Loading...
HomeMy WebLinkAboutSW7091214_CURRENT PERMIT_20210709STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW JdZ42Z� DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ,�a� (D -(()1 YYYYMMDD ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Axelson Properties, LLC Attention: Thomas J. Axelson, D.C. 411 Emmen Road New Bern, NC 28562 NORTH CAROLINA Environmental Quality July 9, 2021 Subject: Stormwater Permit No. SW7091214 Renewal Axelson Chiropractic High Density Project Craven County Dear Dr. Axelson: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on June 10, 2021. Staff review of the application has determined that the permit can be reissued. We are forwarding Permit No. SV 7091214 dated July 9, 2021, for the continued operation of the existing sand filter system. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from December 31, 2021, until December 30, 2029, and shall be subject to the conditions and limitations as specified therein and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, -4 � Roger K. Thorpe Environmental Engineer DE— North Carolina Department of Environmental Quality I Division of Energy. Mineral 3rd Land Resources Washington Regional Offire 1 943 Washington Square Mall I Washington. North Carolina 27889 m\V/— 352.946,6+31 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Axelson Properties, LLC Axel Chiropractic Located at 901 Newman Road, New Bern, NC Craven County FOR THE construction, operation and maintenance of one closed sand filter in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and.considered a part of this permit. This permit shall be effective from December 31, 2021, until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 25,372 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this permit, and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. �� North Carolina Department of Env it Quautv Division of Energy, Wne:al and Land resources Washington Regional Office 943 Washingrcn Square Hall ! Washington North Carolina'7889 000"" 2529.16.u481 7 2. The built -upon areas associated with this project shall be located at least 50 feet landward of all surface waters. The following design criteria have been permitted for the sand filter and must be provided and maintained at design conditions: a. Drainage Area, ft2: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Design Volume, ft3: e. Adjusted Water Quality Volume, ft3: f. Provided Storage Volume, ft3: g. Sediment Chamber Surface Area, ft2: h. Sand Chamber Surface Area, ft2: i. Predevelopment 1 year 24 hour: j. Post -development 1 year 24 hour: k. Top / Bypass Weir Elevation, FMSL: I. Bottom of Sand Filter Elevation, FMSL M. Seasonal High -Water Table, FMSL: n. Receiving Stream/River Basin: o. Stream Index Number: P. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 35,268 25,372 1.50 3,075 2,306 3,071 567(L'xW) 1,080 �L' x W') 1.35 ft /s 0.50 ft3/s 23.5 23.5 18.5 Trent River/ Neuse River Basin 27-101-(39) "SB. Sw. NSW" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal- C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. �� North Carolina Depaitrrurtof Envitcnmentai Quality Division of Energy. Mineral at.d Land Resources Washington Regional Office : 043 Washington>quare Mall Washington. North Carolina 21880 4. Records of maintenance activities must be kept for each permitted SCM. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division an annual summary report of the maintenance and inspection records for each SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. ® North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Washington Regional Office 1 0-13 Washington Square Hall I Washington, North Carolina 27889 252.o•16.6,181 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves any transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. —E No, t'h Carolina Department of Environmental Quality ; Division of Energy, Mineral and Land Resources Washington Regional Office 14a3 Washington Square Mail I Washington. North Carolina 2788n Yn an..n ra.in.mvawi�,� 252.g4h.6481 10. . The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from December 31, 2021, until December 30, 2029. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 9 th day of July 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION �1 For Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7091214 — North Carolina Department of Environmental Quality ! Division of energy. Mineral and Land Resources Washington Regional Office ! q43 W'ashingron Square Stall I Washington, North Carolina 2788a DEMLR USE ONLY Date Received Fee Paid Permit Number (Q(JIiQ'Z I 4S(0s.oz, SW-1,09IsILJ NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3) the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: < LA 2. Project name: 0" 3. Project street address: " 10� t� l N [ t c1 City: �w E) � 1\) C- County: 4. What, if any, changes have been made to the project as permitted? ZIP : to =- If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https://dea.nc.gov/about/divisions/energy- mineral-Ian d-resources/energy-mi neral-land-ruleslstormwater-program/post-construction. B. PERMITTEE INFORMATION if changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at., h>fti)s //deg.nc.gov/about/divisions/energy-mineral-land-resources/ enerov-mineral-land-rules/stormwater-oroaram/post-construction. State Stormwater Permits do not 1. Current Permit Holder's Company Name/Organization: NN &-\Scv� `, �, 1v ?Tckc+ 2. Signing Official's Name: �� �w �< AXE \sue i� T-> C- - 3. Signing Official's Title: 4. Mailing Address: 411 l= Nnr nzo� Q<1 City: Q]Pry, TJc- State: �jC--ZIP : 5. Street Address: ;S�D�I Q�lpwar`av" �1 City: I CY State: iJ(" ZIP: .2: Coa 6. Phone: (2S:a) W1 -9W* Email: 0kK0Xe Sow 0 vat ��• coy Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: kt- 1. A permit application processing fee of $505.00 payable to NCDEQ. &.L�2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation - a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) - a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act," c. Public Entity - a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership - the general partner, e. Sole proprietor, or f. Letter of authorization signed by one of the signatories noted in a - e above authorizing the signature of another entity. U'_��3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/ planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. ZW�4 O&M Agreements, Please select one: I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or J do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. a� (� 5. Designer Certifications, Please select one: A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or The project has not yet been built. 6. [IF APPLICABLE] If the project -has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration Stormwaler Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, corr ct and complete. Signature: Date: ^^t0 E aoa NOTARIZATION: 1, _ � HJpJCKL-ey a Notary Public for the State of NO2` P CAgztY )JQA County of zf2plyeAl , do hereby certify that frslM/i S :S. A Xar�'�J personally appeared before me day of 31Ah16 209-1 and acknowledge the due ce-6aiio-n.. rgoing instrument. Witness my hand and official seal, dOTAR :Z=;Z. '-mc'•. AVB1.�G rP�c My commission expires Q3 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 F co _; State Stormwater Management Systems Permit No. SW7091214 - .A Ott �. sp � PR r1lt� r1 K, I.hta Stormwater Permit No. SW7091 b 14 Craven County Designer's Certification APR 2 0 2011 14 I, .c`✓N4�`� ��i��R, as a duly registered 16'04'*Z6-Cw4L-- in the State of North Carolina, laving been authorized to observe (periodically/ weekly/ full time) the construction of the project, AXtt.gOwr �aotearMr%4 % , %.%.C. (Project) for 'r"1 ^% Ajeda.t s#%w - (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the to construction such that the construction was observed to be built within substantial compliance and. intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. . Noted deviations from approved plans and"`specification: FAX !.�! Next D `Qo u 1POC Signature_ Registration mber 'a132�j Date '4' S"W�w1y ❑ COMPLETED SL:AL Page 6 of 7 State Stormwater Management Systems Permit No. SW70912 111_ Certification Requirements: jot1. The drainage area to the system contains approximately the permitted acreage. r2. The drainage area to the system contains no more than the permitted amount of built -upon area. All the built -upon area associated with the project is graded such that the runoff drains to the system. All roof drains are located such that the runoff is directed into the system. The outlet/bypass structure elevations are per the approved plan. The outlet structure is located per the approved plans. AA 7. Trash rack is provided on the outlettbypass structure. All slopes are grassed with permanent vegetation. Vegetated slopes are no steeper than 3:1. �he inlets are located per the approved plans and do not cause short- ircuiting of the system. he permitted amounts of surface area and/or volume have been Pr provided. -dope, 2. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. All required parts of the system are provided, such as a vegetated shelf, and a forebay. The required system dimensions are provided 40,07 cc: NCDENR-DWQ Regional Office Craven County Building Inspections Page 7 of 7 Permit Number.sw 7acT I?_I+ (to be provided by OWQ) ' Red triangles at the upper right hand comer indicate design comments Please complete the yellow shaded items. 2 F �WWAr\\f �O9 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be fitted out on fine, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section lll) and the 18M Agreement (Section IV) 11. PROJECT INFORMATION Project name Axelson Office Complex Contact name Sue Sayger,PE Phone number 252 349-5803 Date December 16, 2009 Drainage area number 1 II.DESIGN INFORMATION Site Characteristics Drainage area (AD) Impervious area % Impervious (Ir Design rainfall depth (Ro) Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff Post -development 1-yr. 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume Design volume (WOV) Adjusted water quality volume (WOVW Volume contained in the sedimentation basin and on top of the sand filter Maximum head on the sedimentation basin and sand filter (hm F1H) Average head on the sedimentation basin and sand filter (hA) Runoff Coefficient (Rv) Type of Sand Filter Open sand filter? If this is an open sand filter: The clearance between the bottom of the sand filter and the SHWT (dsawr) Closedfpre-cast sand filter? If this is a closed sand filter: The clearance between the bottom of the sand filter and the SHWT (dsHwr) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dspj 35,268.00 ft' >r/ OK 25.372.00 f>z 1� 71.9% % y 1.50 in 3.90 in in/hr 1.35 ft3/sec 0.50 ft3/sec -0.85 ft3/sec 3,075.00 ft3 V/ 2,306.25 ft3 ✓ OK 3,294.00 1/ 2.00 It 1/ OK 1.00 It OK 0.70 (unidess) y YorN 4.00 It YorN Form SW401Sand Filter-Rm.4 Parts I and II. Project Design Summary, Page 1 of 1 Sedimentation Basin Permit Number: (to be provided by NWQ) Surface area of sedimentation basin (As) Sand Filter Surface area of sand filter (AF) Depth of the sand media filter bed (dr) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (5011 if SA waters)? If not a closed bottom, is BMP located at least 10011 from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (W,,,)? What is the depth of sand over the outlet pipe? Sedimentation 7mm6er l or Fort•bov) Flow In2:iln Soil ft A's.a Figure 1: Open Sand Filter OK. Meets minimum, but may need to be increased to 1,080.00 fe contain the required volume if error under Storage Volume section. OK. Meets minimum, but may need to be increased to 567.00 ft contain the required volume if error under Storage Volume section. 1.50 fit 3.50 (fl/day) 42.00 hours Insufficient drainage time. 1.75 days y YorN OK n Y or N Insufficient flow splitter. y YorN OK .7U.UU m y YorN OK y YorN OK y YorN OK y YorN OK y YorN OK S;wd Filter Chamber /'-�\ i'•ntlet Pipe ITish R'nl. r'1';d de 30.00 It 1.50 R Ilpipr � [IF i� rt [ rlSNwrr OK OK Form SW401Sand Filter-Rev.4 Parts I and II. Project Design Summary, Page 2 of 3 Permit No. (to be provided by DWQ) {III. REQUIRED ITEMS CHECKLIST I Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 24 -sp-t 1. Plans (1' - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber Maintenance access, Flow splitting device, Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), and Boundaries of drainage easement. Z 2. Plan details (1' = 50' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flo,*splitting device, - Propowd drainage easement and public right of way (ROW), - DesigP at ultimate build -out, - Off-sije drainage (if applicable), and - Boundaries of drainage easement. 'SP Z 3. Section view of the sand filter (1' = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media - Connection between the sedimentation chamber and the sand filter chamber, - SHWT level(s) - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) h? 1`1140 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The 7 results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 407 -L`# 5. Supporting calculations (including drainage calculations) 7H•ff. 6. Signed and notarized operation and maintenance (0&M) agreement tI— 7. A copy of the deed restrictions (if required). Form SW401-Sand Filter-Rev.4 Part III, Page 1 of 1 ` F Date: tvvmos Project MCCARTHY c , ... . '.�9A, fl. S?ti�;,•°-'- FBCIIIIy Sand filter Drainage Area. Impervous % Area-bldgs- Drelnage area number Drainage Area-sq ft Ac Area _sq ft' Impervious Sq ft 1r- —35268 O.BtI 25372 0719405894,] 4213 Design Requirements �0.69]485124 �Rpervi 25372 TOW area are ft) 0 80964/873 Tole) area area ACRES Read storage 1.5" SIMPLE METt10D W75 WOV=Rv'1.5"Ad per SIMPLE method 2306 WOV adj `/ W71 vqv provid drawdcym O=(k)'kh8 k 3.50 Way 0 draw down refs with Ave head, l.SdPM 2.33 Way D over sand filter surface area 1323 ftA3lday WOV Drava. Sme 1.74 day WqV Dre dove, 1me(hours) 41,83 hours Grain discharge 0.0153125 cis Car.(underdrain umety) 1.1 ch Future and Area- streetsSgFt Area-bldgs-Ac Area-streets-Ac 21159 0.098717172 0 M5743602 VOLUME CALCULATIONS ELEV DELTA AREA LENGTH WIDTH DELTA ELEV AREA INCREMNTAL VOLUME CUMMULATNE VOLUME 25.00 24 22 25,00 23S 38 30 18 38 27 30 24 12 30 21 1.00 2 1,50 1080 720 216 1080 567 we 938 0 1235 0 3071 2171 1235 1235 0 Permit Number: (to be provided by Drainage Area Number: Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: J Potential problem: How I will remediate the problem: Entire BMP Trash/debris is present. Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as applicable) pavementsurface. possible. Perimeter of sand filter Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the sediment and depth of greater than six inches. remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than s ra in . BMP element: Potentialproblem: How I will remediate theproblem: Filter bed and underdrain Water is ponding on the surface for Check to see if the collector system is collection system more than 24 hours after a storm. clogged and Flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water Quality have occurred at the outlet. 401 Oversight Unit at 919-733-1786. C,.-.., Q %V A n l Q—A C:I+,,. n V. n e D.... A' nnnc,....17 n...,,. 7 -f' 4 Permit Number: (Io be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Axelson Properties Llc BMP drainage area number: Print name:Thomas Axelson Title: Registered agent/owner Address:3334 Wellons Blvd, New Bern, NC 28560 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, e %_ . Nj' TP✓, a Notary Public for the State of County of CerA l-i -o- i,,- do hereby certify that O Mety S 1. 1 Xco/ < e3 h personally appeared before me this _� day of dQt 3 and acknowledge the due execution of the forgoing sand filter maintenance requirements. SEAL Witness my hand and official seal, ��ja'v "� My commission expires —Z - -" - / Z c.,— cwn n, 0.._d c:]..... nano o,.., n nnnac....17 o.--'I —f'2 -- i High Density Commercial Subdivisions Deed Restrictions & Protective Convenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Management Regulations, deed restrictions and protective covenants are required for High Density Commercial Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a built -upon area consistent with the design criteria used to size the stormwater control facility. I, Thomas Axelson acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot within the project known as Axelson Properties LLC The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is 25, 372. square feet. *Note: If the BUA per lot varies, please substitute the following statement for the one above and provide a complete listing of the proposed BUA for each lot: The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and packing areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. 8. The owner of each lot, whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. 9. The project and each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. C-- Moor I 0...• 0 n9l1l Onnn 0--- i _r ) High Density Commercial Subdivisions Deed Restrictions & Protective Convenances I, a ic0-k o. ; P / i c- ; 4 e r , a Notary Public in the State of v AIC County of ` jr c - u e " , do hereby certify that 7TAAM G_!C b} : A e / So h personally appeared before me this the — " day of pc n , 209, and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL SignatuurOF�rls�—� My Commission expires oZ r,,— Moor I D-" n ncki,.,nnnn M--- 1) -f )