Loading...
HomeMy WebLinkAboutSW8051217_CURRENT PERMIT_20140321STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 OS121-1 DOC TYPE N CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2Q Vy 03 2 YYYYMMDD r NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Stormwater Section Tracy E. Davis, PE, CPM Pat McCrory, Governor Director John E. Skvarta, III, Secretary March 21.2014 Tim Markley, Supedritendant New Hanover County Schools 6410 Carolina Beach Road Wilmington, NC 28412 Subject: State Stormwater Management Permit No. SW8 051217 Ogden Elementary School High Density Commercial Wet Detention Pond Project New Hanover County Dear Mr. Markley: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Ogden Elementary School on March 20, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2008-211. We are forwarding Permit No. SW8 051217 dated March 21, 2014, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until February 13, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, at (910) 796-7215. Si4ely, or Tracy Dav , P. E., Director Division of Energy, Mineral and Land Resources GDS/ csb: G:1WQS1Stonnwater\Pennits & Projects120051051217 HD12014 03 permit 051217 cc: Jeffery Moore, P. E., New Hanover County Building Inspections New Hanover County Engineering Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 051217 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Hanover County Schools Ogden Elementary 3637 Middle Sound Loop Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of three (3) infiltration basins in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until February 13, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 174,084 square feet of impervious area. 3. This basin must be operated with a 30' vegetated filter, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 051217 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 8. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: Onsite, ft`: Offsite, ft`: b. Total Impervious Surfaces, ft': Onsite, ft': Offsite, ft`: c. Design Storm, inches: d. Basin Depth, feet: e. Bottom Elevation, FMSL: f. Bottom Surface Area, ft2: g. Bypass Weir Elevation, FMSL: h. Permitted Storage Volume, ft': i. Predevelopment 1 yr 24 hr peak flow, cfs: j. Post -development 1 yr 24 hr peak flow, cfs: k. Type of Soil: I. Expected Infiltration Rate, in/hr: m. Seasonal High Water Table, FMSL: n. Time to Draw Down, hours: o. Receiving Stream/River Basin: p. Classification of Water Body: cl. Stream Index Number: DA -131 DA-62 DA-C 2.24 3.17 1.59 97,574 138,085 69,360 N/A N/A N/A 62,320 54,869 51,030 62,320 54,869 51,030 N/A N/A N/A 1.5 1.5 1.5 20. 2.0 2.0 28.0 29.0 29.4 3,395 4,830 3,590 30.0 30.5 30.5 7,675 8,265 6,765 N/A N/A N/A N/A N/A N/A Seagate 12.0 12.0 12.0 26.0 27.0 27.4 <3 <10 <7 Howe Creek / Cape Fear SA;ORW 18-87-23 Drainage area D consists of 9,355 square feet of drainage area and 5,865 square feet of impervious surfaces. The imperious surfaces in this area is for the multi use lane and will be treated via sheet flow and treatment Swale filtration as shown on the approved plans. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 4. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 5. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 051217 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 051217 III. GENERAL CONDITIONS 1. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the project or of the permittee or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change form to the Division of Energy, Mineral and Land Resources, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall constitute an approved transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral and Land Resources, in accordance with North Carolina General Statute 143-215.6A to 143- 215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 21 st day of March, 2014. NO H CAROLINA ENWRQN NTAL MANAGEMENT COMMISSION {or 11racy QAvis, P. E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 051217 gden Elementary School Stormwater Permit No. SW8 051217 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 051217 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DEMLR Regional Office New Hanover County Building Inspections Page 7 of 7 ';, t R� r� ,,.. , , • " ;. , .. .: .DEMLUSE'.ONLY .:.;t , ; ,c; Date Received Fee Paid Permit Number _ 7 O G1-7 -37 Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph lI - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This fonn nuay be photocopier) for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ogden Elementary School 2. Location of Project (street address): 3637 Middle Sound Loop Road City:Wilmington County:New Hanover Zip:28412 3. Directions to project (from nearest major intersection): From the intersection of US Hwy 74 and US Hwy 17 head northeast on US hwy 17 (Market St) 3.1 miles and turn right on Middle Sound Loop Road 0.6 miles to Ogden Elementary School 4. Latitude:34° 16' 00" N Longitude:77° 49' 15" W of the main entrance to the project. it. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenn,als:oith modifications also requires SWU-102 - Renaval Application Fornr b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 051217 , its issue date (if known)08/22/08 and the status of construction: []Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 2 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5., Is the project located within 5 miles of a public airport? If yes, see S.L. 2012-200, Part Vl: htto://oortal.ncdenr.g1g& :C'E,IVE FES 10 20% Form SWU-101 Version Oct. 31, 2013 Page I of 6 IIL CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:New Hanover County Schools Signing Official & Title:Dr. Tim Markley S i tr ✓ i h { a ti't b.Contact information for person listed in item I above: Street Address:6410 Carolina Beach Road City:Wilmington State:NC Zip:28412 Mailing Address (if applicable):Same as Above City: State: Zip: Phone: (919 ) 254-4282 Fax: ( ) Email: }'tm,markkeg tvn(cs.nek c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: Karyn Crichton/New Hanover County Planning & Inspections Signing Official & Title:Tim Burgess, Assistant County Manager b.Contact information for person listed in item 3a above: Mailing Address:230 Government Center Drive, Suite 110 City:Wilmington State:NC Zip:28403 Phone: (910 ) 798-7085 Fax: (910 ) 798-7053 Email:kcrichton@nhcgov.com 4. Local jurisdiction for building permits: Point of ContactN/A BY: Form SWU-101 Version 06Aug2012 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the Middle Sound Greenway project within the Ogden Elementary School property will drain offsite and be treated through the use of grass filter strips and vegetated conveyance swales. The remainder of the site will be treated through infiltration basins (see original design calculations from CLH 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:10.47 acres 5. Total Coastal Wetlands Area: 0.35 acres 6. Total Surface Water Area: 0 acres 7. Total Properly Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:10.12 acres Total project area shall be calculated to exclude the following: the normal paol of imyyou��nded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (NHw) line or Mean High Water (MI-i[M line, and coastal wetlands landward f�rrom the NHW (or MHI� line. The resultant project area is used to calculate overall percent built upon area (BR). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 39.1 % 9. How many drainage areas does the project have73 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. # # InYfT ivk.e{ yy'Vq Si=. Receiving Stream Name @ i�edi iia Howe Creek �ili4W^n •m C£.0 ku�iitia @ilie511? Howe Creek Howe Creek Howe Creek Stream Class " SA; ORW SA; ORW SA; ORW SA; ORW Stream Index Number • 18-87-23 18-87-23 18-87-23 18-87-23 Total Drainage Area (so 97,574 (2.24 ac) 138,085 (3.17 ac) 69,360 (1,59 ac) 9,355 (0.21 ac) On -site Drainage Area (sf) 97,574 138,085 69,360 9,355 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area" (so 62,320 54,869 51,030 5,865 % Impervious Area" (total 63.8 39.8 73.6 62.7 ' M.N lij3taifla �Wre i ' pip" '. :A A,`1..,7' u On -site Buildings/Lots (sf) 29,955 14,220 13,820 0 On -site Streets (so 0 0 0 635 On -site Parking (so 26,010 25,540 28,525 0 On -site Sidewalks (so 6,355 8,979 5,605 2,050 Other on -site (so 0 6,130 3,080 2,370 Future (so 0 0 0 0 Off -site (so 0 0 0 0 Existing BUA*"* (so 0 0 0 810 Total (so: 62,320 54,869 51,030 5,865 " Stream Class and Index Number can be determined at: htty://yortal.ncdenr.orghveb/wgIp,�Icstdclassificatlons Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. ## Drainage Area "D" represents the Middle Sound Greenway Project within the permanent greenway easement Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 ** Report only that anotntt of existing BUA that toil/ remain after development. Do not report may existing BUA that is to be reproved and tohich Will be replaced by new BLIA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed than may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bap-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhttp://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. Thecomplete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/so/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wg/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. <5wlk 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (scaled, signed and dated) and O&M F(�A agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to J'WM http://www.envlielp.org/pages/onestopexpress.litml for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor ; WM the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the (�W M receiving stream drains to class SA waters within'h mile of the site boundary, include the'/z mile radius on the map. 7. Sealed, signed and dated calculations (one copy). yym 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: SbJIV a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. �= �\ 9 I' a • Delineate the vegetated buffer landward from the normal pool elevation oft d i1Q structures, the banks of streams or rivers, and the MFIW (or NHW) of tidal'wat�r 8 1 O #)A 4 i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all 13UA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations -By; 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form S WU-101 Version 06Aug2012 Page 4 of 6 91 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Copy of any applicable soils report with the associated SHWT elevations (Please identify _ rf)%r elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifj the SHWT prior to submittal, (910) 796-7378.) A copy of the most current property deed. Deed book: 600 Page No: 582 tJ JA For corporations and limited liability corporations (LLC): Provide documentation from the NC Pj Ja Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.iic.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. Vlll. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:leff Moore Consulting Firm: Kimley-Horn and Associates, Inc Mailing Address:3001 Weston Parkway City:Cary State:NC Zip:27513 Phone: (919 1 677-2000 Email:ieff.nmoore nOkimley-horn.com Fax: (919 ) 677-2050 IX. PROPERTY OWNER AUTHORIZATION (if Con tact Information, item 2 tins been filled out, complete this section) I, (print or type mane of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item In) with (print or type narue of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 06Aug2012 RECEI U FEB 10 2014 Page 5 of 6 b�: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signatu before me this a Notary Public for the State of do hereby certify that day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) Dr. Tim Markleu certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: /1 e / Date: !'/tr I7 v I, Der-Ni5G Ar'leV i ME a Notary Public for the State of No!4E CarDlino , County of �Lls7 �it}L1Wer , do hereby certify that "I im{ V (l lrk�It _ personally appeared before me this Ce_ day of �%Anyy a Viy , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, —1 n rA 2 LZP t/ T�1 �1 E O� N0Tq� F CONMI M1r y _t 'S'111 P�RfS A c G GQLIG c SEAL My commission expires i { 1 5/ao, y FEB�jj,ECEIVE 10 20% Form SWU-101 Version 06Aug2012 page 6 of 6 Permit No. SW oslZP- (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM. INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stonnwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : n C--t>ta1�1 lz—_�L— ContactPerson: Phone Number: (.c 100 319- U-1 l This worksheet applies to: Basin No. T� a- in Drainage Area (= identified on plans) (from Form SWU-101) H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fusl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation 1 2 . o in/hr or cf/hr/sf (circle appropriate units) Z (0 . U fmsl (Seasonal High Water Table elevation) . 5 inch (1.5 inch event for SA waters, I inch event for others) f ' G2�GS T (o IS c.f. O .0 q days ft. x . t45 ft. —110-15 c.f. 29.O fms] 30 . o fmsl 32.0 frnsl 33g5 sq. R. (bottom dimensions) Form SWU-103 Rev 3.99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials CZS a. System is located 50 feet from class SA waters and 30 feet from other surface waters. izS b. System is located at least 100 feet from water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. �ZS d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. S e. System is not sited on or in fill material or DWQ approval has been obtained. {ZS f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. jzS g. Drainage area for the device is less than 5 acres. S h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. }�S i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. F-ZD j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. (z S k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H: V). r=S 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). �z S o. Flow distribution mechanism within the basin is provided. _�� p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. �5 q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). S r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 vvnnu d. IVVCKJVIV UVVU- Infiltration Basin Suplement,pdf - """"' T—"-"—T-' m' ��.. Page 1 IV. 1NP11: rRATION 13ASIN OPERATION .AND MAINTENANCEACREE:w ENT I. After every runull'producing naintSlI event and at Icatt monthly inspect the inf il[rutinn system forerosion. trash accumulation, ccuulation, vegetative cover. and general condition. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover le maintain a maximum height of six inches, and remove trash as needed. J. After every runoll'producing rainfall event and at least nionth1v inspect the bypass. inflow and ever`.lcov stmcuves for blockage and detetio:vion. Remove any blockage and repair the snmncmre to approved decier. specifications. 4. Remove accumulated sediment From the pretreatment system and infiltration basin annually or when depth in the pretreaunent unit is reduced to 75"4, of the original design depth. 'rhe system shall he restored to the original design depth without over -excavating. Over-e.xenvating ntav cause [lie required water table separation to.be reduced and nay ennhpromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatnic it unit. The benchmark will document the original design depth so Ihat accurate sedinent accumulation readings call be taken. 'rhe nieasuing device used to (Iatennine the depth at the henchmenk shall be such that irwill give an accurate depth. reading and not readily penetrate into accumulated sediments. When the design depth reads C).S feet in the pretreatment unit. the sediment shall he removed prom both the pretreatment unit ant the infiltration basic. 5. If the Division determines that the system is foiling, the system will iI'll lied intely'be repaired to original design speci pcationsIf. the system cannot. he rni epaired to perfo its design function. other s-toriw;ucr co11tritl devices as allowed by NCAC 211 . t000 must be designed, approved and constructed. I acknowledge and agree by mv>ignature below that I arm responsible for the-perforiance of the five maintenance procedures listed above. I agreeto notify DWQ ofany problems with line system or prior to any changes ro the system or responsible party. Print Nmncaml Title: Eddie Anderson, Director, NHCS Facilities 6410 Carolina Beach Road Wilmin , NC December 15, 2 Note: Tl"' hgnllr re.rp.....We pnrtr rhnuILnot 1":: lrnerw..... t aasneindoruwL.. name lluve SnyS of I"! [an' hure bcrn enld wrd a I,�� rcvidle•m ni thep,vuhd�lrision hay' peen round rite prexidrau. 1.- 1LtiJ h•�'�-Vq fiGpvr,S .:t Nmary Public lur ehe Stan: of jJpe i Cyrn�enC-Cocnty of 04e,)yo r . do Lcn:bycmry,h:n &610, Y�Qrjp!\ _ penonnlly nppcarcd before me this 15 day ur Q.rvmic" _ , 5.,tad ucknmdedg: ate doe :,,anion of die forgoing infiltration basin maimenarac icquiraucm<, Winn,ss my h:md rind official sad. SEAL bly:ninmissirnt c,pires 5-c2ad009 170imSWO-10t Itev199 pagc..1of J PemritNo. SGu�05�2(i (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: O(ThC^ l �t Contact Person: i -2t�t-K 4s'fz-rr Phone Number: (1�119^ ) -61q U 11(0 This worksheet applies to: Basin No. in Drainage Area t— (�ified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate Z- • q in/hr or ef/hr/sf (circle appropriate units) SHWT Elevation 27 . O ftnsl (Seasonal High Water Table elevation) Basin Design Parameters Design Storm I inch (1.5 inch event for SA waters, I inch event for others) Design Volume —191n�1 c.f. S 1%G' S Drawdown Time O y days C"2 L Basin Dimensions 483o Basin Size + —7 S ft. x : - I n ft. sq. ft. (bottom dimensions) Basin Volume Provided S 2Lo -5 c.f. Basin Elevations Bottom Elevation finsl Storage Elevation 30 •S fmsl Top Elevation 3Z - C> fiml Form SWU-103 Rev 3.99 Page 1 of 3 111. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials �S a. System is located 50 feet from class SA waters and 30 feet from other surface waters. z5i:' b. System is located at least 100 feet from water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. j� d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. R-S e. System is not sited on or in fill material or DWQ approval has been obtained. f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. S g. Drainage area for the device is less than 5 acres. �S h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. 5 j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. S k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H: V). 5 I. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). K!. ) o. Flow distribution mechanism within the basin is provided. �2S p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. 92D q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). —4:�:2— r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 {�✓vvnnu o rtry UCKJUIV uvvU- Int tration Basin Su emenL df "' ___L_ "� 9---11 Pa e__� IV. INFH-rRAT'IO:N BASIN OPERATION AND MAINTENANCE AGRIi E:NIENT I. After every runui! producing rninlall event and at (cast ninnthly inspect the infiltration system fin' erosion. trash aCetnnlllatlot. veltetarive cover. and general condition. _. Repair eroded areas innuediatcly, re -seed as 1A000`SSary to maintain adequate vegetative cover, mow vegetated cover to maintain a maxinum height ofsix inches, and remove tonsil as needed. 3. Alter every runolTproducin2 rainfall event and at least monthly inspect the bypass. inflow and overflow suircntres for blockage and deterioration, Renmce any blockage and repair the structure to approved design specifications. -i. Remove accumulated sediment from the pretreatment system and infiltration It annualiv or when depth in the pietreaunent unit is reduced to 75%otthe original design depth. 'nce system shall be restored to tileoriginal design depth without over -excavating. Over-escnvaline nav cause the required water table separation to be reduced ;And inav connpro Ell ise the ability of the system to perform as designed. Removed Sediment shall be disposed of in an appropriate mtutner and shall not be handled in a manner that will adversely impact wirer quality (i.e. Stockpiling near a snnmvater treanncnt device or sue:un. ete.l. A benchmark shall be established in the pretreahnent unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. the nncasuring device used to dutcimine the depth at the benchm:uk shall be Such that it will give an accurate depth. reading and not readily penetrate into accumulated sediments. When the design depth reads Q.B feet in the pretreatment unit• the sediment shall he removed from both the pfetrcntmcnt unit and tine infiltration basin. 5. Irrhe Division dclennines that the system is failing• the .system will inunediatelybe repairer) to original design specifications, If the system cannot be repaired to performits design hnnctiou. otherstomnvater control devices as allowed by NCAC 111 .1000 must be designed, approved and constructed. I acknowledge mud agree by my signature below that I ant responsible for the performance of the five maintenance procedures listed above. I agreeto notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Prin(MincandTide: Eddie Anderson, Director, NHCS Facilities Address: 6410 Carolina Beach Road Wilmington, NC 28412 Phone: 254-Q82 I Data December 15, 200 Nrdc: The legally,-,,..orra il,ijarn' .I ji nil he o homco+tnrr's.rssnludi... nnlcu more than 50,N, n%lho.lora hm'e bca'rr sold and e rcai(A.,enr n),ttile I"N1!risimr Ir.0 kern named Jra presiJrm. \.tray Publi- I'or the Soc nf_ 0c___, l'oznry of NXWT�oVe( .da hereby certify that �W rQ._rl�Q.(,5C)rl Pcrsonallyuppcored beimrc tom rhis� d:w nr VQ )Mber . -'r , u..d acknowledge the dac c,ecution of the forgoin_e intilrration basin maintenance rcquircmctui. oVitncss my hand and official sail. $T:AI- hry mnvniaion cspircs r / Form SNO-tut It11399 Page?of 3 Permit No. SN'dO S ( I (to be provided by aw-0 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: (D('TfpI—cal \r Contact Person: k tJt rrrr Phone Number: (mot lei) 3IR - 6-1 1 L o This worksheet applies to: Basin No. G in.Drainage Area G (as Identified on plans) (from Form SWU-10/) H. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation S�ltG-F�T-F 3. O in/hr or cf/hr/sf (circle appropriate units) 2--1 - y finSI (Seasonal High Water Table elevation) • 'E�) inch (I.5 inch event for SA waters, I inch event for others) to < U (-A c.f. in . 2-7 days �V 3 GZic� 3590 P� ± q ft. x t c�) D ft. = 44M� sq. ft. (bottom dimensions) t40-1 t.OS c.f. Z01 - Lf fins] 31 . U fknsl 3Z S - finsl Form SWU-103 Rev 3.99 Page 1 of 3 Ili. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stonnwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials r-5 a. System is located 50 feet from class SA waters and 30 feet from other surface waters. jz_s b. System is located at least 100 feet from water supply wells. �S c. Bottom of system is at least 2 feet above the seasonal high water table. LS d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. S e. System is not sited on or in fill material or DWQ approval has been obtained. f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. S g. Drainage area for the device is less than 5 acres. �S h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. 1ZS i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. IDS j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). kS 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. S in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is provided. �LS p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. S q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). �S r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 J . vUrNZ)U v UVVU- Inn ltration Basin Supp ement,pdf Pa e 1. IV. I;NEIi_ rRATIO:N I3ASIN OPERATION AND \IAIN-ri`.NANCE ACRE•'ENIENI' I. After every runo l f producing rainfall event and at feast monthly inspect the in li l tration system for erosion. m trash necuulati0n. vegetative cover, and general condition. _. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover m maintain a mtxinuon height of six inches, and remove nmsh as needed. 3. Afler every runon-producing rainthll went and at least monthly inspect the bypass, inflow and overflow suticlurzs for blockage and dcletiormion. Iienun'e any hloc§age and repair the stmcture to approved design speci fica[ ions. d. Remove accumtdated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% or -the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating only cause the required water table separation to be reduced and may compromise the aoili[y orthz system to perform as designed. Removed sediment shall be disposed otin an appropriate manner and shall not be handled in a nrmnerthat will adversely impact water quality (i.e. stockpiling near a starncvater treatment device or stream. etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that acct[mte sediment accumulation readings con be taken. The measuring device used to Lie termine the depth at the benchmark sha it bz such Ihgi 1t wi 11 give an accurate depth reading and not readily penetrate into accumulated sedinnents. When the design depth reads C7. S feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division deternnincs that the system is failing. the systent will immllediatelybe repaired to original design specifications. If the systcm cannot he repaired to pe:form its clesign function. other s[umnvatcr control devices as' allowed by NCAC 2l I .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the"perfunnmce of the five maintenance procedures listed above. I agree to notify D%V'Q of any problems with the system or prior to any Changes to the system or responsible party. Print Nameanl Title: Eddie Anderson, Director, NHCS Facilities Address: 6410 Carolina Beach Road Wilmington, NC 28412 December 15, 200 (Vole.' Thrck,C`11 erpmrvihlepnrgr arn.iulinn onlery man•J¢... ' (th,dot, hnry heeu snfd und:r ,� resiidtvnr nlThe suhdh kimr ha, hem unntrrd ds, previJrnr. 1. - lob t't v4 AclrQMb Nora, Ptibli � Wr the Srnc of 1 ^-�- .C'oumy of W NQrtOJPl . do li,:rcby cetify that &t\Q.- ,tF i-1CrQ�;j01 �i_—_ personally nppeured before ore Ou, d ty of rv.b Q( and ucknnrcicdge life ills, exceutinn of the forgoing infiltration basin mo intenu rice rc(p,Vr n'nte. witness ury hand and offici:d soak SI:Al_ Nfy commission cspie,s 5-s2J-�l./g form SINU-M.1 Re,399 Pace 3,f3 Ogden Elementary School Stormwater Permit No. SW8 051217 New Hanover County Designer's Certification ��ate Stormwater Management S, stems Permit No. SW8 051217 �I A__ i 4i as a duly registered 11700%1puAl. 6A)Cin the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, for 4W kti C,"D4 aol- S _(Project Owner) hereby state that, to the best of my abilities, due care an diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SN CAF? ' Signature M ° SEAL 23953 Registration Number Z3�(S7j 2.FNQIN�P,.;�C�," Date _ '''y�H A. Aug 3 � Zan Page 6 of 7