Loading...
HomeMy WebLinkAboutSW8011020_HISTORICAL FILE_20210809STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Nozo DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE u l0 0 � 0 q YYYYMMDD Burd, Tina J From: Burd, Tina 1 Sent: Thursday, August 5, 2021 2:53 PM To: gbattle3@ad.unc.edu' Subject: SW8 011020 - UNC-CH Institute of Marine Sciences Fisheries Research Lab & Shop Building The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on August 4, 2021. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Ernraii correspondence to and from this address is subject to the North Ca; o;ina Public Records Law and may be disclosed to third parties. Website: htto //de(l.nc.gov/about/divisions/energy-mineral-land-resourcesistormwater Based on the, current guidance to minimize, the spread of COVID-tg, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes; all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to hancite your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Burd, Tina J From: Microsoft Outlook To: gbattle3@ad.unc.edu Sent: Thursday, August 5, 2021 2:53 PM Subject: Undeliverable: SW8 011020 - UNC-CH Institute of Marine Sciences Fisheries Research Lab & Shop Building Office 365 Your message to gbattle3@ad.unc.edu couldn't be delivered. gbattle3 wasn't found at ad.unc.edu. Tina.Burd Office 365 gbattle3 Action Required Recipient Unknown To address How to Fix It The address might be misspelled or might not exist. Try one or more of the following: Retype the recipient's address, then resend the message - If you're using Outlook, open this non -delivery report message and click Send Again from the menu or ribbon. In Outlook on the web, select this message, and then click the "To send this message again, click here." link located just above the message preview window. In the To or Cc line, delete and then retype the entire recipient's address (ignore any address suggestions). After typing the complete address, click Send to resend the message. If you're using an email program other than Outlook or Outlook on the web, follow its standard way for resending a message. Just be sure to delete and retype the recipient's entire address before resending it. Remove the recipient from the recipient Auto -Complete List, then resend the message - If you're using Outlook or Outlook on the web, follow the steps in the "Remove the recipient from the recipient Auto -Complete List" section of this article. Then resend the message. Be sure to delete and retype the recipient's entire address before clicking Send. Contact the recipient by some other means, (by phone, for example) to confirm you're using the right address. Ask them Non-TranSfer Application Completeness Review Checklist - Short Version Project Name: o4oc.4 r`sAc9_%es RtA" LOB py'a SAO? Project County/Location: L.Aea-r-fL& Permit Action: New Not located in the ETJ of the following deligated and functioning programs: Date Delivered to WIRO: 7 20Z RIMS Received/AccepteddgedDate Date: BIMS Acknowledged Datet: a New Permit #2: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mod Renewal Permit Type: HD D / LD Overall / HD &LD Combo General Permit / Offsite / Exempt Development Type: Commercial / Residential / Subdivided?: Subdivision Rule(s): 1 12017 Coastal 1 12008 Coastal r)41995 Coastal Existing Permit #: Expriation Date 3: $ram all 07-0 ElOffsite to SWB: ❑Is Lot ID'ed in Master Permit? Phase II Universal El1988 Coastal Permittee Type & Documents Needed: Property Owner(s) FIPurchaser Lessee =HOA =Developer =Viable? I =Viable? =Viable? =Deed =Purchase Aemt I =Lease I =Election Minutes Subdivided: Common Area Deed Paperwork IZApplication rquiFee: ®$S05 (within 5mo) Check#(s): ❑Supplement' (1 newform orfor olderforms: I original per SCM) FlO&M' El Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Plans (2 Sets) F�PE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES r Enter BUS Acknowledged Date on this Sheet 2For New Projects -Enter New Permit # on Supplements & Deed Restiction Templates. =No Fee 1— 3If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first. EMAILED ENGINEER DATE: Comments: MK, ZATTILO u%/'«�L �AeEb 70 ?'e6y)bG REVIEWER NAME: �,SHI i I c.J 1A�/A) 6 AV/^D"' ^' , G: W CI%Reference Libra ry\Procedures\Checklists\Completeness Review Checklist_2020 01 31 I;NVIfC FIIiAIXI I & SAFF 1'Y July 30, 2021 The University of North Carolina at Chapel Hill Department of Environment. Health R Safety 1120 Estes Drive Ext.. CB# 1650 Chanel Hill. North Carolina 27599-1650 Christine Hall North Carolina Department of Environmental Quality Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Subject: State Stormwater Permit Number SW801 1020 Permit Renewal Application UNC-CH Institute of Marine Sciences Fisheries Research Lab and Shop Building Carteret County Dear Ms. Hall, Enclosed please find one original and one copy of the State Stormwater Permit Renewal Form and the Inspection and Certification documentation for the above referenced facility. A check for $505 is also enclosed for the permit fee. If you have questions regarding this information, please contact me at (919) 962-9752 Sincerely, Sharon A. Myers, L. G. Environmental Compliance Officer cc: Ms. Catherine Brennan G_IlLo=A V C,�4' AUG 0 4 2021 ry�I-,��' DUNCKIF Nam' & DUNHAM 141P Ls now synTerra June 30, 2021 Ms. Sharon Myers The University of North Carolina at Chapel Hill Department of Environment, Health & Safety 1120 Estes Drive Extension Campus Box 1650 Chapel Hill, North Carolina 27599-1650 Science & Engineering Consultants 511 Keisler Dr # 102, Cary, NC 27518 1919.858.9898 SUBJECT: Inspection and Certification of Stormwater Control Measure Device Institute of Marine Sciences Fisheries Research Lab & Shop Building Expansion Morehead City, North Carolina Permit No. SW8011020 Dear Ms. Myers: SynTerra Corporation (SynTerra) conducted an inspection of the stormwater control measure (SCM) device at the above -referenced site on June 21, 2021. We conducted the inspection in accordance with the Operation and Maintenance Agreement for Infiltration Trenches that is included as part of the facility's Stormwater Management Permit and the Operation and Maintenance Provisions for Infiltration Trenches listed in Part C-1 of the North Carolina Stormwater Design Manual (revised 11/20/20). The SCM device installed at the site and listed in the Stormwater Management Permit consists of an infiltration trench installed beneath the front parking lot on the north side of the site. The location coordinates of the BMP are N34° 43' 26" (34.7240), W76° 44' 43" (76.7453). Storm water runoff from 0.22 acres of site impervious areas, consisting of a parking lot on the north side of the property, follows the site surface grade and flows into surface catch basin inlets, a lift station, and through inlet piping into the infiltration trench. The infiltration trench is designed to capture and treat a runoff volume from the first 1.5 inches of rainfall per the Coastal Area Management Association (CAMA) stormwater requirements. The trench is designed to draw down the design storm volume within a 1.7-hour period. Volume in excess of the design storm is routed through 18-inch piping and discharged through a 50-foot vegetated filter ditch to daylight on the south side of the property. synterracorp.com C��g Ftr; HuG 0 4 20?1 Inspection and Certification of SCM Device UNC Institute of Marine Sciences -Fisheries Research Lab June 30, 2021 Page 2 Inspection Criteria and Results We conducted our inspection within 24-hours following a storm event that produced 0.5 inches of rain locally. We based our inspection on the following criteria: 1. SCM Perimeter and Surrounding Drainage Area 2. Grass Filter Strip/Pretreatment Area 3. Flow Diversion Structure 4. Main Treatment Area 5. Observation Well 6. Emergency Overflow Berm 7. Receiving Area Inspection observations are provided in the attached checklist, and inspection photos are provided in the attached inspection log Based on the criteria used as part of this inspection and our observations, we certify that the SCM device installed at the subject site is operating as designed, and no deficiencies are noted. All the best, SynTerra Andrew M. Rodak, P.E. f``�: ;U Lu1i.`r•. .a Senior Peer Review . V $7 ; SEAL s p/ 24573 6— F7. Senior Engineer Certified Storm Water BMP Inspection & Maintenance Professional 4993 Attachment/s: Inspection Checklist Photo Log $V/ . Chris J. Bagley, P.E., CIH, CHMM, QEP Senior Engineer/Industrial Hygienist synterracorp.com Ilsynterracorp.comlNasunilSharedPropl_CaryIUNC-Chapel HiIIUMS-SW Permit Support-00.3865.001ReportsMM Inspection Report-21373.docx Stormwater Control Measure Inspection Checklist — UNC Institute of Marine Sciences Weather Conditions: Partly Cloudy, 80' F Facility Location: Fisheries Research Lab, Morehead City SCM Type: Infiltration Trench Inspection Date: June 21, 2021 Instructions: Place a check mark in the box under "Satisfactory" for criteria meeting expectations and a check -mark in the box under "Unsatisfactory" for criteria that does not. If any response requires elaboration or corrective action, do so in the Notes and Comments spaces provided. Further descriptions or comments should be attached on a separate sheet of paper, if necessary. Please keep the completed form on file at the facility for 1 year. iteria Notes/[tecommendeerimeter rra� e area contributing runoff to SCM is free of trash/debris ilter Strip/Pretreatment Area Inlet pipe, swale or channel is free of debris and un-clogged No debris noted in inlet lift station Areas of bare soil and/or formation of erosive gullies Sediment accumulation depth <3-inches Sediment depth in inlet lift station < 3 inches Flow Diversion Structure Condition of diversion structure Main Treatment Area Water accumulation on surface of trench more than 24 hrs after storm event No evidence of accumulation above invert of inlet piping after a 0.5-inch storm event Grass or other plant growth on surface of trench Trench is installed beneath a paved parking lot. Observation Well Presence of water more than three days after storm event Emergency Overflow Berm Condition of berm- evidence of erosion SGM Criteria Notes/RecoInmended Corrective Satisfactory Unsatisfacto 4N Receiving Water Presence of erosion or other signs of damage at the outlet Discharges from the trench are causing erosion or sedimentation in receiving water Additional Comments Inspectors Name and Signature: Andrew Rodak, P.E. 6/23/21 P:1_Caryl UNC-Chapel ,`IHMM.S-SW Permit Support-00.3865. OOIFormsWAfP Inspection Checklist-Fi.sheries.doc 4e PHOTOGRAPHIC LOG yrTa Client Name: Site Location: Project No. UNC-Chapel Hill Institute of Marine Sciences -Fisheries Building, Morehead 00.3865.00 City, North Carolina Photo No. 1 Date: 6/21/21 t} TM`�`� " 9 Direction of Photo: N/A� Description: Inlet device, infiltration' trench „ Y 1 DUNCKLEE ,/ & DUNHAM is now synTerra June 30, 2021 Ms. Sharon Myers The University of North Carolina at Chapel Hill Department of Environment, Health & Safety 1120 Estes Drive Extension Campus Box 1650 Chapel Hill, North Carolina 27599-1650 Science & Engineering Consultants 511 Keisler Dr # 102, Cary, NC 275181919.858.9898 SUBJECT: inspection and Certification of Stormwater Control Measure Device Institute of Marine Sciences Fisheries Research Lab & Shop Building Expansion Morehead City, North Carolina Permit No. SW8011020 Dear Ms. Myers: SynTerra Corporation (SynTerra) conducted an inspection of the stormwater control measure (SCM) device at the above -referenced site on June 21, 2021. We conducted the inspection in accordance with the Operation and Maintenance Agreement for Infiltration Trenches that is included as part of the facility's Stormwater Management Permit and the Operation and Maintenance Provisions for Infiltration Trenches listed in Part C-1 of the North Carolina Stormwater Design Manual (revised 11/20/20). The SCM device installed at the site and listed in the Stormwater Management Permit consists of an infiltration trench installed beneath the front parking lot on the north side of the site. The location coordinates of the BMP are N34° 43' 26" (34.7240), W76° 44' 43" (76.7453). Storm water runoff from 0.22 acres of site impervious areas, consisting of a parking lot on the north side of the property, follows the site surface grade and flows into surface catch basin inlets, a lift station, and through inlet piping into the infiltration trench. The infiltration trench is designed to capture and treat a runoff volume from the first 1.5 inches of rainfall per the Coastal Area Management Association (CAMA) stormwater requirements. The trench is designed to draw down the design storm volume within a 1.7-hour period. Volume in excess of the design storm is routed through 18-inch piping and discharged through a 50-foot vegetated filter ditch to daylight on the south side of the property. synterracorp.com Inspection and Certification of SCM Device UNC Institute of Marine Sciences -Fisheries Research Lab June 30, 2021 Inspection Criteria and Results Page 2 We conducted our inspection within 24-hours following a storm event that produced 0.5 inches of rain locally. We based our inspection on the following criteria: 1. SCM Perimeter and Surrounding Drainage Area 2. Grass Filter Strip/Pretreatment Area 3. Flow Diversion Structure 4. Main Treatment Area 5. Observation Well 6. Emergency Overflow Berm 7. Receiving Area Inspection observations are provided in the attached checklist, and inspection photos are provided in the attached inspection log Based on the criteria used as part of this inspection and our observations, we certify that the SCM device installed at the subject site is operating as designed, and no deficiencies are noted. All the best, SynTerra Senior Peer Review SEALp • "",7 r' '6m ^_/ Q ///J � ^ e n"NINE _. A : Andrew M. Rodak, P.E.*�F'��'�O�,��`V .; Chris J. Bagley, P.E., CIH, CHMM, QEP Senior Engineer „ °°��OliPii1414 :' :'C. Senior Engineer/Industrial Hygienist Certified Storm Water BMP Inspection & Maintenance Professional #993 Attachment/s: Inspection Checklist Photo Log synterracorp.com 1lsyntenawrp.comWasunilSharedlProjl CaryIUNC-Chapel HilAIMS-SW Permit Suppo0-00.3865.00IReporlsMM Inspection Report-21373.docz Stormwater Control Measure Inspection Checklist — UNC Institute of Marine Sciences Weather Conditions: Partly Cloudy, 80' F Facility Location: Fisheries Research Lab, Morehead City SCM Type: Infiltration Trench Inspection Date: June 21, 2021 Instructions: Place a check mark in the box under "Satisfactory" for criteria meeting expectations and a check -mark in the box under 'T[INatisfactorv" for criteria that does not. If any response requires elaboration or corrective action, do so in the Notes and Comments spaces provided. Further descriptions or comments should be attached on a separate sheet of paper, if necessary_ Please keep the completed form on file at the facility for 1 year. S(30 criteria ,y ry`1 Satisfacto llnsatisfactoey Notes/Recommended (:orrectiv Action s SQvI Perimeter Drainage area contributing runoff to SCM is free of trash/debris Crass Filter Strip/Pretreatment Area Inlet pipe, swale or channel is free of debris and un-clogged J No debris noted in inlet lift station Arens of ban; soil and/or formation ofcrsive gullies Sediment accumulation depth <3-inches Sediment depth in inlet lift station < } inches Flmv Diversion Structure Condition ofdiversion structure �I Main Treatment Area Water accumulation on surface of trench more than 24 firs after storm event No evidence of accunmlation above invert of inlet piping after a 0.5-inch storm event Gross or other plant gmsr1h on surface nllrcnch 'french is installed beneath a paved parking lot. Observation well Presence of water more than three days alter stone event yl Emergency Overnoar Berm Condition ol'berr- evidence of erosion SCKICi'iteria Satisfacror,� nsatisfnetory NntesBecommended Corrective Action s Receiving Water Presence of erosion or other signs of damage at the outlet Discharges from the trench are causing erosion or sedimentation in receiving water J Additional Comments r rapccuos Name and nlgnanare: Andrew Rodak P.F. Date: 6/23/21 P:1_Gm9IbVC{&,,l Hdl IILS-0'I1'Prrmrr Suppw1-00 3W.00 lormo R /P Gupanou C'Ixokhv-Fin/mn r. d— PHOTOGRAPHIC LOG Client Name: UNC-Chapel Hill oto No. Date: 1 1 6/21/21 Direction of Photo: N/A. Description: Inlet device, infiltration trench Site Location: Institute of Marine Sciences -Fisheries Building, Morehead City, North Carolina Project No. 00.3865.00 11 hwv,�Jl lC HLALTI I & SAWII'Y June 12, 2014 The University of North Carolina at Chapel Hill Department of Environment, Health & Safety 1120 Estes Drive Ext., CB# 1650 Chapel Hill, North Carolina 27599-1650 Ms. Georgette Scott North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Change in Responsible Official Stormwater Management Permit Renewal Application Stormwater Permit #SW8 8011020 The University of North Carolina at Chapel Hill Institute of Marine Sciences Fisheries Research Lab and Shop Building Replacement Carteret County, North Carolina Dear Ms. Scott: This letter serves as formal notification that on June 9, 2014, Mr. Mathew M. Fajack assumed the duties of Vice Chancellor of Finance and Administration at The University of North Carolina at Chapel Hill from the former Vice Chancellor of Finance and Administration, Ms. Karol Kain Gray. Included in these duties is the role of Responsible Official at the University with respect to the above referenced permit. Should you have any questions or require any additional information associated with this notification, please contact Ms. Sharon Meyers, Environmental Health and Safety Professional, at (919) 962-9752. Sincerely, tz& �j'za, M.B.A. Director of Environment, Health, and Safety Cc: Sharon Myers Malachy Donohue ECEIV E JUN 18 20% BY: UNC The University of North Carolina at Chapel Hill IDepartment of Environment, Health & Safety ENVULONMENT, 1120 Estes Drive Ext., CB# 1650 HFAIXI I to SAFETY Chapel Hill, North Carolina 27599-1650 24 February 2012 Ms. Georgette Scott �I11 North Carolina Division of Water Quality Wilmington Regional Office 1 127 Cardinal Drive Extension Wilmington, NC 28405 RE: Change in Responsible Official Stormwater Management Permit Renewal Application Stormwater Permit #SW8 8011020 ��LI The University of North Carolina at Chapel Hill Q Institute of Marine Sciences Fisheries Research Lab and Shop Building Replacement Carteret County, North Carolina Dear Ms. Scott: This letter serves as formal notification that on 1 December 2011, Ms. Karol Kain Gray assumed the duties as Vice Chancellor of Finance and Administration at The University of North Carolina at Chapel Hill from the retiring Richard L. Mann, Ph.D. Included in these duties is the role as Responsible Official with respect to the above referenced permit and/or regulatory document. Should you have any questions or require any additional information associated with this notification, please contact Daniel W. Elliott. Ph.D., Environmental Affairs Manager at (919) 962-5718. Sincerely, Mary Beth /Koza, M.B.A. a Director of Environment, Health, and Safety Cc: Daniel W. Elliott, Ph.D. e FEB 2 g 2012