Loading...
HomeMy WebLinkAboutSW8060530_HISTORICAL FILE_20180716STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Uu o 53u DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE i fl\� (j`1 11-1 YYYYMMDD Johnson, Kelly From: Stubbs, Rebecca <rstubbs@mcadamsco.com> Sent: Monday, July 16, 2018 3:16 PM To: Johnson, Kelly Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater No problem, let me know if you need anything else from me! Rebecca Stubbs, El I Designer II, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 I direct 919. 287. 0740 1 rstubbs@mcadamsco.com www.mcadamsco.com I linkedin I twitter I instagram I Join our team 2 MCADAMS creating experiences through experience From: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Sent: Monday, July 16, 2018 3:11 PM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Got it. Thanks KJ From: Stubbs, Rebecca ]mailto:rstubbs@mcadamsco.comj Sent: Monday, July 16, 2018 3:05 PM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Kelly In the package that I put in the mail on July 2nd 1 included an updated Attachment A and Title Page. The revised Attachment A now shows the required and the provided WQv which should correspond to our Supplement Form and pond calculations within the report. The required volume that we determined in our calculations is 65,111 cf and we are providing 66,951 cf in the wet pond. I have attached those 2 updated documents to this email in case you did not receive that package. Does this cover what you are looking for? r Thank you! Rebecca Stubbs, El I Designer II, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 I direct 919. 287. 0740 1 rstubbs@mcadamsco.com www.mcadamsco.com I linkedin I twitter I instaRram I join our team L'Jl MCADAMS creating experiences through experience From: Johnson, Kelly <kelly.p.iohnson@ncdenr.eov> Sent: Monday, July 16, 2018 2:54 PM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: FW: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Rebecca, Did you send me the required volume calculation for the new impervious area amount? Maybe I am overlooking it? I get 64,439cf (in yellow below), but I need to make sure that matches your numbers. If I don't have that already, can you please email it? Thanks, Kelly 2 S WB 060530 - Attachment 0 DATE 11.219.9031 To SCM Redevelopment 6rtmption for Demiq DA' Total PemtY 2l23/IB Pemte DATE TSD Perms 2/23/13 Permit 2/25/I8 Permit 2/23/16 permit DATF iBD D,oa. a A,.. Totat 1.216.90 It 55 139,667 3 373 Say 1 l73 Sa5 GmSV26 060530 & On UUCW Properq DA: 1,030.1t6 1.030.St6 11,555 121,a13 1,166,11a 1,Min On-SWO060530& Off1INC1V Prop" OA: 6,079 6.019 3,566 9.6e51 9.645 0E%W606MIC& OnLItCW Propcsti DA: 1Lt,959 IU.959 0 1at.9591 1at.959 Otf-SW6060530&Off-WiCW Pmperq DA: _ 37,7191 37,719 0 57,719 37,71S ROW DA 01 0 14,703 14,7081 14,705 Lmp M., TotaF. 608,2891 633,128 14,555 25,145 647,9591 677.526 O=ite Imxtiiou:. Total: 575,1551 575,992 14.555 20.61E 630,3261 611.165 Ondte I". rvioc. Pre-1935: 1t,760 1t,760 0 0 1a,7w 1g760 Onti:r lmo+rvit u:. trs-2SSF': 0 0 0 1,505 LEN 1.&06 Onste Isyerviocs, 1995 Rulem 352,597 352.597 0 6.892 359'"91 559,489 On c Urxrvioes, 2005 Role:: 5.952 5.952 0 5,9521 5.952 Ondte lmxrvious, 2017 Rules Total: 201,5Aa MASS 14,555 11.920 228,119_ 229.15b 0cfldin•s/lois 0 0 0 0 0 Streevv 0 0 0 01 0 Pamir.; iC6,959 187,S31 11,600 3.2_'6 201,717 202,659 5iderals 14,935 1g652 2.955 6,692 26.532 26,499 Fcture Im crriov: AraR:ble: 0 29,OW 0 0 0 29.000 Offtm 6nxtviocs-Tool: 33.1351 S3,136 0 26.7t2 59,67&1 59,671 SeAz.A Sq:ere & Portion of Co6ele Rd.11986-20D81 9554 9,554 - 0 9,554 9,554 A.z M.,WhnA 11938200S1 0 0 0 383 383 353 A. N..Mdb Ave (Po: 201) 0 $51 $51 $51 ROW OM2008 0 0 00 0 IM9 1.989 1.919 ROW 1Pa:t 20171 0 0 0 3, 0 3410 34-10 ROW 1E+ixdrt&Pre-195Si 0 0 0 0 0 0 .e.OIV(!dt:ing&P,.. S591' 0 D 0 20,t0S 20.t09 20.t09 Off:ite Per! = 23,582 23.552 .0 0 23.SU 23,592 SW6031039 13.1541 13.154 0 0 13.SSa 13.15a SIM IODt05 ID,t2a 10,L28 0 0 INN lO . volume companion Req-rind o Provided Reaobed Votamr. 61.0221 64 -33 'Providcd Volvmr. 6 9511 66.951 Tout%; Lor Density fmperviout mom IE+d rLed from Ptojett A. ea per. iO N11161 21 Depsiq,'Toul V Lmperviaus Area* co:M :dd'ktvre' impervious cp to L^: LrpeM.. via fctne mofifi.uon. 'Loy De vr, D.a-vrae Area Calevhdon: Lor N=hyDAcpo:.t LD DA) -(Pte-1931'E.Ltin&_ SUA}. 1 _139,667 Total br Ders: DA(Luludirt D: e-1988'E.i:.li•1: 1 16L902 OndW6 050530 & On4Ji1CW Property DA: 121,413 0n-SW8060530&Off-UM-1 Pope. Od: 3,566 04-SW8 060530 & On41NCV/ ProxnV CIA: 0 Of-SN006OS30&Off-UNM Pmpperry DA: 0 ROW DA 14,708 Pre-1996 'Ulhu = &UAt 22.215 Nvr•"OlY(Ocri:Nmomrcor. Fra-1599J': 1,D06 [Ow jf is L+g & FN4SSd1 20.t09 From: Johnson, Kelly Sent: Tuesday, July 10, 2018 9:19 AM To: 'Stubbs, Rebecca' <rstubbs@mcadamsco.com> Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Thanks Rebecca. I have been out of the office for the past week, but I will hopefully get through all of the mail/email/voicemails today. IU From: Stubbs, Rebecca [mailto:rstubbs@mcadamsco.com] Sent: Tuesday, July 3, 2018 6:30 PM To: Johnson, Kelly <kelly.p.iohnson@ncdenr.gov> Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater CAUTION: External email. Do not.cliek links or open attachments mess verified. Send all suspicious email as an attachmen t.to .. Kelly, < I put the signed/sealed new title page and the revised Attachment A in the mail today via FeclEx. Please let me know if there are any issues in your receiving of this. Additionally, the sheets that I believe are necessary to keep on file with the permit are the following: C-1 Existing Conditions C-5 Overall Site Plan C-6 East Parking Lot Site Plan C-7 West Parking Lot Site Plan C-8 Detailed Bus Stop Plan C-9 Overall Grading & Storm Drainage Plan C-10 East Parking Lot Grading & Storm Drainage Plan C-11 West Parking Lot Grading & Storm Drainage Plan EC-2 East Parking Lot Erosion Control Plan - Stage 2 EC-3 West Parking Lot Erosion Control Plan - Stage 2 SW-1 Stormwater Control Measure Plan View SW-2 Stormwater Control Measure Details SW-3 Stormwater Control Measure Landscape Plan If there is anything else you need from me, please don't hesitate to reach out to me. Thanks! Rebecca Stubbs, El ] Designer II, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 I direct 919. 287. 0740 1 rstubbs@mcadamsco.com www.mcadamsco.com I linkedin I twitter [ instagram [loin our team 'J MCADAMS creating experiences through experience From: Johnson, Kelly <kelly.p Johnson(@ncdenr.gov> Sent: Monday, July 02, 2018 9:17 AM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Cc: Perry, Daniel <dperry@mcadamsco.com>; Riggins, Daryl <riggins@mcadamsco.com>; morganm@uncw.edu Subject: FW: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Rebecca, I started working through this one on Friday because I had to ask Christine how all of the data in the table worked. (There was pre-1988 existing that had been taken out of the low density drainage area and a few other things 9 iJ M.CADAMS ? ;c! JUL 0 6 2012 p LETTER OF TRANSMITTAL Date: July 3, 2018 FEDERAL EXPRESS To: Ms. Kelly Johnson Re: University of North Carolina - Wilmington Department of Environmental Quality Hamilton Hurst Parking Lot 127 Cardinal Drive Extension Stormwater Management Plan Wilmington, North Carolina 2840S Job #: UNW-17060 I am sending you the following items: ❑ Drawings ❑ Letter ❑ Specifications ® Submittal ❑ Plans ❑ Prints ❑ Statement of Qualifications ❑ Other QUANTITY UNIT DESCRIPTION 1 Copy Original Signed Cover 1 Copy Attachment A Transmitted as checked below: ® For approval ❑ For your use ❑ As requested Remarks: Copyto: ❑ For review + comment ❑ Other ❑ Other Signature: —Jiro Daniewff Project Manager, Water Resources creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 • j R UNC WILMINGTON HURST HAMILTON PARKING LOTS WILMINGTON, NORTH CAROLINA STORMWATER MANAGEMENT PLAN PROJECT NUMBER: DESIGNED BY: U N W-17060 DANIEL PERRY, PE REBECCA STUBBS, El DATE: IULY 2018 'J MCADAMS 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 NC Llc. # C-0293 ��6 4\ -EAL �' = 5425 ` 7�L'te FCCFRV �� `'I'� JUL 0 6 20113 IJ HY: - ' pg2d52 - ''�,,'11H cv\a `1` 0 UNC WILMINGTON HURST HAMILTON PARKING LOTS WILMINGTON, NORTH CAROLINA STORMWATER MANAGEMENT PLAN PROJECT NUMBER: DESIGNED BY: U N W-17060 DANIEL PERRY, PE REBECCA STUBBS, El DATE: JUNE 2018 'J MCADAMS 2905 MERIDIAN PARKWAY DURHAM, NORTH CAROLINA 27713 INC LIc. # C-0293 r-��IVE uii 2 G 2013 BY:_---------�- EAL 'r 9 121 MCADAMS UNC WILMINGTON — HURST HAMILTON PARKING LOTS Stormwater Management Plan GENERAL DESCRIPTION Located at the Intersection of Hurst Drive and Hamilton Drive, the Hurst Hamilton Parking Lots project will consist of two (2) surface parking lots providing a total of +/- 574 spaces to accommodate visitors and students. The proposed lots are anticipated to contain one entrance off Hurst, one exit onto Hamilton, and one two-way access to N. MacMillan Drive. The project will include the addition of bike parking stalls, a bus shelter, along with a modification to an existing, adjacent SCM (i.e. the Lot K pond). The proposed project will be high density and will require a major modification to the existing State Stormwater Management Permit (SW8 060530) in this area of the UNCW campus. The addition of the surface parking lots will require an expansion to the existing SW8 060530 permit boundary. To better mimic the true drainage area to the Stormwater Control Measure (SCM), the modified permit boundary will nawr incl de existing BUA that has been previously unaccounted for, meaning that the SCM will be designed to provide equal or better treatment for the net ncrease in BUA for this modified permit boundary. The amount of existing BUA that will now receive treatment credit from the SCM is greater than the proposed amount of impervious bypassed from the small proposed parking lot along MacMillan Ave. Additional impervious outside of the drainage area to the SCM has been calculated to remain under the low -density threshold of 24% for the remaining portion of the permit boundary. Please refer to the BUA map included in section 4 of this report. The existing Lot K pond will be renovated / expanded to accommodate the proposed increase In impervious area. As a result of the increase in BUA and expansion of the existing SCM, the wet pond design will be modified to meet NC DEQ's Minimum Design Criteria. The project is located within the Cape Fear River Basin, with stormwater runoff from the proposed project draining to Burnt Mill Creek. According to the N.C. Division of Water Quality BasinWide Information Management System (BIMS), the waterway is classified as C; Sw" at this location (Stream Index q 18-74-63-2). The intent of this report is to provide updated stormwater calculations to the State Stormwater permit issued on February 23, 2018 due to the slight alteration to the bus stop layout along Hurst Drive. CALCULATION METHODOLOGY • Rainfall data for the Wilmington, NC region is from NOAA Atlas 14. This data describes a depth -duration - frequency (DDF) table describing rainfall depth versus time for varying return periods in the Wilmington, NC area. These rainfall depths are input into the meteorological model within PondPack for peak flow rate calculations. Please reference the miscellaneous site information section within this report for additional information. Using maps from the NRCS Web Soil Survey, the on- and off -site soils were determined to be from hydrologic soil group (HSG) 'A' soils, 'B' soils and 'D' soils. Since the method chosen to compute both pre- and post - development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Number (SCS CN). For this analysis, the HSGs for the site consisted of'A','B', and V. Within the site boundary, an approximate proportion of each soil group was determined using NRCS Web Soil Survey. Once an approximate proportion was determined, a composite SCS CN was computed for each cover condition. creating experiences through experience 2905 Meridian Parkway, Durham, No / 919. 361. 5000 J MCADAMS NARRATIVE > UNW-17060 Land cover conditions for the site were taken from a recent aerial mapping survey prepared by Avioimage Inc and combined with ground truth survey prepared by Atlantic Coast Survey. • The times of concentration are calculated using the SCS TR-55 Segmental Approach. The Tc flow paths are divided into three segments: overland flow, concentrated flow, and channel flow. The travel time is then computed for each segment, from which the overall time of concentration is determined by taking the sum of each segmental time. PondPack Version V8i, by Bentley Systems, Inc., was used in determining the pre- & post - development peak flow rates for the 1-, 2-, 10-, 25- and 100-year storm events, as well as routing calculations for the modified stormwater management facility. • The drainage ditches along Hamilton Drive and MacMillan Avenue were modeled as interconnected ponds with the existing SCM and with its proposed modifications. The ditches provide a significant amount of storage to the watershed and therefore their stage storage function was determined using best available survey data. • There are three proposed driveway culverts for entrances to the proposed parking lots. One along Hamilton Drive and two along MacMillan Avenue. The driveway culverts were sized such that the interconnection of ponds would balance the water surface elevation of the roadside ditches with the SCM. There is an existing culvert under the driveway to existing substation off of MacMillan Avenue that was modeled, and performance verified in throughout this analysis. • The offsite drainage area from the adjacent apartment complex was assumed to be full build -out in the calculation of impervious area to the SCM. If new development were proposed for the site, a 20' setback mentioned in the ordinance would be required similar to that currently provided for this property; therefore, this development has reached its impervious threshold which could drain to the SCM. • There is an existing 42" RCP culvert at the intersection of S College Rd and MacMillan Ave that was used as the overall point of analysis in the existing and proposed scenarios of the drainage ditches and SCM. This culvert was modeled with a tailwater condition to match crown of pipe to be conservative in the analysis of conveyance through the pipe. • The existing forebay of the wet detention basin will not be modified and therefore was modeled with the same stage storage function in both the existing conditions analysis and the proposed modifications analysis. To provide an accurate analysis of current conditions of the existing forebay, a stage storage function was generated from survey prepared by Avioimage. • It is acknowledged that the forebay percentage in the proposed build -out condition exceeds the volume requirement for forebays stated in the MDCs. The existing forebay which will remain unaltered, was previously approved with a forebay volume in excess of 20%. As a part of this project, additional concentrated discharges to the SCM were required. Project elements such as location of the concentrated discharges and physical shape of the SCM influenced the size and location of the proposed forebays. For instance, Proposed Forebay 41 utilizes a berm that will be constructed as part of the construction access to the west lot and will be converted to a permanent forebay berm for the lifetime of the SCM. Additionally, a large forebay in this location is more effective to capture the concentrated discharges from both inlets draining the east parking lot. Proposed Forebay #2 also exceeds the 20%requirement, however, it was in the engineers opinion that a smaller forebay than what was designed would not be as constructible and may require more frequent sediment cleanouts. Each of the forebays provided are proportional in size to the drainage areas directed to them. This is in addition to the volume provided by the existing forebay, therefore in total the forebay volume well exceeds the MDCs requirement. The surface area of the main pool remains oversized, providing better treatment of stormwater runoff directed to this SCM. creating experiences through experience 2905.Meridian Parkway, Durham, NC / 919, 361. 5000 JI MCADAMS NARRATIVE > UNW-17060 • The existing outlet structure will remain, with modifications to account for additional water quality volume storage. The outlet structure information was provided to the John R. McAdams company by survey performed by Atlantic Coast Survey. It is important to note that between the as -built survey conducted in 2006 and the survey performed by Atlantic Coast survey in 2017, the reference datum was adjusted from NAVD29 to NAVD88. This datum shift accounts for the discrepancies in elevation information between the as -built survey and the current project survey of the outlet structure. A future BUA assumption is included in the calculation of the water quality volume and Attachment A of this report. The future BUA amount was determined to be the maximum amount of impervious that can receive appropriate water quality treatment by the outlet structure modifications proposed as part of this report. To demonstrate storage capacity of the SCM, an allocation of future impervious was proportionally distributed between the "Sub -basin to Main Pool" and the "Sub -basin to Forebay". The Summary of Results included in this report reflects this distribution of future impervious assumptions. At the time of future development, a revised routing analysis of the SCM will be required. CONCLUSION If the development on this tract is built as proposed within this report, then the applicable requirements will be met with the proposed stormwater management facility. However, modifications to the proposed development may require that this analysis be revised. Some modifications that would require this analysis to be revised Include: 1. The proposed site impervious surface exceeds the amount accounted for in this report. 2. The watershed breaks change significantly from those used to prepare this report. The above modifications may result in the assumptions within this report becoming invalid. The computations within this report will need to be revisited if any of the above conditions become apparent as development of the proposed site moves forward. creating experiences through experience 2905 Meridian Parkway, Durham, NC / 919. 361. 5000 Permit: staff OW530 ATTACHMENT A 5/30/2018 project Number: UN W-1J050 Drainage AreD/Impervious Breakdown Basin Information Drainage Arrit. to KM REDEVELOPMENT EXEMPTION Drainage Area LOW DENSNY Drainage Area TOTAL Reeefving Stream Name Burnt Mill Creek Burnt Mill Creek Burnt Mill Creek Stream Class C'Sw - CiSw CSw Stream Index Number 19 74L3-2 18J433 2 18 74 63 2 Total Drainage Area (It) 1.218,903 14,555 139,687 1,373,145 On SIVA 060530& On UNCW Pm,eI, Drainage Area isQ On Says OW530 is Off UNCW Property Drainage Area Dort 1,030,146 14,555 121,413 1,166,114 6,079 3,566 9,645 Off SW8050530 is On UNCW Property Drainage Area lsfJ 144,959 0 144,959 OB�SWLIW530& OHLNCW Property Drainage Area(sf) 37,719 0 37,719 ROW Drainage Area DQ 0 14,708 14.708 TotalPmparedlmpervkws Areaffn 638,128 14,555 25145 677,828 On SW8060530 Parody" Impervious Area 590,232 14,_555 19746 623,599 ROW Proposed lmpernous Area 0 5,399 5,3% Total %Impervnui Area 52.35% I00.00% 18.00a 49.36% OmsWB 060530%Impervious Area %.%% 100.00% 15.80% $348% ROW ea Impervious Area 3631% 36,71% im esWous Surface Area DidellialleMe. to SCM REDEVELOPMENT EXEMPTION bell na eMe. LOW DENSITY Drainage Area TOTAL On We 5w8060530 Buildings/Lots an 0 0 a On site SW8060530 Streets (so 0 0 0 On un. 5W8 W530 Parking lsn 187,831 11,600 3,228 202,659 On .In 5W8 W530 Sid ... IU(sf) 14,852 2,955 8,692 26,499 19883008 352,597 - 6,892 359,489 2018 2017 5,94 - a 5,952 Staff 031039 13,154 0 13,154 SW8100405 10,428 0 10,428 OH UNCW Property& OH SWBC605301sO 19882008 (Seuhow45pwre& smad pwrim of case. Ad! Off UNCW Property& On SWBC6a5301sO 19882008 (.note Mo[M ..Ave) 9,554 - 0 9,554 0 - 383 383 Off UNCW Property & On SW8060530 [sO Post 2017 (.eves Me[Millonave) 0 - 551 551 ROW (sO 1938 2008 0 1.989 1,989 ROW (so Post 2plJ 0 3,410 3,410 ROW Exisring Pre 1988 BOA lsn 0 20,409 0 Om5W8 a60530 Existing Pre-l9Be BOA an 14,2W 1,805 14,J60 Pomre BUA Allowance (if) 29,000 19,000 Tell (a) 638,128 14,555 25,145 677,828 'This permit utiliaes redevelopment exemprion by treating 14,760 if of existing Pre 1998 gory, allowing 14,555 sf of proposed impervious to be bypassed' Total Drainage Area to 5CM= 1,218,503 2298 'Era in age Area LOW UENSIM= [Total IXainage Areal ITuring Pre-1988 BOA) Total-Orain.ge Are. I OWDENSITy'= 161,902 5) Total-Existng Pre-1988 BOA-= 22,215 sf 'Drainage Arco LOW DENSITY'= 139,687 s) Total Permit Boundary Area 1.212,682 2184 UNCW HURST HAMILTON PARKING LOTS Attachment B R. STUBBS, El UNW-17060 SW8060530 Permit Boundary 5/30/2018 Point 1 Northing 173614.3524 Easting 2338018.013 2 173551.6309 2337986.431 3 _ 173523.1011 2338009.813 4 173477.8453 2338046.902 5 173457.3113 2338064.923 6 173418.3321 2338104.223 7 173388.1056 2338128.879 8 173356.2498 2338151.488 9 173325.6648 2338154.02 10 173321.0007 2338165.02 11 173326.1876 2338181.018 12 173283.7679 2338211.615 13 173228.8061 2338250.022 14 173202.1854 2338262.634 15 173183.9206 2338276.657 16 173162.5925 2338302.562 17 173149.1343 2338321.541 18 173128.6557 2338352.24 19 17 313 5.7 201 233 8363.42 2 20 173145.1592 2338374.125 21 173174.5574 2338433.889 22 173035.5778 2338650.05 23 173050.275 2338666.617 24 173086.963 2338688.792 25 173126.7 2338710.72 26 173171.15 2338735.654 27 173215.119 2338760.154 28 173246.555 2338777.688 29 173317.5487 2338816.729 30 173349.657 2338834.606 31 173394.419 2338859.493 32 173440.884 2338885.297 33 173487.276 2338911.19 34 173530.446 2338935.226 35 173574.7259 2338959.795 UNCW HURST HAMILTON PARKING LOTS Attachment B R. STUBBS, El UNW-17060 SW8060530 Permit Boundary 5/30/2018 ---Point 36 Northing 173586.8484 Easting 2338965.131 37 17 3596.1651 23 38955.3 9 38 173 634.6391 23 38976.8 54 39 173621.5874 2339002.365 40 17365 6.2801 233 9020.572 41 173679.6085 2338995.677 42 173695.1705 2338964.066 43 173704.601 2338961.913 44 173703.6307 2338982.544 45 173697.8086 2338993.625 46 173697.367 2338997.171 47 174192.1105 2339264.52 48 1742 24.4251 2339265.891 49 174247.9494 2339229.919 50 174259.5502 2339212.606 51 1742 75.2491 2339200.09 52 174283.3214 2339195.042 53 174308.3 271 23 39147.9 36 54 174271.6218 2339129.496 55 174268.2436 2339126.213 56 174265.3885 2339123.439 57 174262.4074 2339112.14 58 174263.4914 2339091.349 59 174251.5669 2339082.942 60 174257.0028 2339063.762 61 174257.2739 2339046.949 62 174267.482 2339029.05 63 174301.3921 2 33 8990.802 64 174311.6483 2338985.671 65 174328.3896 2338986.96 66 174470.1399 2339065.248 67 174475.1628 2339055.842 68 174497.3755 2339067.553 69 174527.6788 2339015.126 70 174598.935 2338886.495 UNCW HURST HAMILTON PARKING LOTS Attachment B R. STUBBS, El UNW-17060 SW8060530 Permit Boundary 5/30/2018 Point 71 Northing 174669.8453 Easting 2338760.735 72 174655.3846 2338752.581 73 174652.63 2338742.46 74 17467 2.0001 23 38708.643 75 174686.8859 2338705.953 76 174680.3946 2338682.005 77 174627.6809 2338575.698 78 174561.0585 2338482.735 79 174474.0516 2338396.315 80 174381.6797 2338314.097 81 174276.3425 2338235.706 82 174188.2818 2338211.33 83 174131.8014 2338178.128 84 174107.2665 2338185.416 85 174055.9475 2338288.51 86 173995.9768 2338308.39 87 173994.1492 2338282.877 88 174006.1218 2338258.137 89 174034.1257 2338218.619 90 174048.3 241 2338197.953 91 174073.5 891 23 38146.159 92 174122.9122 2338050.034 93 174122.2639 2338049.289 94 174071.3467 2338020.394 95 173962.3523 2337958.489 96 173877.3673 2338131.771 97 173808.2846 2338272.867 98 173917.3186 2338334.452 99 173840.7622 2338490.01 100 173621.1446 2338370.853 101 17 3853.6611 23 37896.7 59 102 173799.9257 2337866.242 SUMMARY OF RESULTS 1 MISCELLANEOUS SITE INFORMATION 2 PREVIOUS STATE STORMWATER PERMITS 3 PRE -DEVELOPMENT HYDROLOGIC 4 CALCULATIONS POST -DEVELOPMENT HYDROLOGIC 5 CALCULATIONS STORMWATER MANAGEMENT FACILITY. 6 DESIGN CALCULATIONS UNCW - HURST HAMILTON PARKING LOTS SUMMARY OF RESULTS R. STUBBS, El \ UNW-17060 6/13/2018 A RELEASE RATE MANAGEMENT RESULTS EXISTING CONDITIONS PROPOSED CONDITIONS Ditch #1 Ditch #6 Return Period Max WSE i [kP 1-Year 35.72 2-Year 36.31 10-Year 37.01 25-Year 37.06 50-Year 37.12 100-Year 37.18 Return Period Max WSE I Ik1 36.18 36.57 37.10 3T23 37.25 37.25 1-Year 2-Year 10-Year 25-Year 50-Year 100-Year Ditch #2 Return Period Max WSE Iftl 1-Year _ 36.18 2-Year 36.56 10-Year 37.11 25-Year 37.25 50-Year 37.25 100-Year 37.25 Ditch #3 Return Period Max WSE Ikj I 1-Year 36.18 2-Year 36.55 10-Year 37.00 25-Year 37.09 50-Year 37.12 100-Year 37.14 UNCW - HURT HAMILTON PARKING LOTS SUMMARY OF RESULTS R. STUBBS, EI UNW-17060 6/13/2018 (RELEASE RATE MANAGEMENT RESULTS EXISTING CONDITIONS Ditch #7 Return Period Max WSE Iftj I 1-Year 35.72 2-Year 36.30 10-Year 36.63 25-Year 36.78 50-Year 36.89 100-Year 36.93 Pre-Forebay Return Period Max. WSE [ftl Freebaardj ftl I 1-Year 35.70 1.30 2-Year 36.30 0.70 10-Year 36.66 0.34 25-Year 36.87 0.13 50-Year 37.02 -0.02 100-Year 37.06 -0.06 Pre -Main Pool Return Period Max. WSE Iftl Freeboard) Iftl 1-Year 35.70 1.30 2-Year 36.30 0.70 10-Year 36.64 0.36 25-Year 36.80 0.20 50-Year 36.92 0.08 100-Year 36.97 0.03 PROPOSED CONDITIONS Ditch #4 Return Period Max WSE IftI 1-Year 36.17 2-Year 36.54 10-Year 36.88 25-Year 37.00 50-Year 37.00 100-Year 37.02 Ditch #5 Return Period Max WSE [ftl 1-Year 36.16 2-Year 36.52 10-Year 36.67 25-Year 36.71 50-Year 36.72 100-Year 36.74 Post-Forebay Return Period Max. WSE [ftj Freeboard Iftj 1-Year 36.16 0.84 2-Year 36.55 0.45 10-Year 36.95 0.05 25-Year 3T04 -0.04 50-Year 3TOB -0.08 100-Year 37.11 an Post -Main Pool Return Period Max. WSE [ftl Freeboard) [ftl 1-Year 36.16 0.84 2-Year 36.54 0.46 10-Year 36.91 0.09 25-Year 37.00 0.00 50-Year 37.02 -0.02 300-Year 37,05 -0.05 UNCW - HURST HAMILTON PARKING LOTS SUMMARY OF RESULTS UNW-17060 SCM - Existing :STORMWATER CONTROL MEASURE SUMMARY ' Design Drainage Area = 24.77 ac Design Impervious Area = 9.35 ac ` Impervious= 37.7% Top of Dam = 37.00 ft NWSE= 33.30 ft Surface Area at NWSE = 53,925 sf WQ Orifice Diameter= 4.00 in WQ Orifice Elevation = 33.30 fit Number of Orifices = 2 Area Orifice #1 Area = 1.29 sf Area Orifice #1 Top Elevation = 34.39 ft Area Orifice #1 Invert Elevation = 33.96 ft Number of Orifices = 1 Area Orifice #2 Area = 3.69 sf Area Orifice #2 Top Elevation = 34.37 ft Area Orifice #2 Invert Elevation = 33.96 ft Riser Size = 6' x 10' Riser Crest = 35.56 ft Barrel Diameter= 24 in # of Barrels = 3 Upstream Invert = 33.75 ft Downstream Invert = 33.25 ft Length = 42 ft Slope = 0.0119 ft/ft R. STUBBS, El 6/13/2018 UNCW - HURST HAMILTON PARKING LOTS SUMMARY OF RESULTS UNW-17060 SCM - Modified STORMWATER CONTROL MEASURE SUMMARY Design Drainage Area = 27.98 ac Design Impervious Area = 14.65 ac Y Impervious = 52.4% Top of Dam = 37.00 ft NWSE= 33.30 ft WQ Storm Depth = 1.00 ft WQVolume = 61,573 cf WQ Volume Elevation = 34.30 ft Surface Area at NWSE = 31,275 sf WQ Orifice Diameter = 4.00 in WQ Orifice Elevation = 33.30 ft Number of Orifices = 2 Area Orifice #1 Area = 1.50 sf Area Orifice #1 Top Elevation = 34.80 ft Area Orifice #1 Invert Elevation = 34.30 ft Number of Orifices = 1 Area Orifice #2 Area = 4.50 sf Area Orifice #2 Top Elevation = 34.80 ft Area Orifice #2 Invert Elevation = 34.30 ft Riser Size = 6' x 10' Riser Crest = 35.56 ft Barrel Diameter= 24 in it of Barrels = 3 Upstream Invert = 33.75 ft Downstream Invert = 33.25 ft Length = 42 ft Slope = 0.0119 ft/ft R. STUBBS, El 6/13/2018 9 MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Sub to Forebay Post- lyr 24hr 1 2.509 733.50 26.80 Sub to Forebay Post- 2yr 24hr 2 3.515 733.50 37.82 Sub to Forebay Post- 10yr 24hr 10 7.047 733.50 66.69 Sub to Forebay Post- 25yr 24hr 25 9.747 733.50 83.91 Sub to Forebay Post- 50yr 24hr 50 12.240 733.50 97.28 Sub to Forebay Post- 100yr 24hr 100 15.107 733.50 110.59 Sub to Main Pool Post- lyr 24hr 1 1.642 734.00 17.30 Sub to Main Pool Post- 2yr 24hr 2 2.173 734.00 22.64 Sub to Main Pool Post- 10yr 24hr 10 3.942 734.00 35.28 Sub to Main Pool Post- 25yr 24hr 25 5.246 734.00 42.43 Sub to Main Pool Post- 50yr 24hr so 6.432 734.00 47.90 Sub to Main Pool Post- 100yr 24hr 100 7.782 734.00 53.32 Sub to Ditch#1 Post- Lyn 24hr 1 0.566 731.2S 6.49 Sub to Ditch#1 Post- 2yr 24hr 2 0.837 731.25 9.90 Sub to Ditch#1 Post- 10yr 24hr 10 1.837 729.00 19.50 Sub to Ditch#1 Post- 25yr 24hr 25 2.631 729.00 25.62 Sub to Ditch#1 Post- 50yr 24hr so 3.376 729.00 30.42 Sub to Ditch#1 Post- 100yr 24hr 100 4.242 729.00 35.28 Sub to Ditch#2 Post- lyr 24hr 1 1.170 746.75 7.15 Sub to Ditch#2 Post- 2yr 24hr 2 1.933 742.50 13.75 Sub to Ditch#2 Post- 10yr 24hr 10 5.043 742.25 37.44 Sub to Ditch#2 Post- 25yr 24hr 25 7.683 738.25 54.23 Sub to Ditch#2 Post- 50yr 24hr 5o 10.240 738.25 68.76 Sub to Ditch#2 Post- 100yr 24hr 100 13.281 738.00 84.13 Sub to Ditch#3 Post- lyr 24hr 1 0.029 721.50 0.56 Sub to Ditch#3 Post- 2yr 24hr 2 0.042 721.50 0.82 Sub to Ditch#3 Post- 10yr 24hr 10 0.088 721.25 1.50 Sub to Ditch#3 Post- 25yr 24hr 25 0.123 721.25 1.91 Sub to Ditch#3 Post- 50yr 24hr 50 0.157 721.25 2.21 Sub to Ditch#3 Post- 100yr 24hr 100 0.195 721.25 2.53 Sub to Ditch#4 Post- lyr 24hr 1 0.019 726.00 0.17 Sub to Ditch#4 Post- 2yr 24hr 2 0.035 722.75 0.44 Sub to Ditch#4 Post- 10yr 24hr 10 0.106 721.50 1.63 Sub to Ditch#4 Post- 25yr 24hr 25 0.170 721.25 2.50 Sub to Ditch#4 Post- 50yr 24hr 50 0.233 721.25 3.21 Sub to Ditch#4 Post- 100yr 24hr 100 0.309 721.25 4.01 Sub to Forebay Pre- lyr 24hr 1 2.399 733.50 25.42 Sub to Forebay Pre- 2yr 24hr 2 3.385 733.50 36.25 Sub to Forebay Pre- 10yr 24hr 10 6.868 733.50 64.99 Sub to Forebay Pre- 25yr 24hr 25 9.545 733.50 82.27 Sub to Forebay Pre- 50yr 24hr 50 12.020 733.50 95.73 Sub to Forebay Pre- 100yr 24hr 100 14.872 733.50 109.15 Sub to Ditch#6 Pre- lyr 24hr 1 1.607 749.00 9.79 Sub to Ditch#6 Pre- 2yr 24hr 2 2.655 744.50 18.90 Sub to Ditch#6 Pre- 10yr 24hr 10 6.925 740.25 51.51 Sub to Ditch#6 Pre- 25yr 24hr 25 10.551 740.25 74.87 Sub to Ditch#6 Pre- 50yr 24hr So 14.063 740.25 94.69 Sub to Ditch#6 Pre- 100yr 24hr 100 18.239 740.25 115.61 Sub to MainPool Pre- lyr 24hr 1 0.242 740.75 1.58 Sub to MainPool Pre- 2yr 24hr 2 0.405 737.50 3.22 Hamilton -Hurst Parking Lot R. STUBBS, El UNW 17060.ppC 5/31/2018 9 MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Sub to MainPool Pre- 10yr 24hr 10 1.078 734.25 9.05 Sub to MainPool Pre- 25yr 24hr 25 1.654 734.00 13.27 Sub to MainPool Pre- 50yr 24hr 50 2.214 734.00 16.82 Sub to MainPool Pre- 100yr 24hr 100 2.882 734.00 20.56 Sub to Ditch#7 Pre- lyr 24hr 1 0.037 759.50 0.11 Sub to Ditch#7 Pre- 2yr 24hr 2 0.082 756.25 0.38 Sub to Ditch#7 Pre- 10yr 24hr 10 0.308 739.00 2.12 Sub to Ditch#7 Pre- 25yr 24hr 25 0.526 735.75 3.80 Sub to Ditch#7 Pre- 50yr 24hr 50 OJ49 735.75 5.34 Sub to Ditch#7 Pre- 100yr 24hr 100 1.026 735.75 7.02 Sub to Ditch#5 Post- lyr 24hr 1 0.085 721.50 1.66 Sub to Ditch#5 Post- 2yr 24hr 2 0.123 721.50 2.43 Sub to Ditch#5 Post- 10yr 24hr 10 0.258 721.25 4.43 Sub to Ditch#5 Post- 25yr 24hr 25 0.364 721.25 5.65 Sub to Ditch#5 Post- 50yr 24hr 50 0.462 721.25 6.52 Sub to Ditch#5 Post- 100yr 24hr 100 0.576 721.25 7.48 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Overall POA Post- lyr 24hr 1 0.000 0.00 0.00 Overall POA Pre- lyr 24hr 1 0.000 0.00 0.00 Overall POA Post- 2yr 24hr 2 1.429 1,094.00 3.29 Overall POA Pre- 2yr 24hr 2 0.000 0.00 0.00 Overall POA Post- 10yr 24hr 10 10.988 795.75 24.93 Overall POA Pre- 10yr 24hr 10 7.524 839.75 21.66 Overall POA Post- 25yr 24hr 25 18.532 752.75 28.42 Overall POA Pre- 25yr 24hr 25 14.500 799.50 32.47 Overall POA Post- 50yr 24hr 50 23.360 752.50 28.98 Overall POA Pre- 50yr 24hr 50 21.210 791.00 38.64 Overall PDA Post- 100yr 24hr 100 27.217 727.75 29.81 Overall POA Pre- 100yr 24hr 100 28.969 788.50 40.18 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Maximum Maximum Water Pond Storage Surface (ac-ft) Elevation (ft) Post-Forebay Post- lyr 24hr 1 2.509 733.50 26.80 (N/A) (N/A) (IN) Post-Forebay Post- lyr 24hr 1 0.506 742.00 14.46 36.16 2.588 (OUT) Post-Forebay Post- lyr 24hr 1 -0.055 782.25 -0.72 (N/A) (N/A) (Reverse) Post-Forebay Post- 2yr 24hr 2 3.515 733.50 37.82 (N/A) (N/A) (IN) Hamilton -Hurst Parking Lot - R. STUBBS, El UNW17060.ppe 5/31/2018 2 MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Post-Forebay (OUT) Post-Forebay (Reverse) Post-Forebay (IN) Post-Forebay (OUT) Post-Forebay (Reverse) Post-Forebay (IN) Post-Forebay (OUT) Post-Forebay (Reverse) Post-Forebay (IN) Past-Forebay (OUT) >ost-Forebay (Reverse) Post-Forebay (IN) Post-Forebay (OUT) Post-Forebay (Reverse) Post -Main Pool (IN) Post -Main Pool (OUT) Post -Main Pool (Reverse) Post -Main Pool (IN) Post -Main Pool (OUT) Post -Main Pool (Reverse) Post -Main Pool (IN) Post -Main Pool (OUT) Post -Main Pool (Reverse) Post -Main Pool (IN) Hamilton -Hurst P: UN W 17060opo Post- 2yr 24hr Post- 2yr 24hr Post- l0yr 24hr Post- l0yr 24hr Post- 10yr 24hr Post- 25yr 24hr Post- 25yr 24hr Post- 25yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- lyr 24hr Post- lyr 24hr Post- lyr 24hr Post- 2yr 24hr Post- 2yr 24hr Post- 2yr 24hr Post- l0yr 24hr Post- l0yr 24hr Post- l0yr 24hr Post- 25yr 24hr rking Lot 2 2 10 10 10 25i 25 25 50 50 50 100 100 100 1 1 1 2 2 2 1.088 -0.174 7.047 4.405 -0.008 9.747 7.060 -0.008 12.240 9.404 -0.008 15.107 12.185 -0.011 2.092 0.000 -1.160 3.086 0.797 -1.439 10 8.338 10 5.374 10 -0.800 25 12.298 738.75 769.25 733.50 725.25 436.50 733.50 745.75 366.00 733.50 733.75 308.25 733.50 724.25 701.75 739.75 0.00 752.75 737.00 1,104.50 768.75 19.79 -2.31 66.69 19.12 -0.05 83.91 18.53 -0.05 97.28 23.82 -0.05 110.59 20.24 -0.52 29.71 0.00 -9.12 41.41 1.90 -13.82 Maximum Water Surface Elevation (ft) 36.55 (N/A) (N/A) 36.95 (N/A) (N/A) 37.04 (N/A) (N/A) 37.08 (N/A) (N/A) 37.11 (N/A) (N/A) 36.16 (N/A) (N/A) 36.54 (N/A) 732.50 52.85 (N/A) 786.75 15.89 36.91 734.25 -19.77 (N/A) 733.75 55.19 (N/A) Maximum Pond Storage (ac-ft) 3.151 (N/A) (N/A) 3.806 (N/A) (N/A) 5.599 (N/A) (N/A) 7.149 (N/A) (N/A) 8.859 (N/A) (N/A) 5.473 (N/A) (N/A) 5.958 (N/A) (N/A) 6.445 (N/A) (N/A) R. STUBBS, El 513112018 9 MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Post -Main Pool (OUT) Post -Main Pool (Reverse) Post -Main Pool (IN) Post -Main Pool (OUT) Post -Main Pool (Reverse) Post -Main Pool (IN) Post -Main Pool (OUT) Post -Main Pool (Reverse) Ditchl (IN) Ditchl (OUT) Ditchl (IN) Ditchl (OUT) Ditchl (IN) Ditchl (OUT) Ditchl (Reverse) Ditchl (IN) Ditchl (OUT) Ditchl (Reverse) Ditchl (IN) Ditchl (OUT) Ditchl (Reverse) Ditchl (IN) Ditchl (OUT) Ditchl (Reverse) Ditchl (IN) Ditchl (OUT) Ditchl (IN) Ditchl (OUT) Hamilton -Hurst Pa UN W 17060.ppc Post- 25yr 24hr Post- 25yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- Lyr 24hr Post- Lyr 24hr Post- 2yr 24hr Post- 2yr 24hr Post- l0yr 24hr Post- 10yr 24hr Post- l0yr 24hr Post- 25yr 24hr Post- 25yr 24hr Post- 25yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 50yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- 100yr 24hr Post- lyr 24hr Post- lyr 24hr Post- 2yr 24hr Post- 2yr 24hr king Lot 25 9.358 25 -0.857 50 15.827 50 12.998 50 -1.087 100 100 100 L 1 2 2 10 10 10 25 25 25 50 50 50 100 100 100 1 1 2 2 19.955 17.188 -1.215 0.566 0.509 0.837 0.753 1.837 1.836 -0.087 2.631 2.989 -0.450 3.376 2.991 -0.326 4.242 2.192 -0.171 1.679 1.448 2.686 2.389 754.25 48.29 722.25 -21.59 733.75 71.61 755.00 30.97 721.00 -19.32 724.25 732.00 706.50 731.25 735.50 731.25 733.75 729.00 729.25 777.25 729.00 723.50 782.25 729.00 716.50 755.00 729.00 703.75 743.25 739.50 751.75 735.00 748.50 59.50 25.42 -13.57 6.49 5.73 9.90 8.77 19.50 10.72 -1.31 25.62 9.14 -4.32 30.42 6.54 -5.13 35.28 5.90 -4.85 11.97 9.97 20.18 16.94 Maximum Water Surface Elevation (ft) 37.00 (N/A) (N/A)' 37.02 (N/A) (N/A) 37.05 (N/A) (N/A) 36.18 (N/A) 36.57 (N/A) 37.10 (N/A) (N/A) 37.23 (N/A) (N/A) 37.25 (N/A) (N/A) 37.25 (N/A) (N/A) 36.18 (N/A) 36.56 Maximum Pond Storage (ac-ft) (N/A) 7.531 (N/A) (N/A) 8.593 (N/A) (N/A) 0.057 (N/A) 0.085 (N/A) 0.979 (N/A) (N/A) 1.981 (N/A) (N/A) 2.173 (N/A) (N/A) 2.173 (N/A) (N/A) 0.231 (N/A) 0.300 R. STUBBS, El 5/31/2018 9 MCADAM.S Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Ditch2 (IN) Post- 10yr 10 6.792 742.25 37.84 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 10yr 10 6.486 733.50 23.00 37.11 1.342 24hr Ditch2 (IN) Post- 25yr 25 10.221 738.00 54.13 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 25yr 25 9.904 726.00 20.41 37.25 2.486 24hr Ditch2 (IN) Post- 50yr 50 12.904 738.00 67.33 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 50yr 50 11.151 718.75 17.89 37.25 2.521 24hr Ditch2 (IN) Post- 100yr 100 15.302 738.00 80.94 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 100yr 100 10.731 706.00 16.41 37.25 2.521 24hr Ditch3 (IN) Post- lyr 24hr 1 1.476 751.25 10.11 (N/A) (N/A) Ditch3 (OUT) Post- lyr 24hr 1 1.455 751.75 10.12 36.18 0.022 Ditch3 (IN) Post- 2yr 24hr 2 2.431 748.50 17.14 (N/A) (N/A) Ditch3 (OUT) Post- 2yr 24hr 2 2.402 748.00 17.01 36.55 0.029 Ditch3 (IN) Post- 10yr 10 6.573 733.50 23.41 (N/A) (N/A) 24hr Ditch3 (OUT) Post- 10yr 10 6.543 733.75 22.56 37.00 0.041 24hr Ditch3 (IN) Post- 25yr 25 10.027 726.00 21.66 (N/A) (N/A) 24hr Ditch3 (OU-0 Post- 25yr 25 9.996 726.25 20.62 37.09 0.418 24hr Ditch3 (IN) Post- 50yr 50 11.308 718.75 19.71 (N/A) (N/A) 24hr Ditch3 (OUT) Post- 50yr 50 11.271 719.25 18.43 37.12 0.534 24hr Ditch3 (IN) Post- 100yr 100 10.926 706.00 17.04 (N/A) (N/A) 24hr Ditch3 (OUT) Post- 100yr 100 10.886 706.25 16.17 37.14 0.614 24hr Ditch4 (IN) Post- Lyr 24hr 1 0.305 730.25 2.72 (N/A) (N/A) Ditch4 Post- lyr 24hr 1 -0.002 948.00 -0.21 (N/A) (N/A) (Reverse) Ditch4 (OUT) Post- lyr 24hr 1 0.176 738.50 2.14 36.17 0,132 Ditch4 Post- lyr 24hr 1 0.000 725.50 -0.03 (N/A) (N/A) (Reverse) Ditch4 (IN) Post- 2yr 24hr 2 1.795 747.00 4.92 (N/A) (N/A) Ditch4 Post- 2yr 24hr 2 0.000 768.75 -0.32 (N/A) (N/A) (Reverse) Ditch4 (OUT) Post- 2yr 24hr 2 1.629 748.75 3.28 36.54 0.167 Ditch4 Post- 2yr 24hr 2 0.000 768.75 -0.23 (N/A) (N/A) (Reverse) Ditch4 (IN) Post- 10yr 10 11.224 786.75 25.34 (N/A) (N/A) 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UN W 17060.ppc 6/31/2018 M" MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Ditch4 (OUT) Post- 10yr 10 11,058 793.75 24.76 36.88 0.205 24hr Ditch4 Post- 10yr 10 -0.003 721.50 -0.68 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Post- 25yr 25 18.669 754.25 55.80 (N/A) (N/A) 24hr Ditch4 Post- 25yr 25 -0.002 722.25 -0.57 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 25yr 25 18.504 804.25 29.19 37.00 0,219 24hr Ditch4 Post- 25yr 25 -0.010 722.50 -2.16 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Post- 50yr 50 23.416 755.00 38.96 (N/A) (N/A) 24hr Ditch4 Post- 50yr 50 -0.001 617.00 -0.08 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 50yr 50 23.236 912.75 28.76 37.00 0.217 24hr Ditch4 Post- 50yr So -0.004 723.00 -0.91 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Post- 100yr 100 27.170 1,120.00 34.13 (N/A) (N/A) 24hr Ditch4 Post- 100yr 100 -0.001 554.00 -0.07 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 100yr 100 26.983 910.75 29.02 37.02 0.311 24hr Ditch4 Post- 100yr 100 4003 557.75 -0.10 (N/A) (N/A) (Reverse) 24hr Pre-Forebay Pre- lyr 24hr 1 2.399 733.50 25.42 (N/A) (N/A) (IN) Pre-Forebay Pre- lyr 24hr 1 1.026 748.75 15.52 35.70 1.901 (OUT) Pre-Forebay Pre- 2yr 24hr 2 3.385 733.50 36.25 (N/A) (N/A) (IN) Pre-Forebay Pre- 2yr 24hr 2 1.299 745.00 23.98 36.30 2.613 (OUT) Pre-Forebay Pre- 10yr 24hr 10 6.868 733.50 64.99 (N/A) (N/A) (IN) Pre-Forebay Pre- 10yr 24hr 10 4.424 736.25 36.80 36.66 3.163 (OUT) Pre-Forebay Pre-25yr 24hr 25 9.545 733.50 82.27 (N/A) (N/A) (IN) Pre-Forebay Pre- 25yr 24hr 25 7.080 727.00 32.94 36.87 3.507 (OUT) Pre-Forebay Pre- 50yr 24hr 50 12.020 733.50 95.73 (N/A) (N/A) (IN) Pre-Forebay Pre- 50yr 24hr 50 9.535 738.75 39.34 37.02 4.393 (OUT) Pre-Forebay Pre- 100yr 100 14.872 733.50 109.15 (N/A) (N/A) (IN) 124hr Hamilton -Hurst Parking Lot R. STUBBS, El U N W 17060.ppc 5/31/2018 9 MCADA M S Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Pre-Forebay Pre- 100yr 100 12.311 734.50 43.98 37.06 6.406 (OUl) 24hr Pre-MainPool Pre- lyr 24hr 1 1.267 748.50 16.95 (N/A) (N/A) (IN) Pre-MainPool Pre- lyr 24hr 1 0.000 0.00 0.00 35.70 4.292 (OUT) Pre-MainPool Pre- lyr 24hr 1 -1.052 759.50 -8.53 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 2yr 24hr 2 1.704 744.75 26.84 (N/A) (N/A) (IN) Pre-MainPool Pre- 2yr 24hr 2 0.000 0.00 0.00 36.30 5.281 (OUT) Pre-MainPool Pre- 2yr 24hr 2 -1.623 749.75 -12.85 (N/A) (N/A) (Reverse) Pre-MainP00l Pre- 10yr 24hr 10 5.502 736.25 45.83 (N/A) (N/A) (IN) Pre-MainPool Pre- 10yr 24hr 10 3.130 872.00 10.13 36.64 6.014 (OUT) Pre-MainPool Pre- 10yr 24hr 10 -1.410 742.50 -22.53 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 25yr 24hr 25 8.734 734.25 45.78 (N/A) (N/A) (IN) Pre-MainPool Pre- 25yr 24hr 25 5.816 768.00 19.29 36.80 6.367 (OUT) Pre-MainPool Pre- 25yr 24hr 25 -0.943 730.75 -19.40 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 50yr 24hr 50 11.749 738.50 55.42 (N/A) (N/A) (IN) Pre-MainPool Pre- 50yr 24hr 50 8.888 768.00 28.91 36.92 6.638 (OUT) Pre-MainPool Pre- 50yr 24hr 50 -1.021 718.75 -16.20 (N/A) (N/A) (Reverse) Pre-MalnP00l Pre- 100yr 100 15.193 734.50 64.48 (N/A) (N/A) (IN) 24hr Pre-MainPool Pre- 100yr 100 12.474 749.75 31.14 36.97 6.742 (OUT) 24hr Pre-MainPool Pre- 100yr 100 -1.230 698.50 -12.94 (N/A) (N/A) (Reverse) 24hr Ditch #6 Pre- lyr 24hr 1 1.607 749.00 9.79 (N/A) (N/A) (IN) Ditch #6 Pre- lyr 24hr 1 1.365 758.75 8.94 35.72 0.242 (OUT) Ditch #6 Pre- 2yr 24hr 2 2.655 744.50 18.90 (N/A) (N/A) (IN) Ditch #6 Pre- 2yr 24hr 2 2.233 757.25 16.44 36.31 0.422 (OUT) Ditch #6 Pre- 10yr 24hr 10 6.925 740.25 51.51 (N/A) (N/A) (IN) Ditch #6 Pre- 10yr 24hr 10 6.398 747.25 28.39 37.01 1.328 (OUT) Hamilton -Hurst Parking Lot UNW 17060.ppc R. STUBBS, El 5/31/2018 9 MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (R3/s) (years) (ac-ft) Ditch #6 (IN) Ditch #6 (OUT) Ditch #6 (IN) Ditch #6 (OUM Ditch #6 (IN) Ditch #6 (OUT) Ditch#7 (IN) Ditch#7 (Reverse) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (Reverse) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch #5 (IN) Ditch #5 (Reverse) Ditch #5 (OUT) Ditch #5 (IN) Ditch #5 (Reverse) Ditch #5 (OUT) Ditch #5 (IN) Ditch #5 (Reverse) Hamilton -Hurst N UN W 17060opc Pre- 25yr 24hr Pre- 25yr 24hr Pre- 50yr 24hr Pre- 50yr 24hr Pre- 100yr 24hr Pre- 100yr 24hr Pre- lyr 24hr Pre- 1yr 24hr Pre- lyr 24hr Pre- 2yr 24hr Pre- 2yr 24hr Pre- 2yr 24hr Pre- 10yr 24hr Pre- 10yr 24hr Pre- 25yr 24hr Pre- 25yr 24hr Pre- 50yr 24hr Pre- 50yr 24hr Pre- 100yr 24hr Pre- 100yr 24hr Post- lyr 24hr Post- Syr 24hr Post- lyr 24hr Post- 2yr 24hr Post- 2yr 24hr Post- 2yr 24hr Post- 10yr 24hr Post- l0yr 24hr rking Lot 25 25 50 50 100 100 1 1 1 2 2 2 10 10 25 25 50 50 100 100 1 1 1 2 2 2 10 10 10.551 10.012 14.063 13.514 18.239 17.662 0.337 -0.007 0.000 0.691 0.000 0.000 8.426 7.524 15.411 14.500 22.131 21.210 29.931 28.969 0.261 0.000 0.000 1.751 0.000 1.429 11.312 0.000 740.25 735.50 740.25 729.25 740.25 721.25 735.25 1,270.25 0.00 757.50 1,257.75 0.00 803.25 839.75 768.00 799.50 755.00 791.00 741.50 788.50 738.50 0.50 0.00 748.75 768.75 1,094.00 793.75 0.50 74.87 27.70 94.69 26.19 115.61 24.06 2.80 -0.50 0.00 4.16 -0.14 0.00 25.84 21.66 38.25 32.47 47.22 38.64 50.84 40.18 2.54 0.00 0.00 3.87 -0.03 3.29 24.95 0.00 Maximum Water Surface Elevation (ft) (N/A) 37.06 (N/A) 37.12 (N/A) 37.18 (N/A) (N/A) 35.72 (N/A) (N/A) 36.30 (N/A) 36.63 (N/A) 36.78 (N/A) 36.89 (N/A) 36.93 (N/A) (N/A) 36.16 (N/A) (N/A) 36.52 (N/A) (N/A) Maximum Pond Storage (ac-h) (N/A) 3.390 (N/A) 5.623 (N/A) 8.256 (N/A) (N/A) 0.334 (N/A) (N/A) 0.692 (N/A) 1.038 (N/A) 1.256 (N/A) 1.419 (N/A) 1.466 (N/A) (N/A) 0.261 (N/A) (N/A) 0.323 (N/A) (N/A) R. STUBBS, El 5/31/2018 9 MCA DAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Ditch #5 Post- 10yr 10 10.988 795.75 24.93 36.67 0.349 (OUT) 24hr Ditch #5 Post- 25yr 25 18.858 753.50 30.03 (N/A) (IN) 24hr Ditch #5 Post- 25yr 25 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 25yr 25 18.532 752.75 28.42 36.71 0.357 (OUT) 24hr Ditch #5 Post- 50yr 50 23.694 752.50 29.87 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 50yr 50 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 50yr 50 23.360 752.50 28.98 36.72 0.359 (OUT) 24hr Ditch #5 Post- 100yr 100 27.556 726.50 30.86 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 100yr 100 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 100yr 100 27.217 727.75 29.81 36.74 0.361 (OUT) 24hr Hamilton -Hurst Parking Lot R. STUBBS, EI UN W 170fi0.ppc 5131/2018 MISCELLANEOUS SITE INFORMATION UNCW - HURST HAMILTON PARKING LOTS U N W-17060 UNCW PROPERTY N A 0 100 zoo I inch - 200 fcct e PROJECT BOUNDARY , UNC WILMINGTON lil SITE AERIAL MAP 400 mFeet PROJECT #: UNW-17060 F WILMINGTON, NORTH CAROLINA A . o AaM t' Y OPP � UNCW PROPERTY ' OA r PROJECT BOUNDARY �Y ' ; ; + ]AT ♦ a i' ♦ { i{. .' A T • st y a go K w� - An F a4 � e y n � �'MSVICIE ' s. rNw,ar « •t • � �� ! .. �� 6�a+f texusn `' It l r / ^ , ^ :j C6pyi�ght �P013 Napbnai Ge rap ociety-cuhetl ti UNC WILMINGTON lill USGS TOPO MAP Emma 0 1,000 2,000 4,000 PROJECT #: UNW-17060 Feet I inch 2,000 feet WILMINGTON, NORTH CAROLINA NC UENK - UIVISUN UFWA I LK KPSUr1KCES 28.0300 .0311 CAPE FEAR RIVER BASIN Name of Stream Description Class Class Date Index No. 'c Creek From source to Northeast Cape Fear C;Sw 09/01/74 18-74-60 River .-_.,neast Cape Fear River From mouth of Ness Creek to Cape SC;Sw 04/01/59 18-74-(61) Fear River Ness Creek From source to Northeast Cape Fear C;Sw 09/01/74 18-74-62 River Smith Creek From source to Northeast Cape Fear C;Sw 09/01/74 18-74-63 River Spring Branch From source to Smith Creek C;Sw 09/01/74 18-74-63-1 Burnt Mill Creek From source to Smith Creek C;Sw 03/01/77 18-74-63-2 Mineral Springs Branch From source to Burnt Mill Creek C;Sw 08/01/85 18-74-63-2-1 Alligator Creek From source to Cape Fear River SC;Sw 04/01/59 18-75 Greenfield Creek From Greenfield Lake to Cape Fear SC;Sw 04/01/59 18-76 River Greenfield Lake Entire Lake C;Sw 04/01/59 18-76-1 Silver Stream Branch From source to Greenfield Lake, C;Sw 04/01/59 18-76-1-1 Greenfield Creek Clay Bottom Branch From source to Greenfield Lake, C;Sw 04/01/59 18-76-1-2 Greenfield Creek Jumping Run Branch From source to Greenfield Lake, C;Sw 04/01/59 18-76-1-3 Greenfield Creek Squash Branch From source to Greenfield Lake, C;Sw 04/01/59 18-76-14 Greenfield Creek iswick.River From source to Cape Fear River Sc 08/09/81 18-77 Jeon Creek From source to Burnswick River C;Sw 04/01/59 18-77-1 Mill Creek From source to Sturgeon Creek C;Sw 04/01/59 18-77-1-1 Rowell Branch From source to Mill Creek C;Sw 04/01/59 18-77-1-1-1 Banton Branch From source to Mill Creek C;Sw 04/01/59 18-77-1-1-2 Redmond Creek From source to Brunswick River SC;Sw 04/01/59 18-77-2 Jackeys Creek From source to Brunswick River C;Sw 04/01/59 18-77-3 Piney Branch From source to Jackeys Creek C;Sw 04/01/59 18-77-3-1 Mallory Creek From source to Cape Fear River C;Sw 04/01/59 18-78 Little Mallory Creek (Beaverdam From source to Mallory Creek C;Sw 04/01/59 18-78-1 Branch) Barnards Creek From source to Cape Fear River C;Sw 04/01/59 18-80 Town Creek (Rattlesnake From source to Cape Fear River C;Sw 09/01/74 18-81 Branch) Turkey Branch From source to Town Creek C;Sw 04/01/59 18-81-1 Lewis Swamp From source to Town Creek C;Sw 09/01/74 18-81-2 Tompkins Branch (Tomolin From source to Lewis Swamp C;Sw 09/01/74 18-81-2-1 Branch) Lewis Branch From source to Lewis Swamp C;Sw 09/01/74 18-81-2-2 F 1 rdam Swamp From source to Town Creek C;Sw 09/01/74 18-81-3 Creek From source to Town Creek C;Sw 04/01/59 18-81-4 Russells Creek From source to Town Creek C;Sw 09/01/74 18-81-5 47 UNCW PROPERTY J PROJECT BOUNDARY f 4 446 mrr yak 41 a. V 4L 14 AIN i UNC WILMINGTON �J SOIL MAP 0 100 200 400 mmmmmm7z:� Feet PROJECT#: UNW-17060 I itich - 200 feet WILMINGTON, NORTH CAROLINA VNIIMJ O Hi2JON 'NOIONIWIIM 090LVMNn :# 1o3roMd dVW -IIOS Fri NO.LJNIWIIM ONn swinosaa leinleN vase aoinog 0 6 alu e.3 AlJVONno9 lO3rONd pues aug all !Aj nVq Taal 00Z - pui 1 laa� OOt? ON ON 0 y IM J-i AUtOdOad MONn NOAA Atlas 14, Volume 2, Version 3 _ Location name: Wilmington, North Carolina, USA` t� Latitude: 34.2227", Longitude:-77.8652° , Elevation: 35.37 ft** 'source: ESRI Maps f source'. USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnn, D. Martin, B. Lin, T. Parzybok, MNekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inchesp Average recurrence interval (years) Duration 10 25 50 IF 100 200 IF 500 F1000 0.822 0.728 0.811 0.916 0.995 1.08 1.16 1.26 1.35 jF-0.524 5tttln (0.489.0,565) (0.580-0.670) (0.678-0.7B3) (0.752-0.872) (0.846-0.982) (0.914-1.07) (0.984-1.16) (1.05-1.24) (1.13-1.36) (1.20.1.45) 0.837 0.995 1.17 1.30 1.46 1.58 1.71 11 1.99 2.12 �10-mrn (0.782.0,902) (0.928-1.07) 1 (1,09-1.25) 1 (1.20-1.39) 1 (1.35-1.56) (1.46-1.70) (1.56-1.84) (1.67.1.97) (1,79-2,15) (1.89.2.29) 1.05 1.25 1.48 1.64 1.85 2.01 2.16 2.31 2.51 2.66 15-min ( (0,977-1.13)I (1.17-1.35) (1,37-1.59) (1.52-1.76) (L71-1.98) (1.84-2.15)I (1.98-2.32)I (2.10-2.49)I(2.28.271) (237.2.87) . 1.73 2 3.so 4.o0 4.31 (1.34-1.54) (1.61-1.86) (1.95-2.25) (2.21-2.56) . (253-2.94) I(2.78-3.24) I143 . (303-355)(327-3.87)(3.59-4.31)(3.a4-4.66) 130t 2.17 2.69 3.10 3.85 4.09 4.56 5.05 5. 33 6.29 60 n IF1.79 (1.67.1.93) (2,02.2,33) 1 (2.50-2.89) (2.87-3.33) (3.37-3.91) 1 (3.76 4.39)) (4.17-4,89) (4.59-5.43) (5.16-6.18) (581-6.79) 2.11 2.57 3.28 3.87 6.72 5.45 6.24 7.11 a.39 9.5o 2-hr 1 I I I (1.95 2.31) (2,37-2 81) (3 02-3,58) (3,55-4.22) (4 31-5.14) (4.95-5.93) (5.84 8 79) (6 38-7.72)I (7.45.9.13) (8 38.10.4)I 2.25 2.74 3.51 4.17 5.16 I 8.02 6.98 8.05 9.67 11.1 3ftr (2.08-2.47) (2.53.3.00) (3.23-3.84) (3,82-4,56) (4.70.5.62) (5.45-6.56)I (6.27-7.59)I (7.17-8.73) (8.50-10.5) (9.83-12.1j1 2.80 3.41 4.37 5.20 6.46 7.55 8.79 10.2 12.3 14.1 6-hr (2.59.308) (3.15.3.75) (4.02-4.79) (4.77-5.70) (5.88-7.04) (6.83-8.24) (7.89-957) (9.03-11.1)1(108-13.4) (12.3-154) 3.28 3.99 5.15 6.17 7.70 9.07 10.6 12.4 15.1 17.5 12-hr IF 1 I (3,00-3.63) (3,65.4,41) (4.70-5.88) (5.60-6.79) (6,94-B.46) (8.12-9.94) (9,43-11.6) (10.9-13,5)1 (13.1-16.5) (14.9-19,1) 3.88 4.70 6.09 7.37 9.18 10.9 12.8 14.9 18.3 21.3 24-hr 1 (3.53-4.32) (429-5.25) (1,14-6.78) I (11.63 8,12) (8.25-10.2) (9,66-120)1 (11.2-142) (12.9.16.8)I (155-20.5)1 (17.8.23 B) 4.60 5.56 7.13 8.51 10.6 12.4 14.5 16.9 20.5 23.7 2-0ay (4.21.5.09) 1 (509.8.15) (8.51.7.90) (7.73-9,42) (9.54-11.7) (11.1-13.8) (12.8-162) (14,7-18,0) (17.4-23.0) (19,8-268)I 4.90 5.91 1 7.53 IF 8.94 IF 11.0 IF 12.9 15.0 17.3 20.8 23.9 3-0ay (4.49.5,41) (5.42.653) (6.89.8.33) (8.14.9,88) (9.97-12.2) (11.5-14.3)1 (132-16,6) (15. hi9.3)I(17.8.23.4) (20.1.27.1) 628 79 937 15-4 7 21 4 �ay I IF I (4.77-5.73) (5.75.6.91) (7.26-8.76) (8.54-103) , (104.12.7) , ,, (120.748) (115.20 3Z(15.5.19.7)(18.2.23.7)(20.5-27 .3) 5.98 7.19 9.05 10.6 12.9 16.8 16.9 19.1 22.5 25.3 F]F7day I ( 552-6.51) (6.65-7.84 ) ( 8,35-9,86) (9.74-11.5) (11.8-14.0) (134-16A) (15.2-18.4 ) ( 17.0-21.0) (19.7-24.9) (21.8-28.2) 6.75 8.07 10 -01F 1.6 F 14.0 F 16.0 18.1 -IF 20.6 F 23.8 26.6 10-day (6257.31) (7.49.8.77) 1 (9.25-10.9) 1 (10.7.12.8) 11 (12.8.15.2) (14.5.17.4) (16.3-19.7) (18.2-22.3) (209-26.2) (23.1-295) 9.01 10.7 13.1 15.0 17.8 I 20.0 I 22.5 25.0 28.7 31.7 F20-day 20 7day(841-9.69) (10.0-11.6) (12.2-14.1) (14.0.16.1) (165.19.1) II (184-21.6) (20.5-24.3) I (22.7-27.2) I (256-31.4) (27.9-35,0) 11.1 13.1 IF15.8 IF 17.9 20.9 23.3 25.7 28.3 31.8 34.6 30-0ay (10.4-11.8) (124.140) (14.8-16.8) (168-19,1) (19.5-22.3) 1 (21.6-24,9) (23.7-27.6) (25.9.304) (28.8-344) (31,0-37.7) 13.6 18.3 19.4 21.8 25.2 27.9 30.7 1 33.5 37.4 40.4 45-dey (13.0-14.7) (15.4-174) (18.2-20.6) (205-232) (236.288) (260-297) (26,4-32.7) (30.8.35.9) (34.0-40.3) (35.5-439) 16.6 19.5 22.8 25.5 29.0 31.6 3d.5 37.3 47.0 43.8 60-day 1 (15,7-17.6) (18.5-20.7) 1 (21.6.24.2) 1 (24.1-27.0) (27.330.8) I (298.338) (322-36.8) 1 (34.6.39.9) (37.7.44.0) (40.0�47.3) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. :- r r- http://hdsc,ms.noaa.gov/hdsctpfds/pfds_printpage.html?lat=34.2227&lon=-77.8652&data=depth&units=erglish&series=pds 114 'J1MCA DAMS Storm Data Detailed Report: UNW17060 Element Details ID 40 Notes Label UN W 17060 1 yr 24hr Label lyr 24hr Increment 5.00 min Return Event 1 years End Time 1,440.00 min Start lime 0.00 min Storm Event Depth Type Cumulative lyr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (In) (in) 0.00 0.000 0.004 - 0.008 0.013 0.017 25.00 0.021 0.025 0.029 0.033 0.037 50.00 0.042 0.046 0.050 0.054 0.058 75.00 0.063 0.067 0.071 0.075 0.079 100.00 0.083 0.087 0.092 0.096 0.100 125.00 0.104 0.108 0.113 0.117 0.121 150.00 0.125 0.129 0.133 0.138 0.142 175.00 0.146 0.150 0.154 0.158 0.163 200.00 0.167 0.171 0.175 0.179 0.183 225.00 0.188 0.192 0.196 0.200 0.204 250.00 0.208 0.212 0.217 0.221 0.225 275.00 0.229 0.233 0.238 0.242 0.246 1 300.00 0.250 0.254 0.258 0.262 0.267 325.00 0.271 0.275 0.279 0.283 0.288 350.00 0.292 0.296 0.300 0.307 0.313 375.00 0.320 0.327 0.333 0.340 0.347 400.00 0.353 0.360 0.367 0.373 0.380 425.00 0.387 0.393 0.400 0.407 0.413 450.00 0.420 0.427 0.433 0.440 0.447 475.00 0.453 0.460 0.467 0.473 0.480 500.00 0.487 0.493 0.500 0.507 0.513 525.00 0.520 0.527 0.533 0.540 0.555 550.00 0.571 0.586 0.601 0.616 0.632 575.00 0.647 0.662 0.678 0.693 0.708 600.00 0.723 0.739 0.754 0.769 0.784 625.00 0.800 0.815 0.827 0.838 0.850 650.00 0.862 0.873 0.885 0.912 0.938 675.00 0.965 0.992 1.018 1.045 1.127 700.00 1.209 1.292 1.374 1.639 2.159 725.00 2.424 2.506 2.568 2.671 2.753 750.00 2.835 2.862 2.888 2.915 2.942 775.00 2.968 2.995 3.007 3.018 3.030 800.00 3.042 3.053 3.065 3.080 3.096 825.00 3.111 3.126 3.141 3.157 3.172 850.00 3.187 3.203 3.218 3.233 3.248 875.00 3.264 3.279 3.294 3.309 3.325 900.00 3.340 3.347 3.353 3.360 3.367 925.00 3.373 3.380 3.387 3.393 3.400 950.00 3.407 3.413 3.420 3.427 3.433 975.00 3.440 3.447 3.453 3.460 3.467 1,000.00 3.473 3.480 3.487 3.493 3.500 1,025.00 3.507 3.513 3.520 3.527 3.533 Hamilton -Hurst Parking Lot R. STUBBS, El UN W 17060.ppc 2/9/2018 JI M.CADAMS Storm Data Detailed Report: UNW 17060 lyr 24hr Time Depth Depth Depth Depth Depth (min) (In) (In) (in) (In) (in) 1,050.00 3.540 3.547 3.553 3.560 3.567 1,075.00 3.573 3,580 3.584 3.588 3.593 1,100.00 3.597 3.601 3.605 3.609 3.613 1,125.00 3.618 3.622 3.626 3.630 3.634 1,150.00 3.638 3.643 3.647 3.651 3.655 1,175.00 3.659 3.663 3.668 3.672 3.676 1,200.00 3.680 3.684 3.688 3.693 3.697 1,225.00 3.701 3.705 3.709 3.713 3,718 1,250.00 3.722 3.726 3.730 3.734 3.738 1,275.00 3.743 3.747 3.751 3.755 3.759 1,300.00 3,763 3.768 3.772 3.776 3.780 1,325.00 3.784 3.788 3.793 3.797 3.801 1,350.00 3.805 3.809 3.813 3.818 3.822 1,375.00 3.826 3.830 3.834 3.838 3.843 1,400.00 3.847 3.851 3.855 3.859 3.863 1,425.00 3.868 3.872 3.876 3.880 (N/A) 2yr 24hr Label 2yr 24hr Increment 5.00 min Return Event 2 years End Tlme 1,440.00 min StartTime 0.00 min Storm Event Depth Type Cumulative 2yr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.00 0.000 0.005 0.010 0.015 0.020 25.00 0.025 0.030 0.035 0.039 0.044 50.00 0.049 0.054 0.059 0.064 0.069 75.00 0.074 0.079 0.084 0.089 0.094 100.00 0.099 0.104 0.108 0.113 0.118 125.00 0,123 0.128 0.133 0.138 0.143 150.00 0.148 0.153 0.158 0.163 0.168 175.00 0.173 0.178 0.182 0.187 0.192 200.00 0.197 0.202 0.207 0.212 0.217 225.00 0.222 0.227 0.232 0.237 0.242 250.00 0.247 0.251 0.256 0.261 0.266 275.00 0.271 0.276 0.281 0.286 0.291 300.00 0.296 0.301 0.306 0.311 0.316 325.00 0,320 0.325 0.330 0.335 0.340 350.00 0.345 0.350 0.355 0.363 0.371 375.00 0.379 0.387 0.395 0.403 0.411 400.00 0.419 0.428 0.436 0.444 0.452 425.00 0.460 0.468 0.476 0.484 0.492 450.00 0.500 0.508 0.516 0.524 0.532 475,00 0.540 0.548 0.556 0.564 0.573 500.00 0.581 0.589 0.597 0.605 0.613 525.00 0.621 0.629 0.637 0.645 0.664 1 550.00 0.682 0.701 0.719 0.738 0.757 575.00 0.775 0.794 0.813 0.831 0.850 600.00 0.868 0.887 0,906 0.924 0.943 Hamilton -Hurst Parking Lot R, STUBBS, El 2/9/2018 UNW17060,ppc 9 MCADAMS Storm Data Detailed Report: UNW17060 2yr 24hr Tlme Depth Depth Depth Depth Depth (min) (in) (in) (in) (In) (in) 625.00 0.961 0.980 0.994 1.008 1.023 650.00 1.037 1.051 1.065 1.098 1.132 675.00 1.165 1.198 1.232 1.265 1.367 700.00 1.469 1.572 1.674 1.989 2.609 725.00 2.924 3.026 3.128 3.231 3.333 750.00 3.435 3.468 3.502 3.535 3.568 775.00 3.602 3.635 3.649 3.663 3.678 800.00 3.692 3.706 3.720 3.739 3.757 825.00 3.776 3.794 3.813 3.832 3.850 850.00 3.869 3.888 3.906 3.925 3.943 875.00 3.962 y 3.981 3.999 4.018 4.036 900.00 4.055 4.063 4.071 4.079 4.087 925.00 4.095 4.103 4.111 4.119 4.128 950.00 4.136 4.144 4.152 4.160 4.168 975.00 4.176 4.184 4.192 4.200 4.208 1,000.00 4.216 4.224 4.232 4.240 4.248 1,025.00 4.256 4.264 4.273 4.281 4.289 1,050.00 4.297 4.305 4.313 4.321 4.329 1,075.00 4.337 4.345 4.350 4.355 4.360 1,100.00 4.365 4.370 4.375 4.380 4.384 1,125.00 4.389 4.394 4.399 4.404 4.409 1,150.00 4.414 4.419 4.424 4.429 4.434 1 1,175.00 4.439 4.444 4.449 4.453 4.458 1,200.00 4.463 4.468 4.473 4.478 4.483 1,225.00 4.488 4.493 4.498 4.503 4.508 1,250.00 4.513 4.518 4.523 4.527 4.532 1,275.00 4.537 4.542 4.547 4.552 4.557 1,300.00 4.562 4.567 4.572 4.577 4.582 1,325.00 4.587 4.592 4.596 4.601 4.606 1,350.00 4.611 4.616 4.621 4.626 4.631 1,375.00 4.636 4.641 4.646 4.651 4.656 1,400.00 4.661 4.665 4.670 4.675 4.680 1,425.00 4.685 4.690 4.695 4.700 (N/A) 10yr 24hr Label 10yr 24hr Increment 5.00 min Return Event 10 years End nme 1,440.00 min Start Time 0.00 min Storm Event Depth Type Cumulative 10yr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.00 0.000 0.008 0.016 0.024 0.032 25.00 0.040 0.048 0.055 0.063 0.071 50.00 0.079 0.087 0.095 0.103 0.111 75.00 0.119 0.127 0.135 0.143 0.150 100.00 0.158 0.166 0.174 0.182 0.190 125.00 0.198 0.206 0.214 0.222 0.230 f. 150.00 0.238 0.245 0.253 0.261 0.269 175.00 0.277 0.285 0.293 0.301 0.309 Hamilton -Hurst Parking Lot R. STUBBS, El UNW17080.ppc 2/9/2018 McAnAMs Storm Data Detailed Report: UNW17060 10yr24hr Time Depth Depth Depth Depth Depth (min) (In) (in) (in) (in) (in) 200.00 0.317 0.325 0.333 0.340 0.348 225.00 0.356 0.364 _0.372 0.380 0.388 250.00 0.396 0.404 0.412 0.420 0.428 275.00 0.435 0.443 0.451 0.459 0.467 300.00 0.475 0.483 0.491 0.499 0.507 325.00 0.515 0.523 0.530 0.538 0.546 350.00 0.554 0.562 0.570 0.583 0.597 375.00 0.610 0.624 0,637 0.651 0.664 400.00 0.678 0.691 0.705 0.718 0.732 425.00 0.745 0.759 0.772 0.786 0.799 450.00 0.813 0.826 0.839 0.853 0.866 475.00 0.880 0.893 0,907 0.920 0.934 500.00 0.947 0.961 0.974 0.988 1.001 525.00 1.015 1.028 1.042 1.055 1.084 550.00 1.112 1.141 1.169 1.198 1.227 575.00 1.255 1.284 1.313 1.341 1.370 600.00 1.398 1.427 1.456 1.484 1.513 625.00 1.541 1.570 1.595 1.620 1.645 650.00 1.670 1.695 1.720 1.784 1.848 675.00 1.913 1.977 2.041 2.105 2.267 700.00 2.429 2.592 2.754 3.169 3.979 725.00 4.394 4.556 4.718 4.881 5.043 750.00 _ 5.205 5.269 5.333 5.398 5.462 775.00 5.526 S.590 5.615 5.640 5.665 800.00 5.690 5.715 5.740 5.769 5.797 825.00 5.826 5.854 5.883 5.912 5.940 850.00 5.969 5.998 6.026 6.055 6.083 875.00 6.112 6.141 6.169 6.198 6.226 900.00 6.255 6.268 6.282 6.295 6.309 925.00 6.322 6.336 6.349 6.363 6.376 950.00 6.390 6.403 6.417 6.430 6.444 975.00 6.457 6.471 6.484 6.498 6.511 1,000.00 6.524 6.538 6.551 6.565 6.578 1,025.00 6.592 6.605 6.619 6.632 6.646 1,050.00 6,659 6.673 6.686 6.700 6.713 1,075.00 6.727 6.740 6.748 6.756 6.764 1,100.00 6.772 6.780 6.788 6.795 6.803 1,125.00 6.811 6.819 6.827 6.835 6.843 1,150.00 6.851 6.859 6.867 6.875 6.883 1,175.00 6.890 6.898 6.906 6.914 6.922 1,200.00 6.930 6.938 6.946 6.954 6.962 1,225.00 6.970 6.978 6.985 6.993 7.001 1,250.00 7.009 7.017 7.025 7.033 7.041 1,275.00 7.049 7,057 7.065 7.073 7.080 1,300.00 7.088 7.096 7.104 7.112 7.120 1,325.00 7.128 7.136 7.144 7.152 7.160 1,350.00 7.168 7.175 7.183 7.191 7.199 1,375.00 7.207 7.215 7.223 7.231 7.239 1,400.00 7.247 7.255 7.263 7.270 7.278 1,425.00 7.286 7.294 7.302 7.310 (N/A) Hamilton -Hunt Parking Lot R, STUBBS, El UNW17060.ppc 2/9/2018 9 MCADAMS Storm Data Detailed Report: UNW17060 25yr 24hr Label 25yr 24hr Increment 5.00 min Return Event 25 years End Time 1,440.00 min Start Time 0.00 min Storm Event Depth Type Cumulative 25yr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (In) (in) (in) 0.00 0.000 0.010 0.021 0.031 0.041 25.00 0.051 0.062 0.072 0.082 0.092 50.00 0.103 0.113 0.123 0.134 0.144 75.00 0.154 0.164 0.175 0.185 0.195 100.00 0.206 0.216 0.226 0.236 0.247 125.00 0.257 0.267 0.278 0.288 0.298 150.00 0.308 0.319 0.329 0.339 0.349 175.00 0.360 0.370 0.380 0.391 0.401 200.00 0.411 0.421 0.432 0.442 0.452 225.00 0.462 0.473 0.483 0.493 0,504 250.00 0.514 0.524 0.534 0.545 0.555 275.00 0.565 0.576 0.586 0.596 0.606 300.00 0.617 0.627 0.637 0.647 0.658 325.00 0.668 0.678 0.689 0.699 0.709 350.00 0.719 0.730 0.740 0.757 0.774 375.00 0.792 0.809 0.826 0.843 0.861 400.00 0.878 0.895 0.912 0.929 0.947 425.00 0.964 0.981 0.998 1.016 1.033 450.00 1.050 1.067 1.084 1.102 1.119 475.00 1.136 1.153 1.171 1.188 1.205 500.00 1.222 1.239 1.257 1.274 1.291 525.00 1.308 1.326 1.343 1.360 1.396 550.00 1.432 1.468 1.504 1.541 1.577 575.00 1.613 1.649 1.685 1.721 1.757 600.00 1.793 1.829 1.866 1.902 1.938 625.00 1.974 2.010 2.047 2.083 2.120 650.00 2.157 2.193 2.230 2.319 2.408 675.00 2.498 2.587 2.676 2.765 2.965 700.00 3.165 3.365 3.565 4.030 4.950 725.00 5.415 5.615 5.815 6.015 6.215 750.00 6.415 6.504 6.593 6.683 6.772 775.00 6.861 6.950 6.987 7.023 7.060 800.00 7.097 7.133 7.170 7.206 7.242 825.00 7.278 7.314 7.351 - 7.387 7.423 850.00 7.459 7.495 7.531 7.567 7.603 875.00 7.639 7.676 7.712 7.748 7.784 900.00 7.820 7.837 7.854 7.872 7.889 925.00 7.906 7.923 7.941 7.958 7.975 950.00 7.992 8.009 8.027 8.044 8.061 975.00 8.078 8.096 8.113 8.130 8.147 1,000.00 8.164 8.182 8.199 8.216 8.233 1,025.00 8.251 8.268 8.285 8.302 8.319 1,050.00 8.337 8.354 8.371 8.388 8.406 1,075.00 8.423 8.440 8.450 8.461 8.471 1,100.00 8.481 8.491 8.502 8.512 8.522 1,125.00 8.533 8.543 8.553 8.563 8.574 Hamilton -Hurst Parking Lot R. STUBBS, El UN W 17060,ppc 2/9/2018 9 MCADAMS Storm Data Detailed Report: UNW17060 25yr24hr Time (min) 1,150.00 1,175.00 1,200.00 1,225.00 1,250.00 1,275.00 1,300.00 1,325.00 1,350.00 1,375.00 1,400.00 1,425.00 50yr 24hr Depth (In) 8.584 8.635 8.687 8.738 8.789 8.841 8.892 8.944 8.995 9.046 9.098 9.149 Depth (in) 8.594 8.646 8.697 8.748 8.800 8.851 8.903 8.954 9.005 9.057 9.108 9.159 Depth (in) 8.604 8.656 8.707 8.759 8.810 8.861 8.913 8.964 9.016 9.067 9.118 9.170 Depth (In) 8.615 8.666 8.718 8.769 8.820 8.872 8.923 8.974 9.026 9.077 9.129 9.180 Depth (in) 8.625 8.676 8.728 8.779 8.831 8.882 8.933 8.985 9.036 9.088 9.139 (N/A) Label 50yr 24hr Increment 5.00 min Return Event 50 years End Time 1,440.00 min Start Tlme 0.00 min Storm Event Depth Type Cumulative 50yr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 0.00 0.000 0.012 0,025 0.037 0.050 25.00 0.062 0.075 0.087 0.099 0.112 50.00 0.124 0.137 0.149 0.162 0.174 75.00 0.186 0.199 0.211 0.224 0.236 100.00 0.249 0.261 0.273 0.286 0.298 125.00 0.311 0.323 0.336 0.348 0.360 150.00 0.373 0.385 0.398 0.410 0.423 175.00 0.435 0.448 0.460 0.472 0.485 200.00 0.497 0.510 0.522 0.535 0.547 225.00 0.559 0.572 0.584 0.597 0.609 250.00 0.622 0.634 0.646 0.659 0.671 275.00 0.684 0.696 0.709 0.721 0.733 300.00 0.746 0.758 0.771 0.783 0.796 325.00 0.808 0.820 0.833 0.845 0.858 350.00 0.870 0.883 0.895 0.916 0.937 375.00 0.958 0.979 1.001 1.022 1.043 400.00 1.064 1.085 1.106 1.127 1.148 425.00 1.169 1.191 1.212 1.233 1.254 450.00 1.275 1.296 1.317 1.338 1.359 475.00 1.381 1.402 1.423 1.444 1.465 500.00 1.486 1.507 1.528 1.549 1.571 525.00 1.592 1.613 1.634 1.655 1.698 550.00 1.740 1.783 1.825 1.868 1.910 575.00 1.953 1.995 2.038 2.080 2.123 600.00 2.165 2.208 2.250 2.293 2.335 625.00 2.378 2.420 2.468 2.515 2.563 650.00 2,610 2.658 2.705 2.818 2.932 1 675.00 3.045 3.158 3,272 3.385 3.616 700.00 3.847 4.078 4.309 4.819 5.809 Hamilton -Hurst Parking Lot R, STUBBS, El UNW17080.ppc 2/9/2018 'McADAMS Storm Data Detailed Report: UNW17060 50yr 24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (in) (in) (in) 725.00 6.319 6.551 6.782 7.013 7.244 750.00 7.475 7.588 7.702 7.815 7.928 775.00 8.042 8.155 8.203 8.250 8.298 800.00 8.345 8.393 8.440 8.483 8.525 825.00 8.568 8,610 8.653 8.695 8.738 850.00 8.780 8.823 8.865 8.908 8.950 875.00 8.993 9.035 9.078 9.120 9.163 900.00 9.205 9.226 9.247 9.268 9.289 925.00 9.311 9.332 9.353 9.374 9.395 950.00 9.416 9,437 9.458 9.479 9.501 975.00 9.522 9.543 9.564 9.585 9.606 1,000.00 9.627 9.648 9.669 9.691 9.712 1,025.00 9.733 9.754 9.775 9.796 9.817 1,050.00 9.838 9.859 9.881 9.902 9.923 1,075.00 9.944 9.965 9.977 9.990 10.002 1,100.00 10.015 10.027 10.040 10.052 10.064 1,125.00 10.077 10.089 10.102 10.114 10.127 1,150.00 10.139 10.151 10.164 10.176 10.189 1,175.00 10.201 10.214 10.226 10.238 10.251 1,200.00 10.263 10.276 10.288 10.301 10.313 1,225.00 10.325 10.338 10.350 10.363 10.375 1,250.00 10.388 10.400 10.413 10.425 10.437 1,275.00 10.450 10.462 10.475 10.487 10.500 1,300.00 10.512 10.524 10.537 10,549 10.562 1,325.00 10.574 10.587 10.599 10.611 10.624 1,350.00 10.636 10.649 10.661 10.674 10.686 1,375.00 10.698 10.711 10.723 10.736 10.748 1,400.00 10.761 10.773 10.785 10.798 10.810 1,425.00 10.823 10.835 10.848 10.860 (NIA) 100yr24hr Label 100yr 24hr Increment 5.00 min Return Event 100 years End Time 1,440.00 min Start Time 0.00 min Storm Event Depth Type Cumulative 100yr24hr Time Depth Depth Depth Depth Depth (min) (In) (in) (in) (in) (in) 0.00 0.000 0.015 0.030 0.045 0.060 25.00 0.075 0.090 0.105 0.119 0.134 50.00 0.149 0.164 0.179 0.194 0.209 75.00 0.224 0.239 0.254 0.269 0.284 100.00 0.299 0.314 0.328 0.343 0.358 125.00 0.373 0.388 0.403 0.418 0.433 150.00 0.448 0.463 0.478 0.493 0.508 175.00 0.523 0.538 0.552 0.567 0.582 200.00 0.597 0.612 0.627 0.642 0.657 225.00 0.672 0.687 0.702 0.717 0.732 250.00 0.747 0.761 0.776 0.791 0.806 275.00 0.821 0.836 0.851 0.866 0.881 Hamilton -Hurst Parking Lot R. STUBBS, El 2/9/2018 UNW17060.ppc 9 .MCADAMS Storm Data Detailed Report: UNW17060 100yr24hr Time Depth Depth Depth Depth Depth (min) (in) (in) (In) (In) (in) 300.00 0.896 0.911 0.926 0.941 0.956 325.00 0.970 0.985 1.000 1.015 1.030 350.00 1.045 1.060 1.075 1.100 1.126 375.00 1.151 1.176 1.201 1.227 1.252 400.00 1:277 1.303 1.328 1.353 1.378 425.00 1.404 1.429 1.454 1.479 1.505 450.00 1.530 1,555 1.581 1.606 1.631 475.00 1.656 1.682 1.707 1.732 1.758 500.00 1.783 1.808 1.833 1.859 1.884 525.00 1.909 1.934 1.960 1.985 2.035 550.00 2.086 2.136 2.186 2.236 2.287 575.00 2.337 2.387 2.438 2.488 2.538 600.00 2.588 2.639 2.689 2.739 2.789 625.00 2.840 2.890 2.952 3.013 3.075 650.00 3.137 3.198 3.260 3.400 3.540 675.00 3.680 3.820 3.960 4.100 4.367 700.00 4.633 4.900 5.167 5.707 6.787 725.00 7.327 7.593 7.860 8.127 8.393 750.00 8.660 8.800 8.940 9.080 9.220 775.00 9.360 9.500 9,562 9.623 9.685 800.00 9.747 9.808 9.870 9.920 9.971 825.00 10.021 10.071 10.121 10.172 10.222 850.00 10.272 10.323 10.373 10.423 10.473 875.00 10.524 10.574 10.624 10.674 10,725 900.00 10.775 10.800 10.826 10.851 10.876 925.00 10.901 10.927 10.952 10.977 11.003 950.00 11.028 11.053 11.078 11.104 11.129 975.00 11.154 11.179 11.205 11.230 11.255 1,000.00 11.281 11.306 11.331 11.356 11.382 1,025.00 11.407 11.432 11.458 11.483 11.508 1,050.00 11.533 11.559 11.584 11.609 11.634 1,075.00 11.660 11.685 11.700 11.715 11.730 1,100.00 11.745 11.760 11.775 11.790 11.804 1,125.00 11.819 11.834 11.849 11.864 11.879 1,150.00 11.894 11.909 11.924 11.939 11.954 1,175.00 11.969 11.984 11.999 12.013 12.028 1,200.00 12.043 12.058 12.073 12.088 12.103 1,225.00 12.118 12.133 12.148 12.163 12.178 1,250.00 12.193 12.208 12.223 12.237 12.252 1,275.00 12.267 12.282 12.297 12.312 12.327 1,300.00 12.342 12.357 12.372 12.387 12.402 1,325.00 12.417 12,432 12.446 12.461 12.476 1,350.00 12.491 12.506 12.521 12.536 12.551 1,375.00 12,566 12.581 12.596 12.611 12.626 1,400.00 12.641 12.655 12.670 12.685 12.700 1,425.00 12.715 12.730 12.745 12.760 (N/A) Hamilton -Hurst Parking Lot R. STUBBS, El UN W 170BO.ppc VM018 ®i -MCADAMS Storm Data Detailed Report: UNW17O60 15.000 13.750 12.500 11.250 10.000 8.750 c L 7.500 n g 6.250 5.000 3.750 2.500 1.250 0.000 0.00 144.00 288.00 432.00 576.00 720.00 864.00 1,008.00 1,152.00 1,296.00 1,440.0( Time (min) 1OOyr 24hr — 5Oyr 24hr — 25yr 24hr — 10yr 24hr — 2yr 24hr — tyr 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060.ppc N912016 PRE -DEVELOPMENT HYDROLOGIC CALCULATIONS UNCW - HURST HAMILTON PARKING LOTS U N W-17060 UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Summary of Results 2/9/2018 HYDROLOGY INPUT SUMMARY Onsite Area [acres] Offsite Area [acres] Total Area SCS CN (min] Tc min Sub -basin ID Impervious Open Wooded Pond Total Impervious Open Wooded Pond Total [aces) Main Pool 0.50 ] 0.70 I 2.75 0.94 4.88 0.00 0.29 0.00 1 0.00 0.29 5.17 57 25.37 Forebay 8.73 9.54 0.00 0.45 1 18.72 0.02 I 0.48 0.00 1 0.00 0.50 19.22 74 23.41 Ditch6 5.05 11.39 ] 14.71 0.00 31.15 0.00 0.11 0.78 0.00 0.89 32.04 58 32.66 Ditch7 0.09 0.47 1.50 0.00 2.06 0.11 0.37 6.00 0.00 0.48 2.54 46 25.43 Totals = 14.38 22.09 18.96 1.38 56.82 0.13 1.26 0.78 0.00 2.17 58.97 UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS, El UN W-17060 Sub to Main Pool 2/9/2018 r. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 0 98 8o 77 HSG'A'= 62.9% HSG'B'= 37.1% HSG'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Im ep rvlous 98 Open 47 Assume goad condition Wooded 39 Assume good condition 11. PRE -DEVELOPMENT Watershed Breakdown Contributing Area Onsite impervious Onsite open Onsite wooded SCS ON 98 47 39 I Area 1!9 21,701 30,406 119,710 Area [acres] 0.50 0.70 2.75 Comments - Assume good condition Assume good condition Onsite pond 100 40,773 0.94 Offsite impervious 98 0 0.00 Offsite open 47 12,795 0.29 Assume good condition Offsite wooded 39 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area = Composite SCS CN - % Impervious = 5.17 acres 225,385 sq. R. 57 9.6% UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY UNW-17060 Sub to Main Pool Ill. TIME OF CONCENTRATION INFORMATION Time ci concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 It Length = 300 Tap Elev= 38.5 It Top Elev= 36.50 Bot Elev= 36.5 It Bot Elev= 36 Height= 2 it Height 1 Slope= 0.0200 ft/fit Slope= 0.0017 Manning's n - 0.40 wooded, dense underbrush Paved 7 = No P (2-year/24-hour) = 4.70 inches(Wlimington, NC) Velocity= 0.66 Segment Time= 17.72 minutes Segment Time Z59 Segment 3: Pipe Flow Length= 18 ft Top Elev= 36 Bot Elev= 35.75 Height = 0.25 It Slope= 0.0139 ft/ft Manning's n= 0.013 concrete Flow Area = 0.79 sf (assume 12' RCP) Wetted Perimeter= 3.14 If (assume 12" RCP) Channel Velocity= 5.36 fit/sec Segment Time= 0.06 minutes Time of Concentration- 25.37 minutes SCS Lag Time - 15.22 minutes (SCS Lag = 0.6- Tc) Time Increment= 4.41 minutes 1= 0.29-SCS Lag) R. STUBBS, El 2/9/2018 ft ft ft ft ft/ft ft/sec minutn UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Foreboy 2/9/2018 1. SCS CURVE NUMBERS Assume. HSG Impervious Open Wooded A I 98 39 30 e 98 61 55 C 98 74 70 D 98 80 77 HSG'A'= 43.1% HSG'B'= 56.9% HSG'C'= 0.0% HSG'D'= 0.0% Co"rCoodRbn SCS CN Comments Impervious 98 Open 52 Assume good condition Wooded 44 Assume good condition II. PRE-DEVELAPMENT Watershed Breakdown Contributing Area SCS ON AreaIs I Area acres Comments Onsite impervious 98 390,433 8.73 Onsite open 52 415.487 9,54 Assume good condition Onsite wooded 44 0 0.00 Assume good condition Onsite pond S00 19,500 0.45 Offslte Impervious 98 816 0.02 Offsite open 52 21.105 0.48 Assume good condition Offsite wooded 44 0 0.00 Assume goodcondition Offsite pond 100 0 0.00 Total area e Composite SCS ON - % Impervious = 19.22 acres 837,341 sq. ft. 74 45.5% UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY UN W-17060 Sub to Forebay fit. TIME OF CONCENTRATION [INFORMATION Time of concentration is calculated using the SCS Segmental Approoch (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Now Length 100 it Length= 235 Top Elev= 41.0 it Top Elev= 40.5 Bat Elev= 40.5 it Bat Elev= 37.9 Height= 0.5 R Height= 3 Slope= 0.0050 ft/ft Slope= 0.0111 Manning's n= 0.24 dense grass Paved 7= No P(2-year/24-hour(= 4.70 Inches (Wilmington, NC) Velocity= 1.70 Segment Time= 20.50 minutes Segment Time= 2.31 Segment 3: Pipe Flow Length= 358 it Top Elev= 37.9 Bat Elev= 34.0 Height = 3.9 it Slope= 0.0109 ft/ft Manning's n= 0.013 concrete Flow Area = 1.77 sf (assume 18" RCP( Wetted Perimeter= 2.36 If(assume 18"RCP) Channel Velocity= 9.88 ft/sec Segment Time= 0.60 minutes Time of Commntration - 23.41 minutes SCS Lag Time- 14.05 minutes(SCS Lag =0.6•Tc) Time Increment= 4.07 minutesI=0.29'SC5 La R. STUBBS, El 2/9/2018 ft ft ft R Wit fit/sec minutes UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS, El UN W-17060 Sub t0 OItch6 2/9/2018 I. SCS CURVE NUMBERS Assume: HSG Impervious I Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 g0 77 HSG'A'= 29.8% HSG'B'= 70.2% HSG'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Impervious 98 - Open 54 Assume good condition Wooded 48 1 Assume good condition IL PRE -DEVELOPMENT Watershed Breakdown Contributing Area SCS ON I Area[sj Area[acres Comments Onsite impervious 98 220,015 5.05 Onslte open 54 _ 495,933 11.39 Assume goodcandition Onsite wooded 48 _ 640,858 14.71 Assume good condition Onsite pond 1 100 0 0.00 - OHsile impervious 98 39 0.00 - Offsl[e open 54 4,867 0.11 Assume good condition Offsite wooded 1 48 33,968 0.78 Assume good condition Offsite pond 1 100 0 0.00 - Total area = Composite SCS ON = % Impervious - 32.04 acres 1,395,680 sq. ft. 58 15.8% UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY UN W-17060 Sub to Ditch6 Bf. TIME OF CONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length = 100 it Length = 762 Top Elev = 42.00 It Top Elev = 40.00 Sot Elev = 40.00 It Bot Elev = 36.28 Height= 2 it Height= 4 Slope 0.0200 ft/ft Slope= 0.0049 Manning's In = 0.40 wooded, dense underbrush Paved 7 = No P (2-year/24-hour) = 4.70 Inches (Wilmington, NC) Velocity = 1.13 Segment Time= 17.72 minutes Segment Time 11.27 Segment 3: Pipe Flow Length= 677 ft Top Elev = 33.91 Bot Elev = 33.00 Height= 0.91 it Slope= 0.0013 ft/ft Manning's n= 0.013 concrete Flow Area = 1.23 sf (assume 15" RCP) Wetted Perimeter= 1.96 If (assume 15" RCP) Channel Velocity= 3.07 ft/sec Segment Time= 3.67 minutes Time of Concentration = 32.66 minutes SCS lag Time = 19.59 minutes (SCS Lag = 0.6• Tc) Time Increment = 5.68 minutes (=0.29•SCS Lag) R. STUBBS, El 2/9/2018 k ft ft it ft/ft ft/sec minutes UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS. 6l UNW-17060 Sub to Ditch 2/9/1018 L SCS CURVE NUMBERS Assume: HSG ImpemlWs Open Wooded A 96 39 30 B 96 61 55 C 98 74 70 0 1 96 80 77 HSG'A'= 67.2% HSG'B'= 32.8% HSG'C'- 0.0% HSG'0'= 0.0% Cover Condition SCS CN I Comments Impervious 98 Om,! 4fi Assume good condition Wooded 38 Assume good condition II. PRE -DEVELOPMENT Watershed Breakdown Contdlwting Area I SCS ON J! I Area acres Comments 98 .044 0.09 46 .610 0.47 Assume good condition Onsite wooded 38 ,131 1.50 Assume good condition Onsite pond 100 FAma 0 0.00 Othite impervious98 .661 0.11 ,067 0.37 Assume good condition Offsite wooded 38 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area= 2.54 acres 110,513 sq. R. Composite SCS ON = 46 % Impervious = 7.9% UNCW HURST HAMILTON PARKING LOT PRE -DEVELOPMENT HYDROLOGY R. STUBBS, El UN W-17060 Sub to Ditch? 2/9/2018 Ill. TIME OF CONCENTRATON INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment2: Concentrated Flow Length = 1D0 ft Length - 96 Top Elev= 37.25 it Tap Elev= 36.00 Bot Elev- 36.00 ft Bot Hey= 35.00 Height= 1.75 ft Height= 1 Slope= 0.0125 ft/ft Slope= 0.0104 Manning's n= 0.40 wooded, dense underbrush Paved 7= No P(2-year/24-hour)= 4.70 inches (Wilmington, NC) Velocity= 1.65 Segment flare- 21.38 minutes Segment Time 0.97 Segment 3: Channel Flow Segment4: Channel flow Length = 104 ft Length = 399 Top Elev= 35.00 Top Ele,= 34.00 Bot Ele,= 34.00 Bot Elev- 33.00 Height= 1 ft Height= 1 Slope= 0.0096 ft/ft Slope= 0.0026 Manning's n = 0.045 nautral channel Manning's n - 0.045 Flow Area= 6.00 sf(assume 2'w x Th channel) Flow Area 50.D0 Wetted Perimeter= 8.00 If (assume 2'w x Th channel) Wetted Perimeter= 25.00 Channel Velocity= 2.68 ft/sec Channel Velocity= 2.66 Segment stare = 0.65 minutes Segment Time= 2.43 Time of Concentration= 25.43 minutes SCS Lag Time= 15.26 minutes (SCS Lag -0.6•Tc) Time increment= 443 minutes (=0.29-SCS Lag) ft R ft ft ft/ft ft/sec minutes it Rift nautral channel sf (assume 5'w x 10'h chance If (assume 5'w x 10'h channel ft/sec minutes '="J' MCADAMS Scenario: Pre- Development Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060, DPc 2/92018 "I'MCADAMS FlexTable: Catchment Table (UNW17O6O.ppc) Current Time: 0.00 min Notes Label Area SCS CN Time of Concentration (ft2) (min) Pre Sub to Ditch#6 1,395,680 58 32.66 Pre Sub to Ditch#7 110,513 46 25.43 Pre Sub to Forebay 837,341 74 23.41 Pre Sub to MalnPooi 225,385 57 25.37 Post Sub to Ditch#1 263,581 68 18.10 Post Sub to Ditch#2 1,016,238 58 32.56 Post Sub to Ditch#3 11,492 71 5.00 Post Sub to Ditch#4 27,400 52 5.00 Post Sub to Ditch#5 33,897 71 5.00 Post Sub to Forebay 837,646 74 23.41 Post Sub to Main Pool 381,257 82 25.37 Hamilton -Hurst Parking tot R. STUBBS, El UNW77080.ppc 2/9/2018 1111 McADAMs Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Sub to Forebay Pre- iyr 24hr 1 2.399 733.50 25.42 Sub to Forebay Pre- 2yr 24hr 2 3.385 733.50 36.25 Sub to Forebay Pre- 10yr 24hr 10 6.868 733.50 64.99 Sub to Forebay Pre- 25yr 24hr 25 9.545 733.50 82.27 Sub to Forebay Pre- 50yr 24hr 50 12.020 733.50 95,73 Sub to Forebay Pre- 100yr 24hr 100 14.872 733.50 109.15 Sub to Ditch#6 Pre- Syr 24hr 1 1.607 749.00 9.79 Sub to Ditch#6 Pre- 2yr 24hr 2 2.655 744.50 18.90 Sub to Ditch#6 Pre- 10yr 24hr 10 6.925 740.25 51.51 Sub to Ditch#6 Pre- 25yr 24hr 25 10.551 740.25 74.87 Sub to Ditch#6 Pre- 50yr 24hr 50 14.063 740.25 94.69 Sub to Ditch#6 Pre- 100yr 24hr 100 18.239 740.25 115.61 Sub to MainPool Pre- lyr 24hr 1 0.242 740.75 1.58 Sub to MainPool Pre- 2yr 24hr 2 0.405 737.50 3.22 Sub to MainPool Pre- 10yr 24hr 10 1.078 734.25 9.05 Sub to MainPool Pre- 25yr 24hr 25 1.654 734.00 13.27 Sub to MainPool Pre-50yr 24hr So 2.214 734.00 16.82 Sub to MainPool Pre- 100yr 24hr 100 2.882 734.00 20.56 Sub to Ditch#7 Pre- Syr 24hr 1 0.037 759.50 0.11 Sub to Ditch#7 Pre- 2yr 24hr 2 0.082 756.25 0.38 Sub to Ditch#7 Pre- 10yr 24hr 10 0.308 739.00 2.12 )Sub to Ditch#7 Pre- 25yr 24hr 25 0.526 735.75 3.80 Sub to Ditch#7 Pre- 50yr 24hr 50 0.749 735.75 5.34 Sub to Ditch#7 Pre- 100yr 24hr 100 1.026 735.75 7.02 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/s) (years) (ac-ft) Overall POA Pre- lyr 24hr 1 0.000 0.00 0.00 Overall POA Pre- 2yr 24hr 2 0.000 0.00 0.00 Overall POA Pre- 10yr 24hr 10 7.524 839.75 21.66 Overall POA Pre- 25yr 24hr 25 14.500 799.50 32.47 Overall POA Pre- 50yr 24hr 50 21.210 791.00 38,64 Overall POA Pre- 100yr 24hr 100 28.969 788.50 40.18 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Maximum Maximum Water Pond Storage Surface (ac-ft) Elevation (ft) Pre-Forebay Pre- lyr 24hr 1 2.399 733.50 25.42 (N/A) (N/A) (IN) Pre-Forebay Pre- lyr 24hr 1 1.026 748.75 15.52 35.70 1.901 (OUT) I Pre-Forebay Pre- 2yr 24hr 2 3.385 733.50 36.25 (N/A) (N/A) ;IN) Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060,ppc 2/9/2018 2 MCADAMS Subsection: Master Network Summary lond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/S) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Pre-Forebay Pre- 2yr 24hr 2 1.299 745.00 23.98 36.30 2.613 (OUT) Pre-Forebay Pre- IOyr 24hr 10 6.868 733.50 64.99 (N/A) (N/A) (IN) Pre-Forebay Pre- IOyr 24hr 10 4.424 736.25 36.80 36.66 3.163 (OUT) Pre-Forebay Pre- 25yr 24hr 25 9.545 733.50 82.27 (N/A) (N/A) (IN) Pre-Forebay Pre- 25yr 24hr 25 7.080 727.00 32.94 36.87 3.507 (OUT) Pre-Forebay Pre- 50yr 24hr 50 12.020 733.50 95.73 (N/A) (N/A) (IN) Pre-Forebay Pre- 50yr 24hr 50 9.535 738.75 39.34 37.02 4.393 (OUT) Pre-Forebay Pre- 100yr 100 14.872 733.50 109.15 (N/A) (N/A) (IN) 24hr Pre-Forebay Pre- 100yr 100 12.311 734.50 43.98 37.06 6.406 (OUT) 24hr Pre-MainPool Pre- lyr 24hr 1 1.267 748.50 16.95 (N/A) (N/A) (IN) Pre-MainPool Pre- lyr 24hr 1 0.000 0.00 0.00 35.70 4.292 )(OUT) Pre-MainPool Pre- lyr 24hr 1 -1.OS2 759.50 -8.53 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 2yr 24hr 2 1.704 744.75 26.84 (N/A) (N/A) (IN) Pre-MainPool Pre- 2yr 24hr 2 0.000 0.00 0.00 36.30 5.281 (OUT) Pre-MainPool Pre- 2yr 24hr 2 -1.623 749.75 -12.85 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 10yr 24hr 10 5.502 736.25 45.83 (N/A) (N/A) (IN) Pre-MainPool Pre- IOyr 24hr 10 3.130 872.00 10.13 36.64 6.014 (OUT) Pre-MainP00l Pre- 10yr 24hr 10 -1.410 742.50 -22.53 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 25yr 24hr 25 8.734 734.25 45.78 (N/A) (N/A) (IN) Pre-MainPool Pre- 25yr 24hr 25 5.816 768.00 19.29 36.80 6.367 (OUT) Pre-MalnPool Pre- 25yr 24hr 25 -0.943 730.75 -19.40 (N/A) (N/A) (Reverse) Pre-MainPool Pre- 50yr 24hr 50 11.749 738.50 55.42 (N/A) (N/A) (IN) Pre-MainPool Pre- 50yr 24hr 50 8.888 768.00 28.91 36.92 6.638 (OUT) Pre-MainPool Pre- 50yr 24hr 50 -1.021 718.75 -16.20 (N/A) (N/A) '(Reverse) Pre-MainPool Pre- 100yr . 100 15.193 734.50 64.48 (N/A) (N/A) !IN) 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UNW17080.ppc 2/9/2010 9MCADAMs Subsection: Master Network Summary 1 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event volume (min) (ft3/S) (years) (ac-ft) Pre -Main Pool (OUT) Pre-MainPool (Reverse) Ditch #6 (IN) Ditch #6 (OUT) Ditch #6 (IN) Ditch #6 (OUT) Ditch #6 (IN) Ditch #6 (OUT) Ditch #6 (IN) Ditch #6 (OUT) Pitch #6 '(IN) Ditch #6 (OUT) Ditch #6 (IN) Ditch #6 (OUT) Ditch#7 (IN) Ditch#7 (Reverse) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (Reverse) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) Ditch#7 (OUT) Ditch#7 (IN) I Ditch#7 (our) Hamilton -Hurst Pai UNW17060,ppc Pre- 100yr 24hr Pre- 100yr 24hr Pre- lyr 24hr Pre- lyr 24hr Pre- 2yr 24hr Pre- 2yr 24hr Pre- 10yr 24hr Pre- 10yr 24hr Pre- 25yr 24hr Pre- 25yr 24hr Pre- 50yr 24hr Pre- 50yr 24hr Pre- 100yr 24hr Pre- 100yr 24hr Pre- lyr 24hr Pre- Syr 24hr Pre- lyr 24hr Pre- 2yr 24hr Pre- 2yr 24hr Pre- 2yr 24hr Pre- 10yr 24hr Pre- 10yr 24hr Pre- 25yr 24hr Pre- 25yr 24hr Pre- 50yr 24hr Pre- 50yr 24hr Pre- 100yr 24hr Pre- 100yr 24hr king Lot 100 100 1 1 2 2 10 10 25 25 50 50 100 100 1 1 1 2 2 2 10 10 25 25 50 50 100 100 12.474 749.75 31.14 -1.230 698.50 -12.94 1.607 749.00 9.79 1.365 758.75 8.94 2.655 744.50 18.90 2.233 757.25 16.44 6.925 740.25 51.51 6.398 747.25 28.39 10.551 740.25 74.87 10.012 735.50 27.70 14.063 740.25 94.69 13.514 729.25 26.19 18.239 740.25 115.61 17.662 721.25 24.06 0.337 735.25 2.80 -0,007 1,270.25 -0.50 0.000 0.00 0.00 0.691 757.50 4.16 0.000 1,257.75 -0.14 0.000 0.00 0.00 8.426 803.25 25.84 7.524 839.75 21.66 15.411 768.00 38.25 14.500 799.50 32.47 22.131 755.00 47.22 21.210 791.00 38.64 29.931 741.50 50.84 28.969 788.50 40.18 Maximum Water Surface Elevation (ft) 36.97 (N/A) (N/A) 35.72 (N/A) 36.31 (N/A) 37.01 (N/A) 37.06 (N/A) 37.12 (N/A) 37.18 (N/A) (N/A) 35.72 (N/A) (N/A) 36.30 (N/A) 36.63 (N/A) 36.78 (N/A)I 36.89 (N/A) 36.93 Maximum Pond Storage (ac-ft) 6.742 (N/A) (N/A) 0.242 (N/A) 0.422 (N/A) 1.328 (N/A) 3.390 (N/A) 5.623 (N/A) 8.256 (N/A) (N/A) 0.334 (N/A) (N/A) 0.692 (N/A) 1.038 (N/A) 1.256 (N/A) 1.419 (N/A) 1.466 R, STUBBS, El 2/9/2018 POST -DEVELOPMENT HYDROLOGIC CALCULATIONS UNCW - HURST HAMILTON PARKING LOTS U N W-17060 UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Summary of Results 5/30/2018 'HYDROLOGY INPUT SUMMARY Onsite Area [acres] Offsite Area [acres] Total Area SCS CN Tc Sub -basin ID Impervious Open Wooded Pond Total Impervious Open Wooded Pond Total [acres] min [min] i Main Pool 4.93 1.77 0.39 0.95 8.04 0.22 0.28 0.00 0.00 0.50 8.55 84 25.37 Forebay 8.83 8.99 0.00 0.45 18.27 0.00 0.50 0.00 0.00 0.50 18.77 75 23.41 Ditchl 2.30 3.75 0.00 0.00 6.05 0.00 0.00 0.00 0.00 0.00 6.05 68 18.10 Ditchl 2.92 7.58 11.97 0.00 22.46 0.00 0.09 0.78 0.00 0.86 23.33 58 32.56 Ditch3 0.09 0.14 0.00 0.00 0.24 0.00 0.03 0.00 0.00 0.03 0.26 71 5.00 Ditch4 0.09 0.44 0.00 0.00 0.54 0.01 0.08 0.00 0.00 0.09 0.63 52 5.00 DitchS 0.33 0.27 0.00 0.00 0.60 0.01 0.17 0.00 0.00 0.18 0.78 71 5.00 Totals = 19.50 22.95 12.36 1.39 56.20 0.24 1.14 0.78 0.00 2.17 58.37 UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub CO Main Pool 5/30/2018 1. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 S5 C 98 74 70 D 98 80 77 HSG'A' = 64.2% HSG'B'= 35.8% HSG'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Impervious 98 Open 47 Assume good condition Wooded 39 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributing Area SCS ON Area lsfl Area acres) Comments Onsite impervious 98 214,917 4.93 Onsite Future Impervious 98 8,990 0.21 Onsite open 47 77,098 1.77 Assume good condition Onsite wooded 39 17,112 0.39 Assume good condition Onsite pond 100 41,263 0.95 Offsite impervious 98 9,554 0.22 Offsiteopen 47 12,323 0.28 Assume ood condition Offsite wooded 39 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area= 8.75 acres 381,257 sq. h. Composite SCS CN= 84 %Impervious= 58.9% UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Main Pool 5/30/2018 III. TIME OFCONCENTRATION INFORMATION Time of concentration is calculated using the SC5 Segmental Approach (TR.55). Segment l: Overland Flow Segment 2: Concentrated Flaw Length = 100 ft Length = 300 ft Top Elev= 38.5 ft Top Elev= 36.50 h Bat Elev= 36.5 ft Bat Hey= 36 ft Height= 2 it Height= 1 ft Slope= 0.0200 ft/ft Slope= 0.0017 ft/ft Manning's n= 0,40 wooded, dense underbrush Paved?= No P (2-year/24-hour) = 4.70 inches (Wilmington, NC) Velocity= 0.66 ft/sec Segment time= 17.72 minutes Segment Time= 7.59 minutes Segment 3: Pipe Flaw Length= 18 ft Top Elev= 36 Bat Elev= 35.75 Height= 0.25 k Slope = 0.0139 ft/ft Manning's n= 0.013 concrete Flow Area= 0.79 sf(assume 12"RCP) Wetted Perimeter= 3.14 If (assume 12"RCP) Channel Velocity= 5.36 ft/sec Segment Time= 0.06 minutes Time of Concentration= 25.37 minutes SCS Lag Time= 15.22 minutes (5CS Lag =0.6'Tc) Time Increment= 4.41 minutes (= 0.29-SCS Lag) UNCW HURST HAMILTON HARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Forebay 5/30/2018 I. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 1 61 55 C 98 74 70 D 96 1 80 77 HSG'A'= 43.1% H5G'B'= 56.9% HSG'C' = 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Impervious 98 Open 52 Assume good condition Wooded 44 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributing Area SCS CN Area Isq Area acres Comments Onsite impervious 98 384,657 8.83 Onsite Future Impervious 98 20,010 0.46 Onsite open 52 391625 8.99 Assume good condition Onsite wooded 44 0 0.00 Assume good condition Onsite pond 100 19,433 OAS Offsite impervious 98 0 0.00 Offsiteopen 52 21,921 0.50 Assume good condition Offsite wooded 44 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area = Composite SCS CN = % Impervious = 19.23 acres 837,646 sq. h. 75 45.9% UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Forebay 5/30/2018 ------------------------------ III: TIMEOFCONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Oaerlond Flow Segment 2: Concentrated Flow Length= 100 ft Length= 235 it Top Elev= 41 IT Top Elev= 40.5 ft Bot Elev= 40.5 ft Sot Elev= 37.9 ft Height= 0.5 ft Height= 3 it Slope= 0.0050 ft/ft Slope= 0.0111 ft/ft Manning's n= 0.24 dense grass Paved?= No P (2-year/24-hour) = 4.70 inches (Wilmington, NC) Velocity= 1.70 ft/sec Segment Tme= 20.50 minutes Segment Time= 2.31 minutes Segment 3: Pipe Flow Length= 358 ft Top Elev= 37.9 Bat Elev= 34 Height= 3.9 ft Slope= 0,0109 ft/ft Manning's n= 0,013 concrete Flow Area= 1.77 sf(assume 18"RCP) Wetted Perimeter= 2.36 If (assume 18" RCP) Channel Velocity= 9.88 ft/sec Segment Time 0.60 minutes Time of Concentration= 23.41 minutes SCS Lag rime= 14,05 minutes (SCS Lag =0.6"Tc) Time Increment= 4.07 minutes L=0.29"SCS Lag) UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, EI UNW-17060 Sub t0 DltChl 5/30/2018 I. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded i A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 H5G'A'= 48.2% HSG'B'= 51.8% H5G'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments -- Impervious 98 - Open 50 Assume good condition Wooded 43 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributing Area SCS ON Area Area acres Comments i Onsite impervious 98 100,155 2.30 Onsite open 50 163,426 3.75 Assume good condition Onsite wooded 43 0 0.00 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 0 0.00 Offsiteopen 50 0 0.00 Assume good condition Offsite wooded 43 0 0.00 Assume good condition Offsite pond 100 0 0.00 - Total area = 6.05 acres 263,581 sq. k. Composite SCS CN = 68 % Impervious = 38.0% UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Ditchl 5/30/2018 III. TIME OFCONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmen tot Approach (TR-55). Segment 1: Overland Flow Length = Top Elev = Bot Elev = Height = Slope = Manning's n = P 12-year/24-hour) = Segment rime= Segment 3: pipe Flaw Length = Top Elev = Bat Elev = Height = Slope = Manning's n = Flow Area = Wetted Perimeter= Channel Velocity = Segment Time= Segment2: Concentrated Flaw 100 ft Length = 513 ft 42.00 ft Top Elev= 39.00 ft 39.00 ft Bot Elev= 36.40 ft 3 ft Height= 3 ft 0,0300 ft/ft Slope= 0.0051 WILL 0.24 dense grass Paved?= No 4.70 inches (Wilmington, NC) Velocity= 1.15 ft/sec 10.01 minutes Segment Time= ]AO minutes 164 R 34.37 34.04 0.33 ft 0.0020 ft/ft 0,013 concrete 1.77 sf (assume 18" RCP) 2.36 If (assume 18" RCP( 4.24 ft/sec 0.64 minutes Time of Concentration= 18.10 minutes SCS Lag Time= 10.86 minutes SCS Lag =0.6'Tc) Time Increment= 3.15 minutes 1=0.29-SCS Lag) UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, EI UNW-17060 Sub to Ditch2 5/30/2018 I. SCS CURVE NUMBERS Assume: HSG Impervious open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG'A' = 21.7% H5G'B'= 73.3% HSG'C'= 0.0% HSG'0'= 0.0% Cover Condition SCS CN Comments Impervious 98 Open 56 Assume good condition Wooded 50 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributin Area SCS CN Area lsfl Area acres Comments I Onsite impervious 98 127,154 2.92 Onsite open 56 330,098 7.58 Assume good condition Onsite wooded 50 521,308 11.97 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 0 0.00 Offsite open 56 3710 0.09 Assume good condition Offsite wooded 50 33,968 0.78 Assume ood condition Offsite panel 100 0 0.00 Total area = 23.33 acres 1,016,238 sq. R. Composite SCS CN = 58 %Impervious= 12.5% UNCW HURST HAM ILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Ditch2 5/30/2018 111. TIMEOFCONCENTRATIONINFOM RATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Segment 1: Overland Flow Segment 2: Concentrated Flow Length= 100 k length= 762 ft Top Elev= 42.00 ft Top Elev= 40.00 ft Bot Elev= 40.00 ft Bot Eley= 36.28 ft Height= 2 ft Height= 4 ft Slope= 0.0200 ft/ft Slope= 0.0049 ft/ft Manning's n= 0A0 dense grass Paved?= No P (2-year/24-hour)= 4.70 inches (Wilmington, NC) Velocity= 1.13 ft/sec Segment Time= 17.72 minutes Segment Time= 11.27 minutes Segment 3: Pipe Flow Length= 665 ft Top Elev= 33.91 Bot Elev = 33.00 Height = 0.91 ft Slope= 0.0014 ft/ft Manning's n= 0.013 concrete Flow Area = 1.23 sf (assume 1S' RCP) Wetted Perimeter= 1.96 If (assume 15"RCP) Channel Velocity= 3.10 ft/sec Segment Time= 3.58 minutes Time of Concentration = 32.56 minutes SCS Lag Time= 19.54 minutes (SCS Lag =0.6'Tc) Time Increment= 5.67 minutes (=0.29-SCS Lag) UNCW HURST HAMILTON PARSING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub t0 Ditc)73 5/30/2018 Assume: HSG Impervious Open Wooded A 98 39 30 B 1 98 1 61 1 55 C 98 74 70 D 98 80 77 HSG'A'= 21.11% HSG'B'= 79.0% HSG'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Impervious 98 Open 56 Assume good condition Wooded 50 Assume good condition IL POST -DEVELOPMENT Watershed Breakdown Contdbutin Area SCS CN Area Isfl Area [acresl Comments Onsite impervious 98 4,064 0.09 Onsiteopen 56 6,233 0.14 Assume good condition Onsite wooded 50 0 0.00 Assume ood condition Onsite pond 100 0 0.00 Offsite impervious 98 39 0.00 Offsite open 56 1,156 0.03 Assume good condition Offsite wooded 50 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area= 0.26 acres 11,492 sq. I'L Composite SCS CN= 71 % Impervious = 35.7% III. TIME OF CONCENTRATION INFORMATION Time of concentration is calculated using the SCS Segmental Approach (TR-55). Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag =0.6'Tc) Time Increment= 0.87 minutes (=0.29'5CS Lag) UNCW HURST HAM I LTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Dltch4 5/30/2018 1. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 1 74 70 D 98 1 80 77 HSG A' = 79.9% HSG'B'= 20.1% H5G'C'= 0.0% HSG'D'= 0.0% Cover Condition SCS CN Comments Impervious 98 Open 43 Assume good condition Wooded 35 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributing Area SCS ON Areas Area facresl Comments Onsite impervious 98 4,010 0.09 Onsite open 43 19,383 0.44 Assume good condition Omite wooded 35 0 0.00 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 543 0.01 Offsite open 43 3,464 0.08 Assume good condition Offsite wooded 35 0 0.00 Assume good condition Offsite pond 100 0 0.00 Total area= 0.63 acres 27,400 sq. h. Composite SCS CN = 52 %Impervious= 16.6% Ill. TIME OF CONCENTRATION INFORMATION Time ojconcentration is calculated using the SC5 Segmental Approach (TR-55). Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes (SCS Lag =0.6'Tc) Time Increment= 0.87 minutes (=0.29'SCS Lag) UNCW HURST HAMILTON PARKING LOT POST -DEVELOPMENT HYDROLOGY R. STUBBS, El UNW-17060 Sub to Ditch$ 5/30/2018 I. SCS CURVE NUMBERS Assume: HSG Impervious Open Wooded A 98 39 30 B 98 61 55 C 98 74 70 D 98 80 77 HSG'A'= 47.0% HSG'B'= 53.0% H5G'C'= 0.0% HSG'D'= 0.0% Cover Condition 12 CIN Comments Impervious 98 Open 51 Assume good condition Wooded 43 Assume good condition II. POST -DEVELOPMENT Watershed Breakdown Contributing Area SCS ON Area isf] Area acres Comments I Onsite impervious 98 14435 0.33 Onsite open 51 11,823 0.27 Assume good condition Onsite wooded 43 0 0.00 Assume good condition Onsite pond 100 0 0.00 Offsite impervious 98 440 0.01 Offsite open 51 7,199 0.17 Assume good condition Offsite wooded 43 0 0.00 Assume good condition Offsite pond 100 0 0.00 - Total area Composite SCS ON %Impervious Time of concentrotian is calculated using the SCS Segmental Approach (TR-SS). 0.78 acres 33,897 sq. ft. 71 43.9% Time of Concentration= 5.00 minutes SCS Lag lime= 3.00 minutes (SCS Lag =0.6'Tc) — TimeIncrement= 0.87 minutes (= 0.29-SCS Lag) '='1j' MCADAMS Scenario: Post- Development Hamilton -Hurst Parking Lot R. STUBBS, El UNW17090.ppc 2J912018 2 MCADAMS Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Sub to Forebay Post- lyr 24hr 1 2.509 733.50 26.80 Sub to Forebay Post- 2yr 24hr 2 3.515 733.50 37.82 Sub to Forebay Post- 10yr 24hr 10 7.047 733.50 66.69 Sub to Forebay Post- 25yr 24hr 25 9.747 733.50 83.91 Sub to Forebay Post- 50yr 24hr 50 12.240 733.50 97.28 Sub to Forebay Post- 100yr 24hr 100 15.107 733.50 110.59 Sub to Main Pool Post- lyr 24hr 1 1.642 734.00 17.30 Sub to Main Pool Post- 2yr 24hr 2 2.173 734.00 22.64 Sub to Main Pool Post- 10yr 24hr 10 3.942 734.00 35.28 Sub to Main Pool Post- 25yr 24hr 25 5.246 734.00 42.43 Sub to Main Pool Post- 50yr 24hr 50 6.432 734.00 47.90 Sub to Main Pool Post- 100yr 24hr 100 7.782 734.00 53.32 Sub to Ditch#1 Post- lyr 24hr 1 0.566 731.25 6.49 Sub to Ditch#1 Post- 2yr 24hr 2 0.837 731.25 9.90 Sub to Ditch#1 Post- 10yr 24hr 10 1.837 729.00 19.50 Sub to Ditch#1 Post- 25yr 24hr 25 2.631 729.00 25.62 Sub to Ditch#1 Post- 50yr 24hr 50 3.376 729.00 30.42 Sub to Ditch#1 Post- 100yr 24hr 100 4.242 729.00 35.28 Sub to Ditch#2 Post- lyr 24hr 1 1.170 746.75 7.15 Sub to Ditch#2 Post- 2yr 24hr 2 1.933 742.50 13.75 Sub to Ditch#2 Post- 10yr 24hr 10 5.043 742.25 37.44 Sub to Ditch#2 Post- 25yr 24hr 25 7.683 738.25 54.23 Sub to Ditch#2 Post- 50yr 24hr 50 10.240 738.25 68.76 Sub to Ditch#2 Post- 100yr 24hr 100 13.281 738.00 84.13 Sub to Ditch#3 Post- lyr 24hr 1 0.029 721.50 0.56 Sub to Ditch#3 Post- 2yr 24hr 2 0.042 721.50 0.82 Sub to Ditch#3 Post- 10yr 24hr 30 0,088 721.25 1.50 Sub to Ditch#3 Post- 25yr 24hr 25 0.123 721.25 1.91 Sub to Ditch#3 Post- 50yr 24hr s0 0.157 721.25 2.21 Sub to Ditch#3 Post- 100yr 24hr 100 0.195 721.25 2.53 Sub to Ditch#4 Post- lyr 24hr 1 0.019 726.00 0.17 Sub to Ditch#4 Post- 2yr 24hr 2 0.035 722.75 0.44 Sub to Ditch#4 Post- 10yr 24hr 10 0.106 721.50 1.63 Sub to Ditch#4 Post- 25yr 24hr 25 0.170 721.25 2.50 Sub to Ditch#4 Post- 50yr 24hr 50 0.233 721.25 3.21 Sub to Ditch#4 Post- 100yr 24hr 100 0.309 721.25 4.01 Sub to Ditch#5 Post- lyr 24hr 1 0.085 721.50 1.66 Sub to Ditch#5 Post- 2yr 24hr 2 0.123 721.50 2.43 Sub to Ditch#5 Post- 10yr 24hr 10 0.258 721.25 4.43 Sub to Ditch#5 Post- 25yr 24hr 25 0.364 721.25 5.65 Sub to Ditch#5 Post- 50yr 24hr 50 0.462 721.25 6.52 Sub to Ditch#5 Post- 100yr 24hr 100 0.576 721.25 7.48 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) Overall PDA Post- lyr 24hr Overall POA I Post- 2yr 24hr Hamilton -Hurst Parking Lot UNW17060.ppc 2 I 11.4029 I 1,094.00 I 3.29 0.00 R. STUBBS, El 5/30/2018 2 MCADAMS Subsection: Master Network Summary Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (min) (ft3/s) (years) (ac-ft) Overall POA Post- 10yr 24hr 10 10.988 795.75 24.93 Overall POA Post- 25yr 24hr 25 18.532 752.75 28.42 Overall POA Post- 50yr 24hr 50 23.360 752.50 28.98 Overall POA Post- 100yr 24hr 100 27.217 727.75 29.81 Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Post-Forebay Post- lyr 24hr 1 2.509 733.50 26.80 (N/A) (N/A) (IN) Post-Forebay Post- Syr 24hr 1 0.506 742.00 14.46 36.16 2.588 (OUT) Post-Forebay Post- lyr 24hr 1 -0.055 782.25 -0.72 (N/A) (N/A) (Reverse) Past-Forebay Post- 2yr 24hr 2 3.515 733.50 37.82 (N/A) (N/A) (IN) Post-Forebay Post- 2yr 24hr 2 1.088 738.75 19.79 36.55 3.151 (OUT) Post-Forebay Post- 2yr 24hr 2 -0.174 769.25 -2.31 (N/A) (N/A) (Reverse) Post-Forebay Post- 10yr 10 7.047 733.50 66.69 (N/A) (N/A) (IN) 24hr Post-Forebay Post- 10yr 10 4.405 725.25 19.12 36.95 3.806 (OUT) 24hr Post-Forebay Post- 10yr 10 -0.008 436.50 -0.05 (N/A) (N/A) (Reverse) 24hr Post-Forebay Post- 25yr 25 9.747 733.50 83.91 (N/A) (N/A) (IN) 24hr Post-Forebay Post- 25yr 25 7.060 745.75 18.53 37.04 5.599 (OUT) 24hr Past-Forebay Post- 25yr 25 -0.008 366.00 -0.05 (N/A) (N/A) (Reverse) 24hr Post-Forebay Post- 50yr 50 12.240 733.50 9Z28 (N/A) (N/A) (IN) 24hr Post-Forebay Post- 50yr 50 9.404 733.75 23.82 37.08 7.149 (OUT) 24hr Post-Forebay Post-50yr 50 -0.008 308.25 -0.05 (N/A) (N/A) (Reverse) 24hr Post-Forebay Post- 100yr 100 15.107 733.50 110.59 (N/A) (N/A) (IN) 24hr Post-Forebay Post- 100yr 100 12.185 724.25 20.24 37.11 8.859 (OUT) 24hr Post-Forebay Post- 100yr 100 -0.011 701.75 -0.52 (N/A) (N/A) (Reverse) 24hr Post -Main Post- lyr 24hr 1 2.092 739.75 29.71 (N/A) (N/A) Pool (IN) ?ost-Main Post- lyr 24hr 1 0.000 0.00 0.00 36.16 5.473 Pool (OUT) Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060. ppc 5/3012018 9 MCADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) W/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Post -Main Post- lyr 24hr 1 -1.160 752.75 -9.12 (N/A) (N/A) Pool (Reverse) Post -Main Post- 2yr 24hr 2 3.086 737.00 41.41 (N/A) (N/A) Pool (IN) Post -Main Post- 2yr 24hr 2 0.797 1,104.50 1.90 36.54 5,958 Pool (OUT) Post -Main Post- 2yr 24hr 2 -1.439 768.75 -13.82 (N/A) (N/A) Pool (Reverse) Post -Main Post- loyr 10 8.338 732.50 52.85 (N/A) (N/A) Pool (IN) 24hr Post -Main Post- 10yr 10 5.374 786.75 15.89 36.91 6.445 Pool (OUP 24hr Post -Main Post- 10yr 10 -0.800 734.25 -19.77 (N/A) (N/A) Pool 24hr (Reverse) Post -Main Post- 25yr 25 12.298 733.75 55.19 (N/A) (N/A) Pool (IN) 24hr Post -Main Post- 25yr 25 9.358 754.25 48.29 37.00 6.656 Pool (OUT) 24hr Post -Main Post- 25yr 25 -0.857 722.25 -21.59 (N/A) (N/A) Pool 24hr (Reverse) Post -Main Post- 50yr 50 15,827 733.75 71.61 (N/A) (N/A) Pool(IN) 24hr Post -Main Post- 50yr 50 12.998 755.00 30.97 37.02 7.531 Pool (OUT) 24hr Post -Main Post- 50yr 50 -1.087 721.00 -19.32 (N/A) (N/A) Pool 24hr (Reverse) Post -Main Post- 100yr 100 19.955 724.25 59.50 (N/A) (N/A) Pool (IN) 24hr Post -Main Post- 100yr 100 17.188 732.00 25.42 37.05 8.593 Pool (OUT) 24hr Post -Main Post- 100yr 100 -1.215 706.50 -13.57 (N/A) (N/A) Pool 24hr (Reverse) Ditchl (IN) Post- lyr 24hr 1 0.566 731.25 6.49 (N/A) (N/A; Ditchl (OUT) Post- lyr 24hr 1 0.509 735.50 5.73 36.18 0.057 Ditchl (IN) Post- 2yr 24hr 2 0.837 731.25 9.90 (N/A) (N/A; Ditchl (OLFT] Post- 2yr 24hr 2 0.753 733.75 8.77 36.57 0.08E Ditchl (IN) Post- 10yr 10 1.837 729.00 19.50 (N/A) (N/A; 24hr Ditchl (OUP Post- 10yr 10 1.836 729.25 10.72 37.10 0.97S 24hr Ditchl Post- 10yr 10 -0.087 777.25 -1.31 (N/A) (N/A; (Reverse) 24hr Ditchl (IN) Post- 25yr 25 2.631 729.00 25.62 (N/A) (N/A; 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060.ppc 5/30/2018 9 MCA DAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (rt) Ditchl (OUT) Post- 25yr 25 2.989 723.50 9.14 37.23 1.981 24hr Ditchl Post- 25yr 25 -0.450 782.25 -4.32 (N/A) (N/A) (Reverse) 24hr Ditchl (IN) Post- 50yr 50 3,376 729.00 30.42 (N/A) (N/A) 24hr Ditchl (OUT) Post- 50yr 50 2.991 716.50 6.54 37.25 2.173 24hr Ditchl Post-50yr 50 -0.326 755.00 -5.13 (N/A) (N/A) (Reverse) 24hr Ditchl (IN) Post- 100yr 100 4.242 729.00 35.28 (N/A) (N/A) 24hr Ditchl (OUT) Post- 100yr 100 2.192 703.75 5.90 37.25 2.173 24hr Ditchl Post- 100yr 100 -0.171 743.25 -4.85 (N/A) (N/A) (Reverse) 24hr Ditchl (IN) Post- lyr 24hr 1 1.679 739.50 11.97 (N/A) (N/A) Ditchl (OUn Post- lyr 24hr 1 1.448 751.75 9.97 36.18 0.231 Ditchl (IN) Post- 2yr 24hr 2 2.686 735.00 20.18 (N/A) (N/A) Ditchl (OUM Post- 2yr 24hr 2 2.389 748.50 16.94 36.56 0.300 Ditch2 (IN) Post- 10yr 10 6.792 742.25 37.84 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 10yr 10 6.486 733.50 23.00 37.11 1.342 24hr Ditch2 (IN) Post- 25yr 25 10.221 738.00 54.13 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 25yr 25 9.904 726.00 20.41 37.25 2.486 24hr Ditch2 (IN) Post- 50yr 50 12.904 738.00 67.33 (N/A) (N/A) 24hr Ditch2 (OUT) Post- 50yr 50 11.151 718.75 17.89 37.25 2.521 24hr Ditch2 (IN) Post- 100yr 100 15.302 738.00 80.94 (N/A) (N/A) 24hr Ditch2 (OUM Post- 100yr 100 10.731 706.00 16.41 37.25 2.521 24hr Ditch3 (IN) Post- lyr 24hr 1 1.476 751.25 10.11 (N/A) (N/A) Ditch3 (OUT) Post- lyr 24hr 1 1.455 751.75 10.12 36.18 0.022 Ditch3 (IN) Post- 2yr 24hr 2 2,431 748.50 17.14 (N/A) (N/A) Ditch3 (OUT) Post- 2yr 24hr 2 2.402 748.00 17.01 36.55 0.029 Ditch3 (IN) Post- 10yr 10 6.573 733.50 23.41 (N/A) (N/A) 24hr Ditch3 (OLM Post- 10yr 10 6.543 733.75 22.56 37.00 0.041 24hr Ditch3 (IN) Post- 25yr 25 10.027 726.00 21.66 (N/A) (N/A) 24hr Ditch3 (OUT) Post- 25yr 25 9.996 726.25 20.62 37.09 0.418 24hr Ditch3 (IN) Post- 50yr 50 11.308 718.75 19.71 (N/A) (N/A) 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060.ppc 5/30/2018 111 1=jMcADAMS Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Ditch3 (OUT) Post- 50yr 50 11.271 719.25 18.43 37.12 0.534 24hr Ditch3 (IN) Post- 100yr 100 10.926 706.00 17.04 (N/A) (N/A) 24hr Ditch3 (OUT) Past- 100yr 100 10.886 706.25 16.17 37.14 0.614 24hr Ditch4 (IN) Post- lyr 24hr 1 0.305 730.25 2.72 (N/A) (N/A) Ditch4 Post- lyr 24hr 1 -0.002 948.00 -0.21 (N/A) (N/A) (Reverse) Ditch4 (OUT) Post- lyr 24hr 1 0.176 738.50 2.14 36.17 0.132 Ditch4 Past- lyr 24hr 1 0.000 725.50 -0.03 (N/A) (N/A) (Reverse) Ditch4 (IN) Post- 2yr 24hr 2 1.795 747.00 4.92 (N/A) (N/A) Ditch4 Post- 2yr 24hr 2 0.000 768.75 -0.32 (N/A) (N/A) (Reverse) Ditch4 (OUT) Post- 2yr 24hr 2 1.629 748.75 3.28 36.54 0.167 Ditch4 Post- 2yr 24hr 2 0.000 768.75 -0.23 (N/A) (N/A) (Reverse) Ditch4 (IN) Post- 10yr 10 11.224 786.75 25.34 (N/A) (N/A) 24hr Ditch4 (OUT) Post- 10yr 10 11.058 793.75 24.76 36.88 0.205 24hr Ditch4 Post- 10yr 10 -0.003 721.50 -0.68 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Past- 25yr 25 18.669 754.25 55.80 (N/A) (N/A) 24hr Ditch4 Post- 25yr 25 -0.002 722.25 -0.57 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 25yr 25 18.504 804.25 29.19 37.00 0.219 24hr Ditch4 Post- 25yr 25 -0.010 722.50 -2.16 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Post- 50yr 50 23.416 755.00 38.96 (N/A) (N/A) 24hr Ditch4 Post- 50yr 50 -0.001 617.00 -0.08 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 50yr 50 23.236 912.75 28.76 37.00 0.217 24hr Ditch4 Post- 50yr 50 -0.004 723.00 -0.91 (N/A) (N/A) (Reverse) 24hr Ditch4 (IN) Post- 100yr 100 27.170 1,120.00 34.13 (N/A) (N/A) 24hr Ditch4 Post- 100yr 100 -0.001 554.00 -0.07 (N/A) (N/A) (Reverse) 24hr Ditch4 (OUT) Post- 100yr 100 26.983 910.75 29.02 37.02 0.311 24hr Ditch4 Post- 100yr 100 -0.003 557.75 -0.10 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- lyr 24hr 1 0.261 738.50 2.54 (N/A) (N/A) Hamilton -Hurst Parking Lot R. STUBBS, El UNW17060.ppc 5/30/2018 W1 MCADAM.S Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (min) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) Ditch #5 Post- lyr 24hr 1 0.000 0.50 0.00 (N/A) (N/A) (Reverse) Ditch #5 Post- lyr 24hr 1 0.000 0.00 0.00 36.16 0.261 (OUT) Ditch #5 Post- 2yr 24hr 2 1.751 748.75 3.87 (N/A) (N/A) (IN) Ditch #5 Post- 2yr 24hr 2 0.000 768.75 -0.03 (N/A) (N/A) (Reverse) Ditch #5 Post- 2yr 24hr 2 1.429 1,094.00 3.29 36.52 0.323 (OUT) Ditch #5 Post- 10yr 10 11.312 793.75 24.95 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 10yr 10 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 10yr 10 10.988 795.75 24.93 36.67 0.349 (OUT7 24hr Ditch #5 Post- 25yr 25 18.858 753.50 30.03 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 25yr 25 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 25yr 25 18.532 752.75 28.42 36.71 0.357 (OUT) 24hr Ditch #5 Post- 50yr 50 23.694 752.50 29.87 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 50yr 50 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 50yr 50 23.360 752.50 28.98 36.72 0.359 (OUT) 24hr Ditch #5 Post- 100yr 100 27.556 726.50 30.86 (N/A) (N/A) (IN) 24hr Ditch #5 Post- 100yr 100 0.000 0.50 0.00 (N/A) (N/A) (Reverse) 24hr Ditch #5 Post- 100yr 100 27.217 727.75 29.81 36.74 0.361 (OUT) 24hr Hamilton -Hurst Parking Lot R. STUBBS, El UN W17060.ppc 5/30/2018 STORMWATER CONTROL MEASURE DESIGN CALCULATIONS UNCW - HURST HAMILTON PARKING LOTS UNW-17060 UNCw HURST HAMILTON PARKING 10T STORMWATER CONTROL MEASURE UNW-17060 SSFxn Above NP R. STUBBS, El 5/30/2018 STAGE -STORAGE FUNCTION'- COMBINED -, ABOVE NORMAL POOL-1 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage i Contour Stage Area Area Volume Volume w/5-S FXn (feet) (feet) (SF) (SF) (CF). (CF) (feet) 33.30 0.00 60763 34.30 1.00 73139 66951 66951 66951 1.03 35.00 1.70 76696 74918 52442 119393 1.64 36.00 2.70 111075 93886 93886 213279 2.63 36.50 3.20 127233 119154 59577 272856 3.21 37.00 3.70 129342 128288 64144 337000 3.81 Storage vs. Stage 400000 350000 300000 Y = 64810X1 23 to R2 = 0.9969 U 250000 rn 200000 N ° 150000 .. N 100000 -- 50000 - - 0 0.00 1.00 2.00 3.00 4.00 Stage (feet) Ks = 64810 b = 1.2316 'STAGE -STORAGE FUNCTION - MAIN POOL & PROP,OSED FOREBAYS „ABOVE NORMAL POOL Average Incremental Accumulated Estimated Contour Contour .Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S FXn (feet) (feetl. (SFI fSFI fCFI (CF) (feet) 0.74 35.00 1.70 51158 49876 34913 79841 1.18 36.00 2.70 54854 53006 53006 132847 1.79 36.50 3.20 56813 55834 27917 160764 2.09 37.00 3.70 58922 57868 28934 189697 2.39 STAGE -STORAGE FUNCTION -EXISTING FOREBAY (Current Condition) r ABOVE NORMAL POOL ' Contour Stage - Contour Area Average Contour Area Incremental Contour Volume Accumulated Contour Volume Estimated Stage w/S-S Fxn RL)<cIripIf, 25042 17529 36.50 3.20 37.00 3.70 80432 1.19 UNCW HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UNW-17060 SSFxn Main Pool R. STUBBS, El 5/30/2018 STAGE -STORAGE FUNCTION MAIN'POOL Average Incremental Accumulated Estimated I Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S FKn Sediment Storage 28.00 1.50 23,633 22614 33921 33921 1.52 29.00 2.50 25,014 24324 24324 58245 2.48 30.00 3.50 26,414 25714 25714 83959 3.46 31.00 4.50 27.838 27126 27126 111085 4.46 200000 180000 160000 140000 U 120000 rn 100000 0 80000 N 60000 40000 20000 0 area and volume used for avg. depth calculation Storage vs. Stage y = 21394x1.1019 W = 0.9997 j 0.00 2.00 4.00 6,00 8.00 Stage (feet) Ks= 2.1394 b = 1.1019 UNCW HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UN W-17060 SSFxn Existing Foreboy - Current Condition R. STUBBS, El 5/30/2018 STAGE-STORAGE'FUNCTION-FOREBAY Average Incremental Accumulated Estimated i Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 29.00 -1.25 9,132 Sediment Storage 30.25 0.00 11,872 30.50 1.50 12,442 12157 3039 3039 1.38 32.00 3.00 16,021 14812 14812 24363 3.17 33.00 4.00 18,557 17289 17289 41652 3.92 33.30 4.30 19,500 19029 5709 47360 4.13 60000 50000 Storage vs. Stage y = 1343.5x2,5132 R2 = 0.9771 • u 40000 U a 30000 - n o H 2O000 10000 0- 1.00 2oO 3.00 4.00 5.00 0.00 Stage (feet) Ks = 1343.5 b = 2.5132 UNCW HURST HAMIJON PARKING LOT STORMWATER CONTROL MEASURE UNW-17060 SSFxn Proposed Foreboy #1 STAGE -STORAGEFUNCTION-FOREBAV Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn 1 (feet) (feet) (SF) (SF) (CF) (CF) (feet) 27.50 -0.50 1,758 Sediment Storage 28.00 0.00 2,210 29.00 1.50 3,160 2685 2685 2685 1.50 30.00 2.50 4,181 3671 3671 6356 2.51 31.00 3.50 5,264 4723 4723 11078 3.49 32.UU 4.5U b,401 5833 5833 16911 4.48 33.00 5.50 7,701 7051 7051 23962 5.51 33.30 5.80 8,081 7891 2367 26329 5.83 30000 25000 Storage vs. Stage y = 1353.5x'6aa2 R2 = 0.9999 20000 - u: U rn 15000 - N O 10000 5000 0 2.00 4.00 8.00 8.00 0.00 Stage (feet) Ks= 1353.5 h = 1.6842 R. STUBBS, El 5/30/2018 UNCW HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE R. STUBBS, El UNW-17060 SSFxn Proposed Foreboy #2 5/30/2018 STAGE-STOR- GE'FUNCTION-FOREBAY Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 29.00 -0.50 192 Sediment Storage 29.50 0.00 271 30.00 1.00 383 327 164 164 0.99 33.00 4.00 1,100 976 976 2387 3.97 33.30 4.30 1,180 1140 342 2729 4.26 3000 2500 Storage vs. Stage y = 168.22x'9239 R2 = 0,9992 u 2000 - U m 1500 n `o 1000 500 - 0 1.00 2.00 3.00 4.00 5.00 0.00 Stage (feet) Ks = 168.2 b = 1.9239 UNCW BURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE R. STUBBS, El UNW-17060 Volume Calculation 5/30/2018 TOTAL VOLUME OF FACILITY Volume of Main Pool below Normal Pool= 178,984 of Volume of Exiting Forebay below Normal Pool = 47,360 c' Volume of Proposed Forebay #1 below Normal Pool = 26,329 cf Volume of Proposed Forebay a2 below Normal Pool= 2,729 Total Volume of Forebays below Normal Pool= 76,418 Cf Total Volume Below Normal Pool = 255,402 cf Total Volume Above Normal Pool= 337,000 Cf Total Volume of Facility = 592,401 cf 'FOREBAY PERCENTAGE OF PERMANENT POOL VOLUME Per NCDEQ Minimum Design Criteria, the farebay volume should equal approximately 15-20%of the main pool volume. Total Main Pool Volume = 179,994 cf Total Provided Forebay Volume = 76,418 of Provided Existing Forebay Volume%= 26.5% Provided Proposed Forebays Volume S6= 16.2% Total Provided Forebay Volume%= 42.7% ADDITIONAL FOREBAY VOLUME CALCULATIONS 20% of Main Pool Volume= 35,797 Cf (Forebay volume required per the NCDEQ Minimum DesignCriteria) Total Drainage Area to the SCM = 1,218,903 sf Existing Forebay DA= 837,646 sf Existing Forebay DA/Total DA = 0.69 Forebay Volume Required for Proportion of DA= ® 24,600 cf Existing Forebay Provided Volume 47,360 Cf Proposed Forebay N1 DA = 272,877 sf Proposed Forebay #1 DA/Total DA = 0.22 Forebay Volume Required for Proportion of DA= 8,014 c' Proposed Forebay #1 Provided Volume = 25,329 cf Proposed Forebay M2 DA= 51,947 sf Proposed Forebay 92 DA/Total DA= 0.04 Forebay Volume Required for Proportion of DA= 1,526 cf Proposed Forebay#2 Provided Volume= 2,729 cf "AVERAGE DEPTX OF MAIN POOL Volume of Main Pool at Permanent Pool = 178,984 cf Surface Area of Main Pool at Permanent Pool = 31,275 sf Average Depth = 5.72 R UNcw HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UN W-17060 Surface Area Calculation R. STUBBS, El 5/30/2018 WET DETENTION BASIN SUMMARY Enter the drainage area characteristics =_> Total drainage area to pond = 27.98 acres Total impervious area to pond = 14.65 acres Note The basin must be sized to treat all impervious surface runoff draining into the pond, not/ust the impervious surface from on -site development. Drainage area = 27.98 acres @ 52.4% impervious Estimate the surface area required at pond normal pool elevation ==> Wet Detention Basins are based on an minimum average depth of = 5.72 feet (Calculated) 5.0 5.72 6.0 Lower Boundary=> 50.0 2.35 1.83 Site % impervious => 52.4 2.45 2.08 1.93 Upper Boundary=> 60.0 2.78 2.26 Therefore, SA/DA required = 2.09 Surface area required for main pool at normal pool = 25,295 fR' = 0.58 acres Surface area provided for main pool at normal pool = 31,275 ft2 Temporary Pool Elevation = 34.30 it Temporary Pool Surface Area = 73,139 it NCDEQStormwater BMP Manual Table 2: Coastal SA/DA Table (Adapted from Driscoll, 1986) 3 4 5 6 7 8 10 0.78 0.61 0.44 - 0 0 0 20 1.48 1.04 0.87 0.7 0.52 0.35 30 2.18 1.65 1.39 1.13 0.87 0.7 40 2.96 2.26 1.83 1.39 0.96 0,78 50 3.65 2.87 2.35 1.83 1.31 - 1.96 60 4.35 3.31 2.78 2.26 1.74 1.13 70 5.22 3.92 3.22 2.52 1.83 1.31 80 5.92 4.52 3.65 2.78 1.91 1.57 90 6.53 5.05 4.18 . 2.96 2.44 1.74 100 7.13 5.92 4.87 3.83 2.78 1.83 UNCW HURST HAM I LTON PARKING LOT STORMWATER CONTROL MEASURE UN W-17060 WQV Calculation R. STUBBS, El 5/30/2018 DETERMINATION OF WATER QUALITY VOLUME Proposed Development WQ v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 812458 sf Total Drain Area, A = 18.65 acres Impervious area = 202683 sf Impervious area = 4.65 acres Percent impervious cover, I = 24.9 % Rainfall, P= 1.50 inches Calculated values: Rv= 0.27 WQv= 0.64 acre-ft = 27880 cf. Previously Permitted 1988-2008 __ WQv = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(1) where 1 is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 352597 sf Total Drain Area, A = 8.09 acres Impervious area = 352597 sf Impervious area = 8.09 acres Percent impervious cover, I = 100.0 % Rainfall, P= 1.00 inches Calculated values: Rv= 0.95 WQv= 0.64 acre-ft 27914 cf. (SW8 060S30/ UNcw HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UNW-17060 WQV Calculation R. STUBBS, El 5/30/2018 Previously Permitted 2008-2017 WQ v = (p)(R v)(A)/12 where, W Qv = water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 5952 sf Total Drain Area, A = 0.14 acres Impervious area = 5952 sf Impervious area= 0.14 acres Percent impervious cover, I = 100.0 % Rainfall, P= 1.50 inches Calculated values: Rv= 0.95 WQV= 0.02 acre-ft = 707 cf. Existing Impervious Not Previously Permitted Pre 1988 WQ v = (P)(R v)(A)/12 where, WQV= water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 14760 sf Total Drain Area, A = 0.34 acres Impervious area= 14760 sf Impervious area= 0.34 acres Percent impervious cover, I = 100.0 % Rainfall, P= 1.50 inches Calculated values: Rv= 0.95 WQv= 0.04 acre-ft = 1753 cf, (SW8 0605301 (SW8 0505301 UNCW HURST HAMILTON PARKwe LOT STORMWATER CONTROL MEASURE U N W-17060 WQV Calculation R. STUBBS, El 5/30/2018 Other Permits 1988-2008 (1"Treated) WQ v = (P)(R v)(A)112 where, WQV = water quality volume (in acre-ft) RV= 0.05+0.009(1) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A= 13154 sf Total Drain Area, A = 0.30 acres Impervious area = 13154 sf Impervious area = 0.30 acres Percent impervious cover, I = 100.0 % Rainfall, P = 1.00 inches Calculated values: Rv= 0.95 WQV= 0.02 acre-ft = 1041 cf. Other Permits 1008-2017 (1.5" Treated) WQ v = (P)(R v)(A)112 where, WQV = water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 10428 sf Total Drain Area, A = 0.24 acres Impervious area = 10428 sf Impervious area= 0.24 acres Percent impervious cover, I = 100.0 % Rainfall, P = 1.50 inches Calculated values: Rv= 0.95 WQV= 0.03 acre-ft = 1238 cf. (S W8 0310391 [SW8100405] UNCW HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UNW-17060 WQV Calculation R. STUBBS, El 5/30/2018 Offsite (1.5" Treated) - includes ROW and Off-UNCW Property areas WO v = (P)(R v)(A)/12 where, WQv= water quality volume (in acre-ft) Rv= 0.05+0.009(1) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A= 9554 sf Total Drain Area, A = 0.22 acres Impervious area = 9554 sf Impervious area = 0.22 acres Percent impervious cover, I = 100.0 % Rainfall, P= 1.50 inches Calculated values: Rv= 0.95 WQv= 0.03 acre-ft = 1135 cf. Future Impervious Allowance WQ v = (P)(R v)(A)112 where, WQv = water quality volume (in acre-ft) Rv= 0.05+0.009(I) where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total Drain Area, A = 29000 sf Total Drain Area, A = 0.67 acres Impervious area = 29000 sf Impervious area = 0.67 acres Percent impervious cover, I = 100.0 % Rainfall, P = 1.50 inches Calculated values: Rv= 0.95 WQv= 0.08 acre-ft = 3444 Cf. ASSOCIATED DEPTH IN POND WQv= 65111 cf. Stage / Storage Data Ks = 64810 b = 1.232 Zo = 33.30 Total WQv= 65111 cf. Calculated values: Depth of WQv in Basin = 1.00 ft 12.05 inches Elevation = 34.30 It UNCW HURST HAMILTON PARKING LOT STORMWATER CONTROL MEASURE UNW-17060 WQV Drawdown Calculation R. STUBBS, El 5/30/2018 'DRAWDOWN.WQ ORIFICE DESIGN 0 orifice = 4 inch 4 orifices = 1 Cd siphon= 0.60 Normal Pool Elevation = 33.30 feet Volume @ Normal Pool = 0 cf Orifice Invert = 33.30 feet WSEL at Water Quality Volume = 34.30 feet Water Quality Volume (Required Volume) = 65111 cf WSEL at Temp Pool (Provided) = 34.30 feet Orifice Equation: 'from NC DEQ Stormwoter Design Manual Calculations Document' Q= CoA(2'r9"IHo/31)0.5 Average driving head on orifice (Ho/3) = 0.278 feet Orifice composite loss coefficient (Co) = 0,600 Cross -sectional area of siphon (A) = 0.087 sf Q= 0.2215 cfs Drawdown Time = Required Volume / Flowrate / 86400 (sec/day) Drawdown Time 3.40 days Ke From: Johnson, Kelly Sent: Monday, July 2, 2018 9:17 AM To: 'Stubbs, Rebecca' Cc: 'dperry@mcadamsco.com'; 'riggins@mcadamsco.com'; 'morganm@uncw.edu' Subject: FW: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Attachments: 2018 07 permit 060530_draft.docx; 2018 07 Excel_BUA 060530.xlsx; 2018 07 excel_WP 060530_To Engineer.xlsx Rebecca, I started working through this one on Friday because I had to ask Christine how all of the data in the table worked. (There was pre-1988 existing that had been taken out of the low density drainage area and a few other things that weren't immediately obvious when I was trying to figure out the big picture of what you all were proposing.) But, I rendered it down and I have drafted it up. There is one value that I can't find in the package. I have re -formatted the table that was called "Attachment A" in the previous version of the permit. (FYI, It is now called "Attachment B" because there was another table that was referenced in the permit text as "Attachment A".) This table is in the attached file with "Excel BUA" in its title. I understand that the intention of this modification is to increase the impervious area to the pond from 608,289sf to 638,128sf, and so it is just a matter of showing that the required volume is less than the provided volume. The provided volume is 66,951cf (per the supplement). I see from Christine's previous calculations that the required volume was 61,082cf for the 2/23/18 permit. I re -ran her calculation with your new impervious values and found the new required volume to be 64,439cf, which works because that is below 66,951cf. (See the file with "Excel_WP" in its title.) I put this value in the "Excel_BUA" file in Cell C34. Attachment B now documents what was permitted on 2/23/18, the increase in impervious for this modification, and the required & provided volumes for the pond for both permit versions. I have also drafted the permit to include all of this information (also attached). I need to have the required volume on file in stamped calculations showing that the provided volume is less than the required volume. Can you please send that to me? I had not intended to send this as a formal "Additional Information Request" letter. If that is necessary, please let me know. I also need to set a response date for the file. Please respond by 7/18/18. Thanks, Kelly From: Johnson, Kelly Sent: Friday, June 29, 2018 9:10 AM To: 'Stubbs, Rebecca' <rstubbs@mcadamsco.com> Subject: RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Thanks! From: Stubbs, Rebecca [mailto:rstubbs@mcadamsco.com] Sent: Friday, June 29, 2018 8:27 AM To: Johnson, Kelly <kellv.p.iohnson@ncdenr.gov> Cc: Perry, Daniel <dperrv@mcadamsco.com>; Riggins, Daryl <riggins@mcadamsco.com> Subject: [External] RE: SW8 060S30, UNCW - Hurst Hamilton Parking Lots - State Stormwater Good Morning Kelly, I am working with Daryl Riggins on the stormwater component of the UNCW Hurst Hamilton Project. He forwarded me your questions regarding the Stormwater Management Plan. I have provided responses below to those questions in blue. 1.) Will you please email me Attachment A? — please see attached PDF 2.) It does not look like you are redesigning the pond. a. Is this modification essentially to establish that you can fit more impervious area in the pond without changing its' design? There was a lot of documentation submitted, and so I want to make sure that it isn't something more complicated than that. — Correct. The layout of the bus stop and bike parking area was adjusted, increasing impervious surface area, therefore the pond calculations were included to demonstrate that no design changes were warranted for the pond. b. If it is just a math exercise and an increase in impervious in the permit text, then which sheets do I need from the package to effectively show the revised layout that you are changing? I can pull those out and approve them to go with the previously -approved set. Or, is it your intention to fully replace the previously -approved set? — To ensure that all updates are captured on the corresponding sheets in the plan set, our intent is to fully replace the previously - approved set. If there is any additional information or clarification I can provide you on this project, please don't hesitate to reach out to me. Thankyou! Rebecca Stubbs, El I Designer II, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 I direct 919. 287. 0740 1 rstubbs@mcadamsco.com www.mcadamsco.com I linkedin ) twitter I insta¢ram I join our team MCADAMS creating experiences through experience From: Perry, Daniel Sent: Thursday, June 28, 2018 8:41 AM To: Stubbs, Rebecca <rstubbs(almcadamsco.com> Subject: FW: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Daniel Perry, PE I Project Manager, Water Resources McAdams 2905 Meridian Parkway, Durham, INC 27713 office 919. 361. 5000 x134 I direct 919. 287. 0795 1 mobile 919. 614.6212 1 dperry@mcadamsco.com www.mcadamsco.com I linkedin ) twitter I instagram ) join our team °= MCADAM.S creating experiences through experience From: Riggins, Daryl Sent: Thursday, June 28, 2018 6:58 AM To: Perry, Daniel <dgerry(@mcadamsco.com> Subject: Fwd: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Daniel, would you please help Kelly with her questions? Thanks! Daryl Riggins, PE Project Manager, Institutional McAdams Mobile 919. 357. 0445 From: Johnson, Kelly Sent: Wednesday, June 27, 4:40 PM Subject: FW: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater To: Riggins, Daryl Mr. Riggins, I have two quick questions about this before I get this logged in: 1.) Will you please email me Attachment A? 2.) It does not look like you are redesigning the pond. a. Is this modification essentially to establish that you can fit more impervious area in the pond without changing its' design? There was a lot of documentation submitted, and so I want to make sure that it isn't something more complicated than that. b. If it is just a math exercise and an increase in impervious in the permit text, then which sheets do I need from the package to effectively show the revised layout that you are changing? I can pull those out and approve them to go with the previously -approved set. Or, is it your intention to fully replace the previously - approved set? Thanks, Kelly From: Johnson, Kelly Sent: Wednesday, June 27, 2018 4:35 PM To: 'morganm@uncw.edu' <morganm apuncw.edu> Cc: 'riggins@mcadamsco.com' <riggins(ct�mcadamsco.com> Subject: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505 fee (check number 104844) on 6/26/18. The project has been assigned to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly Kelly Johnson Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Johnsc From: Sent: To: Subject: Thanks! Johnson, Kelly Friday, June 29, 2018 9:10 AM 'Stubbs, Rebecca' RE: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater From: Stubbs, Rebecca [mailto:rstubbs@mcadamsco.com] — Sent: Friday, June 29, 2018 8:27 AM To: Johnson, Kelly <kelly.p.johnson@ncdenr.gov> Cc: Perry, Daniel <dperry@mcadamsco.com>; Riggins, Daryl <riggins@mcadamsco.com> Subject: [External] RE: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Good Morning Kelly, I am working with Daryl Riggins on the stormwater component of the UNCW Hurst Hamilton Project. He forwarded me your questions regarding the Stormwater Management Plan. I have provided responses below to those questions in blue. 1.) Will you please email me Attachment A? — please see attached PDF 2.) It does not look like you are redesigning the pond. a. Is this modification essentially to establish that you can fit more impervious area in the pond without changing its' design? There was a lot of documentation submitted, and so I want to make sure that it isn't something more complicated than that. — Correct. The layout of the bus stop and bike parking area was adjusted, increasing impervious surface area, therefore the pond calculations were included to demonstrate that no design changes were warranted for the pond. b. If it is just a math exercise and an increase in impervious in the permit text, then which sheets do I need from the package to effectively show the revised layout that you are changing? I can pull those out and approve them to go with the previously -approved set. Or, is it your intention to fully replace the previously -approved set? — To ensure that all updates are captured on the corresponding sheets in the plan set, our intent is to fully replace the previously - approved set. If there is any additional information or clarification I can provide you on this project, please don't hesitate to reach out to me. Thank you! Rebecca Stubbs, El [ Designer It, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x224 [ direct 919. 287. 0740 [ rstubbsC@mcadamsco.com www.mcadamsco.com [ linkedin [ twitter [ instaeram I loin our team MWADAMS creating experiences through experience From: Perry, Daniel Sent: Thursday, June 28, 2018 8:41 AM To: Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: FW: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Daniel Perry, PE I Project Manager, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x134 I direct 919. 287. 0795 1 mobile 919. 614.6212 1 doerry@mcadamsco.com www.mcadamsco.com I linkedin I twitter I instagram I loin our team TI MCADAMS creating experiences through experience From: Riggins, Daryl Sent: Thursday, June 28, 2018 6:58 AM To: Perry, Daniel <dperrv@mcadamsco.com> Subject: Fwd: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater Daniel, would you please help Kelly with her questions? Thanks! Daryl Riggins, PE Project Manager, Institutional McAdams Mobile 919. 357. 0445 From: Johnson, Kelly Sent: Wednesday, June 27, 4:40 PM Subject: FW: SW8 060530, UNCW - Hurst Hamilton Parking Lots - State Stormwater To: Riggins, Daryl Mr. Riggins, . I have two quick questions about this before I get this logged in: 1.) Will you please email me Attachment A? 2.) It does not look like you are redesigning the pond. a. Is this modification essentially to establish that you can fit more impervious area in the pond without changing its' design? There was a lot of documentation submitted, and so I want to make sure that it isn't something more complicated than that. b. If it is just a math exercise and an increase in impervious in the permit text, then which sheets do I need from the package to effectively show the revised layout that you are changing? I can pull those out and approve them to go with the previously -approved set. Or, is it your intention to fully replace the previously - approved set? Thanks, Kelly from:.Johnson, Kelly Sent: Wednesday, June 27, 2018 4:35 PM To: 'morganm@uncw.edu' <morganm(o)uncw.edu> Cc: 'riggins@mcadamsco.com' <riggins(aDmcadamsco.com> Subject: SW8 660530, UNCW - Hurst Hamilton Parking Lots - State Stormwater The Wilmington Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) accepted the Stormwater Permit Application and $505 fee (check number 104844) on 6/26/18. The project has been assigned to me and you will be notified if additional information is needed. Please be advised that the construction of built -upon area may not commence until the Stormwater Permit is issued. Thanks, Kelly Kelly Johnson Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone: 910.796.7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Project Name: Project I �Application Com// Coastal n2008 Coastal 1 Review Checklist / Date Delivered to WIRO: ' C' / a0/ BIMS Received/Accepted Date: Jc, . *BIMS Acknowledged Date: Coastal it Action: NepG/ Major_Mnd-/)Minor Mod / Renewal / Transfer LD / LD Overall / HD &LD Combo General Permit / Offsite / Exempt / Rescission SCM Type(s): Development Type: Commercial / Residential / Other Subdivided?: Subdivision or Sin For New or Transferred Per mlttee is: 7PropertyOwner(s) Developer ❑Lessee ®Purchaser❑HOA Paperwork Emailed Engineer on: se II uUniversal u1988 Coastal "New New Permit #: cisting Permit #: FiPE Cert on File? Offsite to SW8: 1:15jjpplement(s) (1 original per BMP) F� ��&M with correct/original signatures (1 original per BMP except LS/VFS and swoles) MApplication with correct/original signatures ®Corp or LLC: Sig. Auth, per SoS or Signature Authorization letter or report ®3505 (within 6mo) Check#(s): /O z/ 014t­( ONo Fee oils Report: w/SHWT or e�neral--& rt Difalculations(signed/seoled)�6jcs.%�R--�-'J ®Deed Restrictions, if subdivided: "Signed & Notarized Template Recorded Covenants Recorded Plats M50% or more Lots Sold List 2ct Narrative JUSGS Map Plans ❑Master PE Cart on File? Stream Class: EISA Map ❑ORW Map DEmail Address: Design Engineer ail Address: Property Owner Deed Email Address: Lessee Lease Agreement ❑Email Address: Purchaser Purchase Agreement Email Address: Developer ❑Email Address: HOA Representative 01�Sets Wetlands: Delineated or No Wetlands ffJVicinity Map Project Boundaries Legend L�! t (proposed BUA dimensions) F7JDA Maps „1 4�,,JJL� ETetails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Egrxisting Conditions Landscape Plan GradingSeal REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet **FOR NEW Projects -Enter New Permit # on Supplements & Deed Restiction Templates. G:WQ\\\Reference Library\Procedures\Checklists\Completeness Review Checklist_201803 13 MCADAMS Date: June 14, 2018 To: Ms. Christine Hall Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 I am sending you the following items: ❑ Drawings ❑ Letter ❑ Specifications ® Submittal ❑ Plans ❑ Prints LETTER OF TRANSMITTAL FEDERAL EXPRESS Re: University of North Carolina - Wilmington Hamilton Hurst Parking Lot Stormwater Management Plan Job#: UNW-17060 ❑ Statement of Qualifications ❑ Other QUANTITY UNIT DESCRIPTION 1 Copy Stormwater Impact Analysis 2 Copy + Original SCM 0&M 2 Copy + Original SCM Supplement Form 2 Copy+ Original Sotmrwater Permit Application 2 Copies Construction Drawings NA 1 CD Digital Copy 'I 1 Check $505.00 Review Fee r.•_Ati�' d1�r Transmitted as checked below: ® For approval ❑ For your use ❑ As requested Remarks: Copy to: ❑ For review+comment ❑ Other n nthar )e(i\� h L,)(YCz) :CEO JUN 15 2U18 Signature: Daniel2ecr��E�rd _ Project Manager, Water Resources creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 / 919. 361. 5000 Nothing Comparrs Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Perry, Daniel [mailto:dperry@mcadamsco.com] Sent: Wednesday, May 09, 2018 4:09 PM To: Hall, Christine <Christine.Hall@ncdenr.gov> Cc: Riggins, Daryl <riggins@mcadamsco.com>; Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: [External] Hurst Hamilton Parking Lot (SW8 060530) Christine, Good Afternoon. A change to the layout was made per the request of UNCW, following SW permit issuance, which adds 1,400 sf of impervious to the permit. All of the additional impervious drains to the approved SCM but does not change the CN for the subbasin or the WQv elevation of the SCM. Since this is an additional amount of impervious with no SCM changes, what is the most efficient process to make this change to the permit? It looks like this would only change the stormwater permit application (Attachment A), the supplement form, post -development hydrology calculation, the WQv calculations, and the BUA map. I appreciate your help with this. Thank you, Daniel Perry, PE I Project Manager, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x134 I direct 919. 287. 0795 ] mobile 919. 614.6212 1 dperry@mcadamsco.com www.mcadamsco.com I linkedin I twitter I instagram I join our team 'J MCADAMs creating experiences through experience Hall, Christine From: Perry, Daniel <dperry@mcadamsco.com> Sent: Wednesday, May 09, 2018 4:36 PM To: Hall, Christine Cc: Riggins, Daryl; Stubbs, Rebecca Subject: RE: [External] Hurst Hamilton Parking Lot (SW8 060530) The drainage area to the SCM would not be altered. Thank you for the information about permitting fees and the recommendation about future impervious allocation. Daniel Perry, PE I Project Manager, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x134 I direct 919. 287. 0795 1 mobile 919. 614.6212 1 dperrvPmcadamsco.com www.mcadamsco.com I linkedin I twitter I instaeram I join our team �JI MCADAMS creating experiences through experience From: Hall, Christine <Christine.Hall@ncdenr.gov> Sent: Wednesday, May 9, 2018 4:29 PM To: Perry, Daniel <dperry@mcadamsco.com> Cc: Riggins, Daryl <riggins@mcadamsco.com>; Stubbs, Rebecca <rstubbs@mcadamsco.com> Subject: RE: [External] Hurst Hamilton Parking Lot (SW8 060530) Your e-mail doesn't indicate if the drainage area to the pond is changing. Either way, in looking at the permit, unfortunately there was no allocation of future BUA made within the drainage area of the pond. The addition of BUA beyond the approved amount is considered a major modification (15A NCAC 02H.1002(25) and (23)) and will require a modification package to be submitted with any updated sheets/documents. Major modifications can be submitted to the regular program for $505 or to the express program for $4,000. I'd recommend trying to "max out the system" by including a future BUA allocation such that future improvements within the pond drainage area could be considered a minor modification. Christine Hall Environmental Engineer Division of Energy, Mineral and Land Resources — State Stormwater Program Department of Environmental Quality 910 796 7215 office 910 796 7335 direct christine. hall(o)ncdenr.gov 127 Cardinal Drive Ext. Wilmington, NC 28405