Loading...
HomeMy WebLinkAboutSW8040346_APPROVED PLANS_20061120STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0403'410 DOC TYPE ❑ CURRENT PERMIT &I APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 'Loo�g \\2o YYYYMMDD - WASTEWATER TREATMENT PLANT IMPROVEMENTS TOWN OF SWANSBORO ONSLOW COUNTY, NORTH CAROLINA OCTOBER 2003 PROJECT FINANCING HK3H UNIT GRANT COST PROJECT No. E-SRC-T-00-0105 NORTH CAROLINA RURAL ECONOMIC DEVELOPMENT CE NORTH CAROLINA. CLEAN WATER MANAGEMENT TRUST PHASE 2 - WASTEWATER RECEIVED MAR 3 0 2004 BY:�_ FACILITY UPGRADE CONTRACT 1 -GENERAL CONSTRUCTION ----------= CONTRACT 2 - SPRAY IRRIGATION FACILITY CONTRACT 3 - RECLAIMED WATER MAIN EXTENSION CONTRACT 4 - ELECTRICAL MAYOR: Paul Edgerton MANAGER: Edward L. Faison PUBLIC UTILITIES SUPERINTENDENT: Don Redfearn COMMISSIONERS: James G. Allen Elbert Benton David L. Russell Phil Keagy GREEN ENGINEERING WATER WASTEWATER MRVEYNQ PLANW4Q PROJECT MANAOEMENi 3W (l OOLD®OFOO HT. P.O. BOX GM MOCK Mr— 271M ..TB (2521 W7-6M PAX (2s2J Y43--74e OFFM 6QFW8841c0m 'Kkk`r8b MAR 2 9 2004 ;reen Engineering, P.LLC. 'K,14 ma" u"GSWCOMNSSION C, e, r a. r w LOCATION MAP sow r - mw —asnW cwnT Guam ,. "� 1 � i r 0 i i s ♦ � __� -� � N: LOCATION MAP ND ec aovDY(�p w� eaRerl':Rwos°�'14Nµ ,�� ' (14NTAN IOL J R. com) Q W ' WATER INc Patio �� // / ���:�•� 1•;�g C w ��is Imiu�cn � wE W W W tea. m w m a. 12"0 RE�UED WATER TOWN OF u SS/0,,1" by a MAIN i /y9 ' SWANSBORO wWTP 2RO M . 3 r LDJ TOPE ki DfECa0f111 EAL4ear EFADI L" 495 DuN . R. wm> GREEN ENGINEERING INEF;.. WATM WASIEWATM SURVEYM PLAW0A POJ RECTMANACBABff SPRAY IRRIGATION N GREEN„•�' �+ K oo(.»eeoao sr. P.PO.eox SW wisoTa Iaa � TOWN OF SWANSBORO FACILITY RRRRT % TE - (242) =7-& 8S FAX (2= 243-740 OFFICE 0CFE$B4000M IONSLOW COUNTY NORTH CAROLNA NOTE. ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE SPECIFICATIONS OF THE LOCAL GOVERNING BODY. UTILITIES SHOWN ON PLANS ARE LOCATED APPROXIMATELY. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UTILITIES AND SERVICES WHETHER SHOWN ON PLANS OR NOT. CONTRACTOR TO BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF THESE FACIUDES IF DAMAGED. , EROSION CONTROL NOTES SEEDING AND MULCHING TO BE APPLIED WITHIN 15 DAYS OF ALL LAND DISTURBING ACTIVITIES NOT PREVIOUSLY STABILIZED. SILT FENCE TO BE INSTALLED AS SHOWN OR AS DEEMED NECESSARY BE VISUAL OBSERVATION. SILT FENCE —.-- --- --.-- -- ROCK CHECK DAM C) LEGEND N PROPOSED ZONE VALVE 1K. PROPOSED 1AOf1UAL ORWN VALVE ASSEMBLY PROPOSED 2Y IRRIGATION UNE PROPOSED 3'A IRRIGATION UNE PROPOSED 4'0 IRfIX.ATXNI UNE PROPOSED 6'* IRRK;AnON UNE PROPOSED 6'0 IR TION UNE PROPOSED 12'0 IRRIGATION UNE ®ZONE / PROP 75.5•R SPRINKLER ZONE / PROPOSED W5'R SPRINKLER 61 SOIL EIORING SITE W WETLWDS w 501ATED WETLmm —:—rr SITE FENCE SOIL TYPES H. to Ponally Lois to seasonally high water table high w ot eboro/Lynchburg: 1 ft. to 2 ft. ts to seasonally high water table Norfolk/Naboco: 2 ft. to 4 ft. to seasonally high water table BoYm/Blanton ft. tseasonally high water table NOTE: FINAL LOCATION OF ALL ZONE VALVES (TYPICAL OF 10). MANUAL DRAIN VALVE ASSEMBLIES (TYPICAL OF 10) AND SYSTEM ISOLATION VALVES (TYPICAL OF 10) SHALL BE FIELD VERIFIED PRIOR TO INSTALLATION. BUFFERS - PROPERTY LINEAR - 0 FEET WETLANDS - 25 FEET SA WATERS — 100 FEET — 25' WETLAND & 100' SA WATER BUFFERS P m m we mo wwwwl %aT MTE NVON R�. m affr1WX I-1 aP 10 � "aNA C, a I ':` PROPERTY LINE" _- NEW CHAYAN( FTNCE ARCIRD PROPERTY LIE PERIMETER, V-O' OFFSET, TYP ----- 5—DAY HOLDING LAGOON CLEAR AND GRUB AREA TO PROPERTY LINE FOR CONSTRUCTION OF NEW STRUCTURES SLUDGE LOADING STATION DIN OLPROPOSED DRIVE TANK H TANK NEW OXIDATION DITgl I -11 .F, x 1111�iwv � IIII�O' �Wa N • .. � WIYNa P N UI �WWWaaaWTaa� . �T' ,C� •L 100 YEAR FLOOD ELEVATION 10.00 i SITE PLAN 9) GREEN ENGINEERINQ WATER WASTEWATE3k SURVEYM PLANW4 , PROJECT MANAOEMENT GREEN eoo K OOLDBBCC R6T. PA. BOX am WLSOR KC. Zmw �FIFFFFFF�"` TT3 CM 237-SM PAX C20.21 243,-7489 OFFICE•N7�cCIM ONSLOW COUNTY D EXISTING 12'/ RECLAIMED WATER FORCE MAIN TO SPRAY FIELD INSTALLED UNDER PREVIOUS CONTRACT EXISTING 12'0 SENIOR FORCE MAIN TO EO BASIN INSTALLED UNDER PREVIOUS CONTRACT CONNECT PROPOSED 12'0 RECLAIMED WATER FORCE MAIN TO EXISTING 12'0 FORCE MAIN INSTALLED UNDER PREVIOUS CONTRACT APPROX SURVEY COORDINATE N 344683.76 E 2558430.34 NEW RELAIMED WATER METER BOX NEW 3—WAY CONTROL VALVE NEW RETREATED O WATER METER BOX ABREMTKJN LE IEP0 NOTES CLARIFIER EFFLUENT DECANT CE I. UNDERGROUND UTILITIES SHOWN W THESE PLANS ARE APPROXIMATE THE DUCTILE IRON PIPE DEC CONTRACTOR SHALL FIELD VERIFY THE SRE AND LOCATION OF EXISTING UTILITIES DIP WITHIN THE PROJECT AREA. LOCATION AND VEWFICATICN OF UTUTES SHALL BE DRAIN FIANCE JOINT ON INCLUDED N LUMP AIM PRICE AND NO ADDITIONAL PAYMENT WILL BE MADE THE FL CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY FORCE MAIN FM DAMAGED UTILITIES DURING CONSTRUCTION AT NO ADDITIONAL COST TO OWNER. MANHOLE MECHANICAL JOINT MJ 2. THE WASTEWATER PUNT MUST STAY N OPERATION DURING ALL CONSTRUCTION MIXED LOUOR ML PHASES OF PROJECT. THE CONTRACTOR SHALL COORDINATE WITH THE PLANT PLAIN END PE SUPERVISOR ON ANY SHUT DOWNS OR BYPASS OF STRUCTURES NEW STRUCTURES RETURN ACTIVATED SLUDGE RAS SHALL BE CONSTRUCTED AND OPERATIONAL BEFORE EXISTING STRUCTURES ARE SCUM LINE SL DEMOLISHED. THE OWNER IS RESPONSIBLE FOR THE CONTMIOUS OPERATION OF THE TREATED EFFLUENT TE WASTEWATER TREATMENT PLANT. N NO SITUATION SHALL THE CONTRACTOR OPERATE WASTE ACTIVATED SLUDGE WAS THE PLANT OR A PORTION OF THE PLANT. SEE CONSTRUCTION SEQUENCE. SYMBOL L E<ASN L EXISTING PROPOSED/NEw GUY POST AND WIRE - — - — --.F FIRE HYDRANT 4 WATER METER ❑ a POWER POE O 0 VALVE oa N YARD HYDRANT WON PIPE Dv .� SEWER MANHOLE O • CHAIN -LINK FENCE — STRUCTURE — ROADWAY RS' 311' SIDEWALK 0 PROCESS PIPE DRAIN PIPE ----- _---- SLUDGE PIPE CHEMICAL PIPE POTABLE WATER PIPE — OVERHEAD ELECTRIC NEW CHANLIM FTNCE MWND PROPERTY LINE N EIFN, PROPERTY LINE - - I -O OFFSET, IMP NEW 20'-0• GTE AT "I ENTRY ROAD EMSTING WASTEWATER PLANT ACCESS ROAD _@— J ' //CO�UC11ON SEQUENCE EXISTING, 1 I. INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE DRAWINGS. NOTIFY BUILDING tVPILDING I - / NCDENR LAND QUALITY 30 DAYS PRIOR TO LAND DISTURBING ACTIVITIES I LAND {( 2. RELOCATE AND INSTALL NEW SITE FENCING AS SHOWN TO PROVIDE SECURITY DURING CONSTRUCTION. T TBM-CORNER OF 3. BEGIN ROUGH GRADING AT NEW STRUCTURES. ••.," LIGHT PULE EL 28.18 4. BEGIN CONSTRUCTION AC TI105E STRUCTURES THAT NOT IMPACT THE CURRENT OPERATION ER THE FACILITY, THOSE STRUCTURES INCC LUDE: NEW OXIDATION,SLUDITON, NEW CLARIFIER, SLUDGE ULTRAVIOLET DISINFECTION, FFL DENT PUMP STATION, SLUICE I HOLDING TANK, SLUDGE LOADING STATION, EFFLUENT FORCE MAIN, HOLDING I � LAC", 3-WAY VALVES AND METERS D ALL SPRAY IRRIGATION FACIU FACILITIES I 5. ALL YARD PIPING MAY BE INSTALLED WITH THE EXCEPTION IC THE CONNECTION J X�X-J TO ROSE TREATMENT UNITS AND PIPES THAT ARE IN SERVICE. ��� 6. UPON COMPLETION OF THE NEW TREATMENT UNITS AND ACCEPTANCE BY THE ENGINEER, THE UNITS MAY BE PUT W SERVICE IN THE FOLLOWING ORDER: / G) DEMOLISH HEADWORKS STRUCTURES AND INSTALL ROW PACING METER AND / AND DISTRIBUTION BOX No 1 AND DISTRIBUTION BOX No 2. b) DIVERT ALL THE FLOW TO THE NEW OXIDATION DITCH AND NEW CLARIFIER. PERFORM DEMOLITION AND RETROFITS TO EXISTING OXIDATION DITCH AND EASTNG CLµIFERS. EXISTING CHLORINE CONTACT C) INSTALL THE NEW SLUDGE RETURN PUMP STATION AND NEW PIPING LINE 48 AND TANK 480 REMOVE OLD RAS PUMPS AND INSTALL NEW CHEMICAL FEED SYSTEM. —EXISTING TERTIARY FILTERS o) WHEN NEW RAS PUMPS, SLUDGE HOLDING TANK AND DIGESTER BYPASS LINE (48o) ARE COMPLETE, THE AEROBIC DIGESTER MAY BE TAKEN OUT OF SERVICE FOR (INSTALLED UNDER PHASE 1) REHABILITATION. —NEW UV AND WETWELL 7. WHEN ALL STRUCTURES ARE COMPLETED AND THE SPRAY IRRIGATION SYSTEM IS (OLD BACKWASH BASIN) FULLY OPERATICNAL, THE FLOW MAY BE DIVERTED FROM THE CHLORINE CONTACT CHAMBER TO THE NEW UV DISINFECTION UNITS. REMOVE TEMPORARY PVC PIPING —NEW EFFLUENT FROM FILTERS AND DEMOLISH CHLORINE CONTACT CHAMBER. PUMP STATION 8. THE FINAL GRADING AND INSTNUTICN OF SIDEWALKS AND DRIVES SHOULD BE COMPLETED AT THIS TIME B. THE SITE SHOULD BE SEEDED AND MULCHED IN ACCORDANCE WITIR THE SPECIFICATIONS. NOTE: PRIMARY TREATMENT AND DISINFECTION SHALL BE MAINTAINED AT ALL TIMES ANY CHANGES TO THE ABOVE SEQUENCE MUST BE APPROVED BY THE ENGINEER, ANY REQUIRED SHUT-DOWIN OF THE FACILITIES MUST BE COORDINATED WITH THE TOWN AND THE ENGINEER 48-HOURS PRIOR TO BEGINNING WORK. ALL ABANDONED EQUIPMENT SHALL REMAIN THE PROPERTY OF THE TOWN. THE TOWN SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL SLUDGE. TOWN OF SWANSBORO FACILITY UPGRADES WASTEWATER TREATMENT PLANT OVERALL PLAN IMPROVEMENTS NORTH CAROLM KEY XX EXISTING UNES 0 40• 80• H EXISTING UNE ABANDONED 1'�80•-0' XX PROPOSED LINES .®T o CI H 6 �^ RACK 1'-0' OFFSET FROM PROPERTY LINE, TYP---I: Y PROPOSED 3-WAY VAL�t- \\ \ / / AND EFFLUENT METER PIT 2+50 - j SILT FENCE, SEE \ \\ 27- 2100 m4` 26.3P ? / STD DETAILS, TYP \ 16' WDE PAVED ROAD SECTION \ \\ ) WITH CURB AND GUTTER, SEE STD DETAIL SHEET O6 pF 8, \ \ DISSIPATOR, FLOW SPREADER AND NATURAL R" " 7Y,� p FES No I (DETAIL SHEET D8 OF - INV 19.00 \- m 99 CARRY TO DAYLIGHT \ CB No 2 TOP 24.07 - n-150 -- INV 2050 .m -�; p S7 +- EXISTINGAO.. l !1! 1 w 9 rc 24W I EXISTING OXIDATION m ❑ I III / DITCH / / b --------� ' i II �� _`- r . EXISTING i CONTROL BLDG NEW EXIST DI No 1 DISTRIBUTION TOP 2975 BOX No 2jLLLLLjE INV 21 85 EXISTING p LPr 6'-0" HIGH CHAINUNK I 1 NEW � I - 1 FENCE WITH BARBED 2 # DISTR_IBUTIO_N 11 LP I ' WRE. SEE STD DETAILS -30 "BOX No 1 � / TBM - CORNER OF 31 33 - - - ` �_ ''�. \i - LIGHT POLE El 28.18 I r PROPOSED SLU EXIST\ - EXIST - '� CONNECT NEW FENCING PUMPING STATION / - _ To30 Exlsnrlc aT J / CLARIFIER CLARIFIER PROPOSED / LOCATION SHOWN _ CLARIFIER- I EXIST MANHOLE "o _ _______ -- - ,, __ _' TOP 33.85 - - / 7 INV 26.41 __ ______ --- 5/ EXISTING SLUDGE i i 34 -__ - __________ LP _-__-______ )POSED SWALE DRYING BEDS r I 25 2> 28 -SILT FENCE, SEE CB No t TOP 22.75 INV 19.50 CEIVE JUL 2 8 2004 RHADE 00.40R I / _______________-i__ / - __- STD OETAILS_TYP $ETAIL SHEET i I I i ___ _. _ __ _ __ - _ 23 26------___ __ /+ NOTES PROD # - �F 8) EX TING i --____--_-__ _ _ 24 ____ - - 1 UNDERGROUND UTILITIES SHOWN IN THESE PLANS ARE APPROXIMATE THE CONTRACTOR 2 WORK OP AND I I �_ -22-- i/ SHALL FIELD VERIFY THE SZE AND LOCATION OF EXISTING UTILITIES WITHIN THE PROJECT Y \ SLUD PRESS l j I i i - -__--- ___-� - -- - _ -__ / AREA. LOCATION AND VERIFICATION OF MALES SHALL TR INCLUDED IN LUMP SUM PRICE AND , L ADDITIONAL AN PAYMENT WILL BE MADE THE CONTRACTOR SHALL BE RESPONSIBLE C / I /' / 2 _-' _ �Y0 FOR REPLACEMENT OR REPAIR OF ANY DAMAGED UTILITIES DURING CONSTRUCTION AT NO /.'ri i r/i �' - ,_- _ ADDITIONAL COST TO OWNER ---------- ---_ ------ -_-------- k 2. CONTRACTOR SHALL CLEAR AND GRUB SHE OF ALL DENSE BRUSH AND TREES BACK TO ------- - / PROPERTY LINE. ALL AREAS INSIDE OF PROPERTY LINE SHALL BE GRADED AND SEEDED ACCORDING TO SEEDING SCHEDULE. EXIS 12"0 CMP /'� ' II,_ _ SYMBOL LEGEND INV \ INV 6.7? _ ---� i r r I i i _ i EXIpTIP{G,{I-f PROPOSED DRAINAGE SCHEDULE TE TIA2 ALS \` I I I EXISTING PROPOSED, I gNUNG I EXISTING I I I\ BUILDING / L 6'-O'\HIGH \I II / CHAINUNK FEND 1I WTH BARBED WREN SEE STU OIETAISI I \I 1 I\ I EXISTING AEROBIC DIGESTER PROPOSED SLUDGE HOLDING TANK AND SLUDGE LOADING STATION DROP INLET TOP 30.08 INV 27.00 \ SEE DRAWING C4 FENCE, SEE _ DETAILS, rw ` PROPOSED DRIVE 4+50 - \ 4+00 ' 3F50 3+00 + 9.90 / 29.19 - � - iL - 2e33 (20' B/C TO B/C) 27.57 � / -29 29 - x , i' ' -31-- - _______- _' ---------- J PROPOSED / OXIDATION DITCH FPROPOSED MANHOLE TOP 3017 INV IN 27 25 INV OUT 27.00 1 CB No 5 TOP 300 INV 27.52 -12'0 RCP -CB No 4 TOP 30 00 INV 27.57 I � / N SILT FENCE, SEE STD DETAILS, TYP -EXIST PAVEMENT - .. EL 3091 O REMOVE AND REPLACE PAVEMENT AS SHOWN gaol 35 4 fE 1L CWPLEDl IVNDER PHA�E 1) I �I f 1 /lI �i __ �_�x l 1 I I I I 1 /S /70 -_____ I I I I I i 11 11 \ �20-� + I I I 1 1 / / I I I INV 20:45 �> - - LP -'_____-- + I I I I I I I \% 1III ii----' DSSPATOR; fCOW'SPREAOER-__ 11 1 1 I I II I�I EXISTING /ClI D' ry / AN HA RAL AREA I 1 c STORAGE I ii1l Ii I1 �-(DETMCSHEET-D8-OF By--- _ I li J I ICY CB No 1 TOP 22.75 INV 19.50 CB No 2 TOP 24.07 INV 20.50 CB No 4 TOP 30.00 INV 27.57 CO No 5 TOP 30.00 INV 27.52 FES No 2 INV 27.50 DI No 1 TOP 3008 INV 2700 MH No I TOP 3017 INV IN 27 25 INV OUT 27.00 BLDG 1 11j. 1 \\ `' .` ` Ii11 v �X - :`Ia E LL[f�E�lT PIPE SCHEDULE /I. 111 `\\I\I .\I \\\ -� ' 1 1 1 1 I yPUTM�(Rq,� 1 I - �� _____ +\� I I I Y-9 I \ II If II \ THERE ARE NO EXISTING "ND�ON $I \�\`'o �;\;\`\\\\ I ROCK CHECK DAM. \+ e I I 11 I-1 i == ```� `�\ \��\ i SEESIU DETAILSI + I II II 1 I I ` RE�FERiJLT-SHEET-CS'OF 6 FOR EROSION CONTROL NOTES \ \ \ \ \ \\ �j{jADI� NG,PLAN ___-__ 160 YEAR FLOOD ELEVATION = 1A:00 MSL SL / 4495 IIUY f�rnn•AA = GREEN ENGINEERING TOWN OF SWANSBORO WATER WASTEWATER SURVEYING, PL.ANNINa PROJECT MANAGEMENT g5 --•••. N',�;.� WASTEWATER TREATMENT PLANT ••••••• 309 N OOLD9BOFi0 8T. P.O. BOX B08 tA�80N, NC. 27593 ° IcREEo X4' TEL(252) 237-5365 FAX (252)24a-7410 oIIFICE®cMISNIIE3+aCOM ONSLOW COUNTY IMPROVEMENTS NE T SIZE ATEAI FROM To REMAINS 29 9"¢ 01 uH 1777 Mu 1624 DECANT ED S.BNAIE 30 8'. DI MH 1524 RAS PUMP 5iA➢ON DECART ED SUBNATE 31 6 m DI EX OXIDATION DITCH YN 11824 BASIN DRAIN 32 e 0 DI Ex OXIDATION DITCH DROP INLET 111556 SUB DRAIN 33 12 ¢ RCP DROP IN1ET 1656 DROP INLEL llb55 STORM DRAIN 34 WO RCP DROP IMET 1655 MIT 11654 STORM DRAIN 35 12'm RCP MIT 11654 _MR [1653__ PROSED M,WHo OP UNE M PROPOSD MANHO,E STORM DRAIN REROUTE 55 56 64 8•e 8 0 6 0 DI DI DI 51 ODGE 04ERfEOw DECANT SUIUGE LOADING DRNN OADATION DITCH ONNN MAN OR DECANT MAN ROTOR BOX DRAIN 65 8.0 DI RROPDSED MANHO.E EXISTING SLUDGE DRAIN TO RA5 FACILITY UPGRADES GRADING PLAN NORTH CAROLINA GUY POST AND WIRE - - -I - - -, FIRE HYDRANT Q ; WATER METER ❑ ■ POWER POLE 0 / VALVE Da N YARD HYDRANT -1� { IRON PIPE 0 ■NP SEWER MANHOLE 0 CHAIN -LINK FENCE -X-X- -X-x x STRUCTURE ROADWAY 0 SIDEWALK O OVERHEAD ELECTRIC - - - - - - PROPERTY LINE - - - - SWALE DRAINAGE AREA DELINEATION 0 20' 40' 1"=4O'-0" Bf DATE IX.TOBBI SOOO SCALEI PROJECT Na. E7-4722 PIDT W.T[: PMD ■ff w C //••��4cfF C IMP NOD ASV 6 Il/'IM I m \ PROPERTY LANE �� .off EROSION CONTROL NOTES \ �� \ PROPOSED D W HIGH CSTD DETAIL, FENCE PROP' OFFSET FROM \ WITH BARBED WIRE, SEE STD DETAIL, TYP I \ X�� K-�X \\ \ 1 j,aa2t�� u3o2[ 1. SEEDING AND MULCHING TO BE APPLIED WITHIN 15 PROPERTY UNE, TYP \ Ir `� yI�><� x� / \ namal---'�w H�mat �'— WORKING DAYS OR 30 CALENDAR DAYS, WHICHEVER IS SHORTER, OF ALL LAND DISTURBING ACTIBITIESROCK CHECK DAM, STANDARD NOT PREVIOUSLY STABILIZED. SEE STANDARD DETAILS FOR SEEDING SCHEDULE. �x / SEE STO DETAIL III namat�— 'I namat 3 31 -__I 2 SILT FENCE TO BE INSTALLED AS SHOWN ON -29- PLANS OR AS DEEMED NECESSARY BY VISUAL 'x namzt w�mzt 3 8 - - - OBSERVATIONS. -�J �3 �^: naa2` wJaZi I I - -_ `\ SILT FENCE 37 , / � \ � � � ROCK CHECK OAM O ay x TDP,OF�N 37:50 I 37 �� �! �-_`____ _3,r 3 3 \wa I \ �� INLET PROTECTOR 3t 37 3 3 1 _ 2 � 4 --T RECEIVED N I I \ PROPOSED SUBDRAIN COLLECTION SUBDRAIN COLLECTION DITCH AT IJUL 2 8 201)<F 32 / DITCH, SEE DETAIL 1/C6 \ 113 POINTS, SEE DETAIL 1/C6 //i j^ N ` �\ p //o PROJ # I PROPOSED 5-DAY HOLDING LAGOON I LAGOON INFLUENT AND r I / LAGOON SHALL BE UNED WITH 60 EFFLUENT STRUCTURE, SEE I \\�( �26/a \ --1 / MIL HOPE UNER, SEE DETAIL 1/C6 I DETAIL SHEET C6 I I 1 I 7 I \\\ / 12"0 FM PLANT INFLUENT FROM / COLLECTION SYSTEM (INSTALLED UNDER PREVIOUS CONTRACT) / SILT FENCE, SEE I I 12"0 DIP PLANT EFFLUENT TO I $ / \ `� I �� l I I iy \ SPRAY FIELD INSTALLED STO DETAIL, TYP Ix m I \ t \ \ I i \ o °'� UNDER PREVIOUS CONTRACT) _I I 7 [ W ^ \ 1 SILT FENCE, SEE STD DETAIL, TYP I 7 j' CLEAN, OUT WITH 2' THICK CCNCAEIE.PAQ AT ROUTE / DISCHARGE FROM 3� \\ // I \� I .Z9'� m NOTES PROPOSED i I INTOSUBDRAIN PUMP STATION \ \ /lr I ` \ / i I INTO 5-DAY HOLDING 1. UNDERGROUND THE CON SHOWN IN THESE PLANS ARE STATIONN PUMP " _ _ \ \ / I \ / I ��I�� _ SIZE AND LOCATION THE CONTRACTOR SHALL FIELD VERIFY THE STATION. SEE - I POND, PROVIDE APR CAP 3 �� �� _ THE DETAIL 2/C6 W n I _ ` ; /! IIl \ O� \ / I _ \�� PROJECT AREA. LOCATIONpSTING AND VERIFICATION OFUTIES NUTLITES STALL BE INCLUDED IN LUMP SUM PRICE AND NO I \ / 2j� " \ �� ADDITIONAL PAYMENT WILL BE MADE. THE CONTRACTOR '� \\\ ANY SHALL BE RES ORI NSIBLE FOR REPLACEMENT NG ORION REPAIR OF ADDITIONAL COST TO OWNER. I _ ____ ________________J______________________tSTALL CLEARn.___ _= 2. CONTRACTOR EAR AND GRUB SITE OF ALL -TBe `` _ - n,=---- i/ i DENSE BRUSH AND TREES BACK TO PROPERTY LINE. ALL 2 2 - _- �-T-- � AREAS INSIDE OF PROPERTY LINE ALL BE GRADED AND I 31 SEEDED ACCORDING TO SEEDING SCHEDULE. 33 34 7 .4YAIB(I. LECiEHID I F36 37 \L EMSTING PROPOSED/NEW I \ -- PROPOSED 12'0 DIP TOP OF BERM 3750 LAGOON EFFLUENT \ x I WY POST AND WIRE `\ �^ FIRE HYDRANT 36 37 OPOSED 12"0 DIP ,2m WATER METER ❑ ■ Ix LAGOON INFLUENT POWER POE C X S 33 3 / VALVE 3-WAYPROPOSED VA oa H / YARD HYDRANT { 3-WAY - AND METER/PITS IRON PIPE ov ■w SEWER MANHOLE 0 0 PROPOSED SLUDGE I_ PROPOSEDRL�'E—+. - 1- -. / CHAIN-UNK FENCE HOLDING TANK / STRUCTURE ROADWAY / -_-- / I 9- SIDEWALKaun n7n7fZ0\ / / ) - OVERHEAD ELECTRIC e. CAR 7q,, I PROPERTY LINE— - - — SN". 'O/ SEE DRAWNGRADING PLAN G C4 OF 6 FOR CONTINUATION THERE ARE NO E)JSTING WETLANDS ON SITE 0 '"? Jq 100 YEAR FLOOD ELEVATION = 10.00 MSL 1"=40'-o" P 4495 ° E ITEV90N °ATE IOU oATr ocrol3a1 afro �2Qba GREEN ENGINEERING scAlE ROPER „o.E97_477T TOWN OF'SWANSBORO 5—DAY wAT13i WAstEWATER suRverlNq PLIWMNCi PROJECT MANAGEMENT FAI WASTEWATER TREATMENT PLANT HOLDING LAGOON H°� � AM � "4"" m 303 NL OOLOSBORO 6F. P.O. BOX 808 WLBON, N.C.278M %�foIIGREE ,.• „ ,a (252) 237-5365 FAX (252) 243-7489 o�, 0061 ONSLOW cour�n IMPROVEMENTS NORo-, CARouNA GRADING PLAN "" 9ffTN0. C5 oP 6 RACK I .. L��.. . ,.' �. 91191ilD10]INS L I'll'ILI\J11J1\ V VVL 1 W\ AND BRACKET MTG. STAND, HANDWHEEL & LINKAGE M WALL MOUNTED HANDWHEEL BRACKET ' WEIR Im i r 8'-4' OPENING ELEVATION GASKETS TYP -1 [ GROUt 15' ,JI 2' 30' (50' FOR SA CLASS WATERS) C _ v Y V W � C - BY OTHERS EVENLY DISTRIBUTED FLOW 50 30 FT. NATURAL AREA UNDISTURBED v U AREA OUTLET PIPING v � v RIP RAP ENERGY DISSIPATION PAD �— FLOW SPREADER MECHANISM (HALF —PIPE DESIGN) /EIR h�G USE 24' DIAMETER PIPE FOR DESIGN TEMPORARY LINER STRAW W/NETTING F OUTLET PLAN PIPE DISSIPATOR \� /� NATURAL AREA / UNDISTURBED y�\/�/ /� AREA \v%Z 5 5 SECTION C-C GRASS LINED CHANNEL (PERMANENT) INTING STRAW W/NETTING (TEMPORARY) FLOW SPREADER DETAIL TYPICAL DRAINAGE NO SCALE SWALE SECTION NO SCALE BAFFLE & MTG. WALL MOUNTED HANDWHEEL BRACKET LL-Ar IT III 4 1 16 0 Ll ra J w MAX. ATE iY I I I I \ \ I T— DESIGN 18.00 6 MIN, ° ' e' ° e •. ° �• �• e SECTION 'A -A' • JLf1L __ 44952Y0�` GREEN ENGINEERING TOWN OF SWANSBORO --- --- WASTEWATER TREATMENT PLANT •. cINE.:: e;= WATER, WASTEWATER' SURVEMq PLANNUNq PROJECT MANAGEMENT STANDARD DETAILS �•"",� 3W R OCLD8130RO ST. P.O. BOX W9 W�80N, N.C. 27883 FO...... ,. TELWWW7-5365 FAX(=243-74M 0FFCE0CFVB0 ,C(W mooWCOUNTY IMPROVEMENTS NORTH CARouNA LEVEL @ 14.8' 4TER LEVEL @ 9' ECEIVED JUL 2 8 2004 DWQ PROJ # i5WR) `w 3¢(a 9)4]3-20! A9LII i11E' 9]aR. M nm w>E we 90 BffTNQ D8 � 8 RACK t1 J2, • CB No 5 TOP 30 00 INV 27.52 —12"0 RCP CB No TOP 30.00 NV 27.57 / PROPOSED DRIVE / I D.A. -- No. 2 _ \ 1 II / 16' WIDE PAVED ROAD SECTION \\ WITH CURB AND CUTTER, SEE \ STD DETAIL SHEET D6 OF 8 `\ INV 190 1 INV 1900, \2 100 FT VEGETATED \\ AREA TO DAYLIGHT 1 / 3 - - ! r , PROPOSED SWALE i / ,---- -- --- - I '-I GRADE'®040% (DETAIL S EEi I I / i ______________ _____ _ __ _-_- __-- \D8 OF 8 I it _�-__—_ IN/V/ 67�_____ - __--It l 11r I III EXIST 2 C_ �• \I. ,- __- II _ / g 'SJPATOR�ROY(SPREADFR jXS lid �I� {TND ,NATWtAL'AREA�—vv� --___ 1 / (DETAIL SH�T D8 OFF-_ 1 `� A 1 I I IAAA T \� A`V `AA A I -- V A THERE ARE NO EXISTING WETLANDS ON SITE ,ARO >Slpl REFERENCE SHEET CS OF 6 FOR EROSION CONTROL NOTES �` \\ GRADING PLAN 100 YEAR �-��`: `��, 1"=50' ,GS� a FLOOD ELEVATION = 10.00 MSL �' _ I I � I' I I I I _ I ' _ I \ DISSIPATOR ROW SPREADER I PE - IN TO 100 FT. VEG. AREA \ (DETAIL MEET De OF 8) f 15"0 CB No I 15 70CBP/N b x /��-APP ���p���RNORTH CAROu� EWRQNWi 4 AL MANAGEMENT COMMISSION'— DMSION OF WATER QUAL]TY, Z--JAoj--ZC05 .��"�� • •". _! yam. �•.1 CB No I TOP 22.75 INV 19.50 CB No 2 TOP 24.07 INV 2050 CB No 4 TOP 30.00 INV 2Z57 CB N0 5 TOP 30.00 INV 27.52 FES No I INV 1900 FES No 2 INV 27.50 GREEN ENGINEERING TOWN OF SWANSBORO DRAINAGE BASIN IrsE�, s WATER WA3TEWATETi suAVEnN� w4NMN1C; PawecTMANA( MEMr WASTEWATER TREATMENT PLANT DELINEATION GRE- - 303 N. oOLD8BOR0 ST. P.O. BOX 6W VVILSON, PLC. 27M I I III,,,,\•� TEL (252) 237-5365 PAX M2) 243-7489 OIFICe 0 Ql;r=ENENQCOM ONSLOW COUNTY IMPROVEMENTS M7Rrrl caaoL.INA RECEIVED DEC 2 2 2004 DWQ PROJ # 2O� cummc PROPOSED/NEW GUY POST AND WEE - — - - — -I FIRE HYDRANT Q WATER METER ❑ ■ POWER POLE 0 0 VALVE oa N YARD HYDRANT j IRON PIPE oo= •� SEWER MANHOLE O CHAIN -LINK FENCE -Y _* -9 X X STRUCTURE ROADWAY 0 SIDEWALK OVERHEAD ELECTRIC - — - - — - PROPERTY LINE — - - — SWALE DRAINAGE AREA DELINEATION 0 25 50' 1"=50'-0"� e Na 1 of 1 No 4 9 �)�ta d' a F. a f DIA!alc';a of tons orvniA VIN":ealln-81COl:'fa;"c2U viouH monviv Ew kida4 "dE uvr V-91�0-50AM d /4, 0 WASTEWATER TREATMENT PLANT IMPROVEMENTS TOWN OF SWANSSORO ONSLOW COUNTY, NORTH CAROLINA MAY 2006 PROJECT FINANCING HW UMT GRANT COST PROJECT No. ESRG-T-00-= NORTH CAROM RURAL ECONOMIC DEVE-OPMENT CeNTER NORTH CAROL M CLEAN WATER MANAGEMENT TRUsT FUND -•- • • DALPI... �1 i -0= IA= LID _CONTRACT-3 RECLAIMED WATER —MAIN- EXTENSION CONTRACT 4 - LOW RATE INFILTRATION BASINS MAYOR: David L. Russell MANAGER: Edward L. Faison PUBLIC UTILITIES SUPERINTENDENT: Mark C. Young %II COMMISSIONERS: 11 James G. Allen Elbert Benton WATER n Is er Phil Keagy '' APPROVED NORTH CAROLINA ENVIRONMENTA MANAGEMENT COMMISSION DIVISION OF WATER QUALITY 7a- f.XJU -ZOCXo GREEN ENGINEERING WASTEWATER, SURVEYING, PLANNING, PROJECT MANAGEMENT 303 N. GOLDSBORO ST. P.O. BOX 609 WILSON, N.C. 27893 TEL (252) 237-5365 FAX (252) 243-7489 OFFICE GREENENG.COM RECEIVED AUG 0 7 2006 — DWQ PROJ#�W R O�{Q�y IltO ,r3n Fryineznng, P.LL.C. LOCATION MAP SCALE 1 " = 4,000' .I. I, I,II PAJORAD 111:2OW fin; 2}?.;i�iC3 TUl i�f r AKANI YTj-,!,UD RYA N 90 MOM 1 E, a 0 II 3 0 1- a 0 _ A`��4 0�i a oft,,. 0 GVt; �`0\ ` 1200 FORCE MAIN FROM WWTP 12'0 NEW ACCESS ROAD I � _ I --- -- = n =— - // ■ _— — — 12'0 UNDERDRNN II 12'0 UNDERDRAIN C II -------- - II Y` T� = =_=-===- a �DO u II I II _ n 12'0 UNDERDRNN �� ~�~ ^-✓-------_ — — — — — — ---- b r -1 /-- 2 __ _______________ ____ _ __ �II 0• 0 m do 4W yq py GREEN ENGINEERING TOWN OF SWANSBORO WATER WASTEWATEWq R, SURVEYPLANNING, PROJECT MANAGEMENT 303 K IPOLD5BOR0 BT. P.O. BOX BOB WB.BOK µC. 27893 LOW RATE INFILTRATION BASINS TEL (252) 2375365 Fax (252) 243 7489 OFFICE BOBEElENacobA ONSLOW COUNTY NORTH CAROLINA III OVERALL PLAN LEGEND PROP S.S 12'0 FM PROP. U G. 12"0 DRAIN --- 12.UD --- LIMITS OF DISTURBANCE WETLANDS ISTURE BRANCH RTOWN ROAD (BR 1432) buALt CLIENT: SWANS PROJECT No'E97-472 5 A9&gWll FB Y 647.655.68 CH4NGE OATE'MAT 3. 200i SHEETNO 1-1 12 " OF �1C I EROSION CONTROL NOTES- w I C SEEDING AND MULCHING TO BE APPLIED WITHIN d 1 21 DAYS OF ALL LAND DISTURBING ACTIVITIES 1BASINFI TO 1 ® NSTALL DI ASSSHOWNBIORS DEED. MED ILT FENCE TO BE EMED NECESSARY I - 12 X 12" TEE 1 �® - BY VISUAL OBSERVATION. - �cL, - ;, _ IY I I 2 - 12" GATE VALVE$ w _ I� SILT FENCE -%i1' ©\ \ 8 ®'dti ® _ _ ROCK CHECK DAM O \\ _ - - - - ' - P i ® IA I DISSIPATOR PAD 12'0 48 LF HDPE ___ \ / ® /' ® - " INLET PROTECTOR ® INSTALL AT LOW POINT / 11 ®® ® - _ - - _ - 3 SEDIMENT TRAP 8 ® ___ OF EXISTING GRADE /% _-,. 111 FILTER BASIN ._�__�' - ♦ __��--�-wu' __� �G�� 8` III II all �® 12"0 FM TO 10,{ ®� % ELOWk�.O® L -_` 4 48•0 48 RCPS 1 BAD ® BASIN 3 ° ° ®" 8 % PROP.. GRADE . ®' INV. 25.50 CENTERED y g ON EXISTING DITCH 0 . _� - ,' • "b / s .-,-' 1 - 12"0 48 LF HOPE ®o Ss� ,-''; INSTALL AT LOW POINT a ® i_" - _ _ - ,''� ® ,,,.-' OF IXI$TING GRADE ®®� r/ 1 12" X 12" TEE I I N LEGEND Yq�-_' 2 - 12+ GATE VALVES rr•+s'�7 I I . 0 EXISTING VALVE _ C'4 •_<_.�_ <i _ _ _ _ _ g BASIN 2A � PROPOSED MANHOLE -- � BI I . _ VVV o PROPOSED RISER CLEAN -OUT PROPOSED VALVE SOILD BORE"� - 1 - 12" X 12" TEE ® m C= m ®m ® am mull 2 - 12" GATE VALVES n ( PROP. S.S. 12.0 FM 12eFM I1 1 I u I_ PROP. U.G. 12"m DRAIN ­ 12eUD 12 0 FM TO I 1 1 n I LIMITS OF DISTURBANCE p ®® ® p9 ®®®®®p BASIN 2B 1 - 12"0 45 BEND 1 I - GRAPHIC SCALES WETLANDS PROFILE (HOR20NTAL) o LS® INFILTRATION BASIN ACCESS ROAD PROIE ERT CA) PVI STA = 0+0'0.00 - -- PVI STA = 1+50.00 --- -- I - _ - - _ aELEV = 39.50 ELEV = 40.50 PVIELEV = 275 000 —1 _-_ _-- -__"" - +_-- -_ -- _ _- PVI STA = 9+50.00 --_ _-"-_ - _—_ - --i--- -- - -- ---I`— --- -- ---I--- --I--- PVI STA = 15+00.0 50 VC = 150' - - __ I- -__ -- - - --_ - - -�-__ -- - - - - 1__- _- -_ -- _- -._. __ _ _. !_-_ ___ __ -� ELEV - 37.00 _ :=1 _ _ _ _f _ ELEV - 40.00 -- �- --- - -I _ - _ LI - ---1 - ----- � - --- VC=500' -- VC - -- _ _ VC = 200' 50 WO�1-- 45 _ ----------�__--_�--_�- ---=-j_-- -- - m as -- - -�- -- - - %� = = I - -- --- -I -- -- -- -- - i- --- - -- - n x y - _ 4 48"0 48 ' LF RCPS - I_ _0.67°/+ 1' BELOW PROP. GRADE -- - - -� INV. 25. E O O] _ 50 CENTERED _----- ------ ----- --- -- ON EX35 ISTING TEE—E - --- - --- -- I I -- — II— I t= 30 N 25 1 12oO48 LF HOPE - - - - _ -INSTALL AT LOW POINT _ 25 - - - --- -- -- _ _ _- - -- - - - ---I-- - -- - - OF EXISTING GRADE - 1 - 12"0 48 LF HOPE eF1y- - - - - - �- -_� __ -- INSTALL AT LOW POINT _- - -------__�-------------_ -- _ _-- -- — --I--- -- - —� OF IXISTIN E - = 20 — — - - -- N { 20 1 t- � -L_- -1 _ _ n —I _ I 0+00--1— R� 10 5 ,+oo WATER, WAST 3031 TEL QI52) 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 REEN ENGINEERING TOWN OF SWANSBORO Tom, &MEYM PLANII PRC\ECT MANACIMIENT ! SIT PA' BOX °OD t LWK KG 2AM LOW RATE INFILTRATION BASINS I SFAX (25Z a3-74W 0FFIMe°F®434Q=W ONSLOW COUNTY NORTH CAROLINA Ises 11+00 12+00 CONSTRUCTION PLAN 13+00 14+00 - — -- 10 - -= 5 15+00 1 'LENT: SWANS ROlECT N°:E)7-472.5 AB p10YM IF.B. / cl ° o SHEET NO 1-8 OF 12 1 1 11 11 11 Z 1111 II"a \ __________________ \\ ® m m 11 '� ®0FJ ®®®® II II E � II anon — — — — — an0z► — — — — — anon ---y V 00 I ' V7A I \ \ BASIN 2A \ `e INFILTRATION BASIN ACCESS ROAD a , I PVI STA = 15+00.00 -_ _ T�'E�LEV _ _ _ _ __ __ __ _ -_-PVSEA = 18.50.00 _ _ -�-- _ _- PVI STA = 21.50.00 =46.00 ----50 VC = 200' - �- - -- ---... --r- - - ELEV = 38.00 VC -----i----�- VC=200' -I_ _ 40 35 20 15+00 10 +' 16+00 (� 17+00 18+00 19+00 20+00 21+00 22+00 23+00 u v®1Ti1 L�1� [GREEN ENGINEERING 11 \1 1\ . II I � I i / I I 1 I I 1 1 I I m I I PVI STA = 23+92.00 ELEV = 38.00 VC = 200' 24+00 25+00 26+00 27+00 s, hh1w�NNy m� wnTEt1 wAsr> wAT�R IMMITYM PLArom4 PaoIECTn1ANAGaelr TOWN OF SWANSBOR , CONSTRUCTION Ta �,"W7-M8XM;�; LOW RATE INFILTRATION BASINS PLAN ONSLOW COUNTY NORTH CAROLINA EROSION CONTROL NOTES SEEDING AND MULCHING TO BE APPLIED WITHIN 21 DAYS OF ALL LAND DISTURBING ACTIVITIES NOT PREVIOUSLY STABILIZED. SILT FENCE TO BE INSTALLED AS SHOWN OR AS DEEMED NECESSARY BY VISUAL OBSERVATION. SILT FENCE ROCK CHECK DAM 0 DISSIPATOR PAD INLET PROTECTOR SEDIMENT TRAP FILTER BASIN S LEGEND EXISTING VALVE PROPOSED MANHOLE • PROPOSED 6"0 RISER CLEAN -OUT PROPOSED VALVE N SOILD BORE PROP. S.S. 12"0 FM 120FM PROP. U.G. 12"0 DRAIN -- 120UD -- LIMITS OF DISTURBANCE 0 ®0 m ® ®p ® ® p WERANDS ED GRAPHIC SCALES 4 i® PROFILE (HORIZONTAL) 4 .® PROFILE (VERTICAL) 28+00 29+00 30+00 ,ISION I DATE I IW M77 u.v fnm msHow sREETRD 1-9 OF 12 50 45 40 35 30 25 20 15 10 5 0 e 0 u 50 Q 0 3 45 0 a n � 40 m EE o, 35 0 o` s 30 i 0 9 25 m w N 20 m w 15 i i= n o` �g r EROSION CONTROL NOTES 9fT9+9.Od B '� 0 `,•+, +\'� `•� ` • SEEDING AND MULCHING TO BE APPLIED WITHIN "'� g ( ` \ �` ` I 21 DAYS OF ALL LAND DISTURBING ACTIVITIES 'I 4` ® \ ` \ •\_` `-��, + -� ` I NOT PREVIOUSLY STABILIZED. SILT FENCE TO BE L1Yo FM TO \ . . ,'�,\ \` i •i .\-` `' \ L \ \•" ` INSTALLED AS SHOWN OR AS DEEMED NECESSARY BASIN 2B ` ` •� \x \' ` - +� ` `/,�:•" \ `` '�� I BY VISUAL OBSERVATION. I ® �I - ' + \` •, .+1` `+' ``, •` ': `\ \. `;..I `� \\ - ` . �` "\ `'+ •• \` '+` I SILT FENCE-+-+- ROCK CHECK DAM \..`� \ O N DISSIPATOR PAD 1 - 1200 48 LF HDPE \,` `; \ .,.: \-' \ • \ ® •� INLET PROTECTOR 1 - 12' X 12' TEE INSTALL AT LOW POINT ai I 1 - 12'0 48 LF HDPE ® OF EXISTING GRADE ; ; \ \ \\ \ ® INSTALL AT LOW POINT R SEDIMENT TRAP 2 - 12' GATE VALVES ` \ \ " ` ® 1OF EXISTING GRADE 6 FILTER BASIN ealm am t . , 1200 FM TO 8 '� Y ® a ---- - — g -- LEGEND BASIN 1 J ®� �. �- .�- VO ®®® IS2S ®®m ®®® II®®® ®® 111I ; a& ----- --------- Wi■at S - EXISTING VALVE pd -- — $ -- - 'g ° PROPOSED MANHOLE • I p tt 11.0 22p, BEND B PROPOSED 6"0 RISER CLEAN -OUT O\ \ 0 PROPOSED VALVE N SOILD BORE PROP. S.S. 12"0 FM - 12oFM \ \ ® PROP. U.C. 12"0 DRAIN 120UD ® I \\ 0 i LIMITS OF DISTURBANCE a ®m ®® 1>9 0® m m m B ® o BASIN 3 ® I 1 \\ \ ® ?P WETLANDS \ El I� I 1 \\\\\ 1 ® li F13 ® I 1 1\\\ ® 1J GRAPHIC SCALES • 4 L� PROPOSED ROAD EXISTING ROAD PROFILE ( PVI STA = 0+00.00 -- I— _- pVl STA = 1+75.00 --"-' ------ -- PVI STA = 3+75.00 _ _ _ _I— _ 1— ----- PVI STA = 7+00.00 - — -" PVI STA = 9+00.00 - — - - — -- --- - PROFILE (VERTICAL) ELEV = 40.08 _ ELEV = 33.00 ELEV = 35.00 _ _ _ __I - --- - I---- --- -- I �1 �--- VC=150' - VC=150' ELEV=3050 ELEV=35.00 -II --_ _I----=j_---_ 50 0+00 to .d+. ._ o I "y1b�`e - 12'0 48 LF HOPE )TALL AT LOW POINT 10 1+00 2+00 3+00 4+00 GREEN ENGINEERING WATER, WASTEWATFR MWNEYEA PLAN PRO.MCT MANAGEfL Nr 303 it OOLDSOOR0 Or PA. BOX 80G Wa80K N.C. 27M TEL (2621 2371-S FAX (= 243-74BD OFRCE DORMN43MXCOM 1 - 1200 48 LF HOPI INSTALL AT LOW POINT 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 TOWN OF SWANSBORO CONSTRUCTION LOW RATE INFILTRATION BASINS PLAN ONSLOW COUNTY NORTH CAROLINA - 45 I - 40 35 -- 30 - I-- 25 —i--- 20 }— 15 �— 10 _-_ 5 13+00 14+00 15+00 buAL CLIENT: SPANS PROJECT No: E97-472.5 ASIIHOW1 F.B. 1 647 IZ5,68 CN GATE ANY'R 20 ur x9. 6—NoI-10o, 12 EXISTING GRADE 1 TAMPED BACKFILL 2' x 2' x 6" CONCRETE PAD ® 8340 EAST JORDAN MONUMENT BOX, OR EQUAL COVER TO BE CAST TO READ: "RECLAIMED WATER" C.I. NO -HUB BAND WITH A BLIND CAP 12"z6" IN -LINE WYE� _�j---7 12"0 PERFORATED HDPE �`\ 7 , UNDERDRAIN PIPE FLOW — UNDERDRAIN CLEANOUT DETAIL NO SCALE SELECT SAND BACKFILL — TAMPED IN 12 IN. LAYERS 12"0 HDPE CORRUGATED PERFORATED PIPE — #57 STONE °I I�O_ PERIMETER SUBDRAIN DETAIL NO SCALE .rY'^rr sti9J1. _:-•tin_-:_� e l`1 ENISRGY DIMPATOR DETAL NO SC&E CL DITCH TO CL DITCH 76' 6' 6' .V PEF , R. /%77T/77l/T/%i/7117i71T- ----- !LEER I'1 8" CABC STONE ACCESS ROAD I 12' TYPICAL ACCESS ROAD NO SCALE NO SCALE HOGWIRE SITE FENCE DETAIL NO SCALE xx 2' x' x" �, PROP. ACCESS ROAD Yw. Nw, uw Ty F� T J EXIST. STREAMBED RECEIVED E IVE D PARTIAL BURY PIPE I FT. AUG 2 12006 DWQ PROD # — PROP. QUADRUPLE 48'0 CORRUGATED PIPES (SIDE BY SIDE) WITH FLARED -END SECTIONS 2 F7 ` BURY IN EXIST. STREAMBED APPROX. 1 FT. PROP. 12"m RECLAIMED WATER MAIN TO ALLOW NATURAL FLOW THROUGH CULVERTS (INSTALL BELOW PROPOSED 48"0 CULVERT) STREAM CROSSING SECTION BENEATH ACCESS ROAD NO SCALE L1 uu 1-1 4uuu JGREEN ENGINEERING TOWN OF SWANSBORO ��to1NE�;. WATER WASTEWAT� SUFNEYCJ4 PL4NWN4 PROJECT MANAGEMENT FO GRE�a,��' �°' "� °WO �. P.O. BOX OM WILSO , µC. � LOW RATE INFILTRATION BASINS x22 a n n a"1 =4 237-Sti �eS FAX «)-�� OFPCE ec� ONSLOW COUNTY NORTH CAROLINA INFILTRATION BASIN DETAILS PRQIECT No E97-4725 AB ExYJW„ F B / 647.655.688.75; CIVAGE WEMAY 26. 2006 JE —T-1-12- 12 1wn No I-; WASTEWATER TREATMENT PLANT IMPROVEMENTS Mal TOWN OF SWANSBORO #NSLOW COUNTY, NORTH CAROLINA MAY 2006 PROJECT FINANCING HKIH UNIT COST GIANT PROJECT No. E—SRG-T-00-M NORTH CAROLINA RURAL ECONOMIC DEVELOPMENT CENTER NORTH CAROLINA CLEAN WATER MANAGEMENT TRUST FUND PHASE 2 - WASTEWATER TREATMENT .11 PLANT IMPROVEMENTS CONTRACT 1 - GENERAL CONSTRUCTION WWTP CONTRACT 2 - ELECTRICAL CONTRACT 3 - ' 'J • •�. Bill = 5;1 WATER MAIN EXTENSION 11 SEPARATE SET ji OF DRAWINGS CONTRACT 4 - LOW RATE INFILTRATION BASINS of TWINSET MAYOR: I APPROVED A David L. Russell NORTH CAROUNA ENVIRONM MANAGEMENT COMMISSII MANAGER: 1,1 I DIVISION OF WATER QUAD Edward L. Faison ZO- wOv.W-Xo PUBLIC UTILITIES SUPERINTENDENT: Mark C. Youna James G. All Elbert Bentc John Lister Phil Keagy GREEN EP4 WATER, WASTEWATEi, SUI 3133 N. OOLD®ORO Ur. P.O. TEL (2= 2V—SM FAX Lim V PRINTED AUG 1 S 20M Green Rigineaiig, P.LLC. MFi4Y 24wa �'' �Fr1 GREEN 4L 4, 11 INC COUNTY MAP q ef. f) W n � Y a 0 COUNTY s "Ea Eb �P Py AUG 2006 SGv SG LOCATION MAP scab T - low tE�!07sq'- A .JATA3W,liOSM43 A6jf. OFAO Jfif101A V10188INUA00 UUMMAAAM YTUA D H3TAW 30 00121Vi0 It w GRADING PLAN 1'=1 DO' vO 1495`"Vp C GREEN ENGINEERING TOWN OF SWANSBORO NGI Nl. "a-' WATER, WASTEWATER, BURVEYM PL ANNINQ PROJECT MANAGEMENT ;FGREE 3WN. S• P.O. BOX WO YALSO , N8D3 C.27WASTEWATER TREATMENT PLANT DTEL (252J 237-s0e5 PAX (W2) 243-74M OFFICE 0GRET393NIMCOM O1NSLOW COUNTY IMPROVEMENTS NORTH CAROLNA CB No 1 TOP 22.75 INV 19.75 CB No 2 TOP 24.07 INV 20.50 CB No 4 TOP 30.50 INV 26.88 CB No 5 TOP 30.50 INV 26.78 CB No 6 TOP 31.51 INV 27.78 CB No 7 TOP 31.51 INV 27.68 CB No 8 TOP 30.10 INV 27.10 GB No 9 TOP 28,86 INV 25.86 FES No 1 INV 19.00 SWOP No. 2 FES No 2 INV 1500 SNAP No 1 FES No 3 INV 17.00 SWOP Na. 2 FES No 4 INV &GO SWOP No. 1 DI No 1 TOP 30.08 INV 27.40 INV OUT 27.32 01 No 2 TOP 30.50 INV 27.32 DI No 3 TOP 26.75 INV 21.50 DI No 4 TOP 30.25 INV 27.15 DI No 5 TOP 30.00 INV 20.00 DI No 6 TOP 23.50 INV 19.50 MH No 1 1 OP 30.17 INV IN 27.10 INV OUT 27.00 EXISTING DRAINAGE SCHEDULE LINE / SIZE ATERI FROM TO REMARKS 32 8'0 DI EX OXIDATION DITCH DROP INLET #1656 SUB DRAIN 33 12 0 1 RCP I DROP INLET #1656 1 DROP INLET #1555 STORM DRAIN 34 12 0 RCP DROP INLET 01655 1 MH #1554 STORM DRAIN 35 12 0 RCP MH 1654 1 MH 11653 STORM DRAIN THERE ARE NO EJOSTING WETLANDS ON SITE 100 YEAR FLOOD ELEVATION = 10.00 MSL DRAINAGE BASIN DELINEATION SWALE DRAINAGE AREA DELINEATION 0$ m 1 aP 1 M: "7-4M2 II SILT FENCE, SEE SEE DRAWING C5 OF 10 FOR CONTINUATION CB No 9 o4r+ i - m W I 1 N M STD DETAILS, TYP TOP 28.86 g m i'-0" OFFSET IM !7 - �' • 1 m FROM-FES No. 1 PROPERTY 1 ej1• T 31.4 rC 1>e \ / ,99 TO 299] a 3' // C INV. 19.00 I > LINE, TYP PROPOSED SLUDGE _ N SWOPI I z HOLDING TANK AND CA PROP CB No 6 NO' 21 1 I UNE SLUDGE LOADING Top 31.51 j� 4+50 50 PROPOSED DRIVE 3 00 2 50 TC 2751 o 1I STATION _ _.INV. 27.78- - - -� __ _ _- _ _ _ 2+ 30 30.90 (20' B/C TO B/C)- gOP I- Tc zees 1 1 t41 Ze7� tl I I 1 I 1 t0 DI No. I / / T J1.JB TC 30.50 .14 _ Top w.ae - SEE DETAIL 3/C7 FOR _ 0 / _ TOP 30.10 INV 27.32 '• SIDEWALK LAYOUT , i O INV. 27.1 -� PROPOSED 1 1 tl M C C i 1 HEADW�Df�KS I,'' 7+p0 Tn z4.a1 , _ 1 'z ISEE DETAIL 4/C7 FOR , CB No. 7 =_ '- I \I TC W 75 T M75 SIDEWALK --'1 ___-_-_ _ TOP 31.51 LAYOUT I � I.7 INV. 27.68 PROPOSED 1 jf� DI No. 2 \� %< OXIDATION DITCH _ _�_ 1#1 TOP 30.50 \\ / _= aDISTRI WTION I- O -�`\1 \ , TC I I INV. D SECT 6 BOX No j I i -ap� 16' NiDE PAVED ROAD SECTION WITH CURB AND CUM, SEE / \ TC 31.27 STD DETAIL SHEET O6 SILT FENCE, SEE TAIL 6/ I I EXISTING 1 1 , / tr �, DI No. 6 TOP 22.75 I I STD DETALS, TYP FOR SIOEWALK I EQUALIZATION 1 1 i' / / ,' CB No. 2 TOP 23.50 INV. 19.75 Ij Tc 31.oz S XISTING OXI TI LAYOUT I BASIN ❑ 11 \ ,' ,/ ,� TOP 24.07 INV. 19.50,- I i I . INV. 20.50,' (TO 2480 3.0 DI No. 4 EXISTING TOP 30.25 I - /'._ ,, CONTROL BLDG > 1 . INV. 27.15 \ ( 1y r�F E IST DI No 1 -' 1 1\ IV21.85 EXISTING DISTRIBUTION BOX / ____u_4 11�-______- / i/ / / / J ` - / -AlBox No z 1 1 {( I 11-T'1-' // i 6'-0" HIGH CHAIN LINK TC 31.00 32 #• ___ 3__ i'-n% � //. ,� ,' ' / FENCE NTH STI) RBED DETAILS \ , MIRE, SEE STD DETAILS CB TOP N30.50 INV. 26.88 _ _ _ ' / TBM -CORNER .1 EXISTING 11 TC .65 _ 33 SEE DETAIL 2/C7 FOR S ` DETAIL 2/C7 FOR UGHT POLE EL 288 AEROBIC - :f TRANSITION TO 1 DIGESTER I I _ _ , RIXL-OUT CURB _� - _- 1 1 I SEE DETAIL r - � '-- I I / SIDE FOR EOP 30.64 EXIST EXISTCONNECT NEW FENCING 1. SIDEWALK CLARIFIER CLARIFIER / TO EXISTING AT _ , LOCATION SHOWN ��-- LAYOUT, /1 Bz PROPOSED ' a I 'aa --_ .I GD No. 5 PROPOSED SLUDGE TOP 36.78 -PUMPING STATION �-_ CLARIFIER I -aa ____� - INV. 26.78 , - ---' - _ EXISTING SLUDGE / i / 3 -__, ___`� _ ', _-- ,, + ,' •C a DRYING BEDS 1 -� - _ SILT FENCE, SEE+� PROPOSED DRAINAGE SCHEDULE 1 < ' END NEW FENCING AT EXISTING BUILDING - 6'-0" HIGH CHAIN LINK FENCE NTH BARBED WRE, SEE STD DETAILS �f0 GREEN I I � ----- - - ,-SfM ETAILS_TYP_- ' EXISTING I- i A I i '-',-- WORKSHOP AND d t i ' "�_------ SLUDGE PRESSu - - _ II - - - - / I ��k>c /''- --'•P / i / i i ' EXISTING TERTIARY FILTERS 1 _ �•\ j .DI No. 5 (COMPLETED Y \ / I UNDER PHASE 1)..II 1 W II i t 7z CT/P \I J�TOP 30.00 0INV. 20.00.- �' -- �-��/ EXIST. 12'0 CLIP/ , _ _ _ _ _ _ +� I I I I I I , N I \ THERE ARE NO EXISTING WETLANDS ON SITE INV 2D.45 EXISTING I REFERENCE SHEET CS OF 7 FOR EROSION CONTROL NOTES STORAGE II //7 /' -'-,-_ + I r ED BLDG I IIII IIII r' _ \ I 11 PROPOSED a 1 1 1` } 100 YEAR FLOOD ELEVATION = 10.00 MSL CB No 1 TOP 22.75 INV 19.75 CB No 2 TOP 24.07 INV 20.50 CB No 4 TOP 30,50 INV 26.88 CB No 5 TOP 30.50 INV 26.78 CB No 6 TOP 31.51 INV 27.78 CB No 7 TOP 31.51 INV 27.68 CB No 8 TOP 30.10 INV 27.10 CB No 9 TOP 28.86 INV 25.86 FES No I INV 19.00 SWOP No 2 FES No 2 INV 15.00 SWOP No. 1 FES No 3 INV 17.00 SWOP No. 2 FES No 4 INV BOO SWOP No. I DI No 1 TOP 30.08 INV 27.40 INV OUT 27.32 DI No 2 TOP 30.50 INV 27.32 01 No 3 TOP 26.75 INV 21.50 01 No 4 TOP 30.25 INV 27.15 DI No 5 TOP 30.00 INV 20.00 DI No 6 TOP 23.50 INV 19.50 MH No 1 TOP 30.17 INV IN 27.10 INV OUT 27.00 ULTRAVIOLET 1 E LIGHT "f DISINPEcTION �A1PIT j EXISTING DRAINAGE SCHEDULE -1� I ANION / ry'b"la. DETAIL I/C71 SIDEWALK IOUT III le RADING PL,A14--R� ROCK CHECK DAM._ _ 9 ' SEE STD DETAILS. TYP MATCHING 1'=40' ------ G \ \ LINE y SIZE ATERIA FROM TO REMARKS 32 8"O DI EX OXIDATION DITCH DROP INLET 1656 SUB DRAIN 33 12 0 RCP DROP INLET 1656 DROP INLET 1655 STORM DRAIN 34 12 0 RCP DROP INLET 1655 MH 1654 STORM DRAIN 35 12 0 RCP MH 1654 MH 1653 STORM DRAIN C9 OF 10 F SEE DRAWING \ ` \\, \ \\ I` ,. ,. , \.�\ \I\\ \�\ / I � CONTINUATION / '- � / � - 1'=40'-o' � :u tEYBON DATE BY DAM MAY ]OOa GREEN ENGINEERING TOWN OF SWANSBORO BALE pRa:TM No. Es/_.715 WATER, WASTEWATER, SURVEYWq M ANN14a PROJECT WASTEWATER TREATMENT PLANT FACILITY UPGRADES I i I NDIQ As BIDMN ASCII Nam, wa]7.pNr %DT DATE Yo O ( 2) 2BOX 89 FPICE 6OP p78p3 GRADING PLAN - x0. Ta t282I zn-638q IFAX Czszl 243-7480 pR�et�goOfA aJBLKnV COUNT)' IMPROVEMENTS NORFr� C;PRCIL,NA aEF r_. cd of In rTACK .� SIDEWALK LAYOUT DETAIL I'-20 C7 `11 RAS PUMP STATION EwSTING FJ(ISTING CLARIFIER CLARIFIER OSIDEWALK LAYOUT DETAIL 2 V-2W C7 DETAIL s I•_2e I CT i PR CLARIFIER �o OPOSED SYL130L LEAD SLUDGE EASTING PROPOSE) TATION SIDEWALK NOTE: SEE SIDEWALK DETAILS SHEET D6 OF 6 TOWN OF SWANSBORO WASTEWATER TREATMENT PLANT SIDEWALK PLAN amowcouffly IMPROVEMENTS NORM cAROLM ROADWAY a.n son O � H i F� I1 56'-II SIDEWALK LAYOUT DETAIL F67 r-au I CT T SIDEWALK LAYOUT DETAIL a r-26 cT 1 MTS WT 2WO ecaF pFO m H U7-47" p.B / swµ sioexux T M span Inm are pss WP H0. aN�rNu c7 aF 10 RACK L = 12 FT. W = 8 FT. THICKNESS _ 1 FT. 4��ZN CAI 4 = CFI MATCHLINE SEE DRAWING C4 OF 10 FOR CONTINUATION i y 6 K %I ffi z9 ze / 27 26 25 No. 2 15.00 `\ \\ •� N9 OUTLET STRUCTURE \ SEE DETAIL (THIS SHEET) / 12 FT. VEGETATED • / ENERGY DISSIPATION PAD 24 PERIMETER SHELF L = 6 FT. 23 22 21 / I 17 16 ' 1 1 73 �� / W = 4 FT. 2 19 18 i THICKNESS = 1 FT. —115', 5'CLASS "A" STONE POND PERIMETER SHELF - BELOW PERMANENT POOL ACCEPTABLE WETLAND SPECIES TO BE PLANTED ON 6:1 SUBMERGED VEGETATED PERIMETER SHELF: BROOMSEDGE ANDROPOGON VIRGINIWS) CATTAIL TYPHA SPP.) SOFT RUSH JUNGUS EFFESUS) ISCIRPUS SMARTWEED POLYGONNUM SPP.) SOFT -STEM BULRUSH VALIDES) TALL FESCUE PENSACOLA BAHIAGRASS SERICEA LESPEDEZA KOBE LESPEDEZA EROSION CONTROL NOTES SEEDING AND MULCHING TO BE APPLIED WTHIN 21 CALENDAR DAYS OF ALL LAND DISTURBING ACTIVITIES NOT PREVIOUSLY STABILIZED. SILT FENCE TO BE INSTALLED AS SHOWN OR AS DEEMED NECESSARY BY VISUAL OBSERVATION. SILT FENCE INLET PROTECTOR ROCK CHECK DAM O EXPANDED SHEET METAL MESH ANTI -VORTEX PLATE ANTI -VORTEX PLATE 43'{ TRASH RACK DETAIL CLEAR AND GRUB OUTLET STRUCTURE SITE. CONSTRUCT RISER/BARREL STRUCTURE AS SHOWN ON THE CONSTRUCTION DRAWINGS AND SPECIFIED IN THE CONTRACT SPECIFICATIONS. CLEAR AND GRUB ENTIRE POND SITE, REMOVING ALL TREES, STUMPS, AND DECAYED MATERIAL INSTALL ALL TEMPORARY SEDIMENTATION AND EROSON CONTROL MEASURES SURROUNDING POND SITE AS SHOWN ON THE PLANS. AFTER EACH RAINFALL EVENT, CHECK ALL TEMPORARY SEDIMENT CONTROL MEASURES AND CORRECT AS NECESSARY (FOREBAY TO BE USED AS TEMPORARY SEDIMENT TRAP AND SHOULD BE CLEANED OUT BEFORE POND IS PLACED INTO OPERATION). REMOVE TOPSOIL FROM POND SITE AND PLACE IN DESIGNATED BERM AREAS. PROOF ROLL DIKE FOUNDATION SOILS, UNDERCUTTING ALL UNSUITABLE MATERIAL AND REPLACING WITH SUITABLE BACK FILL EXCAVATE POND AREA, CONSTRUCT AND BACK FILL STORM DRAIN OUTFALL AS SHOWN ON THE CONSTRUCTION DRAWINGS. PROPERLY STABILIZE POND AREA TO PREVENT EROSION OF DIKE SLOPES, UPON COMPLETION OF PROJECT CONSTRUCTION REMOVE ALL SEDIMENT FROM FOREBAY AREA. LINE TOP AND SIDE OF EACH FOREBAY DIKE NTH CLASS I RIP RAP. ONCE POND AREA IS PROPERLY STABNZED AND APPROVED. REMOVE TEMPORARY DIVERSIONS, SILT FENCING, SEDIMENT BASINS, ETC. AND SEED PER SPECIFICATIONS. • THERE ARE NO EXISTING WETLANDS ON SITE • 100 YEAR FLOOD ELEVATION = 10.00' MSL ,15 16 75 FES No. 41 24"0 TRASH RACK �- 14 -- INV. 8.00 9 _ g, ' 12 1 10 TOPELEF RISER ,00 / - H 8'12 MODEL 101-C (a 18*0 RISER PIPE FOREBAY DIKE to SLIDE GATE WITH WH HANDEEL OR iJ j _POND I, •CLASS "A" STONE 14 EWAL 17 to— 8' DISCHARGE PIPE 15 tr 0 6'-0'x6'-0' CONCRETE SLAB m SIDE VIEW 710 F1 DIKE WATER OUALITY POND SUMMARY DRAINAGE AREA: POND INVERT: RISER/BARREL INVERT. INVERT CULVERT AT OUTET: PERMANENT POOL: PRIMARY SPILLWAY ELEV.: TOP OF RISER ELEV.: TOP OF DIKE: RISER DIA.: BARREL DIA.: TOP OF RISER E V. 16.00 4*0 DRAW DOWN PIPE INV. ELEV. 15.00 1"0 ORIFICE INLET INV. ELEV. 14.50 INVERT AT RISER 11.00 60'x6O' ANT] SEEP COLLARS OUTLET STRUCTURE DETAIL No Scale 6:1 SUBMERGED VEGETATED PERIMETER SHELF 5.10 AC. 11.00 11.00 8.00 15.00 15.00 16.00 19.00 18' 8. 18"0 RISER PIPE 8' MODEL 101-C _SLIDE GATE NTH HANDWHEEL OR EOUAL REAR VIEW 6. CE POND BEcnON NOV 15 2006 No Scale PROJ'0 TOWN OF SWANSBORO �° °"'E °"M '""'°°° NO�( � �a GREEN ENGINEERING STORMWATER OUALfTY REVISED POND 7-24-06 WLY SCALE PRLUECI No E97-472.5 F :NCI I NEB WATER, WASTEWATER SURVEYINQ PLAM41NC;4 PROJECT MANAOlEmENT R 1 �. WASTEWATER TREATMENT PLANT REVISED CONTOURS B_,6_06 WILY Holes u"nle s" 97. P5 ASCI fRL 9t.2. Fo cREE?. N 303 NE QOLDBBORO STE P.O. BOX 809 VVM.HOK PLO 27893 POND No. 1 owmE alE Nw i4. 2006 SON oNSLOW COUNTY IMPROVEMENTS NORTH CAROLwA ° "a' iEttti itt,t. TEL (252) 237-6385 FAX (252) 243-74M OFFICE ®OfNQCOM affrw. C9 aF �O RACK D FOR CONTINUATION SEE SHEET C4 OF 10 & C5 OF 10 ENERGY DISSIPATION PAD Q�� L=6Fr. 4 W = 4 FT. THICKNESS = 1 FT. a I H CLASS "A" STONE :\2930 b 29 POND FOREBAY DIKE 25 27 CLASS "A" STONE \\ \ 6 / • 25 _ 12 FT. VEGETATED= a M1 aeFES No. 123 PERIMETER SHELF- a CB' No. 2 INV. 19.00 5 98' 2 TOP 24.07 21 INV. 20.50 .� 19 20 9e' 17 FS",r 17 a, DI No. 6co 5 TOP 23.50 a - g 'INV. 19.50 - e 1 Ci I -18 22 21 _- 25- CB No. 1 23 TOP 22.75 24 27 2 21 22 23 INV. 19.75 �y 19 ` 19 17 I I i / 11 18 19 20 01 11 22 21 \ EX.1 RCP INV ' 29 INV. 15.5.49 2� 6 25 - x11 _%- 1 ' q 4 - WWTP ENTRANCE ROAD 4ii�-]C7.[d*7.I I;10701!LYu: K SEEDING AND MULCHING TO BE APPUED WITHIN 21 CALENDAR DAYS OF ALL LAND DISTURBING ACTIVITIES NOT PREVIOUSLY STABILIZED. SILT FENCE TO BE INSTALLED AS SHOWN OR AS DEEMED NECESSARY BY VISUAL OBSERVATION. SILT FENCE INLET PROTECTOR )--) ROC( CHECK DAM O ^IbI. GRADE 6 1 SUBMERGED VEGETATED - EL 20.00 PERIMETER SHELF 3.1 6.1 NORM. POOL EL. 1S _. BOTTOM EL 1. I •- I1�T_/L� pbrp,/ • p/t��1 FOND SEC1M� No Scale No. 17. ET STRUCTURE DETAIL (THIS SHEET) 24 L=6Fr. W=4Fr. THICKNESS = 1 FT. WATER (DUALITY POND SUMMARY DRAINAGE AREA: 1.80 AC. POND INVERT: 15.00 RISER/BARREL INVERT: 18.00 INVERT CULVERT AT OUTLET: 17.00 PERMANENT POOL: 19.00 PRIMARY SPILLWAY ELEV.: 19.00 TOP OF RISER ELEV.: 20.00 TOP OF DIKE: 22.00 RISER DIA.: 18, BARREL DIA.: 8' RECEI ♦ ED NOV 15 2006 DWQ�/�� - PROJ # �'V go'F"0 �� • THERE ARE NO EXISTING WETLANDS ON SITE • 100 YEAR FLOOD ELEVATION = 10.00' MSL CLEAR AND GRUB OUTLET STRUCTURE SITE. CONSTRUCT RISER/BARREL STRUCTURE AS SHOWN ON THE CONSTRUCTION DRAWINGS AND SPECIFIED IN THE CONTRACT SPECIFICATIONS. CLEAR AND GRUB ENTIRE POND SITE, REMOVING ALL TREES, STUMPS, AND DECAYED MATERIAL INSTALL ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES SURROUNDING POND SITE AS SHOWN ON THE PLANS. AFTER EACH RAINFALL EVENT, CHECK ALL TEMPORARY SEDIMENT CONTROL MEASURES AND CORRECT AS NECESSARY (FOREBAY TO BE USED AS TEMPORARY SEDIMENT TRAP AND SHOULD BE CLEANED OUT BEFORE POND IS PLACED INTO OPERATION) REMOVE TOPSOIL FROM POND SITE AND PLACE IN DESIGNATED BERM AREAS. PROOF ROLL DIKE FOUNDATION SOILS, UNDERCUTTING ALL UNSUITABLE MATERIAL AND REPLACING WITH SUITABLE BACK FILL EXCAVATE POND AREA, CONSTRUCT AND BACK FILL STORM DRAIN OUTFALL AS SHOWN ON THE CONSTRUCTION DRAWINGS. PROPERLY STABILIZE POND AREA TO PREVENT EROSION OF DIKE SLOPES. UPON COMPLETION OF PROJECT CONSTRUCTION REMOVE ALL SEDIMENT FROM FOREBAY AREA. LINE TOP AND SIDE OF EACH FOREBAY DIKE WITH CLASS I RIP RAP. ONCE POND AREA IS PROPERLY STABILIZED AND APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCING, SEDIMENT BASINS, ETC. AND SEED PER SPECIFICATIONS. POND SEEDM REOUFEMENTS POND PERIMETER H F - BELOW PERMANENT POOL ACCEPTABLE WETLAND SPECIES TO BE PLANTED ON 6:1 SUBMERGED VEGETATED PERIMETER SHELF: BROOMSEDGE ANDROPOGON NRGINICUS) CATTAIL TYPHA SEP.) SOFT RUSH JUNCOS EFFESUS) ISCIRPUS SMARTWEED POLYGONNUM SPP.) SOFT -STEM BULRUSH VALIDUS) POND SIDE SLOPES - ABOVE PERMANENT TALL FESCUE POOL PENSACOLA BAHIAGRASS SERICEA LESPEDEZA KOBE LESPEDEZA 'K EXPANDED SHEET METAL MESH TOP OF RISER ANTI -VORTEX T LEV. 2 .60 _ PLATE ELEV. 20.00 I-� 4'0 DRAW DOWN PIPE-18'0 RISER PIPE 8' MODEL 101-C INV. ELEV. 19.00 8' MODEL 101-C SUDE CATE WITH HANDWHEEL OR �/ "RISER SLIDE GATE WITH EOUAL 1/2.0 ORIFICE INLET INV. ELEV. 18.50 HANDWHEEL OR ANTI -VORTEX EQUAL8INVERT 0 AT RISER 18.00 431 60'x60' ANTI SEEP 6•0'z6'-0' CONCRETE SLAB COLLARS SIDE VIEW REAR VIEW TRAM RACK DETAIL OUTLET STRUCTURE DETAIL No Scale o n m o o cl V� 449b F GREEN ENGINEERING TOWN OF SWANSBORO STORMWATER DUALITY F •.•• I NE..•: ,�,, WATER' N. OWASTEWATER, 9UHVEYM PLAN 4M PROUECT MANAOEME34T WASTEWATER TREATMENT PLANT •, 303 OI.D8BOfl0 8T. P.O. BOX 009 WILSOK N.C. 27893 POND No. 2 .,,,Fo GREE„�S�''� 713 (252) 237-5305 FAX (252) 20.3-7489 OFFICE 0CFEE 34MOOM ONSLOW COUNTY IMPROVEMENTS NORTH CA IOLINA a Tigm CIOcF 10 1 RACK