Loading...
HomeMy WebLinkAboutSW7080805_CURRENT PERMIT_20080826STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW a&f DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD \o�pF W ATF9oG W a'Ko Michael F. Easley, Governor William G. Ross Jr., Secretary r%JDMar- North Carolina Department of Environment and Natural Resources 1 -� Coleco H. Sullins, Director Division of Water Quality August 26, 2008 Mr. Ed Mitchell River Dunes Corporation 416-A Pollock Street New Bern. NC 28560 Subject: Stormwater Permit No. SW7080805 River Dunes Marina and Residential Development — Harbor Village IV & V High Density Subdivision Project Pamlico County Dear Mr. Mitchell: The Washington Regional Office received a complete Stormwater Management Permit Application for River Dunes Marina and Residential Development — Harbor Village IV & V on August 6, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW7080805, dated August 26, 2008, for the construction of the project, River Dunes Marina and Residential Development — Harbor Village IV & V. r2 /30/s--I This permit shall be effective from the date of issuance until August 26, 2018, and shall be subject to the conditions and limitations as specked therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. Ancer I .-D al —supervisor Surface Water Protection Section Washington Regional Office AH/sd: J:\WPDATA\WQS\Samir - State SW\Permits — Infiltration cc: Curtis Blazier, PE, McKim & Creed, PA (1730 Varsity Dr., Suite 500, Raleigh, NC 27606) Pamlico County Building Inspections Washington Regional Office Central Files North Carolina Division of Water Quality Internet: o%i%v,nc%vateruualit%,oru One 943 Washington Square Mall Phone (252) 946-6481 NorthCarolina Washington, NC 27889 Fax (252) 946-9215 N l L fls� atom/ y An Equal Opportunity/Affirmative Action Employer-50% RecydeNlO% Post Consumer Paper State Stormwater Management Systems Permit No. SW7080805 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO River Dunes Corporation River Dunes Marina and Residential Development — Harbor Village /V & V Pamlico County FOR THE construction, operation and maintenance of three infiltration basins in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 26, 2018 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 78,309 square feet of impervious area. The subdivision is permitted for 13 lots, each allowed (See Attached Table) square feet of built -upon area. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The basin must be operated with a 50' vegetated filter. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 10 State Stormwater Management Systems Permit No. SW7080805 6. The following design elements have been permitted for the three infiltration basins stormwater facility, and must be provided in the system at all times. Harbor Village IV Basin IV-1 Basin IV-2 a. Drainage Area, acres: 1.57 1.43 b. Total Impervious Surfaces, ft2: 23,424 21,837 C. Design Storm, inches: 1.5 1.5 d. Basin Depth, feet: 1.50 1.50 e. Bottom Elevation, FMSL: 3.30 3.30 f. Bottom Surface Area, ft2: 3,478 3,941 g. Permitted Storage Volume, ft3: 6,265 6,779 h. Type of Soil: SM SM i. Expected Infiltration Rate, in/hr: 1.30 1.30 j. Seasonal High Water Table, FMSL: 1.04 -2.15 k. Time to Draw Down, hours: 13 20 I. Receiving Stream/River Basin: Neuse River / Neuse River Basin M. Stream Index Number: 27-(118) n. Classification of Water Body: "SA, HQW, NSW" Harbor Village V Basin V-1 a. Drainage Area, acres: 1.97 b. Total Impervious Surfaces, ft2: 33,048 C. Design Storm, inches: 1.5 d. Basin Depth, feet: 1.50 e. Bottom Elevation, FMSL: 3.30 f. Bottom Surface Area, ft2: 4,950 g. Permitted Storage Volume, ft3: 8,526 h. Type of Soil: SM i. Expected Infiltration Rate, in/hr: 1.30 j. Seasonal High Water Table, FMSL: 0.42 k. Time to Draw Down, hours: 13 I. Receiving Stream/River Basin: Parris Creek / Neuse River Basin M. Stream Index Number: 27-141-6 Page 3 of 10 State Stormwater Management Systems Permit No. SW7080805 Classification of Water Body: "SA, HOW, NSW' II. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. Page 4 of 10 State Stormwater Management Systems Permit No. SW7080805 The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 12. Prior transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7080805, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot is (See Attached Table) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Page 5 of 10 State Stormwater Management Systems Permit No. SW7080805 All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built -upon area in excess of the permitted amount will require a permit modification. 14. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 15. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. Page 6 of 10 State Stormwater Management Systems Permit No. SW7080805 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the permit. 10. This permit shall be effective from the date of issuance until August 26, 2018. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 26th day of August, 2008. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7080805 Page 7 of 10 State Stormwater Management Systems Permit No. SW7080805 Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 10 Certification Requirements: atate atormwater management aystems Permit No. SW7080805 Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NC DEN R-DWQ-Wash ington Regional Office Pamlico County Building Inspections Page 9 of 10 State Stormwater Management Systems Permit No. SW7080805 River Dunes Marina and Residential Development Harbor Village IV & V Table of Allowable Built -upon areas Lot # Lot Area Allowable BUA %Impervious 405 11,060 4,000 36% 406 9,822 4,000 41% 407 10,323 4,000 39% 408 12,996 4,200 32% 426 7,909 4,000 51% 427 9,063 4,000 44% 428 10,869 4,000 37% 429 11,954 4,200 35% 510 8,968 4,000 45% 511 8,100 4,000 49% 512 8,100 4,000 49% 513 9,450 4,000 42% 515 7,755 4,250 55% Page 10 of 10 DWQ USE ONLY Date Received I Fee Paid IPermit Number K5t'6,2cer I f4bice 1 SW70go$cS G K *- State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): River Dunes Corporation 2, Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Mr. Ed Mitchell, President 3. Mailing Address for person listed in item 2 above: 4"16-A Pollock Street City:New Bern State:NC Zip:28560 Phone: (252 ) 634-3373 Fax: (252 ) 633-5775 Email:ed.mitchell©riverdunes.com • 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): River Dunes Marina and Residential Development Harbor Village IV and V 5. Location of Project (street address): SR 1317 (Orchard Creek Road) City:Oriental County:Pamlico Zip:28571 6. Directions to project (from nearest major intersection): From the intersection of NC-55 and Straight Road, right on Straight Road, right on Orchard Creek Road (SR 1317), right on Old Lighthouse Road (Proposed) 7. Latitude:350 04' 49" N Longitude:76° 36' 13" W of project 8. Contact person who can answer questions about the project: Name:Ed Mitchell Telephone Number: (252 ) 634-3373 Email:ed.mitchell©riverdunes.com 0 IL PERMIT INFORMATION: Form SWU-101 Version 03.27.08 Page I of 4 1. Specify whether project is (check one): ®New [-]Renewal ❑Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ® ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated using three infiltration basins. Level spreader overflow devices, located on berms surrounding the basins and grassed filter strips will be used to treat stormwater and discharge it to the wetlands. 2. Stormwater runoff from this project drains to the Neuse River basin. 3. Total Property Area: 4.96 acres 4. Total Wetlands Area: 0 acres 5. 100' Wide Strip of Wetland Area: N/A acres (not applicable if no wetlands exist on site) 6. Total Project Area**:4.96 acres 7. Project Built Upon Area:36 8. How many drainage areas does the project have?3 is9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name See Attached See Attached Stream Class & Index No. Total Drainage Area (so On -site Drainage Area (sf) Off -site Drainage Area (so Existing Impervious* Area (so Proposed Impervious*Area (so % Impervious* Area (total) Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) On -site Streets (so On -site Parking (sf) On -site Sidewalks (so Other on -site (so Off -site (sf) Total (sf): Form SWU-101 Version 03.27.08 Page 2 of Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **7'otal project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). 010. How was the off -site impervious area listed above derived?N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from htto:Hh2o.enr.state.nc.us/su/bmp forms.hthn - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the • sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from httl2://h2o.enr.state.nc.us/su/bmp forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-13ermeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration "French Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the ® interactive online map at htto://h2o.enr.state.nc.us/su/msi maps.hnn) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form CA LT • Original and one copy of the Deed Restrictions & Protective Covenants Form (if L,/q required as per Part IV above) • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP C/YJ/f • Permit application processing fee of $505 (Express: $4,000 for I -ID, $2,000 for LD) payable to NCDENR G 8 • Calculations & detailed narrative description of stormwater treatment/management L, Wlff • Copy of any applicable soils report C/YJ/3 • Two copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures . - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):McKim & Creed, P.A. Mailing Address:]730 Varsity Drive, Suite 500 Phone: (919 ) 233-8091 EmaiCcblazier©mckimcreed.com VIIL APPLICANT'S CERTIFICATION State:NC Zip:27606 Fax: (919 ) 233-8031 I, (print or type name of person listed in General Infornmtion, item 2) Ed Mitchell certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions an o ec ovenants� d, and that the proposed project complies with the requirements of 15A N AC 2H .1000. • Signature: Date: Form SWU-101 Version 03.27.08 Page of High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and tective covenants are required for High Density Residential Subdivisions where lots will be subdivided and 1 and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective enants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, j!�a Z , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA `5icz fkl�tCtT -t„►�� This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them 4in orient of t ter collection system. Lots that will naturally drain into the system are of required vide e additional measures. Signature: Date: a Notary Public in the State of rvo2TW e-4AelLlw/q , County of 4vog1cAZi , do hereby certify that !>%0 !y 1'7?,// /z LL personally appeared before me this the / day of tga6-GCS % .2009 , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL Signature 4y WALTER B. BYFORD 'STATE OF NORTH CAROUNA My Commission expires '��i5�o 9 WAKE couNTv Form DRPC-3 Rev.I Page 1 of 1 • 1 • High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and tective covenants are required for High Density Residential Subdivisions where lots will be subdivided and i and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective u enants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, �v , acknowledge, affirm and agree by my signature below, that I will cause -the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: EiW/QtTrC ,,II Lot # BUA Lot # BUA Lot # BUA Lot # BUA This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them in ponent of water collection system. Lots that will naturally drain into the system are rfqt require to provide e additional me cures. //J a Notary Public in the State of wo,4,74d 4a4"LIA-W , County of 1,I//iK6, do hereby certify that 1;�0 m ) I z!ShAL L personally appeared before me this the % day of ,200.9 and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, d44liYi aX/ SEAL Signature 40,11, f__ @'I' WALTERB. BYFORD My Commission expires T9�; STATEW� COUNTY CAYROui�A Form DRPC-3 Rev.I Page 1 of 1 0 •- 0 • 0 Permit Number: (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement 1510TA .,1 Z 4 I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection v�Jl(,bO ] 2008 corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. ®WO_WAR® Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem; How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 U 0 9 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event, media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) ® I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. • Project name: River Dunes Marina and Residential Development - Harbor Village IV BMP drainage area number: Print name: Title:President Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, V�Al:rl�A 12, Q /ro/dd) , a Notary Public for the State of /v�21+1 l 69Q6LI�79 , County of do hereby certify that I�q v✓i i% NhL L personally appeared before me this !O % day of Jlw ✓ ZOO , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, Ilo WALTER B. BYFORO r ;« STATE OF NORTH CAROUNA WAKE COUNTY SEAL My commission expires 0 Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 Permit No. (to be provided by DWD) ��p4 WArpg0 ®wL&— STORMWATER MANAGEMENT PERMIT APPLICATION FORM p $ • NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Date Drainage Area Number River Dunes Marina (252)634-3373 712212008 II:r:DESIGNiINF,ORMATION(i'...a„.Z.i i Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required • Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 68,372.00 ff2 23,424.00 it" 0.34 % 3.00 in 3.48 in 0.15 in/hr 991.00 ft'/sec 7,105.00 11'/sec 6,114.00 ft'/sec J 6,125.00 it' d 6,264.80 it' in ft' ff' ff' W SM 1.30 in/hr 1.04 fmsl J0.54 days 3.00 :1 3.30 fmsl 4.80 fmsl 4,885.98 ft' d 5.80 fmsl 113.71 ft 35.04 1t 3,478.22 ft' OK for non -SR waters OK OK OK Form SW401-Infiltration Basin-Rev.2 Parts I. a II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Additional Information Total runoff volume captured by basin •Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided • • 1.73 ac-in 50.00 it NIA it 50.00 it NIA ft NIA it 2.26 it Y (Y or N) Y (YorN) Y (YorN) NIA (Y or N) Y OK OK OK OK OK OK OK OK OK OK OK Form SW401-Infiltration Basin-Rev2 Parts I. S II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III: `REQUIRED,;ITEMS CHECKLIST,' IsPlease indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. CAF C 1.1 oc3 / 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GI fi S �zi. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. G3 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. 0 4e- ZIL0 ��,,A��'��-5 --Fw4, A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. Tj4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils ��77 investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. Slef* 7. The supporting calculations. Y A4;WJ 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. C078 F6M,r 9. A copy of the deed restrictions (if required). S4rcr o/J Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1