Loading...
HomeMy WebLinkAboutSW7131102_HISTORICAL FILE_20210401STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. sw-mj DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M DD vm-q ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Qualify April 1, 2021 Wal-Mart Stores East, LP Attention: Mr, Rich Dailey, Sr. Director, EH&S Compliance 702 SW 8 th Street — Mail Stop 0505 Bentonville, AZ 72716-0505 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7131102 Wal-Mart — Grantsboro, NC Dear Mr. Dailey: Pamlico County A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7131102 for a stormwater treatment system consisting of a wet detention pond serving a Wal-Mart Store located on NC Hwy 55 in Grantsboro, NC expires on December 6, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: https:Hdeq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roper thorpe ncdenrgov. Sincerely, A4& a, for Roger K. Thorpe Environmental Engineer ®� �� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington. North Carolina 27889 �_ tm.�M�m..u'. 252.946.6481 mho MCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary August 7, 2014 Mr. Michael Thomas, Director of Project Design & Management Wal-Mart Stores East, LP 2001 SE 10 th Street Bentonville, Ar 72716 Subject: Failure to Provide Certification Stormwater Management Permit SW7131102 Wal-Mart Store # 7238, Grantsboro, NC High Density Commercial Wet Pond Project Pamlico County Dear Mr. Thomas: This letter is to inform you of certain conditions of your stormwater permit that have not been met. Permit SW7131102 was issued on December 6, 2013 for a wet detention pond to serve Wal-Mart Store # 7238 located on Hwy 55 in Grantsboro, INC. A Division of Energy, Mineral, and Land Resources file review and inspection confirms that a certification of completion has not been submitted. Permit condition number II. 8 states "Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation..." Please provide a copy of the certification to this Office at the letterhead address within 30 days of receipt of this letter. If you have questions, please feel free to contact me at (252) 948-3923. Sincerely, U `` r . : �' Roger`K. Thorpe Environmental Engineer Washington Regional Office Cc Bohler Engineering Division of Energy, Mineral, and Land Resources . Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-6481/ FAX: 252-975-3716 Internet: htto://PoOal.ncdenr.org/web/Ir/land-Quality An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper October 10, 2013 Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, North Carolina 28208 Attention: Mr. Chris Capellini, P.E. c c a oe I l i n i(a,bo h l e re n e. co m Reference: Report for Soil Evaluation / Seasonal High Water Table (SHWT) Estimation for Stormwater Best Management Practices (BMP's) Proposed Walmart (WM #86322) NC Hwy 55 Grantsboro, Pamlico County, North Carolina S&ME Project No. 1051-13-234B Dear Mr. Capellini: S&ME, Inc. (S&ME) has conducted a soil evaluation including SHWT estimation in general accordance with S&ME Proposal P140-13E dated July 9, 2013. Our evaluation was conducted to provide information for the design of an appropriate stormwater Best Management Practice (BMP) device and a Stormwater Management Permit Application to the North Carolina Department of Environment and Natural Resources (NCDENR) — Division of Water Resources (DWR). A soil scientist evaluated the soil conditions within the proposed stormwater BMP area. PROJECT BACKGROUND Development of the 15.23 acre site will include a Walmart building (north portion of site), associated paved parking and access drives (primarily south of the proposed building), and a stormwater BMP (north of the proposed building). We also understand that a gas station will be developed on the south portion of the site. The property is currently being used as a com field, is undeveloped, and does not contain any structures. As a result of the proposed construction and associated impervious surface, a stormwater BMP is required to treat stormwater generated from the site to comply with State stormwater management requirements. Use of stormwater BMP's are subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for 4permitting of stormwater BMP's are provided in the North Carolina Division of Water foot,&' Resources— Stormwater BMP Manual (NCDENR-S W-BMP), dated July 2007 (Revised 1l 9N S&ME, INC. / 3201 Spring Forest Road / Raleigh, NC 27616 / p 919.872.2260 1919.790.8909 / www.smeinc.com Soil Evaluation for Stonnwater BMP SBME Project No. 1051-13-234B Walman Store, Hwy 55, Grantsboro, North Carolina October 10, 2013 September, 2009). There is one wet detention basin area proposed as depicted on the attached Stormwater Soil Evaluation Map (Figure 1). FINDINGS The soil evaluation was performed with hand auger borings at two locations (B-1 and B. 2) within the proposed wet detention basin area as shown on the attached Figure 1. Our evaluation consisted of identifying and recording the soil morphological conditions at these locations in order to develop soil profile descriptions, which are also shown on the attached Figure 1. Permeability/Hydraulic Conductivity Estimation Under current North Carolina Division of Water Resources (NCDWR) requirements for various stormwater devices, the in -situ soil permeability/conductivity is an important design factor. Therefore, the soil profile descriptions on the attached Figure 1 show the soil morphological conditions including texture, estimated United States Department of Agriculture (USDA) permeability and estimated USDA hydraulic conductivity (Ksat) for the different soil horizons found on -site. In the area of Boring Location B-1 and B-2 within the proposed wet detention basin area, the soil surface layer consisted of loam material which has an estimated USDA permeability range of-0.6 to 2 inches/hour and USDA estimated Ksat range of 0.14 to 1.4 inches per hour. The underlying soil material consisted of clay and silty clay material which has an estimated USDA permeability range of 0.06 to 0.2 inches/hour and USDA estimated Ksat range of 0.014 to 0.14 inches per hour. Please refer to the enclosed map and soil profile descriptions, for more information. These estimates were obtained from one or more of the following: Pamlico County Soil Survey "Physical & Chemical Properties of the Soil - Permeability'; and/or USDA- NRCS (United States Department of Agriculture - Natural Resource Conservation Service) official series description, and/or "NRCS Field Book for Describing & Sampling Soils" the permeability estimates were converted to conductivity on the profile description tables. SHWT Estimation and OWT Measurement Under current NCDWR regulations, the depth of various stormwater BMP devices from the SHWT is an important design consideration. For example, current regulations for wet detention basins require that the permanent pool elevation (PPE) shall be no more than six inches above or below the SHWT in order to maintain a permanent pool of water and to avoid doing a hydrogeologic analysis. Therefore, S&ME evaluated the SHWT by advancing hand auger borings and evaluating the soil for evidence of SHWT influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate Soil Evaluation for Stormwater BMP S&ME Project No. 1051-13-234B Walmart Store, Hwy 55, Grantsboro, North Carolina October 10, 2013 processes that are driven by SHWT fluctuations, such as iron reduction and oxidation and organic matter staining. See Table 1 below and the soil profile descriptions on Figure 1 for the estimated SHWT depths based on soil color. In addition, S&ME recorded the observed water table (OWT) level at each indicated hand auger boring location if applicable. The OWT was measured as the static water level in each of the temporary hand auger boring locations below existing ground level (EGL). It should be noted that the static water level/OWT measured in the auger holes is a measurement of the water table at that moment and does not represent an average water level or the highest point at which the water table may rise to. Furthermore, it is expected that groundwater elevations in the study area will likely be influenced by factors such as precipitation and proximity to surface water discharge/recharge features. See Table 1 below and the attached soil profile descriptions for the estimated SHWT depths based on soil color and measured OWT depths. Table 1: SHWT & OWT Information L= b SH,Ag5, s IchebeowfEGL A �mocatin�# h::e; zs p belojw%'E• G` L1y' ),. B-1 <12 26 B-2 <12 24 CONCLUSION The NCDENR-SW-BMP Manual requires that the permanent pool elevation (PPE) of a wet detention basin shall be within +/- 6 inches of the SHWT or be maintained using a liner with permeability below 0.01 inches per hour. The SHWT estimations at both Boring Locations B-1 and B-2 is less than 12 inches below the existing ground surface and therefore the PPE should be 6 to 12 inches below the existing ground surface at these locations. Also, current regulations for wet detention basins state that if a liner is required, it must be constructed or compacted such that the infiltration rate is no more than 0.01 inches per hour. Both Boring Location B-1 and B-2 had soil with estimated permeability/infiltration rates that may be conducive for use as a clay liner, however additional laboratory or in - situ testing would be required to confirm. LIMITATIONS Data only from hand auger borings, where performed, and conditions may vary in other areas of the proposed stormwater BMP. Soil Evaluation for Stormwater BMP S&ME Project No. 1051-13.234B Walmart Store, Hwy 55, Grantsboro, North Carolina October 10, 2013 CLOSING S&ME appreciates the opportunity to provide these services to you. If you have any questions, please contact us. Sincerely, S&ME, Inc. Walter Cole, L.S.S. Rob Willcox, L.S.S Environmental Scientist Natural Resources Team Leader (919)801-3798 wcole@smeino.com Attachments: Figure 1: Stormwater Soil Evaluation Map S:tProjects11051-13-234B%Gmntsboro Walmart\SHWTIRePorMStomiwater Soil Evaluation.doc 1 0 z*HAOt .seer We t2 HA0t B -0 I V I r_a Q W/`.'YW1I\O rrfr i .w l I BOHLER E N G I N E E R I N G November 25, 2013 Via: FedEx NCDENR-Express Permitting 943 Washington Square Mall Washington, NC 27889 Attn: Mr. Scott Vinson Re: Proposed Commercial Development Express Permitting for Stormwater Permit and Land Disturbance Permit Oriental, Grantsboro, New Bern BE 4NCC138117, 138114, 138113 Dear Mr. Vinson: With regard to the above -referenced projects, we are providing signed applications as requested for your records. Please let me know if you have any questions. Thanks. Please confirm that you do not need any additional information for review. Should you have any questions or require additional information, please contact me at (980) 272-3400. Sincerely, enc. cc: File K)Gtmd BOIILER ENGINEERING, INC. KJle J. Crowe, P.E. D E71h NOV 2 7 2013 CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS Vinson, Scott From: kcrowe@bohlereng.com Sent: Wednesday, November 20, 2013 10:21 AM To: Vinson, Scott; Peed, Richard Cc: pbellantoni@bohlereng.com Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Guys, I wanted to follow up with you on the outstanding items for New Bern and Grantsboro. You should have received the Grantsboro plans yesterday and the New Bern plans will arrive today. I have also requested the signed original documents again from Wal-Mart for both projects. It usually take a day or two to get these from them. Ideally we will have them this week and I can get them to you on Monday. I will include the copy of the deed for Grantsboro with that package. Please let me know if you are missing anything other than those items for those projects. We are currently working on revising the Oriental project and have original signatures for those. We will get those in ASAP to help facilitate the review. We appreciate all of your help on these projects. Kyle Crowe, PE Assistant Project Manager BOHLER E N G I N E E R I N G Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email: kcrowenbohleren-,.com www.BohlerEnL,,ineering.com Please consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Vinson, Scott [mailto:scott.vinson@ncdenr.gov] Sent: Tuesday, November 19, 2013 10:26 AM To: Kyle Crowe; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Kyle, Thanks. We will need a revised copy of the FRO, page 1, showing WalMart as the owner and copy of the new deed prior to being able to issue either permit. An email of an .pdf of both will work. I'll also need the original signed copy of the Stormwater Application and pond 0&M agreement as we discussed several weeks ago for both the Grantsboro application and the New Bern WalMart application as soon as possible. We also never received full sized hard copies of the revised plans for the New Bern project, just the .pdfs by email. Could you also send 4 copies of those plans as soon as possible? Thanks, Scott SCOTT VINSON LAND QUALITY SECTION DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES NC DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES 943 WASHINGTON SQUARE MALL WASHINGTON. NC 27889 DIRECT:(252) 948-3844 OFFICE:(252) 946-6481 Before printing this email, please consider your budget and the environment. *E-mail correspondence to and fiom this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: kcrowe()bohlereng.com [mailto:kcrowe(a)bohlereng.com] Sent: Tuesday, November 19, 2013 9:58 AM To: Vinson, Scott; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Scott, I just got word that Wal-Mart actually purchased the property on Friday. So they are the owner of all property that grading operation will occur on. Do you need anything else for me for that? If not, you will get the 4 hard copies of the revised sheets today. Kyle Crowe, PE Assistant Project Manager BOHLER E N G I N E E R I N G Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email: kcrowe((5)bohlerene.com www.BohlerEneineering.com Please consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Vinson, Scott [mailto:scott.vinson(a ncdenr.gov] Sent: Monday, November 18, 2013 4:36 PM To: Kyle Crowe; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Kyle, I finished the Grantsboro Stormwater review and all looks good, but like Richard, I will also need something from Mr. Ireland giving permission to WalMart to work on his property and four hard copies of the revised plans (2 for Richard and 2 for me). I still have not received hard copies of the revised plans for the New Bern WalMart that I need to mark both "Approved" for our file and to send to Mr. Michael Thomas with WalMart. If possible, could you please either bring them along to tomorrow's meeting or send overnight mail as soon as possible? Thanks, Vinson, Scott From: Vinson, Scott Sent: Tuesday, November 19, 2013 10:26 AM To: 'kcrowe@bohlereng.com'; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Kyle, Thanks. We will need a revised copy of the FRO, page 1, showing WalMart as the owner and copy of the new deed prior to being able to issue either permit. An email of an .pdf of both will work. I'll also need the original signed copy of the Stormwater Application and pond 0&M agreement as we discussed several weeks ago for both the Grantsboro application and the New Bern WalMart application as soon as possible. We also never received full sized hard copies of the revised plans for the New Bern project, just the .pdfs by email. Could you also send 4 copies of those plans as soon as possible? Thanks, Scott SCOTT VINSON LAND QUALITY SECTION DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES NC DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES 943 WASHINGTON SQUARE MALL WASHINGTON. NC 27889 DIRECT:(252) 948-3844 OFFIICE:(252) 946-6481 ( W Before printing this email, please consider your budget and the environment. *E-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: kcrowe@bohlereng.com [mailto:kcrowe@bohlereng.com] Sent: Tuesday, November 19, 2013 9:58 AM To: Vinson, Scott; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Scott, I just got word that Wal-Mart actually purchased the property on Friday. So they are the owner of all property that grading operation will occur on. Do you need anything else for me for that? If not, you will get the 4 hard copies of the revised sheets today. Kyle Crowe, PE Assistant Project Manager BOHLER F N C I N E E. R d N C Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email: kcrowe(a),bohlereng.com www.Bohlei-Eneiiieeriiiv,.com Please consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Vinson, Scott [mailto:scott.vinson(cbncdenr.govl Sent: Monday, November 18, 2013 4:36 PM To: Kyle Crowe; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Kyle, I finished the Grantsboro Stormwater review and all looks good, but like Richard, I will also need something from Mr. Ireland giving permission to WalMart to work on his property and four hard copies of the revised plans (2 for Richard and 2 for me). I still have not received hard copies of the revised plans for the New Bern WalMart that I need to mark both "Approved" for our file and to send to Mr. Michael Thomas with WalMart. If possible, could you please either bring them along to tomorrow's meeting or send overnight mail as soon as possible? Thanks, SCOTT VINSON LAND QUALITY SECTION DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES NC DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES 943 WASHINGTON SQUARE MALL WASHINGTON, NC 27889 DIRECT:(252) 948-3844 OFFIICE:(252) 946-6481 ( 42r-' Before printing this email, please consider your budget and the environment. *E-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: kcroweColbohlereno.com [mailto:kcrowe@bohlereng.com] Sent: Monday, November 18, 2013 10:27 AM To: Peed, Richard Cc: Vinson, Scott Subject: FW: Grantsboro-DENR Richard, Attached are the revised erosion control plans. I will put the hard copies in FeclEx today. Kyle Crowe, PE Assistant Project Manager BOHLER Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Vinson, Scott From: Vinson, Scott Sent: Monday, November 18, 2013 4:36 PM To: 'kcrowe@bohlereng.com'; Peed, Richard Subject: RE: Grantsboro Wal Mart -DENR, project #SW7131102 Kyle, I finished the Grantsboro Stormwater review and all looks good, but like Richard, I will also need something from Mr. Ireland giving permission to WalMart to work on his property and four hard copies of the revised plans (2 for Richard and 2 for me). I still have not received hard copies of the revised plans for the New Bern WalMart that I need to mark both "Approved" for our file and to send to Mr. Michael Thomas with WalMart. If possible, could you please either bring them along to tomorrow's meeting or send overnight mail as soon as possible? Thanks, SCOTt- VINSON LAND QUALITY SECTION DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES INC DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES 943 WASHINGTON SQUARE MALL WASHINGTON, NC 27889 DIRECT:(252) 948-3844 (OF�FICE(252) 946-6481 `` ) Before printing this email, please consider your budget and the environment. *E-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: kcrowe(olbohlereng.com (mailto:kcrowe(cbbohlereng.com] Sent: Monday, November 18, 2013 10:27 AM To: Peed, Richard Cc: Vinson, Scott Subject: FW: Grantsboro-DENR Richard, Attached are the revised erosion control plans. I will put the hard copies in Fed Ex today. Kyle Crowe, PE Assistant Project Manager BOHLER r N G t N'r r R t N G Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email kcrowe o bohleren .corn www.13oh IerEn gineerins.corn Please consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. 2 Vinson, Scott From: kcrowe@bohlereng.com Sent: Thursday, November 14, 2013 3:46 PM To: Peed, Richard Cc: Vinson, Scott Subject: Grantsboro Revised Plans Attachments: 06- SWPP 2.pdf; 25- Details.pdf; 05- SWPP 1.pdf Richard, Attached are the revised plans per your request. Please see response below concerning your comments. Please let me know if you need anything further. 1. By statute, no plan can be approved in which land disturbance is shown on land owned by a party other than the responsible party without authorization. Provide a notarized letter of authorization for the work shown on the property not owned by the responsible party. Response: A temporary easement is to be in place to allow this grading operation. We will provide ASAP with a copy of the letter allowing the operation. 2. According to the submitted plans the limits of disturbance is equal to the property lines. If that is the case, additional measures will be required along the property lines and outfall ditches. Pleases have this addressed. Response: Project complies. The plans have been revised to show silt fence offset one foot from the property lines which results in the limits of disturbance not terminating at the property line. 3. Will additional stabilization methods me utilized to stabilize the emergency spillway? Response: Project complies. In the temporary condition, the sediment basin emergency spillway is to be lined with North American Green S150lining as noted on the Phase 1 Erosion and Sedimentation Control Plan. In the permanent condition, the emergency spillway is to be lined with North American Green SC250 lining. Calculations are provided within the Erosion & Sediment Pollution Control Calculations and Stormwater Management Report. 4. A typical cross-section or construction drawing for the following must be provided: The drawings that were provided did not include a detail for the proposed retaining wall. Please provide a detail for the wall. Response: Project complies. All proposed retaining walls have been eliminated within the site design and therefore no details have been provided. b. Provide a cross-section through the stormwater basin that goes from the project side through the rear property line. Response: Project complies. A cross-section through the stormwater basin that goes from the project side through the rear property line has been provided on detail sheet D-4. Kyle Crowe, PE Assistant Project Manager BOHLER r N G f N r r R t ,N G Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email: kcrowe@bohlerenzkom www. BohlerEnsiiieerin�,,.com Please consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Vinson, Scott From: Vinson, Scott Sent: Thursday, October 24, 2013 10:39 AM To: 'kcrowe@bohlereng.com'; Peed, Richard Subject: RE: New Bern Wal-Mart Project Kyle, We are going to go through the attached documents later today and tomorrow, but we noticed there were no additional cross section details through the pond nor cross sectional details of the collection swales. Could you please provide these as well? If we have any additional questions while finishing the reviews we'll let you know. Thanks, Scott Before printing this email, please consider your budget and the environment. *E-mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: kcrowe(d)bohlereng.com [mailto:kcrowe@bohlereng.com] Sent: Wednesday, October 23, 2013 4:55 PM To: Peed, Richard; Vinson, Scott Subject: New Bern Wal-Mart Project Richard and Scott, Attached are the updated plans per your initial comments. Please let me know if you need anything further to continue your review. Kyle Crowe, PE Assistant Project Manager BOH LER E N G I N E E R I N G Bohler Engineering 800 West Hill Street, Suite 101 Charlotte, NC 28208 Serving the East Coast Office: 980-272-3400 Mobile: 704-641-2689 Email: kcrowe a bohlerene.com www.BohlerEneineerine.com Please. consider the environment before printing this e-mail Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. if the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. BOH LER E N G I N E E R I N G October 8, 2013 Via: Fed Ex NCDENR-Express Permitting 943 Washington Square Mall Washington, NC 27889 Attn: Mr. Scott Vinson 800 West Hill Street, Suite 101 Charlotte, NC 28208 PHONE 980.272.3400 FAX 980.272.3401 Re: Proposed Commercial Development Express Permitting for Stormwater Permit and Land Disturbance Permit Highway 55 Grantsboro, NC Pamlico County BE #NCC 138114 Dear Mr. Vinson: With regard to the above -referenced project, we are requesting a permit for Stormwater and land disturbance through your express permitting option. We have attached the necessary documents, plans, report and fees. Attached for your use are: • Four (4) copies each of civil plans, stormwater report, and erosion control narrative. • One (1) copy each of Stormwater Application, Financial Responsibility Fonn, and Express Application • One (1) check for $4,000 • One (1) check for $975 Please confirm that you do not need any additional information for review. Should you have any questions or require additional information, please contact me at (980) 272-3400. Sincerely, enc. cc: File KJdimd 6013I,ER ENGINEERING, INC. /////(/ Kyle J. Crowe, P.E. OTHER OFFICE LOCATIONS • Southborough, MA • Albany, NY • Ronkonkoma, NY • Warren, NJ • Center Valley, PA • Chalfont, PA • Philadelphia, PA 508.480.9900 518.4 38.9 900 631.738.1200 908.668.8300 610.709.9971 215.996.9100 2 67.40 2.3400 • Towson, MD • Bowie, MD • Sterling, VA • Warrenton, VA • Fort Lauderdale, FL • Tampa, FL 410.821.7900 301.809.4500 703.709.9500 540.349.4500 954.202.7000 813.379.4100 CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS www.BohierEngineering.com D%VQ USE ONLY ' Date IieCelyCd Fee Paid Permit Numbrr / G -S— / zoo Jp)-.cSG Applicable Rules: ❑ Coastal SW -'1995 ❑ Coastal SW - 2008 ❑ I'll II - Post Construction (selcel llll 16n1 apply) EI Non -Coastal SI\'- I-IQt1r/01:4Y Waters CI Universal Storm water iManagenxatt flan 0 Other 1vQ Ni•mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality Fv , t-"` E ,, ra, STORMWATER MANAGEMENT PERMIT APPLICATION FORM 77lis firrrn weep be photocopied )ia' list, fia fill original NOV — 5 2013 GI,NI?RAI, INFORMATION 1. Project Name (subdivision, facility, of eslaIII ishnu-nl name - should beconsistenl with prdjstrltitagie; prl aj�j t 'i.,• specifications, letters, operation and maintenance agreements, etc.): Pro Poeed Wal-\4arl Slurp 4 7238 2. Location of Project (street address): NC Highway 55 City:Granlsboro Count -:Pamlico %ip:28529 3. Directions to project (from nearest major intersection): 2,175 fl oast of the NC 306 Lhyy and NC 55 Plvv intersection 4. I AItitUdv 35° 8' 32.7" N Longitude:76 50' 7.1" 4V of the main entrance to the project. H. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ONew ❑tlodificalion ❑ Renewal w/ i1modificationt l Rence als roilb nmdilirafinus ❑tar rrquins SI VU-IO2 - Rearmed Appliralion pin m 11.11'this application is being submitted as lilt' result of a modification to an CNisling permit, list the aXislillg permit number , its issue dale (if known) , and the status of COJIMIUCllUn: ❑Not Started ❑Partially Completety ❑ Coml,leled' 'provide it desipler's cerlirrnlion 2. Specify the type of project (check one): ❑Low Density ZI ligh Density ❑Drains to an Offsite Sormwaler System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from D1'VQ requesting a stale stormwater management permit application, list the stormwater project number, if assigned, and the previous name' of the project, if differenl Than currently proposed, 4.a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contictinl; the Customer Service Center at 1-877-623-6748): ❑CAiNIA rIMajor ❑NIT)EL" Industrial Slormwale•r ❑4' Sadimentalion/lirosion Control; 15 ac of Disturbed Area ❑404/401 Permit: hoposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue dale and the type of each permit: 5. Is the project located within 5 miles of a public airport? Z No ❑1'es I)"ycs. see S.L. 2012-200• Part N: Lit lylportal.nctienr.orckvebhvgla's/suhl destelrulc< law Perm SVVU-101 Version 06A ,201'- Paue I of 6 1,11. CONTACT INFORMATION 1.a. Print Applicant / Signing Official's name and title (speciIicalir the developer, properIN. owner, lessee, designated government official, individual, etc. who owns the pIt iecl): Applicant/Orgsni'ration:l\'al-�\dart Stores Bast, LP Signing Official & TilleAlichael Thomas, Director of I'rolect Desinn and Management b.Contact information for person listed in item le above: Sheet Address:2.001 S1- 101"Strect City:13enlonville State:AR %ip:72716 Mailing Address Ql'applicable): GIN,: Iv: Phone: 079 ) 20.1-2186 FIna i1:Michad.ThomasI rt war-marl.com State: Zip: Pas: (479 1 273-8380 Please check the appropriate box. The applicant listed above is: ❑The properly owner (Skip to Conrad Information, item 3a) Lessee' (Attach a copy of the lease agreement and complete Contact Information, item 2a and 211 below) 0 Purchaser' (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 21) below) Developer" (Complete Contact Information, item 2a and 26 below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. ('Phis is the person who owns lilt. properly that the project is located on): I'ropt.rh' Owner/Organs%afuma,mwuod Irt.land Signing Official &-'Title: b.Conlect information for person listed in item 2a above: Street Address:4201 Old Cherry Point Road Cily:Nerr Bern Stale:NC %ip:28560 \flailing Address (i/upplicabh City: Plume: ( ) Email: State: Zip: Fat. 1 ) 3. a. (Optional) Print the name and title of another contact Such as the projecl's construction supervisor or other person who can answt.r questions about the project: OtherCrmtacl Pelson/Organization: Signing Official & Tillc b.Contacl information tin' person listed in item 3a above' \Mailing r\ddreSs: City: Phone: Pax: 4. Local jurisdiction for building permits: "Town of Grantsboro Point of ConlactTal Prescott Phone #: (252 ) 745-6511 Form SWU-101 Version O6Aug2012 Page 2 of6 9 p, C Awl C I oz IIIvgo uu1sJ'A 101-(lA%s u1,10a :)ja'soaaV Ia1m.IS •sypulta ,�: ;:11.,.111$my.md 'q,uV.I ':3lgjlplrq t,I paluuq jolt pltq 'Smpn1 un Va.m Vo11 n IIVI'l a111 sl) IrrurJ.yr :r ua,w snonzlal�iul >rrolll:nil ;u1? rrl/.I er rj,,z . al'au.,.ult4Jor/., IAI :In lr.,uuu.r.lj.lp.lrl uruJaqulr4V VdIr1(IIrlrVsagn nwa.yy 4g1`61Z IISSMIZ :0s) I'!1t1J. 0 0s) .,.unsl llll)SI.d 0 (ls) al!s JJo 0 (Is) a.n pi,j tt 6 (Is) n11sAm aaglO Of (Is) syle.voplSalls-uO H06t 0%') Nulyats,l ally-uO S6WZII (Js) slos.l)Salls-uO SL9'tL (Is) slu Ids u11,lln}I 1lls-u0 l?.l.l\{ ai l?IIIB.l C1 emv ai eLquJ(l ea.ly ai mqu.I(I I. vm\1 as 1!tlleJ(l vm\J a]l!J. nS sluff AJal fill °nCL•LL IL!l Ul) t l!,l,l\J sil 111 A.I Jt fill 4( OSS'9tZ (Is)caJV snulAJat ull posoc oJd `{ 0 ps) ea.l\{ a"imqu'J(l ai!s-JJO LI ILL£ (Is) ea.1\1 oSteule.I(J ))Is-Ilo h16f 1 J!. AI'LI£ (I5)Va,I\JoSieu!UJCII'!1JJ.1. ONI1z Iagtun?q vapul mumIS I\15N ',\1S JS sselJ un?a.115 Jaya .Cell %10.1 1 g1nu5 ORLINi UIVN)S 13ulAlao?1 ea.l\{ o etlltsJ(l CaJV 01 ellltsJ(l L'aJ\{ o, lltq U.Icj I. UWV a1 P. gVJ(I IIO1ll1IlIJOJIII IIISL'9 'MOIaq se ieul.Ily oule9 oqI m poplAUJd emu gma.uy uullummTq ayl qpm laogs Ieu lg1pe ue gn!))e'p4W aql ill wan allmgwpmy uegl mcm, me 0.10111 JI '6 Moll u0lleulAyI1I paloJ,l u1 pa111)uapl eo.le a;ieuleap gaea.1 l uolleuuu)ul 8ulmopoJ 0111 alalduuJ-) '(11 (Il1JV liLlaJo.1J aµuprt aqI lt! 1 asV pill' IilJsuap dtnl Joa W IAIN .Ialnntnl.ugs pa.ladlt1lua patolloId 1plo.lol l lwntl'/ijrsuap gSltj aol) j zoneg lJalu.ld alp soup sea.Its 1fteu!VAI1 XtMm M01.1 '6 cL'LL = 001 \ ('!oJ\{ poluJ,I p!101. / ea1\1 snolA.lodull le)u.l.) :eaae snol.\.IVdun lu lual.lad paluJ,l .s 'uzu, I .litud /Viol xII w I,.,pnliVr aq IiIUV . 1"I (NIHIN jj9 A IHN •rID f l p.1Vot1n1VI 91111)11ao! 1904 r-uoN 'WIN) 10.111 Irodn Illnq lu.u.lad 1111.mou.11VI)OIll.1 01 paeV %I Va.nl Lra(tVl lurgplsa.l .11/1•a 'ull G\•1hl LV an) A•IHN MII Vln.rf p,ltaupuol spltVllaot jojslna a,111111 •u!1 (A•1FIbV) Ja1ur\q r1Y.1-1 Vu.11N .1u ."111(NIHN) 10IObI 0-11.1 prlu.lol\1 aqI Vxyttl lu'lit aq1 'a.I;Wp pill) 5Vulags to syuuq aqI uaaoeiaq 11,211r aqI 'saJuI7VJ1s I,al,llllo(lilllfo loot) 1U1rl.hAl a111 .r511)o2oll'!l'Igl ''Irr1pv of paIIIIII.11U,.111111,119 VAIV 1.1.110.111 pgo.l. sal-11! LZS171 VO.I\1 Val"01 IUPIL _ (9) VOW 1a1e1\.l aatsiJlIS Il!1t1.L - (9) PMV spU11110 \I Ielseu-) Il'10.1. - (t) e01V XIJadu.I,I IVIO.l. 'L sa.lae O .uoi\1 .lolehl 1iwp S lelo.l. 9 saJ:n! 0 :VAIV spuellnhl ielst".) p!N,.1. 'S ulseq JaAla sm.)V LZS-tI :eaJV XpadoJd II?lt,.l. -t- aq) ill suleJp palu.Id snl) Mu.IJ JIOIIIM JaleA\watg5 '£ u011 )n.11suoJ )sod - 11 Id ❑ 5661 - MS Ielseu7 ❑ alllA\ anntpauaats w POUIsap un aq sett paloJd A111 (s)uollclnaal aqI .C1lauop! 'S 42"I palsaA Sulwl, JI'q :ale(/ :.Iatl10 ❑ :al'!CI IJanssl 11w.lo,l NulpllnU IMvA ❑ :01VC1 leauJdd V Clnd Ju Ueld Rloutdulo ,\o(I J111 iadS nl'S e Ju Ienu.lddV ❑ :p Amdde Nam Aaq) mup aql puts pop1mud sluaununp Mgpmdns alp ApILL 1'ggSg palsaA SUIWlga JI''!Z ]VIMVIV dIW •'a)e•\\Iu MS?INWON Jn slunulo.nn )aI ath Pow p1A1 pile lenaunJ SS.I. °6116 Jul aplAOJt ill pail, /sap uaaq sell Inseq nq.L 'uiseq uogtnlap laa\ c q,innJgl Po1ea.11 aq III.v IJounJ .la)emwJOJS paµaJl a9111.\\ llnun.I Jale.vuuols ayl .voy anaeununs nliilJq'molaq poplauJd oveds olp III '1 NOLLVIN1110INI JD0011d , 'M kepIII l mIIit IIII l aununII nj r.risIIng BIIA IIII tt will rcnnrfn alto do hgnucnt. I)o urrl report aaq caisting I?LIA Ilit d is to be reunna•d mitt aIII icla will be replared In! nem RUA. I I. 11(t+v +vas the off -site intPervious area listed above deterl»iietl? PrOylde ducun?enla tion. N/r\ P ruiects in Union Cu It Inv: C•unlucl UI rU Central U%lice sta!lirr check il'the project is /armed within a Threakned & l{ndan,terrd.Sj?ecit.r m'atrrs%hed Phut tear he sidiect Pn wurr su•in,>;eru eun•nnrutcr rcyairewent.e as per I A NC•IC 0.; 8.0000. V. SUPPLEMENT AND O&M FORMS The applicable Slate Storn?waler mana};emamt permit supplement and operation and maintenance (O&M) forms must be Still m?itled lilt' inch SNIP specified for this project. 'I•he IalesI vcisit) its of the Iorms can be do%vnIoaded fromhlt?�[1!?artnl.ucdrnr.(trg ++'ch/ay/++S/wlbmp•mmucnl. V1. SU13M1.1"I'AL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the iten?s listed below. A detailed application instruction sheet and 13NIP checklists are available from htlh[f!?ortal.ncdenr.or arch +vq/++"/Su151ales++/forms does. The complete application package should be submitted to the appropriate DWQ Office. ('I'll(! appropriate office may be found by locating project on the interactive online map al h�tjpurlal.ncdenr.nrg/wrh/wy/++s1su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be Signed and initialed in blue ink. Download the latest versions for each submitted application package from hill pnrlal.ncdenr.un!III wi.b/wq/wS/S»/slateSw/ft?rms does. h?' ials I. Original and erns copy/ (tf the Siormwaler Nlanagenu:nt Pern?it Application Form. 2. Original and one copy of the signed and notarised Deed Restrictions &- Pr(tteCEVC Covenants Form. (i(regaired its per purl vll hrlou0 3. Original of the applicable Supplement I70rn?(s) (scaled, Si}'ned and dated) and O&NI agrecmenl(s) for each IiNIP. 4. Permit application processing fee of $505 palpable to NCI)ENR. (For an Express review, refer to hilt'://+v+aw.cnvhclp.or;;/j?agus/oneSloprs?ress.hIn?I for information on the I Spress program and the associated fees. Contact the appropriate regional office Express Pern?il Coordinator for additional information and to Schedule the required application n?veting.) 5. A detailed narrative ((tile to two pages) describing the slorn?waler treatment/nnungcnumlfor the project. This is required in addition to the brief sun»nary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class tic\ or the receiving stream drains to class SA walena within h mile of the site boundary, include the 1/2 n?ile radius on tile, map. 7. Sealed, signed and dated calculations (one copy). F. Two sets of plans folded to 8.5" S Id" (sealed, signed, &dated), including: a. Developn?ent/Project name. b. Engineer and firm. C. Location mall With named streets and NCSR numbers. d. Legend. c. North arrow. L Scale. g. Revision lilt ntberand dates. It. Identify all surface waters on the plans by delineating the not n?al pool elevation of impounded structures, the banks of streanns and rivers, the MI RV ur NI IW line of tidal waters, and any coastal wetlands landward of the NIFRY or NJ RV lines. • Delineate the vegetated buffer landward from the normal pool elevation (If impounded structures, the banks of Streams or rivers, and the M W (or NI'I%V) of tidal waters. i. Dimensioned property/project boundary ++•lilt hearings & distances. j. Site Layout with all 13UA identified and dimensioned. k. I-Nisting contours, proposed contours, Spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and storn?+vater control measures. m?. Wet lill (IS delineated, (tr it note on the plans that nuns e.CiSt. (IMIISt he drlincafed by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. Form Skoklj-101 Version 06r\ue2012 Pmuc-1 of 6 A copy of the most CUri'Cot property deed. Deed book: 138 ]age No: 297 For corporations and limited liability corporations (L I.C): Provide dOCnnlLntilt0❑ from the NC Secretary of Slate or other official dOCU011'ntat011, WhiCh Slrpports the ttILS and pOSItOnS [let([ by the persons listed in Contact Information, item la, 2a, and/or 3a per I5A NCAC 21-1.1003(c). The corporation or LLC must be listed as an active corporation in good Standing with the NC Secretary of Slate, otherwise the application will be returned. help:/ /t�•twtwsecrcl:uvslale.ncus/COrporalions/CScarch.asp� V11. DEED RESTRICTIONS AND PRO'I'1--01V1?COVENANTS rm I:\istillg (Ir'alnilge (including off -site), drainage easements, pi lie Sizes, rulit) f f caIculatioIS. o. I Irainage areas delineated (include(l in the main set of plans, not as a separate document). p. VLgctaled botfut:S (%wher(! required). Copy of any applicable Soils report With the associated SI IW'I' elevations (['least- identify elevations in addition to depths) IS Well as a neap of the boring locations with the ecistirli; elevations and boring logs. Include on 8.5'sll" copy ofthe NRCS Coil nly Soils nrtp with the project area clearly delineated. For projects with infiltration It.NIPS, the report should also include the soil type, expected infiltration rate, and till' method Of determining the infiltration rate. (Infiltration Devices Submitted to INTRO: Si hedmlc a site, aisit Jirr Dl•VQ to verify tie- Sf ll•Vl' prior lit Submittal, (910) 796-7373.) y`,C For all Subdivisions, oulparcels, and futm'e development, the appropriate properly restrictions and protective covenants arc required to be recorded prior to the Sale Of ant- lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each Iol number, lot size, and the allowable built -upon arm most he provided as an attachment to file completed and notarized steed restriction form. The appropriate deed restrictions and protective covenants forms call be downloaded front hltt1LportaLnclet r,or wV111 tvc(/te.fSu/Slaleav/forms doors. Download the latest versions for each submittal. In the instances where the applicant is different than the properly owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form While the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the websile, that the covenants Will be binding on all parties and persons claiming tinder them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence front the NC DWQ, and that they will be recorded prior to the sale of any lot. Vlll. CONSUIJANT INFORMATION AND AUTHORIZATION Applicant: GnnplLte this Section it you wish to designalL authoriIV to another individual and/or firm (Such as a consulting Lngincer and/or firm) So that they /nay provide information on your behalf fill- this project (Such as addressing requests for additional infornlalion). Consulting Hngineer:hyle I Cl-cove, I'I Consulting Firm: Bolder lingineering Mailing Address:500 West Bill Street City:Charlote State:NC %ip282118 Phone: (980 ) 272-3400 Email:kcioweD, bohlerenv.com Fax: (980 ) 272-3:101 IS. PROPERTY OWNER AUTHORIZATION (if Conlacl /n/irrmation, ilea 2 has been filled tell/, coulptelr this St'i tlerli) I, (print or hype mare e f person listed in Contact lmlor million, item 2a) Lhavood Ireland certify that I own the properly identified in this permit application, anti thus give permission to (print or hype maws of lrerSoa listed in Contact Information, ilem la) Michael'1'homas with (priml or tgpc aaarr listed in Contact lajirrmration, itrur 111) I•Val-Marl Storrs fast , I_ to develop the project as currently proposed. A cop), of the lease agreement Or pending property sales contract has been provided with the Submittal, which indicates the party responsible for the operation and maintenance of the Slurnlwater system. Form SVVU-101 Version 06Aug2012 Pace 5 of G i\s'thtr Icgal property Owner I acknowledge, underssland, and al;ree by my sil;na lu re belOw, that if my designated agent (en lily listed in Contact Information, item l) IfiSSOIV0S their Corti pany and/or ISO r defaultSO n their lease agreement, or pendinl; Salo, responsibility for compliance with the 1)WQ Stormwalei permit reverts back to me, life property owner. As the property owner, it is nry responsibility to notify DWQ immediately and Submil a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a Sim mwater treatment facility without a valid permit. I understand that the operation of it stormwaler treatment facility without it valid permil is a violation of NC General Statue 1.43-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Da do hereby cerlifv that before me this day of - a Notary Public for the Slate of Count' of personally appeared , and acknowledge the due e\ecufion of the application for a shtrnnwaler permit. Witness my hand and official seal, SEA I. Nly commission ex X. APPLICANT'S CERTIFICATION 1, (print eP t ypc name nl persmr listed for Contact In/in oudion, item 7u) Michael 77winus certify that the information included on this permil application form is, to the hest of my knowledge, coned mid that the project will be constructed in ConfOrmanCO with the aPPrOvcd plans, [hat file required deed restrictions and prulective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under -I5A NCAC 21-1 .1000 and any Other applicable state stormwatCr requirements. Signature: �h�tn���^' a Notary Public fur the elate of p��__J_� �Y_k_at7IG1S , cotrnyy nr _JK LLl-UYi , cTi hereby certify that _Wrbaiii �imgs _personally appeared before nx• this av of OdK ber , -013, and acknowledge file d • '\eculion of the application for a Slot III tyalcr permil 11'it11eSs my hand and official seal, L ANA TEAGUE TARYPUBLIC n County, Arkansas ission Exppires 5/2912016 sion Number 12347908 SEAL. Nly commission expires Form SWO• Ill 1 Version 06Ate 2012 Paee 6 oT6 Permit Ntlmher:_Sp ?I? If �)Z. (h) be provided hr b1PU) Drainaee Areal Number: I . Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this I3,NIP. This maintenance record will be kept in a lot; in a known set location. Any deficient 13NIP elements noted in the inspection will he corrected, repaired or replaced iminediately. These deficiencies can affect the integrity Of structures, safety Of the public, and the removal efficiency of the Bl\•Ip. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays 111d the vegetated filter if One is provided. This system (check one): ❑ does ❑X does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does X does not incorporate pretreatment other than a forebay. Important maintenance procedures - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of lho basin should be watemd twice weekly if needed, until the plants become established (conullonly six weeks). - No portion of the wel detention pond should be fertilize) after the first initial fertilization that is required to establish the plants On the vegetated shelf. - StablC groundcover should be maintained in the drainage area to reduce the sediment load to the beet detention basin. - If the basin nulst be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be nlininlized to the nlaxilnunl extent practical. - Once a year, a danl safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall Ile repaired immediately. BNIP element: Potential problem: Flow I will renlediate the roblem: The entire 13N1P 'Trash/debris is piesent. Remove the trash/debris. The perimeter of the wet Ateas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and hater until it is eetablisllod. PI'ovide llllle and a olle-tillle tel'tlliZel' application. Vegetallon Is too short or too 1Alaintain Vegetation at a height of I long. approximately Six inclles. Form S\V401-\Vet Detention Basin O&M-Rev.4 Paee I of d Permit Number: _ tlo be pruwided hr 011'Q) Draina_e Area Number: 13MI, element: Potential roblem: liov I will renlediale the problem: The inlet device: pipe or Shale The Pipe is Clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sedinlenl and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. E rOSio n has OCCUI rell. Provide additional crosion Ill otection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Renuwc the weeds, preferably by hand. If pesticide IS Used, wllpe It oil the plants rather than spravin g. The vegetated shelf Best professional practices 1'rune according to best professional show that pruning is needed practices to maintain optimal plant heallh. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and I'eplace plants. Provide a one -Mlle lertllizer application to establish the ground covet' Il a soil lost indicates it IS Ilecessa Irv. ,deeds are present. RCI11UV0 the wcCliS, III Cl'ably by llandif pesticide IS used, Wipe It on T'he main treatment area Sediment has accumulated to file fliants rather Ilan spl'a\'l ll'. Search for the source of the a dcPth greater than the sediment and remedy the Problem if original design sediment possible. Remove the sediment and Storage depth. dispose Of it in a (ovation where it Will not Cause impacts to streams or the EMU'. Algal growth covers over Consult a professional to remove 50°6 of the area. and control the al gal rovth. Cattails, phragmites or other invasive plants cover 50',% of Remove the plants by wiping them with pesticide (do not Stray). the basin surface. Form SW401-Bret Delention Basin O&M-ReN,A Paee 2 of d Permit \'umber: — (a be In."vided hr 011'0) Drainaec Arca Number: 13NIP clement: Potential problem: Ilow I will remediate the problem: The embankment Shrubs have stalled to grow Kemove shrubs inuncdiatcly. on the embankment. Evidence of muskrat or Use traps to remove muskrats and buaVVI" -ICtiVitV IS pICSL!Ilt. COoSlllt a prOfesslnllal to r0IoOVC beavers. A h'ee has started to grow on Consult a dam safely, specialist to the embankment. remove the free. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable The ordlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occol-red at the Water Quality Kegional Office, Ill' Millet. the401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation Shall be Such that it will give an accurate depth reading and not readily, penetrate into accumulated Sediments. When the permanent pool depth reads 9.00 feet in the main pond, the Sediment shall be removed. (q. o dey) When the permanent pool depth reads 9.00 feet in the foreba.v, the sediment shall be removed. Sediment Removal Boaom Eleval 10_00 ----------------- FORFBAY BASIN DIAGRAINI (fill in the hlunksl 4t \•tin. Sedintcnl Sloraee Permanent Pool Elevation 14.00 Pool \ Sediment Removal I Icvation 10.011— Voltnne Bottom Flevatioll MAIN POND Form SW401-(Vet Detention Basin O N-Rev.4 Pa_e : of 4 Permit Nun,her: (to he provided /iv I'mig) I acknoMedue and aerce by my siunaturc helow that I am responsible Ior the perlhrnumce of the maintenance pawedums listed ahoye. I agree to notify MVQ oramy problems with the system or prior to any changes to the system or responsible party. Prnirer nam eTruposed Wal-Mart Store 9 7238 BA41' thwina!,,e area number: I Print name:iMichael Thomas Title:Directon 01'111.0icct Design and \gang Cmcnt Address:2U0l SE IUa' Sweet. Bwunyillc. Alt 72716 Phone:479-204-2186 Signature: Date: lO-ON - 13 Note: The legally respunsible Mwy should na be a homeowners association unless more than 50".b of the IotS have peen sold and a resident of the subdivision has been named the president. I. —✓L AIJx� it Notary PubliC fiW the State ah �k-aDSAS U . County of ' }pp do hereby certify that _ — L-Ci1G�I_�[�]L�Y)1f�LS personally appeared heforc nee this L th day <,r_QCt lea r • aQ13_. and acknowledge the due CxeCution ohthC littgoing wet delentiosin maintenance requiruncnls. Witness ma hand and ollicial FTEAGUE �1— DANAOTARY PUBLIC o on Ccunty. Arkansas mmission Expaes 5/2912016 Mniss,unNumbern234 906 SEAL My commission expires o1.Q o201 &P Poem SM01-Wet Detemion Basin page 4 or MH01 Rim-17.73 IN02 Invert-9.12 IN01 Invert-10.12 EW01—Invert-9.14 051 Rim-15.33 EW02 Invert-13.69 3" ORIFICE —Elevation 14.02 —EW02 Invert-13.59 GRAPHIC SCALE 0' 40' 80, (IN FEET) 1 INCH = 40 FT. WALMART EXPRESS •uu u•u••• u•uuuuuu• ••••••••••••••••• u• •u•uo•• .00 •�� ,. ......1 AA CAR �// (H R / 0 / _ S T EA -484 �: / JU' , ; SURN� � iqL� JI // 0 F. �S1E �� / = _ 6 CT CE21113-112 DATEPROJ narr:: osi3anola 301 TOWN OF GRAN"fSQORO PAMLICO COUNTY, N.C. DESIGN RY: DRAWN BY : J. PUTREI.1, CAROLINA ENGINEFRS, P.A. CHECKED BY: nrPRoS EDEr: ' STORM DRAINAGE PONDASBUILT SCALIi. P=4F ENGINEERING LICENSE CER1'1FICA9'Ii NO.G0205 '1EL:(252)-633-242s $IlEE3' OF I 00 NO. DESCRIWI'ION DATE API'. REVISIONS P0.BOX1595 NEW KERN, N.C. VAX'.(252)-634.9718 W W W.cm'01iaacneineers c0111 OF r- i 1v t, e, "•�. / 7` d 1 G I , - ;- - It y f t ' / p Grantaboro Walmart Site S&ME Project No.1064-13.2348 Boring 1 A 018 10YR 2/i loan "Ok O1 '® Made 06, Big 1&38. 10YR 42 clay mes" %"Y An exlareem 0.06 - I Seasonal High Water Table from as Ming ground surface: 02 [=has (< /.0 foot) Observed Water Table from ex being ground surface: 26 Inches (2.1 %et ) Grentsboro Walmart Site S&NE Project No. 106443.234B Boring 2 Depth or Moba USDA Sdh"*Wd USDABWWAbil. Norizo n blx plichil exlute Drift Structure Consistency Notes Pamsee linii On" Corxbeavly 0nAa1 A 016 1CYR 2/1 ban weak subeng" Mable 90%cooled pock I N41n organic& 0.0-2 0.14-14 Big 1&36. 10Y Sti 7.5VR B.eO cloy massive .ery Ann want 0.06-0.2 0.014-0.14 Seasonal High Weter Table from oxIadng ground surface: <12 Inthos 1016foot ! Observed Water Table from existing ground surface: 24 Inches (2.0 %et ) LEGEND B-# APPROXIMATE SOIL AUGER BORING LOCATION Q WITH ASSOCIATED PROFILE DESCRIPTION ABOVE r� 0 N w w o a m N a w i Z zZ O W w Q J g 00 Z U O = Q CN N 0 M Z J Q0 Q U UJ w Z wOf �0 o 11 �2 a j O 0 m to OO z to FIGURE NO. 1 THIS MAP IS ONLY A PORTION OF A REPORT FOR THE NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT - BACKGROUND AUTOCAD MAP FROM FILE SUPPLIED BY BOHLER ENGINEERING NAMED GRANT SBORO ORADING.DWG