HomeMy WebLinkAboutSW7080618_COMPLIANCE_20130516STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
DOC TYPE
El CURRENT PERMIT
El APPROVED PLANS
El HISTORICAL FILE
COM PLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Permit: SW7080618
County: Dare
Region: Washington
Compliance Inspection Report
Effective: 09/19/08 Expiration: 12/30/21 Owner: Dare County ,
Project: Roanoke Island Senior Center - SWI,
962 Marchall C Collins Dr
Contact Person: Robert Outten Title:
Directions to Project:
Northwest corner of US 64 and US 64/264
Type of Project: State Stormwater - HID - Infiltration
Drain Areas: 1 - (Croatan Sound) (03-01-51 ) (SA;HQW)
On -Site Representative(s):
Related Permits:
Inspection Date: 05116/2013 EntryTime: 10:OOAM
Primary Inspector: William J Moore
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: N Compliant 0 Not Compliant
Question Areas:
E State Stormwater
(See attachment summary)
Manteo NC 27954
Phone: 252-475-5803
Exit Time: 10:30 AM
Phone: 252-946-6481
Ext.264
Inspection Type: Compliance Evaluation
Page:
( 0 V 90
Pemit; SW7080618 Owner - Project: Dare County
Inspection Date: 05/16/2013 Inspection Type: Compliarw Evaluation
Inspection Summary:
ReasonforVisit: Routine
Roanoke Island Senior Center located at 962 Marshall C. Collins Drive, Manteo, NC was inspected on 45/16,12013. The
impervious areas & stormwater control measures appear to be constructed according to approved plans. Stormwater
control measures appeared to be operated & maintained properly. PE Certification submitted 09/03/2010 by John Delucia
with Albemarle & Associates.
Built Upon Area
Is the site BUA constructed as per the permit and approval plans?
Is the drainage area as per the permit and approved plans?
Is the BUA (as permitted) graded such that the runoff drains to the system?
Comment:
SW Measures
Are the SIN measures constructed as per the approved plans?
Are the inlets located per the approved plans?
Are the outlet structures located per the approved plans?
Comment:
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Yes No NA NE
11 11 0
0 0 0
0000
Yes No NA NE
0 0 0
0000
N 0 0 0
Yes No NA NE
E 0 0 0
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ 0 El 0 0
upon request?
Comment:
Page: 2