013
1 06-26-2017
Extended 9/29/15
SW8030913
1.3
11-18-2003
06-24-2010
09-21-2019
09-21-2023
Extended 9/29/15
SW8040912
1
01-23-2006
01-23-2006
01-23-2016
01-23-2020
Extended 9/29/15
SW8050817
1.1
09-29-2005
12-18-2008
09-29-2015
09-29-2019
Extended 9/29/15
SW8050830
1A
05-04-2006
06-02-2011
05-04-2016
05-04-2020
Extended 9/29/15
SW8050925
1
03-13-2006
03-13-2006
03-13-2016
03-13-2020
Extended 9/29/15
SW8051018
1.2
12-13-2005
07-30-2009
12-13-2015
12-13-2019
Extended 9/29/15
SW8051065
1
03-14-2006
03-14-2006
03-14-2016
03-14-2020
Extended 9/29/15
SW8060110
1
02-02-2006
02-02-2006
02-02-2016
02-02-2020
Extended 9/29/15
SW8060137
1
03-03-2006
03-03-2006
03-03-2016
03-03-2020
Extended 9/29/15
SW8060147
1
07-13-2010
07-13-2010
07-13-2020
12-31-2021
Extended 9/29/15
SW8060309
1
05-01-2006
05-01-2006
05-01-2016
05-01-2020
Extended 9/29/15
SW8060323
1.2
04-10-2006
10-18-2010
04-10-2016
04-10-2020
Extended 9/29/15
SW8070108
1.2
03-21-2007
01-04-2011
08-19-2019
08-19-2023
Extended 9/29/15
SW8070239
1
03-28-2008
03-28-2008
03-28-2018
12-30.2021
Extended 9/29/15
SW8070708
1
07-16-2007
07-16-2007
07-16-2017
07-16-2021
Extended 9/29/15
SW8070831
1
07-11-2008
07-11-2008
07-11-2018
12-30-2021
Extended 9/29115
SW8070925 -
1
10-10-2007
10-10-2007
10-10-2017
10-10-2021
Extended 9/29/15
SW8071034
1.1
12-13-2008
09-23-2010
12-13-2017
03-22-2019
Extended 9/29/15
SW8080126
1
02-06-2008
02-06-2008
02-06-2018
12-31-2021
Extended 9/29/15
SW8080510
1
05-30-2008
05-30-2008
05-30-2018
12-30-2021
Extended 9/29/15
SW8080521
1
06-03-2008
06-03-2008
06-03-2018
12-30-2021
Extended 9/29/15
SW8080522
1A
06-17-2008
08-11-2011
06-17-2018
11-06-2018
Extended 9/29/15
SW8080649
1
07-23-2008
07-23-2008
07-23-2018
12-30-2021
Extended 9/29/15
SW8080653
1
11-19-2008
11-19-2008
11-19-2018
12-30-2021
Extended 9/29/15
Iof5
Attachment A - USMC Proiects - Permit Extensions - 9/29/15
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Permit Number
Permit
Version
Original,
Issued Date
Issued Date
ExpirationNew
Date
Expiration Date
Comments
SW8080714
1
07-21-2008
07-21-2008
07-21-2018
12.30-2021
Extended 9/29/15
SW8080715
1
08-01-2008
08-01-2008
08-01-2018
12-30-2021
Extended 9/29/15
SW8080728
1
07-28-2008
07-28-2008
07-28-2018
12-30-2021
Extended 9/29/15
SW8080734
1
08-15-2008
09-15-2008
09-15-2018
12-30-2021
Extended 9/29/15
SW8080927
1
10-21-2008
10-21-2008
10-21-2018
12-30-2021
Extended 9/29/15
SW8080931
1.1
10-09-2008
09-27-2011
10-09-2018
01-12-2019
Extended 9/29/15
SW8080932
1
10-17-2008
10-17-2008
10-17-2018
12-30-2021
Extended 9/29/15
SW8080933
1
10-20-2008
10-20-2008
10-20-2018
12-30-2021
Extended 9/29/15
SW8080936
1
11-03-2008
11-03-2008
11-03-2018
1230-2021
Extended 9/29/15
SW8080944
1
11-21-2008
11-21-2008
11-24-2018
01-02-2022
Extended 9/29/15
SW8080945
1.1
11-06-2008
11-17-2011
11-06-2018
12-20-2018
Extended 9/29/15
SW8080950
1
12-03-2008
12-03-2008
12-03-2018
12-30-2021
Extended 9/29/15
SW8081016
1.1
12-03-2008
02-16-2011
12-03-2018
10-17-2019
Extended 9/29/15
SW8081113
1
04-08-2009
04-08-2009
04-08-2019
12-30-2021
Extended 9/29/15
SW8090108
1
04-20-2009
04-20-2009
04-20-2019
12-30-2021
Extended 9/29/15
SW8090116
1
03-18-2009
03-18-2009
03-18-2019
12-30-2021
Extended 9/29/15
SW8090117
1
03-13-2009
03-13-2009
03-13-2019
12-30-2021
Extended 9/29/15
SW8090330
1
04-23-2009
04-23-2009
04-23-2019
12-30-2021
Extended 9/29/15
SW8090407
1
05-12-2009
05-12-2009
05-12-2019
12-30-2021
Extended 9/29/15
SW8090412
1
07-07-2009
07-07-2009
07-07-2019
12-30-2021
Extended 9/29/15 .
SW8090517
1.1
08-31-2009
08-26-2011
08-31-2019
01-05-2020
Extended 9129/15
SW8090625
1
07-28-2009
07-28-2009
07-28-2019
12-30-2021
Extended 9/29/15
SW8090632
1
07-02-2009
07-02-2009
07-02-2019
12-30-2021
Extended 9/29/15
SW8090710
1
11-16-2009
11-16-2009
11-16-2019
12-30-2021
Extended 9/29/15
SW8090714
1
09-15-2009
09-15-2009
09-15-2019
12-30-2021
Extended 9/29/15
SW8090810
1
09-04-2009
09-04-2009
09-04-2019
1 12-30-2021
Extended 9/29115
SW8090814
1
10-26-2009
10-26-2009
0-26-2019
i
12-30-2021
Extended 9/29/15
SW8090912
1
10-06-2009
10-06-2009
10-06-2019
12-30-2021
Extended 9/29/15
2of5
Attachment A - USMC Proiects - Permit Extensions - 9/29/15
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
1
2
3
4
5
6
7
8
9
Permit Number
Permit
Version
Original
Issued Date
Issued Date
Expiration
Date
New Expiration Date
Comments
SW8090913
1
10-01-2009
10-01-2009
10-02-2019
12-31-2021
Extended 9/29/15
SW8090918
1
12-01-2009
12-01-2009
12-01-2019
12-30-2021
Extended 9/29/15
SW8091109
1
01-15-2010
01-15-2010
01-15-2020
12-30-2021
Extended 9/29/15
SW8091111
1.1
05-07-2010
03-17-2011
05-07-2020
02-20-2021
Extended 9/29/15
SW8100214
1
05-07-2010
05-07-2010
05-04-2020
12-28-2021
Extended 9/29/15
SW8101106
1
12-09-2010
12-09-2010
12-09-2020
12-31-2021
Extended 9/29/15
SW8921101
1.1
12-16-1992
01-17-2007
01-17-2017
01-17-2021
Extended 9/29/15
SW8950708
2
01-08-1996
02-18-2008
02-18-2018
02-18-2022
Extended 9/29/15
SW8950710
2
10-19-1995
02-19-2008
02-19-2018
02-19-2022
Extended 9/29/15
SW8960103
2
03-07-1996
07-08-2008
07-08-2018
07.08-2022
Extended 9/29/15
SW8960509
2
11-04-1996
06-03-2008
06-03-2018
06-03-2022
Extended 9/29/15
SW8970205
2
09-02-1997
03-07-2008
03-07-2018
03-07-2022
Extended 9/29/15
SW8970219
2
10-23-1997
04-14-2010
10-23-2017
10-23-2021
Extended 9/29/15
SW8970408
2
05-15-1997
03-12-2008
03-12-2018
03-12.2022
Extended 9/29/15
SW8970618
1.2
01-28-1998
06-17-2010
09-15-2019
09-15-2023
Extended 9/29/15
SW8970847
2
01-28-1998
03-07-2008
03-07-2018
03-07-2022
Extended 9/29/15
SW8970927
2
06-25-1998
03-07-2008
03-07-2018
03-07-2022
Extended 9/29/15
SW8990624
2
10-22-1999
10-09-2009
10-22-2019
10-22-2023
Extended 9/29/15
SW8990848
2
11-01-1999
10-09-2009
11-01-2019
11-01-2023
Extended 9/29/15
SW8010431
1.1
08-08-2001
01-10-2005
01-10-2015
01.10-2019
Previously Extended
SW8010640
2
09-18-2001
02-02-2011
09-18-2025
09-18-2029
Previously Extended
SW8010817
1.1
03-21-2002
12-16-2002
12-16-2012
12-16-2016
Previously Extended
SW8011202
1
06-17-2002
06-17-2002
06-17-2012
06-17-2016
Previously Extended
SW8020113
1.1
06-28-2002
08-20-2009
j 06-28-2012
06-28-2016
Previously Extended
SW8020319
1.1
07-26-2002
11-18-2011
11-18-2021
11-18-2025
Previously Extended
SW8020320
1
06-28-2002
06-28-2002
06-28-2012
06-28-2016
Previously Extended
SW8020504
1
08-12-2002
08-12-2002
08-12-2012
08-12-2016
Previously Extended
SW8020611
1
08-16-2002
08-16-2002
08-16-2012
08-16-2016
Previously Extended
3of5
Attach mPnt A -I KMr Drniartc - Porm it Fvtoncinnc - O/)Oh
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Permit Number
Permit
Version
Original
Issued Date
Issued Date
Expiration
Date
New Expiration Date
Comments
SW8020612
1
08-16-2002
08-16-2002
08-16-2012
08-16-2016
Previously Extended
SW8020725 -
1
11-05-2002
11-05-2002
11-05-2012
11-05-2016
Previously Extended
SW8020911
1
12-13-2002
12-13-2002
12-13-2012
12-13-2016
Previously Extended
SW8030720
1.3
12-12-2003
12-20-2010
01-26-2015
01.26-2019
Previously Extended
SW8060832
1.1
10-06-2006
02-16-2007
10-06-2016
10-06-2020
Previously Extended
SW8070847
2.1
01-24-2008
12-16-2011
07-11-2018
07-26-2018
Previously Extended
SW8070926
1.4
11-16-2007
12-22-2011
11-16-2017
11-16-2021
Previously Extended
SW8071213
1
01-28-2008
01-28-2008
01-28-2018
12-31-2021
Previously Extended
SW8080206
1
03-13-2008
03-13-2008
03-13-2018
12-30-2021
Previously Extended
SW8080301
1.1
04-29-2008
12-11-2008
04-29-2019
05-18-2022
Previously Extended
SW8080313
1
04-29-2008
04-29-2008
04-29-2018
12-30-2021
Previously Extended
SW8080740
1.1
08-22-2008
12-11-2009
08-22-2018
09-10-2020
Previously Extended
SW8080813
1.1
09-25-2008
07-08-2011
09-25-2018
03-20-2019
Previously Extended
SW8080907
1.1
10-08-2008
04-07-2010
10-08-2018
07-02-2020
Previously Extended
SW8081007
1
12-12-2008
12-12-2008
12-12-2018
12-30-2021
Previously Extended
SW8081015
1.2
01-21-2009
04-01-2011
01-20-2019
10-21-2019
Previously Extended
SW8081202
1.1
03-06-2009
08-04-2011
03-06-2019
08-02-2019
Previously Extended
SW8090630
1.3
02-08-2010
06-01-2011
02-08-2020
09-08-2020
Previously Extended
SW8090815
1.1
02-01-2010
04-11-2011
02-01-2020
10-22-2020
Previously Extended
SW8090901
1.1
12-14-2009
03-24-2011
12-14-2019
09-21-2020
Previously Extended
SW8090925
1.1
10-16-2009
02-01-2011
02-01-2021
12-31-2021
Previously Extended
SW8091108
1.1
08-27-2010
10-04-2011
08-27-2020
11-23-2020
Previously Extended
SW8091113
1
04-13-2010
04-13-2010
04-14-2020
01-01-2022
Previously Extended
SW8100406
1
06-28-2010
06-28-2010
06-28-2020
12-31-2021
Previously Extended
SW8100502
1
09-27-2010
09-27-2010
09-27-2020
12-31-2021
Previously Extended
SW8100701
1
09-30-2010
09-30-2010
09-30-2020
12-31-2021
Previously Extended
SW8960117
2
08-06-1996
02-19-2008
02-19-2018
02-19-2022
Previously Extended
SW8960329
2.1
07-09-1996
07-09-2010
02-20-2018
02-20-2022
Previously Extended
4of5
38
39
40
41
42
43
m
45
Attachment A - USMC Projects - Permit Extensions - 9/29/15
Perot Number
Permit
Version
Original
Issued Date
Issued Date
Expiration
Date
New Expiration Date
Comments
SW8960501
1.1
09-18-1996
12-08-2004
12-08-2014
12-08-2018
Previously Extended
SW8960815
2
10-29-1996
07-14-2008
07-14-2018
07-14-2022
Previously Extended
SW8961204
2
06-30-1997
06-20-2008
06-20-2018
06-20-2022
Previously Extended
SW8970136
2
02-10-1997
07-08-2008
07-08-2018
07-08-2022
Previously Extended
SW8980204
1.1
10-02-1998
07-06-2005
07-06-2015
07-06-2019
Previously Extended
SW8980401
2
10-28-1998
06-03-2008
06-03-2018
06-03-2022
Previously Extended
SW8990850
2.1
02-03-2000
12-09-2011
02-03-2020
02-03-2024
Previously Extended
SW8991135
2
08-09-2000
10-28-2009
08-09-2023
08-09-2027
Previously Extended
5of5
Lewis,Linda
From: Lewis, Linda
Sent: Friday, January 08, 2010 8:23 AM
To: 'Bryan Dick (bryan.dick@earthtech.com)'
Subject: PE Certification for Recon Battalion SW8 080521
Contacts: Bryan Dick
Bryan:
On November 30, 2009, the Division received a Designer's Certification for the subject project from Ken Lacy,
PE, who I am assuming works for EarthTech. The certification is a little confusing because in the "noted
deviations" section of the form, it only refers to attached revised drainage drawings. The drawings are much
too small to be able to read or understand clearly what deviations have occurred. We will need a written out list
of the specifics of what has changed. Some deviations may require a permit modification, but without knowing
exactly what the deviations are, we can't tell.
Thank you for your attention to this matter.
Linda
Please note my new email address is Linda.Lewis@ncdenr.aov
Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Ext.
Wilmington, NC 28405
910-796-7215
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may
be disclosed to third parties.
F0FoS2/
AMENDMENT OF SOUCITATIONNOEIMCATION OF CONTRACT
I. CONTRACTIDCODE
PAGEOF PAGES
1 3
2. AMENDMENIUMODI4CATION NO.
3. EFFECTIVE DATE
4. REQUISITTON/PURCHASE REQ. NO. _
5. PROJECTNOMspPlieshlc)
03
26-Mar-2009
ACOR734M
6. ISSUED BY CODE INIM
7.ADMITISTEREDBY Motherthwitem(i) CODE
NAYFAC MID ATLANTIC -
See Poem 6
OFFICER NCRA(1(lEOF CONSTRUCTION
MARINE CORPS NSTAt1ATCN3 FAST
1005MCHAELROM
AMP L&JE1NE NC 21150- 4t
8. NAME AND ADDRESS OF CONTRACTOR (No., Bred, County, State and Zip Code)
9A. AMENDMENT OF SDLIC717ATION NO.
JOsCE&ASBOCIATESCONSMUCTCN NC
MNYA POBORI
POBDTT
9B. DATED (SEE ITEM 11)
NEwPORT NC 29610
X
IOA MOD. OF CONTRACr/ORDER NO.
N40085-07-D•1808.OD49
X
108. DATED (SEE ITEM 13)
25,Aa►2008
CODE 1TFPo IFAC11TYCDDE
II. THIS ITEM ONLY APPLIES TO AMENDMEN'SOF SOLICITATIONS
The above anointed solicitation is mended m at lsnh in Item 14. The hour and time spedied for aaipt ofOaf ❑is Wended, Elisnot extended.
Oei trust wknowledge mceipt ofthis standout pnorto the hour ad date speciaed in (he mlicitatlon or in amended by one ofthe bllowing nobods:
(a) By wopldiag Item g and 15. and returning ofthe a®dmam; (b) By acknowledging nedpt ofthis woudomt on each copy ofthe oar sub ritted;
_copies
or (c) By scpante Idtaor tdegramwldchinduda a reEsma to the solicitation and wordsmn nunbas, FAILURE OFYOUR ACKNOWLEDOMENTTO BE
RECEIVED ATTHE PLACE DESIGNATED MR THE RBt:IIPT'OFOPPBRS PRIOR TOTHE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER Ifby vinue ofthis mendnmt you desire to change an oRralmdy subedtted, such change say be made by telegram Inner,
Provided each telegnmor Iota makes heb to the solicitation and this a®damt, and is received prior to theopening hourand due spoiled.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
See Schedule
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF OONTRACTSrORDERS
IT MODIFIES THE ODNTRACTAORDER NO. ASDESCRIBED IN ITEM 14. -„
A. THIS CHANCE ORDER IS ISSUED PURSUANT TO: (SImify authority) THE CHANCES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM IOA. IK„)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (mach as changes in paying
office, appropriation date, tic.) SET FORTH IN ITEM 14,PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
X
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FAR QauBe 52.243.4, atengess
D. OTHER (Specify type of motlifcation and authority)
E. IMPORTANT: Contractor is not, ❑X is rtgired to sign this doorman and return I copiea to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Orpn'ized by UCF x ion headngs, inclufing snlicitation/mnlract dbjad meter
where feasible.)
Modification Control Norther: aloWkI9082127
Racon Platoon hlerim FBcNtles (OB0031)
DSON
CONTINUED
I7s1: Mchael W Carr. Darrel L Coster
Travelers Oasualy & Surety Co. of Anwica One Tow or Square, Hartford Cr 06183
Ea M Tech 701 Corporate Cantor Drive, SLO 475, Raleigh NO 27607 grep.w addm0ear8dech.com
Esapt as provided level n, all tend and conditions ofthe dawmnt attend in Joun9A or IOA, as hemo6m changed, remains unchanged and in bll bra and elect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TNERGAM. CRUMP/CONIWLT SPECMIIST
TEL (M*I-2W EXT= EMAL Iaraamarperaayrdl
15B. CONTRACTOR/OFFEROR
15C DATE SIGNED
168. UNITED STATFSOF AMERICA
16C. DATE SIGNED
BY
27-Mar-2009
(Signature of person authorized to sift)
(Signature of Contracting Officer)
EXCEPTION TO SF 30 30-105-04 STANDARD FORM 30 (Rev. 1"3)
APPROVED BY OIRM 11-84 Premenbed by (SA
FAR (48 CFR) 53.243
ANUMNO NP OF 8OIJC1TATION/MODMCAnON OF CONTRACT
1'ODxiRM.Tm�
PAt18oP PAGO
. J
2.AN-OKWOMMODYWATM NO.
m1mM DATE
2&MI4=
4.89601m11[M TUltCHAM1G3%M&
ACOOmm
I.FROmCTNO4lr"Ok 4
6. 06Um BY ODDS MINE
7.AD1QUF!l! mBY Room Om Nm6) ODa
NORM MDXnA1ID
OFFCM M � P camBmwION
SN IIRIn (f
1t18 oapvsxasrimnapmtwt7
1®t8011A<1101D
O/I/lER1 mcmw1t1
8. NA8B AND ADF3 =OF oOM ACPUR (No.. Bttml. Cbot7. &Aft =dZlp C)de)
9A. ANOOMOAMIT OPSOUCTFATION.M.
9& DATED (SHE ]TM 11)
MHMNIWIO
POMM
NNFm "CM5O
X
P110�607-01Y06401B TAR�tiO.
X
to& DATED (8ffi IP®1 13)
4b,1BF =
CODE FO
11.THI MSM(DLYAPPLMTOAB A'8OPmuaTATIOM
mmemhrmrWWaermmltdrrmObYol4. 7Mhowmd dmt/poldtrdyt af06 �hrmld �r.aamdea.
O!r oat odooeladp model oftwe mdmt plor to 1b hmv rd dmt grlad b Oo mI W utlm a m mwmied b7 an MM DDONrB mdhmt:
WBymgYbgll�Imd lS, and tomwlq mplsaMoemdoml;OlBl dmmhlgbg mldq oAW madortmeo0 oegehbaRrmldnad;
a W B/ ammo Wwattoyrdl3 hdeb�tohramlLmBdlmrwed mmtaetmot6r. PAR.U�t)PYOURAl7QlOwL�1f10
RBGWY®ATTI® MCEmnaltATEDFOB7imMMPIOPOMUMDR10r,MMtMAND DA79WOMMMAYMMTM
RMBCWN OPYDUROMM Irby IlmleetW7 mlmdmt7m dmlmmdm pm e6dr0'weehld.wmdmW mO he mtohy tdgYmwletto;
1mrNd re hdyl�w Imm e� mrmm m tho )eRdNdae and dto mrdewl. and r mdwd 9dw m ho � hom otl dm s7adhtd.
12. AODOUHfDUAND APPRM40ATMN DATA (It mq*4
EBR Odwdda
13. T169ITEM APPIJWGWY TO MODUgCATMM(IFCDMRACr8DFMM
fr MODEi88THE OoRrRAC[AIMNO. A90B9NIFIND IN ITEM 14.
A TW QIAMW OD81t MFBD PURSUANT TR (wiry mthaky) THB OWAM MT FORTH IN ITEM 14 ARE MADE IN THE
CUNTRACr OROBRND. DI IT M to&
& TIM ABOVE NUAERRI® 0014fRACTMOM ISMODUM TO R®iPCf THE AUMDMSrMTIWCHAN=(such ad—pe in pryW
ofRm, Wrapistim dRe. to.) SBf FORTH IN IT r 14. reUR W f TOTHE Atn'FIDRfl'Y OFFAR 43.1
C TMSSLVVLMWUWAL ACEEMI NT FBENrMMUM PUIWAKr TO AU HON]TY OP.
X
FARMMRMKDWWB
A OTI®t (*ocjf� type of moAlmAjoo andmthndly)
&DAPORTANT: Mueaor ❑ boot. a btwphedtodpthh& mWmdralm I mpb to toe kmbS CBS=
14. DONSM'f ION OF AMMMU ir/MODIRCATICN MMm and Iq DO' omtbe 6sAnµ kandei wbdu oouw l Nowd mite
whore (mtb.) .
MoM the Ombol Iftft t bWVmOB2127
Flom RM= IelelhnFmMn(O=M)
DBON
CONiri!®
or1: Ma1rt walr. OBltt � tLolr
Tmvdrs Owu* 8 &K* Om d Amwba Ow TWw 84m. Holard Cr0B183
MM 71:h Tot owpma O ft Oka, EBM47B1 Adigh NO2M w%wOft OemBtlmflnoln
Bmvt m Ferldodhae.oll mim ad mmtltlem odlhedooemtrokmmd bOr9A or 10A.0 htmohtedlm8e6mmbo m hw4w and IN fall Dmmdmad.
15A. NAMR AND TITLE OPS CM(Type or pdot) 16A. NAM�IJIU1jRLE1)F,(>p FPACTImoFAOO((Typs or print)
�liNTgA M. �HUIYII
Robert E. Bittner, Jr. Vice Presid
15K
ISC DATE SKMED
1611. ATffi
16C DATE 9OJED
3/27/99
;IV(SWIomorONwsaWOffhm)
3 d7d9
(Bimmofpma to )
WOCurrmmToaFju 30-105-04 3PANDARD FMM 30 (Ray. 10-93)
APPROVED BY OMM 1-84 Pt'miled by 08A
PAR (48 CM 53243
N40085-07-D-1908
0D4903
Page 2 of 3
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Acceptance of this modification by the contractor constitutes an accord and satisfaction and represents payment in
full for both time and money for any and all costs, impact effect, and for delays and disruptions arising out of, or
incidental to, the work as heroin revised.
The contractor shall accomplish the changes as follows:
PCO # 03
Revise storm water management and erosion control per A/E guidance. See attached A/E correspondence and
revised drawing sheets: C-2, C-3, C-4, & C-7.
TIME: 30 calendar days
All other terms and conditions remain unchanged.
SEE ATTACHED CONSENT OF SURETY.
SECTION A - SOLICITATION/CONTRACT FORM
The total cost of this contract was increased by $75,907.00 from $1,494,001.00 to $1,559,908.00.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The pricing detail quantity has increased by 75,907.00 from 1,484,001.00 to 1,559,908.00.
The total cost of this line item has increased by $75,907.00 from $1,484,001.00 to $1,559,908.00.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0002 has been changed from
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
05-APR-2009 1,484,001 N/A
FOB: Destination
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
N40085-07-D-1908
004903
Page 3 of 3
05-MAY-2009 1,559,908 N/A
FOB: Destination
SEMON G - CONTRACT' ADMINISTRATION DATA
Accounting and Appropriation
Summary for the Payment Office
As a result of this modification, the total forded amount for this document was increased by $75,907.00 from
$1,494,001.00 to $1,559,908.00.
SUBCLIN 000201:
AA: 17 07081206 25710323 05205 0 068732 2A 071908 AA00L0017587 (CM,
) was increased by $75,907.00 from $1,484,001.00 to $1,559,908.00
(End of Summary of Changes)
Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST
From: Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST
Sent: Monday, December 22, 2008 8:59 AM
To: 'Randy Dodge'
Cc: Coster, Daniel CIV NAVFAC Atlantic, ROICC JAXNCA
Subject: FW: RECON comments
Attachments: RFP 22DEC08.pdf; Level Spreader Revisions.pdf
iee, be,
RFP 22DECO8.pdf Level Spreader
(42 KB) Revisions.pdf (...
Randy,
Please find attached the A/E's guidance wart to the concerned Fri.'s. A formal RFP is also attached. We welcome your
response. Let me know if you have any questions or concerns.
V/R,
Michael W. Carr
LT, CEC, USN
Project Engineer
OICC Marine Corps Installations East
------------------------------------------
(910) 451-2581 ext 5274
DSN 451-2581 ext5274
michael.w.carr@navy.mil
-----Original Message -----
From: Jenkins, Bill (mailto:Bill.Jenkins@aecom.com]
Sent: Friday, December 19, 2008 17:20
To: Marshburn CIV Brian R; Carr, Michael W LT NAVFAC MIDLANT, OICC MCI EAST
Cc: Burnet, Gil
Subject: RECON comments
Brian and Mike: Response to comments as noted below and revised plan attached
1. Provide/ or modify existing valve box for access to the existing Blow off Valve in the new parking area adjacent to
Courthouse Road, detail pending.
RESPONSE: We have determined that top of the box can be raised to match the pavement elevations. A separate
detail will be provided.
2. Modify existing propane tank concrete slab so that rain water will not gather and stand on it, detail pending.
RESPONSE: Remove existing tank, overlay the existing concrete pad with a 3" to 4" concrete overlay, matching
the elevations of existing and proposed asphalt paving and slope to provide positive drainage. Replace tank and extend
propane lines, if needed.
3. Provide the additional work indicated on the "Permit' set of C-Sheets. C-Sheets to be modified as discussed to
salvage as much of the work placed per the "Contract" set of drawings as practical.
Modifications discussed are:
a. Rock/ Clay lined drainage swales from concrete flumes to splitter boxes, detail pending.
RESPONSE: modify existing "V" ditch from the concrete flume to the flow splitter box with a 2' wide base ditch and
line with permanent soil reinforced matting (per NCDOT spec's) or rip rap and filter fabric. Place rip rap and filter fabric at
the outlet of the concrete flume (see attached plans for locations and details)
b. Remove and provide redesigned splitter boxes, detail pending.
RESPONSE: Given that the flow splitter boxes were not built to the permitted elevations and must be removed, we have
provided in the attached plan sheets details for revised splitter boxes that should provide additional function than the
original details.
c. Modify placed concrete level splitters, detail pending.
RESPONSE: The inlet side of the level spreader shall have a saw -cut section with elevations to match the' V" ditch
entering the level spreader. The saw cut section will have a I'wide opening with 4:1 side slopes. The bottom of the 1"
wide area should be a minimum of 6" below the ditch elevation to allow rip rap and filter fabric to be placed at the invert.
In addition, a saw cut 1' by 2' rectangle shall be made in the bottom of the level spreader to allow for drainage. The
locations of the saw cut hole should be approximately 5' from each end and then 25' on center throughout the length of
the level spreader. Class 57 stone shall be placed in the holes to allow for drainage. See the attached details.
d. Rock check dams to be modified to remain, detail pending.
RESPONSE: The rock check dams are for erosion control during construction. The majority of the site is already
finished and seeded. At this time the rock check dams are not needed.
Additional comments:
1. The "v" ditches from the flow splitters to the level spreaders can remain. The contractor shall verify that the ditches
provide positive slope
2. I believe a question was raised about providing information about a proposed propane tank for the PEB. Electric unit
heaters are shown in the plans and a propane tank is not required for the PEB.
3. The "V" ditch at the PEB site to the splitter box can remain.
Please don't hesitate to call if you have any questions or need additional information. If needed, we can be on site when
the first splitter box is built to review and see if it is being built correctly.
Bill Jenkins, PE, RLA
EARTH TECH / AECOM
701 Corporate Center Drive Suite 475
Raleigh, NC 27607
Telephone:919.854.6228
Fax: 919.854.6259
Mobile: 919.623.0276
email: bill.jenkins@aecom.com
. ILL a To-...E no.. T. TIT EDIT IT .....sT .......a.J
71
ITI
..Qm� T. ,� EE.a III a. WTw $
.... ..
__
T.Ta�ss..r.i ""OT1 AID
zTuin'E
,.. BEET.0 TE..ITa.
..ru.Tay`a'w.°E5wS0"i.�.:.v"...°IT"E"rTle
�`In,T..
"uo `a°u
�l
_
: TTLIIL Owa.a Uvu .�o'.e".T°a."':T.
Ems.
T...I'T M T&MY 1Ta"°"'w� ,:.n 1T Eo-T+ i.e ,,.1
.n
_ �..Et
a`:.➢`.T.nOu TIT sm.nuc ..w
. uEz.1
OR .'EDw z w�0"uE
.":.IaaOF
1
e o IO I: `mim
.. ..
.
"uo°"`:u,IALI 1. .T..`..`m:.. o To
OF.E.�.•'c
"EWE T6TT u.
� :I�RE' W.TT.LWYME"�T s' 1"'I
a
OISI-TTTIT.
"T.awe
:m TTI.:u...w
I—T
a.am
�i
IT
'ter-
__
,'•,
___
TO
IT
IT
IT
V.
I IV I IT
COW
ur
IT IF I
IT
i� mrve:uav�a i
W
7 " a
EarthTech ;; „ ,,.,, C-2
°MARINE
CORPS BASE
RECON PLATOON
_
INTERIM FACILITIES
AT COURTHOUSE BAY
-7-
TYPICAL SECTION- COURTHOUSE ROAD PARKNG LOT
SITE PLAN
'It'v
71
A.
7
j:
GRADING PLAN
ig) EarthTech .... .... C
.-3
- I
MARINE CORPS BASE
CR�
RECON PLATOON
INTERIM FACILITIES
AT COURTHOUSE BAY
80091
n�M
—RHnYF'8�L°Ml.�
BOLLARDyOETAIL
o, d&rot
.UNL OF BUILDING MRON
XX�vy[ '
GRNss swALF DBtuL
GRAPHIC SCALES
o o m a eo 0
DETAIL OF INFILTRATION BASIN /�,1
.1.
SECTION A -A INFILTRATION BASIN
emit r�.vei�
PLAN
oav no.. oaf wu1
SECTION E-E - INLET
. Mram
DETAIL OF BYPASS FLOW OUTLET
LEVEL SPREADER
MtS
SECTION VIEW OF
EXISTING LEVEL SPREADER
--- --- ---- ------ -- ---- —
SECTION B-BB
wuwm win
PLAN VIEW OF EXISTING
LEVELSPREADER
(BOTTOM ONLY SHOWN)
FLOW SPLITTER NARRATIVE
INFILTRATION BASIN TABLES
roarrouttnawwu
By a..u...
2
3
l
5
6
7
2, 1,l (ft)
11.75
11.75
11,50
low
low
17.36
15.30
ln.n ON t. B.,n (9)
l050
10.25
lum
9.00
1
C WmrGast Ebwllon(ft)
ii.w
11..
li.m
10,00
0 Bypass Flow OUM lmn (ft)
10.70
10.70
li'm
9.50
I ig) EarthTech joe... .... C-7 11
I I MARINE CORPS BASE 11
80091
REPORT NUMBER H18M3R51 OBLIGATION AUTHORITY (OA) REQUEST
PAGE : 1
SUBMITTED BY MICHAEL CARR ATLANTICE3
AS OF: 25 FEB 09
ROLE CODE WC: ACICL
_________________________________ _____________________________________________
TIME : 08:26:58
USER CODE G STD DOC NO: N4008507DI908 DO: 0049 MOD/AMD: PC: 000003 OPT:
FUND USAGE:
344409
ACT DOC NO 0708MCN1206MAJ DESCRIPTION: REVISE STORM WATER MANAGEMENT AND EROSION CONTROL
REASON CODE:
DSGN
-CA REQUEST 102419 REQUESTOR: M CARR
CA DESC
ACRN APPROPRIATION SBHD O/C BUCON S/A AAA T/T PAA COST CODE
____ _____________
REQUEST AMOUNT
____ ____ _____ ___ ______ ___ ______ ____________
AA 17 07081206 2571 0323 05205 0 068732 2A 071908 AAOOL0017587 $
_________
75, 907.00
SIOH AMOUNT: $
4,327.00
APPROVALS:
USER CODE WC ROLE APPROVAL STATUS COMMENTS APPROVER NAME DATE
G ABMCI APV M LAEELLE 09/02/20
G LFM10 APV L HARRIS 09/02/20
G LFM10 APV F ANNUNZIATA 09/02/23
FINAL APPROVER
. NOTES: (NOTEBOOK)
_________ ____ _ANT CG_ROT __,.&84-9-06.27-_ _ ___ _... ._
FUNDS REQ $75,907.00
CONTRACT # 07-1908 T.O 0049; RECON PLTN INTM FAC
PROJECT-4 LE-15-P1229
THE PROPOSED CHANGE IS PROPERLY WITH -IN CONTRACT. SCOPE AND
REQUIRED TO COMPLETE THE CONTRACT AS ORIGINALLY AWARDED. FUNDING FOR THI
CHANGE IS PROPERLY CHARGEABLE TO THE APPROPRIATION AND YEAR ORIGINALLY
FINANCING THE AWARD.
MNT-OA-COM-RQT 09FEB20 12:04 NLDMXL
JUST: PROVISIONS WERE DESIGN INTO PROJECT THAT SHOULD HAVE SATISFIED THE
STATE WATER CONTROL BOARD, HOWEVER, AFTER REVIEW OF DESIGN SYSTEM, STATE
REQUIRES ADDITIONAL WORK TO SATISFY PERMIT REQUIREMENTS
MNT-OA-COM-RQT 09FEB20 13:51 NLDLOH---------_______
JUSTIFICATION APPROVED BY S BEALE 2-20-09 ILCH) -
ASSOCIATED FUNDING DETAIL -
WORK AUTH FUND FUND CUST JOB JO WORK EXP F/ HNIS
ACRN PKG/ITEM NUM AUTH ID TYP NUM ACRN ORDER ACRN CENTER ELE SF CAT
____ __________
______ ____________________ ___ ______ ____ ______ ____ ______
AA 21043/1 17587 M670011229 ALL 63423
___ __ ----
••• E N D O F R E P O R T •*`