Loading...
HomeMy WebLinkAboutSW7090603_CURRENT PERMIT_20210714STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. I SW ZQ?,i2(p 5 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2a YYYYMMDD l/ u19,0 ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality July 14, 2021 GWC District Residential NC SPE, LLC Attention: George W. Calomiris,_Manager 1112 1611 Street N.W. Washington, DC 20026 Subject: Stormwater Permit No. SW7090603 Renewal/Transfer of Ownership Wendy's — Edenton, NC High Density Project Chowan County Dear Mr. Calomiris: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on June 18, 2021. Staff review of the application has determined that the permit can be reissued. We are forwarding Permit No. SV 7090603 dated July 14, 2021, for the continued operation of the constructed wetland stormwater treatment system. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from the date of issuance, until July 13, 2029, and shall be subject to the conditions and limitations as specified therein and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the. Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality I Division of Energv, Mineral and Land Resources _ Washington Regional Office 1 943 Washington Square Nall I Washington. North Carolina 27889 252.936 6461 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO GWC District Residential NC SPE, LLC Wendy's — Edenton, NC Located at 510 Virginia Road, Edenton, NC Chowan County FOR THE construction, operation and maintenance of a constructed wetlands in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from the date of issuance until July 13, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 39,204 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Not Carolina Department of Ennronmeniai Quakily , Division or Energy. Mineral and Land Resources Washington Regional Office I o43 Washington Square Stall • Washington, North Carolina 27880 2'24466487 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: 55,321 b. Total Impervious Surfaces, ft2: 39,207 C. Design Storm, inches: 1.50 d. TSS removal efficiency: 85 % e. Permanent Pool Elevation, FMSL: 14.80 f. Wetland Surface Area, ft2: 5,331 g. Permitted Storage Volume, ft3: 5,264 at temporary pool elevation h. Temporary Storage Elevation, FMSL: i. Controlling Orifice: I. Receiving Stream/River Basin: k. Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 15.80 1.25" 0 pipe Pembroke Creek / Chowan 26-1-1 "B: NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. p North Carolina Department of Environmental Quality Division of Energy. Mineral and Land Resources J/ Washington Regional Office I Q43 Washington Square Mall I Washmaton, North Carolina 27389 251og6e481 Maintenance of all slopes in accordance with approved plans and specifications. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted SCM. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division an annual summary report of the maintenance inspection records for each SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Access to the stormwater facilities shall be maintained via appropriate easements at all times. Decorative spray fountains will not be allowed in the stormwater treatment system. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Not Carolina Department of Environmental Quality 1 Division of Energy. _Mineral ind Land Resources 1/ Waenmgton Regional Office 1 °43 Washington Square Mail I `wasi ington, North Carolina 27384 meµ` .000 15244e c481 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 14. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS 0 This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. �tt North Carolina Department of Environmental Quality ; Division of Energy. Mineral and Land Resources J/ Washington Regional Office 1 Q43 Washington Square Mall 1 Washington, North Camlira 2738q s —;m " a�u 251441, c481 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until July 13, 2029, Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 14 th day of July 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION S For Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7090603 Nor th Carolina Department, of Envn onmcntol Quality Division of Ener9y. MUM a[ mid i..3nd Resources _ Washington Regional Otfice 1 o t3 W'ashngton Square Mall I Washngton, North Carolina 7788n >51 a4n.o481 11FMI R I INI INI V II Date Received Fee Paid Permit Number l 1 os cc, Sw 7 0'1 o C 03 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days ., prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number:-; S 70 03 Project name: It) Y S — P N — /li G 3. '-Project street address: /to Ili r2giNi1> i a!' 1 City: f^ Cie .y 7-� _ _ County: G h,00.t .-i ZIP414i 2 4. What, if any, changes have been made to the project as permitted? /Vu >, v If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc oov/about/divlsions/energv- m i n eral-I a nd-resou rces/e nergy-minera I -la rid-rules/stormwater-prop ram/ post -con structlon. Bi'PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization 60C hSrRod' Re sr d.-th-lNG Sfe' LL c_ i•S- 2 Signing Official's Name: &0-0 0. Cg 1OMx i P-l'S 3. Signing Official's Title: Al 4h4 A,; !L 4. Mailing Address: (1 ( I- I (o rh S14ee'T l�/ t✓• City: 14/45k, rv" State: J C ZIP:.2603to i 5. Street Address: 54*4 t% City: State: ZIP 6. Phone: (103. ) NSA- I zop Email: 6COAJ6'Q Co-/Wrrtj'S . Ca--i 9 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 a C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that r, include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president, b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act," c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or C, f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that „,; have not yet been received by DEMLR, including. deed restrictions, protective covenants, condom inium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded If ti the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed, or ❑ The project has not yet been built 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC) Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc gov/online services/search/bv title/ Business Registration coPI or 1'�oP�ty Th>< Ertl Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 ELI PERMITTEE'S CERTIFICATION p I�GIF / �" t/ "�( �� y the person legally responsible for the permit, certify44a14 avd r (or I will obtain a copy and it will be kept on site),:thaf-l-a+n s, gmentaCSl-appraued-plaFts. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All info r tion provided on this permit renewal application is, to the best of my knowledge, correct n complete. l Signature: ( Date: NOTAR ZATI 1, gig that 6�fi this the ubr/vs�W a Notary Public for the State of do hereby certify personally appeared before me ,/ 20_,�, and acknowledge the due ,,, 11,,,,, - •••Cr U , �o •T�O '� Notary Signature........... �J % Z i�� 9OAS � My commission expires ly `�� ZoZr-J �''$,,,,,��`�� �� << 7t � e Ci Wei fOki ��vlk Co-�X no execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) LA Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 CHOWAN COUNTY TAX OFFICE PO BOX 1030 EDENTON NC 27932-1030 '""""""AUTO"MIXED AADC 270 9129099 6w3-PrN 49721 1 2 W GWC DISTRICT RESIDENTIAL NC SPE Ll-� MGC SPE LLC / CIO GEORGE W CALOMIRIS 1112 16TH ST NW STE 900 WASHINGTON DC 20036.4825 Ill�l�ttltl�dll'III'II'II�II�I�rLII�tI���ItltllLtll����1L1�� pNc 2020 PROPf R'1 1' TAX fill -A, DUE ON SEPTEMBER 1, 2020 IMPORTANT -PLEASE READ FRONT AND BACK OF NOTICE CAREFULLY N PLEASE SEE THE INSTALLMENT COUPONS INCLUDED How to pay your bill Please bring/send all your bill(s) when paying to ensure correct payment application, It Is the responsibility of the taxpayer to ensure all bills are paid on or. beforeS:l 2021. Notice Date: 07/30/20 PROPERTY IDENTIFICATION AND VALUE INFORMATION 2020 1 47237 Description: WENDY'S Address: 510 VIRGUIIA RD Return the coupon below with full payment in the envelope provided. Please use appropriate postage. Make certain that the envelope Is postmarked by the United States Postal Service no later than 1/5/2021 to be considered paid on time. See back of bill for more information concerning postmarks. Please write bill year and bill number m the memo held of your check. (IR Pay your bill in person at 305 W. Freemason St, Edenton, NC 27932 between the hours of 8 00 AM and 5'00 PM (except major holidays). We have a secure payment drop box loened In the center island in the parking lot of the building for aftef-hours payments. Please note that credit or debit cards are accepted in the office. There is a convenience fee for this service We do not currently accept American Express. OR To pay by phone or online by credit card, debit card, or ACH call 1-855-239-8400 or visit our websne lit'_3:Ad1L.i_;n mr..r eat and click the link to pay Taxes. There Is a convenience fee for this service. You will need your bill numberls) located below. OR Sign up for our Auto draft program to have four (4) equal Inuallment amounts drafted from your bank account on the 15" of each month to begin September 1.5", 2020. To sign up for this service see the payment Coupons Included. Fill out the first payment coupon, check the box to enroll, sign the form and return to our office with a Voided Check 780500450615 1 6301 Taxable Real Estate Value 1,131 Total Taxa bie Value 1.131 FINAL DATE TO PAY IS TUESDAY JANUARY 5", 2021. INTEREST BEGINS AT CLOSE OF BUSINESS ON THIS DAY WE OFFER INSTALLMENT PLANS. CONTACT OUR OFFICE TO LEARN MORE OR SEE THE ENCLOSED PAYMENT COUPONS TO ENROLL. 'YOU MAY OPT INTO OUR AUTO DRAFT OPTION BY CHECKING THE BOX, SIGN AND SUBMIT A VOIDED CHECK ON OR BEFORE SEPTEMBER &", 2020- COUNTY EDENTON To receive future statements electronically, please visit https://chowan.ostmt.rd t Your Registration ID: 6257-58317r=8RLH-: 7/31 /2020 1 1 /5/2021 Dessrptmn(rate Assessed 0.755 8.113, 0.non 4,526. Current Year Tax 13.069.86 813,069.86 All correspondence should be sent to: CHOWAN COUNTY TAX OFFICE • PO BOX 1030 • EDENTON NC 27932 __/ .... .......:.:. ;.; DETACH AND -RETAIN -THIS PORTION FOR INCOME TAX PURPOSES ................................ ............. .. -_____.....-.--•----------------._.-.-------- BIIt N.n r 6301 V PLEASE RETURN THIS PORTION WITH YOUR PAYMENT V Parcel Number: 780500450615 term oonovory TA,, Ar rxTr/•f TO CHANGE YOUR MAILING ADDRESS, PLEASE F ILl IN YOUR NEW ADDRESS BELOW ADDRESS, CITY: PHONE STATE. l e. GWC DISTRICT RESIDENTIAL NC SPE LLC MGC SPE LLC / CIO GEORGE W CALOMIRIS 1112 16TH ST NW STE 900 WASHINGTON DC 20036-4825 MAKE CHECK PAYABLE & REMIT TO: (include the occount F on yourpoyment) CHOWAN COUNTY TAX OFFICE PO BOX 1030 EDENTON NC 27932-1030 Ihtlllllrllir��rinitnhilPgptl°rll�n�prtlturllrlmuh kvM_A TA 020E w A rEh oG 9 NCEdR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. LSP"ROBEUP FORMATION Project name Wendy's - Edenton Contact name Brandon Powell Phone number 2524159-8196 Date October 7, 2009 Drainage area number 1 Site Characteristics Drainage area 55,321.00 ft Impervious area 39,204.00 ftZ Percent impervious 70.9% % Design rainfall depth 1.50 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.15 in 1-yr, 24-hr intensity 0.13 in/hr Pre -development 1-yr, 24-hr runoff 0.10 ft3/sec Post -development 1-yr, 24-hr runoff 0.16 ft3/sec Pre/Post 1-yr, 24-hr peak control 0.06 113/sec Storage Volume: Non -SA Waters Minimum required volume 4,910.00 ft3 Volume provided (temporary pool volume) 15,264.00 ft3 OK Storage Volume: SA Waters Parameters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Outlet Design Depth of temporary pool/ponding depth (DPwj 12.00 in OK Drawdown time 2.58 days OK Diameter of orifice 1.25 in OK Coefficient of discharge (Cc) used in orifice diameter calculation 0.60 (unitless) Driving head (Ho) used in the orifice diameter calculation 0.33 It OK Form SW401-Wetland-Rev.5-7/10/09 Parts I and II. Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow Water The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pool surface area percentage is: Total of wetland zone areas Add or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) Shallow Water bottom Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) This design meets Option #2, Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants recommended in Shallow Water Area: Herbaceous (4'cubic-inch container) Number of Plants recommended in Shallow Land Area: Herbaceous (4'cubic-inch container), OR Shrubs (1 gallon or larger), OR Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) Number of Plants Drovided in Shallow Water Area Herbaceous (4'cubic-inch container) Number of Plants orovided in Shallow Land Area Herbaceous (4'cubic-inch container) Shrubs (1 gallon or larger) Trees (3 gallon or larger) and Grass -like Herbaceous (4+ cubic -inch) 5,331.00 ft' OK 2,132.00ft2 OK 40% % 2,131.00 It' OK 40% % 537.00 it' OK 10% % 531.00 ft2 OK 10% % 5,331.00 it' OK 0.00 ff 15.80 ft amsl IJ 14.80 ft amsl 14.30 ft amsl 13.00 it amsl 12.00 it amsl Y (Y or N) 15.30 it amsl OK (Y or N) in 12.00 in OK 6.00 in OK 21.60 in OK 33.60 in OK N (Y or N) OK 550 550 88 11 and 440 550 OK 0 More required if not planting shrubs or trees. 88 OK 0 More required if not planting herb. and/or shrubs. 0 More recommended if planting trees. Forth SW401-Wetland-Rev.5-7/10/09 Parts I and 11. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? If yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? ft Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 4.00 :1 OK Approximate wetland length 140.00 ft Approximate wetland width 35.00 ft Approximate surface area using length and width provided 4,900.00 ft This approx. surface area is within this number of square feetof the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wenand-Rev 5-7/10/09 Parts I and 11 Project Design Summary, Page 3 of 3 Permit No. (to be provided by DWQ) III:_ -REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan SG tip f 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. �[ (� 7 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: - A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. �l 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). L 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. SW401-Wetland-Rev 5-7/10/09 Part III, page 1 of 1 Permit Number: S IV % t7 7 U6 d 3 (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). — No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How'I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. if applicable). -damaged Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.4 Page 1 of 3 Permit Number: (to be provided by DWQ) BMP element: Potentialproblem: How I will remediate theproblem: Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. health. -plant Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. 401 Oversight Unit at 919-733-1786. Form SW401-Wetland O&M-Rev.4 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Wendy's - Edenton BMP drainage area number: Print name:Charles Sechrist Title:President Address:3670 Virginia Avenue, Collinsville, VA 24078 Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, .J 1KICHhEL S10cr—S a Notary Public for the State of Plc fN (AI?AU8 q , County of NksH , do hereby certify that �jrb a a&ZFi2r� personally appeared before me this-9_*"day of t�%F�f32 mot' , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, ' / 51v* L MWOR STOCKS ROUry Public fth re, m C. SEAL My commission expires FEs . 160 7-o10 Form SW40 I -Wetland O&M-Rev.4 Page 3 of 3 State Stormwater Management Systems Permit No. SV 7090603 Wendy's - Edenton Stormwater Permit No. SV 7090603 Chowan County Designer's Certification JAN 1 2 2011 v I, ,�. YVI�G I3�lil S�&S , as a duly registered i�b* erIAtiaer in the State of North Carolina, having been authorized to observe eriodical tithe construction of the project, (Project) for !,J—PC ir�5+ hVoIk At 6OW, LM(Project Owner) hereby state that, to the best of my abilities, due 'Care and was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature r j- a J S" — Registration umber N ( I R 8�:_ Date I— IU— State Stormwater Management Systems Permit No. SV 7090603 Certification Requirements: ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of bwlt-upon'area. ✓3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓4. _ All roof drains are located such that the runoff•,is directed into the system. ✓ 5. The outlet/bypass structure elevations are per the approved plan. ✓ 6. The outlet structure is located per the approved plans. ✓ 7. Trash rack is provided on the outleUbypas's structure. 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. ✓ 13. All required design depths are provided. 14. All required parts of the_ system are provided, such as a vegetated shelf, and a forebay. ✓ 15. The required system dimensions are'provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Chowan County Building Inspections n