Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7111109_APPROVED PLANS_20080219 (2)
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. SW DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD ALL ROOF DRAINA6E TO BE DIRECTED TO STORMWATER TREATMENT UNIT. REVISIONs Rim 27.9 00 \ \ Inv 22.9 / a / A�\' Rim236.0Inv up \ / •i -0 / / \5 J %8 \TUTU\ O �o / �. \ 22 / e f } N3, \ -- /.` EDEDPTO % 5 J S�OUT CURB U _(6, / / \ C) O-omO° . \Or PDS51 0°'0"2PICNITY iAP Rim 29.0 / -Inv 2 \\. .O O - Inv 23.0 Oy., Inv 21.1 � \ _�� \ i �.✓z �s'<�� / % / �. '/ H-Jo/ ea �\oo / Rim 27. Inv 23.53.5!� / Seee<°8 \ 00 O \ \8 �Z9:. PAVEMENT WIDENING / � /' �\� \ � � \� �--'' 8" ABC 3.5"119.08 , 1.5" S9.58 / / -/ / !, �'. / J4 O 0' ` \\ RELOCATE UTILITIES \\ o / AS NEEDED p n \ �! !l S!' �a,• PET l IPARKf a BPACE153 0- T9 .5 \ \i WOO 33 \ I / Rim 29.0 / Z J '\ao `\\ ,; t`'Y' ` \\\\ op It lit Inv 25.8 \\ Building 70 -13 coo 10 395 I 9, 0 �. a \K1 Ngr� \ \ . g0 I \\\ 1 \_ GpL, l 't8 G \N . 1 V > or \ \ v\\ Z �soA \ :�� \ \ N 48'13'00° W \\ip \ O\\\ \ \ \ \ \ * \ O Nv , \\ I 120.42' \ \\\\\\ Wq O <�•`\ \\ 295 \ \ \\ \ t �q\ + 395 \ \Nk kkk a \6 \ \\ems• � \\h � GRADING NOTES: I. All contours and spot elevations reflect finished grades. 2. All elevations are in reference to the surveyors bsnclvna^k v*llm must be verified by the General Gontractor prior to ground breaking. 3. Permanent cut and fill slopes placed on a suitable foundation should be constructed at 2:1 (Horizontal to Vertical) or flatter. Permanent slopes of 3:1 should be constructed where mowing Is desirable and as Indicated. 4. IF fill material Is brought Onto the property or If waste motelal Is hauled from the property, then this Information must be disclosed to the erosion control Inspector. 5. The proposed contours shown In road sections are flnished elevations Including asphalt. Refer to pavement cross-sectlon data to establish correct sub -base or aggregate base course elevations to be, completed under this contract. 6. Limits of cleaning shown are based an cut and FIII slopes or other grading requirements. 1. Any grading beyond the limits of construction shown Is subject to a fie. B. Contractor shall blend row earthwork smoothly wIth e.lsting contours. ,i. Insure that each build" site will have adequate drainage to comply State Building Codes. GENERAL NOTES: I. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE AND THE CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. 2, ANY D5GREPANCIES FOUND IN THE FIELD SHALL BE GALLED TO THE ATTENTION OF THE OMER AND EN61NEER PRIOR TO PROCEEDING WITH WORK. 3. PRIOR TO BEGINNING CONSTRUCTION, GEIERAL CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM ALL REGULATORY AUTHORITIES. 4, THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNER5 OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, FU IG AND PRIVATE, PRIOR TO TO WORKING IN THESE AREAS. 5. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL INSIDE OR OUTSIDE CONSTRUCTION LIMITS. 6. THE CONTRACTOR SHALL MAINTAIN THE 51TE IN A MANNER 50 THAT WORKMEN AND PUBLIC ARE PROTECTED FROM INJJRY. 1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES IN THE FIELD PRIOR TO CONSTRUCTION. 5. STABILIZATION 15 THE BEST FORM OF ER051ON CONTROL. ALL DISTURBED AREAS 5HALL BE SEEDED AND MULCHED WITHIN 30 DAYS OF COMPLETION OF GRADING. ALL OTHER AREAS SHALL BE 5EEDED AND MULCHED WITHIN 120 DAYS. ALL DISTURBED SLOPES SHALL BE ESTABLISHED WITHIN 15 DAY. q. APPROVAL OF TH15 PLAN 15 NOT A AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-51T= GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER 10. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR 13ACKWA514 CHANNEL IN AN UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER JUNK, AND OTHER ACCUMULATIONS. SEE DETAIL SHEET FOR PIPE SCHEDULE AND CALCULATIONS. ALL ROOF DRAINAGE TO BE TIED INTO STORM 'DRAIN SYSTEM ALL MAJOR STORM STRUCTURES PER CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. NP= NYLO-PLAST SUPPLIMENTAL 12" INLETS WITH HDPE INSTALLED NO LESS THAN 0.20%. ! \ I I f I 1 I I l � I I -- o \' < 2e.9 Mal4 �� 29.4 ZD. 2e.9 29 \ /% N. E` 7g60 000' FFE= 31.60 i t 'z3 ficr25 'sic 7441 2-0 Tra a Af � \ p, + 293 \ I . I 1 \ 1 \`\C7 FFE>30-Vl1 -- ----------- --- =: V_ _ _ =----------- -- - _ -- --- --- ---- ------------ ------------------- - - ----- ---- - - ------------- --- - -- - - a n ` T162 N2�95x � 29 2e.9 4 29.9 � --Z L 1 ------ 11 12 ------ 2eb 2 // J N'MS 295 - : :94- 9 - D ----------------------------- _l5_ S 69-55'00S5'00" W 747.99' Georgia P. Moclnnis, Lane T. Parrott, & Seth W. Parrott, Jr. DB. 1209, Pg. 138 WETLANDS ARE NOT PRESENT ON SITE STORMWATER MANAGEMENT PLAN AND EROSION CONTROL PLAN TO BE SUBMITTED TO APPROPRIATE ATHORITIES AND APPROVED BEFORE CONSTRUCTION SHALL BEGIN. ZONED: R10 NOTE: NP REPRESENT5 NYL01PLA5T DRAINS BY A05 ALL ON -SITE STREETS AND DRAINA6E WILL BE PRIVATE. SEE PROFILE SHEETS FOR I NVERT5 SHEET 4G FOR PIPE GHART 5POT5 ARE TOP OF CURB UNLESS NOTED, CALL EN& I NEER IF CLARIFICATION NEEDED. Remaining Property of Fox Chase Village, LLC DB, 1441, PC. 250 MB 14, Pg. 29 ZONED: R-6 sE\ 295 / CONTRACTOR SHALL HAVE CLEARING LIMITS FIELD STAKED AND SHALL VERIFY WITH OWNER OR OWNER'S REPRESENTATIVE ON - SITE PRIOR TO CLEARING. DEVELOPER: BRG NERY BERN, L.L.0 5826 5AII DRIVE, SUITE 105 H/6H POINT, NC 27265 336-bell-1.500 CONTACT: LYNDA HILL ALL RGP TO BE WATERTI6HT O-RING JOINT PIPE RETAINING WALL NOTES: I. PROP05ED RETAINING WALL5 ARE FOR ILLUSTRATION PURP05E5 ONLY DEPIGTING CHANGE IN GRADE REOUIREMENT5. CPT ENGINEERING AND 5URVEYIN6, INC. 15 NOT RE5PON51BLE FOR RETAINING WALL DESIGNS. / 2. RETAINING WALL PERMITS WILL BE / REQUIRED BY THE CITY OF NEW BERM / INSPECTIONS DEPARTMENT. D K To Pool Armstead Dalton Toler, Jr. DB. 1858, PG. 38 n'\\ ZONED: R-6 611 \ I I 1 1 I I Z I I I I I I in N N O o l 0 0 Cn O i I O Cn • I I _ I I I I I I I I IT I I I L---J 60.00' S 69-55'00" W ENGINEER: CPT EN6/NEER/N6 if SURVEYI)I INC. 4400 T1'N/N6 STREET 1411 POINT, NC 27265 (336) 8/1 EXT. 3/3 CONTACT: ROBERT D. THOMPF20N, P.E. FA ` 024CI41 _ 0 a 69'55'00" W GRADING/ DRAINAGE PLAN SCALE: 1 " = 60' DATE: 10-3-07 PROJECT: 746.07 DRAWN BY: RDT BLUE RIDGE JOB# 407-108-NC FSHE�ETI Commtrn4ly ��fe9Q, :8P VIC/CT I�TY ff,4P /14000, u �I Sheet Index I Cover Sheet 2 Existing Conditions (By Others) j 3 -Site flan Z 4A,43,46, Grading Plan 5 Wetland Detention Plan 6A,63 Erosion Control Plan 7 Overall Utility Plan 8 Storm ^^ter (Profiles) z9 Storm lNater (Profiles) 3 IO Storm Water (Profiles) 11 Storm Water (Profiles) 12 Site Sewer Plan (Profiles) D-1 Standard Details #1 o 4 -2 Standard Details #2 % D-3 Standard Details #3 y I D-4 Standard Details #4 pl D-S Standard Details #3 n�d THE RESERVE at Clenburnie \\ �•G e'�s \\ by 2 1 7 s,, s 00 qey\WIC Td :P S $y' �1g w NAYSJ iCP "✓ �W�riO IBANMN , " El CB M PL aInv qzr.. RNnxxY9 / �'�•. cuyi' aMrmx of jed c '„ an i 9 b 1J.etl PA4fNENI MOEmrvG `1 �� a W" y RanolnMq Pro9vtY of eeee"q, . 144 VPQ 0.t es't t9a 9 / F q 1.5'49.59 / / p 5'�Qi OB. leer .2230 RE.9 T uDums <+ `if• 1, ZO le,NED: R-8 S NEE9E9 b PET J, ZO6 1W�ra¢ �pw �Sa qc o + ye ••.. Q � � 014 Ae 'FIN'P�`IL ' t. {� .0p0e 2a9 `2 ip 9S O by 2s.6 BuBEing Q� �P yJ \ 2 O DB. \' •V\ e1 ''��B Rx'` T �Uy^' � 7�99. i7 . A, '� 1PD.JB ZONED. R-6sNgna� 0pCe5J TyaJC ,� V • 6 `. �C- V Atl6. 10 F �. ZF b• \ L r N e813'00' W � 1 c l N 1 -- -- _ rn« __ T � 9ey"O reTxrm stl O.� PWg3 A�LaLL 0 P �` fPO fE..i2QJ �� NeT ND P/19EAENT 169.51' e I 1e1.29' 5 9 ,DO,Co. W y+ S 69"JS'00' W 589'56'00'W 7e7.99' 1+ z to Lone t Pemotl, 6 Seth W. Parrott, D8. 1209, Pq. 138 $ ? $ 8 ZONEO: R10 E m 60.011 9 6936'00' W SITE PLAN OWNER/DEVELOPER0 : BR C NEW BERN, LL C 5826 CA MET DRIVE, SUITE ios High Point, NC 27265 PHONE: (336)-w88q,-iyoo October, zoo? APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER OUALITff Date 'F F BKufiRy �9 m?o SWm waW Permit NO. -1o71109 REVISIONS REV'D PER TRG COMMENTS II-1-Ol ADDED GON5T ENT, DETAILS 11-21-01 REV'D PER ENG GOMMENT5 12-1-01 NWOTILW6S COMMENTS 1-10-Ob q y o 0 V O COVER SCALE I" =100" DATE- 10-3-07 PROJECT' 746-07 DRAWN BY,• RDT SHEET 1 ALL ROOF DRAINAGE TO BE DIREGTED TO 5TORMWATER TREATMENT UNIT. 1 REVISIONS 0 z 0 Q D z / / / s \ Rim 27.9 / \ p \ O1 \ Inv 22.9; �A / C.0-0 \ \ O \ 01, / An v � \ � � Rim 26.0 \� N���,� Inv 23.7 {/�� f 1 / / 1 WIN2�T �`oN� w� `'Aq�''0 / oqe 0\)"�Ong.. T TOP E \ \ DED TO , O J OUT OF CURB - �' / / 8 to6 SON LIFE - EX. CB / S / C\ -O \ lC .� E� POSSI i'(nv 24.4 / 0.� / Q` GT OO \ P%Rim 25.7 llICI1VITY 1YIAP / Inv 21.1 / \ Oo \ \ Inv SCALE !'=IGIGYJ' / /' © o e / / Him 27.9 Inv PAVEMENT WIDENING 8" ABC / �i'' /,i g5 / \ t-\o RELOCATE UTILITIES n O o/ \ / �'''�"�" P \AS NEEDED \ iS 00 / ��ii %ii'' // _ 2a, »' I N�nf 9 \IPARK'II N SPACE e Na15 \ / � ✓. / 201�O mob \ -� m V Q , " t / G II5. 4' �,..� A \ \'A: n o 9 up \ /rRim 29,0 '-t�\�Ol�\v.' \\\\\\ ,/p\ O Ilk Inv 25.6 / �(S\.it\ `fir �\ \` /.Ji' i OTYP / a �A \off s. 6, \ I R2% ✓�F // 1\ 2es *\ ? .4 {t1/G per/ 5PP ryQ7/ 293 I 5 w e / OoEN W 7.55 \>\� ` 9 / f Q� g \\ \�\ \ O N. \ 9 \ \\ 120.42' GRADING NOTES: I. All contours and spot elevations reflect finished grades. 2. All elevations are In reference to the surveyors bsnchmark which must be verified by the General Contractor prior to ground breaking. 3. Permanent cut and fill slopes placed on a suitable Foundation should be constructed at 2d (Horizontal to Vertical) or flatter. Permanent slopes of 5,1 should be constructed where mowing Is desirable and as Indicated. 4. If fill material Is brow ht onto the property or If waste matelal is hauled From the property, 9 P � y P oP `Y then this Information must bs disclosed to the erosion control Inspector. 5. The proposed contours shown In road sections are finished elevations Including asphalt. Refer to pavement cross-sectlon data to establish correct sub -base or aggregate base course elevations to be completed under this contract. 6. Limits of clearing shown are based an cut and fill slopes or other grading requirements. 1. Any grading beyond the ItrMts of construction shown b subject to a fine. 8. Contractor shall blend new earthwork smoothly with exHtln9 contours. 9. Insure that each bulldkrg site will have adegVate dro"a to damply State Building Codes. GENERAL NOTES: I. ALL IMPROVEMENTS AND CONSTRUCTION SHALL BE IN AG<,ORDANCE WITH NORTH CAROLINA STATE AND THE CITY OF NEVI BERN STANDARDS AND SPECIFICATIONS. 2, ANY DISGREPANGIES FOUND IN THE FIELD SHALL BE GALLED TO THE ATTENTION OF THE OWNER AND ENGINEER PRIOR TO PROCEEDING WITH WORK. 3. PRIOR TO BEGINNING CONSTRUCTION, GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL REGViRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM ALL REGULATORY AUTHORITIES. 4. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND RIGHT OF WAYS, PUBLIC AND PRIVATE, PRIOR TO TO WORKING IN THESE AREAS. 5. THE CONTRACTOR 15 RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL IN51DE OR OUTSIDE CONSTRUCTION LIMITS. 6. THE CONTRACTOR SHALL MAINTAIN THE 51TE IN A MANNER 50 THAT WORKMEN AND PUBLIC ARE PROTECTED FROM INJURY. 1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES IN THE FIELD PRIOR TO C01,15TRUGTION. 8. STABILIZATION 15 THE BEST FORM OF EROSION CONTROL ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITHIN 30 DAYS OF COMPLETION OF GRADING, ALL OTHER AREAS SHALL BE SEEDED AND MULCHED WITHIN 120 DAYS. ALL DISTURBED SLOPES SHALL BE E5TABL15HED WITHIN 15 DAY. 4. APPROVAL OF THI5 PLAN 15 NOT A AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITION5 WARRANT OFF-51TE GRADING, PERM155ION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OMER. 10. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH GHANNEL IN AN UN085TRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE 5TREAM ALL DEBRIS, LOGS, TIMBER JUNK, AND OTHER ACCUMULATIONS. SEE DETAIL SHEET FOR PIPE SCHEDULE AND CALCULATIONS. ALL ROOF DRAINAGE TO BE TIED INTO STORM DRAIN SYSTEM ALL MAJOR STORM STRUCTURES PER CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. NP= NYLO-PLAST SUPPLIMENTAL 12" INLETS WITH HDPE INSTALLED NO LESS THAN 0,20%. ►\ FFE= 31.60 29A' v7s'), , C!'es C// . A R 11441 'f '-�o T,q�/C iVt.6. 14tag d` F I DB ^h/9 I C. 1, x'� a m A Tlcct 4 A' \ X2 \ • 293 \ 1 I U 1 NN \ 'N \ 1 \ O� \ 7 FFE= 30.2011 NP REPRESENTS NY`L0PLA5T DRAINS BY A05 ALL ON -SITE STREETS AND DRAINAGE WILL BE PRIVATE. SEE PROFILE SHEETS FOR INVERTS SHEET 4G FOR PIPE GHART 5POT5 ARE TOP OF CURB UNLESS NOTED, CALL ENGINEER IF CLARIFICATION NEEDED. Remaining Property of Fox Chase Village, LLC \ DB. 1441, PG. 250 \�\ MB 14, Pg. 29 \ ZONED: R-6 aT \f i I \ 293 1 O I I a \ a - T192 3,3 \ 29A N]93� X 20., 2e.9 - !- ; 29.9 Ulr- 20.q 2e.9. ___ __________________ tea.+ _ ---_-__----- l____----- A,BUFFER (lO'MINs)..� _- 00 W �Z "1-._------ 747.99` S 69-55'00" W Georgia P. Macinnis, Lone T, Parrott, & Seth W. Parrott, Jr. DB. 1209, Pg. 138 r ZONED: RIO WETLANDS ARE NOT PRESENT ON SITE STORMWATER MANAGEMENT PLAN AND EROSION CONTROL PLAN TO BE SUBMITTED TO APPROPRIATE ATHORITIES AND APPROVED BEFORE CONSTRUCTION SHALL BEGIN. ALL RCP TO BE WATERTIGHT 0-RIN6 JOINT PIPE M l./ \ 6� FFI'x30.A2-- IPaB9 _ ____ _ -- NOTE: CONTRACTOR SHALL HAVE CLEARING LIMITS FIELD STAKED AND SHALL VERIFY WITH OWNER OR OWNER'S REPRESENTATIVE ON - SITE PRIOR TO CLEARING. DEVELOPER: BRC NEW KERN, L.L.0 W26 5AMET DRIVE, 507-E /05 H/6H POINT, NC 27265 eeb-19109-1500 CONTACT: LYNOA HILL RETAINING WALL NOTES: I. PROP05ED RETAINING WALL5 ARE FOR ILLU5TRATION PURP05E5 ONLY DEPICTING CHANGE IN GRADE REQUIREMENT5. CPT ENGINEERING AND SURVEYIN(5, INC. 15 NOT RE5PON51BLE FOR RETAINING WALL DESI61,15. 2. RETAINING WALL PERMITS WILL BE REQUIRED BY THE CITY OF NEW BERN IN5PECTION5 DEPARTMENT. � 9fv.�ovse ez✓rrf ro vesrnmr stiearoN roaeAr seen Armstead Dalton Toler, Jr. DB. 1858, PG. 38 ZONED: R-6 � \ 1 l NORMAL POOL SURFACE AREA 33,458 5F .c ELEV. 2LF1 _11 6 SHELF`l\:1 SLOPE i \ ENGINEER: CPT EN6INEERIN& $ SURVEY/N&, INC. 4400 TYN/N6 STREET H/6H POINT, NC 27265 (Bea) 612-6600 EXT e/e CONTACT: ROSERT D. THOMP50N, P.E. / / / / / TS z `n r v �1 �N WZtm Q� K Q �tnQ� 2vr q� zip QO \jro .4 pztq Q xm Z� vm v O w • W ro 3 2 GRADING/ DRAINAGE PLAN SCALE: 1 " = 60' DATE: 10-3-07 PROJECT: 746.07 DRAWN BY: RDT BLUE RIDGE JOB# 407-108-NC SHEET 4A V NEEDED TO / AS REMAIN OUT QF CURB ABANDON -LINE REVISIONS WdS COMMENTS 1-10-05 r/Rim 29.0 lI hh Inv 25.8 / Q I r CJ�, ttp \ 31. v v Building O, \ t� \ \ 31x \/\ ` e A / o •, \o / \ o. \`\\ \,pm'S ,• ' 6 `fit \ � � j � -O� � O � ' \ \` CP ^ \\ I , fir`- J \ \\ ip \ ALL RGP TO BE HATERTI6HT 0-RIN6\x\��I JN GRADING NOTES: I. All contours and spot elevations reflect Finished grades. 2. All elevations are In reference to the surveyors benchmark which must be ,erlfled by the General Contractor prior to ground breaking. 3. Permanent cut and Fill slopes placed on a suitable Foundation should be constructed at 2.1 (Horizontal to Vertical) or flatter. Permanent slopes of 3.1 should be constm,ted where mowing Is desirable and as Indicated. 4. If fill material Is brought onto the property or if waste mateial b hauled from the property, then this Information must be dlsclosed to the erosion control Inspector. 5. The proposed contours show In road seltb are Finished elevations Including asphalt. Refer to pavement crass -section data to establish correct sutr-base or aggregate base course elevations to be completed under this contract. 6. Llmlts of clearing show are based on cut and fill slopes or other grading requirements. 7. My grading beyond the limits of conetrvctlon shorty Is subject to a fine. 8. Contractor shall blend new earthwork smoothly rvIth e.1sting contours. a. Insu a that each Wilding site .11I have adequate drainage to comply State Building Codas. GENERAL NOTES: I. ALL IMPROVEMENTS AND CON5TRUCTION SHALL BE IN ACCORDANCE WITH NORTH CAROLINA STATE AND THE CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. 2. ANY 0 SCREPANr IE5 FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OVWER AND ENGINEER PRIOR TO PROCEEDING WITH WORK. 3. PRIOR TO BEGINNING CON5TRI-CTION, GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM ALL REGULATORY AUTHORITIES. 4, THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND R16HT OF WAYS, PUBLIC AND PRIVATE, PRIOR TO TO WORKING IN THESE AREAS. 5. THE CONTRACTOR 15 RESPONSIBLE FOR DAMAGE TO ANY EXISTING ITEM AND/OR MATERIAL INSIDE OR OUT5IDE CON5TRUCTI014 LIMITS. 6. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER 50 THAT HYORKMEN AND PUBLIC ARE PROTECTED FROM IN-URY. 1. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES IN THE FIELD PRIOR TO CONSTRUCTION. b. STABILIZATION 15 THE BEST FORM OF EROSION CONTROL. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WITHIN 50 DAYS OF COMPLETION OF GRADING. ALL OTHER AREAS SHALL BE SEEDED AND MULCHED WITHIN 120 DAYS. ALL DI57.19.5ED SLOPES SHALL BE ESTABLISHED KTHIN 15 DAY. a. APPROVAL OF THIS PLAN 15 NOT A AUTHORIZATION TO GRADE ADJASENT PROPERTIES. WEN FIELD CONDITIONS WARRANT OFF -SITE 61RADM6, PERM15SION MU5T BE OBTAINED FROM THE AFFECTED PROPERTY OMER. 10. THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN AN UNO55TRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOC,5, TIMBER, JJNK, AND OTHER AC6JMULATCN5. 30. \ \ NP `` `� N \ \ 120.42\�\\ \�\\ NP�� 28- \ Jam• \ \\� \� .\S, \ LOT• \ \\� \i' \� x 2a.5 \ \� 61 3 �. ALL ROOF DRAINA6E TO'BE DIRECTED TO STORMWATER TREATMENT UNIT. �2.\\ SEE DETAIL SHEET FOR PIPE \� SCHEDULE AND CALCULATIONS. ALL ROOF DRAINAGE TO BE TIED INTO STORM DRAIN SYSTEM ALL ON -SITE STREETS AND DRAINAGE WILL BE PRIVATE. ALL MAJOR STORM STRUCTURES PER CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. WETLANDS ARE NOT PRESENT ON SITE. NP= NYLO-PLAST SUPPLIMENTAL STORM WATER MANAGEMENT PLAN AND EROSION 12 11 INLETS WITH HDPE INSTALLED CONTROL PLAN TO BE SUBMITTED TO NO LESS THAN 0.20%. APPROPRIATE ATHORITIES AND APPROVED BEFORE CONSTRUCTION SHALL BEGIN. 024941 ` C6 -- ` Z5A y 8A NPu85 2a.3 " _ — — — —x 2S•a — — — — — -NPuB� ` - GRADING/ -' x W _ _ Npu DRAINAGE EVELO _ R RA7—------- ---------- PLAN SCALE: 111 = 40' 0 Op'• IN �$.�` �T-^.,_��.,��.- DATE: 10-3-07 PROJECT: 746.07 ENG/NEER: CPT EN6/NEERIN6 f WRVEY/N6, INC. DRAWN BY: RDT 4400 71KN/N6 STREET H16H POINT, NC 27265 (336) 8/2-15600 EXT. 313 CONTACT: ROCERT D. 7HOMP50N, P.E. BLUE RIDGE JOB# 407-108-NC SHEET 4B I, z a Q 0 z co 0 0 N i R6 '�' p i. P16EIdN1 yf 1 `a.,, �A� C13yenr Mr,Mleo Tj 9 Itimse (N _Cra$ ri CMiftunity ICJ s� \ r, YYIebim - lis�}go -. YtOnnre. lllCI1VITY MAP CCALE 11=1000, ISbmnPke%wocy.. 10 Yea Lmaipdm Pnopowdsitestam&vbW Loowim Area 'le C I13bffl6it3r Q-aA . Sim IM Phan 1b Sill Tom[WWI II#1 Sash Q(2 a02 SOD Q60 466 Q06 10S5 QOJ a#a a#6 LM LM SOD Q6D 466 425 is 265 aMR a#4 Q49 Q49 SOD 1116D 466 137 12 208 a#4 a#5 02D Q69 SOD a6D 466 L93 is235 NNIM IINPM Q10 a10 SOD a6D 4,66 028 8 L55 NPN40 ' a#5 1110 Q20 SOD 0,61) 4,66 0,56 11 L55 a#5 a#6 Q37 279 SOD Q6D 466 7.77 is 5.94 a#6 a#7 038 316 SOD QGD 466 s84 is a% NK41 'NPW Q05 Q05 MOD Q6D 466 Q14 8 L55 NFIM INPMW5 om QIO SOD a60 4,66 0.28 8 L55 NPIM ',NP044 003 Qa3 SOD (Lac) 466 Q08 8 L55 NP#44 'NP045 am am 5.01) Q6D 466 02D a 155 NPM NPN96 Q05 022 5M a60 466 Qet 10 L79 NSM ICW7 0M Q27 SOD Q60 466 Q75 10 L79 NPW 'NPOOD Q10 a10 SOD Q6D 466 028 a Lys NPOD NP051 Q09 Q19 SOD a6D 466 (153 8 Lys NPtMl a#7 Q16 035 SOD a60 466 Q96 10 L79 a#7 a#8 QOD a78 SOD Q6D 466 1a57 24 3,22 NE#147 NPM Q07 Q07 SOD QGD 4.66 aw 8 LMM NPM CM Q07 Q14 SOD a60 466 039 8 L55 a#e a#9 am 0,12 SOD a61) 466 1LM 24 322 NP92A 'NPMW QX Q04 SOD Q60 466 all 8 L55 NFMR jNP053 om Q08 SOD Q6D 466 022 8 L55 NP4953 NMI om a12 SOD Q6D, 4,66 034 8 L55 NP04 NNW am Q04 SOD Q60 466 all 8 Lys NPA55 ''a#9 Q02 a18 SOD Q6D 466 as0 8 L55 a,* am, 0M 4,M MOD a60 4,66 la53 21 322 a#1a a#11 (161) Q6D SOD Q60 466 L68 is 235 a#u ;a#12 031 %75 SOD a60 466 1608 30 am a#12 a#15 025 60D 5.00 a6D 466 1678 30 3.73 a#13 a#14 Q48 Q48 SOD a6D 466 L34 15 235 a#17 MIS Q59 Q59 SOD a6Dl 466 L65 115 235 NP#63 NP164 Q10 Q10 SOD Q6D 466 a28 8 L55 NP#64 NPNIM Q10 020 SOD QGD 466 056 8 L55 NPN65 a#IS Q10 030 SOD 0,60 466 Q84 10 L79 a#IS a#19 am Q91 SOD 04D 466 254 0 235 a#14 la#LS 021 Q69 SOD a61) 466 L913 is 265 NP456 ,NP07 QO2 Q(U SOD QOD 465 a06 8 L55 NPMR7 'a#I5 0M Q% MAD a60 4,66 all 8 L55 a#15 la#16 027 7.00 SAD Q60 466 1%37 30 4517 NPM iNPNW 0A5 Q05 SOD (161) 466 0.14 8 L55 NPM NPN60 om Q10 SAO 0.61) 466 028 a LM NPN6D 'a#16 Q17 027 S00 DAD 466 11175 10 L79 NPWA INP11I62 012 QM SOD Q6D 466 Q06 a L55 NRM a#16 QM Q04 SOD Q6D 466 all a L55 a#16 (a#al 034 7.71 SOD Q6D 466 22.56 30 S28 a#19 IOPAL Q27 Q27 SOD QeD 466 Q75 15 235 aw a#71 Q41 Q41 S00 QGD 466 LIS 35 235 W10% NP067 Q(2 QC2 SOD Q60 466 (106 8 L55 NP#67 a1121 am Q0t SOD a60 466 all 8 L55 a#al 114w 028 8.71 SOD a60 4,66 2+135 5.90 NP#b8 NPOW Q02 Q02 SOD a60 466 Q06 L55 NPM189 'NPN70 Q02 a04 SOD Q6D 466 all 1 L55 MWM IYt#a2 QM Q06 SOD QW &W 0.17 L56 M= INESM QW 8.91 SOD a60 466 2i91 5190 NP#71 NP#72 0.04 0.04 5.00 0.60 4.66 0.11 8 1.55 NP#72 NP#73 0.04 0.08 5.00 0.60 4.66 0,22 8 1.55 NP#73 NP#74 0.08 0.16 3.00 0.60 4.66 0.43 8 1.55 NP#74 NP#75 0.09 0.25 5.00 0.60 4.66 0.70 8 1.53 NP#75 NP#76 0.08 0.24 5.00 0.60 4.66 0.67 8 1.55 NP#76 CI#26 0.07 0.32 5.00 0.60 4.66 0.89 8 1.55 C1#26 CI#27 0.26 0.58 5.00 0.60 4.66 1.62 13 2.35 NP#77 C1#27 0.03 0.03 5.00 0.60 4.66 0.08 8 1.55 NP#98 NP#99 0.02 0.02 5.00 0.60 4.66 0.06 8 LISS NP#99 CI#24 0.02 0.04 8.00 0.60 4.66 0.11 8 1.55 C1#24 CI#25 0.61 0.55 5.00 0.60 4.66 1.54 15 2.33 C1#25 CI#27 0.37 0.92 5.00 0.60 4.66 2.57 15 2.35 CI#27 C1#28 0.17 1.70 5.00 0.60 4.66 4.75 i8 2.65 NP#78 CI#28 0.02 0.02 3.00 0.60 4.66 0.06 8 1.55 CI#28 C1#30 0.16 1.88 5.00 0.60 4.66 5.26 18 2.65 NP#94 NP#95 0.02 0.02 5.00 0.60 4.66 0.06 8 1.53 NP095 C1#29 0.02 0.04 5.00 0.60 4.66 0.11 8 1.55 NP#89 NP#90 0.90 0.90 5.00 0.60 4.66 2.52 10 1.79 NP#90 NP#97 0.16 1.06 5.00 0.60 4.66 2.96 10 1.79 NP#96 NP#97 0.02 0.02 6.00 0.60 4.66 0.06 8 1.55 NP#97 C1#29 0.02 1.10 5.00 0.60 4.66 3.08 10 1.79 C1#29 CI#30 0.44 1.58 5.00 0.60 4.66 4.42 18 2.65 C1#30 C1#31 0.52 3.98 5.00 0.60 4.66 11.13 24 3.22 C1#31 CI#32 0.35 4.33 5.00 0.60 4.66 12.11 24 3.22 NP#79 CI#32 0.02 0.02 5.00 0.60 4.66 0.06 8 1.55 C1#32 C1#34 0.18 4.53 3.00 0.60 4.66 12.67 24 10.17 NP#81 NP#82 0.02 0.02 5.00 0.60 4.66 0.06 8 1.55 NP#82 NP#83 0.02 0.04 5.00 0.60 4.66 0.11 8 1.55 NP083 CI#33 0.02 0.06 5.00 0.60 4.66 0.17 8 1.59 NP084 NP#85 0.02 0.02 5.00 0.60 4.66 0.06 8 1.55 NP#85 NP#86 0.02 0.04 5.00 0.60 4.66 0.11 8 1.55 NP#86 NP#87 0.02 0.06 S.00 0.60 4.66 0.17 8 1.55 NP#87 NP#88 0.02 0.08 5.00 0.60 4.66 0.22 8 1.55 NP#88 C1033 0.02 0.10 5.00 0.60 4.66 0.29 8 1.56 01033 C1034 0.40 0.56 5.00 0.60 4.66 1.57 15 2.35 NP080 CI#34 0.02 0.02 5.00 0.60 4.66 0.06 8 1.55 C1#34 CI#36 0.18 3.29 5.00 0.60 4.66 14.79 24 5.09 C1#35 CI#36 0.11 0.11 5.00 0.60 4.66 0.31 1S 2.35 C1#36 YI#37 0.30 5.70 5.00 0.60 4.66 15.94 30 5.90 YI#37 F68#38 0.02 5.72 5.00 0.60 4.66 15.99 30 5.90 EOP0100 F88#101 4.50 4.50 5.00 0.60 4.66 12.58 18 8.40 SEE PROFILE SHEETS FOR INVERTS SHEET 4G FOR PIPE CHART NP REPRESENTS NYLOPLAST DRAINS BY ADS O� \ \ doEPim 25.7 J S 0 \. 2 Inv 23.0 cP L . \ // ///. / / 29.5• 1 ` 29., \ 4 0 I q / 1 OPEN/ SPACE ,.8 NP#52A Is, /ice ///•' q � \ / / Q x LO 29.1 / C` NP#52 39 S \ �L P�' iap �3• • 0.3 Is, / 2 q 0#1 2 .o I Al x / / /2 / / 29.9 x NP053 x / / / / / / ' 3 •� 30. // 3 \� 0 2 z4. , NP#48 ✓' 30.4 29.6 i .4 P 00 ` 14P450 NP4049 q 30.9 x x .j s 29 x 01 "H3 ALL ROOF DRAINAGE TO BE DIRECTED TO STORMWATER TREATMENT UNIT. I Remaining Property of Fox Chase Village, LLC DB. 1441, PG. 250 \\\ MB 14, Pg. 29 ZONED: R-6 2 \ \ 28. \ \ x \ \ 1 \ f ono 00 V 2H.4 \ 5 29. • 29.H GI#I� \h z8. z 29.5 B. • y 22.69 20 NP REPRESENTS NYLOPLAST DRAINS BY ADS 4\22.-72 RIP -RAP OVER BERM \ \\ \\ WE DETAIL NO VEGI7AT/VE SHELF ON FORBAY BERM Armstead Dalton Toler, Jr. DB. 1858, PG. 38 \\� ZONED: R-6 \ \\ 6 \ \22.-IQ .. REVISIONS >r ti O u ro NP#95 • 30.5 ' 30.5 I #/ s HG 290 s a NPe#96 --- - - '1ia' �I \\ \\ `\ \ \\ ``\\ \\\\\ \� \\ CV h it•'V•y -Qo ME 1 \ ONP#94 2885 2 301 �• 29.5 JT 50- ,-R-- ----------------- I EA -----�...�--- ------ --- --- --- - Z9.1 "----- - ----- ---- 10_P91d¢ - _ _ _ _.�-=------------ ----- ---------- ---------- ---------------- ---- -- - -- -- -tOF _ - - -- - - -` s e � q spaces u# N .I \��\ •�;a \\ 22 .52 - � INETPO --- -- - � s - s - - -- -- - -- - I s - e GI a 31 a e G zH.z j {. . { \ \•` • .\ a� \ �. NPa80 - - x 30. N NP#1 29.4 . 28.9 YI#32 29.3 29 29.3 : I/ NORMAL POOL \\• \ \�` / 1#28 x • 29.3 28.9 , SURFACE AREA 28.9 x 29.3------_ --- 29. � � L'_ .33,456 SF O O \ 12 N I N ; - - - - \ \ !O' VE6. SHEL Q /O: / SLOPE W a vV �: '\ �} .75 �--I''�� O 30.0` -- -'9LZ __----_-- • • 29.8 \ �\� 29.8• • li l F?\\ �� 1 \ \ \. 29.429. 2 9.4• • �, • • 300 1 / a 6RADIN6/ ze9 - - - -'. 2 - _ rk+- .�. Lo-' , om N '� `I\ - DRAINAGE . I . J PLAN CD F-FE1= 30.00 FEE= 29.60/' /! a --------- o = } 1 x - - - -- - NP#8"i - - - - - 289 >�- - - " NP#82 NP#81 ET POND EASEMEN '� 1 1�\;� SCALE: 1 " 40' 28.9 " 84 NP#85 29.3 - - -' - -x �q NPa03 ---- -- -- x G#3 - 1 ------ - / _ 115� 4 'lb ---.---------- ----- - -- --- ---- ---�a- s-- ------ ' - •6 - - I II _- - -296 _--- - 28.--------- - I5' TYPE ABUFFER MN)_------ ------- - PROJECT:746.07 --- -- ( --- - ______==_ ---------- ------- ----------0-2=-. . . S 69°55' I I DRAWN BY: RDT I I BLUE RIDGE JOB# 407-108-NC SHEET 4C FFE= 31.60 31.4 50.9 C�i i YI#2 FES#23 2H.6 P#59 m 28. I I QI#2 2, GI s Ch I I #H� 28.65 29.15 2 65 I FOREB 4.1 ,O i • •5 Arc �,B. 1441, 'F'\G21�0 0.1")_ 14, F''ti u9 cF .i } P(� �'eg28.5 a 6 �o A Tract 4 ARrR 29sx x 29.5 // \ \\ •29.15 \ N I� lA I � I I m 8•I j$ I 30.0• • . 29.0 I 1rG rn a •• 30.0 30.0 j � I \ i c I \ 1 I \\ FE:. \ \ \O FFE= 50.2011 \ NPaIt H x 29.1 N x I-Yla3 T OF�L4LL 2B_3' \ 30.0 • _ I HH2H.6s �H.Bs--�---- Bx--- I 00 0 0 N 25.65 1 .1 29.15 Q\22.-72 RIP -RAP OVER BERM r `� \ \ \\ ,$ DETAIL \ \ \\ NO VE6ITATIVE SHELF ON FORBAY B16¢M YI#22 FE5#23 �` \ & 5 FOREB \\ �\�\�\ Armstead Dalton Toler, Jr. > ":;: \ \ \\\ DB. 1858, PG. 38 ZONED: R-6 22.1G FP- - �1 I I - � i C � 29.3 I I O 29 GO 15 3,61 BELOW FFE 1 ADJUST PLUMBING A5 • 29.6 29,8 • • - I _ W'#82 NP#81 NP#83 _ - II Q\\\ S`y C a 2.6E 1 \ \ \ 52 \\ \ \ \ IAJETPONI7 2.52 / NORMAL POOL SUR5345E6 SFF \ \ ELEV. 25.0' \ \ \ 10' VE6. 6HELF`10:1 SLOPE \ �\ 7 5 \ 1 1 1 \UN Il..p T POWEA5EMEN � _ Q\ 111 (P." 1 11}m 111 _ 04 ---- I C2 \ 8 I VEGETATIVE SHELF TO BE PLANTED PER LANDSCAPE ARCHITECTS PLANTING PLAN NO EXISTING WETLANDS ARE KNOWN TO EXIST ON THIS SITE. as DESIGN INFORMATION: TOTAL DRAINAGE AREA TO POND 16.0 AC. IMPERVIOUS AREA 9.84 AC. (61.5% BUA OF D.A.) REQUIREMENTS: REQUIRED PROVIDED SURFACE AREA 32478 SF 33456 SF (REQ. FOR 90% TSS REMOVAL) PERM. SED. STORAGE 7,260 CF 12,411 CIF FROM 15' TO 16' IN POND AND FORBAY TEMP. W.O. VOLUME 34,848 CIF 36,697 CIF STRUCTURE: SIZE WATER QUALITY RELEASE 3" RISER 4'X4' BOX BARREL 24" WEIR IN BOX 18" WIDE TO TOP OF BOX EMERGENCY WEIR 30' TOP EL. 25.5 WEIR 15" WIDE EL. 24.0 3" DIA. PVC ORIFICE (INV. 23) 2"x2" NOTCH FOR TRASH RACK 11� GRAPHIC SCALE ( IN FEET ) I inch = 40 11 160 DAM AND EMBANKMENT CONSTRUCTION INAT'E1 SHM INFORMATION: OPERATION AND MAINTENANCE INSPECTION EVERY MONTH TO INCLUDE THE FOLLOWI% i) AND N STRIPPED OF ALLERAL - THE VEGETATIVE AND AND AMATERIAL M AREA �AND TOPSOIL HALL BE APRIORGiOUBBED 1. REMOVE DEBRIS FROM THE TRASH RACK DAM CONSTRUCTION. THE DISPOSAL OF TREES, STUMPS, CONSTRUCTION I. DEVELOPER, BRC NEVI BERM, 11 2. CHECK AND CLEAR THE ORIFICE OF ANY OBSTRUCTIONS. DEBRIS, VEGETATIVE MATERIAL, ETC. SHALL NOT BE PERMITTED IN 5526 SAMET DRIVE SUITE 105 3. CHECK THE WETLAND POOL'S SIDE SLOPES; REMOVE TRASH, REPAIR ERODED AREA BEFORE THE DAM OR POOL AREA OF THE WETLAND, WHEN BLASTING IS USED TO HIGH POINT, INC 21265 THE NEXT RAINFALL EVENT, REMOVE ROCK FROM THE POOL AREA, THE BLASTED AREA SHALL BE 556-669-1500 OVER -EXCAVATED TO A DEPTH OF AT LEAST TWO FEET (2') BELOW 2. TYPE OF ROADI"IAYs, CURB AND 6UrTER INSPECTION EVERY 3 MONTHS TO INCLUDE THE FOLLOWING: FINISH GRADE AND BROUGHT BACK TO FINISH GRADE WITH CLEAN RELATIVELY IMPERVIOUS SOIL MATERIAL. COMPACTED IN PLACE. S. SLOPES, 0-216 5. BEHA6E DI5F05AL SHALL BE BY PRIVATE COLLECTION 5POIL 1. INSPECT THE COLLECTION SYSTEM (I. E. CATCH BASINS, PIPING, GRASSED SWALES) S) FOR PROPER FUNCTIONING. CLEAR ACCUMULATED TRASH FROM BASIN GRATES AND 2) EARTH FILL DAMS A) SOIL MATERIALS USED FOR EARTH FILL WHICH ARE HIGHLY 4. THE PROPERTY OWNER (OR HOMEOYWER9'ASSOCIATIOW 15 RESPONSIBLE BASIN BOTTOMS, AND CHECK PIPING FOR OBSTRUCTIONS. FOR MAINTAINING THE. COMPLETED PERMANENT: VET DETENTION POND 2. CHECK WETLAND INLET PIPES FOR UNDERCUTTING, REPLACE RIPRAP, AND REPAIR PERMEABLE OR WHICH EXHIBIT USED CANT SHRINKAGE SWELL, OR DISPERSION SHALL NOT BE USED IN THE EMBANKMENT. ACCORDING TO THE APPROVED MAINTENANCE PLAN AS DIRECTED BY THE BROKEN PIPES, 60YERNPMWAL OFFICES HAVING-MISDICTION FOR WATERSHED 3. RESEED GRASSED SWALES TWICE A YEAR AS NECESSARY. REPAIR ERODED AREAS B) A CUTOFF TRENCH ( CORE TRENCH) SHALL BE PROVIDED WITH PROTECTION AND IF THE HOMEOWNERS' ASSOCIATION SHOULD Be DISSOLVED OR CEASE TO EST, THEN IN THAT EVENT ALL THE OMER9 OF EAST, IMMEDIATELY. A MINIMUM WIDTH OF FIVE FEET LOCATED THE CENTERLINE OF THE CUTOFF TRENCH SHALL NOT BE LOCATED DOWNSTREAM F THE TIME OF. RECORD AT THESHALL MAINTENANCE SL BE JOINTLY AND INSPECTION EVERY 6 MONTHS M INCLUDE THE FOLLOWING: INSIDE TOP OF SLOPE OF THE DAM, THE CUTOFF TRENCH SHALL SEVERALLY LIABLE FOR ANY AND ALL COSTS ATTENDANT THERETO 1. REMOVE ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE OUTLET STRUCTURE. BE CAREFULLY BACK -FILLED WITH HIGHLY IMPERMEABLE MATERIAL S. THE 6OVEKNMENT OFFICE HAVING JURISDICTION FOR AATERSHEp PROTECTION AND THEIR ASSIGNS HAVE RIGHT OF ACCEy TO THE 2. CHECK WETLAND DEPTH AT VARIOUS POINTS IN THE STRUCTURE. IF DEPTH IS REDUCED TO AND COMPACTED TO AT LEAST NINETY-FIVE PERCENT (959.) OF STANDARD PROCTOR DENSITY, PERMANENT 9TORMWATR CONTROL(9) FOR INSPECTIONS AND iHAINTEHIANCE 1' OF ORIGINAL DESIGN DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ENFORCEMENT. ORIGINAL DESIGN DEPTH. C) THE MINIMUM TOP WIDTH OF THE DAM SHALL BE TEN FEET (10') 6. THE PERMANENT YETLAND DETENTION $WALL HAVE Fyl-L DESIGN VOLUME MAINTENANCE AS REQUIRED: AND SLOPES SHALL NOT BE STEEPER THAN 2:1 (TWO HORIZONTAL TO ONE VERTICAL) ON THE DAM OR EMBANKMENTS AROUND THE WETLAND, AVAILABLE PRIOR TO ANY ISSUANCE OF CERTIFICATES OF OCCUPANCY FOR SITE AND/OR PRIOR TO ANY PLAT RECORDATION FOR THE SITE. THIS 1. MOW THE SIDE SLOPES ACCORDING TO THE SEASON. MAXIMUM GRASS HEIGHT MAY REQUIRE THE CLEAN OUT AND DISPOSAL OF SEDIMENT FROM THE WILL BE 6•. D) ALL DISTURBED GROUND AREAS AND EMBANKMENTS SURROUNDING THE WETLAND SHALL BE MECHANICALLY STABILIZED OR HAVE PERMANENT POND, 1. THE CONTRACTOR SHALL SCHEDULE A PRECONSTRUCTION MEETING w1711 2. THE ORIFICE IS DESIGNED TO DRAW DOWN THE POOL IN 2-5 DAYS. IF DRAWDOWN GROUND COVER ESTABLISHED IN ACCORDANCE WITH THE PERMANENT THE CITY OF NEW BERN INATER9HED EN&INMER WHEN THE PERMANENT IS NOT ACCOMPLISHED IN THAT TIME, THE SYSTEM MAY BE CLOGGED. THE SOURCE SEEDING SCHEDULE, WETLAND DETENTION 51TE HAS BEEN CLEARED AND THE WETLAND HAS BEEN OF THE CLOGGING MUST BE FOUND AND ELIMINATED, FIELD STAKED. 3. ALL COMPONENTS OF THE DETENTION SYSTEM MUST BE KEPT IN GOOD NOTES: 6. FINAL APPROVAL OF THE WETLAND DETENTION SMALL BE DONE AT WORKING ORDER. FINALIZATION OF THE GRADING PERMIT OR AT ISSUANCE OF THE FINAL BUILDIN6 CERTIFICATE OF OCCUPANCY WWICHEVER COMES LATER THE 1. OWNER SHALL BE RESPONSIBLE FOR ROUTINE OPERATION AND MAINTENANCE. POND SHALL BE COMPLETED IN ACCORDANCE PITH THE APPROVED PLANE 2. CONTRACTOR SHALL ESTABLISH GRASS ALONG THE WETLAND BANKS AROUND AND SPECIFICATIONS, INCLUDING ESTABLISHED PERMANENT &ROUND COVei VEGETATION ABOVE THE PERMANENT POOL THE PERMANENT POOL AS SOON AS GRADING OPERTIONS DICTATE. ON ALL EMBANKMENT5 WITH THE YETLAND AND DAM COMPLETELY 1. VEGETATION ABOVE THE PERMANENT POOL SHALL BE A BLEND OF LOCAL GRASSES. SEE PERMANENT SEEDING SPECIFICATIONS FOR SEEDING SCHEDULE. GONSTWICTED., A PRE -CERTIFICATION INSPECTION SHALL BE COMPLETED MAINTAINED BY MECHANICAL MOVING ON THE SAME FREQUENCY AS THE APARTMENT 3. THE PERMANENT WETLAND SHALL USED FOR TEMPORARY BETYIEEN CPT EN&INEERIN6 4 SURVEYINS, INC AND THE ENFORCEMENT OFFICER AND ALL ITEMS IDENTIFIED DURING THAT INSPECTION SHALL EE GROUNDS. MOST AREAS WILL BE SERVED BY A SPRINKER SYSTEM. SEDIMENT STORAGE DURING CONSTRUCTION. EDURI GC ON T IT S C ONCE HE SITE HAS BEEN C COMPLETED PRIOR OR TO THE ACCEPTANCE OF THE CERTIFICATION 2. LANDSCAPING L DSC ING WILL BE PROVIDED ABOVE 1 P N 3. SLOPE BENCHES SUBJECT TO APPROVAL WETLAND WETLAND SHALL BE CLEANED TO THE STABILIZED, THE PERM. SEDIMENT SHALL DESIGN GRADES. ALL SEDIMENT SHALL BE REMOVED AND THE WETLAND COMPLETION THE CERTIFICATION OF COMPLETION SHALL NOT PRECEDE ION S ALL BY THE CITY OF NEW BERN. LANDSCAPING ONSITE WILL INCLUDE A VARIETY OF SPECIES STABILIZED PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. THE TFE NNALIZATION Or THE GRADING PERMIT OR THE 159JANCE OF THE FINK. OF SHRUBS, UNDERSTORY TREES, ECT. 4, SEDIMENT SHALL BE REMOVED FROM THE WETLANDS WHENEVER G.O. BY MORE THAN Two (2) PEEKS. THEY COLLECT DEBRIS AND WHENEVER IT ACCUMULATES R T LEAST E 0 A LE S TANKED ANNUALLY. 5. WETLANDELF HAS BEEN DESIGNED FOR A MAXIMUM 61.SR IMPERVIOUS AREA OF DRAINAGE AREA. 1 TIFIGA GE�t I ��-- ST-���_TY �1TROL R DEVELOPMENT HAIL IN 7 6. FUTURE DEVELO ME SHALL SURE THAT ALL FUTURE IMPERVIOUS SURFACE WILL T E LL NO I CERTIFY THAT PURSUANT T SU T O GENERALLY ACCEPTED ENGI A GGE NEERIN6 STANDARDS IN THE COMMUNITY IT I 5 MY PROFESSIONAL DISCHARGE INTO THE DETENTION WETLAND AT A LOCATION WHICH WILL SHORT CIRCUIT THE OPINION THAT RUNOFF FROM THE FIRST_INCH_QF-R&NEA'LL_FR4LAREAS._INAZABEM211RIcl2_'C2@E_G_0NTR4kLE0 PER SECTION REQUIRED 2:1 LENGTH TO WIDTH RATIOS. Q (,ITT oF- NEI^i_B�RN ORDINAN4EIS CONTROLLED BY A PERMANENT ENGINEERED STORMWATER 7. OWNER SHALL BE RESPONSIBLE FOR THE PUMP REQUIRED TO BE USED AS QUALITY CONTROL THAT HAS BEEN DE516NED TO MEET OR EXCEED THE REQUIREMENT5 IN THE NG STATE 5TORMHATER THE DRAWDOWN MECHANISM TO DRAIN THE WETLAND FOR MODIFICATIONS. MANAGEMENT MANUAL. 8. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND THE OWNER'S LANDSCAPE ARCHITECT FOR THE SELECTION OF PERMANENT AQUATIC PLANTS. AQUATIC/ WETLAND VEGETATION SHALL BE ESTABLISHED AROUND THE PERMANENT POOL , 516NATURE, 1" 1--t '�' P.E. SEAL xtI+TT"Rf�`tI,YT9A AND AS FAR UP THE SLOPE AS POSSIBLE. WETLAND VEGETATION SHALL BE ESTABLISHED AS REQUIRED BY LANDSCAPE ARCHITECT. VAT E° Q fJH k`Nyit` *q F�ARO,, t�"ycbb°a'o.3ya f/•y E La ENGINEERS STATEMENT OF POND AND DAM 5AFETY90,1+" POND AND ON THIS PLAN REQUIREMENTS 5' MIN. THE STORMHATER DAM SHOWN 5AT15FIES OF THE RIP -RAP NORTH CAROLINA STATE DAM SAFETY LAW OF NOT [AS AMENDED THROUGH 19951 AND THE I' THICK MIN. RULES AND REUILATIONS AS PRESENTED IN THE NORTH CAROLINA ADMINISTRATIVE CODE TOP F BAFFLE O O B LE ELEV. 24.0 TITLE 15A, SUBCHAPTER 2K - DAM SAFETY. EVEN IN THE CASE MERE THE DAM SHOWW ON THIS PLAN IS DETERMINED BY THE STATE TO BE EXEMPT FROM THE ABOVE NOTED DAM "1d n'' SAFETY REQUIREMENT5, I, A5 THE QUALIFIED DESIGN EN6INEER, STATE THAT THE POND AND + ',. BAFFLE WEIR ELEVATION 23.0 WIDTH 10' �'� 'AS p. 'q DAM ARE 015516NED TO BE SAFE AND ADEGUATE FOR THE PROTECTION OF PUBLIC HEALTH, 2 SAFETY, WELFARE, AND DOHN5TRF_AM PROPERTY. I UNDERSTAND THATTHIS STATEMENT A5 THE DESIGN ENGINEER SHALL NOT RELIEVE THE OWNER OR OPERATOR OF THE POND AND DAM FROM THE LEGAL DUTIES, OBLIOATION5, AND LIABILITIES ARISING FROM SUCH OMM5HIP OR OPERATION. ' "` _? THE 5TORMWATER CONTROL 5TRUGTURE(5) 5HOWN ON TH15 PLAN IS DE516NED TO REDUCE THE P05T-DEVELOPMENT I -YEAR 24 ,��:- CONTOURS SHONN REFLECT TOP OF RIP RAP HOUR STORM EVENT AND THE 10-YEAR 24 HOUR STORM EVENT TO PRE -DEVELOPMENT RATE5.' PERMANENT POND 5URFAGE AREA DIMEN51ON5 TABLE APPROXIMATE AREA 33456 SFt EARTH BAFFLE WITH RIP -RAP DETAIL KT9 LINE TABLE LINE LENGTH BEARING LI 24.41 1409.9955'H L2 159.14 11,100.20'27E LB 45.0E N69•5352E L4 24A9 581'035gr= L5 4.91 911.1952•H L6 536 SIS-13-16-H L7 5.42 NO4*O' 44E LB 15h9 981.OB9nE L9 900.67 550.5410E 1.101 11 927'0499E Lit 16.21 wg-169111"I 11.12 29:16 561•I1 LI5 60J2 NO[-A967H L14 1.64 N46•20'24E L15 5432 NOI.15114•A L16 5635 NOB•1296'H LI7 4.91 1406.4146•101 LIB 22.10 9B9.14'49'H LI9 55.94 HO6.19G2E CURVE TABLE CURVE LENGTH RADIUS CI 1934 116E 02 664 244105 C6 31.22 68.9E 04 12J& 6934 05 039 T-m C6 4:19 257129 61 14:75 5105 CO 463E 65.90 C9 226 1957 CIO 6.10 962 012 5.26 44.16 CIS low 5.10 0I4 s1h1 1620.25 'C15 5631 620536 C16 12hO 152 CI7 12.07 15.92 CIB 1254 15.41 CI9 23.40 1665 C20 8.9E SO6 021 Is 33 5O6 c22 60.75 we-m PRE -CAST OUTLET STRUCTURE DETAIL POND STRUCTURE RA ' n-T+4 �,Ll,-E. ! R ILI 4 {/ lJtII AI 21 /14 ILL r T >TR 4PPRC1EFJ r.4 REBAR GRATE (TOP OF BOX) DETAIL N. T S. S' SHOP DRAWINGS MUST BE APPROVED BY THE ENGINEER 4'x4' FRECA5T CONCRETE STRUCTURE 24" CAP H/ HATER T16HT JOINT5 (16' TOTAL HEIR 6 N R 1 OUTLET STRUCTURE NOTES, LENGTH) I. SHOP DRAHIN65 5EALED BT' A STRUCTURAL ENGINEER MUST BE SUBMITTED TO THE DESIGN ENGINEER FOR APPROVAL I PRIOR TO CONSTRUCTION. I < _ 2. ALL RCP MUST MUST BE HATER TIGHT 1 - , 0 Or a PJU 1 `F O-RING JOINT AND INSTALLED IN 1 , r Try -IF. ` ACCORDANCE WITH THE MANUFAGTUREW5 1 DIMEN51ON5 AND SPECIFICATIONS. - 3. PRECAST STRUCTURE MUST HAVE HATER - TIGHT JOINTS. 2"x2" NOTGH FOR TRASH RACK TRASH RACK WITH ANTI -VORTEX SUPPORT WITH A TOP GRATE OF ALUMINUM BARS SPACED 6" OC E/W 4'x4' PRECAST O/ - l GONGRETE RI5ER H/ -- CULTURED STONE 6'5( 6'-W REPAR 6RA7P. VENEER REPAR TO BE WELDED AT INTERSECTIONS 6 ATTACHED TO TOP OF BOX. 3" DIA WG ORFIGE ' W/ 90• TURNED DOWN ELBOW EL, 215 TRASH GRATE TO SET IN 2'x2" NOTCH ON PRE CAST STRUCTURE &'X8'Xi8" GONG REBAR TRASH RACK DETAIL FOOTING POND OUTLET STRUCTURE NTs PRIOR TO CONSTRUCTION un "fAR BLLVAT :V 2 /.2' -- n `EaR FL.vf:, .V 26.4 - Will -( VArh)h 25.3' B" V, J� 1I, 'E'✓r ,nA,r;' Frl. i VV "C 1_T' 23' ll t,I �l .1 _I ( l 11 r 1 i7vGd l r .f.4 JFrA r FOOL 16.0' F, iB it N.T.S, Ham. RCGOMMENOMP PLANT LIST (51512 DETAILED PLANTING PLAN) us acal 25 iCi3°s CZ?�..Tils �S --- BO;Y AV',,. A,- JLI' I1 STO 6'f 1 i'<r, i1GM� 6 r` 6"-#4 - R, 3AR c'FAIF. 10' H90E 70P OF DAM J7 1C, tI. 5t@Pt'7 7� CrAS° 1 f' l 4x4' GHCF<1 AT iJ ✓�1. .TAT BOX 00L1.1R WC' rF 1 RGHT n0' r_ r -'4 ' AL L74?/r 1 Ad U PF REC, X -� I0 s r7ro -:4r' . „ 1ilN NAY. LS 1.TE^ � �H �L A Jet_ � ✓�"1111 ?_S 8.0, i 3' DEEP (MIND \ I - 11vV. -OFF TRENCH \ - 80x r'k 7 5' C9'vu, rr 3a.�f I. OMER (OR OWNERS A550CIATION) SHALL BE RESPONSIBLE FOR ROUTINE OPERATION AND MAINTENANCE. 2. CONTRACTOR SHALL ESTABLISH GRA55 ALONG THE BANKS AROUND THE PERMANENT POOL AS SOON AS 6RADIN6 OPERATIONS DICTATE. SEE PERMANENT SEEDING SPECIFICATIONS FOR 5EIEDIN6 SCHEDULE. 5. THE PERMANENT POND DETENTION SHALL BE LEE FOR TEMPORARY SEDIMENT STORAGE OURIN& CON5TRUCTION. ONCE THE 517E HAS BEEN STABILIZED, THE PERM, WETLAND DETENTION SHALL BE CLEANED TO THE ORIGINAL DE51ON 6RADE5. ALL SEDIMENT SHALL BE REMOVED AND THE POND STABILIZED PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 4. 5EDIMENT SHALL BE REMOVED FROM THE POND WRING DEVELOPMENT "hI NEVER THE STORAGE VOLUME EXCEEDS 1S% OF THE POND VOLUME. 5. POND HAS BEEN DESI6HED FOR A MAXIMUM 613% IMPERVIOUS AREA WITHIN THE DRAINAGE AREA. 6. A PUMP HILL BE PROVIDED BY THE OVIER (OR OYWER5 ASSOGIATGW IF HEEDED TO DRAIN THE POND FOR MAINTENANCE, W_' O3T center tora'a"T 24" on cenleZ on center 3W n center ,- REVISIONS - 0244141 rf�ND 1^ %'A,AD� WETLAND PLAN ENGINEER: GPT ENGINEERING 6 5URVEYIN6, ING. SCALE: 1 40' 5826 5AMET DRIVE, SUITE 105 HIGH POINT, NC, 21265 CONTACT, ROBERT THOMPSON, P.E. DATE: 10-22-07 PHONE:(556) 812-8600 EXT:915 FAX, (556) 612-6760 PROJECT: 746.07 NOTE: REFER TO GRADING & DRAINAGE PLAN DRAWN BY: RDT FOR MORE INFORMATION. BLUE RIDGE JOB# 407-108-NC SHEET 5 _'t IIIIC[7- JNIII C316 1 L I•�.„ia. '1'11FIC-SERVFA'I' GLIFINBURNIE I.rr:,p.re' 10,: 11W Ilal.-. n/aa; If; / / /� / / \ \ STOCKPILE AREA: ...r • INI \\Nn11N ""'" ""' "'T' "°"' "^ "" BUILDING PADS WILL BE UTILIZED AS STOCKPILE AREA PER SOIL CONSULTANTS GENERAL EROSION CONTROL PLAN NOTES REPORT TO PROVIDE STABLE FOUNDATION DESIGN. E. COMPACTION) I. 501E EROSION AND CONTROL DEVICES MUST BE INSTALLED INITIALLY AFTER THE GRADING -1 w��,,,I la II. .,� / / / \ \ PERMIT 15 ISSUED AND ROUGH GRADING STARTS. rr:n„ I' ururx„ : r: .Il x,n ,. I,r:.,Iul / 2. DURING THE DEVELOPMENT A SITE, THE PERSON RESPONSIBLE FOR THE DISTURBING ACTIVITY SHALLL I PERMANENT AND MAINTAIN ALL TEMPORARY AND PERMANENT EROSION / Rim 2.T9 / °o \ O AND SEDIMENTATION CONTROL MEASURES A5 REQUIRED BY THE APPROVED PLAN. NINE ®®®®®®®®®®®®®®®®® / _ �c1 DDIT ONAL DEVICES MAY BE REQUIRED. Iny 22.9,% -'4l / p. \-ate \ \ 3. IF FILL MATERIALS ARE BEING BROUGHT ONTO TH15 PROPERTY OR IF WASTE MATERIALS ARE a� TAKEN FROM THIS PROJECT, TH15 INFORMATION MUST BE P15CL05ED AND SHOWN ON THE LAO�' \ \ EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OF TH15 PROJECT. O 4. IN AN EFFORT TO MINIMIZE EROSION AND EXPOSURE TIME, EASEMENT AREAS SHALL NOT Np :. '� ' /\ 2�TT LB\ o \ \ C' BE GRUBBED OR GRADED UNTIL UTILITIES ARE READY TO BE INSTALLED. ALSO, THE / / �\ \ \ \ / �+'00• IMMEDIATE 5EEDIN6 OF DISTURBED EASEMENT AREAS AFTER UTILITIES ARE INSTALLED WILL ELIMINATE MANY PROBLEMS. EASEMENT AREAS WHICH OR055 OR ARE ADJACENT TO sRim 26.0 p, WATERCOURSES SHOULD RECEIVE SPECIAL CONSIDERATION. Inv 23.7 .oN nimrwr CAME SFncwGma r, xs"L,I; :. Ur uNFncE narn '\ 5. CONSTRUCTION ACTIVITIES DISTURBING ONE OR MORE ACRES WILL BE 155UED A NPDE5 / / P \\N� \ O / STORM WATER DI5GHAR6E PERMIT A5 REQUIRED BY THE FEDERAL GLEAN WATER ACT. 1 Ise 11. U kl 11 11 A A 1 (r 1. 1 ll" 2 II 1, 11 I l'1 (r , , 91n, r I. narn 'r n rn a mrl Ir n nl 1 If fp T rvm�T Nm 1 -.1 I' 111 I 111 Ikl 1' IAI 1' alklu L1 1 11I , Lnl,m lr,l 4n lrl ,. u. 1 •+Iklw IXrlll 1pl A1ieIL tO/ u 1 IN lnl I LI"Irp H.ImNy \"I.I.(p I c c, Il li rl IS I, 1L :I4 li Lf Irr I I 14 4 / V 4T SECTION B OF THIS PERMIT REQUIRE5 THE PERMITEE TO PERIODICALLY INSPECT ALL 2'/ SEDIMENT AND ER05ION CONTROL DEVICES AND TO KEEP A RECORD OF THESE INSPECTIONS. ", O1-o�1 N \ �R 1 \ / \�' i�� �^ ^/ B. GROUNDGOVER (TEMPORARY OR PERMANENT) SHALL BE PLACED ON EXPOSED SLOPES le / \ 1 ' / N7 / !\\\l,� i �,�%�Y/F,,�% WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING, / a� f�. O DIVERSION DITCH $r �• �/"�� ' /// PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE PLACED ON ALL /' DISTURBED AREAS WITHIN 15 WORKING DAYS OR CIO CALENDAR DAYS (WHICHEVER k" 15 SHORTER) FOLLOWING THE COMPLETION OF CONSTRUCTION OF DEVELOPMENT. \. \ /\� '-\ / MAINTENANCE SCHEDULE: IJ ALL ER05ION AND SEDIMENT CONTROL PRACTICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY STORM EVENT, BUT IN NO CASE LE55 THAN ONCE EVERY WEEK. ANY CURB / ' / \\� . / / 6`� 6 .\\ \ REPAIRS OR GLEANING NECESSARY TO MAINTAIN EROSION AND SEDIMENT CONTROL PRACTICES \ SHALL BE COMPLETED IMMEDIATELY. EX.'EB / $ v / n '° o \ /�/ /i/ \ \ \\ 2) ALL SEEDED AREAS WILL BE REFERTILIZED, RESEEDED A5 NECESSARY, AND MULCHED SSI /'Inv 24,4 / 0. / ;3\ `? 0 '\ P�Rim 25 / /// ' '%' / `\ \� ACCORDING TO THE SEEDING SCHEDULE. ,/ RIm 299 0 \ 1d / 'i i" \ �♦ 3J NO OFF -SITE BORROW OR WASTE AREAS HAVE BEEN CONSIDERED FOR THIS SITE. OFF -SITE ! Inv 2f 1 / d{ - / \ `�, 00 . \ Inv 23.0 a\a\ r/ r r _ j , qy BORROW OR WASTE AREAS ARE SUBJECT TO PERMITS THAT HAVE NOT BEEN OBTAINED FOR TH15 / / / ' �•„/ , f.-.O N �/ di N \ iP 22B \ (y`� r ' ' iii' i \ ' �;1 @ �. \ ` n SITE. TEMP SILT FENCE RtInvm22er lDboa \ o? \ so RCp9: ,r \ SEE DETAIL FOR STORM DRAINAGE UNDER CONSTRUCTION, STORM DRAINAGE PAVEMENT WIDENING 8" ABC \� /-i' ' i� / / P \ / / /'- o /_ �. / y Remaining Property of OUTLETS TO BE STABILIZED PRIOR TO / / / \ O x Chose Village, LL UPLAND 015TRUBANGE 1.5" S9.58 / f // 14 \ Fo c o // G / p e \ FoDB. 1441, PG, 250 C • n o0 V 1;1 � �/ o� 1 I � o a vv MB 14, Pg. 29 / RELOCATE UTILITIES \ \ 6\ �i '// $ .r I @ / 1 1 1 \\ \.AS NEEDED LS O /,.'ii /ii' TDA I PET I'� \ ZONED: R-6 \ / / - _ /,' NGI ` \ - "� J \ \ \ ^ X ' :' �,,'• T /C e % OOEN SPADE IMIT5 OF CONSTRUCTION \ / 2A // SDa '`,`,\ i '' `\\��w yoo,�'m \ ��0�.�'/�'^�^,?+'r �/c/✓i0. / ;s' � �/ OG• ' / / ZO ... / p 9 115. 4' \`$' \\` \ \ 'P+, n � O :D / l� ii' rrr / I y� TDA.#R -'. , � 1� .,'•' / f1' 0 / /00 '\ 111 Inv 25.8/ 'Ad / / O \ \ Building \414R \`!,C I\LT FENCE / = ^ ^ V 3 , yl \\ \\ l ;1 \ '� I 3o.r1 • i `\ \ ` A , / \� `\w.t 0.4 d� POROVe DA"Llb TO EE .LTG EA010P I rr COIRfroew bw*ou.to Be TRQCAID K eAlR2e p 51+o ON rrLAILFL*\ \\,:,, \ \ \A2 R$ 0 �: 0 a \lN Mll / \ y' p -\ �R. pi \ •r�$]9p L.�\ r1 c e 5 'o/C TO 5C 9T/IILQV AND I \ I r1 d // SEDIh6JT R ]DJ F�' M\ •D .]+g/ \� ,1' ' / T.gCN/G-� O tsJ. - - JL3. �G ANDIMID SMC4Mt \ \' \ \ ! r " 4' / (9 B \ \/^\ ` �'' e<F m'E;. 7Ea 9, Pg rY Gc �iT TO r �'; \ \ \\ g. '(' 1.3 P 6P' \`\ G�i� �%� _ 1 �>.,., MSTALLATIotLMOETNL WIND \,'� \\\\ \ \o \ ��Q,/. .'i. \ ``\ � •/"'�' ' �I \\ ._ @ tract 4 .1 i�� 1lfOlYhhT10N '� \ O- PP• / I \ ly y �' I B\ \ \ : ' j \p3b.9 I 1 '• DD., ^ \ � p NL ,t- PROTECTION 1' \ , TEOTI s l � ® \\+�\ \\� w. � \\ FFE.30201t dk a' ......... T c " `o , \ ,• W .\\\ \ \ �\\ \ \\ - - 6 9 } __�._ _ ____ _T -(♦ '--- _ _ __ _ iI N 48'13 00 a\\ \ O\ ->\ s 120.42 - x '\\ \\l\�. < \ \ • 2+ -. ���' `� -- --- --' "1'-- --__----' -__- -_--- ib M„ d An d d. \,.. ' tj\b t.\ \\ \ ]9 ��'�' __ __-ID_91TQ�E=¢ _--- _ __ __ ___ _ _ _ ., urM1,,. Q \\� \\ / \ \ twn Suvie pe su4pwz 4mq \ /1 \ \\VA 9eM / L` rt n2. C 1 TEMP CON5TIP.\UCTION \.3 ]• • 399^ _ ti ENTRANCE \`\ ��. _ 9., DO ' nae t :fe \i 00\\. IYF,4 39.1 ]9A •SOD TEMP SILT FENCE \\�? ],.,. 6� u *b ] ]°I 5 J6lG v. R. fFE- I ov v _. ! I. 5GEVtI c A RiE-LONSTRWngi HEETINS WITH THE OY R. ALL CONTRACTORS FOR LAN I AND/OR EROSION AND THE ER0510N CONTROL INSPECTOR D D STURBA 15R CONTROL, AND , TO DISCUSS THE EROSION TION LIMITS FLAN AND TO OBTAIN TIE FL A DO PERMIT. Z. R THE IffW GONSTRI1 T LIMITS AS INDI N_ ON TIE PLPN, DO NOT EXCEED FROL'ERTY BJWZIW, LIMITS W THAN' WRITTBI TH THE tF AOPRIOR TO PROPERTY OHffRS. FLAG IN CLEARING. LIMITS AND VERIFY WITH THE ROUND PRIOR TO CLEAR T 3. BEGIN DR,4 R JE ONLY Tiff ADEQUATE SPPCE.AROUSD THESITE PERMffTER. TO INSTALL Tiff 1EMPORARY EROSWN CONTROL MIEASLRES ALONG TIE PERIMETER CP "(FE DISMEBED LIMITS 4. INSTALL TIE TE P Til fgN5TENTR ANCE. INSTALL SEDIMEFENC NT IIYa TO. PROTECT BANKS5OF E%ISnHNS0 CM.•IrPP A B. ALL917KTK JAPToo Sn2MA NRuLA ON 0101wl4.Tl4VRW ROAP: CM806 0 O-OWW s10gOR/iMAE IN MC DLL M70leRAINIStT $D ANDX Ps70 CLEAR9t GYAS IN APIL%ICATIE INSTALL 1515R IM DJNEYSEDIMIN 11 BASINS C TEMPORARY LL ARC Eli- AS MOIL Pl M1PA RISER 1N SEDIMENT BASIN 1 I5 COMPLETED INSTALL ARP PIL SASIN PIPE INVERT. T 0tENCARY DIVERSIONS SMNl BE MAINTAINED T A SE SEFIST BA51N TNR11NP T THE SEOLENLE OF OR AIND SSDI . 0 5B. SILT FENCING SITE BE INSTALLED BEHIND ALL EARTIffN DIVERSION AND SEDIMENT BERMS ALONG THE SITE PERIMETER, KONS DRAINAGE EASEMENTS AND AT Tiff TOE OF L THTrf SLOPES. SILT FENCING WILL BE Ir TO PROTECT THE BANKS 0P THE DIGHS T FOR E TEMPORARY GROSSING OLRING EARLY CONSTRUCTION. D. GENERAL L TIQNN5 SHALL OR,N THAT EROSION CONTROL MENSES ARE IN PLACE AND PUNP MILT'G PRIOR TO GRPDING. GTORMv NP OETELTTION POND AND OUTLETS MUST BE CLEAR 5 STPBILIZED PRIOR TO UPLAND GRADING. ,. INST L T5TOR CLEARING AND GRUBBING PHASE 5 BEGIN RLYIGH GRADING 5 RO B. INSTALL STORM S ROJfNA5 5L\1f1 AS TIE GRADING PHASE ALL L INSTALL ERALL CONTROL OEVILE5 DRAT THE STORM.INLETS. BLOCK AND GRAVEL DEVICES. INSTALL AND MAINTAIN STORE, DRAIN ENDER LONTRLGTION DEVICE AT END OF DAY OR ONSET OF RAIN. 9, SEED SCOFFS AND GRADED AREAS OJTSIME OF STREET RI6FIT-OF-YL4Y ONCE FINK GRADE 15 ESTABLISHED. 10. STAGILOO THE BEST FORM NT EROSION CONTRA-, TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL OF N LARGE DELUDED AREAS. ALL GRADED SLOPES MUST F ANY SEEDED AND MULCHED NITMIN IS WORKING DAYS FOLLOWING Y TION PHASE GRADIN 11, G II. CONTRACTOR SHALL ADL5T EXISTING EROSION LONTROL ADDITIONAL A5 SI OUIRED dR11SG COH5TRLGTION L CIE95A TCB S I RNSTNLLOS$ON ANY ADDITIONAL EROSION CONTROL -_ A5 ME, NEPE55ARY BY THE ERO5tON C.OMROL INSPECTOR IT INSTALL STOLE, LLRB, AND /9PHALT. I3. PERMALENT 6RLUND COVER SHALL SEEDED FOR KL E%P05ED AREAS WITHIN IS WORKING GAYS OR 30 CALENDAR DAYS OPI INTER IS SHORTER) F 6RAPiG LOTMT115ON OF CONSTRUCTION OR DEVELOPMENT OR LEASAnON CF GRADING 14, I TES. 14. N.L EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE GIICLe&S FOR STABILITY AND OPERATION FOLLOWING EVERY STORM ECeS 5 RT IN NO CASE LESS THAN ONCE EVERY MEEK, ANY REPAIRS OR GLEANING IEGE55/•RY TONI MAINTAIN EROSION AND SEDIMENT LONTR0. FRPLTILFS SAKI. BE COMPLEED TIMMEDIATELY. 15, - SEEDED AREAS SHALL BE REFERnLIZED, RESEEDED A5 LffcE55ARY, AND MW.LCHED ACCORDING TO THE SEEMING SGIEPILE. IS. APTER 517E HAS BEEN PROPERLY SrABie ENOI AND INSPECTED BY THE EROSION CONTROL INSPECTOR MID OR RESPONSIBLE ENGINEER REMOVE TEMPORARY EROSION CONTROL DEVICES. n, THE OWSER SHALL PERPETUALLY MAINTAIN ALL NENt EROSION (ANTROL DEVICES IN ORDER TO MINIMIZE THE EFFECTS OF EROSI EROSION. 44Tj a 1b • LBS51N ib PREVEIT SLLCR N'XE s OD 27 . Nvt iarFr _� srarwFas Cl./-� l 3 -TW 1A^ I Zi+1L k9hff AT LEA5T LG5 EALN. ,b MJRE tINN lO% Sfatl AEIDN 1E95 TNAN.IS.L% 5 10 IS 20 4.♦`,5 - tos SLxuL >'Erur Ar LEASr LBS fAG+ NO MGRE n✓uv 3A G4KL.W'Jd11C55 1I4W 30 LB �' M=NIft%MUM Y•b r ION DHFII%IX Or PFEWI'IDT CL.L,S 3-KV ND 6RAOATICN'l[GIFED OFFROW tM1 1" Pst waar /IV/ L!M �nm pat AF" � AF" I ow ALItrrl n s dw sips aAs M"'" I'MOM 21.46 so 5.4 28 2 D ewe 24 1 OUTLET 2261 24• 102 2 3 16 ewe 24 1 LSD Ib 6.qq 'JO' SA 25 2 R eAle 24 1 FBI" 1286 ID' 6A IA 2 C &Ale 24 1 ` L£, 15M'K I GN<MEL LlN'N5 PFLGEP.R£9: M1L9'i YLRK LYPAQRIATQ` 11FANWQTfAilpy OM51pf L1^ LF5/6N AND CNLa1R14T1p( I9T/. 1 1 L _ C 1 LL 1 1 + Y J ' I- Y � } I F yet; }.: I i �-rrr �Itt ry 7 X><' A/Rt !91 Q.1s9 Q !! Q LIIM Q' A1RAl/ Itss1! ils'A� Qllat slat JIpI. I STCNE F//E 3• 4XD 9• 1 STONE LIDHT 6' b X D IT' 3 STOI'E MEDIIId l3' e x D lD' / STCNE IEAW ]3' D X D W. 5 STOLE IEAW 33^ b XD. 30' b STONE fEAYI' T3' /T X D 3D• REQMRES [.9R5ER STOTE CR AfYInER T>FE OF T IXV/CG OCS'3N 5 flEYp® 11£ X-L1`£ t� THIS PRLCEgFE WtiD1N•DIN£!H2♦DAhR451W 6'MINIM9M 1.60 30.00 LIMITS OF CONSTRUCTION / / / l / / 22b9 0011 FiFI 05yya(yyE,�_ V/ / ( p III` ♦ _I VA E.G. LEGEND rY•YY Y1 . DISTURBED AREA LIMIT TYP. STONE rf WIRE O INLET PROTECTION goliffil RIP -RAP SILT FENCE DISTURBED AREA: = 18.Oa ACRE5± � RIP-RM OVBP fiC£Y 5B` DETAIL M YfbITA11K LIBf pI FGR81Y FERN Armstead Dalton Toler, Jr. DB. 1858, PG. 38 ZONED: R-6 - __-_ I I I I `-•- LIMITS OF CONSTRUCTION WETLANDS ARE NOT PRESENT ON SITE. STORMWATER MANAGEMENT PLAN AND EROSION CONTROL PLAN TO BE SUBMITTED TO APPROPRIATE ATHORITIES AND APPROVED BEFORE CONSTRUCTION SHALL BEGIN. SEE DETAIL SHEET AND GRADING PLAN FOR PIPE SCHEDULE AND CALCULATIONS. ALL ROOF DRAINAGE TO BE TIED INTO STORM DRAIN SYSTEM ALL MAJOR STORM STRUCTURES PER CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. NP= NYLO-PLAST SUPPLIMENTAL 12" INLETS WITH HDPE LAND NO LESS THAN 0.20%. I 1 I I 2 I I V1 N I I N Georgia P. Moclnnis, C3 0 Line T. Parrott, & Seth W. Parrott, Jr. �' 0 1 1 0 0 DR 1209, Pg, 138 O O 0 1 ? o • I 1 ZONED: RIO NOTE: I 1 m 51TE NARRATIVE: CONTRACTOR SHALL HAVE CLEARING LIMITS FIELD STAKED AND I 1 THE PROPOSED SITE (IG.08 AG.3) IS CURRENTLY A MOBILE HOME PARK WITH SHALL VERIFY WITH OWNER OR OWNER'S REPRESENTATIVE ON - i 1 APPROX. 120 MOBILE HOMES. ONLY A FEW TREES EXIST WHERE THE PROPOSED SITE PRIOR TO CLEARING. I I GLUI3HOt,5E 15 PROPOSED THE REST OF THE 51TE HAS ROADS, EXISTING UTILITIES, 1 1 MOBILE HOMES WITH CONCRETE PADS AND SOME SMALL PATCHE5 OF GRA55ED AREAS BETWEEN HOMES. THE 51TE 15 VERY FLAT, ELEVATIONS DIFFERENCES ON DEVELOPER: BLUE R/DGE DEVELOPMENT 6ERV/GE5, L.L.G. 60.00' THE 51TE RANGE FROM APPROX. 29 TO 25 ON M05T OF THE SITE. EXISTING 5826 SAMET DRIVE, SUITE /OS S 69.55'00" W DRAINAGE DITCHES SURROUND THE 51TE THE PROPOSED SITE WITH AN INVERT H/6H POINT, NG 27265 ELEVATION AROUND 22.5'. THESE DITCHES PROBABLY WERE INSTALLED TO DRAIN 336-669-1500 THE AREA. ALL EXISTING UTILITIES AND DRAINAGE ON 517E WILL BE DEMOLISHED CONTACT: LINDA HILL FOR THE NEW GONSTRUGTION. THE NEW SITE WILL INCLUDE 13-24 UNIT APARTMENTS, GARAGE5, AND PARKING THAT WILL BE APPROX. G.54 AG. IMPERVIOUS. SEWER AND WATER EXTEN51ONS AND ROADWAY5 WILL BE PRIVATE ON SITE. STORM WATER FROM THE PROJECT WILL BE CAPTURED BY A NIETPOND DETENTION AREA TO THE EAST OF THE SITE THAT WILL BE INSTALLED PRIOR TO BUILDING CERTIFICATE OF OCCUPANCY. TH15 SYSTEM WILL THEN DRAIN TO THE EXISTING DITCH ON SITE WHIGH ENG/NEER: GPI EN6/NEERINC5 6 SURVEY/NI LNG. WILL BE GLEAN OUT OF ALL EXISTING TRASH AND PEOR15 AND THE FLOW TO A 4400 TYN/N& STREET TRIBUTARY OF JACK SMITH CREEK. H/6H POINT NC 27265 MB6) 612-6600 EXT. B13 CONTACT.• ROBERT 0. THOMPSON, P.E. WETLAND DETENTION POND SHALL BE BUILT W/ PERIMETER EROSION CONTROL MEASURES ff UTILIZED AS A TEMP SEDIMENT BASIN DURING GONSTRUC,TION NO FLANTIN65 UNTIL SEDIMENT REMOVED / / / / / LI MITS OF CONSTRUCTION REVISIONS SEAL 024GI41 '\ I Ito i; \z.00 ER05ION CONTROL PLAN SCALE: 1 " = 60' DATE: 10-3-07 PROJECT: 746.07 DRAWN BY: RDT BLUE RIDGE JOB# 407-108-NC SHEET 6A co 15- Rim 274 0 Inv 22.9.,��-z- A\ o 0 -)-'Q C) c 'A NN Rim 26.0 C-) Inv 23.7 9,G U :2.41 2 05 0 0 Q G) 0- ON "' . . . . . . . 1:5 I -A �2_ ADJUST TOP 9e AS NEEDED TO REMAIN ABA NDON EX. -6 S POS I,- -7n v 24.4 5.7 Rim 2 90 0 '0 Inv 23.0 tar In v 211' vo Ri;m� &27.9/obor`11 Inv 23 5 C'e e- -13 Remaining Property oY Fox Chose Village, LLC 4RELOCATE UTILITIES C) -1 0 D8. 1441, PG. 250 -;, Q - I I I MB 14, Pg. 29 AS NEEDED C) PET ZONED: R-6 IPARK O c' cd Z� 1.5\ P.A45 Ac. 2q.1 N, 551111#1 QJ-1 5EVI 1.6 Building 0 20 �11 -13 o' 2qD W#46 2qJ205 k '�2 2.12 X 6,10 4 RIP -RAP OVER BE" �cll �E �AfL NovITAI`IYE �F � �r BERM q at 28. 21 Armsteod Dolton Toler, Jr. 102 DB, 1858, PG. 38 & ZONED: R-6 REVISIONS I ty z Z, \.1) - I V jO W- U- LA L-U :y .4 � LL, LU z r" \\N 14, D 'S" PC 16 1 1,crt 4 ct WA q t4NTT \A -71- F Cl 30.0 1.4 0 4.j 4� FFE1 30.20' ;-4 FFE- 3160 29 4-- yO 51.4 .62 NP 4 2 5c A tn A. N 48-13'00" W \ 1\11� ------------- ;gT ------------ Sys i ------------- — ------------ --- - ------ ------------ -- 120,42' ------ ---- --- --------- t-4-4 4 ------------------ --- kqETFONO ?2.52 2 Iq TI NORMAL POOL D.A SORFACE AREA ELEV. 23.'0' •q.4 FO. -5HELF' \ SLOPE '75 0' VA "10: 1 5L CORE 2q. 'Mb 2q.5 NP974 z9.a 29.a -50.0 •2 2 7 2.5 Ac 2q6o F, EF EROSION CONTROL F — — — — — — — — ==V �04 168 PLAN ER (0' 2.116 -------------- SCALE: 1 50' = . ........ 9*5500" W 747.99' DATE: 10-3-07 S 69'55'00" W PROJECT: 746.07 I U) Georgia P, MccInnis, d v j d DRAWN BY: RDT Lane T. Parrott, & Seth W. Parrott, Jr. Ln 0 ; D8. 7209, Pg, 138 C:� C BLUE RIDGE JOB# 407-108-NC 6B SHEET 70MC'n- 010