HomeMy WebLinkAboutSW7111201_APPROVED PLANS_20111212STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT �O APPROVED PLANS ((❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDb .m EROSION CONTROL PLANS - LAYDOWN YARD PASQUOTANK AND PERQUIMANS COUNTIES NORTH CAROLINA Yfm^ lm�I /1 ATI IKl NORTH CAROLINA STATE MAP Know what's below. Call before you dig. NORTH CAROLINA: 1-800-632-4949 ENGINEERS: FISHERASSOCIATES 135 Calkins Road, Rochester, NY 14623 Phone: 585-334-1310 LOCATION MAP NOT TO SCALE a t I BE RDROLA s -1- INDEX DRAWING NO. TITLE OF DRAWING COVER GN-1 GENERAL NOTES AND LEGEND GP-1 OVERALL PROJECT PLAN IND-2 INDEX OF PLANS SP-3A LAYDOWN YARD SITE PLANS SP-313 LAYDOWN YARD GRADING PLAN SP-3C BMP DETAILS DET-3/7/8/9 DETAILS APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY 20_LL_ ,,.-tar Permit Nc.S��� �0 FISHER ASSOCIATES, P.E. L.S. P.C. S. SALMAN MOAZZAM, P.E. DATE LAYDOWN YARD PERMIT SUBMITTAL - OCTOBER, 2011 ,.9 GENERAL NOTES PLANIMETRIC FEATURES, ORTHOPHOTOS, ELEVATIONS, AND CONTOURS WERE PREPARED BY BOWMAN CONSULTING FROM AERIAL PHOTO DATA GATHERED IN 2011. CONTRACTOR SHALL RESOLVE ANY DISCREPANCIES BETWEEN THE PLANS AND FIELD CONDITIONS. SURVEYED BOUNDARY AND RIGHT OF WAY INFORMATION PROVIDED BY BOWMAN CONSULTING, 2011. THE ELEVATIONS SHOWN ON THESE DRAWINGS ARE TO BE CONSIDERED GUIDANCE AND SHOULD BE ADJUSTED TO FIT ACTUAL FIELD CONDITIONS DURING CONSTRUCTION. THE CONTRACTOR SHALL USE JUDGEMENT WHEN ESTABLISHING CONSTRUCTION GRADES AND ELEVATIONS. FROM THE CONTROL POINTS AND BENCHMARKS PROVIDED BY THE OWNER'S ENGINEER, THE CONTRACTOR SHALL SUPPLY ALL CONSTRUCTION SURVEYING AND STAKING REQUIRED TO BUILD THE PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR EXTRACTING STAKING COORDINATES FROM THE CONSTRUCTION DRAWINGS PROVIDED BY THE OWNER'S ENGINEER. ELECTRONIC COPIES OF THE CONSTRUCTION DRAWINGS WILL BE PROVIDED TO THE CONTRACTOR IF REQUESTED. ALL STAKEOUT SHALL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE EROSION AND SEDIMENT CONTROL DURING THE PERIOD OF CONSTRUCTION OF THIS PROJECT IN ACCORDANCE WITH THE NCDENR APPROVED EROSION AND SEDIMENT CONTROL PLANS AND THE NC DIVISION OF WATER QUALITY CONSTRUCTION GENERAL PERMIT NCGO1. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING DRAINAGE THROUGHOUT THE CONSTRUCTION OF THIS PROJECT AND SHALL NOT BLOCK NATURAL OR MANMADE CREEKS OR DRAINAGE SWALES CAUSING RAINWATER TO POND. ALL MATERIALS AND SOILS SHALL BE DISPOSED OF IN PERMITTED DISPOSAL SITES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ADDITIONAL NCDENR PERMITTED DISPOSAL SITES. THE CONTRACTOR SHALL APPLY FOR AND SECURE PERMITS FROM THE STATE AS NECESSARY BEFORE DRIVING CONSTRUCTION EQUIPMENT OVER AND ACROSS THE STATE HIGHWAYS AND ROADS. THE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITIONS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) "STANDARD SPECIFICATIONS AND DETAILS" AND ''NATIONAL MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS". DISTURBANCE LIMITS ARE SHOWN ON THE CONSTRUCTION DRAWINGS. THE CONTRACTOR SHALL KEEP ALL CONSTRUCTION ACTIVITY INCLUDING TRAVELING BETWEEN TURBINE SITES AND CONSTRUCTION LOCATIONS WITHIN THESE LIMITS. ALL OPEN EXCAVATIONS LEFT OVERNIGHT THROUGHOUT THIS PROJECT SHALL BE PROTECTED BY FENCES AND BARRICADES. WHILE BUILDING THE ROADS AND EXCAVATING THE TURBINE FOUNDATIONS EXCESS SOIL WILL RESULT. THE CONTRACTOR SHALL DISPOSE OF THIS EXCESS SOIL IN AN APPROVED MANNER. NO TOPSOIL WILL BE ALLOWED TO LEAVE THE PROPERTY FROM WHICH IT WAS DUG. EXCESS TOPSOIL SHALL BE DISTRIBUTED INTO A THIN LAYER ON LAND IMMEDIATELY ADJACENT TO WHERE THE TOPSOIL ORIGINATED. WHILE DOING SO THE CONTRACTOR SHALL AVOID CAUSING RIDGES OR MOUNDS THAT WOULD MAKE IT DIFFICULT TO CULTIVATE THE PROPERTY OR THAT WOULD CAUSE RAINWATER TO POND. THE FINAL SURFACE OF THE DISTRIBUTED TOPSOIL SHALL BE SMOOTH AND FOLLOW THE NATURAL CONTOUR OF THE LAND. ALL OTHER SOIL THAT WOULD NOT BE CLASSIFIED AS TOPSOIL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT A DISPOSAL SITE ARRANGED FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL OBSERVE ALL APPLICABLE USEPA AND NCDENR RULES AND REGULATIONS DURING THE HANDLING AND DISPOSAL OPERATION. IT WILL NOT BE NECESSARY FOR THE CONTRACTOR TO REMOVE AGRICULTURAL CROPS FROM THE FIELDS PRIOR TO TRAVELING ACROSS THEM WITH CRANES AND OTHER CONSTRUCTION EQUIPMENT. SIMPLY PUSHING CORN STALKS OVER IN FRONT OF THE CONSTRUCTION EQUIPMENT PROVIDES SOME STRUCTURAL SUPPORT. THE FINISHED SURFACE OF CRANE PAD SHALL NOT SLOPE MORE THAN 1% IN ANY DIRECTION. THE CRANE PAD SHALL BE CONSTRUCTED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL PROOF ROLL THE SUBGRADE PRIOR TO ANY AGGREGATE MATERIALS BEING PLACED. THE PROOF ROLL OPERATIONS SHOULD COMPLY WITH THE GEOTECHNICAL ENGINEER RECOMMENDATIONS. IF IT RAINS BETWEEN THE TIME THE FINISHED CRANE PAD SURFACE IS PROOF ROLLED AND THE WTG ERECTION CRANE IS TO BE USED ON THE CRANE PAD, THE CRANE PAD SURFACE SHALL BE PROOF ROLLED AGAIN TO SHOW THAT RAIN HAS NOT WEAKENED IT. OVER LEGAL WEIGHT VEHICLES SHALL FOLLOW THE DESIGNATED DELIVERY ROUTE ONLY. PERMANENT PIPE CULVERTS SHALL BE SMOOTH INTERIOR CORRUGATED PLASTIC PIPE. TEMPORARY PIPE CULVERT EXTENSION MATERIALS SHALL BE DETERMINED BY THE CONTRACTOR. TEMPORARY CULVERTS SHALL BE CHOSEN BASED ON ANTICIPATED EXPOSURE TO OVERWEIGHT CONSTRUCTION TRAFFIC. CONTRACTOR SHALL FIELD VERIFY THE LENGTHS OF ALL PIPE CULVERTS TO BE REMOVED AND INSTALLED PRIOR TO ORDERING THE PIPE. TO MINIMIZE AIRBORN DUST DURING CONSTRUCTION, THE CONTRACTOR SHALL UTILIZE WHATEVER MEANS ARE NECESSARY, INCLUDING, BUT NOT LIMITED TO, THE APPLICATION OF WATER OR CHEMICALS AS FREQUENTLY AS NEEDED IN ACCORDANCE WITH THE NCDENR EROSION CONTROL PERMIT. THE CONTRACTOR SHALL HAVE THE RESPONSIBILITY BEFORE ANY CONSTRUCTION WORK HAS BEGUN, OF OBTAINING FROM ALL UTILITIES THE EXACT LOCATION OF ANY UNDERGROUND FACILITIES IN THE AREA OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. WHENEVER A QUESTION ARISES REGARDING THE EXISTENCE OR LOCATION OF A BURIED UTILITY, CALL THE TOLL FREE TELEPHONE NUMBER, 1-800-632-4949, BEFORE STARTING EXCAVATION. ALLOW 48 HOURS FOR OTHER THAN EMERGENCY ASSISTANCE. ANY FACILITIES DISTURBED BY THE CONTRACTOR SHALL BE RESTORED AT CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL COORDINATE WITH THE PROPER UTILITY FOR THE RELOCATION OF ANY FACILITY DESIGNATED ON THE PLANS OR DEEMED NECESSARY TO BE RELOCATED IN ORDER TO COMPLETE CONSTRUCTION OF THE PROJECT. RESIDENTS SHALL BE NOTIFIED OF IMPENDING SERVICE OUTAGES AND NO RESIDENCE SHALL BE WITHOUT SERVICE OVERNIGHT DUE TO CONSTRUCTION ACTIVITIES. ALL WORK PERFORMED ON STATE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH THE PERMIT ISSUED BY THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ON FILE WITH THE OWNER'S ENGINEER AND PROVIDED TO THE CONTRACTOR. THE CONTRACTOR SHALL OBTAIN AND PROVIDE AN INDIVIDUAL HIGHWAY PERMIT BOND BEFORE BEGINNING WORK ON STATE RIGHT-OF-WAY. ALL ROADS SHALL REMAIN OPEN TO THROUGH TRAFFIC DURING CONSTRUCTION ON THE PRIVATE SITES. THE CONTRACTOR SHALL BE REQUIRED TO RELOCATE OR TO REMOVE AND RE -INSTALL ALL ROAD SIGNS WHICH INTERFERE WITH CONSTRUCTION OPERATIONS AND TO TEMPORARILY RESET ALL SUCH SIGNS DURING CONSTRUCTION. ALL WORK INVOLVING SIGNS SHALL BE GOVERNED BY THE FOLLOWING REQUIREMENTS: * SIGNS SHALL NOT BE MOVED UNTIL PROGRESS OF WORK DEMANDS. • EVERY SIGN REMOVED MUST BE RE -ERECTED AT A TEMPORARY LOCATION IN A WORKMANLIKE MANNER AND BE VISIBLE TO HIGHWAY TRAFFIC. ALL SUCH SIGNS MUST BE MAINTAINED STRAIGHT AND NEAT FOR THE DURATION OF THE TEMPORARY SETTING. THE LATEST EDITION OF THE NATIONAL "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL PROPERTY MARKERS AND MONUMENTS UNTIL THE OWNER, AN AUTHORIZED SURVEYOR OR AGENT HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION. ALL OTHER EXISTING ROW MARKERS AND/OR PROPERTY PINS SHALL BE MAINTAINED OR REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH NORTH CAROLINA LAW. A CONCRETE WASH OUT AREA SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS AT EACH TURBINE LOCATION. ALL DEBRIS SHALL BE DISPOSED OF OFF -SITE AT LOCATIONS PROVIDED BY THE CONTRACTOR. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE FROM ACCESS ROADS, EXCAVATIONS AND STAGING AREAS AROUND THE TURBINE SITES. THE INTENT OF THE PLANS IS TO LOCATE THE ACCESS ROADS ALONG THE EDGE OF FIELDS AND TOP OF BANKS. CONTRACTOR IS RESPONSIBLE FOR ALL TURNAROUNDS AND CRANE BUILD AREAS. THEIR LOCATIONS ON THE PLANS ARE APPROVED LOCATIONS SHOULD THE CONTRACTOR DESIRE TO CONSTRUCT THEM. DEWATERING OPERATIONS ARE EXPECTED THROUGHOUT CONSTRUCTION AND SHALL BE PERFORMED IN ACCORDANCE WITH THE DETAILS. REFER TO ELECTRICAL PLANS FOR ELECTRICAL SYSTEM SPECIFIC DETAILS. ANY CONFLICTS BETWEEN PLAN SETS SHOULD BE RESOLVED BY THE OWNER. LEGEND ------------ HB ACCESS LIMITS CRANE WALK PATH IMPROVED ACCESS ROAD NEW ACCESS ROAD TEMPORARY IMPROVEMENT UNDERGROUND COLLECTION OVERHEAD COLLECTION PROPOSED CULVERT PROPOSED SWALE EXISTING CULVERT EXISTING DITCH EXISTING UNPAVED ROAD PROPERTY LINE HIGHWAY BOUNDARY SILT FENCE LIMIT OF DISTURBANCE ROCK CHECK DAMS FLOW DIRECTION SPOT ELEVATIONS RIP RAP PROTECTION WETLAND PROPOSED PERMANENT CULVERT LABEL PROPOSED TEMPORARY CULVERT LABELS PROPOSED SWALE LABEL EXISTING CULVERT LABEL w a 0 o©ommm D L U c .o� m3 moron m o .yam ra NOO �DyC;yV �uS�O�NCIC O m�Qa m�mm— agLaaa �12L- m9 'yV'rr'il 00 mOi f_ OIL i.4w f� aO`C mmOEn mC O._aOm} mO Teo .;mamoy w a=oL U .Nor C .p} dO0 :omm� °3 m Q vim `0000 noc,% oo« m 1 0000 4'yLl 3CD0 _mm4 It Oa O Nm CmC OOCOLOL L} 30�0m> OOim 00 m mm F! -, goo IT 13 III i m Ng 0 9 w in _ lu =a tla� LL U) w z Z) O U U) z ¢ ('1 U) m Qoa °"z EL _J z0Zm ;�in�¢ U wF- �C1'� U) W>¢O 0 U d z PROJECT NO. 110003 DRAWING NO. GN-1 SHEET OF Am ru L c C O U U / c w 11 C cl- 3 00 + CV s_ 4 M n � N o. \ LEGEND msx /e WTG 36 •\ """°""� ppNpRpp,D I PROPOSED TURBINE wo- PROPOSED ACCESS ROAD TP R 6 COLLECTION LINES ,� o aaxan,ervc ` R 7 �e DESERT VIEW r R 10 _ COURT e� R 3, f a--- -�P 5 -- S40 - •� ttCC WTYERHAE ERC PANY 11 S 3 - _ 7956- g SUMS ACR LLG P 6 1� R 8 ADALIA HARRELL 7966840728 S 41 7966-545110 R 1 Q 8. HARRELL 3 SUN'S ACRES LLC ^r R 5 ENTERPRIZES DIANEH 6ERE __ / -, � •' � - 7966-238674 - : 7976-13682342` Of WINNIE HUMB51 S P - 4 O 1 of 1 37 o, �.i'' _. •k R 2 JW JONES LUMBER CO INC g SUN'S ACRES LL P 1xaesr 'Asrser 7956814237 79763 4741 } -- b 2 I 0.1 _. yo \,\ 1 S 38 R�R�ai�> Q 2 Q 6 Q 11 SUN ACRES Q 7 REALTY CORP \ KI AND SUN REALTY CORP � 7955865 7965586256 � 4 7965 S 27 S._43 91 KIAND REALTY CORP S 28 AND UN ADAUA HARRELL 79654SB955 KI AND SUN REAL ORP 7975 54Z51 � -' YO n C 1 _. REALTY CORP �g8 00 'r -�_ sJ 7965,M59 wfw,ew.«o.�.w na m �O I T 20 ,�,,.,� mnsavercewrai __. ' �i �� ^LA� 1 O�C,rOsS'rp •.- \\ _ STEPHEN I.BROBIN �O 19 29 S 34� T 17 T� ° wue aasx 7955-727349 - ,ovonn STEPHEN 1. 8 ROBIN A HARRIS "b A 1-00130001 \` s-. ISMC LEMUE T 21 w NQ - S 30 T 18 R •/. _ -_ 7 N 8 S 9 985-U3416 DIA NE H-FER 6EE e N 5 `` LISA S. WNSLOW - S 2 7965-81M S 31 '� T 22 - 79855 2772 R� T 25 LISA S. WINSLOW \ 7955-9,9423 - _ " 23 - "gl°an�"'ff DONALD RAY STAWNGS 1-0013-0001A ,\ N 4 SUNSACRES- C '� T 1 T---'--- 1-0007-0D45 ` 79�209J2�._._ .,S 21_. T 1 _ <resuu r 2 am. 3 .\ PRITCHARD JJ _ .r T 1 OPQ - bORO�7-OMD01CK' i HORACE C, SR. B DONNA S. PRITCHARD 3 796"1243 : KEVIN L 8 T 6 s �l �I H. C. PRITCHARD, JR \ ) ^ L 1 M 1-0013-0002 \ f� S 1 1 S 22 i WEN B. B4-SB C349 GUSE n DAVID S. RIDDICK' `., N__1 L 3 S 3 ENCEN.AND 1-0007-0040 HORACE C. SR. 8 �' LAVM2ENCE N. 8 M J. LARABEEj�64-073863 MARY J. EE-`. '""'•. 2� I T 5 T 7"„ N �i DONNA S. PRITCHARD 1-0013-0003 l 'Qt)s H: . PRITCHARD JR n . I�' M1 \, \ KI A UN REALTY CORP S 24 �T VV 2`T \. L 2 �•HDRACE G. SRB " S 4 S 17964.76A,3, 4' DONNAS. PRITCHARD H. C. PRITCHARD, JR \ S S S 2 OiyQ `�xxmas A CUFFORD S. L ,-00130003C M 4 coWNSLOW R���F 1-0012-0006 W 28 H. C. PRITCHARD JR Ro 0 22 L 4 S 6 1Q, qQ EVERETT W. 8 MEGAN F. RABEE S 4y; h cr 6 23 EVERETT W. B`a, 1-001300038 \ - ufrxic.n - a' 'uma01Ov •R T MEGAN F. LARABEE C 1 nvamr ewe 1-0013-MB J \• ISAAC L 8 EARLENE RRISS 15 JULIAN E.8 _ L SUNS ACRES \ S 7%"18826 ,�-'- Q e.e�wYcw CONSTANCE E. BAKER 0 1.001 -m r 1-0012-0011 __ ` EVERETTW `�.� - MLA F /ea�earss exwr _a,i `w uewam/,a� _ , b 2 -.. { im1�33A S 2 ,ampiwwvn S 16, ri . rmrrmx LL isxos/xmr mnrwz-aea�� ., �frsmnxssampw (A [Y )V µYSt� 11� JWAN E. BAKER W 14 \ 27 z 0- �� 1-0012-0008 W 20 < A O&M cb SUBSTATION o1 W 1 W 19 : \\ LAYDOWN YARD cl)C 12° N a nnw"�is`av L O. WHITE LESTER J. wr"`mm,'" ANN C. B NAL ARD G. BAKER D 1 WEYERHAEU : OMPANY O w "q1m' ,�. 001. 104 1-0017-0115 d 1-00 -oon W 18 `- ILLARDSIMPSON \ O� y y J,ID`� 2 A : V V 8 % ` `"5MG0013 \ 0� W 2 an xne,xcen � o W 1 a 50019-0001 l fij� B C4 ;I W7 ®` 10 W16 e HENRY EN WINSLOW p ,ems ----- FAMILY LI DP T RSHIP a ° o =A2 '�° 5 4 C W 3` 9 o� W 4 15 e W 2W 5 "V/YGS fyF REU5BAN E. JJAMES -... A7sFso7 RF UNDY ROAD °e TERCONNECT �","M�c`�,,Ta ' 7°BNB FpRANB7 rerewumier r — ' --. ,mnuw snanceaaw�x/eiomv �•� -- cse,F H ueamn, G2 !•{r.S'. N/C.Sf Q.Y6Yf EAK LEW NIFRED ..Re`.�' �¢ I JR C,gRO<Y/y SM05 s� 0,v G _ _ 1-001 y. 2� AIIq e� �((FN N FG 8 s _ FY 0 p 6 e�� - 2P J�coS .iusvz axe y yid • rO Z`�vsm°wa t N F e4�2� •. �RE NEML \ n BYPASS o0 to ��o- �5� b D y SR 1?14�ysr 9� oy O 90 NnTF- w a 0 a©m©m a� mToa"p � ✓mi+L•F a 0o NNOC pW oo Cc�mr= o"a Lwva 0 © /^ O y j[C'•'^5 abNCm• ON�En � rt4r � o � t moa. y Q 0} C N O a O L C} 0 L D 0 a� �a� ➢omo o�o Edo ul O f N T C'•' p O L 0 H 30�001 �a0p m u" Zi-�"UN .�_Or btL 00 0 m y W _ 4n o o u O O z W M a= M~ /Of 4 C W W N 1 O IYN W Z 7 J LL �--• a U va�i Q m WM a t Q� :E)131;. 13� � Iz M `Z WE W LL T w z 0 0 z ¢Q G g°z a°�-J zzz0 Sc�Q� StoI.-U x cl O � �wJC� W V, V! oLu <0 Ro0amz PROJECT NO. 110003 DRAWING NO. GP-1 SHEET OF M. L L N U / c C W C � 3 v +' N L V N � N U N 0 c-7 9 r9 m i +� U 0 O N 0 \ 0-,L M���POND ROAD \ 02 - — Q 11 HORNER ROAD �RR�PAD - Q2 Q6- S26c Q7 • qo ,\ S 1 ' 10 I N9 N 7 N8,S9 N5 N 4 3 k. 0 2 3 .\ S 10' L 1 Q`'� �Ro M N 1 \ 3 i A W24 L2 3 �� � � S4 °° W 28 L M 4 �,\ S 5 / Rip�FRogo+ 22 L 4 `\ j % sR r2 23 S 1 DESERT VIEW COURT P5 ��. S 3 S 40 `.S 41 P 6:* co co S3 �I S42' 4 QP2 .P3 37 S 38 iw Qf preT 27 S 28 S 29 S 3 19 S 30 S 20` S21 OLD DOMINION ROAD S 39 L 1 S 43 f 33 S 341 I' �S 31 W S 24° S 12' a LR S 2 �l 2�r g S14 Q L S S 15 21 i $ S �� S16, 14 W20 3W ` d sp. I i W1 W19. & i � yF 1 C D 1 $ 12 W 18 W 26 1 ya \ Pob 2 W 8 \ 2 W1 W W2, B C4 W7 10 W16 A 2 . ;�_ . )'C 5 <14 "1 I j` T 1 T T5 T w a 0 N z 0 N w w©0©o � v L U Lm c L c ° o om>mapo o c mLmm n ate'-NOOm y_QmL;yU O w JEC Om� m�CL°a0 P� > ®rV'l] sV !pp, VmiO LTtV o c } maam m i•O tL 00P° m}OjDt vo-p a ooc op° OQinmo� °} E.-.z m -' °o m U Yp VdL m miF.-ca s cao _ ON V'a.NN CCp°COBOL [L mVNLmVJ �CLLL �t'f o m N �m -o o ti V cs u O O = W a = �~ N C HMO N iL 1 O W N W Z �J J III Wn F. y € g Mom p �-7 w a �a w tlu` N W_ z O U z Q gaQ a�z zzQ� u F Q �w0V � Lu u En ow>QO a�UELz \ 00 PROJECT NO. 110003 DRAWING NO. IND-2 SHEET OF R. —_—_---_—_—_—___—_—_—_—_—II_—_—_—_—_—_—_—_—_—_—_—_—_---_—_—_—_—_—_—_---_—_ TEMPORARY SECURITY FENCING /- EDGE OF TEMPORARY GRAVEL ------------------- ------------------------- cn / U Q C W C d 3 N L � Ln N O N cl) m m m LAYDOWN YARD TEMPORARY GRAVEL / STABILIZED SOIL AREA PER GEOTECHNICAL ENGINEER'S RECOMMENDATIONS SUNS ACRES LLC 7964-02-3306 .....C�.J.J.-�.�I..':a •• II jj �� STEP-UP SUBSTATION 0&M FACILITY 6" TEMPORARY PERFORATED DRAIN TILE POTENTIAL DRIVEWAY LOCATION LOCATION AND NUMBER TO BE DETERMINED BY CONTRACTOR I -- 6" TEMPORARY PERFORATED DRAIN TILE —crST — — — — — ------- 81 PROPOSED OVERHEAD ELECTRIC COLLECTION SYSTEM HEIGHT AND POLE SPACING PER ELECTRICAL ENGINEER'S PLANS I I I I I I II L,I r� Lij Q I I I 1' I' I I I t I I I I I T I I t I II I 1 i I I ,I I I I T I I I II i SCALE: 11 X 17 1 "=120' 22X34 1"=60' W F_ to Z O_ N W w I`°LL'l-q-l"'IN c3 m L r OWL Op OpTy� Q. .UO�O03 m;QL O N N+LwOCp OONNNOd �-1 NO LO}L W �0s 0--pn�\wD0 �Uj 00 mq� O LTL� �mCL 9 m00ED+- LCO � pLoz abm+yLjpm to Cmt Q me omm° y Q N m O] O Y L O O c m Lp EOCx a�♦ OL 0. 'yW^ L+3C00 _ m O N O t � T C COO C L O L zi-+�_m �m+aa-cHo O_ Lu m N ti W m C�l O W U O z Z 2 Lai 0 Wip me-- N NLjj d Q WN _ 7 J am WF F 5 a jj m 103 O m �Q1 �< �LJ lz&I Win -- {1: E L- W_ H Z Z) O U U) Z L7 � gaz d od J ozyo ZU, ZN '^ QL LLL al vul 0I Q � ui _J LL W Q O a�UaZ 'PROJECT NO. 110003 DRAWING NO. SP-3A ,SHEET OF N U i lT c w i c� C cl- 3 c I� LC7 i C�5 O M N CV 0 m m m m 12" OUTLET PIPE INV. EL. = 8.5 \ NORTH SEDIMENT BASIN FLASHBOARD RISER STRUCTURE TOP EL. = 11.0 BOARD EL. = 10.0 \ BOTTOM EL. = 8.7 SUMP EL. = 6.7 \ o \ \ __ _--. ...........- .......................--... /J I , SEE SECTION- `,\ -----'--- ON SP-3C ` I \ I \ I I , / 1 / I / I / I / I / 1 "ROCK OUTLET ------- PROTECTION 1 I 1 , I LIMITS OF DISTURBANCE 20.32 ACRES (THIS SHEET) 1 _ I \ 1 \ 1 \ I \ 1 \ I I , / I I / 1 / ROCK OUTLET PROTECTION I I 1 1 I `-----------ZF------- I ` I \\ I I I I 1 I 1 I 1 I I I 1 I / SEE SECTION ON SP-3C �- ------------zl-- --"-zl. 12" OUTLET PIPE INV. EL. = 10.3 _ .\. �I O____ _____ -. -- ....... --------of- - - 10 __ .-0i -= 10-= 0[ - _= _-10- _ oc- _ _ _ ___ __ _ _ _ _ - -o[ ..-10 - at-- ------------ VI 11.6 8 11.6 11.7 SOIL DATA 3 12 I ii I II SOIL BORING LOCATION (TYP) NORTH SEDIMENT BASIN "1" ' DA=8.7AC T. VOLUME REQ. = 1,800 CF/AC X 8.7 AC. = 15,660 CF `\ VOLUME PROVIDED = 28,753 CF OUTLET EL. = 10.0 o BOTTOM EL. = 8.7 + /I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -� - - - - - - - - - - - - - - - - - - - - - - - -C \ 6" TEMPORARY PERFORATED DRAIN TILE PER DETAIL `- ---;- --- -- -.:.. - - =-.- Si-- - ST _ ST.. -- - ST - ---- .... : i -ZI .. ..-- - ____- --Zl --__-------�----_- - - --- .....-.. .-. T... ................. c \ + / \ I 1, 14 TEMPORARY LAYDOWN YARD / I i I I I I \ \ \ \ \ 6"TEMPORARY SUNS ACRES LLC PERFORATED DRAIN TILE \7964-02-3306 PER DETAIL ---- ---- Sf.... - Sf- -.. Si- �_ / \ I / I . -- :--- - -Z 1.-- - -- _- SOUTH SEDIMENT BASIN 8 FLASHBOARD RISER STRUCTURE TOP EL. =13.0 BOARD EL. = 12.0 TEMPORARY CONSTRUCTION ENTRANCE 14 SOUTH SEDIMENT BASIN "2" DA = 8.7 AC VOLUME REQ. = 1,800 CF/AC X 8.7 AC. = 15,660 CF VOLUME PROVIDED = 32,472 CF OUTLET EL. = 12.0 BOTTOM EL. = 10.5 13.3 --�.-=- ---- --_-------------------1z--- --' --- - - - --------zl------------------------ -- SOIL DATA 4 I BOTTOM EL. = 10.5 SUMP EL. = 8.5 / n \ 1 SOIL DATA SUMMARY LOCATION SOILTYPE SEASONAL HIGH WATER TABLE DEPTH (IN) INFILTRATION RATE (IN/HR) INSITU Ksat (IN/HR) SOIL DATA 3 PORTSMOUTHL0 M 28(EL:8.7) 0.5-1.0 18.2 SOIL DATA 4 PORTSMOUTH LOAM 28 (EL. 10.2) 0.5 - 1.0 17.5 TESTS PERFORMED BY SOIL, WATER, & ENVIRONMENT GROUP, LLC IN JULY 2011 Ih A II I '2 \ II I \ :III III \ Ill \ \ s1 , LAND PISTURBANCE DUE TO CONSTRUCTION OF FOREMAN ROAD IS DETAILED IN THE N ROAD/ CONSTRUCTION PLANS 101 I ' IM I n, I. I'I I I li I 11 V TI I: r `o/ )I I. 1 I OI N I X I: `44 Q jSk?:r.. 'I Z a :I ,I v p N �I o� v I p I o- 4 .I 9 'I p ''I 4 SI Q el i1:(:I �6 ', I . l l III ' I Ill ':I 0 rr :I iN N Ir .I I,' 0 rf 'I } W p :I :I I I•, :I xr :I ll'F :I :!II: :I 11. :I .1 NOTES: a; a 1. TOPSOIL STOCKPILE, IF NEEDED, TO BE aN LOCATED WITHIN THE LIMITS OF THE LAYDOWN YARD. TOPSOIL STOCKPILE AND I' OTHER DISTURBED AREAS TO BE MULCHED WITH WHEAT STRAW ONLY AND SEEDED as 'I WITH FESCUE. ar,' I A '.I : 2. DISTURBED SOILS AT SLOPES EQUAL TO OR I' GREATER THAN 3:1 SHALL BE STABILIZED 31 r WITHIN 7 DAYS OF THE LAST DISTURBANCE. FLATTER SLOPES SHALL BE STABILIZED WITHIN 14 DAYS OF LAST DISTURBANCE. I 3. LAYDOWN YARD TO BE REMOVED AND tt ;ii RESTORED TO PRECONSTRUCTION 'r CONDITIONS AFTER WIND FARM n c CONSTRUCTION IS COMPLETED. R a 4. ANY MATERIAL REMOVED FROM THE SITE SHALL BE DISPOSED OF IN A NCDENR PERMITTED SITE. CONTRACTOR SHALL OBTAIN NCDENR SCALE: 11X17 1 "=120' 22X34 1"=60' to Z O N W cr MORON L y Lo V i4 td� [� nT nOY o moo arc°Lvov om�H�°a OOL3VN '" W JOOOmC O nL OnOv oL �� OO,m P" MOOL TAU om O.',L5 905OEaa'0 _O ^ W' O Y C L P N 0 L N aO_ICL o Lo C °: n+` ai v�'ip nnmmo a-doLoo° O Q N m O V 0' Q (T % O m U YO�Pdo E OOYV CaO _ mom+ N O M O'U c j C C O L L O} wo N PNL V] CAL LL '�•� µ9+NfL00 G c= m H N W - m O � w G O Z a = W N C �� N W O C=o a0 WN WZ mm h� g O� �> IS lz Wn LV zi x a Nlp ,-0 -- 4 U) W z O 0 U) z Q Ci gCLz d`6cl z zz'Dzzw ( iii ~ U Of 0 O = H � J U) OfW>a0 0 U d z PROJECT NO. 110003 DRAWING NO. SP-3B SHEET OF C m 72 s cn C n Q) cn i i c C W c� C W 3 N 19 LCF M N � N O cs) m e m KEY BOARDS INTO STRUCTURE WALLS (TYP.) REMOVABLE BOARDS 6" THICK 4000 PSI REINFORCED CONCRETE STRUCTURE r-- I 36" SO OPENING I ELEV: 10.0 I I I I I I 1 I I I REMOVABLE I I BOARDS i I PROVIDE I WATERTIGHT I GROUT OR BASIN BOTTOM I I GASKET GI Ll/• a 7 I 6" OF a2 STONE BEDDING KEY BOARDS INTO STRUCTURE WALLS (TYP.) REMOVABLE BOARDS UNDISTURBED EARTH 6" THICK 4000 PSI REINFORCED CONCRETE STRUCTURE 36" SO OPENING 1 ELEV: 12.0 I � I i I ' I ' I ' REMOVABLE BOARDS I PROVIDE I WATERTIGHT BASIN BOTTOM i I GROUT OR ELEV: 10.5 GASKET 6" OF #2 STONE BEDDING UNDISTURBED EARTH TOP ELEV: 11.0 COAT INTERIOR AND EXTERIOR WALLS WITH (2) COATS OF KOPPERS BITUMASTIC 300M OR EQUAL BERM ELEV: 70.5 12" OUTLET PIPE k DAYLIGHT AT GRADE INV. 8.7 BEDDING ANTI -SEEP COLLAR. MATERIAL AGRI-DRAIN ASC04 (OR EQUAL) NORTH SEDIMENT BASIN "1 FLASHBOARD RISER NOT TO SCALE TOP ELEV: 13.0 COAT INTERIOR AND EXTERIOR WALLS WITH (2) COATS OF KOPPERS BITUMASTIC 300M OR EQUAL BERM ELEV: 12.5 12" OUTLET PIPE k DAYLIGHT AT GRADE INV: 10.5 ` ANTI -SEEP COLLAR. BEDDING AGRI-DRPJN ASC04 MATERIAL (OR EQUAL) SOUTH SEDIMENT BASIN °2 FLASHBOARD RISER NOT TO SCALE W a 0 Launr-Taira L c � iL °om �A L d�.°rmo o mmoo ✓mi O L O L C O t l y) m O 0 000 ObL3mV 30N O m j W 0VC OND 611�V a l'Cat - O o L T c L V �m. o« x c°i�mDo :'�moam 0 °�Oaop m-mo�Qo° .IQ NmocL J� `°tea mm«w a'm oo Y mo'.�mr otom VNm CL° y ao�Om� °'rnvom;�o LJ m W m O � ti 6.1 o W O O z a a 2 W O Wa C ~ t/1 � O p� O W N w Z _ LL ^ a C! J Q N m W A `t C Iz w2 I� W. =tl - N W_ H Z O U U) Z Q fn CC a z EL °� J Z> (9 ZQ Q > V5 ~ U o O = H � J U) a' W>QO DUn"Z PROJECT NO. 110003 DRAWING NO. SP-3C SHEET OF F w a 0 ArnnrnATr nArr rnIMrr REMOVE TOPSOIL, AS NEEDED GEOTEXTILE SEPARATION FABRIC EXISTING GROUND AGGREGATE BASE COURSE PER GEOTECHNICAL RECOMMENDATIONS °° ° °n°_I °mo( )_° °° -EXISTING G EXCAVATE/STABILIZE/COMPACT % SUBGRADE PER GEOTECHNICAL REMOVE TOPSOIL, AS NEEDED EXCAVATE/STABILISE/COMPACT ENGINEER RECOMMENDATIONS GEOTEXTIL SEPARATION FABRIC SUBGRADE PER Gt OTECHNICAL ENGINEER RECOMMENDATIONS TEMPORARY LAYDOWN YARD & WIDENED AREA CROSS SECTION NOT TO SCALE 0 0 0 ER GEOTECHNICAL DITION OF AGGREGATE R. PERMANENT\ 0 & M / SUBSTATION / INTERCON NOT TO SCALE —AGGRE- TE BASE COURSE PER GE ,TECHNICAL RECOMMA ATIONS °1 CRANE MATS AS NEEDED: `. f tf oa ° ����� °°� o° °o° °°oa� o° °° REMOVE TOPSOIL TO SCALE ASPHALT SECTION NOT TO SCALE T CROS XISTING GROUND EXCAVATE/STABILIZE/COMPACT SUBGRADE PER GEOTECHNICAL ENGINEER RECOMMENDATIONS T "" r'1RFACE E " INTERMENATE COURSE 5" BASE 2" SUBBASE COURSE o©o©© L V C a �+N p[O pTVTv]jC U O�O°3 000d O HOLw c o° ay°o a +N000 +OOL30U ";U °NCmC O pm�Om "-CLpp p OO mP+ O LTLF. �.y 0;40=0 000E Np C + mppU C7 U v' oto0 C Amy m'^ . a o m L C L N+ C C f O;°� °9�0 mod° og'o o � N00 ]° p UCP°m U Ci YO�PO mOL%0�00 Y ON Oi-y� +O0 W 0-O NO LL.__w �m+N+L00 Cw cc m N y W _m 0 0 W Q O Z c W a 2 N C W �C) t/1 O a 0 w Z �J J m WE ul m C7 O v O `< � S W�a =a W n m1 _� l' w z O U z a V g(Lz a- 06 z z�Qa� U Of0QO= � Lu WU)—(n ow>QO aOUCLz PROJECT NO. 110003 DRAWING NO. DET-3 SHEET OF N C) U U Q U c C W S:L 3 0 L U M N � N 0 cl) CED EROSION CONTROL PLAN PRO.IFCT OFSCR1PT10N THE PURPOSE OF THE PROJECT IS TO CONSTRUCT 150 TURBINE WIND FARM WITH ASSOCIATED GRAVEL ROADS, ABOVE AND BELOW GROUND ELECTRICAL COLLECTIONS SYSTEMS, SUBSTATIONS, AND OPERATIONS AND MAINTENANCE FACILITY. APPROXIMATELY 1,800 ACRES WILL BE AFFECTED DURING THIS CONSTRUCTION PERIOD. THE OVERALL PROJECT AREA ENCOMPASSES APPROXIMATELY 30,000 ACRES LOCATED IN PASQUOTANK AND PERQUIMANS COUNTIES, LOCATED NORTH OF HERTFORD AND WEST OF ELIZABETH CITY, NC. THE SITE'S TOPOGRAPHY IS LEVEL COASTAL PLAIN WITH SMALL TO LARGE DRAINAGE CHANNELS THROUGHOUT THE PROJECT AREA. THERE IS NO EVIDENCE OF SIGNIFICANT EROSION UNDER PRESENT SITE CONDITIONS. SEDIMENT CONTROL MEASURES WILL BE IMPLEMENTED TO PREVENT DAMAGE TO THE LOCAL DRAINAGE CHANNELS. LAND USE WITHIN THE PROJECT AREAS AND IN THE VICINITY IS RURAL AGRICULTURE AND FORESTED AREAS WITH MINOR RESIDENTIAL AND COMMERCIAL AREAS. THE AGRICULTURAL LANDS INCLUDE DIVERSE PLANTINGS WITH THE MAJORITY BEING CORN AND WHEAT. THE FORESTED PROPERTIES ARE ACTIVELY TIMBERED. THERE ARE EXISTING GRAVEL AND SAND SURFACED PUBLIC AND PRIVATE ROADS THROUGHOUT THE PROJECT AREA. SOILS THE SOIL IN THE PROJECT AREA IS SANDY LOAM WITH SEASONAL HIGH GROUNDWATER WITHIN 3 FEET OF SURFACE (;FNFRAI NOTES FOR CONTRACTOR THE WORK SHALL CONSIST OF FURNISHING LABOR AND MATERIAL, EQUIPMENT AND PERFORMING ALL OPERATIONS NECESSARY FOR A COMPLETE INSTALLATION OF ALL WORK AS SPECIFIED HEREIN AND AS SHOWN ON THE DRAWINGS. WORK SHALL CONSIST OF INSTALLATION OF TEMPORARY EROSION CONTROL MEASURES; CLEARING; GRUBBING; STRIPPING TOPSOIL; ROADWAY AND GENERAL GRADING; CONTROLLED FILL; UTILITY INSTALLATION; PREPARATION OF SUBGRADE; FINE GRADING; CONCRETE FOUNDATIONS, TOWER INSTALLATIONS; PAVING AND PERMANENT SEEDING. ALL DISTURBED AREAS SHALL BE LEFT IN A STABILIZED CONDITION UPON COMPLETION OF THIS CONTRACT. THE CONTRACTOR IS EXPECTED TO EXAMINE THE SITE TO FAMILIARIZE HIMSELF WITH SITE CONDITIONS. THE CONTRACTOR SHALL CAREFULLY READ ALL THE SPECIFICATIONS AND EXAMINE THE DRAWINGS AND DETAILS IN ORDER TO THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORK TO BE DONE. ANY WORK SHOWN ON THE DRAWINGS OR INCLUDED IN THE SPECIFICATIONS, OR REASONABLY IMPLIED BY EITHER, SHALL BE PERFORMED THE SAME AS IF CALLED FOR BY BOTH. FROSTON CONTROI SPECTFICATIONS GENERAL: PROVIDE THE WORK FOR EROSION AND SEDIMENT CONTROL AS INDICATED AND SPECIFIED AS FOLLOWS: SEDIMENT BASINS; DIVERSION SWALES; CONSTRUCTION ENTRANCE; DRAINAGE STRUCTURES; OUTLET PROTECTION; EXCAVATION DEWATERING, TEMPORARY AND PERMANENT SEEDING; AND SILT FENCE. CONTRACTOR'S RESPONSIBILITY: THE CONTRACTOR SHALL FURNISH THE OWNER A SYSTEM OF TEMPORARY CONTROLS TO MINIMIZE SOIL SEDIMENT EROSION DURING THE CONSTRUCTION PERIOD CAUSED BY STORM WATER RUNOFF. WORK SHALL BE PERFORMED AS CALLED FOR ON THE DRAWINGS AND AS SITE CONDITIONS WARRANT. EROSION AND SEDIMENT CONTROL: THE CONTRACTOR SHALL PROVIDE EROSION AND SEDIMENT CONTROL DURING THE PERIOD OF CONSTRUCTION OF THIS PROJECT IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENT CONTROL PLANS AND THE NC DIVISION OF WATER QUALITY CONSTRUCTION GENERAL PERMIT NCGO1. THE CONTRACTOR SHALL PROTECT AND MAINTAIN THE TEMPORARY EROSION AND SEDIMENT CONTROL STRUCTURES. MAINTENANCE OF THESE FACILITIES SHALL INCLUDE, BUT NOT BE LIMITED TO, REMOVING SEDIMENT BUILD-UP, REGRADING AND FILLING OF WASHED OUT AREAS, ADDING EROSION CONTROL BLANKETS, ADDING SILT FENCES AND RIPRAP, AND RESEEDING AND MULCHING OF THE SWALES DURING THE CONSTRUCTION PERIOD IF DEEMED NECESSARY BY THE OWNER, OWNER'S ENGINEER, OR THE LAND QUALITY SECTION OF N.C.D.E.N.R. EROSION CONTROI COMPONENTS ACCESS ROAD CONSTRUCTION ON EXISTING PUBLIC AND PRIVATE ROADS: EXISTING ROAD IMPROVEMENTS WILL INCLUDE REMOVING SOFT SPOTS AS NEEDED, ADDING SOIL STABILIZER AND/OR AGGREGATE AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. SILT FENCE SHALL BE PLACED BETWEEN ROADS AND WATER COURSES WHERE RUNOFF IS DIRECTED TOWARD A CHANNEL. RUNOFF WILL BE ALLOWED TO DIRECTLY DISCHARGE INTO FARMED FIELDS. ACCESS ROAD CONSTRUCTION ON EXISTING FIELDS: NEW ROADS WILL FOLLOW ALONG THE BANKS OF EXISTING FIELD DRAINAGE CHANNELS. THEIR CONSTRUCTION WILL INCLUDE ADDING SOIL STABILIZER AND/OR AGGREGATE AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER. SILT FENCE TO BE PLACED AT THE TOP OF BANK FOR THE LENGTH OF THE NEW ROAD TO PROVIDE PROTECTION TO ADJACENT WATER COURSE. PERMANENT AND TEMPORARY CULVERT INSTALLATIONS AND REMOVALS: DRAINAGE CHANNELS TO BE TEMPORARILY BLOCKED ON EACH SIDE OF THE CULVERT LOCATIONS AND DEWATERED. AFTER CULVERT AND FILL IS INSTALLED OR REMOVED, TEMPORARY DAMS WILL BE REMOVED. TEMPORARY ROCK CHECK DAMS SHALL BE PLACED IMMEDIATELY DOWNSTREAM OF THE DISTURBANCE. TURBINE SITES: CONSTRUCTION WILL CONSIST OF SILT FENCE INSTALLATION, FOUNDATION EXCAVATION AND CONSTRUCTION, TEMPORARY SEEDING AND MULCHING OF SOIL STOCKPILES. FOUNDATION BACKFILLING, AND WORK PLATFORM AND CRANE PAD CONSTRUCTION. AFTER TURBINE ERECTION, THE WORK PLATFORM AND CRANE PAD WILL BE REMOVED AND DISTURBED AREAS STABILIZED PER THE VEGETATION PLAN. CRANE WALK LOCATIONS: ERECTION CRANES WILL TRAVEL BETWEEN TURBINE LOCATIONS FOLLOWING THE DESIGNATED PATHS SHOWN ON THE PLANS. THESE PATHS WILL RECEIVE MINOR GRADING AT CULVERT AND ROAD CROSSINGS, SOIL STABILIZATION, OR COMPACTION AS NEEDED TO PROVIDE A STABLE ACCESS ROUTE WITH A MAXIMUM 17 CROSS SLOPE. IN MOST CASES, EXISTING VEGETATION WILL NOT BE REMOVED FROM WITHIN OR ALONG THE CRANE WALK LOCATIONS. EROSION CONTROL MEASURES TO BE PROVIDED AT WATERCOURSE CROSSINGS, AS SHOWN IN THE DETAILS, WITH DISTURBED AREAS RECEIVING MULCH AND SEED IN ACCORDANCE WITH THE VEGETATION PLAN. UNDERGROUND ELECTRICAL COLLECTION SYSTEM: INSTALLATION WILL CONSIST OF PLACING ELECTRICAL LINES USING STANDARD TRENCHING OR TRENCHLESS METHODS. EXCAVATED SOILS WILL NOT BE LEFT IN STOCKPILES FOR MORE THAN 24 HOURS. BACKFILLED TRENCHES SHALL BE SEEDED AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN. THE TURBINE, INTERCONNECT, SUBSTATION, OPERATION AND MAINTENANCE FACILITY, LAYDOWN SITES. AND ANY OTHER TEMPORARY AND PERMANENT IMPROVEMENTS THAT REQUIRE SOIL DISTURBANCE AND/OR TOPSOIL STOCKPILES WILL HAVE SILT FENCE INSTALLED ALONG THE DOWNHILL SIDE OF THOSE DISTURBANCES. ALL DISTURBED AREAS DURING CONSTRUCTION AND AFTER REMOVAL OF TEMPORARY IMPROVEMENTS AFTER CONSTRUCTION SHALL BE MULCHED AND SEEDED IN ACCORDANCE WITH THE VEGETATION PLAN. THE LAYDOWN AREA WILL ALSO INCLUDE THE INSTALLATION OF TWO SEDIMENT BASINS THAT WILL BE REMOVED AFTER THE REMOVAL OF THE LAYDOWN AREA. THE INTERCONNECT, SUBSTATION, AND 0&M SITES WILL DISCHARGE TO PERMANENT BMPS TO BE INSTALLED ONCE SITES ARE STABILIZED. FROSION CONTROI SEQUENCE THE FOLLOWING SEQUENCE OF CONSTRUCTION SHALL BE STAGED AS REQUIRED TO PROVIDE ACCEPTABLE EROSION AND SEDIMENT CONTROL: 1. CONTRACTOR AND OWNER SHALL ARRANGE A PRECONSTRUCTION MEETING AT LEAST ONE WEEK PRIOR TO ANY LAND DISTURBING ACTIVITY. ATTENDEES TO INCLUDE APPROPRIATE NCDENR, PASQUOTANK COUNTY, AND PERQUIMANS COUNTY REPRESENTATIVES. 2. CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT AT ACCESS POINTS TO PUBLIC ROADS. ANY SEDIMENT ACCUMULATION ON PUBLIC ROADS AS A RESULT OF THIS PROJECT SHALL BE IMMEDIATELY CLEANED OFF BY THE CONTRACTOR. 3. CONSTRUCT SEDIMENT BASINS AT LAYDOWN YARD BEFORE INITIAL CONSTRUCTION. 4. INSTALL TEMPORARY SILT FENCE AT LOCATIONS WHERE FIELD CONDITIONS PROHIBIT PROPER CONSTRUCTION OF TEMPORARY DIVERSION SWALES AND AS INDICATED ON THE PLANS. 5. CLEAR VEGETATION AND GRUB STUMPS FROM WOODED AREAS TO BE DISTURBED. 6. STRIP TOPSOIL AND STOCKPILE ON SITE FOR REDISTRIBUTION UPON COMPLETION OF GRADING. 7. TEMPORARILY MULCH AND SEED TOPSOIL STOCKPILES PER VEGETATION PLAN SURROUNDING THEM WITH SILT FENCE. 8. INSTALL STORM DRAINAGE. 9. FINE GRADE AND STABILIZE ROADS AND SITES TO SUBGRADE ELEVATION PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 10. PLACE AGGREGATE BASE ACCORDING TO PLANS AND SPECIFICATIONS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE INSPECTED WEEKLY AND AFTER RAINFALL EVENTS. NEEDED REPAIRS WILL BE MADE IMMEDIATELY. 12. INSTALL ALL UNDERGROUND UTILITIES. 13. CONTRACTOR SHALL CLEAN ALL STORM DRAINAGE STRUCTURES, FLUMES, PIPES, CULVERTS, ETC. PRIOR TO FINAL PAYMENT. 14. AT THE END OF THE PROJECT CONSTRUCTION AND AFTER THE PERMANENT GROUND COVER IS ESTABLISHED, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL STRUCTURES AND SEED AND MULCH ALL REMAINING DISTURBED AREAS. 15. ESTIMATED TIME OF CONSTRUCTION FROM INITIAL DISTURBANCE TO FINAL STABILIZATION--36 MONTHS. MAINTENANCE PI AN ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY 0.5" RAINFALL EVENT WITHIN 24 HOURS BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. THE SEDIMENT BASINS WILL BE CLEANED OUT WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN. VFC.FTATION PI AN STABILIZATION OF DISTURBED AREAS SHALL OCCUR WITHIN 7 DAYS OF LAST DISTURBANCE ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1. STABILIZATION OF DISTURBED AREAS SHALL OCCUR WITHIN 14 DAYS OF LAST DISTURBANCE ON ALL OTHER AREAS AND SLOPES LESS THAN OR EQUAL TO 3:1. STABILIZATION MATERIALS TO CONSIST OF WHEAT STRAW MULCH AND FESCUE SEED ONLY. CONTRACTOR SHALL MINIMIZE THE AMOUNT OF CROP DAMAGE TO THE GREATEST EXTENT POSSIBLE. OWNER, LANDOWNER AND CONTRACTOR SHALL DEVELOP A SCHEDULE OF ALLOWING FARMING OPERATIONS IN CONTRACTOR WORK AND OTHER DISTURBED AREAS FOR EACH AFFECTED FIELD. z o� Q¢ H 2C7U NOTES o o cn = z 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE IW—c¢ifr < o cm TRUCKS. H = I- z " 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION tnI-:. O -i BY ALL CONSTRUCTION VEHICLES. o o v)CC 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT z •j TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. v-o / PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. wo 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. / 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF / INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE / FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO W BE DETERMINED BY THE ENGINEER. / yV 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED = z S 0 BY THE ENGINEER. o CC �T 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES / FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. em Z / z W cc O cc o :3 z CC y F N Z CLASS 'A' STONE 8 IN. MIN. DEPTH J 0 ul w > Q NOTE: PLACE FILTRATION GEOTEXTILE BENEATH STONE TOP AND BOTTOM STRAND - SHALL BE 10 GAUGE MIN. WIRE NOTES 8' MAX. WITH WIRE (6' MAX. WITHOUT WIRE MIDDLE AND VERTICAL WIRES SHALL BE 121/2 GAUGE MIN. A 24" MAX. (18" MIN.) FILTRATION GEOTEXTILE USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE WIRE AS DIRECTED. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. FILTRATION GEOTEXTILE COMPACTED FILL 4„ STEEL POST - 2'-0" DEPTH EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH z ocn H¢C0 :L J(LHZ 000)= w¢z:L= a 3 cr cl F 0_j w oocn¢ z .jx F N aLu o 0 o UJ U- V a z z NJ N LL Q a ~ J o � ¢ N 0 z > CC O y a. N -i W 0 z W 1605.01 w a 0 n©o©©o � a L U C m C U ' "o" Di dr°➢m« °cmO- C �ma} -sm o w o�om a"%Z\oaD L L y Na m[O L0> L+apm C7U w}mot om m�c 6. m o a o- m O- o mC° �a,n m`0 ��� E°Px Pm U YOµ P° mLL�Om00 LtUCO _ 'J NN O •_ COOCLOL C ` mNL V� CAL Lv°}N}`f Zi-tN-N �m♦ L°O c m N y W _m o � L � C-) a Cl = W _ �~ V) C �p c:pd N Q W NCDO W Z _ 7 J IA W n Q� 0 IM3 0 S, I= Y� :. W im _... W N_ LL U) W H z Z) O Tn z Q U) w gCLz a°5J z 0 Q Q �UI— U Of Q � u _j W cn .// oLU <0 EDUa.z 59 PROJECT NO. 110003 DRAWING NO. DET-7 SHEET OF R w a 0 C Q1 N ,) 0 0 10 0 0 U U Q U i U C w 0 C D_ 3 co +1 Ln L CF N � N 0 c-� m m m U m N �Ni ro WELL -VEGETATED AREA WELL -VEGETATED AREA PLAN VIEW CLAMPS NON -WOVEN GEOTEXTILE FILTER BAG r�,-r� I WELL VEGETATED AREA PUMP ELEVATION VIEW 1. FILTER BAGS SHALL BE MADE FROM NON -WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. 2. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES MUST BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 112 FULL. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. 3. BAGS SHALL BE LOCATED IN WELL -VEGETATED (GRASSY) AREA AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. 4. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. 5. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 112 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHOULD BE FLOATING AND SCREENED. 6. ALL FILTER BAGS AND TRAPPED SEDIMENT SHALL BE REMOVED TO A SUITABLE WASTE AREA WHEN ACCUMULATED SEDIMENTS REACH 112 TOTAL BAG CAPACITY. DEWATERING FILTER BAG OUTLET OPTION NOT TO SCALE EXISTING GRADE SELECT GRANULAR FILL LAYDOWN YARD FILL AGGREGATE PER GEOTEXTILE ENGINEER'S RECOMMENDATIONS GEOTEXTILE FILTER FABRIC 6" PERFORATED CULVERT ALONG SWALE BOTTOM DRAIN TILE DETAIL NOT TO SCALE NOTE: SEE RIPRAP STANDARDS AND SPECIFICATIONS MAXIMUM TAILWATER CONDITIONS A� LIGHT STONE FILL B `I A�I B_ _1 L' PLAN VIEW ALUMINUM OR GALVANIZED METAL END SECTION PER PLAN GRADED AGGREGATE — FILTER OR WOVEN GEOTEXTILE PROFILE VIEW w = d + 0.4 L ' 6 GRADED AGGREGATE FILTER OR FILTER CLOTH SECTION A -A (AT END OF CULVERT) DISCHARGE TO SEMI -CONFINED SECTION (MAXIMUM TAILWATER CONDITION) ID L (FT) b (FT) DSl / ES 8 4.45 CULV. #la 8 4.45 CULV. °lb 8 4.45 CULV. °3 24 10.85 1-FT' L w = d + 0.4 L ' DEPTH DICTATED BY CHANNEL SECTION AT END OF APRON GRADED AGGREGATE FILTER OR FILTER CLOTH SECTION B-B (AT END OF APRON) NOTES: 1. SEE PLANS FOR CULVERT SIZES AND LOCATIONS. 2. ANY FILL REQUIRED IN THE SUBGRADE SHALL BE COMPACTED TO A DENSITY OF APPROXIMATELY THAT OF THE SURROUNDING UNDISTURBED MATERIAL. 3. FILTER CLOTH SHALL BE PROTECTED FROM PUNCHING, CUTTING, OR TEARING. ANY DAMAGE OTHER THAN THE OCCASIONAL SMALL HOLE SHALL BE REPAIRED BY PLACING ANOTHER PIECE OF CLOTH OVER THE DAMAGED PART OR BY COMPLETELY REPLACING THE CLOTH. ALL OVERLAPS, WHETHER FOR REPAIRS OR JOINING TWO PIECES OF CLOTH SHALL BE A MINIMUM OF 1-FT. MAINTENANCE NOTES: 1. INSPECT STRUCTURE AFTER HIGH FLOWS FOR EVIDENCE OF SCOUR BENEATH RIPRAP OR FOR DISLODGED STONES. REPAIRS SHOULD BE MADE IMMEDIATELY. ROCK OUTLET PROTECTION OPTION NOT TO SCALE FILTER CLOTH L= THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION CHECK DAM SPACING � 9" MIN. 1.5' MIN. PLAN VIEW 4' TO 6' _ CROSS—SECTION VIEW STONE CHECK DAM NOT TO SCALE AT Lo z 0 N w s � r m ci+ L ao mm y ° 0 3 >0 vi mcmm-T cmmaw: a NON000 V}yJj V'3m� j w J C Y m C O n o\ D n ii a ' �mJ m m@= "r ter:: mmvmc Ymt mmvou m V U wO } U r 0 m C m d m m O Q in o o} E o c x a. c m UG FC YO�m L Om00 L+iOO m OmO�mT Oop0mOm VNL U� CAL Z�+�_N c m � W N m o W U w � O � < W �~ Ld HMO O N O d C> c~i W W Z � J m m W n vi o5 O C <t Imo SI wl. ul c� T W co U) Lu z O U N z Q U Z Lu -i a z a J z�<<� U) U � 0 O = uJwCyF- to — U) LuO 0 U EL z U J_ Q Lu Q J O z U O a z 0 O o U) W o J W H PROJECT NO. 110003 DRAWING NO. DET-8 SHEET OF C N 0) Iu 0 ro 0 SILT FENCE PER DETAIL Ia f� IIW Y z Q r 10' m SPOIL PIL 0 d 0 R\\ !!� TRENCH TEMPORARY CONDUIT FOR DRY THE HING OF DITCH AS NECE AR 1 IIoVII 1 PLAN VIEW 10, m ow Li ---------- ---------------- - a- O TEMPORARY 12" CONDUIT e FOR DRY TRENCHING OF DITCH AS NECESSARY SAND BAGS TO CHANNEL DITCH FLOW AS NECESSARY SILT FENCE PER DETAIL 11 1 1 5 1 1' SAND SAND AGS TO CHANNEL DIT FLOW AS NECESSARY Li 0 CL [-� ----------- PROPOSED ELECTRICAL COLLECTION CONDUIT SECTION VIEW NOTES: 1. TEMPORARY SAND AGS AND CONDUIT ARE TO BE INSTALLED IOR TO ANY CONSTRUCTION WITHIN THE LIM S OF THE DITCH. IN THE EVENT THAT THE TCH IS DRY DURING CONSTRUCTION SAND BAGS AND CONDUIT ARE NOT NECESSARY. 2. PUMP WATE OUT OF WORK AREA USING DEWATERING FILTER BAG, PE DETAIL ON DET-8. 3. EXCAVA D TRENCH MATERIAL SHALL BE STOCKPILED ADJACENT TO THE RENCH. 4. SILT ENCE SHALL BE INSTALLED BETWEEN THE STOCKPILED MATERIAL AN THE TOP OF B Of THE DITCH. 5. LL TEMPORARY AND PERMANENT STABILIZATION MEASURES SHALL BE APPLIED j IN ACCORDANCE WITH THE NCDENR EROSION CONTROL PERMIT. $. REFER TO ELECTRICAL DESIGN FOR CONDUIT DEPTH AND TRENCH DETAILS. UTILITY LINE OPEN CUT Phi TI�ll f%nr%f C*lKlr PLAN VIEW 12"� BERM AROUND PERIMETER 2'-0" MIN. ------------ COMPACTED EMBANKMENT MATERIAL, TYP. 8'x8' MIN. OR AS REQUIRED TO CONTAIN WASTE CONCRETE SECTION A SEE CONSTRUCTION ENTRANCE DETAIL FOR DESIGN OF PAD GROUND SURFACE ��-12" MIN. SAND BAGS Y z Q m Li 0 11 a C) PROPOSED PERMANENT AND/OR TEMPORARY CULVERT --------------- \ \ \ \ BACKFILL CULVERT WITH EXCAVATED MATERIAL U H 0 J VIEW SAND BAGS TO CHANNEL DITCH FLOW AS NECESSARY BYPASS PUMP (AS NEEDED) LIMITS OF FILL SLOPES TO BE STABXLIZED WITH RIP -RAP OR E,,ROSION CONTROL BLANKEVS (PER DETAIL) —TOP OF B SUMP PUMP FILTER BAG SED ROAD GRADE ------------- _,;,,—SELECT FILL 1 `tr CULVERT BURY DEPTH _i SEE NOTE 5 i I ECTION VIEW NOTES: 1. TEMPORARY STAND BAGS AND BYPASS PUMP ARE T& BE INSTALLED PRIOR TO ,R'fVY CONSTRUCTION WITHIN THE LIMITS bF THE DITCH. IN THE EXENT THAT THE DITCH IS DRY DURING C01$TRUCTION, SAND B S AND BYPASS PUMP ARE NOT NECESSARY. 2. PUMP �IATER OUT OF WORK AREA USING DEWATERING FICNIER BAG, PER DETAIL ON DET-8. `t 3. /CAVATED TRENCH MATERIAL SHALL BE STOCKPILED ADJAC° NT TO E TRENCH. / °. 4% ALL TEMPORARY AND PERMANENT STABILIZATION MEASURES SHA)~L BE APPLIED IN ACCORDANCE WITH THE NCDENR EROSION CONTRON, PERMIT 5. REFER TO DT 1-3 FOR CULVERT BURY DEPTH. PERMANENT AND TEMPORARY CULVERT INSTALLATION DETAIL NTS CONCRETE WASHOUT AREA INSTALLATION NOTES: 1. CONCRETE WASHOUT AREAS ARE TO BE INSTALLED AT EACH WTG PAD LOCATION, 0&M BUILDING SITE, SUBSTATION SITE, LAYDOWN AREA AND WHEREVER ELSE NEEDED. 2. THE CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON THE SITE. 3. VEHICLE TRACKING CONTROL IS REQUIRED AT THE ACCESS POINT. 4. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 5. EXCAVATED MATERIAL SHALL BE UTILIZED IN PERIMETER BERM CONSTRUCTION. CONCRETE WASHOUT AREA MAINTENANCE NOTES: 1. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. 2. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED WASTE SITE. 3. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, COVER THE DISTURBED AREA WITH TOPSOIL, DRILL SEED AND CRIMP MULCH OR OTHERWISE STABILIZE IN A MANNER APPROVED BY THE LOCAL JURISDICTION. 4. REGULARLY SCHEDULED INSPECTIONS TO BE COMPLETED. 3:1 OR FLATTER SIDE SLOPES CONCRETE WASHOUT AREA NTS SILT FENCE PER DETAIL IL PILE ---- TRENCH BORE' ,OR RECEIVING PIT SILT FENCE PER DETAIL 10, MIN 10, MIN. z Q m u- 0 a C) 1_ �I , I , I , I SILT FENCE o PER DETAIL t LiA � o 10'ow SPOIL PILE ij MIN. n E r'1 F' if _ _ 10, BORE OR / TRENCH MI . RECEIVING PIT ----------- f a :SAFETY FENCE TO BE INSTALLED CO AROUND THE BORE PIT IF LEFT CD OPEN OUTSIDE THE CL t CONSTRUCTION HOURS. C I I I PLAN VIEW a z I lz 1 WI z cl �I "' m 10' 10, Li `- o j Li, u- o 0- o �I sa 0- o I SILT FENCE PER DETAIL f.' EXISTING GROUND I - i, I ``fir ,A _______________- --------- PROPOSED ELECTRICAL COLLECTION CONDUIT %` /A2" MIN. �: DIRECTIONAL DRILL CONDUIT UNDER STREAM SECTION VIEW NOTES: ; 1. EXCAVATED T4ENCH AND BORE/RECEIVING PIT MATERIAL SHAD, BE STOCKPILED ADJACENT/TO THE TRENCH, NO CLOSER THAN 10 FT FROM THE=,TOP OF BANK OF THE VETCH. 2. SILT FENCE SHALL BE INSTALLED BETWEEN THE STOCKPILED MATE RJAL AND BOR VRECEIVING PIT AND THE TOP OF BANK ON BOTH SIDES OF THE' -;STREAM. 3. IMMtDIATELY AFTER CONSTRUCTION IS COMPLETE, PERMANENT STABILIZATION MtASURES SHALL BE APPLIED IN ACCORDANCE WITH THE NCDENR REQUIREMENTS. 4. THERE SHALL BE NO DISTURBANCE TO THE STREAM DURING CONSTRUCTION. 4 5. REFER TO ELECTRICAL DESIGN FOR CONDUIT DEPTH AND TRENCH DETAILS. UTILITY LINE BORE STREAM CROSSING NTS Ld m L. iL U O V �wL Op OpTyo o m mmo NOLO C Omlmm06 RW O-°�o ©WL 'Vj C' J V C m m l_ 00 mP OLL-TfV ��y O:�NO mC L>OEaOU _V Q« O LO P N m+ L O m v . P � =•-m rM rNi� o 000 o memo `co a �o o ¢� Y0000- maa o ,000 3 a m Ym�UNN CC00�L1?� � 30 N0m� 00'm0 �m ,y mNL m� cLLc m�� O m H W N m -o o 4 U W Q O i a W wM 2 �~ N 0 W N LL •--• a U N Q F 0J3 0< Li mi _ z7, W IM =a w � N IR LL U) w 1= z O U U z U) W g06z [L °6 J z�QQ U 0 O w-jU� ow>Q0 UUDIZ a PROJECT NO. 110003 DRAWING NO. DET-9 SHEET OF