HomeMy WebLinkAboutSW8060609_COMPLIANCE_20140509STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 Ols 0tg O`I
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
C] COMPLIANCE EVALUATION INSPECTION
DOC DATE
20�LV0501111`
YYYYMMDD
Permit: SW8060609
County: Carteret
Region: Wilmington
Compliance Inspection Report
Effective: 07/17/06 Expiration: 07/17/20 Owner: The Peninsula At Ocean Isle Beach LLC
Contact Person: Patrick Ballantine Title:
Project: The Peninsula at Ocean Isle Beach
Third St
Ocean Isl Bch NC 28469
Phone: 910-232-6019
Directions to Project:
From the intersection of NC 179 and NC 904, take NC 904 across the Atlantic Intracoastal Waterway to Ocean Isle Beach. Turn left
onto Third Street. Site is on the left. - -
Type of Project: State Stormwater - HD - Infiltration
Drain Areas: 1 - (Intracoastal Waterway) (03-07-59) ( SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 05/09/2014 EntryTime: 11:00 AM Exit Time: 11:30 AM
Primary Inspector: Christine Nelson Phone: 910-796-7215
Secondary Inspector(s):
Jean Conway Phone:
Reason for Inspection: Complaint
Permit Inspection Type: State Stormwater
Facility Status: m Compliant ❑ Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Inspection Type: Compliance Evaluation
Page:1
Permit: SW8060609 Owner - Project: The Peninsula At Ocean Isle Beach LLC '
Inspection Date: 05/09/2014 Inspection Type: Compliance Evaluation Reason for Visit: Complaint
Inspection Summary:
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
❑
Signed copy of the Engineer's certification is in the file?
■
❑
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
®
❑
fl
❑
Copy of the recorded deed restrictions is in the file?
■
❑
❑
❑
Comment:
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
■
❑
❑
❑
. Is the drainage area as per the permit and approved plans?
❑
❑
❑
■
Is the BUA (as permitted) graded such that the runoff drains to the system?
■
❑
❑
❑
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
■
❑
❑
❑
Are the inlets located per the approved plans?
■
- ❑
❑
❑
Are the outlet structures located per the approved plans?
❑
❑
■
❑
Comment: The infiltration system is underground and thus difficult to confirm it has
been constructed according to the plans. A certification has been provided and the
water level in the pump station inlet was very low, indicating the pump was working.
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
■
❑
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided
to DWQ ❑
❑
❑
■
upon request?
Comment:
Other Permit Conditions
Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
■
❑
❑
❑
Comment:
Other WQ Issues
Yes
No
NA
NE
Is the site compliant with other water quality issues as noted during the inspection?
■
❑
❑
❑
Comment
Page: 2