Loading...
HomeMy WebLinkAboutSW7080711_HISTORICAL FILE_20210629STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE /&47& 11�20 YYYYMMDD ROY COOPER Govemor JOHN NICHOLSON Interim Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 29. 2021 City of Elizabeth City Attention: Montre' Freeman, City Manager P.O. Box 347 Elizabeth City, NC 27907-0347 Subject: Stormwater Permit Renewal Stormwater Management Permit SV 7080711 Elizabeth City-Pasquotank Aviation Research & Development Commerce Park, Ph 1 Pasquotank County Dear Mr. Freeman: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7080711 for a stormwater treatment system consisting of four wet detention ponds serving the Elizabeth City-Pasquotank Aviation Research & Development Commerce Park, Ph 1 located at 1049 Consolidated Road, Elizabeth City, NC expires on December 30, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: https://deq.nc.gov/abouUdivisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roger.thorpe cnncdenr.gov. Sincerely, 4�✓//� x—� � Ro er K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality i Division of Energy. Mineral and Land Resources Washington Regional Office 1 943 Washington Square Nall 1 Washington North Carolina 27889 252.946.6481 4� i rr _ •- .7-.. � .. 3_ ..... .:�-�y—ira,-�.�.�s-o-aw �a���+esc..-y+-.�as�— — —vu.Z a -. � _^ _. .5 'Y � .� 1 I' STORMWATER/DRAINAGE NARRATIVE JUL .I 3 2008 Elizabeth City — Pasquotank Aviation Research And Development Commerce Park r - - Elizabeth City - North Carolina -:,. il r 2-- . pr4; Mg-, rev. July 16; 2008 A The Elizabeth City Aviation Center is located on SR 1131 (Consolidated Road) across from the US Coast Guard Base and the Elizabeth City-Pasquotank County Airport. The Center will be constructed on 63.66 acres that are zoned O & I (office and institutional) and 1-1 (industrial) and a portion of the required improvements will be constructed within the NCDOT right-of-way and on the Coast Guard Base. The site will be served by public water and sanitary sewer. Construction of the Center will include water and sewer installation, roadway construction with related drainage, a taxiway which will cross Consolidated Road and connect to an existing taxiway "Gulf' on the Coast Guard property, four detention ponds, and widening of Consolidated Road. The drainage for the Aviation Center consists of several elements. First is the re-routing of the existing road side ditch along Consolidated Road. It is necessary to re-route this drainage to provide storm water treatment to the existing DRS site and to provide an adequate outlet for the Aviation Center. It should be noted that the re-routing of the ditch does not involve filling of the existing drainage ways. Only diversions will be placed within the in the existing ditch. The upstream diversion will be created by plugging a culvert and constructing a headwall wing across the end of the pipe to route all upstream stormwater into the diversion ditch. The other diversion will also be the wing of a headwall, but it will act as a weir. The weir will allow the runoff from the 1" storm from Drainage Area 4 to be directed to Detention Pond D. The weir is designed to be topped when the design storm exceeds I". The 1" storage elevation is 3.75 and the elevation of the top of the weir is to be 4.50. All runoff from Drainage Area 4 is directed to Detention Pond D. Drainage Area 4 contains the existing DRS site as well as the new parking lot that is adjacent to Detention Pond D. Drainage Area 4 also incorporates existing runoff from Taxiway "Gulf' as shown on the attached map in red, and the runoff from 23,334 sf of the new taxiway way as shown in orange. We are picking up the runoff from 39,164 sf of Taxiway Gulf (red) as a trade off for the storm water runoff from 39,150 sf of the new taxiway that we are unable to treat due to constraints placed on this project by the US Coast Guard (area shown in blue). Runoff from another 45,067 sf of Taxiway Gulf will also be treated because it currently drains onto the DRS site. All runoff from Drainage Area I will be directed to Detention Pond A. Runoff from Lot 1 will be required to be collected on the lot and routed to the pond forebay through underground piping. Runoff from Lot 3 and a portion of Lot 2 will be routed to the pond through the open ditch adjacent to the taxiway and the piped drainage system located along Aviation Center Parkway. A portion of the proposed taxiway will also drain into the pond through the open ditch. Although no piping has been shown in the ditch, multiple aprons will be constructed for access to the taxiway. Each of these aprons will require a culvert in excess of normal driveway culvert length. Impervious area within Drainage Area I will include 64,380 sf of roadway, 29,480 sf of taxiway, up to 18,000 sf of apron for access from the taxiway to the lots, and a maximum on each lot as follows: Lot 1 = 198,899 sf, Lot 2 = 397,890 sf, and Lot 3 = 157,210 sf. (Note: for estimating the breakdown between buildings and parking on the application, it has been assumed that buildings will constitute 30% of the maximum impervious area.) Drainage Area 2 contains the remainder of lot 2, a portion of Aviation Center Parkway and a portion of the proposed taxiway. All of the runoff from this area will be directed to Detention Pond B. It is expected that most of the runoff from the lot will be directed into the piped drainage system along the road. Any runoff from the lot not directed to the roadway system will drain to the ditch adjacent to the taxiway. As in Drainage Area 1, this ditch is expected to contain multiple long culverts in the future. Impervious area within Drainage Area 2 will include 49,250 sf of roadway, 64,900 sf of taxiway, up to 18,000 sf of apron for access from the taxiway to the lots, and a maximum on Lot I of 400,965 sf. All runoff from Drainage Area 3 will be directed to Pond C. The only impervious area within this drainage basin will be one-half of the proposed taxiway. Runoff will sheet flow from the center of the taxiway to the open ditch with 3:1 side slopes. Each of the four ponds has been designed for 90% TSS removal. Ponds A and D store more than the required I" runoff. This is being done to address the pre -post runoff issues. However, each drawdown orifice has been designed to release no more than the required storage in a minimum of two days. The seasonal water table for this project area is estimated to be approximately 2.0-2.5 and is reflected as the design value for the permanent pool of the detention ponds. This is approximately 1-1.5 ft above the invert of the existing drainage along Consolidated Road. This elevation is based upon our observation of the standing water level in the Consolidated Road ditches as well as observations of other adjacent detention ponds nearby (DRS). We have included in our application, a copy of the soils investigation performed by S&ME last June -July. Their report states the result of drilling 15 bore locations with a 24 hour observation period to yield a water table at 4.5' to 8' below existing grade. Only B-1 and B-2 resulted in water table 8' below surface, B-3 through 13-15 range from 4.5' to 6.5' in areas where the existing grade ranges from about 6 to 7 for a water table estimate of 1.0 to 1.5. We feel this is low based upon time of the year and the lack of rainfall during those months last year. Disturbed area for the project will not exceed 75 acres. We anticipate the project to be built under two separate construction contracts. We will likely have a taxiway contractor working at the same time another contractor completes the new roadway and utilities. Due the large amount of excavation required for the drainage and storm water treatment portion of this project, we anticipate that much of the project will be disturbed at the same time. Construction sequencing requires that the diversion ditch be constructed and stabilized prior to construction of any of the detention ponds. The contractor will be encouraged during pre -construction meetings to re -seed as soon as practicable. To help with the possible sediment runoff, we are showing temporary stockpile locations throughout the site. Based upon this we are requesting that the project not be limited to a minimum disturbed acreage. !csao II � t �•v wil- �j�-ci. :i-� � �F•.5 F'..J_ FJ a —. ;`-t; '\ M n aa' c �ii ❑ III I �'n "-ir� t* v — o � _• u y��l � II ♦ .1'„ � � ` h ICI, i iil \ .III I ■: 1,N I � ® . ����� .�/' ✓.l �:. - _ = - _- =- 0 PERMANENT POOL DETENTION PONDS Hyman & Robey, PC Page I DESIGN OF POND r: ` "; J 150-A Hwy 158 East ,' Camden, NC 27921 Avialion Ccntcr - Pond A JUL 18 2008 12521-335-1888 10 Yr, 24 Hr Storm 04/24/08 DETENTION POND SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA : 29 89 ACRES WATERSHED % IMPERVIOUS: 0 % PERMANENT POOL ELEVATION: 1.5 FT DESIGN PERMANENT POOL DEPTH: 3 5 FT SA/DA PERCENTAGE FACTOR: (,/ % IFROMABOVETABLE - TAKENFROMDESIGNOFSTORMWATER CONTROL FACILITIES WORKSHOP MANUAL -PENC 19SH) POND SURFACE AREA REQ'D: 87235 SF FOREBAY AREA: 26170 SF AT WIDTH = 0.33 LENGTH, WIDTH = 170.523 LF (BASED UPON MINIMUM SURFACE AREA) LENGTH = 511.57 LF Use these dimensions: WIDTH 46 82 LF LENGTH 2160 LF VOLUME OF l" RAINFALL AREA OF ROOFS: 5,19 AC AREA OF PARKING/CONCRETE: 14.a9 AC AREA OF GREEN AREAS: 10.01 AC VOLUME OF RUNOFF 76765.4 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF 1" RAINFALL = 3.19 Normal Pool Elevation 2.5 VOL (CF)=[( ROOF" 1.0)+(PARK ING'.95)+(GRASS ^0.2)1.43,560/12 0.69 FT DRAWDOWN - WATER QUALITY r Q(2 DAYS) = 0.44424 CFS Q(5 DAYS) = 0.1777 CFS Page 2 1" RUNOFF STAGE 0.91 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 4.18983 INCH DIA HOLE man ua II% I1put duc nunr stni;igc than iapmcd A=[Q/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: # INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 3.13476 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 71 cfs Tc = Time of Concentration = a I min Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (IA0.8*(S+l )A0.7)/(1900*YA0.5) for Lin Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (1000/CN)-10 = 0.86957 L= 0.67952 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D=0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D= 0.09088 hrs Tp = 0.72496 hrs = 43.4977 min Volume under Hydrograph = 1.39 * Qp * Tp = 261195 Cubic Feet 0.86957 97 0.29 Inflow Hydrograph Page SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.07 2 564 0.20 0.10 0.14 7 1879 0.30 0.19 0.22 14 3570 0.40 0.31 0.29 22 5825 0.50 0.47 0.36 34 8832 0.60 0.66 0.43 48 12402 0.70 0.82 0.51 59 15409 0.80 0.93 0.58 67 17476 0.90 0.99 0.65 71 18603 1.00 1.00 0.72 72 18791 1.10 0.99 0.80 71 18603 1.20 0.93 0.87 67 17476 1.30 0.86 0.94 62 16160 1.40 0.78 1.01 56 14657 1.50 0.68 1.09 49 12778 1.60 0.56 1.16 40 10523 1.70 0.46 1.23 33 8644 1.80 0.39 1.30 28 7328 1.90 0.33 1.38 24 6201 2.00 0.28 1.45 20 5261 2.20 0.21 1.59 15 7779 2.40 0.15 1.74 11 5525 2.60 0.11 1.88 8 4021 2.80 0.08 2.03 6 2894 3.00 0.06 2.17 4 2067 3.20 0.04 2.32 3 1503 3.40 0.03 2.46 2 1090 3.60 0.02 2.61 2 789 3.80 0.02 2.75 1 564 4.00 0.01 2.90 1 413 4.50 0.01 3.26 0 470 5.00 0.00 3.62 0 0 Volume under hydrograph = 248097 cf Based upon runoff volume = 261 195 cf Depth req'd for minimum area = 2.36386 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 110495 0 0 0 Surface area at normal pool 2.5 117725 57055 57055 0.5 10.95 -0.69 0.56 3 124972 60674 117729 l 11.68 0.00 1.05 3.5 132238 64302 182032 1.5 12.11 0.41 1.53 4 139521 67940 249971 2 12.43 0.69 2.01 4.5 146823 71586 321557 2.5 12.68 0.92 2.50 5 154142 75241 396798 3 12.89 1.10 3.00 5.5 161479 78905 475704 3.5 13.07 1.25 3.51 6 168835 82579 558282 4 13.23 1.39 4.04 6.5 176208 86261 644543 4.5 13.38 1.50 4.57 7 183600 89952 734495 5 13.51 1.61 5.12 7.5 Regression Output: Constant 9.34346 Ks = S/Z^b = 111885.1 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) 4.86 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = ; Number of Holes Hld = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20 00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = N.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 20,00 Elev Invert Bartel (ft) Bartell Adjustment Factor Cdb = 0.60 Barrel orifice coeff 3 Page 4 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 3 41 Elev weir coeff (ft) Lw, = ?U Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.51 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.54 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.58 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.64 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.73 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.85 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.98 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.13 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.28 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.43 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 3.58 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.1 3.70 0.0 0.0 0.0 0.0 0.0 0.0 0.00 9.5 3.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.9 3.88 0.0 0.0 0.0 0.0 0.0 0.0 0.00 19.6 3.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 23.2 3.97 0.0 0.0 0.0 0.0 0.0 0.0 0.00 25.4 3.99 0.0 0.0 0.0 0.0 0.0 0.0 0.00 26.4 3.99 0.0 0.0 0.0 0.0 0.0 0.0 0.00 26.6 3.99 0.0 0.0 0.0 0.0 0.0 0.0 0.00 26.2 3.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 24.7 3.93 0.0 0.0 0.0 0.0 0.0 0.0 0.00 22.2 3.88 0.0 0.0 0.0 0.0 0.0 0.0 0.00 19.4 3.84 0.0 0.0 0.0 0.0 0.0 0.0 0.00 16.7 3.79 0.0 0.0 0.0 0.0 0.0 0.0 0.00 14.2 3.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 12.0 3.72 0.0 0.0 0.0 0.0 0.0 0.0 0.00 10.2 3.68 0.0 0.0 0.0 0.0 0.0 0.0 0.00 8.6 3.66 0.0 0.0 0.0 0.0 0.0 0.0 0.00 7.3 3.63 0.0 0.0 0.0 0.0 0.0 0.0 0.00 6.3 3.58 0.0 0.0 0.0 0.0 0.0 0.0 0.00 4.1 3.54 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.8 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Page ' Total Riser Riser Riser Darrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) CIS cfs cfs cfs cfs 0.000 0 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.072 2 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.145 7 563.73 2.51 0.00 0.00 0.00 0.00 0.00 0.00 0.217 14 2442.83 2.54 0.00 0.00 0.00 0.00 0.00 0.00 0.290 22 6013.12 2.58 0.00 0.00 0.00 0.00 0.00 0.00 0.362 34 11838.3 2.64 0.00 0.00 0.00 0.00 0.00 0.00 0.435 48 20670.1 2.73 0.00 0.00 0.00 0.00 0.00 0.00 0.507 59 33072.1 2.85 0.00 0.00 0.00 0.00 0.00 0.00 0.580 67 48480.8 2.98 0.00 0.00 0.00 0.00 0.00 0.00 0.652 71 65956.4 3.13 0.00 0.00 0.00 0.00 0.00 0.00 0.725 72 84559.5 3.28 0.00 0.00 0.00 0.00 0.00 0.00 0.797 71 103350 3.43 0.22 0.00 0.00 0.00 0.00 0.22 0.870 67 121897 3.58 4.10 0.00 0.00 0.00 0.00 4.10 0.942 62 138302 3.70 9.47 0.00 0.00 0.00 0.00 9.47 1.015 56 151992 3.80 14.87 0.00 0.00 0.00 0.00 14.87 1.087 49 162767 3.88 19.61 0.00 0.00 0.00 0.00 19.61 1.160 40 170427 3.94 23.21 0.00 0.00 0.00 0.00 23.21 1.232 33 174892 3.97 25.39 0.00 0.00 0.00 0.00 25.39 1.305 28 176911 3.99 26.39 0.00 0.00 0.00 0.00 26.39 1.377 24 177352 3.99 26.61 0.00 0.00 0.00 0.00 26.61 1.450 20 176608 3.99 26.24 0.00 0.00 0.00 0.00 26.24 1.595 15 173435 3.96 24.67 0.00 0.00 0.00 0.00 24.67 1.740 11 168337 3.93 22.21 0.00 0.00 0.00 0.00 22.21 1.885 8 162269 3.88 19.38 0.00 0.00 0.00 0.00 19.38 2.030 6 156172 3.84 16.66 0.00 0.00 0.00 0.00 16.66 2.175 4 150368 3.79 14.19 0.00 0.00 0.00 0.00 14.19 2.320 3 145026 3.75 12.03 0.00 0.00 0.00 0.00 12.03 2.465 2 140250 3.72 10.19 0.00 0.00 0.00 0.00 10.19 2.610 2 136022 3.68 8.64 0.00 0.00 0.00 0.00 8.64 2.755 1 132300 3.66 7.35 0.00 0.00 0.00 0.00 7.35 2.900 1 129029 3.63 6.26 0.00 0.00 0.00 0.00 6.26 3.262 0 121888 3.58 4.10 0.00 0.00 0.00 0.00 4.10 3.625 0 117007 3.54 2.80 0.00 0.00 0.00 0.00 2.80 3.99157 = maximum stage elevation 26.6105 = maximum discharge Page 7 Aviation Center - Pond A Pasquolank County 10 yr STORM 80 70 60 ■ 0 50 m 40 1. r ■ m. ti 30 20 10 0.000 1.000 2.000 3.000 4.000 Time (hrs) m INFLOW (cfs) OUTFLOW (cfs) POND VOLUME CALCULATIONS FOR SAHyman 8 Robey'071070528 - EC Aviation CthExce11070528 (A)POND VOLUME CALCULATIONS.xis POND CALCULATIONS AREA F2 PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE AREA AT TOP OF SHELF 110,507.73 90,974.06 19,533.67 70,441.20 29,923.25 18,798 b6 12,642.49 140.974.70 135.017.40 ELEVATIONS F PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF TOP OF SHELF ELEVATION OF 1" STORAGE 2.50 2.00 -3.00 2.00 -2 00 3.00 3.41 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME BELOW SHELF 250,911.13 FOREBAY VOLUME BELOW SHELF 62,882.70 TOTAL VOLUME BELOW SHELF 313,793.83 AVERAGE POND DEPTH 4.02 MAIN BASIN VOLUME 291,264.94 FOREBAY VOLUME 72,465.83 PERMANENT POOL VOLUME 363,730.77 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 19.92% VOLUME BELOW TOP OF SHELF 425,112.05 TEMP. STORAGE VOLUME (1" RUNOFF) 117,959.66 A I1 -JLAL •/ 1A5o0 — sFh'GINEEC•:� ��77I l l l l I I I 1111 1100 7/2/2008 10:19 AM PAGE 1 OF 1 PERMANENT POOL DETENTION PONDS DESIGN OF POND Aviation Center- Pond B 10 Yr, 24 HE Storm DETENTION POND F`"•.. ; '.; ; r . Hyman & Robey, PC ''150-A Hwy 158 East JUL 1 Camden, NC 27921 8 2008 (252)-335-1888 r-'1[�) r,,,,� 04/21/08 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER Page I % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 • 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 17.81 ACRES WATERSHED % IMPERVIOUS: 70 % PERMANENT POOL ELEVATION: 1. FT DESIGN PERMANENT POOL DEPTH: 5 FT SA/DAPERCENTAGE FACTOR: % (FROM ABOVE TABLE -TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP MANUAL-PENC 198S*iSEAL POND SURFACE AREA REQ'D: 38790 SF FOREBAY AREA: 11637 SF AT WIDTH = 0.33 LENGTH, WIDTH = 113.71 LF (BASED UPON MINIMUM SURFACE AREA)0 LENGTH = 341.131 LF 3 •'F;vGINEEF:•' Use these dimensions: WIDTH 125 LF C.IflpB"J LENGTH 393 "' LF VOLUME OF P RAINFALL Nonna[ Pool Elevation 2.5 AREA OF ROOFS: 276 AC AREA OF PARKING/CONCRETE: 9AS AC AREA OF GREEN AREAS: 5.57 AC VOLUME OF RUNOFF 46754.4 CF VOL(CF)=[(ROOF'1.0)+(PARKING'.95)+(GRASS'0.2)1'43,560/12 STORAGE DEPTH FOR MINIMUM AREA = 0.95 FT ELEVATION OF l" RAINFALL = 3.45 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.27057 CFS Q(5 DAYS) = 0.10823 CFS I" RUNOFF STAGE 0.95 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 3.23518 INCH DIA HOLE DIAMETER OF HOLE TO USE: 1 75 INCH DIAMETER 1" STORM RUNOFF DRAWDOWN TIME 2.1265 DAYS A=[Q/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 45 cfs Tc = Time of Concentration = 34 min Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 Lag Time (L) = (IA0.8*(S+1)A0.7)/(1900*YA0.5) for Lin Firs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (1000/CN)-10 = 0.86957 L= 0.55977 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp, =D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page I6-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.07537 hrs Tp = 0.59745 hrs = 35.8471 min Volume under Hydrograph = 1.39 * Qp * Tp = 134534 Cubic Feet 1 79() = 0.86957 — 92 = 0.14 Page 2 Inflow Hydrograph ' SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.06 I 290 0.20 0.10 0.12 5 968 0.30 0.19 0.18 9 1839 0.40 0.31 0.24 14 3000 0.50 0.47 0.30 21 4549 0.60 0.66 0.36 30 6388 0.70 0.82 0.42 37 7937 0.80 0.93 0.48 42 9001 0.90 0.99 0.54 45 9582 1.00 1.00 0.60 45 9679 1_10 0.99 0.66 45 9582 1.20 0.93 0.72 42 9001 1.30 0.86 0.78 39 8324 1.40 0.78 0.84 35 7549 1.50 0.68 0.90 31 6582 1.60 0.56 0.96 25 5420 1.70 0.46 1.02 21 4452 1.80 0.39 1.08 18 3775 1.90 0.33 1.14 15 3194 2.00 0.28 1.19 13 2710 2.20 0.21 1.31 9 4007 2.40 0.15 1.43 7 2846 2.60 0.11 1.55 5 2071 2.80 0.08 1.67 3 1491 3.00 0.06 1.79 2 1065 3.20 0.04 1.91 2 774 3.40 0.03 2.03 1 561 3.60 0.02 2.15 I 407 3.80 0.02 2.27 I 290 4.00 0.01 2.39 0 213 4.50 0.01 2.69 0 242 5.00 0.00 2.99 0 0 Volume under hydrograph = 127788 cf Based upon runoff volume = 134534 cf Depth req'd for minimum area = 2.73249 Page 3 STAGE STORAGE FUNCTION OF POND ' (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) _ Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s In Z Z est Elevation S Z sf cf cf It 49235 0 0 0 Surface area at normal pool 2.5 50801 25009 25009 0.5 10.13 -0.69 0.59 3 52384 25796 50805 1 10.84 0.00 1.08 3.5 53986 26593 77398 1.5 11.26 0.41 1.56 4 55606 27398 104796 2 11.56 0.69 2.03 4.5 57243 28212 133008 2.5 11.80 0.92 2.50 5 58899 29036 162043 3 12.00 1.10 2.97 5.5 60572 29868 191911 3.5 12.16 1.25 3.44 6 62264 30709 222620 4 12.31 1.39 3.91 6.5 63974 31559 254180 4.5 12.45 1.50 4.39 7 65701 32419 286599 5 12.57 1.61 4.87 7.5 Regression Output: Constant 9.34346 Ks = S/ZAb = 46279.75 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Or = 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) 5.23 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff HIn = 5 Number of Holes Hid = 2 Hole Dia. (in) EHI = 20A11 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 2000 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = I S Barrel Dia. (in) Einv = 950 Elev Invert Barrel (11) Barrell Adjustment Factor Cdb = 0.60 Barrel orifice coeff 93 Page 4 EMERGENCY WEIR Page Elevation Cw Ecr Lw Riser Hole (1) Riser Hole (2) 3 Weir coeff 3.45 Elev weir coeff (ft) 15 Weir Length (ft) Riser Hole Riser (3) (weir) 2.50 0.0 0.0 0.0 0.0 2.50 0.0 0.0 0.0 0.0 2.51 0.0 0.0 0.0 0.0 2.54 0.0 0.0 0.0 0.0 2.60 0.0 0.0 0.0 0.0 2.67 0.0 0.0 0.0 0.0 2.78 0.0 0.0 0.0 0.0 2.92 0.0 0.0 0.0 0.0 3.09 0.0 0.0 0.0 0.0 3.26 0.0 0.0 0.0 0.0 3.45 0.0 0.0 0.0 0.0 3.63 0.0 0.0 0.0 0.0 3.79 0.0 0.0 0.0 0.0 3.92 0.0 0.0 0.0 0.0 4.01 0.0 0.0 0.0 0.0 4.07 0.0 0.0 0.0 0.0 4.10 0.0 0.0 0.0 0.0 4.11 0.0 0.0 0.0 0.0 4.10 0.0 0.0 0.0 0.0 4.07 0.0 0.0 0.0 0.0 4.05 0.0 0.0 0.0 0.0 3.98 0.0 0.0 0.0 0.0 3.92 0.0 0.0 0.0 0.0 3.86 0.0 0.0 0.0 0.0 3.81 0.0 0.0 0.0 0.0 3.76 0.0 0.0 0.0 0.0 3.72 0.0 0.0 0.0 0.0 3.68 0.0 0.0 0.0 0.0 3.65 0.0 0.0 0.0 0.0 3.63 0.0 0.0 0.0 0.0 3.61 0.0 0.0 0.0 0.0 3.56 0.0 0.0 0.0 0.0 3.53 0.0 0.0 0.0 0.0 Riser Barrel Principal Emergcy (orifice) Spillway Weir 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 3.4 0.0 0.0 0.00 8.9 0.0 0.0 0.00 14.4 0.0 0.0 0.00 18.8 0.0 0.0 0.00 22.0 0.0 0.0 0.00 23.8 0.0 0.0 0.00 24.1 0.0 0.0 0.00 23.4 0.0 0.0 0.00 22.2 0.0 0.0 0.00 20.7 0.0 0.0 0.00 17.6 0.0 0.0 0.00 14.6 0.0 0.0 0.00 11.8 0.0 0.0 0.00 9.6 0.0 0.0 0.00 7.7 0.0 0.0 0.00 6.2 0.0 0.0 0.00 5.1 0.0 0.0 0.00 4.1 0.0 0.0 0.00 3.4 0.0 0.0 0.00 2.8 0.0 0.0 0.00 1.7 0.0 0.0 0.00 1.1 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Page Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.060 1 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.119 5 290.361 2.51 0.00 0.00 0.00 0.00 0.00 0.00 0.179 9 1258.23 2.54 0.00 0.00 0.00 0.00 0.00 0.00 0.239 14 3097.19 2.60 0.00 0.00 0.00 0.00 0.00 0.00 0.299 21 6097.58 2.67 0.00 0.00 0.00 0.00 0.00 0.00 0.358 30 10646.6 2.78 0.00 0.00 0.00 0.00 0.00 0.00 0.418 37 17034.5 2.92 0.00 0.00 0.00 0.00 0.00 0.00 0.478 42 24971.1 3.09 0.00 0.00 0.00 0.00 0.00 0.00 0.538 45 33972.3 3.26 0.00 0.00 0.00 0.00 0.00 0.00 0.597 45 43554.2 3.45 0.00 0.00 0.00 0.00 0.00 0.00 0.657 45 53232.9 3.63 3.41 0.00 0.00 0.00 0.00 3.41 0.717 42 62080.7 3.79 8.94 0.00 0.00 0.00 0.00 8.94 0.777 39 69159.8 3.92 14.37 0.00 0.00 0.00 0.00 14.37 0.836 35 74392.9 4.01 18.85 0.00 0.00 0.00 0.00 18.85 0.896 31 77888.5 4.07 22.03 0.00 0.00 0.00 0.00 22.03 0.956 25 79731.5 4.10 23.77 0.00 0.00 0.00 0.00 23.77 1.016 21 80039.6 4.11 24.06 0.00 0.00 0.00 0.00 24.06 1.075 18 79316.6 4.10 23.37 0.00 0.00 0.00 0.00 23.37 1.135 15 78064.1 4.07 22.20 0.00 0.00 0.00 0.00 22.20 1.195 13 76484.3 4.05 20.73 0.00 0.00 0.00 0.00 20.73 1.314 9 72985 3.98 17.61 0.00 0.00 0.00 0.00 17.61 1.434 7 69417.8 3.92 14.58 0.00 0.00 0.00 0.00 14.58 1.553 5 65990.9 3.86 11.84 0.00 0.00 0.00 0.00 11.84 1.673 3 62968.3 3.81 9.57 0.00 0.00 0.00 0.00 9.57 1.792 2 60340.5 3.76 7.73 0.00 0.00 0.00 0.00 7.73 1.912 2 58081.3 3.72 6.24 0.00 0.00 0.00 0.00 6.24 2.031 1 56171.1 3.68 5.06 0.00 0.00 0.00 0.00 5.06 2.151 t 54554.3 3.65 4.13 0.00 0.00 0.00 0.00 4.13 2.270 1 53184.2 3.63 3.39 0.00 0.00 0.00 0.00 3.39 2.390 0 52017.5 3.61 2.79 0.00 0.00 0.00 0.00 2.79 2.689 0 49546.1 3.56 1.66 0.00 0.00 0.00 0.00 1.66 2.987 0 47998.9 3.53 1.06 0.00 0.00 0.00 0.00 1.06 4.10878 = maximum stage elevation 24.0614 = maximum discharge Page 7 Aviation Center - Pond B Pasquotank County 10 yr STORM 50 45 old, 40 4 f G35 v 30 a a INFLOW (cfs) 25 ., 1 .' mad• { �i� � �� . OUTFLOW (cfs) 20 N 15 5 ® ,� ,ear. `.._►' ,i; 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 Time (hrs) POND VOLUME CALCULATIONS FOR S:IHyman & Robey'071070528 - EC Aviation CttiExce11070528 (B)POND VOLUME CALCULATIONS.xis POND CALCULATIONS AREA F2 PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE AREA AT TOP OF SHELF 49.234.90 34,575.86 14,659.04 31,665.18 17,773.53 12,964.90 7,533.67 1 05,306.68 1 54.05E 86 ELEVATIONS F PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF TOP OF SHELF ELEVATION OF 1" STORAGE 2-50 2.00 -5.00 2.00 -1.50 100 3.45 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME BELOW SHELF 173,035.49 FOREBAY VOLUME BELOW SHELF 35,872.50 TOTAL VOLUME BELOW SHELF 208,907.98 AVERAGE POND DEPTH 5.18 MAIN BASIN VOLUME 189,595.75 FOREBAY VOLUME 42,778.48 PERMANENT POOL VOLUME 232,374.23 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 18.41 % VOLUME BELOW TOP OF SHELF 258,197.67 TEMP. STORAGE VOLUME (1" RUNOFF) 50,430.69 4/23/2008 5:23 PM PAGE 1 OF 1 PERMANENT POOL DETENTION PONDS ; t " ' Hyman & Robey, PC Page I f DESIGN OF POND I50-A Hwy 158 East JUL 18 2008 Camden, NC 27921 Aviation Center - Pond C (taxiway (Irainage) (252)-335-1888 10 Yr, 24 Hr Stonn r , . "�, r r� �; 04/21 /08 DETENTION POND SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: (,17 ACRES WATERSHED % IMPERVIOUS: :2 % PERMANENT POOL ELEVATION: 2.; FT DESIGN PERMANENT POOL DEPTH: 4 FT SA/DA PERCENTAGE FACTOR: Boo (FROM ABOVE TABLE -TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP MANUAL- PENT 1988) POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 51.3826 LF LENGTH = 154.148 LF Use these dimensions: WIDTH LENGTH VOLUME OF 1" RAINFALL AREA OF ROOFS: 0 AC AREA OF PARKING/CONCRETE: 1 99 AC AREA OF GREEN AREAS: 4.2s AC VOLUME OF RUNOFF 9969.8 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF 1" RAINFALL = 3.40 7921 SF 2376 SF (BASED UPON MINIMUM SURFACE AREA) 60 14 LF IR5 LF Nonnal Pool Elevation 2.5 VOL (CF)=[(ROOF• 1.0)+(PARKING'.95)+(GRASS'0.2)1'43,560/12 0.90 FT DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.0577 CFS Q(5 DAYS) = 0.02308 CFS Page 2 1" RUNOFF STAGE 1.27 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 1.3892 INCH DIA HOLE Manually input due to mole than rcqun'ed sioiaee A=[Q/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 1 ; INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.45065 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 8 cfs Tc = Time of Concentration = 58 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn. 15.4 Lag Time (L) = (1A0.8*(S+1)A0.7)/(1900*YA0.5) for Lin Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S=(1000/CN)-10= 1.62791 L= 0.95728 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where: D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D=0.133 tc where: Te = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.12857 hrs Tp = 1.02156 hrs = 61.2936 min Volume under Hydrograph = 1.39 * Qp * Tp = 40895.1 Cubic Feet 1.62791 86 0.27 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.10 0 88 0.20 0.10 0.20 1 294 0.30 0.19 0.31 2 559 0.40 0.31 0.41 2 912 0.50 0.47 0.51 4 1383 0.60 0.66 0.61 5 1942 0.70 0.82 0.72 7 2413 0.80 0.93 0.82 7 2736 0.90 0.99 0.92 8 2913 1.00 1.00 1.02 8 2942 1.10 0.99 1.12 8 2913 1.20 0.93 1.23 7 2736 1.30 0.86 1.33 7 2530 1.40 0.78 1.43 6 2295 1.50 0.68 1.53 5 2001 1.60 0.56 1.63 4 1648 1.70 0.46 1.74 4 1353 1.80 0.39 1.84 3 1147 1.90 0.33 1.94 3 971 2.00 0.28 2.04 2 824 2.20 0.21 2.25 2 1218 2.40 0.15 2.45 1 865 2.60 0.11 2.66 1 630 2.80 0.08 2.86 1 453 3.00 0.06 3.06 0 324 3.20 0.04 3.27 0 235 3.40 0.03 3.47 0 171 3.60 0.02 3.68 0 124 3.80 0.02 3.88 0 88 4.00 0.01 4.09 0 65 4.50 0.01 4.60 0 74 5.00 0.00 5.11 0 0 Volume under hydrograph = 38844 cf Based upon runoff volume = 40895.1 cf Depth req'd for minimum area = 3.67567 Page 3 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) _ Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s In Z Z est Elevation S Z sf cf cf ft 11126 0 0 0 Surface area at normal pool 2.5 11870 5749 5749 0.5 8.66 -0.69 0.55 3 12633 6126 11875 1 9.38 0.00 1.04 3.5 13413 6511 18386 1.5 9.82 0.41 1.52 4 14212 6906 25292 2 10.14 0.69 2.01 4.5 15028 7310 32602 2.5 10.39 0.92 2.50 5 15862 7723 40325 3 10.60 1.10 3.01 5.5 16715 8144 48469 3.5 10.79 1.25 3.53 6 17585 8575 57044 4 10.95 1.39 4.06 6.5 18474 9015 66059 4.5 11.10 1.50 4.61 7 19380 9463 75523 5 11.23 1.61 5.18 7.5 Regression Output: Constant 9.34346 Ks = S/Z^b = 11343.92 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Sid Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = IS Riser Dia. (in) Etop = -'0 00 Elev. Top Riser (11) 6.18 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff H I n = S Number of Holes Hld = 2 Hole Dia. (in) EHl = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 2000 Elev. Holes (3) BARREL: Db = I> Barrel Dia. (in) Einv = 20.00 Elev Invert Barrel (ft) Barrel[ Adjustment Factor Cdb = 0.60 Barrel orifice coeff 3 Page 4 EMERGENCY WEIR Page 5 Elevation Cw Ecr Lw Riser Hole (1) = = = Riser Hole (2) 3 3.77 _' Riser Hole (3) Weir coeff Elev weir coeff(ft) Weir Length (ft) Riser Riser (weir) (orifice) Barrel Principal Spillway Emergcy Weir 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.51 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.55 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.62 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.71 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.84 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.21 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.42 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.64 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.86 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 4.07 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.0 4.24 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.9 4.36 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.7 4.45 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.4 4.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.8 4.52 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.9 4.52 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.9 4.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.7 4.47 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.5 4.41 0.0 0.0 0.0 0.0 0.0 0.0 0.00 3.0 4.33 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.5 4.26 0.0 0.0 0.0 0.0 0.0 0.0 0.00 2.1 4.20 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.7 4.14 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.4 4.10 0.0 0.0 0.0 0.0 0.0 0.0 0.00 1.1 4.05 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.9 4.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 3.99 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.6 3.96 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 3.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 3.87 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Page ' Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1+2+3) CIS cfs cfs cfs cfs 0.000 0 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.102 0 0 2.50 0.00 0.00 0.00 0.00 0.00 0.00 0.204 1 88.2628 2.51 0.00 0.00 0.00 0.00 0.00 0.00 0.306 2 382.472 2.55 0.00 0.00 0.00 0.00 0.00 0.00 0.409 2 941.47 2.62 0.00 0.00 0.00 0.00 0.00 0.00 0.511 4 1853.52 2.71 0.00 0.00 0.00 0.00 0.00 0.00 0.613 5 3236.3 2.84 0.00 0.00 0.00 0.00 0.00 0.00 0.715 7 5178.08 3.01 0.00 0.00 0.00 0.00 0.00 0.00 0.817 7 7590.6 3.21 0.00 0.00 0.00 0.00 0.00 0.00 0.919 8 10326.7 3.42 0.00 0.00 0.00 0.00 0.00 0.00 1.022 8 13239.4 3.64 0.00 0.00 0.00 0.00 0.00 0.00 1.124 8 16181.5 3.86 0.16 0.00 0.00 0.00 0.00 0.16 1.226 7 19033.5 4.07 0.97 0.00 0.00 0.00 0.00 0.97 1.328 7 21412.5 4.24 1.91 0.00 0.00 0.00 0.00 1.91 1.430 6 23241.5 4.36 2.74 0.00 0.00 0.00 0.00 2.74 1.532 5 24527 4.45 3.39 0.00 0.00 0.00 0.00 3.39 1.634 4 25282.7 4.50 3.78 0.00 0.00 0.00 0.00 3.78 1.737 4 25540 4.52 3.92 0.00 0.00 0.00 0.00 3.92 1.839 3 25452.7 4.52 3.87 0.00 0.00 0.00 0.00 3.87 1.941 3 25176.6 4.50 3.72 0.00 0.00 0.00 0.00 3.72 2.043 2 24778 4.47 3.51 0.00 0.00 0.00 0.00 3.51 2.247 2 23840.2 4.41 3.04 0.00 0.00 0.00 0.00 3.04 2.452 1 22823.8 4.33 2.55 0.00 0.00 0.00 0.00 2.55 2.656 I 21816.8 4.26 2.08 0.00 0.00 0.00 0.00 2.08 2.860 I 20913.7 4.20 1.69 0.00 0.00 0.00 0.00 1.69 3.065 0 20120.1 4.14 1.37 0.00 0.00 0.00 0.00 1.37 3.269 0 19432.8 4.10 1.11 0.00 0.00 0.00 0.00 1.11 3.473 0 18848.6 4.05 0.91 0.00 0.00 0.00 0.00 0.91 3.678 0 18352 4.02 0.74 0.00 0.00 0.00 0.00 0.74 3.882 0 17929.9 3.99 0.61 0.00 0.00 0.00 0.00 0.61 4.086 0 17569.4 3.96 0.50 0.00 0.00 0.00 0.00 0.50 4.597 0 16804.1 3.91 0.30 0.00 0.00 0.00 0.00 0.30 5.108 0 16321.7 3.87 0.19 0.00 0.00 0.00 0.00 0.19 4.52262 = maximum stage elevation 3.91755 = maximum discharge Page 7 Aviation Center - taxiway pond Pasquotank County 10 yr STORM 7 �• a ; �6 ° aD 5 3 is o_ 0 .+°a°+t*°°o a 0 6 0.000 1.000 2.000 3.000 4.000 5.000 6.000 Time (hrs) °- INFLOW (cfs) OUTFLOW (cfs) POND VOLUME CALCULATIONS FOR S:IHyman 8 Robey '071070528 - EC Aviation CMExcel1070528 (C)POND VOLUME CALCULATIONS.xls POND CALCULATIONS :A FZ PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE AREA AT TOP OF SHELF 11,125.92 7,68754 3,43838 6.375 73 1,475.13 2,669 17 1,385.05 14,183.66 1329825 ELEVATIONS F PP ELEVATION 250 ELEVATION AT EDGE OF MAIN BASIN SHELF 2.00 ELEVATION OF MAIN BASIN BOTTOM -5.00 ELEVATION AT EDGE OF FOREBAY SHELF 200 ELEVATION OF FOREBAY BOTTOM -1.50 ELEVATION OF TOP OF SHELF 3.00 ELEVATION OF 1" STORAGE 377 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME BELOW SHELF FOREBAY VOLUME BELOW SHELF TOTAL VOLUME BELOW SHELF AVERAGE POND DEPTH 4.32 MAIN BASIN VOLUME FOREBAY VOLUME PERMANENTP60LVOLUME FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME VOLUME BELOW TOP OF SHELF TEMP. STORAGE VOLUME (1" RUNOFF) sFgN C. 80 PLO\• 101tnnnl1100 0 27,478.01 7,094.89 34,572.90 30,993.83 8,621.77 39,615.60 21.76% 45,721.64 16,802.08 7/2/2008 10:19 AM PAGE 1 OF 1 PERMANENT POOL DETENTION PONDS DESIGN OF POND Avialmn Center - Pond D (DRS parking ILI) 10 Yr, 24 HIT Stomi DETENTION POND r. ' ' - --Hyman & Robey, PC L. 150-A Hwy 158 East JUL 1 pCamden, NC 27921 8 200$52)-335-1888 04/24/08 Page 1 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: Ia 45 ACRES WATERSHED % IMPERVIOUS: 611°5. PERMANENT POOL ELEVATION: 2 5 FT PERMANENT POOL AVG. DEPTH: 5 5 FT SA/DA PERCENTAGE FACTOR: 4.14 % (FROM ABOVE TABLE -TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP MANUAL - PENC 1988) POND SURFACE AREA REQ'D: 26059 SF FOREBAY AREA: 7818 SF AT WIDTH = 0.33 LENGTH, WIDTH = 93.2003 LF (BASED UPON MINIMUM SURFACE AREA) LENGTH = 279.601 LF Use these dimensions: WIDTH 95.32 LF LENGTH 300 LF VOLUME OF V RAINFALL AREA OF ROOFS: n 96 AC AREA OF PARKING/CONCRETE: S '9 AC AREA OF GREEN AREAS: 5.2 AC VOLUME OF RUNOFF 35848.1 CF Normal Pool Elevation 2.5 VOL (CF)=(( ROOF' 1.0)+(PARKING'.95)+(GRASS'0.2)]'43,560/12 STORAGE DEPTH FOR MINIMUM AREA = 1.25 FT ELEVATION OF I" RAINFALL = 3.75 DRAWDOWN - WATER QUALITY Q(2 DAYS)= 0.20745 CFS Q(5 DAYS)= 0.08298 CFS I" RUNOFF STAGE 1.25 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 2.64281 INCH DIA HOLE A=[Q/(Cd*SQRT(2gh))]* 144 Rad =SQRT(A/PI) Dia. =2*Rad. DIAMETER OF HOLE TO USE: 3 INCH DIAMETER V STORM RUNOFF DRAWDOWN TIME 2.21729 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 3� cfs Tc = Time of Concentration = ?n min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn. 15.4 Lag Time (L) = (IA0.8*(S+I)A0.7)/(1900*YA0.5) for L in Hrs where: I = hydraulic length of watershed (ft) S = (I000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (1000/CN)-10 = 0.75269 L= 0.20533 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D= 0.04433 hrs Tp = 0.2275 hrs = 13.6499 min Volume under Hydrogmph = 1.39 * Qp * Tp = 39844 Cubic Feet �00 0.75269 = U> 03 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.02 1 86 0.20 0.10 0.05 4 287 0.30 0.19 0.07 7 545 0.40 0.31 0.09 11 889 0.50 0.47 0.11 16 1347 0.60 0.66 0.14 23 1892 0.70 0.82 0.16 29 2351 0.80 0.93 0.18 33 2666 0.90 0.99 0.20 35 2838 1.00 1.00 0.23 35 2866 1.10 0.99 0.25 35 2838 1.20 0.93 0.27 33 2666 1.30 0.86 0.30 30 2465 1.40 0.78 0.32 27 2236 1.50 0.68 0.34 24 1949 1.60 0.56 0.36 20 1605 1.70 0.46 0.39 16 1319 1.80 0.39 0.41 14 1118 1.90 0.33 0.43 12 946 2.00 0.28 0.45 10 803 2.20 0.21 0.50 7 1187 2.40 0.15 0.55 5 843 2.60 0.11 0.59 4 613 2.80 0.08 0.64 3 441 3.00 0.06 0.68 2 315 3.20 0.04 0.73 1 229 3.40 0.03 0.77 1 166 3.60 0.02 0.82 1 120 3.80 0.02 0.86 1 86 4.00 0.01 0.91 0 63 4.50 0.01 1.02 0 72 5.00 0.00 1.14 0 0 Volume under hydrograph = 37846 cf Based upon runoff volume = 39844 cf Depth req d for minimum area = 1.39334 STAGE STORAGE FUNCTION OF POND Page 4 (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) _ Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s In Z Z est Elevation S Z sf cf cf ft 28596 0 0 0 Surface area at normal pool 2.5 29791 14597 14597 0.5 9.59 -0.69 0.58 3 31004 15199 29795 1 10.30 0.00 1.07 3.5 32235 15810 45605 1.5 10.73 0.41 1.55 4 33484 16430 62035 2 11.04 0.69 2.02 4.5 34751 17059 79094 2.5 11.28 0.92 2.50 5 36036 17697 96790 3 11.48 1.10 2.98 5.5 37339 18344 115134 3.5 11.65 1.25 3.46 6 38660 19000 134133 4 11.81 1.39 3.95 6.5 39999 19665 153798 4.5 11.94 1.50 4.45 7 41356 20339 174137 5 12.07 1.61 4.96 7.5 Regression Output Constant 9.34346 Ks = S/ZAb = 27520.4 Sid Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficiew(s) 1.15215 = b Sid Err of Coef 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 1 R Riser Dia. (in) Etop = 50 Olt Elev, Top Riser (ft) 3.89 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 0 Number of Holes Hid = 2 Hole Dia. (in) EHI = >000 Elev. Holes (1) H2n = 0 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 50M0 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 50.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = �0.00 Elev Inver Barrel (ft) Barrel] Adjustment Factor Crib = 0.60 Barrel orifice coeff 3 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 3.7i Elev weir coeff (ft) Lw = 12 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.51 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.52 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.55 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.59 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.65 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.73 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 2.92 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.21 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.30 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.38 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.45 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.51 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.56 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.60 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.64 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.67 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.72 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 3.78 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 3.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.4 3.81 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.6 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.7 3.82 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.6 3.81 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.5 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 2.50 0.00 0.00 0.00 0.00 0.00 0.0c 0.023 1 0 2.50 0.00 0.00 0.00 0.00 0.00 0.0c 0.045 4 85.9942 2.51 0.00 0.00 0.00 0.00 0.00 0.0c 0.068 7 372.642 2.52 0.00 0.00 0.00 0.00 0.00 0.0( 0.091 11 917.272 2.55 0.00 0.00 0.00 0.00 0.00 0.0( 0.114 16 1805.88 2.59 0.00 0.00 0.00 0.00 0.00 0.0c 0.136 23 3153.12 2.65 0.00 0.00 0.00 0.00 0.00 0.0c 0.159 29 5044.99 2.73 0.00 0.00 0.00 0.00 0.00 0.0c 0.182 33 7395.5 2.82 0.00 0.00 0.00 0.00 0.00 0.0c 0.205 35 10061.3 2.92 0.00 0.00 0.00 0.00 0.00 0.0c 0.227 35 12899.1 3.02 0.00 0.00 0.00 0.00 0.00 0.0c 0.250 35 15765.6 3.12 0.00 0.00 0.00 0.00 0.00 0.0c 0.273 33 18603.4 3.21 0.00 0.00 0.00 0.00 0.00 0.0c 0.296 30 21269.2 3.30 0.00 0.00 0.00 0.00 0.00 0.0c 0.318 27 23734.4 3.38 0.00 0.00 0.00 0.00 0.00 0.0c 0.341 24 25970.3 3.45 0.00 0.00 0.00 0.00 0.00 0.0c 0.364 20 27919.5 3.51 0.00 0.00 0.00 0.00 0.00 0.0c 0.387 16 29524.7 3.56 0.00 0.00 0.00 0.00 0.00 0.0c 0.409 14 30843.3 3.60 0.00 0.00 0.00 0.00 0.00 0.0c 0.432 12 31961.2 3.64 0.00 0.00 0.00 0.00 0.00 0.0c 0.455 10 32907.1 3.67 0.00 0.00 0.00 0.00 0.00 0.0c 0.500 7 34512.3 3.72 0.00 0.00 0.00 0.00 0.00 0.0c 0.546 5 35699.1 3.75 0.01 0.00 0.00 0.00 0.00 0.01 0.591 4 36540.7 3.78 0.18 0.00 0.00 0.00 0.00 0.18 0.637 3 37125 3.80 0.36 0.00 0.00 0.00 0.00 0.36 0.682 2 37506.9 3.81 0.51 0.00 0.00 0.00 0.00 0.51 0.728 1 37739.2 3.82 0.60 0.00 0.00 0.00 0.00 0.6C 0.773 1 37870.1 3.82 0.66 0.00 0.00 0.00 0.00 0.66 0.819 1 37928.9 3.82 0.68 0.00 0.00 0.00 0.00 0.68 0.864 1 37937.6 3.82 0.69 0.00 0.00 0.00 0.00 0.69 0.910 0 37911.3 3.82 0.67 0.00 0.00 0.00 0.00 0.67 1.024 0 37792.9 3.82 0.62 0.00 0.00 0.00 0.00 0.62 1.137 0 37609.3 3.81 0.55 0.00 0.00 0.00 0.00 0.55 3.82131 = maximum stage elevation 0.68553 = maximum discharge POND VOLUME CALCULATIONS FOR S:Wyman 8 Robey'071070528- EC Aviation CtrAExceA070528 (D)POND VOLUME CALCULATIONS.xis POND CALCULATIONS AREA Fz PERMANENT POOL SURFACE AREA 28,597.14 MAIN BASIN SURFACE AREA 19,800.72 FOREBAY SURFACE AREA 8,796.42 AREA AT EDGE OF MAIN BASIN SHELF 17,756.44 AREA OF MAIN BASIN BOTTOM 10367.85 AREA AT EDGE OF FOREBAY SHELF 7,436.90 AREA OF FOREBAY BOTTOM 5.155.34 SURFACE AREA AT 1" STORAGE 33,961.36 AREA AT TOP OF SHELF 32,328 44 ELEVATIONS F PP ELEVATION 2.50 ELEVATION AT EDGE OF MAIN BASIN SHELF 200 ELEVATION OF MAIN BASIN BOTTOM -5 50 ELEVATION AT EDGE OF FOREBAY SHELF 200 ELEVATION OF FOREBAY BOTTOM -1.50 ELEVATION OF TOP OF SHELF 3.00 ELEVATION OF 1" STORAGE 3.75 VOLUME CALCULATIONS F3 MAIN BASIN VOLUME BELOW SHELF 106,966.09 FOREBAY VOLUME BELOW SHELF 22,036.42 TOTAL VOLUME BELOW SHELF 129,002.51 AVERAGE POND DEPTH 5.62 MAIN BASIN VOLUME 116,355.38 FOREBAY VOLUME 26.094.75 PERMANENT POOL VOLUME 142,450.13 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 18.32% VOLUME BELOW TOP OF SHELF 157,681.52 TEMP. STORAGE VOLUME (1" RUNOFF) 40,090.07 4/24/2008 11:22 AM PAGE 1 OF 1 JUL 8 2008 CULVERT TABLE - RESULTS FROM XPSTORM ANALYSIS OF THE 10 YR STORM NUMBER MAX. MAX. MAX. VELOCITY IN CULVERT OF ROUGHNESS FLOW VELOCITY DITCH IMMEDIATELY LABEL DIA. (FT) LENGTH BARRELS COEFFICIENT %SLOPE (CFS) (FPS) DOWNSTREAM #1 6 78 2 0.013 0.113 68.25 1.56 0.56 #2 6 48 2 0.013 0.042 118.94 2.94 0.79 #3 6 48 2 0.013 0.083 115.46 2.86 0.78 #4 6 64 2 0.013 0.078 113.78 2.82 #5 6 84 2 0.013 0.179 120.49 2.85 1.23 #6 6 X 6 BOX 195 2 0.013 0.118 91.9 1.88 1.09 All velocities are between 1.56 fps and 2.94 fps. Permanent outlet protection is not required. Permanent channel lining has been provided from Culvert #1 to Culvert #5. Outlet protection has been provided at the outlets of culverts #5 and #6 revised 7.2-08 SEAL ' / 18:ao FA rAs0i OTAI IK COUNTY Prepared by: John G. Sauls, Attorney Return to: William H. Morgan, Jr., Attorney Excise tax stamps: $419 NORTH CAROLINA PASQUOTANK COUNTY Brief Description: 1049 Consolidated Road Tax Parcel Identification: 8932 435147 & 8932 437213 fax Lot No: FILED in Paequctork Conl4 NC .n Oct 28 2007 of 11:20:39 AM b¢ Dalfi 1 Suxmp•ne Rov.te of Duds BOOK 995 PAGE 355 P Loved Oct 20 2007 1919.00 st.t..1 Pasgwfenk North CaroPna CeulV Red Edda Excise Tex This GENERAL WARRANTY DEED, made and entered into on October) $, 2007, by and between: Allan E. Gaines and wife, Donna L. Gaines GRANTORS: whose address is: 2612 Willis Drive, Elizabeth City, NC 27909 (herein referred to collectively as the Grantors) and The City of Elizabeth City, a Municipal GRANTEES: Corporation Organized and Existing under the Laws of the State of North Carolina whose address is: (herein referred to collectively as the Grantees) WITNESSETH: For and in consideration of valuable consideration, from the Grantees to the Grantors, the receipt and sufficiency of which is hereby acknowledged, the Grantors hereby give, grant, bargain, sell and convey unto the Grantees, in Fee Simple subject to the Exceptions and Reservations hereinafter provided, if any, in I BOOK 995 PAGE 356 The following described property, located in Nixonton Township, County of Pasquotank, State of North Carolina, more particularly described as follows: Beginning at a point marked by an iron pipe on the South right of way line of SR to 131 and also being located in the Northwest corner of the property awned now or formerly by Frank W. Hollowell and wife; thence from said beginning point South 31 degrees 50 minutes 38 seconds East 450.00 feet to an iron pipe; thence South 58 degrees 09 minutes 22 seconds West 420.68 feet to a point situated in the centerline of a ditch; thence, along the centerline of said ditch, North 01 degrees 45 minutes 38 seconds West 520.05 feet to an iron pipe located an the South right of way line of SR 01131; thence along the South right of way line of SR #1131 North 58 degrees 09 minutes 22 seconds East 160.00 feel to the POINT AND PLACE OF BEGINNING. This property being described and delineated on that certain plat entitled "Exempt Subdivision for Allan E. Gaines and Donna L. Gaines" by S. L. Cardwell, RS, dated July 17, 2004 and recorded in Map Book 35, Page 34 in the Pasquotank County Public Registry. Said property having been previously conveyed to the Grantors by deed(s) recorded in Deed Book 600, Page 245, and being reflected on plat(s) recorded in Map Book 35, Page 34. TO HAVE AND TO HOLD unto the Grantees, and their heirs, successors and assigns, together with all privileges and appurtenances [hereunto belonging, Fee Simple, subject to the Exceptions and Reservations hereinafter and hereinabove provided, if any. And the Grantors, for themselves and their heirs, successors and assigns, hereby warrant that they are seized of the premises in fee and have the right to convey same as herein provided, that the title is marketable and is free and clear of encumbrances other than as provided herein, and that the Grantors will forever warrant and defend the title against the claims of all persons or entities whomsoever. i This conveyance is made subject to the following Exceptions and Reservations: Easements, restrictions and rights -of -way of record, if any, and ad valorem taxes for the year 2007. All references to Grantors and Grantees as used herein shall include the singular, plural, masculine, feminine or neuter as required by context. IN WITNESS WHEREOF, the Grantors have executed this Deed, as of October 18, 2007. �l' 4t" (SEAL) Allan E. Gaines (SEAL) Donna L. Gaines — (SEAL) (SEAL) State of North Carolina City/County/Parish of Pasquotank 1, J G Sauls, a notary public of the above city/county/parish and state, do hereby certify that Allan E. Gaines and wife, Donna L. Gaines personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal on October 1$ 2007. /J" 1 G Saulk, Notary Public .i r SAULS .q-or,RY PUBLIC ir,�atnmission Expires: ::' 4AU�y pASrpi<iT-NKCOUNTY, NC InvmbWes 31&2IXa N\ ' F.'.T .. / f OTARY%. _ o�-•.......: �a. ; •-... ra Nx �� a.eD ti pa tu& county NC . Octze s 7 at 01:15:o0 Pn y D.e: a &,rear., w0.t.r of D" 300K 995 PAGE 400 Iosuw Oct 26 2007 44,187.00 St.t..t Pagw, ank North L;.lt. V Red estate excise Tax DEED Parcel: 3432 424y73 Revenue Stamps: $ STATE OF NORTH CAROLINA P/SOl10TANK COUNTY Deed number 40 Under tan E 'prc,u,-tank Co my Assessor's OKice PLEASE AC-Tu?4 To; W(LLIA� H. ateWGAN, JR COUNTY OF PASQUOTANK THIS DEED, made and entered into this the )S4k day of Oc�"ber 2007, by and between HOLLOW ELL FAMILY LIMITED PARTNERSHIP, a North Carolina limited partnership, and THE CITY OF ELIZABETH CITY, NORTH CAROLINA, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten and No/100 Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which hereby is acknowledged, has bargained and sold and by these presents does bargain, sell and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: That certain tract or parcel of land situated in Nixonton Township, Pasquotank County, North Carolina, and being all that certain tract of land known as the Barber Farm, being designated on the Pasquotank County tax map as parcel number P125-6, and further described as Tract H in the Deed from Frank W. Hollowell to Hollowell Family Limited Partnership dated December 20, 1993, and recorded in Book 554 at Page 829 in the office of the Register Prepared by WARD AND Smrrtt, P.A., 120 West Fire Tower Road, Post Office Box 8088, Greenville, NC 27835-8088 No opinion on title is rendered by WARD AND Smrrtt, P.A., without a separate written opinion on title from WARD AND SanTH,P.A. BOAC 995 PAGE 101 of Deeds of Pasquotank County, to which Deed reference is hereby made for a more complete and accurate description. LESS AND EXCEPT approximately three acres conveyed to Branch #293, Fleet Reserve Association, Inc. by Deed recorded in Book 411, at Page 82 in the office of the Register of Deeds of Pasquotank County, to which Deed reference is hereby made for a more complete and accurate description. This conveyance is made subject to ad valorem taxes for 2007 and subsequent years, applicable zoning ordinances and governmental restrictions, easements of record or on the ground, and restrictions and rights of way of public record. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. And the party of the first part covenants that said party is seized of said property in fee and has the right to convey same in fee simple; that the same is free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed under seal and in such form as to be binding, this the day and year first above written. BOOK 995 PAGE 102 HOLLOWELL FAMILY LIMITED PARTNERSHIP (SEAL) By: a4LkN � I. Mtti (SEAL) Abb��Manning, General PArtner By: __� --� IJ WQ 4 (SEAL) Frank W. Hollowell, Jr., General Partner &(It, COUNTY, STATE OF NORTH CAROLINA I certify that the following person personally appeared before me this day, acknowledging to me that she signed the foregoing document for the purpose(s) stated therein and, if other than in an individual capacity, in the capacity indicated having been first authorized to do so: Abbey H. Manning, General Partner of Hollowell Family Limited Partnership. ' Date x �— Notary is My commission expires: (Ofjicial Seal) Notary seal or stamp must appear within this box. 50 US Hwy 188 E. PO Box 339 C-amden, NC 2r7931 ph 2.52.338.2913 fx 252.338.5552 nfo@hymanrobe.y.com hymavobey.com y c D) a) �. n m V) f U m T ai 3 m z ° °' m c a a ® U n. O c a) a �' 0 ca E ¢__ ` c «1 C O) n 0) ° m °O a)c c a o cm ca) t E u ai m m ° O m O C ` 5 t a) O W V a) y — N a) > O. C O � t0. Nc tmo g g O°- ` O u y C 3 U U O Y m cm d.O a) C E m r O Q) m L Y N N U) Q a) N U a) U) a N O O > a)o d Y a) c .O a) N 0 U o ca m E n ° w N m e y o ac) o rn d O O m N @ ° a) .t-. m � O N U a m N N U O a) > d V E O t0. O rn 0) d > O O N O m Q m i m w O. a) O O ? a) O rfl t y 3a c m ° 1D m w a a t o o (U Z m> aN y o m "' c m c .c t 2 a)U oo m c y m a) ° �c m °) m�w mo o o o 0 0 0 ° am E a C m cc 3 N () a) N n• U rn o N a m N c° Sao E mtp a) y m n a) a) c m w O U UO N p O. N O CL 27 m 7 Oa Oa O Oa L L O Ea) x c2 m crn m i o c U o U [n W W Q d p c.) .rn'o O O O c m OD n 2 O � C N C CO O a) y O O Co O N a) 7 a W ° L 3 c t 3 3- 3 t o° 6 w CY m m $ m F o F Q H F- a° F U c> O O L C) fn N a) U) .: a) N () O V) n >+ L.:y Z6 C) m d m U m N 2 0 <n 0 Lu C� C+i v ui 6 � a 3 3 rn� ca of the soils report as I believe you retained them from the original submittal. If you need additional copies, please let me know and I will forward them to you immediately. If you have any questions, please do not hesitate to call this office at (252) 335-1888. wSinml/cverely berly DHa y Sr. Project Manager cc: file Mr. Rich Olson CULVERT TABLE - RESULTS FROM XPSTORM ANALYSIS OF THE 10 YR STORM NUMBER MAX. MAX. MAX. VELOCITY IN CULVERT OF ROUGHNESS FLOW VELOCITY DITCH IMMEDIATELY LABEL DIA. (FT) LENGTH BARRELS COEFFICIENT %SLOPE (CFS) (FPS) DOWNSTREAM #1 6 78 2 0.013 0.113 68.25 1.56 0.56 #2 6 48 2 0.013 0.042 118.94 2.94 0.79 #3 6 48 2 0.013 0.083 115.46 2.86 0.78 #4 6 64 2 0.013 0.078 113.78 2.82 #5 6 84 2 0.013 0.179 120.49 2.85 1.23 #6 6 X 6 BOX 195 2 0.013 0.118 91.9 1.88 1.09 All velocities are between 1.56 fps and 2.94 fps. Permanent outlet protection is not required. Permanent channel lining has been provided from Culvert #1 to Culvert #5. Outlet protection has been provided at the outlets of culverts #5 and #6 7-2-08 April 30, 2008 To Whom It May Concern: As the owner of lot #1 in Crosswinds subdivision, I hereby grant permission to the City of Elizabeth City to apply for an erosion control permit and perform land disturbing activities on the northeast corner of my property as necessary for the installation of drainage culverts and connection of the existing ditch to the proposed ditch. Sincerely, Arthur Mitchell,Jr P. O. Box 26 Winfall, NC 27985 (NOTARY) I,`C�C c Lc.c C J. �j nsc; , as a notary public certify under the pains and penalties of perjury that I witnessed the signature of Arthur Mitchell and the individual's identity was verified, on this date 20 Q7C . My commission expires on i ,> - t 1�- . e MARIARNE L COOPER NOTARYPUUUC PASOUOTANN COUNTY NO Prepared by: .John G. Sauls, Attorney Return to: William H. Morgan, dr., Attorney Excise tax stamps: $419 NORTH CAROLINA PASQUOTANK COUNTY Brief Description: 1049 Consolidated Road Pes0:.10=1K COUNTY $ a FILED in Peaquota* Count u NC on Oct 26 2007 it 11:20:3B AN fy: Ocllio a &rnarow Ropotsr of Dud. BOOK 995 PAGE 355 0 Issued Oct 26 2007 4 419.00 st.t..1 Pasquotanit North Carolina County Real Estate Excise Tax Tax Parcel Identification: 8932 435147 & 8932 437213 Tax Lot No: This GENERAL WARRANTY DEED, made and entered into on Octuberl $% 2007, by and between: Allan E. Gaines and wife, Donna L. Gaines GRANTORS: whose address is: 2612 Willis Drive, Elizabeth City, NC 27909 (herein referred to collectively as the Grantors) and The City of Elizabeth City, a Municipal GRANTEES: Corporation Organized and Existing under the Laws of the State of North Carolina whose address is: (herein referred to collectively as the Grantees) W ITNESSETH: For and in consideration of valuable consideration, from the Grantees to the Grantors, the receipt and sufficiency of which is hereby acknowledged, the Grantors hereby give, grant, bargain, sell and convey unto the Grantees, in Fee Simple subject to the Exceptions and Reservations hereinafter provided, if any, in JUL 18 2008 BOOK 995 PAGE 356 The following described property, located in Nixonton Township, County of Pasquotank, State of North Carolina, more particularly described as follows: Beginning at a point marked by an iron pipe on the South right of way line of SR #1131 and also being located in the Northwest corner of the property owned now or formerly by Frank W. Hollowell and wife; thence from said beginning point South 31 degrees 50 minutes 38 seconds East 450.00 feet to an iron pipe; thence South 58 degrees 09 minutes 22 seconds West 420.68 feet to a point situated in the centerline of a ditch; thence, along the centerline of said ditch, North 01 degrees 45 minutes 38 seconds West 520.05 feet to an iron pipe located on the South right of way line of SR #1131; thence along the South right of way line of SR 41131 North 58 degrees 09 minutes 22 seconds East 160.00 feet to the POINT AND PLACE OF BEGINNING. This property being described and delineated on that certain plat entitled "Exempt Subdivision for Allan E. Gaines and Donna L. Gaines" by S. L. Cardwell, RS, dated July 17, 2004 and recorded in Map Book 35, Page 34 in the Pasquotank County Public Registry. Said property having been previously conveyed to the Grantors by deed(s) recorded in Deed Book 600, Page 245, and being reflected on plat(s) recorded in Map Book 35, Page 34. TO HAVE AND TO HOLD unto the Grantees, and their heirs, successors and assigns, together with all privileges and appurtenances thereunto belonging, Fee Simple, subject to the Exceptions and Reservations hereinafter and hereinabove provided, if any. And the Grantors, for themselves and their heirs, successors and assigns, hereby warrant that they are seized of the premises in fee and have the right to convey same as herein provided, that the title is marketable and is free and clear of encumbrances other than as provided herein, and that the Grantors will forever warrant and defend the title against the claims of all persons or entities whomsoever. This conveyance is made subject to the following Exceptions and Reservations: Easements, restrictions and rights -of -way of record, if any, and ad valorem taxes for the year 2007. All references to Grantors and Grantees as used herein shall include the singular, plural, masculine, feminine or neuter as required by context. IN WITNESS WHEREOF, the Grantors have executed this Deed, as of October 18, 2007. (SEAL) Allan E. Gaines p� �U' r�+P`i�.l,�aj (SEAL) Donna L. Gaines (SEAL) (SEAL) State of North Carolina City/County/Parish of Pasquotank 1, J G Sauls, a notary public of the above city/county/parish and state, do hereby certify that Allan E. Gaines and wife, Donna L. Gaines personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal on October 8 2007. J G Sauih, Notary Public U ,1 SAULS d0T nRY PUBLIC ission Expires: $AU�s:••a� PAS(),, SOT INK COUNTY. NC E.o�II&t&2a09 p �mvn r ., 1 ; '(Cr�NK cOJ�,.. /� In P.pwtw* c«nty NC .. Oct 20 2007 .t 01:15:05 PH 300K 995 PAGE 400 Issued Oct 26 2001 01.167.00 ilt.to .t Posgw ank North DWAM 9 Real edst• excise Tax DEED Parcel: a932 424473 Revenue Stamps: $ STATE OF NORTH CAROLINA PASOUOTANK COUNTY Doed number � Tr:nsior tax $ " r,-o,,t-4 Co my As ... wes otfice PLEASE QETNRt•1 To. WILL Ao, H. P&M-AN, JR COUNTY OF PASQUOTANK THIS DEED, made and entered into this the ISN, day of QG"'r 2007, by and between HOLLOWELL FAMILY LIMITED PARTNERSHIP, a North Carolina limited partnership, and THE CITY OF ELIZABETH CITY, NORTH CAROLINA, party of the second part; WITNESSETH: That the party of the first part in consideration of the sum of Ten and No/100 Dollars ($10.00) and other good and valuable considerations to said party paid by the party of the second part, the receipt of which hereby is acknowledged, has bargained and sold and by these presents does bargain, sell and convey unto the party of the second part, said party's successors and assigns, the following described property, to wit: That certain tract or parcel of land situated in Nixonton Township, Pasquotank County, North Carolina, and being all that certain tract of land known as the Barber Farm, being designated on the Pasquotank County tax map as parcel number P125-6, and further described as Tract H in the Deed from Frank W. Hollowell to Hollowell Family Limited Partnership dated December 20, 1993, and recorded in Book 554 at Page 829 in the office of the Register Prepared by WARD AND SatrrH, P.A., 120 West Fire Tower Road, Post Office Box 8088, Greenville, NC 27835-8088 No opinion on title is rendered by WARDAND SmTH, P.A., without a separate written opinion on title from WARD ANDSLnTN, P.A. BBC 995 PAGE 401 of Deeds of Pasquotank County, to which Deed reference is hereby made for a more complete and accurate description. LESS AND EXCEPT approximately three acres conveyed to Branch #293, Fleet Reserve Association, Inc. by Deed recorded in Book 411, at Page 82 in the office of the Register of Deeds of Pasquotank County, to which Deed reference is hereby made for a more complete and accurate description. This conveyance is made subject to ad valorem taxes for 2007 and subsequent years, applicable zoning ordinances and governmental restrictions, easements of record or on the ground, and restrictions and rights of way of public record. TO HAVE AND TO HOLD said property and all privileges and appurtenances thereunto belonging to the party of the second part, said party's successors and assigns forever. And the party of the first part covenants that said party is seized of said property in fee and has the right to convey same in fee simple; that the same is free from encumbrances except any encumbrances or restrictions mentioned above and that said party will warrant and defend the title to the same against the lawful claims of all persons whomsoever. IN TESTIMONY WHEREOF, the party of the first part has caused this instrument to be executed under seal and in such form as to be binding, this the day and year first above written. BOOK 995 PAGE 402 HOLLOWELL FAMILY LIMITED PARTNERSHIP (SEAL) By: (.l'� d Mtti (SEAL) Abbey I�. Manning, General P411mer By: �� tJ %ddK1.l (SEAL) Frank W. Hollowell, Jr., General Partner 1(; pQt�COUNTY, STATE OF NORTH CAROLINA I certify that the following person personally appeared before me this day, acknowledging to me that she signed the foregoing document for the purpose(s) stated therein and, if other than in an individual capacity, in the capacity indicated having been first authorized to do so: Abbey H. Manning, General Partner of Hollowell Family Limited Partnership. Date �, c1� B Notary is My commission expires: ot+ _Lo zcz-I or stamp must appear within this box. 7