SW7080717_APPROVED PLANS_20190613
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW IM 77 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE�L2����j YYYYMMDD GRAPHIC SCALE 300 0 150 300 000 1200 ( IN FEET' ) 1 inch = 300 ft_ PERQUIMANS RIVER �f . r� HIGH DENSITY . Ii +- r'� PROJECT AREA �I fit moo•' ,.^� v 1v PROJEHIGH CTAREA'41 OVERALL PROJECT AREA ¢ fSW718 717 PER... V /SW7180717MOD ��. 0 g LOW DENSITY PROJECT AREA �` 6 Q. ez_14 (( fir ) ( � � � _J �J.�;r�• rt� 'p. ��.)� �"'✓e��' �. ,�c'�,1,tl^ ��. j111' LIS ou .\ �± 112k,' }r 9�/� Lyjl.3o� PROP. 30' X 40.'� �� GRAVEL PAD 1 ! � �% .. � ,;:�� . � �� or d (IY� r` \e a• �'�� � fir=' � � �!p, � �1/ `} �• � v^)� ','/J \(`•• '�� rr NOTES: RECEIVED APR 2 5 1p1� 1. OWNER / APPLICANT: HARVEY POINT DEFENSE TESTING ACTIVITY 2535 HARVEY POINT ROAD HERTFORD, NC 27944 2. TAX MAP PARCEL ID. 2-0073-0031 PIN: 7886-94-5371 3. LOCATION: HARVEY POINT DEFENSE TESTING ACTIVITY HARVEY POINT, INC 4. SCOPE OF PROJECT: HARVEY POINT PROPOSES THE INSTALLATION OF A NEW 30' X 40' GRAVEL PAD WITHIN THE LOW DENSITY AREA OF STORMWATER PERMIT SW7180717MOD. 5. TOPOGRAPHIC INFORMATION SHOWN ON THIS PLAN IS BASED ON GIS k LIDAR INFORMATION PROVIDED BY THE HARVEY POINT DEFENSE TESTING ACTIVITY FACILITY. BOUNDARY INFORMATION SHOWN IS BASED ON DEED DESCRIPTIONS AS APPLIED TO FILE PROVIDED BY HARVEY POINT. 8. PROPERTY IS LOCATED IN F.I.R.M. ZONE •X'. F.I.R.M. ZONES SUBJECT TO CHANGE BY F.E.MJL 7. NO WORK IS PROPOSED IN USACE JURISDICTIONAL WETLANDS. 8. PROPOSED GRAVEL. ACCESS DRIVE IS LOCATED WITHIN THE LOW DENSITY DRAINAGE AREA (1L) OF SWM PERMIT /SW7180717MOD. THE LOW DENSITY COMPONENT OF THE PERMIT ALLOWS FOR UP TO 24% OF TOTAL COVERAGE. THE REVISED COVERAGE BREAKDOWN FOR 1L IS AS FOLLOWS: EXISTING COVERAGE 495,712 SF PROPOSED GRAVEL PAD: 1,200 SF FUTURE COVERAGE 323.349 SF TOTAL: 820,261 SF Z O W r Q oco Q (L 7k d Q $ Z d w K J w LU Q Lr- O LEMQ BUMN r . By D. jL r EXISTING CONCRETE Dn 1 r. +o • i EXISTING ASPHALT PAVEMENT ..+ .. PROPOSED GRAVEL PAD EXISTING CONTOUR o' s.fi. I L 0 0 L 3 4 o IJ V A %J " S RA G N S u m D S. G N .. simig .................., .:. :. :: H pliZy:x .x i5`. ::' .... ...... a ..; . 'j. ..iz.x.., .P: 3>yw i::. # .. :'::{. ... .;, ........ ......... ........ ::.:..;; .... . .. . .. ......... .... .... x: PROJECT ....... LOCATI HARVEY POINT DEFENSE TESTING FACILITY MAP SHEET TITLE GENERAL INFORMATION G-001 TITLE SHEET/INDEX OF DRAWINGS CIVIL C-001 LEGEND, NOTES, & UTILITY SCHEDULES CD101 EXISTING CONDITIONS/DEMOLITION PLAN CD102 EXISTING CONDITIONS PLAN CD103 EXISTING CONDITIONS/DEMOLITION PLAN —OPTION CS101 LAYOUT AND UTILITY PLAN CS102 LAYOUT AND UTILITY PLAN —OPTION CG101 GRADING AND DRAINAGE PLAN CG102 GRADING AND DRAINAGE PLAN —OPTION C-501 EROSION AND SEDIMENT CONTROL NOTES C-502 EROSION AND SEDIMENT CONTROL DETAILS C-503 DETAILS C-504 DETAILS APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY Dom_ // so1-7— SI m.w3teT perrnd No. Sud 70e907� A�leli I I is a sm FOR COMMANDER NAVFAC ACTIVITY SATISFACTORY TO DATE DES LMC JDRW ACN ICHK LMC PM/DM BRANCH MANAGER CHEF ENO/ARCH XX c) Z o Z O z °C = W 0 Z ¢ Q CC m w � ' W I- W W N W Z Q J 0 P: z O Q I-- a_ Z zj W W LL o j ¢ E- z a F_ W } LLI U) a DEC Z o = SCALE: NONE PROJECT NO.: 022216-01 CONSTRUCTION CONTRACT NO.: DRAWING NO.: SHEET 01 OF 28 G-001 u C 01 9 1 1 I 2 X a gyp. X I I I ha �W x 1• c�' 10°EW. W. V J A0 3 v (APPROX. LOc) E. UG. ELEC 11 002 E UG ELEC. (APPRar LOC.) 10 43 1p h°' 1. 1 m � 001. ti E UG 10 � p10 11 11h 1 h I 1 1h I X I,• ST GRASS X 1 , I i I I 0 i �0•� a I x t\ gyp. II X a \ x I \ I \ I h \ LIMITS OF i X CS DISTURBANCE o 1 x •/ h 00 1�' 0°0 pa °0 0 1� 1l' 0 I l � l ^� / / // /hA a CE 1 If �'01 1 �� h % l 11 � � i r � �l ! 0• l l x ° l 1 0/l \\\ \\ �/CRASS 0•� 1 l �y11 `4•// 1 � 9------------ l / r X ,,\\\ • -,' �" 11 i li i j// /0 • / �`t l l l Q.1 LIMITS OF DISTURBANCE FOR ELECTRICAL WORK i l ,00'Cs N / / GRASS D lb A cl) 0I-A x x � % o / 4 x0°� xx� o. CE x� �/ /0`0 0 0�� 0 p p X b `'�0 p1' h? -A1' X TtTg a 8 \ L 2% .0..9. ho•u / 3 p.t i 0 1. 13 1p 1° 11 25 0 hXa 1� �. L a as �6� / SF 0-, 8 " E.S. = GRAVEL�\° ° 0--7 1 `' "� IP ti° �o1� p LIMITS OF 1°W 1. h ' �ti"' ��� 11�p �° 1 x /�''\ 1 11°� �6 �� DISTURBANCE c� x 13 x x L7 i @ 0 1 00 0 1� ASPHALT ^� ��? �' f �\ y\ 02 , p �. I E l ti 1ti 0 1 10" E W. APPROX. LOC. p04Iv GRAVEL ap 0° m O�pO U V �0 /tip 1�h Iv 1� 11 IP 19 (10) 1r x 1`10 xaE' �? p02 7 L CONC. �_ 0 hp 1h 1 2" E SAN• 1/ q x p0. ? 03 h a 0 11 STY. ME \ P TAL � 03 b 1 Y. oa WAREHOUSE BLDC \ \ I 1 % F.F.= 12-25 z a x 8.38 m 1 x E EL 1 GRAVEL 20 20 T GRASS 0 1� E N, 5 GRASS x 1 1 A� E. OHO 01 GRASS u 0 11 ELEC. 1 1 iAE UG. LOC.) 1 UMP a — PPROX \ \11 2 J own II MATCH LINE SHEET CD102 DEMOLITION NOTES ❑1 SAWCUT BITUMINOUS PAVEMENT ❑2 REMOVE BITUMINOUS PAVEMENT ❑3 RELOCATE EARTH SWALE ® REMOVE GRAVEL EROSION & SEDIMENT CONTROL MEASURES TEMPORARY GRAVEL CONSTRUCTION ENTRANCE (NC 6.06) (SEE SHEET C-502/C2) IP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/Ct) CS COMPOST SOCK (NC 6.66) (SEE SHEET C-502/A1) (JP) INLET PROTECTION (NC 6.51) (SEE SHEET C-502/B4) GRAPHIC SCALE 0 25' 50' 1"=25' 5 75' I E i*vVOR R S SURVEYORS NORFOLK. MRGINIA 11/17/2016 5l� APPROVED FOR COMMANDER NAVFAC ACTIVITY SATISFACTORY TO DATE DES CAB DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH XX BZ dz 0- g O �E UJ �- z =o Z Lu 0_ > (13 H F- Z J z IBC 2 H ~ m w W U ww j cn ~ C3 Z w ZZ O Q F— z RLL Z a Z O j wz w w< �� Z = Z z u' A w � (n X g w a 0. o = SCALE: PROJECT NO.: CONSTRUCTION CONTRACT NO.. DRAWING NO.: 100' � SHEET 03 OF ga C D 101 I n r 1 C C 0 U IA h� J 10 ° E. W. w. v. �o �1 i I/G: ELEC (APPROX. E. UG. ELEC, 002 ph1v E. UG. ELEC (APPROX LOC.) CONC1 'v oa 1 1001 1h � Im I� Q UG 10, 101 11� � 110 i I Ih 1• I I I..r� ,p. x ,p. GRASS x I x I I I I �p I x � I � I h LIMITS OF DISTURBANCE I A�lb- ,\ cw Q) CE x �\ x �\ x r p. I � J I° ! / Epp/ ! '�• ! �. �1 O X �GRASS a l l �l!l t' l h�11 pO' � _ _l ! r 9 \\ / I 4 AT, / / ! / x 0 0j� 0h N x xVA 0/ i i l l 1p l 'V ( x h 'b LIMITS OF DISTURBANCE FOR ELECTRICAL WORK CRASS pp0 b 0 0 x 00. CE , x./ 01 / o o� A\ T O.B. �� ` �Og 1 0 1� 10 O.B.x 09 L L 10 �� �k1 i 3 14 h h 04 = \ 6 a.� 1v 2 �Z 25 11 7.49 L/ 1h 00 x1 1�, 13 11 1� \x h , �10 SF � E. S. GRAt EL� �e�GRAY 1 1 10 p J 10-7 �= 1 1�0 ° �' M RIP ti o 1°� 1° 6 LIMITS OF h �ti 1x �. �a 00 DISTURBANCE c x 1 x x L x �h % A50 1 / 0� 1A w 01 00 1°0 1� ASPHAIT� JO" E W. APPROX LOC. IV �° 0ti p04 Y.0 01 h� GRAVEL — �0 2__- Op 1 m x y. h p U V 1�h 1.0 �° 11 IP 19 (JD) 1 x A`1p x�E 5A? p0 7 ° L N. h 2�� E S= �0 CONC. �� 0 ° 1• h 'b W. — - h h 1 K 1• ,1_ p0STy METAL P N 10 za WAREHOUSE BLDG y 03 v x o F.F.=2-25 f! z x8. J8 �. r p 1 1 1 A �_�°, 1 x E GRAVEL T GRA 2D 2O — 0 10 ,/� E p GRASS �x '\ _ 1 A � "E UELEC. C LOC.J (APPROX. GRASS 1 MATCH LINE SHEET CD102 DEMOLITION NOTES w -2 N 9 $� D J z lBBd\AFORTH SURVIYORSNINEERS NORFOLK, VIRGINIA 01 SAWCUT BITUMINOUS PAVEMENT `°NSU`TAW ❑2 REMOVE BITUMINOUS PAVEMENT ❑3 RELOCATE EARTH SWALE ® REMOVE GRAVEL :n 302 EROSION & SEDIMENT CONTROL MEASURES 11 17 2016 5 APPROVED U TEMPORARY GRAVEL CONSTRUCTION ENTRANCE (NC 6.06) (SEE SHEET C-502/C2) RIP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/Ct) FOR COMMANDER NAVFAC ACTIVITY CS COMPOST SOCK (NC 6.66) (SEE SHEEP C-5O2/At) SATISFACTORY TO DATEDES CAB DRW CAD CHK REG IP INLET PROTECTION (NC 6.51) (SEE SHEET C-502/134) PM/DM BRANCH MANAGER CHIEF ENG/ARCH xx Z Z B O liUJ O zLu = � W Z 0 g a Q _O Z F- F— W W 2 w cr) W Z ` LL Q Q Cn O Z Z R o °- Z z > LJ.1 O LL LLLLI V = z 0 °C z A w } � a > Z X o = W SCALE: PROJECT NO.:��� GRAPHIC SCALE CONSTRUCTION CONTRACT NO. DRAWING NO.: 1 - 25 0 25' 50' 75' 100' SHEET 05 OF CD103 5 I N I 11 a. LIMITS OF CONSTRUCTION LIMITS OF CONSTRUCTION FOR ELECTRICAL WORK m m_ 4 } .. f F ,yam} F{ } Atf {y t i F } h $} S✓* X v ` A FAlf r F{ It i t R, if� f F .` CENTERLINE OF r T HEADWALL CONC. HDWL = TOP WALL = 7.60 dw INV. = 5.35 � (REFER TO A1/C-503) CENTERLINE OF RAILROAD TRACK CENTERLINE OF ti R=170.64' HEADWALL y , J SF �a AiR % 4 v RIP LIMITS of , r CONSTRUCTION w 5 ,.IP CONC. HDWLIf . 1, v�x m,. �� _TOP WALL = 7.75 INV. 5.50 fir 03EFER O Al/ �. . .A .T,.,,.._ �Fs'.. , $ *.r ,x• 'ti.✓*'x z x I . 4 w.. x Al LS 0 9' NEW WORK NOTES NOTES: 1. ALL CONCRETE PAVEMENT JOINTS NOT NOTED TE OR TEJ SHALL BE DCJ OR DKJ (SEE SHEET C-504). m Ot CONCRETE SLAB (SEE STRUCTURAL DRAWINGS) OZ CONCRETE PAVEMENT (SEE SHEET C-504/D1) �3 CONCRETE ENTRANCE (SEE SHEET C-504/C5) ® EARTH SWALE (SEE SHEET C-504/A1) ( SAND PIT CONTAINMENT WALL (SEE SHEET C-503/C3) © SAND PIT (SEE SHEET C-503/C3) ( GRAVEL PAVEMENT (SEE SHEET C-504/D2) a Q /" J� S� N J f� 0 in oRTM ENGINEERS S U R V I Y O R S NORFOLK. VIRQNIA EROSION & SEDIMENT CONTROL MEASURES APPROVED 11 17 2016 5EkL RIP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/Ct) FOR COMMANDER NAVFAC Acnvm CS COMPOST SOCK (NC 6.66) (SEE SHEET C-502/A1) IP INLET PROTECTION (NC 6.51) (SEE SHEET C-502/B4) SATISFACTORY TO DATE DES CAB I DR W CAD 77HK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH XX 111 C z BZ c Z a[ rvR O z tE LLJ = w o g Q Z CL. 0 F- WW ~ LU z I— w ILL Z Z OQ Z a z Q� a Z >- z > w w 4 J oQ 2 z Z U. O Ir A W g > Z ui Q = SCALE: PROJECT NO.:�g-•Q� GRAPHIC SCALE CONSTRUCTION CONTRACT NO.: DRAWING NO.: 0 25' 50' 75' 100' SHEET 06 OF 1 " = 25' CS101 5 A C I n F LIMITS OF CONSTRUCTION +: f€ if %$A,} iLF .f r /{ fe f {( Y £F t kxt. T CENTERLINE OF r HEADWALL `tONC. HDWL TOP WALL = 7.60 'IW. = 5.35 F (SEE SHEET C-503/A1) F.: .:..Y CENTERLINE OF % 11 1 RAILROAD TRACK CENTERLINE OF 44` s ` R-170.64 HEADWALL ' R 14 I ,MV,Fa 4 ;.�SF € R 4 LIMITS OF T CONSTRUCTION ID ASs ' IP "k w, 3 CONC. HDWL All NOP WALL = 7.75 . .50 h i r, kk (S SHEET C-5 1) K. N, (SEE SH 03/A { j:TMy'MVv- .,p i.,:.. y ,„ti , ? e £" 2' -::. Ca.F "v n� �'-.,.. ...-`�..✓ /�.. jj w frx LIMITS OF CONSTRUCTION FOR ELECTRICAL WORK - x CRAss _ x , k *{ 4 * v ,�' s v :F.% Y umms f,. 7•• Y, m" 14 lF 411 NOTE: ALL CONCRETE PAVEMENT JOINTS NOT NOTED TE OR TEJ SHALL BE DCJ OR DKJ (SEE SHEET C-504). g SA Ns vez F"t p: 5 a 0 NEW WORK NOTES �1 CONCRETE SLAB (SEE STRUCTURAL DRAWINGS) ORTH E N 01 N E E R S (: CONCRETE PAVEMENT (SEE SHEET C-504/D1) S U R V E}Y O B S CONCRETE ENTRANCE (SEE SHEET C-504/C5) NORFOLK, VIRGINIA ® EARTH SWALE (SEE SHEET C-504/A1) ON$NLTW 05 SAND PIT CONTAINMENT WALL (SEE SHEET C-503/C3) ,.,` © SAND PIT (SEE SHEET C-503/C3) ... �7 GRAVEL PAVEMENT (SEE SHEET C-504/D2) (1) BITUMINOUS CONCRETE PAVEMENT (SEE SHEET C-504/C1) 302 I EROSION & SEDIMENT CONTROL MEASURES IP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/C1) 11/17/2016 $FL APPROVED FOR COMMANDER NAVFAC ACTIVITY COMPOST SOCK (NC 6.66) (SEE SHEET C-502/A1) SATISFACTORY TO DATE DES CAB DRW CAD CHK REG IP INLET PROTECTION (NC 6.51) (SEE SHEET C-502/134) PM/DM 101 BRANCH MANAGER CHIEF ENG/ARCH xx z Bz o Z cO 0 _ ILL � °C UJ Z z = Ci > 0 O V Z 1 c g r- I.— m a w w LLI � I— C3 J LL Z Z O `Z w cl z Q� 0 ~ Q U) w w Z) Z Ow LL m Z LL F- IL'°C^ A cW C vi Q ErZ O = SCALE: PROJECT NO.: =1641 GRAPHIC SCALE CONSTRUCTION CONTRACT NO, DRAMNG NO.: 0 25' 50' 75' 100' 1 " = 25' SHEET 07 OF 28 CS102 m 5 2 3 4 I 5 I C L. 0 UNDERDRAIN SCHEDULE (SEE C-504/A4) STRUCTURE BE 0001 s. Co. UDo1 - ® 85' - 6' UD. 0 0.00% INV. = 8.62 UDO - D® 42' - 6" UD. 0 3.12% ® S. CO. & 6" 45'+22 1/2' BENDS INV. = 8.62 ®- DO 95' - 6" UD. 0 0.14% ® S. CO. ® - ® 22' - 6" UD. 0 3.12% INV. = 8.62 UDO - "DO70' - 6" UD. 0 0.22% ® WYE INV. = 7.31 UDO - U® 18' - 6" LID. 0 0.22% ® PIPE END - SEE NOTE 2 * UDO - UD1 155' - 6" UD. 0 0.18% INV. = 6.00 D1 - UD11 8' - 6" UD. 0 0.18% ® S. CO. INV. = 5.50 * INSTALL UD. PIPE 3' OFF EDGE OF PAVEMENT. DO 45' BEND INV. = 5.34 FUD-0 PIPE END - SEE NOTE 2 INV. = 5.30 IUD-0-S. CO. INV. = 5.30 Y- I ,~_ D1 45' BEND INV. = 5.01 UD 11 PIPE END - SEE NOTE 2 INV. = 5.00 NOTES: 1. REFER TO C5/C-503 FOR UNDER DRAIN DETAIL 2. PROVIDE CONCRETE PAD FOR SHOULDER DRAIN INSTALLATION IN ACCORDANCE WITH PLATE 816.01 NCDOT ROADWAY STANDARD Zi LIMITS OF CONSTRUCTION FOR ELECTRICAL WORK - LIMITS OF CONSTRUCTION A �► . M.E. 7.5 DRAWINGS, JANUARY 2012, PROVIDE A 8" J57 STONE BEDDING MATERIAL UNDER THE PAD. REFER TO < A4/C-503 'v "mow.-.. ... � �+" ...w k+m. £.r.�_n.- .y., .x•.�: � �� x v �xx Y �� V 240 AUGER HOLE DOWN o TO SAND LAYER (6't) o FILL W/ WASHED #57 0 rrnuF ,_ S RIP W, ; E ; : KIP f.x vv ki�l { CONC. HOWL `TOP WALL = 7.75 - INV. = 5.50 fKK" :t t. (REFER TO At/C-503) t Y T' f� ti r k ~•n' 1 xAl A, 14 f P P"x' vt ib it r r� �f t � } t - —CONC. HDWL TOP WALL = 7.80 DO'x INV. = 5.35 ? (REFER TO A1/C-503) 4x £ LIMITS OF CONSTRUCTION EROSION & SEDIMENT CONTROL MEASURES RIP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/C1) 0 COMPOST SOCK (NC 6.66) (SEE SHEET C-502/At) IP INLET PROTECTION (NC 6.51) (SEE SHEET C-502/134) GRAPHIC SCALE 0 25' 1 " = 25' i m a a s� N N 9 EUVF13RTH ENGINEERS S U R V i##Y O R S NORFOLK, MRGINIA n'•JA 02 11/17/2016 SEAL APPROVED FOR COMMANDER NAVFAC ACTIVITY SATISFACTORY TO DATE DES CAB DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH xx 0 Z Ir�0 ILL tE W z = Q Z 0- > ir a P III Z cwn F- C'3 0 w OQ Z o tY Q F- o Z Z U) w W LLJ Q o = Z �R V o 0 z a-F— w >- > Z Q = SCALE: PROJECT NO.: 022216-01 CONSTRUCTION CONTRACT NO.: DRAWING NO.: 75' 100' SHEET EOF � CG 101 � 11 C I NO 1 1 2 3 4 ' 5 2 3 � 4 5 UNDERDRAIN SCHEDULE (SEE C-504/A4) STRUCTURE P_IP,E UD01 S. CO. UD01 - ® 85' - 6" UD. O 0.00% INV. = 8.62 D ®S. CO. & 6' 45•+22 1/7 BENDS UDO - ®42' - 6" U0. O 3.12% INV. = 8.62 ®- DO 95' - 6" UD. O 0.14% ® S. CO. ® - ® 22' - 6" UD. O 3.12% INV. = 8.62 UDO - "DO70' - 60 UD. O 0.22% ® WYE INV. = 7.31 UDO - ® 18' - 6" UD. O 0.22% UDO PIPE END - SEE NOTE 2 * UDO - D1 155' - 6" UD. O 0.18% INV. = 6.00 UD1 - UDt 1 8' - 6" UD. O 0.18% DO S. CO. INV. = 5.50 INSTALL UD. PIPE 3' OFF EDGE OF PAVEMENT. DO 45• BEND INV. = 5.34 FUD-0 PIPE END - SEE NOTE 2 INV. = 5.30 UDO S. CO. INV. = 5.30 Dl 46 BEND INV. = 5.01 C U 111 PIPE END - SEE NOTE 2 INV. = 5.00 0 9 I LIMITS OF CONSTRUCTION SEE SECTION A4 ON SHEET C-504 1 LIMITS OF CONSTRUCTION FOR ELECTRICAL WORK NOTES: �. 1. REFER TO C5/C-503 FOR UNDERDRAIN DETAIL M.E. 7.5 2. PROVIDE CONCRETE PAD FOR i SHOULDER DRAIN INSTALLATION IN M.E. 7.4 ACCORDANCE WITH PLATE 816.01 M.E. 7.1 NCDOT ROADWAY STANDARD 240 AUGER HOLE DOWN o TO SAND LAYER (6'f) c SEE SECTION FILL W/ WASHED #57 O� A4 ON SHEET STONE. y C-504 UD11 v S CS { DO W es 10�p4 8q6 co .{ t r lo / DO jig f jfh ✓ { f # t ii s /y t .. • . Q :^ :� tits x 'f"s` f P` z 4 r f f y oI f' f. f �# * °r r. s �f + il. DRAWINGS, JANUARY 2012, PROVIDE tw M.E. 6.5 t� 1 8" #57 STONE BEDDING MATERIAL 1G UNDER THE PAD. REFER TO Ah A4/C-503 C:4 k f ti i 4 60 j f i} CONC. HOWL $e�0 -vt ffTOP WALL = 7.80 J -' 'INV = 5.35 (REFER TO Al/C-503) df x "yp'S �� j , "` 1• LIMITS OF 1• , h�! CONSTRUCTION fl Y x VI RIP WI 1p .,_. ......... ........ t .. ,,r-Fh--"_ •..`arv;.s ,rcwt•'kifh ...:r`r:.a _". V x • n't„ } CONIC. HDWL I. = 7.75 x TO / 5 M � . —x, (REFER Al C 03) :.x$ ., , x %t•T3AT'y £., T` f F Y' �'�...,e. Ga"•, �.,. k : s to i...,. _.._.,.., sI ypf f, .,. 2 y5 ry d vv EROSION & SEDIMENT CONTROL MEASURES RIP ROCK PIPE INLET PROTECTION (NC 6.55) (SEE SHEET C-502/A4) SF TEMPORARY SEDIMENT FENCE (NC 6.62) (SEE SHEET C-502/Cl) ® COMPOST SOCK (NC 6.66) (SEE SHEET C-502/A1) N S i i cp N 9 0 Bd\AFMTH 0 m a l m ERRS SURVEYORS NORFOLK, MRGINIA ♦♦\\\\\\111111111,�'' ♦ N 11/17/2016 SEAL APPROVED FOR COMMANDER NAVFAC ACTIVITY IP INLET PROTECTION (NC 6.51) (SEE SHEET C-502/134) SATISFACTORY TO DATE I C DES CAB DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH xx U BZ U cZ g C'3 z Z uj = W O v 1 z U � g f— 1— m LLJ LLJ W Q (Wn H (3 z LL O¢ o Z Q z a. Z Q Z w W W ¢ z 0 = Z U. °C A Z 2 /1 � cn �R V Q > Z w _ SCALE: PROJECT NO.: GRAPHIC SCALE CONSTRUCTION CONTRACT N° DRAWING NO.: 0 25' 50' 75' 100' SHEET Og OF 28 1 " = 25' CG 102 4 5 5 RTH CAROLINA SEEDI REQUIREMENTS TEMPORARY GROUND COVER TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING SEEDING MIXTURE R RAIN RATE 'LB ACRE) D 20 THE USE OF ANNUAL RYE GRASS IS PROHIBITED FOR USE IN ANY APPLICATION ANNUAL LESPEDEZA 50 (KOBE IN PIEDMONT AND COASTAL PLAIN) OMIT ANNUAL LEOPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES COASTAL PLAIN - DEC. 1 - APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. C MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER SEEDING MIXTURE SPECIES RATE (LB/ACRE) GERMAN MILLET 40 SEEDING DATES COASTAL PLAIN APR. 15-AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURE LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING B TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING RECOMMENDATIONS FOR FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE GRAIN 120 THE USE OF ANNUAL RYE GRASS IS PROHIBITES FOR USE IN ANY APPLICATION SEEDING DATES COASTAL PLAIN AND PIEDMONT - AUG 15-DEC 30 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2000 LB/ACRE GROUND AGRICULTURE LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY A TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 2 3 EROSION AND SEDIMENT CONTROL NOTE MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. PERMANENT GROUND COVER PERMANENT SEEDING NO. 1CP FOR: WELL -TO POORLY RAINED SOILS WITH GOOD MOISTURE RETENTION• LOW MAINTENANCE SEEDING MIXTURE SPECIES RATE (LB/ACRE) TALL FESCUE 80 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES 1. FROM SEPT 1. - MAR 1., USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB/ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB/ACRE. NURSE PLANTS BETWEEN APR. 15. AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 25 LB/ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB.15-MAR. 20 FEB. 15-APR. 30 FALL: SEPT. 1-SEPT. 30 SEPT. 1-OCT. 31 SOIL AMENDMENTS APPLY 3,000-5000 LB/ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE IF GROWTH IS LESS THAN ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. WATER AS NECESSARY TO MAINTAIN ADEQUATE MOISTURE IN THE ROOT ZONE. DURING THE GERMINATION PROCESS, SEED IS TO BE KEPT ACTIVELY GROWING. IMMEDIATELY AFTER TURFING, PROTECT AGAINST TRAFFIC AND OTHER USE. SOIL REMOVAL NOTE: 1. SOIL REMOVED FROM SITE SHALL BE DISPOSED OF IN A DUMPSTER PROVIDED BY THE GOVERNMENT. 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING DESIGN MANUAL (REVISED JUNE 2006). 2. THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL STABILIZATION TO ALL DENUDED OR DISTURBED AREAS WITHIN 7 DAYS OF THE LAST LAND DISTURBING ACTIVITY FOR THE PERIMETER DIKES, SWALES, DITCHES AND SLOPES, HIGH QUALITY WATER (HWQ) ZONES AND SLOPES STEEPER THAN 3:1. SOIL STABILIZATION MUST ALSO BE APPLIED TO DENUDED OR DISTURBED AREAS WITHIN 14 DAYS OF THE LAST LAND DISTURBING ACTIVITY FOR SLOPES 3:1 OR FLATTER AND OTHER AREAS WITH SLOPES FLATTER THAN 4:1. SOIL STABILIZATION MEASURES INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO BE PAVED. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION. 4. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL DEVICES AND STORM OUTFALLS BE INSPECTED WEEKLY (EVERY 7 CALENDAR DAYS) AND WITHIN 24 HOURS OF A .5 INCH RAIN EVENT. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZATION, EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS REQUIRED TO BE ON SITE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO THE GOVERNMENT AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES CONSTRUCTION PERMIT MUST BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. THE CONTRACTOR IS ADDITIONALLY RESPONSIBLE CONDUCT PHASED SELF -INSPECTIONS REQUIRED IN THE EROSION CONTROL PERMIT APPROVAL. THESE INSPECTIONS SHALL BE MAINTAINED ALONG WITH THE NPDES INSPECTIONS. 5. THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION VEHICLES TO ENTRANCES PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT SHALL BE REMOVED FROM PAVED AREAS ON A DAILY BASIS. 6. STOCKPILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION FOR STOCKPILES ON SITE AS WELL AS FOR MATERIALS TRANSPORTED FROM THE PROJECT SITE. 7. THE CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST INCLUDING (BUT NOT LIMITED TO) USE OF WATER, MULCH, OR CHEMICAL DUST ADHESIVES AND CONTROL OF CONSTRUCTION SITE TRAFFIC. 8. EFFLUENT FROM DE -WATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT ADJACENT PROPERTIES, WETLANDS, WATERWAYS OR THE STORM DRAINAGE SYSTEM. 9. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY. 10. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED. 11. ANY SEDIMENT THAT HAS BEEN TRANSPORTED BEYOND THE PROJECT LIMITS SHALL BE REMOVED. RESPONSIBLE MAINTENANCE CONTACT: CHERYL MURRAY 252-466-5451. 12. ALL BORROW MATERIAL SHALL BE PROVIDED FROM AN APPROVED BORROW PIT. ALL SOIL WASTE SHALL BE TRANSPORTED OFF GOVERNMENT PROPERTY TO AN APPROVED LANDFILL. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. CONTRACTOR SHALL CONTACT NORTH CAROLINA DEPARTMENT OF THE ENVIRONMENT AND NATURAL RESOURCES (NCDENR) PRIOR TO CONSTRUCTION, 3. HOLD PRECONSTRUCTION CONFERENCE WITH PUBLIC WORKS OFFICER AT LEAST ONE WEEK PRIOR TO CONSTRUCTION. 4. FIELD MARK THE LIMITS OF DISTURBANCE AND INSTALL PERIMETER SEDIMENT FENCE, INLET PROTECTION, COMPOST SOCK AND ROCK PIPE INLET PROTECTION AS SHOWN ON CD101. 5. RELOCATE SWALE. INSTALL TEMPORARY CONSTRUCTION ENTRANCES AND DRAINAGE PIPES. 6. INSTALL ROCK PIPE INLET PROTECTION AS SHOWN ON CS101. 7. COMPLETE SITE CLEARING. DEMOLISH AND REMOVE ITEMS INDICATED ON THE PLAN. ROUGH GRADE SITE. 8. MINIMIZE THE AMOUNT OF EXPOSED AREAS DURING CONSTRUCTION. STABILIZE GRADED AND DISTURBED AREAS IMMEDIATELY AFTER GRADING. 9. COMPLETE GRAVEL INSTALLATION. 10. CONSTRUCT CONCRETE PADS. 11. CONSTRUCT BUILDING. 12. PERMANENT STABILIZATION SHALL BE PROVIDED IMMEDIATELY ON AREAS THAT HAVE BEEN FINAL GRADED. 13. TEMPORARY SEEDING AND MULCHING SHALL BE PROVIDED ON ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES NOT COVERED BY PAVEMENT OR SLABS. 14. TEMPORARY EROSION FEATURES SHALL BE INSPECTED PER THE EROSION AND SEDIMENT CONTROL NOTES. 15. REMOVE TEMPORARY EROSION CONTROL MEASURES AT THE END OF CONSTRUCTION PER THE EROSION AND SEDIMENT CONTROL NOTES. SITE NOTES: 1. THE BORING LOGS DEPICT PERCHED WATER AND A SEASONAL HIGH WATER TABLE OCCURRING IN THE SOIL AS NEAR AS 2 FEET BELOW THE GROUND SURFACE ON THE PROJECT SITE DUE TO THE RELATIVELY HIGH AMOUNT OF FINE-GRAINED MATERIAL AND/OR ORGANIC MATERIAL IN THE SOIL OR FROM LENSES OF CLAY AT SHALLOW DEPTHS. THE CONTRACTOR SHALL ANTICIPATE GROUNDWATER BEING TRAPPED IN THE SURFACE SOILS AS NEAR AS 2 FEET BELOW THE SURFACE AT THESE LOCA11ONS FOR EXTENDED PERIODS FOLLOWING RAINFALL, AND SHALL EMPLOY MEASURES AND EQUIPMENT TO PERMIT CONSTRUCTION TO PROCEED. MEASURES SHALL INCLUDE THE CONTROL OF SURFACE WATER AND WATER IN THE NEAR SURFACE SOILS BY PROVIDEING A DRAINAGE LAYER AND UNDERDRAINS AS INDICATED. EXCAVATE TO SUBGRADE ELEVATIONS AND INSTALL FILTER FABRIC, DRAINAGE LAYER, FILTER FABRIC AGGREGATE BASE AFTER STRIPING/ INITIAL DEMOLITION OPERATIONS. 2. SITE PREPARATION SHALL BE ACCOMPLISHED USING EQUIPMENT CAPABLE OF MANEUVERING OVER SOFT MATERIAL. a 9 ORTH ENGINEERS SU RVae}}YGRS NORFOLK, VIRGINIA mil/ • Ef IAA _ w 11/17/2016 SFAL APPROVED FOR COMMANDER NAVFAC ACTIVITY SATISFACTORY TO DATE DES CAB I DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH XX U z o Z O N Fn z u =0 W Z W > 0 cc F_ Z H z Nm OU F- WW h Z H w ZQ o �fr p W z Q O �- Z Z W W Q Z W o Er = Z O Z (� Z d �-j U) 0 ir Q >Z - W 0 a a = SCALE: PROJECT NO.: 022216-01 CONSTRUCTION CONTRACT NO.: DRAWING NO.: SHEET 10 OF C-501 I 0 2 3 4 ' 5 1 1 2 3 I 5 I C 0 9 8' MAX. WITH WIRE (6' MAX. OUT WIRE MIDDLE & VERTICAL WIRES SHALL BE 12 1/2 GAUGE MIN. TOP & BOTTOM STRAIN SHALL BE 10 GAUGE MIN. - WIRE - I �-J FILTER FABRIC FILTER FABRIC COMPACT FILL _I 11=1 I 1=1 I I.6T 4 i STEEL POST: 2'-0" DEPTH EXTENSION OF FABRIC & �- WIRE INTO TRENCH SECTION AT BASE NOTES: NOTES: 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS 2. LOCATE ENTRANCE(S) TO PROVIDE FOR UTILIZATION BY ALL CONSTRUCTION VEHICLES. 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOP -DRESSING WITH STONE WILL BE NECESSARY. 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF EGRESS & UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE & TIMELY MAINTENANCE. 6. NUMBER & LOCATION OF CONSTRUCTION ENTRANCES TO BE DETERMINED BY THE ENGINEER. 7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. 8. PLACE FILTER FABRIC BENEATH STONE 2"-3" COARSE AGGREGATE o z 6 IN. MIN. DEPTH 1. USE WIRE A MINIMUM OF 32" IN WIDTH & MAINTENANCE WITH A MINIMUM OF 6 LINE WIRES WITH 1. INSPECT SEDIMENT FENCE AT LEAST ONCE A WEEK AND AFTER EACH 12" STAY SPACING. RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. USE FILTER FABRIC A MINIMUM OF 36" IN 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE WIDTH & FASTEN ADEQUATELY TO THE WIRE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. AS DIRECTED BY THE ENGINEER. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. 3. PROVIDE 5'-0" STEEL POST OF THE SEDIMENT SHALL BE REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSMON SELF -FASTENER ANGLE STEEL TYPE. REACHES HALF WAY TO THE TOP OF THE BARRIER. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. ANGLE STEEL TYPE. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TEMPORARY SEDIMENT FENCE 1010' MIN EDGE OF EXISTING ROADWAY PAVEMENT MAINTENANCE 12' MIN 0 Ln 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. C2 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE (E & S CONTROL MEASURE CE ) NC 6.06 N.T.S. (E & S CONTROL MEASURE SF } NC 6.62 N.T.S. COMPOST SOCK 8 TO CONSTRUCTION SPECIFICATIONS 12 INCH DIAMETER 3" AREA TO BE 1. MATERIALS USED IN THE COMPOST SOCK MUST MEET THE SPECIFICATIONS OUTLINED AND IN PRACTICE 6.66, COMPOST BLANKETS. -�- PROTECTED 2. COMPOST SOCKS SHOULD BE LOCATED AS SHOWN ON THE EROSION AND SEDIMENTATION CONTROL PLAN. 12" MIN. 2" X 2" 3. PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS INCLUDING ROCKS, CLODS, AND OTHER DEBRIS GREATER THAN ONE INCH THAT MAY STAKES INTERFERE WITH PROPER FUNCTION OF THE COMPOST SOCK. SECTION 4. COMPOST SOCKS SHOULD BE INSTALLED PARALLEL TO THE TOE OF A GRADED SLOPE, A MINIMUM OF 10 FEET BEYOND THE TOE OF MULCH OR COMPOST FOR UNTRENCHED SOCKS SHEET FLOW WORK AREA H I y \WOK, THE SLOPE. SOCKS LOCATED BELOW FLAT AREAS SHOULD BE LOCATED AT THE EDGE OF THE LAND -DISTURBANCE. THE ENDS OF THE SOCKS SHOULD BE TURNED SLIGHTLY UP SLOPE TO PREVENT RUNOFF FROM GOING AROUND THE END OF THE SOCKS. 5. FILL SOCK NETTING UNIFORMLY WITH COMPOST TO THE DESIRED LENGTH SUCH THAT LOGS DO NOT DEFORM. AREA TO BE 6. OAK OR OTHER DURABLE HARDWOOD STAKES 2" X 2" IN CROSS SECTION SHOULD BE DRIVEN VERTICALLY PLUMB, THROUGH THE PROTECTED CENTER OF THE COMPOST SOCK. STAKES SHOULD BE PLACED AT A MAXIMUM INTERVAL OF 4 FEET, OR A MAXIMUM INTERVAL OF 8 FEET IF THE SOCK IS PLACED IN A 4 INCH TRENCH. SEE FIGURE 6.66B. THE STAKES SHOULD BE DRIVEN TO A MINIMUM DEPTH OF COMPOST 12 INCHES, WITH A MINIMUM OF 3 INCHES PROTRUDING ABOVE THE COMPOST SOCK. SOCK 7. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON PAVEMENT) HEAVY CONCRETE BLOCKS SHALL BE USED BEHIND THE SOCK TO HOLD IT IN PLACE DURING RUNOFF EVENTS. 8. IF THE COMPOST SOCK IS TO BE LEFT AS PART OF THE NATURAL LANDSCAPE, IT MAY BE SEEDED AT TIME OF INSTALLATION FOR ESTABLISHMENT OF PERMANENT VEGETATION USING THE SEEDING SPECIFICATION IN THE EROSION AND SEDIMENTATION CONTROL PLAN. 9. COMPOST SOCKS ARE NOT TO BE USED IN PERENNIAL OR INTERMITTENT STREAMS. PLAN MAINTENANCE WOOD MULCH OR COMPOST TO 1/2 HEIGHT OF LOG ISOMETRIC SC?SCONTROL MPOST SOCK Al E & MEASURE CS ) NC 6.66 N.T.S. 1 INSPECT COMPOST SOCKS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1/2 INCH OR GREATER). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE COMPOST SOCK MUST BE REPLACED IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE SOCK NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE COMPOST SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. DISPOSAL/RECYCLING COMPOST MEDIA IS A COMPOSTED ORGANIC PRODUCT RECYCLED AND MANUFACTURED FROM LOCALLY GENERATED ORGANIC, NATURAL, AND BIOLOGICALLY BASED MATERIALS. ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEEN COMPLETED, THE COMPOST MEDIA MAY BE DISPERSED WITH A LOADER, RAKE, BULLDOZER OR SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR LEFT ON THE SOIL SURFACE TO AID IN PERMANENT SEEDING OR LANDSCAPING. THE MESH NETTING MATERIAL WILL BE EXTRACTED FROM THE MEDIA AND DISPOSED OF PROPERLY. THE PHOTODEGRADABLE MESH NETTING MATERIAL WILL DEGRADE IN 2 TO 5 YEARS IF LEFT ON SITE. BIODEGRADABLE MESH NETTING MATERIAL IS AVAILABLE AND DOES NOT NEED TO BE EXTRACTED AND DISPOSED OF, AS IT WILL COMPLETELY DECOMPOSE IN APPROXIMATELY 6 TO 12 MONTHS. 2 1 3 NCDOT #57 Wj STONE 4' MAX 19-GUAGE HARDWARE CLOTH NCDOT #5 OR #57 WASHED STONE - 000000mo 000000000 I CONSTRUCTION SPECIFICATIONS 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE A CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER. MAINTENANCE INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT. ENSURE THE PROTECTIVE SDEVICES ARE SECURED IN THEIR INTENDED LOCATION. CLEAR THE WIRE MESH AND AREAS OF WATER FLOW OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE TO NOT DAMAGE OR NOT UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. B4 INLET PROTECTION (E & S CONTROL MEASURE IP ) NC 6.51 N.T.S. llI j O.JJ MAINTENANCE a rd BAVI=CIRTH E N® I N E E R S SURVEYORS NORFOLK. VIRGINIA a v�. -AIM 11/17/2016 SEA APPROVED FOR COMMANDER NAVFAC ACTIVITY INSPECT ROCK PIPE INLET PROTECTION SATISFACTORY TO DATE AT LEAST WEEKLY AND AFTER DES CAD DRW CAD CHK REG SIGNIFICANT (1/2 INCH OR GREATER) PM/DM RAINFALL EVENT AND REPAIR BRANCH MANAGER IMMEDIATELY. REMOVE SEDIMENT AND CHIEF ENG/ARCH RESTORE THE SEDIMENT STORAGE xx 191 leL. AREA TO ITS ORIGINAL DIMENSIONS B WHEN THE SEDIMENT HAS z d Z ACCUMULATED TO ONE-HALF THE J DESIGN DEPTH OF THE TRAP. PLACE O THE SEDIMENT THAT IS REMOVED IN Fn ;51 THE DESIGNATED DISPOSAL AREA AND = Q REPLACE THE CONTAMINATED PART OF z 0 THE GRAVEL FACING. W -J CHECK THE STRUCTURE FOR DAMAGE. 0 ANY RIPRAP DISPLACED FROM THE c Z Z STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. z co AFTER ALL THE SEDIMENT- PRODUCUNG F AREAS HAVE BEEN PERMANENTLY W W Z STABILIZED, REMOVE THE STRUCTURE w W AND ALL THE UNSTABLE SEDIMENT. w Z Z SMOOTH THE AREA TO BLEND WITH w THE ADJOINING AREAS AND PROVIDE o PERMANENT GROUND COVER (SURFACE z Q STABILIZATION). 5 !- p 5 IL cnw Z W Z Q Ee ¢ Z Z o= z � A w WU) O a ccZ Q- w W o = SCALE: PROJECT NO.: =1"l I CONSTRUCTION CONTRACT NO.: DRAWING NO.: SHEET 11 OF 28 1 C-502 IIJ C Is 0 0-0 12" (TYP.' PIPE DIA. MAXIMUM "D" "A" 6" TO 15" 8" 16" TO 21" 10" 24" TO 30" 12" MAXIMUM TRENCH WIDTH "W" TAKEN AT TOP OF PIPE NOTES: 1. PROVIDE BEDDING MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS. 2. COMMON FILL, EXCEPT STRUCTURAL FILL TO BOTTOM OF PAVEMENT SECTION OR STRUCTURES, SPREAD FOOTINGS AND CONCRETE SLABS. 3. 12" THICK BEDDING MATERIAL ENVELOPED IN GEOTEXTILE. OVERLAY GEOTEXTILE FABRIC AT TOP AND ENDS, 36" MINIMUM. 4. PLACE TAPE 12" BELOW FINISHED GRADE IN UNPAVED AREAS & 6" BELOW TOP OF SUBGRADE IN PAVED AREAS. SEE NOTE 4 IDENTIFICATION TAPE - FINAL BACKFlLL- W SEE NOTE 2 A O.D. A DETECTION WIRE -INITIAL BACKFlLL 6" - 12" �� COVER SEE NOTE 3 C� PIPE TRENCH DETAILS N.T.S. GEOTEXTILE ENVELOPING #57 STONE AT WEEP HOLE 0 PLAN L 45 3/4" CHAMFER THICKENED EDGE EXPANSION JOINT ADJACENT TO t0" ADJACENT TO CONCRETE SLABS. SAND OR SOIL (SEE DETAIL C-504/ 134) 4000 PSI a � CONCRETE da #409" ASTM C33 SAND NOTE: EXTEND BASE COURSE, UNDER DRAINAGE LAYER AND GEOTEXTILE 12" BEYOND PAVED SURFACE AND TO UNDERDRAIN ADJACENT TO PAVEMENT. 18" 0 00 ° ° ° ° ° 0 0 0 0 0 ° O° "I°°°00 0 0 0 00 0 X °° °o ° °o ° o°° ° .°°° °o ° °o ° o BACKFlLL/FILL MATERIAL 8" BASE COURSE WHEN ADJACENT TO PAVEMENT. ASTM C-33 WASHED #57 STONE r' 6" PERFORATED UNDERDRAIN PIPE (ASTM D d 3034 SDR35) W/ HOLES TOWARD BOTTOM. 12" BEDDING FILTER #4 0 9" CONTINOUS l PROVIDE GEOTEXTILE SLEEVE FULL LENGTH TMATERIAL FABRIC 16" 16" OF PIPE. INVERT VARIES, SEE PLAN. � L" 4 - WRAP JOINTS W/ Q a FILTER FABRIC 3' ;�T�����j���� a UNDERDRAIN DETAIL WIDE SECURED 12" a d N W/STAINLESS STEEL 3" CLR. BANDS. a ° ° ° ° ° ° ° ° ° 0 °° 18 ° 0° ° 0 O 0 0 0 ° ° #o 0 9" ° 00 0 0 00 0 o 00 0 0 0 o ° o ° a ° o ° ° ° ° o ° ° ° ° 7' 12" APPROVED SUBGRADE 8" MIN #57 STONE SAND PIT CONTAINMENT WALL (C-3-)_ u T c NOTES: 1. CONCRETE TO BE 4000 PSI MINIMUM COMPRESSIVE STRENGTH. 2. IF PIPE IS SKEWED THE OPENING WILL BE ADJUSTED TO GEOTEXTILE ENVELOPING #57 STONE AT ACCOMMODATE ANGLES OF 37'30' WEEP HOLE 2" WEEP HOLES - TO 45'. PVC PIPE WITH SEE NOTE 10 (TYP.) 18"X18"X18" 3. REINFORCING STEEL IN GEOTEXTILE ACCORDANCE WITH ASTM A-615 ENVELOPING #57 (REINFORCING BARS). STONE BEHIND HEADWALL. 4. PIPE OPENING IN PRECAST DRAINAGE UNITS SHALL NOT ° o° EXCEED 4 INCHES AT ANY GIVEN °°o 6 " #4 BARS ®12 " C-C 8" Q� 5�0 POINT BETWEEN THE PIPE AND EACH WAY, EACH FACE THE PRECAST UNIT. 5. DIMENSIONS SHOWN ARE MINIMUM. SEE DETAIL A ACTUAL MEASUREMENTS MAY VARY H FLOW WITH MANUFACTURER'S SEE DETAIL B I WELD TOLERANCE. 8" 6. IN NO CASE SHALL TOP OF C-503 T- 2'-4" #4 BARS ®6" C-C ENDWALL PROJECT ABOVE FILL EACH WAY, EACH FACE SLOPE,DITCH SLOPE, OR SECTION 8" MIN BEDDING SHOULDER. r2 MATERIAL G S 45 G FRONT ELEVATION SEE NOTE 10 (TYP.) 7. HEADWALL TO BE BEVELED IN ALL SHAPE TO BE AREAS EXCEPT WHERE A CONFLICT r�— BEVELED WITH A : WITH INVERTS OR WINGWALL 8" - ORTAR a: OCCUR. �- DO NOT I 8. BEVEL EDGE IS REQUIRED ON THE a I-- BEVEL ° a_ HEADWALL AT THE INLET END OF <� INVERT THE CULVERT (WHERE THE FLOW T DETAIL A DETAIL B ENTERS THE CULVERT). HEADWALL miniiiii AT OUTLET END MAY BE EITHER SQUARE EDGE OR BEVELED. 1, FOR CIRCULAR FRONT ELEVATION SEE NOTE 10 (TYP.) 7. HEADWALL TO BE BEVELED IN ALL SHAPE TO BE AREAS EXCEPT WHERE A CONFLICT r�— BEVELED WITH A : WITH INVERTS OR WINGWALL 8" - ORTAR a: OCCUR. �- DO NOT I 8. BEVEL EDGE IS REQUIRED ON THE a I-- BEVEL ° a_ HEADWALL AT THE INLET END OF <� INVERT THE CULVERT (WHERE THE FLOW T DETAIL A DETAIL B ENTERS THE CULVERT). HEADWALL miniiiii AT OUTLET END MAY BE EITHER SQUARE EDGE OR BEVELED. 1, FOR CIRCULAR CONCRETE PIPE FOR MULTIPLE PIPE ENDWALL 0 H L 45 1 S I S 45 1 G I a b 15" 12'-3" 8'-2 1/8" 2'-3" 3'-2 1/8" 2'-6" 0'-1 3/4" 0'-1 3/4" 9. 3/4 CHAMFER MAY BE PROVIDED ON ALL EDGES AT MANUFACTURER'S OPTION. 10. COVER WEEP HOLES WITH 316 STAINLESS STEEL (12 GAUGE WIRE MIN) 8" SQUARE WIRE MESH (1" MAX OPENING) SCREEN, BOLTED PRECAST ENDWALL FOR MULTIPLE PIPE CULVERTS TO HEADWALL WITH STAINLESS Al 12fr_ - 36 CIRCULAR PIPES FOR 45' SKEW STEEL BOLTS &WASHERS. N.T.S. o Z 4v F- �4 z as H 0 z � S D 6 rr I.L J 0. ,,,,H Z o n C.)rn 2`-6" 2r _6rr 2x2 TO 4x4 GALV. HARDWARE w c I m , f RAFT CLOTH .063 WIRE OR EQUAL mcnoo i=oz ;� I U) it 6" OUTLET PIPE PIPE cn�L0_j 0 co i I.D. Cn n, r - - - - - N j d z r o , W Z io 6" OUTLET PIPE RODENT SCREEN ., INSTALL RODENT SCREEN L4" 4" TO 6" INTO DRAIN PIPE DRAFT PLAN VIEW TOP VIEW PARTIAL DETAIL OF m CD RODENT SCREEN u- 0 ~ � J r-Cl= z M Z cn f 14 " $!''y p - DRAFT .s���ra ��0 � " d DRAFT C41 Fe y DRAFT DRAFT C3 W �+ `� 2'4 " 5P Zm� , err z�93 H '1Q r iv Q a: .w r , " �, 6" OUTLET PIPE r j Z w O r M 'a Err OUTLET PIPE N V O r _ _ 0 a RODENT SCREEN 2%" I $" L Z CD O N Lu 0 Z END ELEVATI LL 16.01 ELEVATION VIEW QN_VIEW THE CONCRETE PAD CONSISTS OF 0.137 CUBIC YARDS OF CLASS "B" CONCRETE. A4 CONCRETE PADS N.T.S. a g a E dNAF RTH SURVEYORS NORFOLK, VIRGINIA Lv Zo 302 11 17 2016 sm APPROVED FOR COMMANDER NAVFAC ACTIVITY SATISFACTORY TO DATE DES CAB DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH XX U z ci Z O u-cj) z = 0 > V U z m ww J z ZZ w LL OQ o o R � z z COW w ir a= z= o p Z a. H Lu Q >Z W ec o = SCALE: PROJECT NO.: CONSTRUCTION CONTRACT NO.: DRAWING NO.: SHEET 12 OF m C-503 I Is 0 1 1 2 3 il 5 2 3 4 I 5 8" MIN. CONCRETE 6 X 6 - W2.9 X W 2.9 WWF (PCC) NOTE: H/4 +1" a —�. EXTEND BASE COURSE, UNDER 12" GRAVEL SURFACE GRAVEL PAVEMENT SIDELINE H DRAINAGE LAYER AND GEOTEXTILE 12" MATERIAL - NCDOT SIZE (BI C 0 FILTER FABRIC Z- APPROVED FILTER SUBGRADE FABRIC CONCRETE PAVEMENT SECTION FILTER FABRIC N.T.S. ° o ° ° 0 0 ° o ° o ° ° ° ° ° ° ° C) ° O ° 0 O ° - 2" MIN. BITUMINOUS CONCRETE SURFACE COURSE TACK COAT C3N BITUMINOUS TE BASE COURSE AGGREGATE OURSE a a xBEYOND PAVED SURFACE AND TO X NO. ABC STONE ° ° ^ UNDERDRAIN ADJACENT TO PAVEMENT. 0° ° O oo o °° ° o ° O ° o a - — S/\E\E\/p/PLANN ° o ° ° ° ° " O ° °o ° o ° O ° o.° o ° o ° op X 9BASE COURSE o ° °°° O c u 0 OO °° °° °"X° X% -- 12" MIN. ASTM C-33 ' WASHED #57 STONE 12" MIN. ASTM C-33 DRAINAGE LAYER. WASHED #57 STONE III DRAINAGE LAYER. FILTER X12" FABRIC APPROVED SUBGRADE D2 GRAVEL PAVEMENT N.T.S. 12" MIN. ASTM C-33 NOTE: 57 STONE EXTEND BASE COURSE, WASHED # UNDER DRAINAGE LAYER DRAINAGE LAYER. AND GEOTEXTILE 12" BEYOND PAVED SURFACE AND TO �FT.v✓ED SUBGRADE UNDERDRAIN ADJACENT BITUMINOUS PAVEMENT SECTION TO PAVEMENT. TIE TO EXISTING OR NEW GRADE AS INDICATED VARIES N.T.S. NO. 4 BAR ALL SIDES. 6" REMOVABLE THREADED PLUG FLUSH W/ FINAL GRADE 24" SQ. X 4" THICK CONC. SLAB (IF NOT IN PAVEMENT) 6" CAST IRON SOIL PIPE VARIES GRADE POINT SLAKH SWALE N.T.S. SILICONE 1 2" JOINT SEALANT 1/4"t1/16" 1/4" d K /�1 13/4" + 1/2"0 BA CKER SECOND SAWCUT FIRST SAWCUT (AT CONTRACTION JOINT ONLY) ---�-�_ 1 /8" B2 SAWED JOINT DETAIL N.T.S. FINISHED GRADE PCC PAVEMENT 1 /4"R PCC NEAREST JOINT A2 THICKENED EDGE E N.T.S. BREAK WWF 6" BEFORE SEE B2 JOINT, IF PRESENT H/4 + in WWF H/42 4 —X°a— X—n^X —X — X� —X- NEW OR EXISTING PCC $ NEW PCC ° a d v d ° d BOND BREAKER (ASPHALT EMULSION) SMOOTH DOWEL 3/4 16" LONG. 12" O.C. PAINT AND NOTE: AT EXISTING PCC, DRILL AND GROUT DOWEL LIGHTLY OIL FREE END OF AT MID -DEPTH OF EXISTING PCC. AT NEW DOWEL PCC, PLACE DOWEL MID -DEPTH OF NEW PCC. DOWELED CONSTRUCTION JOINT (DKJ VJ) N.T.S. 8" MIN. AGGREGATE BASE COURSE _ GRAVEL OR BITUMINOUS CONCRETE ROAD 12" MIN. ASTMC-313 WASHED #57 STONE DRAINAGE LAYER. ADJACENT PCC PAVEMENT OR r SEE A3 NEAREST JOINT STRUCTURE / THICKEN ADJACENT TO PCC PCC TO NEAREST JOINT DTHICKENED EDGE EXPANSION JOINT i N.T.S. 1/2" UNLESS NOTED OTHERWISE 1 /4"f 1 / 16" d ' 1 /4" R NEW OR NEW OR EXIST. PCC = EXIST. PCC ° 1/4" N SILICONE SEALANT PREFORMED BOND BREAKER DIAMETER JOINT MATERIAL GREATER THAN JOINT WIDTH. EXPANSION JOINT DETAIL (EJ) A3 N.T.S. 2' °. ° ' H/2 d °n d d ° d SEE B2 d .d d . ° a m d e u SMOOTH DOWEL 3/4", 16" LONG. 12" O.C. PAINT AND LIGHTLY OIL FREE END OF DOWEL. PLACE DOWEL MID -DEPTH OF NEW PCC. DO NOT PLACE DOWEL CLOSER THAN 16" TO AN INTERSECTING JOINT. D4 DDOWELLED CONTRACTION JOINT DETAIL (DCJ) N.T.S. 10" MIN. CONCRETE (PCC) CENTERLINE OF SWALE < X °�.,, -� i a d FILTER FABRIC TEJ 6 X 6 - W2.9 H/4 +1" X W 2.9 WWF a, X � d .. 8 C5 CONCRETE ENTRANCE N.T.S. APPROVED SUBGRADE E ENGINEERS SURVEYORS NORFOLK, VIRGINIA 11/17/2016 SA APPROVED FOR COMMANDER NAVFAC ACTIVTfY SATISFACTORY TO DATE DES CAB DRW CAD CHK REG PM/DM BRANCH MANAGER CHIEF ENG/ARCH xx V z In Z Ir O (1) ILL �cl) z = LJJ � U Z C3 m J w W W F- H OQ 0 o F cr_ z CL z z> L_ W LU = z = 0 z 5 X Lu y a > Z o I = SCALE: PROJECT NO.: =16-01 CONSTRUCTION CONTRACT NO.: DRAWING NO.: SHEET 13 OF m C-504 C 0 2 NJ 4 ' 5