HomeMy WebLinkAboutSW8060609_CURRENT PERMIT_20210712STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 0lo OV O�
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
'L02\ 0112
YYYYMMDD
ROY COOPER
Governor
DIONNE DELLI-;ATTI
seartury
BRIAN WRENN
Dtrectur
July 12, 2021
NORTH CAROLINA
EmnmwwraW Quartty
The Peninsula at Ocean Isle Beach Property Owner's Association, Inc
Attn: Roger Hendrix, President
10 Causeway Drive
Ocean Isle Beach, NC 28469
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 060609
The Peninsula at Ocean Isle Beach
Brunswick County
Dear Mr. Hendrix:
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for
the subject project on June 16, 2021. The Division is hereby notifying you that permit SW8 060609 has been renewed
on July 12, 2021, and shall be effective until July 17, 2028. For your records, please find enclosed a renewed, updated,
and re -issued permit and a copy of the renewal application. As requested, a copy of the current operation and
maintenance agreement is enclosed. Please keep this permit on file at all times. Please note that the renewed, updated,
and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide
you with a better understanding of your obligations under the permit
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the
terms and conditions of this state stormwater permit The plans originally approved on July 17, 2006, and most
recently revised on May 11, 2016, will remain in full force and effect in accordance with the regulations set forth in
Title 15A NCAC 2H.1000.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit Failure to establish
an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions,
to transfer the permit, or to renew the permit, will result in future compliance problems.
If any pans, requirements; or limitations contained in this permit are unacceptable, you have the right to request an
adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written
petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within
thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a
filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or
via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit
shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the
Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
G 7am
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/ams: %Stortnwater\Permits & Projects\2006\060609 HD\2021 07 permit 060609
cc: Wilmington Regional Office Stotmwater File
�.� North Carolina Department of Environmental Quality I Division of Energy. Knerai and land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension 1 Wilmington. North Carolina 28405
rvwrtv cwouxa
State Stormwater Management Systems
Permit No. SW8 060609
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
The Peninsula at Ocean Isle Beach Property Owners Association
The Peninsula at Ocean Isle Beach
3' St., Ocean Isle Beach - Brunswick County
FOR THE
construction, operation and maintenance of an underground storage basin and infiltration trench in
compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater
rules') and the approved stormwater management plans and specifications and other supporting data
as attached and on file with and approved by the Division of Energy, Mineral and Land Resources
(the "Division" or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until July 17, 2028 and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.6 on page 2 of this permit. The subdivision is permitted for 24 lots, each
allowed 3,000 square feet of built -upon area. The system must be operated with a 50'
vegetated filter.
3. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
4. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
5. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
Page 1 of 6
State Stormwater Management Systems
Permit No. SW8 060609
The following design elements have been permitted for this infiltration trench stormwater
facility, and must be provided in the system at all times.
Units
Infiltration Trench
Drainage Area
Onsite
Offsite
Acres
ft2
ft2
4.5
199,018
0
Total Impervious Surfaces
Lot BUA at 3,000 ft2/lot
Roads/Parking
Other
Offsite
ftZ
92,055
72,000
13,640
6,415
0
Design Storm
inches
1.5
Trench Dimensions, L x W x H
feet
125x25x0.8
Perforated Pipe Diameter/Length
feet
0.5/750
Season High Water Table
FMSL
7.67
Bottom Elevation
FMSL
9.70
Permitted Storage Volume
ft3
1,000
Expected Infiltration Rate
in/hr
3.8
Type of Soil
Newhan Sand
Receiving Stream
Intercoastal
Waterway
River Basin
Lumber
Stream Index Number
15-25
Classification of Water Body
"SA;HQW'
The following design elements have been provided for the underground storage chamber and
pump system stormwater facility, and must be provided in the system at all times.
Units
Underground System
Number of chambers
2
Chamber dimensions2 (LxW'xH)
feet
56x161x8
Permitted Storage Volume'
ft3
7,168
Design Storm
inches
1.5
Bottom Elevation'
FMSL
-4.0
Bypass/Storage Elevation
feet
5.0
Type of Pump
Tsurumi L62-400, '/2
HP
Operating Point
22 GPM
20 ft TDH
Drawdown Time
days
3.38 + 24hr lag
1 - 2 8ft wide chambers side by side, 2 — design criteria for each chamber
3 — Because the storage chambers are partially below sea level, a watertight seal
must be maintained on the storage chambers to minimize seepage.
II. SCHEDULE OF COMPLIANCE
The permittee is responsible for verifying that the proposed built -upon area for the entire lot,
including driveways and sidewalks, does not exceed the allowable built -upon area. Once the
lot transfer is complete, the built -upon area may not be revised without approval from the
Division of Energy, Mineral and Land Resources, and responsibility for meeting the built -upon
area limit is transferred to the individual property owner.
Page 2 of 6
State Stormwater Management Systems
Permit No. SW8 060609
2. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s). BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. Adding the option to use permeable pavement or #57 stone within the lots as a
permeable surface. The request may require a proposed amendment to the deed
restrictions and protective covenants for the subdivision to be submitted and recorded.
g. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
h. Other modifications as determined by the Director.
1 The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
4. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately. Infiltration systems should not be used as erosion control
devices, due to the potential clogging. If the stormwater system was used as an Erosion
Control device, it must be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
5. The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
7. The permittee shall at all times provide the operation and maintenance necessary to assure
that all components of the permitted stormwater system function at the design condition. The
approved Operation and Maintenance Plan must be followed in its entirety and maintenance
must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch
basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
Page 3 of 6
State Stormwater Management Systems
Permit No. SW8 060609
Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
9. Prior to transfer of the permit, a file review and site inspection will be conducted by Division
personnel to ensure the permit conditions have been met and that the project and the on -site
stormwater system complies with the permit conditions. Any items not in compliance must be
repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities
performed to date may be requested.
10. Prior to the sale of any lot, the following deed restrictions must be recorded:
a. The following covenants are intended to ensure ongoing compliance with State
Stormwater Management Permit Number SW8 060609, as issued by the Division of
Energy, Mineral and Land Resources under NCAC 2H.1000.
b. The State of North Carolina is made a beneficiary of these covenants to the extent
necessary to maintain compliance with the Stormwater Management Permit.
C. These covenants are to run with the land and be binding on all persons and parties
claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded without the
express written consent of the State of North Carolina, Division of Energy, Mineral and
Land Resources.
e. Alteration of the drainage as shown on the approved plans may not take place without
the concurrence of the Division of Energy. Mineral and Land Resources.
f. The maximum built -upon area per lot is 3,000 square feet. This allotted amount
includes any built -upon area constructed within the lot property boundaries, and that
portion of the right-of-way between the front lot line and the edge of the pavement. Built
upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick,
stone, slate, coquina and parking areas, but does not include raised, open wood
decking, or the water surface of swimming pools.
g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in
their allowable built -upon area due to CAMA regulations.
h. All runoff on the lot must drain into the permitted system. This may be accomplished
through providing roof drain gutters which drain to the street, grading the lot to drain
toward the street, or grading perimeter swales and directing them into the pond or
street. Lots that will naturally drain into the system are not required to provide these
measures.
i. Built -upon area in excess of the permitted amount will require a permit modification.
11. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of
the date of recording the plat, and prior to selling lots. The recorded copy must contain all of
the statements above, the signature of the Permittee, the deed book number and page, and
the stamp/signature of the Register of Deeds.
12. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
III. GENERAL CONDITIONS
Any individual or entity found to be in noncompliance with the provisions of a stormwater
management permit or the requirements of the stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
Page 4 of 6
State Stormwater Management Systems
Permit No. SW8 060609
2. The issuance of this permit does not preclude the permittee from complying with and obtaining
any other permits or approvals that are required for this development to take place, as
required by any statutes, rules, regulations, or ordinances, which may be imposed by any
other Local, State or Federal government agency having jurisdiction. Any activities undertaken
at this site that cause a water quality violation or undertaken prior to receipt of the necessary
permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to
enforcement procedures pursuant to NCGS 143-215.6.
3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective
actions. This includes actions required by this Division and the stormwater rules such as the
construction of additional or replacement on -site stormwater systems. These additional or
replacement measures shall receive a permit from the Division prior to construction.
4. Permit Transfer: This permit is not transferable to any person or entity except after notice to
and approval by the Director. The permittee shall submit a completed and signed "Permit
Transfer Application Form" (available on the Division website) accompanied by the required
fee and supporting documentation as listed on the form, to the Division at least 60 days prior
to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the case of an
individual lot sale that is made subject to the recorded deed restrictions and protective
covenants;
b. The assignment or conveyance of declarant rights to another individual or entity;
C. The sale or conveyance of the common areas to a Homeowners or Property Owner's
Association, subject to the requirements of NCGS 143-214.7(c2);
d. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or
NCGS 57D-6-07 and 08,
e. Bankruptcy,
f. Foreclosure, subject to the requirements of Session Law 2013-121;
5. Current Permittee Name or Address Changes: The permittee shall submit a completed
"Permit Information Update Application Form" (available on the Division website) to the
Division within 30 days to making any one or more of the following changes:
a. A name change of the current permittee;
b. A name change of the project;
C. A mailing address change of the permittee;
The permittee is responsible for compliance with all terms and conditions of this permit until
the Division approves the transfer request. Neither the sale of the project, in whole or in part,
nor the conveyance of common area to a third party constitutes an approved transfer of the
permit.
The permittee grants Division Staff permission to enter the property during normal business
hours to inspect all components of the permitted project.
8. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission; however, these actions do
not stay any permit conditions.
9. Approved plans, application documents, supplements, calculations, operation and
maintenance agreement, and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of this permit, application, supplements, operation
and maintenance agreement, and approved plans and specifications shall be maintained on
file by the permittee.
10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater
system must follow the guidelines established in the North Carolina Erosion and Sediment
Control Planning and Design Manual.
11. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the
laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al.
Page 5 of 6
State Stormwater Management Systems
Permit No. SW3 060609
12. A permit renewal request must be submitted at least 180 days prior to the expiration date of
this permit. The renewal request must include the appropriate application, documentation and
the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit renewed, updated and reissued this the 12th day of July.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
l.lVuglrA�o �eQQ
9T., Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 6 of 6
Attachment C - Permitting History
The Peninsula at Ocean Isle Beach
Permit No. SW8 060609
Approval
Date
Permit
Action-.
`BIMS
'Version;
,
Description of the Changes ,
7/17/2006
Original
Approval
1.0
8/1 1/2014
Modification
1 A
Name/Ownership Change &
Plan Revision: include the
rotation of lots 2 and 3 so that
the lots will now face the
Peninsula access road
5/11/2016
Modification
1.2
2006 plan back into effect:
reconfiguring lots 2 & 3
7/12/2021
Renewal
2.0
OPERATING AGREEMENT
�3M
THE RESORT AT OCEAN ISLE BEACH, LLC
(A North Carolina Limited Liability Company)
f
12.15 Counterparts. This Agreement may be executed in multiple counterparts, each
of which shall be deemed an original for aU purposes and all of which when taken together shall
constitute a single counterpart instrument. Executed signature pages to any counterpart instrument
may be detached and affixed to a single counterpart, which single counterpart with multiple
executed signature pages affixed thereto constitutes the original counterpart instrument. All of
these counterpart pages shall be read as though one and they shall have the same force and cfFect as
if all of the parties had executed a single signature page.
IN WITNESS WHEREOF, the undersigned, being the initial Managers and all of the
Members of the Company, have caused this Agree" to be duly adopted by the Company as of
the 30th day of May, 2005, and do hereby assum agree to be bound and to perform all of
the terns and provisions set forth in this Agree n
(Seal)
Myers, II1/ I (Seal)
Pagc 19
(Seal)
q
SCHEDULE II
List of Managers of The Resort at Ocean Isle Beach, LLC
l . Patrick Ballantine
6008 Forest Creek Circle
Wilmington, NC 28403
2. Stuart Cooke
1 Causeway Drive
Ocean Isle Beach, NC 28469
3. Jeff Milliken
P.O. Box 6609
Sunset Beach, NC 28468
4. Jim Myers, III
P.O. Box 240351
Charlotte, NC 28224
Pagc 21
UEMLK UUt UNLY _ __.. __ _ _.._.-__. .. — _ 'll
Date
received
Fee Paid
Permit Number
41
1(0 0
3303
05= I
Su.)&'
0& o
NC DEQ Division of Energy, Mineral and Land Resources �` l I `� Nr C
STATE STORMWATER: ' " '
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew theirhigh density permit 160 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60. (c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 060609
2. Project name: The Peninsula at Ocean Isle Beach Property Ow11cr's Association
3. Project street address: Third Street
City: Ocean Isle Beach County: Brunswick
ZIP: 28469
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https:Hdeg.nc.goviabouUdivisions/energy-
m ine ral-la n d-resou rces/en a rgv-min a ral-I and-rules/stormwater-pros ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at https://deg.nc.goy/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: The Peninsula at Ocean Isle Beach Prope
Owner's Association
2. Signing Official's Name: Roper Hendrix
3. Signing Official's Title: President
4. Mailing Address: c/o BeachManagement P.O. Box 6569
City: Ocean Isle Beach State: NC ZIP
28469
-5. Street Address: 10 Causeway Drive
City: Ocean Isle Beach State: NC ZIP:
28469
6. Phone: (910) 409-6220 Email: wandaebeachmanagement. net
JUN 16 2021 J1
BY: �
Stormwater Permit Renewal Form Page 1 of 3 ay 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQ W/ORIM. Only applications packages that
include all required items listed below will be accepted and reviewed.
Initi each item below to indicate that the required information Is provided in the application package
1. A permit application processing fee of $505.00 payable to NCDEQ.
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including. deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
l/1y[�ItVTj/1// 4. O&M Agreements, Please select one:
❑ 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
® 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
^ , inspected, and that they have been built and maintained in accordance with the permit.
/�II'�►/'/_ 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
JUN 162021
I
BV'
Stormwater Permit Renewal Application Form Page 2 of 3
May 11, 2018
it
D. PER TTEE'S CERTIFICATION
I, < 0 eC � , the person legally responsible for the permit, certify that I have
a copy of the -Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowledge, correct a d com late.
Signature: f Date: / o
NOTARIZATION:
I, kILI n.r+Z)+> a Notary Public for the State of
AJo r2-r,d ClaQo«o County of ^J_5 L'_J L' i<, do hereby certify
that /2c C </E)y�Qs personally appeared before me
this the / o day of 20 2. t and acknowledge the due
M
Rtalrum nt. Witness my hand and official seal,
PUBUC
as
o'un\Ity, NC !� /
Notary Signature: w a� da /< •/cz i£
My commission expires A ioz-72-`1
7.
1UN 16 2021
Stormwater Permit Renewal Application Form Page 3 of 3
May 11, 2018
ols7 H nbrsW
r NKT #05111
Permit No.
State of North Carolina (to be provided by DWQ)
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
UNDERGROUND INFILTRATION TRENCH SUPPLEMENT
This form may be photocopied for use as an original
DWO Stormwater Management Plan Review:
A complete stormwater management plan submittal includes a stormwater management permit application, an
underground trench supplement for each system, design calculations, and plans and specifications showing all
stormwater conveyances and system details.
L PROJECT INFORMATION
Project Name:
The Peninsula at Ocean Isle Beach
Contact Person: J. Phillip Norris, P.E. Phone Number: (910) 343-9653
For projects with multiple infiltration systems, a supplement form must be completed for each system. This
worksheet applies to: Trench 1 & 2 Storage Gallery' in Drainage Area 1
(from plans) �� (from Form SWU-101)
Data shown is for each gallery a �t
H- DESIGN INFORMATION (attach supporting calculations/documentation):
Soils Report Summary (based upon an actual field investigation and soil borings)
Soil Type
Infiltration Rate
SHWT Elevation
Trench Design Parameters
Design Volume
Design Storm
Drawdown Time
Perforated Pipe Size
Perforated Pipe Length
No. Observation Wells
Stone Type (if used)
Stone Void Ratio
Newhan Sand
N/A ❑in/hr or ❑cf/hr/sf (check appropriate units)
7.67 fmsl (Seasonal High Water Table elevation)
7,091 c.f.
1.5 inch event (1.5 inch event for SA waters, 1 inch event for others)
3.38 days
N/A inch diameter
N/A ft.
I' TO
10 1/_1
(may be required on a case —by-case basis)
Tr-eneh Elevations (infect mean seal level) Gallery Elevations
Bottom Elevation
-4.00 fmsl
Storage/Overflow Elevation 5.00 fmsl
FormSWU-107 Version3.99 Page 1 of
Trench Dimensions
Height
Width
8.00 ft.
16 ft.
(2-Boxes Side by Side)
III. REQUIRED ITEMS CHECKLIST
Length
Volume Provided
56 ft.
7.168 cu.ft.
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
System is located 50 feet from class SA waters and 30 feet from other surface waters.
System is located at least 100 feet from water supply wells.
Bottom of system is at least 2 feet above the seasonal high water table.
Bottom of the system is 3 feet above any bedrock or impervious soil horizon.
Off-line system, runoff in excess of the design volume bypasses the system (bypass detail
provided).
System is designed to draw down the design storage volume to the proposed bottom
elevation under seasonal high water conditions within five days based upon infiltration
through the bottom only (a hydrogeologic evaluation may be required).
g. Soils have a minimum hydraulic conductivity of 0.52 inches per hour.
is not sited on or in fill material or DWQ approval has been obtained.
i. Plans ensure that the installed system will meet design specifications (constructed or
restored) upon initial operation once the project is complete and the entire drainage area is
stabilized.
j. System is sized to take into account the runoff at the ultimate built -out potential from all
surfaces draining to the system, including any off -site drainage.
kkSystem is located in a recorded drainage easement for the purposes of operation and
maintenance and has recorded access easements to the nearest public right-of-way.
1. Sy -stem capture and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event
for areas draining to SA waters).
tn. Drainage area for the device is less than 5 acres.
w.. -A pretreatment device (filter strip, grassed swale, sediment trap, etc.) is provided.
o. Trench bottom is covered with a layer of clean sand to an average depth of 4 inches.
p - Sides of the infiltration trench are lined with geotextile fabric.
c---Rook used is free of fines (washed stone) and has a large void ratio.
r. -Side4e-bottom area ratio is less than 4:1.
Form SWU-107 Version 3.99 Page 2 of 4
Observation well(s) are provided (case -by -case basis).
Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters)
and detail is shown on plans.
A benchmark for checking sediment accumulation is provided.
IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT
1. After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for
blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general
condition.
2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated
cover to maintain a maximum height of six -inches, and remove trash as needed.
3. Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth. Restore
depth to original design depth without over -excavating. Over -excavating may cause the required water table
separation to be reduced and may compromise the ability of the system to perform as designed.
4. The water level in any monitoring wells will be recorded after a I inch rainfall event and at least once a
month. Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three
months) shall be reported to DWQ immediately.
5. If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original
design specifications. If the system cannot be repaired to perform its design function, other stormwater control
devices as allowed by NCAC 2H .1000 must be designed, approved and constructed.
6. Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to
75% of the original design depth. The system shall be restored to the original design depth without over -
excavating. Over excavating may cause the required water table separation to be reduced and may
compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an
appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e.
stockpiling near a stormwater treatment device or stream, etc.).
A benchmark shall be established in the infiltration system. The benchmark will document the original
design depth so that accurate sediment accumulation readings can be taken. The measuring device used to
determine the depth at the benchmark shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments.
When the depth at the benchmark reads . /D the accumulated sediment shall be removed
from the system.
Form S WU-107 Version 3.99 Page 3 of 4
I�
Y
I acknowledge and agree by my signature below that I am responsible for maintaining the stormwater
collection system in accordance with the six maintenance procedures listed above. I agree to notify DWQ of
any problems with the system or prior to any changes to the system or responsible party.
Print Name and Title: Patrick J. Ballantine, Member / Manager
Address:
Phone: 910-579-2800
Signature:
Date: S 117
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold
and a resident of the subdivision has been named the president.
� Iti I
_ Lq lk&y of
basin maintenance
�y n O
gR
130
`Zi A SAY �
( a11Notary Public for the State of Xt\ 40(Lcounty of
do hereby certify that T ' C k b personally appeared before me this
and acknowledge the due execution of the foregoing infiltration
irements. Witness my hand and official seal.
❑ expires
Form SWU-107 Version 3.99 Page 4 of
4.
The Peninsula at Ocean Isle. Beach
1 of 2
Stormwater Permit No. SW8 060609
Brunswick County
Designer's Certification
State Stormwater Management Systems
Permit No. SW8 060609
Page
as a duly registereaVdCSS101&1 E nc.r in
the State of North Carolina, having been authorized to obs rve 4ffo �icall weekly/full
time) the construction of the project,
In
(Project)
forle10� nsuck (LA- Nean -Nt oeliA-irl (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form are a part of this Certification.
Noted deviations from approved plans and specifications:
Uate VJ U.L— U I
SEAL
11966
'SAY u �v ► )
3 ?00?
Page 7 of 8
State Stormwater Management Systems
Permit No. SW8 060609
Certification Requirements:
Page 2 of 2
The drainage area to the system contains approximately the permitted
acreage.
The drainage area to the system contains no more than the permitted
amount of built -upon area.
All the built -upon area associated with the project is graded such that the
runoff drains to the system.
All roof drains are located such that the runoff is directed into the system.
The outlet/bypass structure elevations are per the approved plan.
The outlet structure is located per the approved plans.
Trash rack is provided on the outlet/bypass structure.
All slopes are grassed with permanent vegetation.
Vegetated slopes are no steeper than 3:1.
The inlets are located per the approved plans and do not cause short-
circuiting of the system.
1. The permitted amounts of surface area and/or volume have been
provided.
Required drawdown devices are correctly sized per the approved plans.
All required design depths are provided.
�14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
11
The required dimensions of the system are provided, per the approved
plan.
cc: NCDENR-DWQ Regional Office
Delaney Aycock, Brunswick County Building Inspections
��. S . Srn ��, � tr � Tow n s�, � Ceot,>✓ ��� , ��.,�
1 a � k �a 11 an nee ilk Ptn i ns Jk a.A- Nka_n \ku �U,4) LLCM
Page 8 of 8
Project Name: THE PENINSULA AT OCEAN ISLE BEACH
DWQ Stormwater Project Number: SW8 QU DU t / 9
Section 10. Restrictions for Stormwater Regulations.
(a) The following covenants are intended to ensure ongoing
compliance with the State of North Carolina Storm Water
Management Permit Number #SW8 n/9 as issued by
the Division of. Water Quality under 15A NCAC 2H.1000.
(b) The State of North Carolina is made a beneficiary of these
covenants to the extent necessary to maintain compliance
with the Storm Water Management rules.
(c) These covenants are to run with the land and be binding on
all persons and parties claiming under them.
(d) The covenants pertaining to Storm Water may not be altered
or rescinded without the express written consent of the
State of North Carolina, Division of Water Quality.
(e) Alteration of the drainage as shown on the approved plans
may not take place without the concurrence of the Division
of Water Quality.
(f) The maximum built upon area (BUA) per lot is 3000 square
feet. These allotted amounts include any built upon area
constructed within the property boundaries, and, that
portion of the right of way between the front lot line and
the edge of the pavement. Built upon area includes, but is
not limited to, structures, asphalt, concrete, gravel,
brick, stone, coquina and parking areas, but does not
include raised, open wood decking, or the water surface of
swimming pools.
(g) In the case of a lot within CAMA's regulated AEC, if the
built -upon area for that lot, as calculated by CAMA, is
less that the amount shown in these restrictions, the most
restrictive BOA will be the maximum permitted for that lot.
(h) Filling in or piping any vegetative conveyances (ditches,
swales, etc.) associated with the development except for
average driveway crossings, is strictly prohibited by any
persons.
(j) Each lot will maintain a 30' wide vegetated buffer between
all impervious areas and surface waters.
(k) All roof drains shall terminate at least 30' from the mean
high water mark of the surface waters.
1
tF
(1) All runoff from the built -upon areas on the lot must drain
into the permitted system. This may be accomplished
through a variety of means including roof drain gutters
which drain to the street, grading the lot to drain toward
the street, or grading perimeter swales to collect the lot
runoff and directing them into a component of the
stormwater system. Lots that will naturally drain into the
system are not required to provide these additional
measures.
IN WITNESS WHEREOF, the Developer has executed this Stormwater
Deed Restriction this day of , 2006.
THE RESORT AT OCEAN ISLE BEACH, LLC
Patrick J. Ballantine
Member -Manager
STATE OF NORTH CAROLINA
COUNTY OF
I, , a Notary Public of the state and
county aforesaid, do hereby certify that ,
personally appeared before me this day and acknowledged that he is a
MEMBER MANAGER of THE PENINSULA AT OCEAN ISLE BEACH, LLC and that by
authority duly given and as the act of such entity, he signed the
foregoing instrument in its name on its behalf as its act and deed.
Witness my hand and seal, this the day of
2006.
Notary Public
My Commission expires:
2