Loading...
HomeMy WebLinkAboutSW7090224_COMPLIANCE_20140602STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 4** `ter NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvada, III Governor Secretary June 2, 2014 City of Elizabeth City Mr. Steven Horvath, Public Utilities Engineer PO Box 347 Elizabeth City, NC 27907-0347 Subject: NOTICE OF INSPECTION Permit No. SW7090224 South Park Athletic Complex Pasquotank County Dear Mr. Horvath: On May 29, 2014, 1 inspected the South Park Athletic Complex development in Elizabeth City to determine compliance with Stormwater Management Permit Number SW7090224, which was issued on March 27, 2009. The DWQ site inspection revealed that except for the issue listed below, the Project is in substantial compliance with the approved permit. Please see attached Inspection report also. • Designer's Certification not received. Per Schedule of Compliance Section of the stormwater permit (Section III. 11), a certification must be received from the appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit..... This Office requests that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address. Your response should provide a written "Plan of Action" which outlines the actions you will take to correct the above issue and a time frame for completion of those actions. Thank you for your attention to this matter. Please be advised that you are required to comply with the terms, conditions and limitations of your Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater system. Sincerely, _' \ 1 � Samir Dumpor, P.E. Environmental Engineer cc: /WaRO Files Division of Energy, Mineral, and Land Resources . Land Quality Section Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-6481/ FAX: 252-975-3716 Internet:htto7/mU,nodenr.or�ebArAond�uality An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper Compliance Inspection Report Permit: SW7090224 Effective: 03/27/09 Expiration: 12/30/21 Owner: City of Elizabeth City Project: South Park Athletic Complex County: Pasquotank 112 Capital Trace Region: Washington Elizabeth Cty NC 27909 Contact Person: Richard C Olson Title: City Manager Phone: 252-338-3981 Directions to Project: Take US 17 S to Halstead Blvd (right) and make a right on Capital Trace. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1.1 - (Pasquotank River) (03-01-50 ) ( SB) 12 - (Pasquotank River) (03-01-50 ) ( SB) 2 - (Pasquotank River) (03-01-50) ( SB) On -Site Representative(s): Related Permits: Inspection Date: 05/29/2014 EntryTime: 01:15 PM Primary Inspector: Samir Dumpor Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant ■ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 01:45 PM Phone: 252-948-3960 Inspection Type: Compliance Evaluation Page: 1 Permit: SW7090224 Owner - Project: City of Elizabeth City Inspection Date: 05/29/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Project finished and operational. Built -upon area as per plans and permit. Wet pond per constructed as per plans and well maintained. No Engineers Certification received for the project. File Review Yes No NA NE Is the permit active? 0110 ❑ Signed copy of the Engineer's certification is in the file? ❑ ■ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ■ ❑ Comment: Engineers Certification not received Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ ❑ ❑ ❑ upon request? Comment: Page: 2