HomeMy WebLinkAboutSW7090224_COMPLIANCE_20140602STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
DOC TYPE ❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
4** `ter
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvada, III
Governor Secretary
June 2, 2014
City of Elizabeth City
Mr. Steven Horvath, Public Utilities Engineer
PO Box 347
Elizabeth City, NC 27907-0347
Subject: NOTICE OF INSPECTION
Permit No. SW7090224
South Park Athletic Complex
Pasquotank County
Dear Mr. Horvath:
On May 29, 2014, 1 inspected the South Park Athletic Complex development in Elizabeth City to
determine compliance with Stormwater Management Permit Number SW7090224, which was issued on
March 27, 2009. The DWQ site inspection revealed that except for the issue listed below, the Project is in
substantial compliance with the approved permit. Please see attached Inspection report also.
• Designer's Certification not received. Per Schedule of Compliance Section of the stormwater
permit (Section III. 11), a certification must be received from the appropriate designer for the
system installed certifying that the permitted facility has been installed in accordance with this
permit.....
This Office requests that you respond to this letter in writing within 30 calendar days of receipt of this
Notice. Your response should be sent to this office at the letterhead address. Your response should
provide a written "Plan of Action" which outlines the actions you will take to correct the above issue and a
time frame for completion of those actions.
Thank you for your attention to this matter.
Please be advised that you are required to comply with the terms, conditions and limitations of your
Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North
Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater
system.
Sincerely, _' \
1 �
Samir Dumpor, P.E.
Environmental Engineer
cc: /WaRO Files
Division of Energy, Mineral, and Land Resources . Land Quality Section
Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-6481/ FAX: 252-975-3716
Internet:htto7/mU,nodenr.or�ebArAond�uality
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
Compliance Inspection Report
Permit: SW7090224 Effective: 03/27/09 Expiration: 12/30/21 Owner: City of Elizabeth City
Project: South Park Athletic Complex
County: Pasquotank 112 Capital Trace
Region: Washington
Elizabeth Cty NC 27909
Contact Person: Richard C Olson Title: City Manager Phone: 252-338-3981
Directions to Project:
Take US 17 S to Halstead Blvd (right) and make a right on Capital Trace.
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1.1 - (Pasquotank River) (03-01-50 ) ( SB)
12 - (Pasquotank River) (03-01-50 ) ( SB)
2 - (Pasquotank River) (03-01-50) ( SB)
On -Site Representative(s):
Related Permits:
Inspection Date: 05/29/2014 EntryTime: 01:15 PM
Primary Inspector: Samir Dumpor
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
State Stormwater
(See attachment summary)
Exit Time: 01:45 PM
Phone: 252-948-3960
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW7090224 Owner - Project: City of Elizabeth City
Inspection Date: 05/29/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Project finished and operational. Built -upon area as per plans and permit. Wet pond per constructed as per plans and
well maintained. No Engineers Certification received for the project.
File Review
Yes
No
NA
NE
Is the permit active?
0110
❑
Signed copy of the Engineer's certification is in the file?
❑
■
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
❑
❑
Copy of the recorded deed restrictions is in the file?
❑
❑
■
❑
Comment: Engineers Certification not received
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
■
❑
❑
❑
Is the drainage area as per the permit and approved plans?
■
❑
❑
❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
■
❑
❑
❑
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
■
❑
❑ ❑
Are the inlets located per the approved plans?
■
❑
❑ ❑
Are the outlet structures located per the approved plans?
■
❑
❑ ❑
Comment:
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ ❑ ❑ ❑
upon request?
Comment:
Page: 2