Loading...
HomeMy WebLinkAboutSW7080904_COMPLIANCE_20110512STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION ,2aZ%)� DOC DATE YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Mr. C. Brantley Tillman Nags Head Partners, LLC 1648 E. North Market Drive Raleigh, NC 27609 Dear Mr, Tillman: Coleen H. Sullins Director May 12, 2011 Subject: NOTICE OF INSPECTION Permit No. SW7080904 The Shoppes at 10.5 Dare County Dee Freeman Secretary On April 8, 2011, Mr. Samir Dumpor of the Washington Regional Office of the Division of Water Quality (DWQ) inspected The Shoppes at 10.5 development in Nags Head, Dare County to determine compliance with Stormwater Management Permit Number SW7080904, which was issued on September 18, 2008. DWQ site inspection revealed that the project is in substantial compliance with the approved permit. (see attached Compliance Inspection Report) Please be advised that you are required to comply with the terms, conditions and limitations of your Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater system. Please be advised that violations of your Stormwater Management Permit may be subject to the assessment of civil penalties of up to $25,000 per day per violation. If you have any questions please contact me at the Washington Regional Office, telephone number (252) 946-6481. cc: " WaRO Files North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Sincerely, ' I Samir Dumpor Environmental Engineer Internet www ncwaterouality oro Phone: 252-946-6481 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper NorthCarolina Naturally, 0 Compliance Inspection Report Permit: SW7080904 Effective: 09/18/08 Expiration: 09/18/18 Owner: Nags Head Partners LLC Project: The Shoppes at 10.5 County: Dare Hwy 158 And Baltic St Region: Washington Nags Head NC 27959 Contact Person: Brantley Tillman Title: Phone: 919-872-5702 Directions to Project: East side of Hwy 158 approx. 300' south of the intersection of US 158 and Baltic Street Type of Project: State Stormwater - Infiltration System Drain Areas: 1 - (Atlantic Ocean) (03-01-54 ) ( SB) T1 - (Atlantic Ocean) (03-01-54 ) ( SB) T2 - (Atlantic Ocean) (03-01-54 ) ( SB) On -Site Representative(s): Related Permits: Inspection Date: 04/08/2011 Entry Time: 01,00 PM Primary Inspector: Samir Dumpor Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant D Not Compliant Question Areas: ® State Stormwater (See attachment summary) Exit Time: 02:00 PM Phone:252-948-3960 Inspection Type: Compliance Evaluation Page:1 Permit: SV 7080904 Owner - Project: Nags Head Partners LLC Inspection Date: 04/08/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Majority of site is constructed and in good order, however construction is ongoing on southern portion of this site. No issues as far as Stormwater Permit. File Review Yes No NA HE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? ❑ ❑ ■ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ■ ❑ Comment: Site not finished yet. Letter of partial Certification was received on September 14, 2009 with a note that Final certifcation will be submitted when project is complete. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ ❑ ❑ ❑ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ■ ❑ ❑ ❑ Comment Page: 2