Loading...
HomeMy WebLinkAboutSW8080521_HISTORICAL FILE_20080603STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 09052\ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS E7 HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 200 80 �003 YYYYMMDD Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleco H. Sullins Director Division of Water Quality June 3. 2008 Carl Baker, Deputy Public Works Officer MCB Camp Lejeune Building 1005 Michael Road MCB Camp Lejeune, NC 28547-2521 Subject: Stormwater Permit No. SW8 080521 USMCB Camp Lejeune — Second Reconnaissance Battalion High Density Subdivision Project if Onslow County Dear Mr. Baker: The Wilmington Regional Office received a complete Stormwater Management Permit Application for USMCB Camp Lejeune — Second Reconnaissance Battalion on June 3, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW8 080521, dated June 3, 2008, for the construction of the project, USMCB Camp Lejeune — Second Reconnaissance Battalion. This permit shall be effective from the date of issuance until June 3, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7304. Sine y, Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:\WQS\STORMWAT\PERMIT\080521.jun08 cc: Bryan Dick, Earthtech Onslow County Inspections Chris Baker GWilmington Regional Office Central Files Nonh Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet: www. ncwatermualitvore Fax (910)350-2004 NoRhCarolina Aalura!/y Customer Service 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW8 080521 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carl Baker and MCB Camp Lejeune USMCB Camp Lejeune — Second Reconnaissance Battalion NC 172 and Courthouse Rd., Onslow County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 3, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 171,288 square feet of impervious area. This basin must be operated with a 50' vegetated filter. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 080521 6. The following design criteria have been provided in the infiltration basin and must be maintained at design condition: Drainage Drainage Drainage Drainage Drainage Drainage Drainage Area 1 Area 2 Area 3 Area 4 Area 5 Area 6 Area 7 Drainage Area, acres: 0.62 0.63 0.64 0.62 0.65 0.87 0.66 Onsite, ft2: 27,172 27,410 27,740 26,900 28,095 37,745 28,768 Offsite,ft2: None None None None None None None Total Impervious Surfaces, ft2: 26,286 26,090 25,646 25,580 26,490 22,035 19,161 Design Storm, inches: 3.7 3.7 3.7 3.7 3.7 3.7 3.7 Basin Depth, feet: 2.4 1.9 1.9 2.2 2.2 1.5 2.6 Bottom Elevation, FMSL: 9 8.1 8.1 7.6 7.6 8 9.2 Bottom Surface Area, ft2: 3,187 5,128 4,856 4,588 3,979 5,890 1.959 Bypass Weir Elevation, FMSL: 10.8 9.3 9.3 9 9.2 9 11.2 Permitted Storage Volume, W: 7,591 7,459 7,344 7,362 7,452 6,379 5,933 Type of Soil: Ba meade Ba meade Ba meade Ba meade Ba meade Ba meade Ba meade Expected Infiltration Rate, in/hr: 2.42 2.81 0.60 2.73 0.68 2.02 1.11 Seasonal High Water Table, FMSL: 7 1 6.1 1 6.1 1 5.2 5.2 6 7.2 Time to Draw Down, hours: 11.8 6.24 30.2 7.0 33.1 6.5 32.6 Receiving New River/White Oak Stream/River Basin: Stream Index 19 - (27) Number: Classification of SA;HQW Water Body: II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 080521 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Access to the stormwater facilities shall be maintained via appropriate easements at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 080521 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued=AROLINA rd day of June, 2008. NORT ENVIRObWENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 080521 USMCB Camp Lejeune — Second Reconnaissance Battalion Stormwater Permit No. SW8 080521 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 080521 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections Page 7 of 7 DWQ.USE ONLY, :.. -. .. Date Received Fee Paid Permit Number Z W O U State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICAT VED This form may be photocopied for use as an original I. GENERAL INFORMATION MAY 2 8 2008 BY: ____j 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Carl Baker, Deputy Public Works Officer 3. Mailing Address for person listed in item 2 above: City: MCB Camp Lejeune State:NC Zip:28547-2521 Phone: (910 ) 451-2213 Fax: Email: carl.h.bakerOusmc.mil 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): USMCB Camp Lejeune - Second Reconnissance Battallion 5. Location of Project (street address): NC 172 and Courthouse Rd - Courhouse Bay City:Camp Lejeune County:Onslow 6. Directions to project (from nearest major intersection): From Sneads Ferry go east on NC 172 though Lejeune gate, turn rt at Couthouse Rd at 6.2 miles, project site 7. Latitude: 34-35-30.8 N Longitude: 77-22-15W of project 8. Contact person who can answer questions about the project: Name:Bryan Dick Telephone Number: (919-854-6252 1 Email:bryan.dickOearthtech.com II. PERMIT INFORMATION: 1. Specify whether project is (check one): ram ❑Renewal ❑Modification Form SWU-101 Version 8.07 Page I of 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberNA and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ❑Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be routed via grassed swales from imperivous areas to 7 separate basins. Each infiltration basin meets DWO requirments for drawdown time and is sized for the required treatment volume. This project is withing 1 /2 mile of SA (SC) waters. 2. Stormwater runoff from this project drains to the White Oak River basin. 3. Total Site Area: 19.03 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: NA acres (not applicable if no Wetlands exist on site) 6. Total Project Area**:4.68 acres 7. Project Built Upon Area:84 % 8. How many drainage areas does the project have? 7 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name New River New River Stream Class & Index No. SA, HQW SA, HQW Drainage Area (so 27172 27410 Existing Impervious* Area (so 0 0 Proposed Impervious*Area(so 26286 26090 % Impervious* Area (total) 97% 95% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 0 0 On -site Streets (so 0 0 On -site Parking (so 26286 26090 On -site Sidewalks (so 0 0 Other on -site (so 0 0 Off -site (so 0 0 Total (so: 26286 26090 Form SWU-101 Version 8.07 Page 2 of 4 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above derived?NA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Form SW U-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at 11ttp://h2o.enr.state.nc.US/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (54,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf; please complete this section. Designated agent (individual or firm): Bryan Dick, PH, Earth Tech Mailing Address: 701 Corporate Ctr. Dr., Suite 475 City:Raleigh State:NC Zip:27607 Phone: (919 ) 854-6252 Fax: (919 ) 854-6259 Email:bryan.dick@earthtech.com VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covey�nts w)II be r}ded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. / / , / /,' A Date:.? ' / — d8 Form SWU-101 Version 8.07 Page 4 of 4 Addendum to Basin Descriptions for Permit Application Basin Information Drainage Area 3 Drainage Area 4 Drainage Area 5 Drainage Area 6 Drainage Area 7 Receiving Stream Name New River New River New River New River New River Stream Class SA, HOW SA, HQW SA, HQW SA, HOW SA, HQW Drainage Area (sf) 27740 26900 28095 37745 28768 Existing Imp. Area (sf) 0 0 0 0 0 Proposed Imp Area (sf) 25646 25580 26490 22035 19161 % Imp Total 92% 95% 94% 58% 67% ImpSurface Area _ On --Site Buildings (sf) 0 0 0 0 1500 On -site Streets (sf) 0 0 0 0 0 On Site Parking (sf) 25646 25580 26490 22035 17661 On -Site Sidewalks (so 0 0 0 0 0 Other On -site (sf) 0 0 0 0 0 Off -site (sf) 0 0 0 0 0 Total 25646 25580 26490 22035 19161 24' 00.00" W 077' 23' 00.00" W /STUMP SOUND fish (E) AM fo o / bl t gt fi p 7 3 f „— a I O i Z eY• O /i y CD 17 V b n r A J t �tl tt' g illie Cove v • ., ....au Ne! D A o MsrMrs (m)"' i $Wfl Am °e Bay ( Poll 3 $fNM(6 i/ t L C) Po n Fe , rns ' t $pal AM �e z � � 1 NybaC0 • y �`,,, CD �, +aPoiM 0 5 � � n 077' 24' 00.00" W 077- 23' 00.00" W I �.. Copyright (C) 1998, Maptech Inc 077' 22' 00.00" W 3 077' 22' 00.00" W m M 0 Legend Wetlands and DWQ Site Layout Existing Roads EarthTech Classifcation Map —DWO Named Streams —PAVED Recon Platoon Interim Facilities -- Unnamed Tributaries UNPAVED Welland Addition -2008 ® Shellfish Area NOW A'!tAICO Intamahona. Ltd. Company at Courthouse Bay I UPLAND ©Shellfish Ana ORW Camp Lejeune Marine Corps Base I —,WETLAND Onslow County, North Carolina 0 500 1,000 2,000 Feet 1 inch equals 1,000 feet Legend @) EarthTech Soils Map Site Layout Recon Platoon Interim Facilities Existing Roads a tyco mlwaiwor,.m Cam"" at Courthouse Bay — PAVED Camp Lejeune Marine Corps Base UNPAVED Onslow County, North Carolina Soil Map Units 0 150 300 600 Feet iI i I I I i 1 inch equals 300 feet P. 01 TRANSACTION REPORT FOR: NCDENR 9103502004 JUN-04-2008 WED 07:01 AM >K SEND DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP JUN-04 07:00 AM 919198546259 1'21" 8 FAX TX OK 537 >K t TOTAL 1M 21S PAGES: 8 State of North Carolina pepartmentW itNatural Resources ingt n Regional Office Michael F. Easley, Governor FAX COVER SHEFT Date: June 4, 2008 To: Co: Fax: Re: Bryan Dicl Plil Earth Tech 919-854-6259 gxQress Permit for USMC Second Reoon Ra lion William G. Ross, Jr., Secretary No. Pages (excl. cover): 7 Express Permitting From: Sandra Exum Phone: aiw2L 265 Fax: 910 350-2004 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer 127 Cardinal Drive Extension. Wilmington. NC 28405 Designer BMD Date: 6/3/2008 Basin # Qp 1 in/hr Hw tin/hr Qp 10 yr Hw 10 Yr Clearence Check for (cfs) (ft) (cfs) (ft) Provide (B to C) Clearance 10 yr 1 0.63 0.30 1.57 0.55 1.10 ok 2 0.60 0.29 1.49 0.53 0.70 ok 3 0.60 0.29 1.51 0.53 0.70 ok 4 0.59 0.28 1.47 0.52 0.50 check value *manually checked and within .02 ft is ok 5 0.61 0.29 1.53 0.54 0.70 ok 6 0.82 0.35 2.06 0.65 0.70 ok 7 0.63 0.30 1.57 0.55 1.20 ok L= 1.3 ft Cw = 3.0 Broad Crested Weir Q=Civ•L•H'5 I HQ s w = C1v • L Designer BMD Date: 6/3/2008 Basin # Qp 1 in/hr Hw 1 in/hr Qp 10 yr Hw 10 Yr Clearence Check for (cfs) (ft) (cfs) (ft) Provide (B to C) Clearence 10 yr 1 0.63 0.30 1.57 0.55 1.10 ok 2 0.60 0.29 1.49 0.53 0.70 ok 3 0.60 0.29 1.51 0.53 0.70 ok 4 0.59 0.28 1.47 0.52 0.90 ok 5 0.61 0.29 1.53 0.54 0.70 ok 6 0.82 0.35 2.06 0.65 0.70 ok 7 0.63 0.30 1.57 0.55 1.20 ok L= 1.3 ft Cw = 3.0 Broad Crested Weir Q=Cw L•H' Hiv Cw • L Q NCDENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 FAX (910)350-2004 Request for Express Permit Review FILL-IN all information below. FAX to Express Coordinator along with a a detailed narrative and vicinity map of the project location. Reviewer Submit 5 /X:�> Time Icr, o Confirm S- k 4-o$ APPLICANT: Name: Carl Baker Title _Deputy Public Works Officer Company Name MCB Camp Leieune Address -Bldg 1005 Michael Rd City MCB Camp Leieune Zip 28547 Phone 910-451-2213 Fax Email_carl.h.baker@usmc.mil_ PROJECT: Name Counter Battery-Site— ENGINEER/CONSULTANT INFORMATION: County Onslow Vk., b;1 t Name Bryan M. Dick Company Earth Tech (04!/ SOS- 1 q (05 Address 701 Corporate Ctr Drive City _Raleigh State NC Zip 27607 Phonegla 9s4-toy z Fax 4h-t 8S4-(o2_59 Email '�.r'C_t ri)CjAck-k CJ%,gym ❑ SCOPING MEETING ONLY DWQ DLR DCM Other ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream ❑ STORMWATER ❑ Low Density 1 ®)High Density -Detention Pond ❑ High Density - Other (check all that apply) ❑ Low Density -Curb & Gutter High Density -Infiltration Off -site Wetlands MUST be addressed below R.NPDES Phase II a Plan Revision ❑ COASTAL MGT. ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Dev. -------------------- ------------------------------------------------------------------------------------------------------------------------------------------------- ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed WETLANDS (401) Wetlands on Property ? ❑ Yes ❑ No Isolated Wetlands on Property? ❑ Yes ❑ No (Check all that apply) Wetlands will be impacted? ❑ Yes ❑ No Wetland impacts: acre(s) Wetlands delineation has been completed? ❑ Yes ❑ No ❑ Buffers impacted: Acre(s) USACOE Approval of Delineation completed? ❑ Yes ❑ No 404 Application in Process w/USACOE? ❑ Yes ❑ No I Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ❑ No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ CAMA $ LQS $ 401 $ EDab Rgeilectit E �WUJ MAY 0 7 2008 DWQ PROJ k Revised 10/9/2007 Project Name MCB Camp Leieune — Counter Battery +Stormwater Express Questionnaire (10/9/2007) What is the applicant's full legal name? Carl Baker -Marine Corps Base Camp Leieune Is the applicant associated with Sole proprietor Corporation ❑ LLC Partnership Municipality If it's an LLC, is it ❑ Manager -managed or ❑ Member -managed? QWhat is the applicant's title within the Corp., LLC or Partnership? Deputy Public Works Officer Will an agent (someone other than the applicant) be signing the application? ❑ Yes ® No If Yes, what is the agent's name and title? OPlease note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. Project Location: County _Onslow Nearest Town/City_Jacksonville, NC (Attach a detailed vicinity map with both local street names and SR, NC, US of Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow, or New Hanover Counties, or a small portion of northern Pender County, NPDES Phase II Post -Construction rules will apply, unless a vested development right, as described in the Session Law, can be demonstrated, which is dated prior to July 1, 2007. 3. Receiving stream name Cogdill's Creek River Basin _ White Oak (03-05-02) What is the classification of the receiving stream? SC, NSW For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. If you claim that the project is not within mile of SA or SR waters, you must conduct a series of chlorides tests to demonstrate that the chlorides level at a point in the receiving stream that is at least % mile from the project is less than 500 ppm. Samples must be sent to a State certified lab for testing. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin Sand Filter Bio-retention Wetlands Alternative e Offsite Dry Detention NPDES Phase II Other. Level Spreader and Filter Strip How many separate BMP's are being proposed? 1 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BMP's on the project and is not being diverted? LJ Yes ® No ❑ N/A 6. Is a road across other property required to access the project? ❑ Yes ® No ❑ N/A 7. Is there any existing development or pre-1988 existing BUA located on the property? (Please document, delineate and identify on the plans.) ® Yes No C [R NJA V E Page 1 of 3 MAY 0 7 2008 D Revised 10/9/2007 DWQ Ppr1J u Project Name MCB Camp Leieune — Counter Battery 8. Will the high density project collect all of the proposed BUA? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet) 9. Will the project involve the subdivision and sale of property? ❑ Yes ® No ❑ N/A Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Will the plans show all delineated wetlands? ® Yes ❑ No ❑ N/A (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located adjacent wetlands? ® Yes F No ❑ N/A (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, a site visit must be completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report. What is/was the scheduled site visit date? (Include a copy of the consultant's soil report with the application.) 13. Level Spreaders are required at the outlet of all engineered controls and,swales prior to entering surface waters or wetlands. Will the plans reflect level spreaders? ® Yes ❑ No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project A modification to an existing permit A lot that will be treated in an existing, previously permitted BMP? What is the name of the existing permitted facility? What is the permit number of the existing permitted facility? SW8 Is the permitted facility in compliance with its permit? Yes No N/A Have the deed restrictions been recorded? Yes No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? Yes No N/A 15. Do the plans reflect all information in 15A NCAC 2H.1003 (g)? ® Yes ❑ No ❑ N/A 16. Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale projects, the individual drainage area for each proposed BMP must be clearly delineated. 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. 19. IS THE PROJECT DESIGNED AND THE APPLICATION READY TO SURO{ljO M M ©V40E (1 1 Page 2 of 3 Illr�llll! MAY 0 7 2008 U Revised 10/9/2007 DWo aan.ix Project Name MCB Camp Leieune — Counter Battery Complete applications may be accepted earlier if there is a cancellation in our submittal schedule. j�E C E I V ED IU�,uf MAY 0 7 2008 Page 3 of 3 PROJ # owe__ Revised 10/9/2007 Camp Lejeune Main Gate 7z ipee Ak' 'o Project Location ... . ......... . ........... ... . . I Camp Lejeune South Gate \1 Pk0J I to Bay Gdhe LeM"d T5 Ferry �17 WZ7 17_; 'L"J Atlantic Ocean Legend EarthTech Location Map PAVED 0 0 5 1 2 Wes A rqC�Q wflull L;d �mUt Counter Artillery Battery UNPAVED Radar Platoon Camp Lejeune MCB Onslow County, NC MAY 07 BmB 44 I IU U 4 Baal I MaC STORMWATER MANAGEMENT PLAN PREPARED FOR: MCB CAMP LEJEUNE SECOND RECONNAISSANCE BATTALION DATE: 5-28-08 EARTH TECH, INC 701 CORPORATE CENTER DR., SUITE 475 RALEIGH, NC 27607 919-854-6200 PREPARED BY: BRYAN M. DICK, EIT, PH CHECKED BY: BILL JENKINS, PE PROJECT DESCRIPTION THIS DOCUMENT IS TO SERVE AS A STORMWATER MANAGEMENT PLAN FOR THE MCB CAMP LEJEUNE - RECON PROJECT. THE PROJECT CONSISTS OF THE ADDITION OF PARKING AREAS, CONCRETE SLABS AND VARIOUS STRUCTURES TO THE ALREADY DEVELOPED SITE. THE COMPLETED PROJECT WILL PROVIDE FOR EXPANSION OF THE FACILITIES TO ACCOMMODATE ADDITIONAL STAFF IN THE COMING YEAR. CONTACT INFORMATION EARTH TECH, INC. ATTN: BRYAN M. DICK, PH 701 CORPORATE CENTER DR., SUITE 475 RALEIGH, NC 27607 TELEPHONE: 919-854-6252 FAX: 9 1 9-854-6259 IDENTIFY PROJECT INVOLVEMENT THIS PROJECT IS A PART OF THE WHITE OAK RIVER BASIN, AND IS CURRENTLY NOT SUBJECT TO ANY BUFFER RULES. THE SITE IS APPROXIMATELY 2,500 FEET FROM THE NEW RIVER AND ABOUT 2,000 FEET FROM COURTHOUSE BAY, JUST OUTSIDE OF SNEEDS FERRY, NC AND IS LOCATED IN ONSLOW COUNTY, WHICH IS A PHASE It - NPDES REQUIREMENT COUNTY. THE PROPOSED PROJECT STORMWATER PLAN WILL MEET THE REQUIREMENTS OF DETAINING THE 3.7 INCH RAINFALL EVENT FOR A PERIOD OF APPROXIMATELY 2 DAYS, PER THE REQUIREMENTS BY THE STATE AS REFERENCED FROM THE DWQ STORMWATER MANUAL, DULY 2007. SEVEN INFILTRATION BASINS ARE USED TO TREAT 7 SEPARATE DRAINAGE AREAS. THIS PROJECT IS WITHIN 0.5 MILES OF SA WATERS AND THE USE OF INFILTRATION DEVICES IS REQUIRED BY DWQ. THE TREATMENT VOLUME PROVIDED AS WELL AS THE USE OF SWALES AND ADEQUATE INFILTRATION CAPACITY WILL PROVIDE A POST DEVELOPMENT PEAK FLOW RATE THAT IS LESS THAN THE PRE -DEVELOPMENT CONDITION, PER THE JULY 2007 START DATE FOR MEETING PHASE II REQUIREMENTS. HYDROCAD MODELS BASES ON TR-55 METHODS WERE USED TO VALIDATE THE COMPLETE CAPTURE OF THE RUNOFF DIFFERENCE FOR THE 3.71' TYPE III - 24 HR. STORM. STORMWATER DESIGN PARAMETERS THE INFILTRATION BASINS ARE BASED ON THE FOLLOWING PARAMETERS OR OBJECTIVES: • PROVIDE 85% TSS REMOVAL • PROTECT THE VALUE OF THE RECEIVING WATER RESOURCE • 3.7" RAINFALL FOR BASIN STORAGE SIZING • THE 1 YR RAINFALL FOR OUTLET STRUCTURE AND ROUTING DESIGN TO MAINTAIN A POST DEVELOPMENT PEAK FLOW THAT IS LESS THAN PRE - DEVELOPMENT PEAK FLOW • RATIO OF IMPERVIOUS SURFACE TO THE TOTAL AREA OF THE DRAINAGE AREA 0 EXCEED A MINIMUM OF 2.0" • RAINFALL EXCEEDING THE DESIGN STORM WILL BYPASS THE BASINS AND FLOW THROUGH A MINIMUM OF 30' LONG VEGETATED FILTER DISCUSSION OF TREATMENT MEASURES THE PROPOSED TREATMENT IS TO UTILIZE 7 SEPARATE INFILTRATION BASINS TO MEET THE TSS AND PEAK FLOW REQUIREMENTS SET FORTH BY DWQ. THE SOILS OF THE PROJECT SITE ARE APPROPRIATE SOILS FOR INFILTRATION AND THE SEASON HIGH WATER TABLE AT EACH BASIN WILL ALLOW CONSTRUCTION OF THESE BASINS, WITH AT LEAST A 2' CLEARANCE FOR EACH BASIN, BYPASS DEVICES ARE PROVIDED TO ALLOW ANY RUNOFF VOLUME THAT EXCEEDS THE DESIGN STORAGE VOLUME TO BE ROUTED TO A LEVEL SPREADER WITH A VEGETATED FILTER STRIP. THE LEVEL SPREADER LENGTH IS DESIGNED TO HANDLE THE 10 YR PEAK RUNOFF RATE, SO NO BYPASS OF THE FILTER IS NECESSARY. PHASE II REQUIREMENTS ARE MET BY USING A GRASSED SWALE TO COLLECT SHEET FLOW FROM THE IMPERVIOUS AREAS AND BY THE INFILTRATION AND STORAGE VOLUME PROVIDED IN EACH BASIN. CONCLUSION THIS STORMWATER MANAGEMENT PLAN REPRESENTS AN ENVIRONMENTALLY SENSITIVE AND EFFECTIVE PLAN FOR UTILIZING THE PROPOSED STORMWATER TREATMENTS TO ACCOMMODATE THE INCREASED RUNOFF OF THE PROPOSED SITE DEVELOPMENT. a OnV�il� SAIPA D e_ 17 70 4 2gSo Piney Gr _ r v (D� ly is Bay Gable L&d BREWSTER BOULEVARD'_� 17 Camp Lejeune Main Gate M. IM Y T 17 �N K o wt �.y 81RCH 0 SIR LL 1110 � G N sy,� pp vo R�qO It f Camp Lejeune South Gate �P n 1s rY Fer Project Location T/ PROJECT SITE Legend — PAVED UNPAVED EarthTech vicinity Map 0 05 z Recon Platoon Miles A tWO WKIaironal',m Comney Interim Facility at Courthouse Bay Camp Lejeune MCB Onslow County, NC NC®ENR North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 FAX (910)350-2004 Request for Express Permit Review FILL-IN all information below.. FAX to Express Coordinator along with a compl, a detailed narrative and vicinity map of the project location. Reviewer C:.S' Submit $/2K_ .Time 11.3c7 Confirm APPLICANT: Name: Carl Baker Title Deputy Public Works Officer Company Name MCB Camp Leieune Address —Bldg 1005 Michael Rd City MCB Camp Leieune Zip 28547 Phone 910-451-2213 Fax Email_carl.h.baker@usmc.mil_ PROJECT: Name _ReconBatt.. ENGINEER/CONSULTANT INFORMATION: County Onslow Name Bryan M. Dick Company Earth Tech Address 701 Corporate Ctr Drive City _Raleigh State NC Zip 27607 ❑ SCOPING MEETING ONLY DWQ DLR DCM Other ❑STREAM ORIGIN DETERMINATION # of Stream calls Stream KN6",++t- ❑ STORMWATER ❑ Low Density ❑ High Density -Detention Pond ❑ High Density - Other (check all that apply) ❑ Low Density -Curb & Gutte High Density -Infiltration. Off -site Wetlands MUST be addressed below �'NPDES Phase II Plan Revision ❑ COASTAL MGT. ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Dev. ------------------------------------------------------------------------------------------------------------------------------------------------------ ---------------- ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed WETLANDS (401) Wetlands on Property ? ❑ Yes ❑ No Isolated Wetlands on Property? ❑ Yes ❑ No (Check all that apply) Wetlands will be impacted? ❑ Yes ❑ No Wetland impacts: acre(s) Wetlands delineation has been completed? ❑ Yes ❑ No ❑ Buffers impacted: Acre(s) USACOE Approval of Delineation completed? ❑ Yes ❑ No 404 Application in Process w/USACOE? ❑ Yes ❑ No / Permit recv'd from USACOE❑Yes ❑ No 401 Application Required? ❑ Yes ❑ No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee may be charged for subsequent reviews due to the insufficiency of the permit application. Total Fee:$ Stormwater $ CAMA $ LQS $ 401 $ Date Received E C E I V ED MAY 0 7 2008 DWQ Ravisad 101PO n7 Project Name MCB Camp Leieune — Recon +Stormwater Express Questionnaire (10/9/2007) What is the applicant's full legal name? Carl Baker -Marine Corps Base Camp Leieune Is the applicant associated with Sole proprietor Corporation ❑ LLC Partnership H Municipality If it's an LLC, is it ❑ Manager -managed or ❑ Member -managed? ()What is the applicant's title within the Corp., LLC or Partnership? Deputy Public Works Officer Will an agent (someone other than the applicant) be signing the application? ❑ Yes ®No If Yes, what is the agent's name and title? OPlease note the application signature requirements are listed in NCAC 2H.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member - manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Project Location: County _Onslow Nearest Town/City_Jacksonville, NC_ (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow, or New Hanover Counties, or a small portion of northern Pender County, NPDES Phase II Post -Construction rules will apply, unless a vested development right, as described in the Session Law, can be demonstrated, which is dated prior to July 1, 2007. 3. Receiving stream name Courthouse Bail River Basin White Oak (03-05-02) What is the classification of the receiving stream? SA, HQW For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the % mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. If you claim that the project is not within mile of SA or SR waters, you must conduct a series of chlorides tests to demonstrate that the chlorides level at a point in the receiving stream that is at least % mile from the project is less than 500 ppm. Samples must be sent to a State certified lab for testing. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply) Wet Detention Infiltration Trench Infiltration Basin e Sand Filter Bio-retention Wetlands Alternative Offsite Dry Detention NPDES Phase II Other Level Spreader and Filter Strip How many separate BMP's are being proposed? 5. Is there offsite runoff from the adjacent properties or public right-of-wa that will drain into any of the proposed BMP's on the project and is not being diverted? Yes ® No ❑ N/A 6. Is a road across other property required to access the project? ❑ Yes ® No ❑ N/A 7. Is there any existing development or pre-1988 existing BUA located on the y? (Please document, delineate and identify on the plans.) ® Yesr0C © N. E D Page 1 of 3• MAY 0 7 2008 D Revised 10/9/2007 DWO PROJ# Project Name MCB Camp Leleune — Recon Will the high density project collect all of the proposed BUA? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet) Will the project involve the subdivision and sale of property? ❑ Yes ® No ❑ N/A Is the subdivision ❑ residential or ❑ commercial? How many lots are proposed? (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Will the plans show all delineated wetlands? ® Yes ❑ No ❑ N/A (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located a_diacent wetlands? ® Yes u No ❑ N/A (If, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time. Where possible, all BMP's and swales should outlet into back the wetland (with level spreaders). 12. For infiltration projects, a site visit must be completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report. What is/was the scheduled site visit date? April 17, 2008 (Include a copy of the consultant's soil report with the application.) 13. Level Spreaders are required at the outlet of all engineered controls and swales prior to entering surface waters or wetlands. Will the plans reflect level spreaders? ® Yes ❑ No ❑ N/A (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project A modification to an existing permit A lot that will be treated in an existing, previously permitted BMP? What is the name of the existing permitted facility? What is the permit number of the existing permitted facility? SW8 Is the permitted facility in compliance with its permit? Yes No N/A Have the deed restrictions been recorded? Yes No N/A Have the deed restrictions been submitted? Yes No N/A Has the Designer's Certification been submitted? H Yes NNo N/A 15. Do the plans reflect all information in 15A NCAC 2H.1003 (g)? ® Yes ❑ No ❑ N/A 16. Will all of the design requirements for each proposed BMP be met? ® Yes ❑ No ❑ N/A (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale projects, the individual drainage area for each proposed BMP must be clearly delineated. 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. 19. IS THE PROJECT DESIGNED AND THE APPLICATION READY TO SUBM,3 j'JE &sE❑fNp� E Revised 10/9/2007 Page 2 of 3 n MAY 0 7 2008 D PROD # DWQ e r•n;a 1 �P�RpbpJ PR�pO ti � /'• �k'v.Y y H d O T N 'Qj' AbB ywµ,_ OVOy N33b`1A3Nb U 'L. � SytP L. J•ti "b �P � IORINMMVFNUE Z � fREE3 z ��'✓ �� � G 1 5 E e 0 m 0 ' �,.• d N f c �. 2Lf AVMM'J.'N JN � O o �P �0. Legend Site Layout Existing Roads — PAVED UNPAVED Soil Map Units 7n ON EarthTech Soils Map Recon Platoon Interim Facilities A 1<YCO ImemaOona.1W Cwwv at Courthouse Bay Camp Lejeune Marine Corps Base Onslow County, North Carolina 0 150 300 600 Feet 1 inch equals 300 feet N I about:blank May 14, 2008 Recon Battalion & Counter Battery Bryan: The two above -referenced projects have been scheduled for Express Stormwater submittal meetings with Chris Baker on May 28, 2008 at 10:30 and 11:30 here in the Wilmington Regional Office, 127 Cardinal Drive Extension. I have received confirmation from Camp Lejeune (David Towler) that this date & time is acceptable to him for a meeting. However, I'm not sure that I've heard from you. Please confirm or reconfirm that this meeting date and times will work with your schedule. Thank you so much and I apologize if I'm asking you to confirm twice. Janet Russell Express Coordinator I of 1 5/14/2008 2:00 PM RE: Express Appointments Subject: RE: Express Appointments From: "Dick, Bryan' <Bryan.Dick@earthtech.com> Date: Wed, 14 May 2008 14:49:32 -0400 To: "Janet Russell" <Janet.Russel I@ncmail.net> CC: "Dean, Neil' <Neil.Dean@earthtech.com> Those meetings times are fine with me Janet. I have been out of the office but thought I had sent out a response. The remote email access does not always work properly. I will be there at 10:30 hrs on May 28th. Have a good week and thanks for trying for afternoon slots even thought we did not get them.. Bryan Bryan M. Dick, PH Project Manager EARTH TECH, INC. 701 Corporate Center Drive, Suite 475 Raleigh, NC 27607-5074 . Phone: (919) 854-6252 864-506-1465 (cell) Fax: (919) 654-6259 -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net) Sent: Wednesday, May 14, 2008 2:10 PM To: Dick, Bryan Subject: Express Appointments Bryan, I forgot to mention...... it was noted that you prefer afternoon appointments. The 10:30 & 11:30 appointments were what I was offered. If those times do not work for you, I will keep trying. Janet I of 1 5/14/2008 3:22 PM RE: Express Stormwater Pennit Review Request - MCB Lejeune an... Subject: RE: Express Stormwater Permit Review Request - MCB Lejeune and MCB- Recon Sites From: "Towler CIV David W" <david.towler@usmc.mil> Date: Mon, 12 May 2008 08:59:42 -0400 To: "Janet Russell" <Janet.Russel I@ncmai1.net>, "Dick, Bryan" <Bryan.Dick@earthtech.com>, "Baker CIV Carl IT' <carl.h.baker@usmc.mil> All, The dates and times are acceptable for Camp Lejeune. If anything is changed or any information is required please let us know. Thanks. V/r, David W. Towler, EI Marine Corps Base, Camp Lejeune Civil Engineer Public Works Division, Bldg 1005 Civil Design Branch Phone: (910) 451-3238 ext. 254 -----Original Message ----- From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Friday, May 09, 2008 17:02 To: Dick, Bryan; Baker CIV Carl H; Towler CIV David W Subject: Re: Express Stormwater Permit Review Request - MCB Lejeune and MCB- Recon Sites Bryan: We have scheduled the *Recon Battalion* and *Counter Battery* sites for stormwater submittal meetings with *Chris Baker on May 28, 2008 at 10:30 and 11:30* here in the Wilmington Regional Office, 127 Cardinal Drive Ext. The applicant must attend the meeting. I am copying Carl Baker & David Towler on this email. Please be sure to use the most current stormwater application form, supplement sheets, operation and maintenance form, and initial checklist from the BMP website. The link to the BMP is in the attachment, submittal requirements. _Keep in mind that we require a supplement sheet and 0 & M for each BMP. The exception to this is level spreaders & swales for treatment. We only need 1 0 & M for the swales and 1 for the level spreaders. Please respond within 2 business days to confirm and reserve the submittal meeting date and times_. I know that you prefer an afternoon appointment. If you can work with these times, we would appreciate it. However, if these won't work, let me know and we'll keep looking for something later in the day. FYI... we are currently scheduling meetingsl-2 weeks after we receive the request. Thanks, Janet Russell Express Coordinator Dick, Bryan wrote: Thanks for keeping me in mind when you start to schedule for that week. We have the gis based metadata layer that has the recorded date and document reference for the official Corps approval for the wetlands (all within the last 5 years) for the site. This is Lejeune's system I of 3 5/12/2008 9:02 AM aboutblank From: Janet Russell[mailto:Janet.Russell@ncmail.net] Sent: Wednesday, May 07, 2008 4:55 PM To: Dick, Bryan Subject: Re: Express Stormwater Permit Review Request - MCB Lejeune and MCB- Recon Sites Thank you for the Express Requests for the *Recon. Battalion and Counter Battery Sites*. You have requested to be scheduled the week of May 26 which is farther out than we are scheduling currently. However, I will try and accommodate you if possible. Question - you make reference to the Corps approving the wetland delineation but not that you have a signed copy of the wetland delineation. Please clarify what you have. The Express Request Wetlands portion has been left blank for both projects. We do require a Corps of Engineers signed wetland delineation (less than 5 years old) with the stormwater application packages. Please note also, the Express Request materials changed back in February, 08. I am attaching the new Request form and guidance for a complete stormwater narrative which replaced the questionnaire. In addition to the Express Request and project stormwater narrative, we need a vicinity map and a pdf site plan. This was changed in an effort to make the Wilmington Office and Washington Regional Office consistent with what was required in the Express program. (Don't worry about replacing what you just sent in.... just use the new forms for all future requests... please). I will contact you within a day or so with a meeting date and time. Thanks, Janet Russell Express Coordinator Dick, Bryan wrote: 2 of 2 5/9/2008 5:01 PM Express Stormwater Permit Review Request - MCB Lejeune and M... Subject: Express Stormwater Permit Review Request - MCB Lejeune and MCB- Recon Sites From: "Dick, Bryan" <Bryan.Dick@earthtech.com> Date: Wed, 7 May 2008 01:08:00 -0400 To: 'Janet Russell" <Janet.Russel l@ncmail.net> CC: "Towler CIV David W" <david.towler@usmc.mil>, 'Jenkins, Bill" <Bill.Jenkins@earthtech.com>, "Dean, Neil' <NeiI.Dean@earthtech.com>, 'Burnet, Gil" <gi I.burnet@earthtech.com> Mrs. Russel, I have attached the request form and questionnaire form for 2 Camp Lejeune project sites, Counter Battery and Recon. Please let me know if we can schedule the meeting for the week of May 26-30. Any day that week will work for me. This may need to be done in two separate meetings and if so, can we make them on the same day? That would help me with my travel time. Please let me know if you need any additional information. I am away from the office for the remainder of the week, but will check email most days and you can contact me on my cell to finalize a date and time. I know you usually have concerns of the wetland so I attached the wetland image. Metadata indicating the date of the Corps approval on the wetlands is included in the stormwater management plan. Thank you in advance for your help and have a good day! Bryan Bryan M. Dick, PH Project Manager EARTH TECH, INC. 701 Corporate Center Drive, Suite 475 Raleigh, NC 27607-5074 Phone: (919) 854-6252 864-506-1465 (cell) Fax: (919) 854-6259 EXPRESS COVERSH Counter Battery 5-6-08.doc EXPRESS Content -Description: COVERSH Counter Battery 5-6-08.doc Content -Type: application/msword Content -Encoding: base64 i Content -Description: Express Permit Quest Counter Battery 5-6-08 (2).docj Content -Type: Express Permit Quest Counter Battery 5-6-08 (2).doc application/msword Content -Encoding: base64 1 of 3 5/7/2008 4:28 PM aboutblank Bryan: We have scheduled the Recon Battalion and Counter Battery sites for stormwater submittal meetings with Chris Baker on May 28, 2008 at 10:30 and 11:30 here in the Wilmington Regional Office, 127 Cardinal Drive Ext. The applicant must attend the meeting. 1 am copying Carl Baker & David Towler on this email. Please be sure to use the most current stormwater application form, supplement sheets, operation and maintenance form, and initial checklist from the BMP website. The link to the BMP is in the attachment, submittal requirements. Keep in mind that we require a supplement sheet and O & M for each BMP. The exception to this is level spreaders & swales for treatment. We only need 1 O & M for the swales and 1 for the level spreaders. Please respond within 2 business days to confirm and reserve the submittal meeting date and times. I know that you prefer an afternoon appointment. If you can work with these times, we would appreciate it. However, if these won't work, let me know and we'll keep looking for something later in the day. FYI... we are currently scheduling meetings]-2 weeks after we receive the request. Thanks, Janet Russell Express Coordinator Dick, Bryan wrote: Thanks for keeping me in mind when you start to schedule for that week. We have the gis based metadata layer that has the recorded date and document reference for the official Corps approval for the wetlands (all within the last 5 years) for the site. This is Lejeune's system for keeping up with the official approval by the corps (it can be traced back to the actual signed documents). This metadata sheet is the same verification that we have used for the recent DWQ permits at Lejeune. Hope that helps with the wetland question.. Please let me know as soon as you can finalize a date for that week. For my reference point, how may weeks out are you usually scheduling express meetings? Thanks Bryan Bryan M. Dick, PH Project Manager EARTH TECH, INC. 701 Corporate Center Drive, Suite 475 Raleigh, NC 27607-5074 Phone: (919) 654-6252 864-506-1465 (cell) Fax: (919) 854-6259 -----Original Message----- Iof 2 5/9/2008 5:01 PM 1033541Aecon - Infiltration Basin 1 Dmin a Area (Sf 27172 Step 1: Determine Runoff Volume Simple Method a. Rv=.OS +.9(/A)=Rv(post)=.05+.9'.67 Rv (pre) = .05+.9'0 h V=3630xR xR xA Post V=3630'3.7'0.67'.6273 Pre V=3630'3.7'0.05'.6273 Designed By. Date: V (Post) _ V (Pre) = BMD 5/5/2008 0.92 0.05 7713 cf 419 ct Min. Treatment Vol ffPost - Pre)-- 7294 ct Treatment Vol in Ac-in 2.01 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 2.42 (1) Intended Days to Infiltrate(days) 2 a. A - V = A=5232/(2'(6.69'2)) IMin SA of Basin = 753.6 sf 2*(K *T) Step 3. Determine Dimensions Basin Volume Depth to Exist grount to SHWT (tt) 4.42 -Frc Existing Ground Elevation 11.30 Design Storage Elevation 10.80 Bottom Elevation 9.00 Flow Splifter - Outlet to Basin Elev. 9.70 Max Excavation Depth 2.42 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width 0 Storage Elev Bottom Width Flow Splitter - Inlet Elevation Flow Splitter - Inlet Elevation 11.00 Flow Splitter - Bypass Flow Outlet 10.50 Top of Berth Elevation 11.40 1.80 4052 Target Area 4050 sf Top Length @ Storage Surface Area Storage = 5250 $f Bottom Length Surface Area Bottom = 1Avg 31M of Surface Area = 4217 at 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: '0 is actually the Damian Flow Rate Q=A (K) Conversion=cfs ExampleCalculatim of Q: SurfbceArea=3184sf (K)=2.42in/hr 3184 sf-2.42in Ijt Ihr =0. 18efs hr 12in 3600s ExampleCalculatim: Q=0.18cfs V=3184cf V =T :. 3184ft' Is Ihr= 2. lhrs =.049days Q 1 0.18ft' 3600s- Volume of Basin De th'SA) = 7591 cf Area (so (K) in/hr D (infiltration) = 0.18 cfs 3184 2.42 Drawdown Time for Desi n Vol Volume cf O Hours Da a 7591 0.18 11.8 0.49 Pre -development Su4 Reach Aon Link 103354 Recon Basin 1- Pre Prepared by Earth Tech Subcatchment 1S: Pre -development Runoff = 0.01 cfs @ 13.33 hrs, Volume= 0.006 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 27.172 45 Woods. Poor. HSG A 27,172 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftisec) (cfs) 31.0 245 0.0400 0.13 Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" 3 LL Subcatchment 1S: Pre -development Hydrograph 0 Type-H i4- fir- 1;yr-- --- Rainfall, 3.70 _Runoff Area=27,172 sf --Runoff-Volume=0.006 af- Runoff Depth>0.11;" Tlow.Eength=245"---- - Slope=6.0400 T -Tc=31:0-min- CN=45 ; - ----------- ---- - a 9 10 11 12 13 Time (hours) Type 11 24-hr 1 yr Rainfall=3.70" Page 2 1S Post Develor Infiltration Basin Sub4 Reach Aon Llnk 103354 Recon Basin 1- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Pond 2P: Infiltration Basin Inflow Area = 0.624 ac, Inflow Depth > 3.46" for 1 yr event Inflow = 3.65 cfs @ 11.93 hrs, Volume= 0.180 of Outflow = 0.18 cfs @ 11.23 hrs, Volume= 0.180 af, Atten= 95%, Lag= 0.0 min Discarded = 0.18 cfs @ 11.23 hrs, Volume= 0.180 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 9.77' @ 12.72 hrs Surf.Area= 0 sf Storage= 3,240 cf Plug -Flow detention time= 131.5 min calculated for 0.180 of (100% of inflow) Center -of -Mass det. time= 130.6 min ( 876.6 - 746.0 ) Volume Invert Avail.Storage Storage Description #1 9.00, 7,591 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 9.00 0 10.80 7,591 Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.18 cfs Exfiltration at all elevations LDiscarded OutFlow Max=0.18 cfs @ 11.23 hrs HW=9.02' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.18 cfs) 103354 Recon Basin 1- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 N U 3 0 E Pond 2P: Infiltration Basin Hydrograph ---- 3.65 cfs Inf1o*Area=0.624 ac -Peak Elev=9.-77'-- Storage=3,240 d i i i i i i --------------------- i i i i 0.18 cfs i i ---------------------------- i i ///&VIOMOM=01%%MOM, 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Time (hours) ® Inflow p Discarded 103354 Recon Basin 1- Post Prepared by Earth Tech Hydrograph for Pond 2P: Infiltration Basin Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 9.00 0.00 0.50 0.00 0 9.00 0.00 1.00 0.00 0 9.00 0.00 1.50 0.00 1 9.00 0.00 2.00 0.01 3 9.00 0.01 2.50 0.01 5 9.00 0.01 3.00 0.02 6 9.00 0.01 3.50 0.02 7 9.00 0.02 4.00 0.02 8 9.00 0.02 4.50 0.02 10 9.00 0.02 5.00 0.03 11 9.00 0.03 5.50 0.03 12 9.00 0.03 6.00 0.03 14 9.00 0.03 6.50 0.04 15 9.00 0.04 7.00 0.04 16 9.00 0.04 7.50 0.04 18 9.00 0.04 8.00 0.05 19 9.00 0.04 8.50 0.06 22 9.01 0.05 9.00 0.07 27 9.01 0.06 9.50 0.07 29 9.01 0.07 10.00 0.09 35 9.01 0.08 10.50 0.11 45 9.01 0.11 11.00 0.16 62 9.01 0.15 11.50 0.26 127 9.03 0.18 12.00 1.80 2,802 9.66 0.18 12.50 0.22 3,228 9.77 0.18 13.00 0.15 3,222 9.76 0.18 13.50 0.11 3,128 9.74 0.18 14.00 0.09 2,983 9.71 0.18 14.50 0.08 2,807 9.67 0.18 15.00 0.07 2,617 9.62 0.18 15.50 0.06 2,412 9.57 0.18 16.00 0.05 2,192 9.52 0.18 16.50 0.05 1,962 9.47 0.18 17.00 0.05 1,727 9.41 0.18 17.50 0.04 1,486 9.35 0.18 18.00 0.04 1,240 9.29 0.18 Type 11 24-hr 1 yr Rainfall=3.70" Page 4 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 18.50 0.04 989 9.23 0.18 19.00 0.04 733 9.17 0.18 19.50 0.03 471 9.11 0.18 20.00 0.03 205 9.05 0.18 20.50 0.03 19 9.00 0.05 21.00 0.03 12 9.00 0.03 21.50 0.03 12 9.00 0.03 22.00 0.03 12 9.00 0.03 22.50 0.03 12 9.00 0.03 23.00 0.03 11 9.00 0.03 23.50 0.03 11 9.00 0.03 24.00 0.03 11 9.00 0.03 103354 Recon Basin 1- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Elevation Discarded (feet) (cfs) 9.00 0.00 9.01 0.18 9.02 0.18 9.03 0.18 9.04 0.18 9.05 0.18 9.06 0.18 9.07 0.18 9.08 0.18 9.09 0.18 9.10 0.18 9.11 0.18 9.12 0.18 9.13 0.18 9.14 0.18 9.15 0.18 9.16 0.18 9.17 0.18 9.18 0.18 9.19 0.18 9.20 0.18 9.21 0.18 9.22 0.18 9.23 0.18 9.24 0.18 9.25 0.18 9.26 0.18 9.27 0.18 9.28 0.18 9.29 0.18 9.30 0.18 9.31 0.18 9.32 0.18 9.33 0.18 9.34 0.18 9.35 0.18 9.36 0.18 Elevation Discarded (feet) (cfs) 9.37 0.18 9.38 0.18 9.39 0.18 9.40 0.18 9.41 0.18 9.42 0.18 9.43 0.18 9.44 0.18 9.45 0.18 9.46 0.18 9.47 0.18 9.48 0.18 9.49 0.18 9.50 0.18 9.51 0.18 9.52 0.18 9.53 0.18 9.54 0.18 9.55 0.18 9.56 0.18 9.57 0.18 9.58 0.18 9.59 0.18 9.60 0.18 9.61 0.18 9.62 0.18 9.63 0.18 9.64 0.18 9.65 0.18 9.66 0.18 9.67 0.18 9.68 0.18 9.69 0.18 9.70 0.18 9.71 0.18 9.72 0.18 9.73 0.18 Stage -Discharge for Pond 2P: Infiltration Basin Elevation Discarded (feet) (cfs) 9.74 0.18 9.75 0.18 9.76 0.18 9.77 0.18 9.78 0.18 9.79 0.18 9.80 0.18 9.81 0.18 9.82 0.18 9.83 0.18 9.84 0.18 9.85 0.18 9.86 0.18 9.87 0.18 9.88 0.18 9.89 0.18 9.90 0.18 9.91 0.18 9.92 0.18 9.93 0.18 9.94 0.18 9.95 0.18 9.96 0.18 9.97 0.18 9.98 0.18 9.99 0.18 10.00 0.18 10.01 0.18 10.02 0.18 10.03 0.18 10.04 0.18 10.05 0.18 10.06 0.18 10.07 0.18 10.08 0.18 10.09 0.18 10.10 0.18 Elevation Discarded (feet) (cfs) 10.11 0.18 10.12 0.18 10.13 0.18 10.14 0.18 10.15 0.18 10.16 0.18 10.17 0.18 10.18 0.18 10.19 0.18 10.20 0.18 10.21 0.18 10.22 0.18 10.23 0.18 10.24 0.18 10.25 0.18 10.26 0.18 10.27 0.18 10.28 0.18 10.29 0.18 10.30 0.18 10.31 0.18 10.32 0.18 10.33 0.18 10.34 0.18 10.35 0.18 10.36 0.18 10.37 0.18 10.38 0.18 10.39 0.18 10.40 0.18 10.41 0.18 10.42 0.18 10.43 0.18 10.44 0.18 10.45 0.18 10.46 0.18 10.47 0.18 Elevation Discarded (feet) (cfs) 10.48 0.18 10.49 0.18 10.50 0.18 10.51 0.18 10.52 0.18 10.53 0.18 10.54 0.18 10.55 0.18 10.56 0.18 10.57 0.18 10.58 0.18 10.59 0.18 10.60 0.18 10.61 0.18 10.62 0.18 10.63 0.18 10.64 0.18 10.65 0.18 10.66 0.18 10.67 0.18 10.68 0.18 10.69 0.18 10.70 0.18 10.71 0.18 10.72 0.18 10.73 0.18 10.74 0.18 10.75 0.18 10.76 0.18 10.77 0.18 10.78 0.18 10.79 0.18 10.80 0.18 103354 Recon - Infiltration Basin 2 Drain a Area (Sf) 27410 Imp Area (sf) 26090 (A) Drainage Area (Ac) 0.629247 (Iq) Imp Fraction 0.95 (Ro)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method 6 V=3630xR„xRvxA Post Pre = Rv (post) _ .05+.9'.67 Rv (pre) = .05+.9.0 V =3630 ' 3.7' 0.67 ' .627 3 V=3630 ' 3.7'0.05 '.6273 Designed By: BMD Date: 4/2/2008 0.91 0.05 V (Post) = 7663 cf V (Pre) = 423 cf. Min. Treatment Vol Post - Pre )= 7240 cf Treatment Vol in Ac-in 1.99 ac-in Step 2: Determine Surface Area- Min. K) Infiltration Rate (in/hr) 1 2.81 (T) Intended Days to Infiltrate(days) 2 a. A - V = A=5232/(2'(6.69.2)) IMin SA of Basin = 644.1 sf 2*(K *T) Step 3. Determine Dimensions Basin Volume Depth to Exist grount to SHWT (ft) 4.00 Existing Ground Elevation 10.10 Bypass Weir Elevation 9.30 Design Storage Elevation 9.30 Flow Splitter- Inlet Elevation 9.60 Bottom Elevation 8.10 Flow Splitter - Bypass Flow Outlet 9.10 Flow Splitter- Outlet to Basin Elev. 8.60 Top of Berm Elevation 10.00 Max Excavation Depth 2.00 Storage Depth 1.20 Surface Area Required (Avg of Top and Bottom SA) 6033 Target Area 6035 sf Top Width 0 Storage Elev Top Length ® Storage Surface Area Storage = 7304 at Bottom Width Bottom Length Surface Area Bottom = 5128 sf lAvg Surface Area = 6216 sf Volume of Basin De th'SA = 7459 cf 4. Calculation of Volumetric Flow Rate of Infiltration and Drawdown 0 from infiltration: '0 is actually the Damian Flaw Rate Q=A (K) Conversion=(f Example Calculation of Q: Surface Area=4556.sf (K)=3.94 inl hr 3.94 in Ifi Ihr 4.556.c(�-=(7.42yfe hr 12in 3600s Drawdown Time for Treatment Volume Example Calculation: Q=0.42cfs V=3458cf V _T . 3458ft' Is Ihr =2 Mrs=.089days Q I 0.42ft3 3600s Area (sf) (K) in/hr 10 (infiltration )= 0.33 cfs 5128 2.81 Drawdown Time for Desi n Vol Volume cl O Hours Days 7459 1 6.2 1 0.26 1S Post-developme Infiltration Basin Subcat Reach Aon Link 103354 Recon Basin 2- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Pond 2P: Infiltration Basin Inflow Area = 0.629 ac, Inflow Depth > 3.13" for 1 yr event Inflow = 3.52 cfs @ 11.93 hrs, Volume= 0.164 of Outflow = 0.33 cfs @ 11.60 hrs, Volume= 0.164 af, Atten= 91 %, Lag= 0.0 min Discarded = 0.33 cfs @ 11.60 hrs, Volume= 0.164 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 8.51' @ 12.29 hrs Surf.Area= 0 sf Storage= 2,525 cf Plug -Flow detention time= 49.1 min calculated for 0.164 of (100% of inflow) Center -of -Mass det. time= 48.6 min ( 818.4 - 769.8 ) Volume Invert Avail.Storage Storage Description #1 8.10' 7,459 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 8.10 0 9.30 7,459 Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.33 cfs Exfiltration at all elevations MDiscarded OutFlow Max=0.33 cfs @ 11.60 hrs HW=8.11' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.33 cfs) 103354 Recon Basin 2- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD® 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Pond 2P: Infiltration Basin Hydrograph ; ® Inflow 3.52 cfs ❑ Discarded 3- 2- 0 LL ; 1- i 0.33 cfs 0 1 2 3 4 5 6 7 8 9 Inf1ow:Area=0.629 ac Peak- Elev=8:51' Storage=2,525 cf i i i i 11 12 13 14 Time (hours) 21 22 23 24 103354 Recon Basin 2- Post Type /I 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Hydrograph for Pond 2P: Infiltration Basin Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 8.10 0.00 0.50 0.00 0 8.10 0.00 1.00 0.00 0 8.10 0.00 1.50 0.00 0 8.10 0.00 2.00 0.00 0 8.10 0.00 2.50 0.00 0 8.10 0.00 3.00 0.00 0 8.10 0.00 3.50 0.00 1 8.10 0.00 4.00 0.01 2 8.10 0.01 4.50 0.01 2 8.10 0.01 5.00 0.01 3 8.10 0.01 5.50 0.02 4 8.10 0.02 6.00 0.02 4 8.10 0.02 6.50 0.02 5 8.10 0.02 7.00 0.03 6 8.10 0.03 7.50 0.03 6 8.10 0.03 8.00 0.03 7 8.10 0.03 8.50 0.04 9 8.10 0.04 9.00 0.05 11 8.10 0.05 9.50 0.06 12 8.10 0.05 10.00 0.07 15 8.10 0.07 10.50 0.10 21 8.10 0.09 11.00 0.14 30 8.10 0.13 11.50 0.24 50 8.11 0.22 12.00 1.86 2,319 8.47 0.33 12.50 0.22 2,483 8.50 0.33 13.00 0.14 2,204 8.45 0.33 13.50 0.11 1,837 8.40 0.33 14.00 0.09 1,420 8.33 0.33 14.50 0.08 973 8.26 0.33 15.00 0.07 511 8.18 0.33 15.50 0.06 46 8.11 0.20 16.00 0.05 12 8.10 0.05 16.50 0.05 11 8.10 0.05 17.00 0.05 11 8.10 0.05 17.50 0.04 10 8.10 0.04 18.00 0.04 10 8.10 0.04 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 18.50 0.04 9 8.10 0.04 19.00 0.04 8 8.10 0.04 19.50 0.03 8 8.10 0.03 20.00 0.03 7 8.10 0.03 20.50 0.03 7 8.10 0.03 21.00 0.03 7 8.10 0.03 21.50 0.03 6 8.10 0.03 22.00 0.03 6 8.10 0.03 22.50 0.03 6 8.10 0.03 23.00 0.03 6 8.10 0.03 23.50 0.03 6 8.10 0.03 24.00 0.03 6 8.10 0.03 103354 Recon Basin 2- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Elevation Storage (feet) (cubic -feet) 8.10 0 8.11 62 8.12 124 8.13 186 8.14 249 8.15 311 8.16 373 8.17 435 8.18 497 8.19 559 8.20 622 8.21 684 8.22 746 8.23 808 8.24 870 8.25 932 8.26 995 8.27 1,057 8.28 1,119 8.29 1,181 8.30 1,243 8.31 1,305 8.32 1,367 8.33 1,430 8.34 1,492 8.35 1,554 8.36 1,616 8.37 1,678 8.38 1,740 8.39 1,803 8.40 1,865 8.41 1,927 8.42 1,989 8.43 2,051 8.44 2,113 8.45 2,176 8.46 2,238 Stage -Area -Storage for Pond 2P: Infiltration Basin Elevation Storage (feet) (cubic -feet) 8.47 2,300 8.48 2,362 8.49 2,424 8.50 2,486 8.51 2,548 8.52 2,611 8.53 2,673 8.54 2,735 8.55 2,797 8.56 2,859 8.57 2,921 8.58 2,984 8.59 3,046 8.60 3,108 8.61 3,170 8.62 3,232 8.63 3,294 8.64 3,357 8.65 3,419 8.66 3,481 8.67 3,543 8.68 3,605 8.69 3,667 8.70 3,729 8.71 3,792 8.72 3,854 8.73 3,916 8.74 3,978 8.75 4,040 8.76 4,102 8.77 4,165 8.78 4,227 8.79 4,289 8.80 4,351 8.81 4,413 8.82 4,475 8.83 4,538 Elevation Storage (feet) (cubic -feet) 8.84 4,600 8.85 4,662 8.86 4,724 8.87 4,786 8.88 4,848 8.89 4,911 8.90 4,973 8.91 5,035 8.92 5,097 8.93 5,159 8.94 5,221 8.95 5,283 8.96 5,346 8.97 5,408 8.98 5,470 8.99 5,532 9.00 5,594 9.01 5,656 9.02 5,719 9.03 5,781 9.04 5,843 9.05 5,905 9.06 5,967 9.07 6,029 9.08 6,092 9.09 6,154 9.10 6,216 9.11 6,278 9.12 6,340 9.13 6,402 9.14 6,464 9.15 6,527 9.16 6,589 9.17 6,651 9.18 6,713 9.19 6,775 9.20 6,837 Elevation Storage (feet) (cubic -feet) 9.21 6,900 9.22 6,962 9.23 7,024 9.24 7,086 9.25 7,148 9.26 7,210 9.27 7,273 9.28 7,335 9.29 7,397 9.30 7,459 103354 Recon - Infiltration Basin 3 Drain a Area (Sf) 27740 Imp Area (at) 25646 (A) Drainage Area (Ac) 0.636823 (Is) Imp Fraction 0.92 (Ru)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method Rv=.05+.9(/A) V=3630xR xR xA Post Pre = Rv (post) = .05+.9'.67 Rv (pre)=.05+.9'0 V=3630'3.7'0.67 '.6273 V=3630'3.7'0.05 '.6273 Designed By: BMD Date: 402008 0.88 0.05 V (Post) = 7544 cf V (Pre) = 428 cf Min. Treatment Vol Post- Pre )= 7117 cf Treatment Vol in Ac-in 1.96 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate in/hr O.6 T Intended Days to Infiltrate (clays) 2 a. V = A=5232/(2'(6.69'2)) lMin SA of Basin = 2965.3 sf A - 2*(K *T) Step 3. Determine Dimensions Basin Volume Depth to Exist grount to SHWT (h) 4.00 Existing Ground Elevation 10.10 Design Storage Elevation 9.30 Bottom Elevation 8.10 Flow Splitter - Outlet to Basin Elev. 8.60 Max Excavation Depth 2.00 Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width 0 Storage Elev Bottom Width Flow Splitter- Inlet Elevation Flow Splitter- Bypass Flow Outlet 1.20 5931 Target Area 5930 at Top Length @ Storage Surface Area Storage = 7384 at Bottom Length Surface Area Bottom = 1Avg 4856 at Surface Area = 6120 at Volume of Basin De th'SA = 7344 of 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: '0 is actually the Damian Flow Rate Q=A (K). Conversion=cfs Example Calculation of Q: Surface Area=4556 sf (K)=3.94 in/hr 3.94in I ft Ihr 4556 sf �- =0.42 cfs hr 12in 3600s Drawdown Time for Treatment Volume Example Calculaticxi : Q = 0.42cfs V = 345W V =T 3458ft' Is Ihr =2 Ihrs=.089days Q 1 0.42fr 3600s Area (s0 (K) inthr 0 (infiltration) = 0.07 cfs 4856 0.6 Drawdown Time for Desi n Vol Volume c 0 Roura Days 7344 0.07 30.2 1 1.26 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. Plans (1 ° - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. 2. Plan details (1"= 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build -out. 3. Section view of the level spreader (1"= 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present. 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Pre -development 9 Reach Aon Llnk 103354 Recon Basin 3- Pre Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Subcatchment 1S: Pre -development Runoff = 0.01 cfs @ 13.33 hrs, Volume= 0.006 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 27.740 45 Woods. Poor. HSG A 27,740 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.0 245 0.0400 0.13 Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 1S: Pre -development Hydrograph I I 0.01 cfs 0009 Type 24-Fir 1jyr 0 009i ' -II -^--_-,--; 0.009' I , Rainfall 3:70" o.0oe I I I 0.007-� ; -Runoff Area=27;740 sf- 0.007-- -- -- - - - -' -- - -I - 000ii- ; -Runoff-Volume=0.006 af- fL 0006 ' (Depth>0.1V' _ 00.0s- Runoff oo�_ Length=245'-; Flow --- 0004-. ; -Slope=0:0400-�p---j----�- 0.003-. 0003' i I I I lc=31:0-min - 0.002; -I - l - T - f 0002- , _CN=45 ,-----------� ---- - 0.001- I I 0001- 11 12 13 Time (hours( I , i i i � 0 Runoff I __ '---- r� I I I I ± _T - I -, _T -r I I (III I I 1s Post-developme 2P Infiltratin Basin 3 Subcat Reach Aon Link 103354 Recon Basin 3- Post Prepared by Earth Tech Pond 2P: Infiltratin Basin 3 Inflow Area = 0.637 ac, Inflow Depth = 3.03" for 1 yr event Inflow = 3.54 cfs @ 11.93 hrs, Volume= 0.161 of Outflow = 0.07 cfs @ 10.35 hrs, Volume= 0.161 af, Atten= 98%, Lag= 0.0 min Discarded = 0.07 cfs @ 10.35 hrs, Volume= 0.161 of Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 8.76' @ 14.98 hrs Surf.Area= 0 sf Storage= 4,019 cf Plug -Flow detention time= 535.5 min calculated for 0.161 of (100% of inflow) Center -of -Mass det. time= 535.6 min ( 1,311.2 - 775.7 ) Volume Invert Avail.Storage Storage Description #1 8.10' 7,344 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 8.10 0 9.30 7,344 Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.07 cfs Exfiltration at all elevations Qiscarded OutFlow Max=0.07 cfs @ 10.35 hrs HW=8.11' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.07 cfs) Type 1124-hr 1 yr Rainfall=3.70" Page 2 103354 Recon Basin 3- Post Type /I 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Pond 2P: Infiltratin Basin 3 Hydrograph 3.54 cfs ; Inflow Area=0.637 ac Peak Elev=8.76' 3- Storage=4,019 cf w -------------' -------------------- U i i 2 O ' i LL 0.07 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) ® Inflow ❑ Discarded 103354 Recon Basin 3- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Hydrograph for Pond 2P: Infiltratin Basin 3 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 8.10 0.00 2.00 0.00 0 8.10 0.00 4.00 0.00 3 8.10 0.00 6.00 0.02 15 8.10 0.01 8.00 0.03 28 8.10 0.03 10.00 0.07 61 8.11 0.06 12.00 1.65 3,061 8.60 0.07 14.00 0.09 3,991 8.75 0.07 16.00 0.05 3,989 8.75 0.07 18.00 0.04 3,828 8.73 0.07 20.00 0.03 3,583 8.69 0.07 22.00 0.03 3,288 8.64 0.07 24.00 0.03 2,977 8.59 0.07 26.00 0.00 2,476 8.50 0.07 28.00 0.00 1,972 8.42 0.07 30.00 0.00 1,468 8.34 0.07 32.00 0.00 964 8.26 0.07 34.00 0.00 460 8.18 0.07 36.00 0.00 15 8.10 0.01 38.00 0.00 0 8.10 0.00 40.00 0.00 0 8.10 0.00 42.00 0.00 0 8.10 0.00 44.00 0.00 0 8.10 0.00 46.00 0.00 0 8.10 0.00 48.00 0.00 0 8.10 0.00 50.00 0.00 0 8.10 0.00 52.00 0.00 0 8.10 0.00 54.00 0.00 0 8.10 0.00 56.00 0.00 0 8.10 0.00 58.00 0.00 0 8.10 0.00 60.00 0.00 0 8.10 0.00 62.00 0.00 0 8.10 0.00 64.00 0.00 0 8.10 0.00 66.00 0.00 0 8.10 0.00 68.00 0.00 0 8.10 0.00 70.00 0.00 0 8.10 0.00 72.00 0.00 0 8.10 0.00 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 74.00 0.00 0 8.10 0.00 76.00 0.00 0 8.10 0.00 78.00 0.00 0 8.10 0.00 80.00 0.00 0 8.10 0.00 82.00 0.00 0 8.10 0.00 84.00 0.00 0 8.10 0.00 86.00 0.00 0 8.10 0.00 88.00 0.00 0 8.10 0.00 90.00 0.00 0 8.10 0.00 92.00 0.00 0 8.10 0.00 94.00 0.00 0 8.10 0.00 96.00 0.00 0 8.10 0.00 103354 Recon Basin 3- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/5/2008 Elevation Storage (feet) (cubic -feet) 8.10 0 8.11 61 8.12 122 8.13 184 8.14 245 8.15 306 8.16 367 8.17 428 8.18 490 8.19 551 8.20 612 8.21 673 8.22 734 8.23 796 8.24 857 8.25 918 8.26 979 8.27 1,040 8.28 1,102 8.29 1,163 8.30 1,224 8.31 1,285 8.32 1,346 8.33 1,408 8.34 1,469 8.35 1,530 8.36 1,591 8.37 1,652 8.38 1,714 8.39 1,775 8.40 1,836 8.41 1,897 8.42 1,958 8.43 2,020 8.44 2,081 8.45 2,142 8.46 2,203 Stage -Area -Storage for Pond 2P: Infiltratin Basin 3 Elevation Storage (feet) (cubic -feet) 8.47 2,264 8.48 2,326 8.49 2,387 8.50 2,448 8.51 2,509 8.52 2,570 8.53 2,632 8.54 2,693 8.55 2,754 8.56 2,815 8.57 2,876 8.58 2,938 8.59 2,999 8.60 3,060 8.61 3,121 8.62 3,182 8.63 3,244 8.64 3,305 8.65 3,366 8.66 3,427 8.67 3,488 8.68 3,550 8.69 3,611 8.70 3,672 8.71 3,733 8.72 3,794 8.73 3,856 8.74 3,917 8.75 3,978 8.76 4,039 8.77 4,100 8.78 4,162 8.79 4,223 8.80 4,284 8.81 4,345 8.82 4,406 8.83 4,468 Elevation Storage (feet) (cubic -feet) 8.84 4,529 8.85 4,590 8.86 4,651 8.87 4,712 8.88 4,774 8.89 4,835 8.90 4,896 8.91 4,957 8.92 5,018 8.93 5,080 8.94 5,141 8.95 5,202 8.96 5,263 8.97 5,324 8.98 5,386 8.99 5,447 9.00 5,508 9.01 5,569 9.02 5,630 9.03 5,692 9.04 5,753 9.05 5,814 9.06 5,875 9.07 5,936 9.08 5,998 9.09 6,059 9.10 6,120 9.11 6,181 9.12 6,242 9.13 6,304 9.14 6,365 9.15 6,426 9.16 6,487 9.17 6,548 9.18 6,610 9.19 6,671 9.20 6,732 Elevation Storage (feet) (cubic -feet) 9.21 6,793 9.22 6,854 9.23 6,916 9.24 6,977 9.25 7,038 9.26 7,099 9.27 7,160 9.28 7,222 9.29 7,283 9.30 7,344 103354 Recon - Infiltration Basin 4 Drain a Area (St) 26900 Imp Area (sf) 25580 (A) Drainage Area (Ac) 0.617539 (Iq) Imp Fraction 0.95 (RD)Raintall Depth Per State SWP(in) 3.7 Step 1: Determine Runoff Volume Simple Method a. h V = 3630x RDxRv x A Post Pre = Rv (post) = .05..9'.67 Rv (pre) _ .05+.9'0 V =3630 ' 3.7' 0.67 ' .62 73 V=3630 ' 3.7'0.05 '.6273 Designed By: BMD Date: 4/2/2008 0.91 0.05 V (Post) = 7513 cf V (Pre) = 415 cf Min. Treatment Vol(Post- Pre)= 7098 of Treatment Vol in Ac-in 1.96 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 2.73 (T) Intended Da to Infiltrate (da ) 1 2 a. A - V = A=5232/(2'(6.69'2)) IMin SA of Basin = 650.0 sf 2*(K *T) Step 3. Determine Dimensions Depth to Exist grount to SHWT (h) 4.00 Existing Ground Elevation 9.20 Bypass Weir Elevation 9.00 Design Storage Elevation 9.00 Flow Splitter - Inlet Elevation 9A0 Bottom Elevation 7.60 Flow Splitter - Bypass Flow Outle 8.60 Flow Splitter - Outlet to Basin Elev. 8.50 Top of Boom Elevation 9.80 Max Excavation Depth 2.00 Storage Depth 1.40 Surface Area Required (Avg of Top and Bottom SA) 5070 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown D from infiltration: '0 is actually the Darcian Flow Rate Q=A (K) Conversion =cfc E.carnple Calculation of Q: Surface Area=4556sf (K)=3.94 in Ihr 3.94in Ift Ihr 4556sf -=0.42 cfs hr 12 in 3600s Drawdown Time for Treatment Volume EutnlpleCaladation: Q=0.42cfs V=3458cf V _T . 3458fY Is Ihr=21hrs=.089days Q 1 0.42 fY 3600s Target Area 5070 sf Surface Area Storage = 5929 sf Surface Area Bottom = 4588 sf Avg Surface Area = 5259 sf Volume of Basin De th'SA) = 7362 of Area (sf) (K) in/hr D (infiltration) = 0.29 cfs 4588 2.73 Drawdown Time for Design Vol Volume cf 0 Hours Days 7362 0.2 1 7.1 1 0.29 Pre -development Subcat Reach Aon LIniC 103354 Recon Basin 4- Pre Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 5/14/2008 Subcatchment 1S: Pre -development Runoff = 0.01 cfs @ 13.04 hrs, Volume= 0.006 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 26,900 45 Woods Poor, HSG A 26,900 Pervious Area Tc Length Slope min) (feet) (ft/ft) 19.4 255 0.1400 N 3 0 E 0.22 0.01 I Capacity Description Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 1S: Pre -development Hydrograph 0.01 cfs Type II 24-hr 1 yr -Rainfall,=3.70 Runoff Area=26,900 sf Runoff Volume=0.006_af- Runoff bepth>0.11" Flow Length=255' Slope=0.1400 T Tc=19.4 min CN=45 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) 1S Post-developm 2P Infiltration Basin 4 Subcat Reach Aon Llnk 103354 Recon Basin 4- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/14/2008 Pond 2P: Infiltration Basin 4 Inflow Area = 0.618 ac, Inflow Depth = 3.47" for 1 yr event Inflow = 0.85 cfs @ 12.86 hrs, Volume= 0.178 of Outflow = 0.29 cfs @ 12.22 hrs, Volume= 0.178 af, Atten= 66%, Lag= 0.0 min Discarded = 0.29 cfs @ 12.22 hrs, Volume= 0.178 of Routing by Stor-Ind method, Time Span= 0.00-96.00 hrs, dt= 0.01 hrs Peak Elev= 7.99' @ 13.97 hrs Surf.Area= 0 sf Storage= 2,050 cf Plug -Flow detention time= 48.2 min calculated for 0.178 of (100% of inflow) Center -of -Mass det. time= 48.2 min ( 866.6 - 818.4 ) Volume Invert Avail Storage Storage Description #1 7.60' 7,362 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 7.60 0 9.00 7,362 Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.29 cfs Exfiltration at all elevations Discarded OutFlow Max=0.29 cfs @ 12.22 hrs HW=7.61' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.29 cfs) 103354 Recon Basin 4- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/14/2008 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 Pond 2P: Infiltration Basin 4 Hydrograph 0.85 cfs -Inflow Area 0:'618 ac- Peak Elev=7.99' Stora' e, -2 050 0.29 cfs ----- - - - - -- -- 0 5 1015 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 Time (hours) Lflowiscarded 103354 Recon Basin 4- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HVdroCAD Software Solutions LLC 5/14/2008 Hydrograph for Pond 2P: Infiltration Basin 4 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 7.60 0.00 2.00 0.00 0 7.60 0.00 4.00 0.01 3 7.60 0.01 6.00 0.03 6 7.60 0.03 8.00 0.04 9 7.60 0.04 10.00 0.06 15 7.60 0.06 12.00 0.19 43 7.61 0.17 14.00 0.28 2,050 7.99 0.29 16.00 0.08 973 7.78 0.29 18.00 0.05 13 7.60 0.05 20.00 0.04 9 7.60 0.04 22.00 0.03 7 7.60 0.03 24.00 0.03 7 7.60 0.03 26.00 0.00 1 7.60 0.00 28.00 0.00 0 7.60 0.00 30.00 0.00 0 7.60 0.00 32.00 0.00 0 7.60 0.00 34.00 0.00 0 7.60 0.00 36.00 0.00 0 7.60 0.00 38.00 0.00 0 7.60 0.00 40.00 0.00 0 7.60 0.00 42.00 0.00 0 7.60 0.00 44.00 0.00 0 7.60 0.00 46.00 0.00 0 7.60 0.00 48.00 0.00 0 7.60 0.00 50.00 0.00 0 7.60 0.00 52.00 0.00 0 7.60 0.00 54.00 0.00 0 7.60 0.00 56.00 0.00 0 7.60 0.00 58.00 0.00 0 7.60 0.00 60.00 0.00 0 7.60 0.00 62.00 0.00 0 7.60 0.00 64.00 0.00 0 7.60 0.00 66.00 0.00 0 7.60 0.00 68.00 0.00 0 7.60 0.00 70.00 0.00 0 7.60 0.00 72.00 0.00 0 7.60 0.00 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 74.00 0.00 0 7.60 0.00 76.00 0.00 0 7.60 0.00 78.00 0.00 0 7.60 0.00 80.00 0.00 0 7.60 0.00 82.00 0.00 0 7.60 0.00 84.00 0.00 0 7.60 0.00 86.00 0.00 0 7.60 0.00 88.00 0.00 0 7.60 0.00 90.00 0.00 0 7.60 0.00 92.00 0.00 0 7.60 0.00 94.00 0.00 0 7.60 0.00 96.00 0.00 0 7.60 0.00 103354 Recon Basin 4- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCAD®8 00 s/n 003562 © 2006 HvdroCAD Software Solutions LLC 5/14/2008 Elevation Storage (feet) (cubic -feet) 7.60 0 7.61 53 7.62 105 7.63 158 7.64 210 7.65 263 7.66 316 7.67 368 7.68 421 7.69 473 7.70 526 7.71 578 7.72 631 7.73 684 7.74 736 7.75 789 7.76 841 7.77 894 7.78 947 7.79 999 7.80 1,052 7.81 1,104 7.82 1,157 7.83 1,209 7.84 1,262 7.85 1,315 7.86 1,367 7.87 1,420 7.88 1,472 7.89 1,525 7.90 1,578 7.91 1,630 7.92 1,683 7.93 1,735 7.94 1,788 7.95 1,840 7.96 1,893 Stage -Area -Storage for Pond 2P: infiltration Basin 4 Elevation Storage (feet) (cubic -feet) 7.97 1,946 7.98 1,998 7.99 2,051 8.00 2,103 8.01 2,156 8.02 2,209 8.03 2,261 8.04 2,314 8.05 2,366 8.06 2,419 8.07 2,472 8.08 2,524 8.09 2,577 8.10 2,629 8.11 2,682 8.12 2,734 8.13 2,787 8.14 2,840 8.15 2,892 8.16 2,945 8.17 2,997 8.18 3,050 8.19 3,103 8.20 3,155 8.21 3,208 8.22 3,260 8.23 3,313 8.24 3,365 8.25 3,418 8.26 3,471 8.27 3,523 8.28 3,576 8.29 3,628 8.30 3,681 8.31 3,734 8.32 3,786 8.33 3,839 Elevation Storage (feet) (cubic -feet) 8.34 3,891 8.35 3,944 8.36 3,997 8.37 4,049 8.38 4,102 8.39 4,154 8.40 4,207 8.41 4,259 8.42 4,312 8.43 4,365 8.44 4,417 8.45 4,470 8.46 4,522 8.47 4,575 8.48 4,628 8.49 4,680 8.50 4,733 8.51 4,785 8.52 4,838 8.53 4,890 8.54 4,943 8.55 4,996 8.56 5,048 8.57 5,101 8.58 5,153 8.59 5,206 8.60 5,259 8.61 5,311 8.62 5,364 8.63 5,416 8.64 5,469 8.65 5,522 8.66 5,574 8.67 5,627 8.68 5,679 8.69 5,732 8.70 5,784 Elevation Storage (feet) (cubic -feet) 8.71 5,837 8.72 5,890 8.73 5,942 8.74 5,995 8.75 6,047 8.76 6,100 8.77 6,153 8.78 6,205 8.79 6,258 8.80 6,310 8.81 6,363 8.82 6,415 8.83 6,468 8.84 6,521 8.85 6,573 8.86 6,626 8.87 6,678 8.88 6,731 8.89 6,784 8.90 6,836 8.91 6,889 8.92 6,941 8.93 6,994 8.94 7,046 8.95 7,099 8.96 7,152 8.97 7,204 8.98 7,257 8.99 7,309 9.00 7,362 103354 Recon - Infiltration Basin 5 Drain eArea(SI) 28095 Imp Area (st 26490 (A) Drainage Area (Act 0.644972 (Ip) Imp Fraction 0.94 (Ro)Rainfall Depth Per State SW P(in) 3.7 Step 1: Determine Runoff Volume Simple Method Rv = .05 +.9(1,l ) V=3630xRoxRvxA Post Pre = Rv (post) _ .05+.9'.67 Rv (pre)=.05+.9*0 V=3630 '3.7'0.67 '.6273 V=3630 ' 3.7' 0.05 '.6273 Designed By: BMD Date: 4/2/2008 0.90 0.05 V (Post) = 7784 of V (Pre) = 433 of Min. Treatment Vol Post - Pre)= 7351 of Treatment Vol in Ac-in 2.0 ac-in Step 2: Determine Surface Area- Min. K Infiltration Rate (in/hr 0.68 (1) Intended Days to Infiltrate (days) it 2 a. A _ V = A=5232/(2'(6.69'2)) Min SA of Basin = 2702.6 sf Step 3. Determine Dimensions Storage Elevation 9.20 Flow Splitter- Inlet Elevation Elevation 7.60 Flow Schiller - Bypass Flow Outle Storage Depth Surface Area Required (Avg of Top and Bottom SA) 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: '0 is actually the Darcian Flow Rate Q=A (K) Conversion=cfs F_rample Calodarion of Q: Surface Area=4556sf (K)=3.94inIhr 3.94in I fr I hr 4556sf �=0.42 cfs hr 12in 3600s Drawdown Time for Treatment Volume Example Calculation: Q=0.42cfs V=3458cf V = T . 3458fr Is Ihr = 2 1hr5 =.089dncs Q 1 0.42ff' 3600s 1.60 4594 Target Area 4595 st Surface Area Storage = 5336 sf Surface Area Bottom = 3979 sl AvgSurface Area = 4658 sf Volume of Basin (Depth'SA) = 7452 of Area (sf) (K) in/hr 0 (infiltration) = 0.06 cfs 3979 0.68 Drawdown Time for Design Vol Volume cf 0 Hours Days 7452 0.06 1 33.0 1 1.38 Basin 5 Pre -development 9 Reach zf�� Link 103354 Recon Basin 5- Pre Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 Subcatchment 1S: Basin 5 Pre -development Runoff = 0.01 cfs @ 13.41 hrs, Volume= 0.006 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (so CN Description 28,095 45 Woods Poor, HSG A 28,095 Pervious Area Tc Length Slope min) (feet) (ft/ft 32.7 252 0.0371 Capacity Description 0.13 Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 1S: Basin 5 Pre -development Hydrograph 0.01 . ' — I OI S Type II 24-hr 1 yr/ u.009- Rainfall=3.70" ------ 0.008= Runoff Area=28,095 sf 0.007: Runoff Volume=0.006 af_ 0.006= Runoff Depth>0.11" 3 0.005: - Flow Lerigth=252' ' Slope=6.0371 T LL 0.004: Tc=32.7, min - - - - - 0.003- CN=45I 0.002 0.001= ---------- ❑Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) 103354 Recon Basin 5- Pre Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.50 0.02 0.00 0.00 1.00 0.04 0.00 0.00 1.50 0.06 0.00 0.00 2.00 0.08 0.00 0.00 2.50 0.10 0.00 0.00 3.00 0.13 0.00 0.00 3.50 0.15 0.00 0.00 4.00 0.18 0.00 0.00 4.50 0.20 0.00 0.00 5.00 0.23 0.00 0.00 5.50 0.26 0.00 0.00 6.00 0.30 0.00 0.00 6.50 0.33 0.00 0.00 7.00 0.37 0.00 0.00 7.50 0.40 0.00 0.00 8.00 0.44 0.00 0.00 8.50 0.49 0.00 0.00 9.00 0.54 0.00 0.00 9.50 0.60 0.00 0.00 10.00 0.67 0.00 0.00 10.50 0.75 0.00 0.00 11.00 0.87 0.00 0.00 11.50 1.05 0.00 0.00 12.00 2.45 0.00 0.00 12.50 2.72 0.01 0.00 13.00 2.86 0.01 0.01 13.50 2.96 0.02 0.01 14.00 3.03 0.03 0.01 14.50 3.10 0.03 0.01 15.00 3.16 0.04 0.01 15.50 3.21 0.05 0.01 16.00 3.26 0.05 0.01 16.50 3.30 0.06 0.01 17.00 3.34 0.06 0.01 17.50 3.37 0.07 0.01 18.00 3.41 0.07 0.01 Hydrograph for Subcatchment 1S: Basin 5 Pre -development Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 18.50 3.44 0.07 0.01 19.00 3.47 0.08 0.01 19.50 3.50 0.08 0.01 20.00 3.52 0.09 0.01 20.50 3.55 0.09 0.00 21.00 3.57 0.09 0.00 21.50 3.59 0.10 0.00 22.00 3.61 0.10 0.00 22.50 3.64 0.11 0.00 23.00 3.66 0.11 0.00 23.50 3.68 0.11 0.00 24.00 3.70 0.12 0.00 Post Inifiltratin Basin 5 9 Reach on Link 103354 Recon Basin 5- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 H droCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 5/15/2008 Pond 2P: Inifiltratin Basin 5 Inflow Area = 0.645 ac, Inflow Depth = 3.47" for 1 yr event Inflow = 3.65 cfs @ 11.94 hrs, Volume= 0.186 of Outflow = 0.18 cfs @ 11.22 hrs, Volume= 0.186 af, Atten= 95%, Lag= 0.0 min Discarded = 0.18 cfs @ 11.22 hrs, Volume= 0.186 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 8.33' @ 12.78 hrs Surf.Area= 0 sf Storage= 3,382 cf Plug -Flow detention time= 138.3 min calculated for 0.186 of (100% of inflow) Center -of -Mass det. time= 138.3 min ( 885.5 - 747.3 ) Volume Invert Avail Storage Storage Description #1 7.60' 7,452 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 7.60 0 9.20 7,452 _Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.18 cfs Exfiltration at all elevations Discarded OutFlow Max=0.18 cfs @ 11.22 hrs HW=7.62' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.18 cfs) 103354 Recon Basin 5- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 M KI Pond 2P: Inifiltratin Basin 5 Hydrograph 3.65 cfs-- Inflow Are6=0.:645 ac Peak Elev=8.33' N 3 2- _o LL 1- x -1 1 0.18 cf Storage=3,,382 cf ; 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hours) ® Inflow ❑p Discarded 103354 Recon Basin 5- Post Prepared by Earth Tech HvdroCADO 8.00 s/n 003562 ©2006 Hydrograph for Pond 2P: Inifiltratin Basin 5 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 7.60 0.00 2.00 0.01 3 7.60 0.01 4.00 0.02 9 7.60 0.02 6.00 0.03 14 7.60 0.03 8.00 0.05 19 7.60 0.05 10.00 0.09 35 7.61 0.08 12.00 2.39 2,773 8.20 0.18 14.00 0.09 3,149 8.28 0.18 16.00 0.06 2,378 8.11 0.18 18.00 0.04 1,439 7.91 0.18 20.00 0.03 413 7.69 0.18 22.00 0.03 12 7.60 0.03 24.00 0.03 11 7.60 0.03 26.00 0.00 0 7.60 0.00 28.00 0.00 0 7.60 0.00 30.00 0.00 0 7.60 0.00 32.00 0.00 0 7.60 0.00 34.00 0.00 0 7.60 0.00 36.00 0.00 0 7.60 0.00 38.00 0.00 0 7.60 0.00 40.00 0.00 0 7.60 0.00 42.00 0.00 0 7.60 0.00 44.00 0.00 0 7.60 0.00 46.00 0.00 0 7.60 0.00 48.00 0.00 0 7.60 0.00 50.00 0.00 0 7.60 0.00 52.00 0.00 0 7.60 0.00 54.00 0.00 0 7.60 0.00 56.00 0.00 0 7.60 0.00 58.00 0.00 0 7.60 0.00 60.00 0.00 0 7.60 0.00 62.00 0.00 0 7.60 0.00 64.00 0.00 0 7.60 0.00 66.00 0.00 0 7.60 0.00 68.00 0.00 0 7.60 0.00 70.00 0.00 0 7.60 0.00 72.00 0.00 0 7.60 0.00 Type 11 24-hr 1 yr Rainfall=3.70" Page 4 103354 Recon Basin Prepared by Earth Tech HvdmCAD® 8.00 s/n 003562 Elevation Storage (feet) (cubic -feet) 7.60 0 7.61 47 7.62 93 7.63 140 7.64 186 7.65 233 7.66 279 7.67 326 7.68 373 7.69 419 7.70 466 7.71 512 7.72 559 7.73 605 7.74 652 7.75 699 7.76 745 7.77 792 7.78 838 7.79 885 7.80 932 7.81 978 7.82 1,025 7.83 1,071 7.84 1,118 7.85 1,164 7.86 1,211 7.87 1,258 7.88 1,304 7.89 1,351 7.90 1,397 7.91 1,444 7.92 1,490 7.93 1,537 7.94 1,584 7.95 1,630 7.96 1,677 5- Post 1o3041I0I1 Stage -Area -Storage for Pond 2P: Inifiltratin Basin 5 Elevation Storage (feet) (cubic -feet) 7.97 1,723 7.98 1,770 7.99 1,816 8.00 1,863 8.01 1,910 8.02 1,956 8.03 2,003 8.04 2,049 8.05 2,096 8.06 2,142 8.07 2,189 8.08 2,236 8.09 2,282 8.10 2,329 8.11 2,375 8.12 2,422 8.13 2,468 8.14 2,515 8.15 2,562 8.16 2,608 8.17 2,655 8.18 2,701 8.19 2,748 8.20 2,795 8.21 2,841 8.22 2,888 8.23 2,934 8.24 2,981 8.25 3,027 8.26 3,074 8.27 3,121 8.28 3,167 8.29 3,214 8.30 3,260 8.31 3,307 8.32 3,353 8.33 3,400 Elevation Storage (feet) (cubic -feet) 8.34 3,447 8.35 3,493 8.36 3,540 8.37 3,586 8.38 3,633 8.39 3,679 8.40 3,726 8.41 3,773 8.42 3,819 8.43 3,866 8.44 3,912 8.45 3,959 8.46 4,005 8.47 4,052 8.48 4,099 8.49 4,145 8.50 4,192 8.51 4,238 8.52 4,285 8.53 4,331 8.54 4,378 8.55 4,425 8.56 4,471 8.57 4,518 8.58 4,564 8.59 4,611 8.60 4,658 8.61 4,704 8.62 4,751 8.63 4,797 8.64 4,844 8.65 4,890 8.66 4,937 8.67 4,984 8.68 5,030 8.69 5,077 8.70 5,123 Type 11 24-hr 1 yr Rainfall=3.70" Page 5 Elevation Storage (feet) (cubic -feet) 8.71 5,170 8.72 5,216 8.73 5,263 8.74 5,310 8.75 5,356 8.76 5,403 8.77 5,449 8.78 5,496 8.79 5,542 8.80 5,589 8.81 ' 5,636 8.82 5,682 8.83 5,729 8.84 5,775 8.85 5,822 8.86 5,868 8.87 5,915 8.88 5,962 8.89 6,008 8.90 6,055 8.91 6,101 8.92 6,148 8.93 6,194 8.94 6,241 8.95 6,288 8.96 6,334 8.97 6,381 8.98 6,427 8.99 6,474 9.00 6,520 9.01 6,567 9.02 6,614 9.03 6,660 9.04 6,707 9.05 6,753 9.06 6,800 9.07 6,847 Elevation Storage (feet) (cubic -feet) 9.08 6,893 9.09 6,940 9.10 6,986 9.11 7,033 9.12 7,079 9.13 7,126 9.14 7,173 9.15 7,219 9.16 7,266 9.17 7,312 9.18 7,359 9.19 7,405 9.20 7,452 103354 Recon - Infiltration Basin 6 Drain a Area (Sf) 37745 Imp Area (sf) 22035 (A) Drainage Area (Ac) 0.866506 (IA) Imp Fraction 0.56 (Ro)Rainfall Depth Per State SW P(in) 3.7 Designed By: BMD Date: 4/2/2008 Step 1: Determine Runoff Volume Simple Method a' RV = +.9(iA = Rv (post)=.05+.9*Z7 0.58 .05 Rv (pre) = .05r.9'0 0.05 V=3630xRDxR xA 6 Post V=3630'3.7'0.67'.6273 V (Post) = 6697 cf Pre V=3630'3.7'0.05'.6273 V (Pre) = 582 cf Min. Treatment Vol Post - Pre)= 6115 cf Treatment Vol in Ac-in 1.7 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 2.02 (T) Intended Days to Infiltrate (days) 2 a. A - V 2*(K*T) = A=5232/(2'(6.69'2)) IMin SA of Basin = 756.8 at Step 3. Determine Dimensions Storage Elevation 9.00 Flow Splitter - Inlet Elevation Elevation 8.00 Flow Splinter- Bypass Flow Outle Storage Depth 1.00 Surface Area Required (Avg of Top and Bottom SA) 6115 Target Area 6115 sf Storage: L = 101 W = 68 Surface Area Storage = 6868 at Bottom: L= 95 W = 62 Surface Area Bottom = 5890 sf lava Surface Area = 6379 at 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown D from infiltration: '0 is actually the Darcian Flow Rate Q=A (K) Conversion=cfs Esarnple Calculation of Q: Surface Area=4556sf (K)=3.94inI hr 3.94 in l ft I hr 4556 s(=0.42(fs Irr 12in 3600s Drawdown Time for Treatment Volume EeampleCalctdatial: Q=0.42cfs V=3458cf V =T 3458ft' Is Ihr=21hrs=.089dacs Q I 0.42ft' 3600s Volume of Basin (Depth'SA) = 6379 of Area (sf) (K) iafhr D (infiltration) = 0.28 cfs 5890 2.02 Drawdown Time for Design Vol Volume cf) I Hours I Dave 6379 0.28 6.4 0.27 Pre -development Sub4 Reach Aon Link 103354 Recon Basin 6- Pre Prepared by Earth Tech HvdroCADO 8.00 s/n 003562 @ 2006 Subcatchment 1S: Pre -development Runoff = 0.01 cfs @ 13.89 hrs, Volume= 0.008 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 37,745 45 Woods, Poor HSG A 37,745 Pervious Area Tc Length Slope Velocity min) (feet) (ft/ft) (ft/sec) 54.1 365 0.0221 0.11 N 3 0 LL 0.012 0.012 0.011 0.01 Description Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 1S: Pre -development Hydrograph 0.01 CfS I look Type II 24-hr 1 yr Rainfall=3.70" Runoff Area=37,745 sf _ Runoff Volume=0.008-af Runoff bepth>0.11" - - -. Flow Length=365------ Slope=0.0221 T Tc=54.1; min CN=45 0.001=�,I -- Type 11 24-hr f yr Rainfall=3.70" Page 2 ❑Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Post Infiltration Basin 6 Sub4 Reach Aon Link 103354 Recon Basin 6- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCADO 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 5/15/2008 Pond 2P: Infiltration Basin 6 Inflow Area = 0.867 ac, Inflow Depth > 1.51" for 1 yr event Inflow = 2.23 cfs @ 11.99 hrs, Volume= 0.109 of Outflow = 0.28 cfs @ 11.76 hrs, Volume= 0.109 af, Atten= 87%, Lag= 0.0 min Discarded = 0.28 cfs @ 11.76 hrs, Volume= 0.109 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 8.25' @ 12.39 hrs Surf.Area= 0 sf Storage= 1,567 cf Plug -Flow detention time= 39.3 min calculated for 0.109 of (100% of inflow) Center -of -Mass det. time= 38.5 min ( 882.5 - 844.0 ) Volume Invert Avail.Storage Storage Description #1 8.00' 6,379 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 8.00 0 9.00 6,379 Device Routina Invert Outlet Devices #1 Discarded 0.00' 0.28 cfs Exfiltration at all elevations Discarded OutFlow Max=0.28 cfs @ 11.76 hrs HW=8.01' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.28 cfs) 103354 Recon Basin 6- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 4T t� 3 O M Pond 2P: Infiltration Basin 6 Inflow O. Peak: EI0=8.25' • IV I� o o� a O///////// //// 1 2 4• 112 14 16 18 20 Time (hours) ® Inflow p Discarded 103354 Recon Basin 6- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD® 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 Hydrograph for Pond 2P: Infiltration Basin 6 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 8.00 0.00 0.50 0.00 0 8.00 0.00 1.00 0.00 0 8.00 0.00 1.50 0.00 0 8.00 0.00 2.00 0.00 0 8.00 0.00 2.50 0.00 0 8.00 0.00 3.00 0.00 0 8.00 0.00 3.50 0.00 0 8.00 0.00 4.00 0.00 0 8.00 0.00 4.50 0.00 0 8.00 0.00 5.00 0.00 0 8.00 0.00 5.50 0.00 0 8.00 0.00 6.00 0.00 0 8.00 0.00 6.50 0.00 0 8.00 0.00 7.00 0.00 0 8.00 0.00 7.50 0.00 0 8.00 0.00 8.00 0.00 0 8.00 0.00 8.50 0.00 0 8.00 0.00 9.00 0.00 0 8.00 0.00 9.50 0.00 0 8.00 0.00 10.00 0.00 0 8.00 0.00 10.50 0.01 2 8.00 0.01 11.00 0.03 5 8.00 0.02 11.50 0.07 14 8.00 0.06 12.00 2.22 913 8.14 0.28 12.50 0.23 1,556 8.24 0.28 13.00 0.14 1,361 8.21 0.28 13.50 0.11 1,078 8.17 0.28 14.00 0.09 747 8.12 0.28 14.50 0.08 386 8.06 0.28 15.00 0.07 32 8.01 0.14 15.50 0.06 14 8.00 0.06 16.00 0.05 12 8.00 0.05 16.50 0.05 12 8.00 0.05 17.00 0.05 11 8.00 0.05 17.50 0.04 10 8.00 0.05 18.00 0.04 10 8.00 0.04 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 18.50 0.04 9 8.00 0.04 19.00 0.04 8 8.00 0.04 19.50 0.03 8 8.00 0.03 20.00 0.03 7 8.00 0.03 20.50 0.03 7 8.00 0.03 21.00 0.03 7 8.00 0.03 21.50 0.03 7 8.00 0.03 22.00 0.03 7 8.00 0.03 22.50 0.03 6 8.00 0.03 23.00 0.03 6 8.00 0.03 23.50 0.03 6 8.00 0.03 24.00 0.03 6 8.00 0.03 103354 Recon Basin 6- Post Type 11 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCADO 8.00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/15/2008 Elevation Storage (feet) (cubic -feet) 8.00 0 8.01 64 8.02 128 8.03 191 8.04 255 8.05 319 8.06 383 8.07 447 8.08 510 8.09 574 8.10 638 8.11 702 8.12 765 8.13 829 8.14 893 8.15 957 8.16 1,021 8.17 1,084 8.18 1,148 8.19 1,212 8.20 1,276 8.21 1,340 8.22 1,403 8.23 1,467 8.24 1,531 8.25 1,595 8.26 1,659 8.27 1,722 8.28 1,786 8.29 1,850 8.30 1,914 8.31 1,977 8.32 2,041 8.33 2,105 8.34 2,169 8.35 2,233 8.36 2,296 Stage -Area -Storage for Pond 2P: Infiltration Basin 6 Elevation Storage (feet) (cubic -feet) 8.37 2,360 8.38 2,424 8.39 2,488 8.40 2,552 8.41 2,615 8.42 2,679 8.43 2,743 8.44 2,807 8.45 2,871 8.46 2,934 8.47 2,998 8.48 3,062 8.49 3,126 8.50 3,190 8.51 3,253 8.52 3,317 8.53 3,381 8.54 3,445 8.55 3,508 8.56 3,572 8.57 3,636 8.58 3,700 8.59 3,764 8.60 3,827 8.61 3,891 8.62 3,955 8.63 4,019 8.64 4.083 8.65 4,146 8.66 4,210 8.67 4,274 8.68 4,338 8.69 4,402 8.70 4,465 8.71 4,529 8.72 4,593 8.73 4,657 Elevation Storage (feet) (cubic -feet) 8.74 4,720 8.75 4,784 8.76 4,848 8.77 4,912 8.78 4,976 8.79 5,039 8.80 5,103 8.81 5,167 8.82 5,231 8.83 5,295 8.84 5,358 8.85 5,422 8.86 5,486 8.87 5,550 8.88 5,614 8.89 5,677 8.90 5,741 8.91 5,805 8.92 5,869 8.93 5,932 8.94 5,996 8.95 6,060 8.96 6,124 8.97 6,188 8.98 6,251 8.99 6,315 9.00 6,379 103354 Recon - Infiltration Basin 7 Drain a Area (St) 28768 Imp Area (sf) 19161 (A) Dmina a Area (Ac) 0.660422 (Iq) Imp Fraction 0.67 (Ro)Raintall Depth Per State SWP(m) 3.7 Step 1: Determine Runoff Volume Simple Method a. Rv=.OS +.9(IA)=Rv(post)=.o5..9'.67 Rv (pre) = .05+.9'0 b V= 3630x Rt, x R x A Post V=3630'3.7'0.67'.6273 Pre V=3630'3.7'0.05'.6273 Designed By: BMD Date: 5/512008 0.65 0.05 V (Post) = 5761 cf V (Pre) = 444 cf Min. Treatment Vol (Post - Pre)= 5317 cf Treatment Vol in Ac-in 1.46 ac-in Step 2: Determine Surface Area- Min. (K) Infiltration Rate (in/hr) 1.11 (T) Intended Days to Infiltrate (days) 2 a. A - V = A=5232/(2'(6.69'2)) IMin SA of Basin = 1197.6 sf Step 3. Determine Dimensions 2.50 -From DWQ Soil Scientist Site Visit and Soils Storage Elevation 11.20 Flow Splicer- Inlet Elevation Elevation 9.20 Flow Splitter- Bypass Flow Outle Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width @ Storage Elev Bottom Width Top Length @ Storag Bottom Length ET2 2.00 2659 Target Area 2660 st Surface Area Storage = 3974 at Surface Area Bottom = 1959 sf Avg Surface Area = 2967 sf Volume of Basin (De th'SA) = 5933 of 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown 0 from infiltration: '0 is actually the Darcian Flow Rate Area (sf) (K) in/hr 0 (infiltration) = 0.05 cfs Q=A (K) Conversion=cfs 1959 1.11 ExampleCa leulatim of Q:Sit rfaccA rea=3184sf (K)=2.42ia1hr 2.42in I ft I hr 3184sf 0.18cfs hr I2in 3600s Drawdown Time for Treatment Volume Drawdown Time for Design Vol Example Calculation: Q=0.18cfs V=3184cf V 3184ff' Is Ihr —=T :.—=2.Ihrs=.049daYs Q 1 0.18ft' 3600s Volume cf)Q Hours Days 5933 0.05 32.7 1.36 Pre -development 9 Reach Aon Llnk 103354 Recon Basin 7- Pre Prepared by Earth Tech Subcatchment 1S: Pre -development Runoff = 0.01 cfs @ 13.92 hrs, Volume= 0.006 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1 yr Rainfall=3.70" Area (sf) CN Description 28,768 45 Woods, Poor, HSG A 28,768 Pervious Area Tc Length Slope Velocity Capacity Description :..\ /f--4\ IHIN\ /H/-....\ Info\ 56.7 145 0.0031 0.04 Sheet Flow, sheet flow forest Woods: Light underbrush n= 0.400 P2= 3.70" Subcatchment 1S: Pre -development Hydrograph 0.01- ' 0.01 Cfs 0.009= ' Type II 24-hr 1 yr 0.008= ' Rainfall=3.70" Runoff Area=28,768 sf 0.007= Runoff Volume=0.006 af_ 0.006= " Runoff bepth>0.11" 0.005= Flow Length=148' 0 0.004: " Slope=tl.0031 '/' 1 0.003= ' Tc=56.7, min CN=45 0.002. 0.001= ' I- 0 2 4 6 8 10 12 14 16 18 20 22 24 Time (hours) Type /124-hr 1 yr Rainfall=3.70" Page 2 ❑ Runoff 1S Post-develol Infiltration Basin 7 9 Reach Aon Link 103354 Recon Basin 7- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 2 HydroCAD@ 8.00 s/n 003562 @ 2006 HydroCAD Software Solutions LLC 5/16/2008 Pond 2P: Infiltration Basin 7 Inflow Area = 0.660 ac, Inflow Depth = 1.80" for 1 yr event Inflow = 2.37 cfs @ 11.94 hrs, Volume= 0.099 of Outflow = 0.05 cfs @ 11.39 hrs, Volume= 0.099 af, Atten= 98%, Lag= 0.0 min Discarded = 0.05 cfs @ 11.39 hrs, Volume= 0.099 of Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 10.04' @ 15.57 hrs Surf.Area= 0 sf Storage= 2,505 cf Plug -Flow detention time= 529.1 min calculated for 0.099 of (100% of inflow) Center -of -Mass det. time= 529.1 min ( 1,358.6 - 829.5 ) Volume Invert Avail Storage Storage Description #1 9.20' 5,933 cf Custom Stage Data Listed below Elevation Cum.Store (feet) (cubic -feet) 9.20 0 11.20 5,933 Device Routing Invert Outlet Devices #1 Discarded 0.00' 0.05 cfs Exfiltration at all elevations Discarded OutFlow Max=0.05 cfs @ 11.39 hrs HW=9.22' (Free Discharge) t1=Exfiltration (Exfiltration Controls 0.05 cfs) 103354 Recon Basin 7- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 3 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/16/2008 Pond 2P: Infiltration Basin 7 Hydrograph 2.37 cfs I Inflow Area=O :660 ac I Peak Ellev=10.04' I I 2- ' Storage=2,505 cf I � I N II I I I I I I 3 I C I I I I I 0.05 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Time (hours) ® Inflow ❑S Discarded 103354 Recon Basin 7- Post Type // 24-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 4 HydroCAD®8 00 s/n 003562 © 2006 HydroCAD Software Solutions LLC 5/16/2008 Hydrograph for Pond 2P: Infiltration Basin 7 Time Inflow Storage Elevation Discarded (hours) (cfs) (cubic -feet) (feet) (cfs) 0.00 0.00 0 9.20 0.00 2.00 0.00 0 9.20 0.00 4.00 0.00 0 9.20 0.00 6.00 0.00 0 9.20 0.00 8.00 0.00 0 9.20 0.00 10.00 0.01 9 9.20 0.01 12.00 1.45 1,644 9.75 0.05 14.00 0.07 2,450 10.03 0.05 16.00 0.04 2,501 10.04 0.05 18.00 0.04 2,426 10.02 0.05 20.00 0.03 2,285 9.97 0.05 22.00 0.02 2,102 9.91 0.05 24.00 0.02 1,907 9.84 0.05 26.00 0.00 1,550 9.72 0.05 28.00 0.00 1,190 9.60 0.05 30.00 0.00 830 9.48 0.05 32.00 0.00 470 9.36 0.05 34.00 0.00 110 9.24 0.05 36.00 0.00 0 9.20 0.00 38.00 0.00 0 9.20 0.00 40.00 0.00 0 9.20 0.00 42.00 0.00 0 9.20 0.00 44.00 0.00 0 9.20 0.00 46.00 0.00 0 9.20 0.00 48.00 0.00 0 9.20 0.00 50.00 0.00 0 9.20 0.00 52.00 0.00 0 9.20 0.00 54.00 0.00 0 9.20 0.00 56.00 0.00 0 9.20 0.00 58.00 0.00 0 9.20 0.00 60.00 0.00 0 9.20 0.00 62.00 0.00 0 9.20 0.00 64.00 0.00 0 9.20 0.00 66.00 0.00 0 9.20 0.00 68.00 0.00 0 9.20 0.00 70.00 0.00 0 9.20 0.00 72.00 0.00 0 9.20 0.00 103354 Recon Basin 7- Post Type 1124-hr 1 yr Rainfall=3.70" Prepared by Earth Tech Page 5 HydroCADO 8.00 s/n 003562 O 2006 HydroCAD Software Solutions LLC 5/16/2008 Elevation Storage (feet) (cubic -feet) 9.20 0 9.22 59 9.24 119 9.26 178 9.28 237 9.30 297 9.32 356 9.34 415 9.36 475 9.38 534 9.40 593 9.42 653 9.44 712 9.46 771 9.48 831 9.50 890 9.52 949 9.54 1,009 9.56 1,068 9.58 1,127 9.60 1,187 9.62 1,246 9.64 1,305 9.66 1,365 9.68 1,424 9.70 1,483 9.72 1,543 9.74 1,602 9.76 1,661 9.78 1,721 9.80 1,780 9.82 1,839 9.84 1,899 9.86 1,958 9.88 2,017 9.90 2,077 9.92 2,136 Stage -Area -Storage for Pond 2P: Infiltration Basin 7 Elevation Storage (feet) (cubic -feet) 9.94 2,195 9.96 2,255 9.98 2,314 10.00 2,373 10.02 2,433 10.04 2,492 10.06 2,551 10.08 2,611 10.10 2,670 10.12 2,729 10.14 2,789 10.16 2,848 10.18 2,907 10.20 2,967 10.22 3,026 10.24 3,085 10.26 3,144 10.28 3,204 10.30 3,263 10.32 3,322 10.34 3,382 10.36 3,441 10.38 3,500 10.40 3,560 10.42 3,619 10.44 3,678 10.46 3,738 10.48 3,797 10.50 3,856 10.52 3,916 10.54 3,975 10.56 4,034 10.58 4,094 10.60 4,153 10.62 4,212 10.64 4,272 10.66 4,331 Elevation Storage (feet) (cubic -feet) 10.68 4,390 10.70 4,450 10.72 4,509 10.74 4,568 10.76 4,628 10.78 4,687 10.80 4,746 10.82 4,806 10.84 4,865 10.86 4,924 10.88 4,984 10.90 5,043 10.92 5,102 10.94 5,162 10.96 5,221 10.98 5,280 11.00 5,340 11.02 5,399 11.04 5,458 11.06 5,518 11.08 5,577 11.10 5,636 11.12 5,696 11.14 5,755 11.16 5,814 11.18 5,874 11.20 5,933 Cross Reference Table - Basin Name to Soils Report Label Desi n Basin Name # 1 2 3 4 5 6 7 Soils Report Test Number 3 7 2 8 1 4 6 The Catena Group SOILS REPORT FOR STORM WATER BASINS Second Reconnaissance Battalion Camp Lejeune, NC Prepared For: EarthTcch 701 Corporate Center Drive Suite 475 Raleigh, NC 27607 Prepared By: The Catena Group Hillsborough, North Carolina April 3, 2008 / Gary S. Kreiser 410-B Millstone Drive Hillsborough, NC 27278 (919)732-1300 INTRODUCTION The Marine Corps Base at Camp Lejeune plans an expansion of The Second Reconnaissance Battalion (2nd Recon Bit). As part of this expansion, several stormwater infiltration basins are proposed to infiltrate runoff from adjacent impervious surfaces. As part of the application process, a soils investigation detailing soil type, infiltration rate, and depth to seasonal high water table is required. The Catena Group, Inc (TCG) has been retained to perform the soil investigations. INVESTIGATION METHODOLOGY Prior to the field investigation, the Onslow County Soil Survey was referenced to get an overview of the possible soil series located at the site. In the area around the 2"d Recon Bn, there are six mapping units. Figure I presents the mapped soil series and the general location of the proposed infiltration basins where the borings and infiltration tests were performed. Table l presents the soil series, map unit symbol and taxonomic class. Table I Soil Series, Map Unit Symbol, and Taxonomic Class Map Unit Symbol Soil Series/Map Unit Taxonomic Class Name BaB, Baymeade Loamy, siliceous, semiactive, thermic Arenic Hapludults Bo Bohicket Fine, mixed, superactive, nonacid, thermic Typic Sulfaquents Mk Muckalee Coarse -loamy, siliceous, superactive, nonacid, thermic Typic Fluvaquents Pt Pits N/A Ur Urban Land N/A WaB Wando Thermic, coated Typic Quartzipsamments The field investigation was performed on March 5, 11, and 27, 2008. Eight (8) soil borings were made with a hand -mined auger in the vicinity of the proposed infiltration basins. Observations of the landscape (slope, drainage patterns, past use, etc.) as well as soil properties (depth, texture, structure, seasonal wetness, restrictive horizons, etc.) to a depth > 48 inches, when possible, were recorded. Soil color was determined with a Mansell Soil Color Chart. The rate of water entry into a soil is referred to as the infiltration rate. The infiltration rate into a soil decreases with time mainly due to an increase in the soil water content and a decrease in the hydraulic gradient. As infiltration continues, the rate of water entry into the soil reaches a constant value (steady state condition) which is considered to be the same as the saturated hydraulic conductivity (Ks,T) of the soil. The Ks,T was measured in the field and used to characterize the infiltration rate for each proposed infiltration basin. KSAT measurements were performed at each of the proposed infiltration basin using a constant - head permeameter (Amoozemeter). Before any readings were recorded, the Amoozemeter was allowed time to equilibrate, typically 25 minutes. Based on conversations with the designer of the proposed infiltration basins (Mr. Bryan Dick of Earth Tech), construction of these basins would remove approximately 6 to 12 inches of topsoil. As such, the KsnT measurements were performed around a depth of 12 inches in order to estimate the infiltration rate at the new soil surface. FINDINGS Soil Type Based on the borings in the vicinity of the proposed basins, it was determined that the majority of the soil at the Recon Site was the Baymeade and Wando soil series. The major exception was boring (B6), where there was approximately 48 inches of loamy sand fill material above the natural soil surface. Detailed boring logs for each boring are attached. Table 2 presents each boring with a soil series determination. Determination of soil series was made through a comparison of soil boring descriptions to the Natural Resources Conservation Service (NRCS) Official Series Description (OSD) for the soil series that were mapped by the NRCS for this site. Table 2 Soil Borings and Soil Series Determination Boring # Soil Series Determination Basin I Baymeade Basin 2 Baymeade Basin 3 Baymeade Basin 4 Wando Basin 5 Wando Basin 6 Urban Land* Basin 7 Baymeade Basin 8 Baymeade *48 inches of fill, no determination of soil series Depth to Seasonal High Water Table During the field investigation, the depth to the seasonal high water table (SHWT) was determined. Since the soil was typically sandy, the determination of the SHWT was made through field indicators of redoximorphic features or the presence of saturated soil. Table 3 presents the soil borings and the determination of the SHWT. Table 3 Boring and Depth to SH WT Boring # SH WT Determination (inches below Surface) Basin 1 32 Basing 48 Basin3 >53 Basin4 36 Basin5 42 Basin >48 Basin7 48 Basin8 >50 Infiltration Rate Multiple saturated hydraulic conductivity tests were performed at each proposed infiltration basin. The results for each test are shown below in Table 4. Data sheets for each hydraulic conductivity tests are also attached. At each basin location the geometric mean was taken and is presented in Table 4. The geometric mean was calculated instead of the arithmetic mean, as it tends to dampen the effect of very high or low values, which might bias the arithmetic mean if a straight average was calculated. Table 4 Results of Saturated Hydraulic Conductivity Tests and Geometric Mean Test Location Test Number Test Depth (inches) Measured Ks,, (in/hr) Geometric Mean in/hr Basin 1 I 12.2 0.90 1.37 2 10.2 0.56 3 12.2 0.34 4 10.6 5.19 5 11.8 5.29 Basin 2 1.20 2 12.2 3.05 Basin 3 1 12.2 2.96 4.84 2 12.2 7.02 3 11.8 5.44 Basin 4 1 11.8 4.27 4.04 2 11.8 4.05 3 11.0 3.80 Basin 5 8.00 3.99 2 11.00 Basin 6 l 11.4 5.01 2.22 2 11.0 0.98 Basin 7 I 12.6 4.51 5.61 2 12.2 4.99 3 12.2 7.86 Basin 8 1 12.6 5.21 5.46 2 11.8 4.26 3 1 LS 7.33 Since soil is inherently non -homogeneous, field tests can often misrepresent the areal hydraulic conductivity of a soil. Typically, field tests underestimate the saturated hydraulic conductivity of clayey soil and overestimate it in sandy soils. As a result of this misrepresentation, a "moderation factor" is suggested to convert point saturated hydraulic conductivity to areal saturated hydraulic conductivity for each proposed infiltration basin. Since the soil is typically fine sand or loamy sand, a moderation factor of 0.5 was used to cor ect for the potential of overestimating the infiltration rate. Table 5 presents the saturated hydraulic conductivity geometric mean for each infiltration basin as well as a moderation factor to get an area infiltration rate for each proposed infiltration basin. Table 5 Geometric Mean, Moderation Factor and Areal Infiltration Rate for Each Basin Test Location Geometric Mean Moderation Factor Areal Infiltration Rate (inches -hour) Basin 1 1.37 _ 0.5 0.68 Basin 1.20 05 0.60 Basin 3 4.84 OS 2.42 Basin 4 Basin 5 4.04 3.99 01 0.5 2.02 2.00 Basin 6 1.11 0.5 1.11 Basin 7 5.61 0.5 2.81 Basin 8 5.46 0.5 2.73 As shown in Table 5, the majority of proposed basin locations have an infiltration rate of 2 inchcshour or greater with the exceptions of Basin 1. 2 and 6. Basins I and 2 are located near a dirt trail and Basin 6(See Figure 1) is located in open field. and it is likely that these areas could have been compacted from past uses. However, even with these lower infiltration rates these areas are still greater than the required 0.52 inches per hour. CONCLUSION'S The findings presented herein represent TC"G's professional opinion based on our site and soils evaluation. This report is provided to assist in the application for the infiltration basins by providing the soil information. North Carolina DWQ must issue the final permit. Any concurrence with the findings in this report would be made at that time. ` �: d : _ \ - / \\]�/ W :; ;�M , Ti;i � Ti ; Id H I H 1-1 ......... _ 1......... j\ \ n \\\\\. �_ \ QRQgol: ! !; GAGe!` 2b29lR ! Gegae R . 68Q3 . / R \ / / ( \( ; .] \ \ | \® GeDR% :;;;;;;; H . } ( 2Rell !§] { _ » 88 9 / \\ / ., \.\ ,....... § . .....,. ; G oo : Y "d o & o o & & & ^ 3 b $ & oo m k, 3 =o y - 3 u oT egee.�$ u v 4g2� mm x oo�u es 5§aa se"ss mz xaoii 9 9 eF 0 &oR& ri i � o000000000a�� � m F &&& :i b • 0 00 $ o r4 0 0000 000 $ o e Y>� 0o e153 00 e Y oNn �a m 8,4: oc �m m e 83 o e �m a g e 88m _ & � 4 3 F F F g _ � 8 m q m F F 6 i• n F�� 00000 � � � � 2<• Y o 00 � � 3 9 g �` oeo o � '$ � � 2 _ � S�� v F 3 ", C v„ m i„ U�„�� s 3 g �, I � e• e m e e�� � s 3 ,y � g g gg g g 3 d O0 g g $ a 4 m $ m