Loading...
HomeMy WebLinkAboutSW7080205_HISTORICAL FILE_20210629STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW_%)'IJD� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ .COMPLIANCE EVALUATION INSPECTION DOC DATE(f��(p YYYYMMDD ROY COOPER Governor JOHN NICHOLSON interim Secretary BRIAN WRENN Director Pasquotank County Attention: Sparty Hammett, 206 E. Main Street Elizabeth City, NC 27909 Dear Mr. Hammett: NORTH CAROLINA Environmental Quality June 29, 2021 County Manager Subject: Stormwater Permit Renewal Stormwater Management Permit SW7080205 River Road Soccer Complex Pasquotank County %✓d,�(J A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7080205 for a stormwater treatment system consisting of a wet detention pond serving the River Road Soccer Complex located at 1701 River Road, Elizabeth City, NC expires on December 30, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Also, it was noted in the file review that a designer's certification that the project was constructed in accordance with the approved plans as required by the permit has not been submitted. Please include this with your application. Permit application forms for renewal can be found on our website at: https://deq.nc gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roger.thorpe(a)ncdenr.gov. Sincerely, i. Roger K. Thorpe Environmental Engineer �< North Carolina Department of Environmental Quality ' Division of Energy, Mineral and Land Resources 1/ Washington Regional Off9re i 943 Washingrnn Square Mall I Washington, North Carolina 27889 m F-D . ' 000 252.946.64SI Permit Number SW7080205 Program Category State SW Penn it Type State Stormwater Primary Reviewer emest.odei-larbi Coastal SWRuIe Coastal Stormwater- 1995 Permitted Flow Facility Central Files. APS _ SWP _ 11/13/2014 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region River Road Soccer Complex Minor Washington Location Address '-�i County 1701 River Rd GV i�, Lf- � mcpq-- � v Pasquotank Facility Contact Affiliation Elizabeth City NC 27907 Owner Owner Name Owner Type Pasquotank County Government - County Owner Affiliation Randy Keaton PO Box 39 Dates/Events Elizabeth City NC 27909 Scheduled Ong Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 4/9/2008 2/4/2008 4/9/2008 4/9/2008 12/30/2021 Regulated Activities Requested /Received Events State Stormwater - HD - Detention Pond Deed restriction requested Deed restriction received Additional information requested 3120108 Additional information requested 2114108 Additional information received 3112108 Additional information received 417/08 Outfall Waterbody Name Streamindex Number Current Class Subbasin River Road Soccer Complex — Detailed Protect Narrative The proposed project is located just south of River Road Middle School in Elizabeth City, NC. This project will includerthe construction of 5 (five) new soccer fields, a picnic shelter, la round; and anew arkiri facilit The existiii school"has 2 two adjoining baseball fields P Yg parking Y g (two) J g and a 1-story"bathroom facility to which our proposed trails will connect. The existing ground surface is relatively flat, with contours ranging from 4.0 to 9.0 ft. There are existing swales that convey water between the proposed soccer field areas, the existing school, and ball fields. The majority of the site has a grassy cover and is sporadically populated with pecan trees. The drainage areas have been broken up into two separate areas that drain to a single location that is on the North side of the project between the existing ball fields and the proposed soccer fields. This project would typically fall under a low -density condition, however the parking lot and driveway makes this project have a "pocket" of high density. The two -areas 7were delineated based on the principal of the pocket of high -density improvements. Area 1-consists of th'e five soccer fields, connecting grass areas, and the playground. This area's runoff coefficient changed from 0.32 to 0.35 resulting in minimal increase in flows. The storm conveyance calculations use the rational method and a storm design frequency of 5-years. This frequency is mandated by the City of Elizabeth City's Unified Development Ordinance (UDO) for areas draining les`s tha i_75 acres. Area 2 contains the majority of the impervious areas (parking and driveways) for this site. This area will be treated and detained using a wet detention basin. This wet detention basin is designed using the most current NCDENR standards for the "90 percent TSS Pollutant Removal Efficiency in the Coastal Region". This wetpond will not require a vegetative filter strip because of the 90% removal efficiency. This pond will treat the 1.5" of rainfall as noted in the Stormwater Best Management Practices Manual (6hapt6r 2, revised 9-28-07) for the coastal areas not draining into SA waters. The outlet will release the temporary water quality over three days using a 4-inch orifice. The release calculation is based upon a chainsaw routing method. The wet detention pond also serves as the site's detention structure ` Area 2 is the only area that enters into the wetpond. The city's UDO states that the "storm drainage shall be designed to maintain the pre -developed runoff rate for the 10 year stone, and that the outlet device or emergency spillway shall be designed to pass the 50-year storm". The pre -developed runoff rate for area #2 (10-yr storm) was 16.40 cfs and the post rate (out of the pond) is 3.26 cfs. There is no need for an emergency spillway since the 50-year storm passes through the outlet and has a minimum of one foot of freeboard. The other requirement that is met per the BMP manual is the 1-yr 24-hr pre -developed runoff rate. The rates for the 1-yr 24-hr pre and post -developed runoff rates are 6.59 cfs and 0.36 cfs respectively. When combined, areas 1 and 2 have a reduced runoff rate for the 1, 2, 10, and 50-year storm events. This demonstrates that treating and detaining only area 2 will have a positive effect downstream of our project. River Road Soccer Complex Elizabeth City, North Carolina Storm Water Management Report 1-23-08 Revised 03-05-08 TE 2%1. r.�.�® SOLUTIONS 2 3 2 0 W. Morehead Street Charlotte, NC 28208 Landscape Architecture Site Planning Civil Engineering w .sitesolutionspa.com Telephone-7W521-98W Fa imtle-704-521-8955 SS Project No. 3017 RECEIVE® MAR 1 0 20G8 DWQ-WARD I LJ I 1 e N I 0 1 I 1 0 1 L L F O e H I L River Road Soccer Complex Elizabeth City, North Carolina Storm Water Management Report TABLE OF CONTENTS Project Description.................................................................. • Topography • Soils • Model Parameters/Analysis Conveyance Design......................................................... • Weighted Coefft. Computations • Time of Concentration Calculations • "Closed" Storm Drainage System Analysis • Culvert Analysis • Flume Analysis • Channel Calculations Section 1 ......... Section 2 Sedimentation and Erosion Control Measures .............................................. Section 3 • Outlet Protection Calculations SiteHydrology........................................................................................................ Section 4 • Weighted Curve Number Computations • Time of Concentration (TR 55): Pre (Qpre) and Post (Qpst) • Site Hydrology Calculations • Pond Flood Routings BMPDesign................................................................................... • Wet Detention Pond Design • 2 8 5 Day Routing Calculations • Draw Down Time Routing Calculations IAppendix ............................. r E fl N • Site Map • USGS Quad Map • Pasquotank County Soil Survey • Pasquotank County Hydrologic Soil Groups • IDF Table • Runoff Curve Numbers • Runoff Coefficient Table • Storm Cad - Pipe Diagram • Component Drainage Area Map • Pre -Development Drainage Area Map • Post -Development Drainage Area Map .............. Section 5 .................... Section 6 d 't 1 fl L' LJ fl Ll River Road Soccer Complex Elizabeth City, North Carolina Storm Water Management Report Revised 03-05-08 Project Description The proposed project involves the construction five (5) new soccer fields, a picnic shelter, and a parking facility near the existing River Road Middle School. Site improvements will also include new "closed" storm drainage systems, culverts, swales, and a stormwater BMP (wetpond). Topography/Drainage The entire site is relatively flat but generally drains from west to east with ground elevations ranging from approximately 4.00 Ft to 9.00 Ft. The area will continue to drain into existing drainage channels which outfall into the Pasquotank River. ' Soils The NCRS soil survey of Pasquotank County indicates that soils on the site are predominately Perquimans silt loam (PeA) and Chapanoke silt loam (ChA). These soil types are classified as Hydrologic Group C/D. Refer to the attached copies of the Soil Conservation Service maps with site location indicated, as well as the attached copy of the soil and water features description indicating a the hydrologic groups that apply to the soils types indicated to be within the project boundaries. 1 r L I i 1 Model Parameters/Analysis Capacity analysis for proposed sedimentation and erosion control measures as well as the storm water conveyance system design was completed using the Rational Method. The water quality design and the sedimentation and erosion control measures were completed using excel spreadsheets developed by Site Solutions. The designs were based off of the most current version of NCDENR's "Manual of Stormwater Best Management Practices" July 2007, revised in October 2007.The onsite Erosion Control devices were designed per NCDENR erosion control and sedimentation standards. There are several pre -development flow areas and patterns as this site is a relatively level site. This site generally drains from River Road to the east property line, then to tributaries draining to the Pasquotank River (see USGS Map attached). The post drainage discharges will be directed to the east. This study is designed per NCDENR guidelines and therefore is designed with a Wet Detention stormwater BMP. This wet detention pond provides 85% TSS water quality treatment for the driveway and parking areas. The Parking lot I impervious areas will drain directly into the wet detention facility for water quality treatment and storage detention. The temporary pool will be drawndown in 2-5 days, but no earlier than 48 hours. The stormwater piping and channels were designed for the 5-year storm event. The site hydrology and detention requirements for this site were designed and routed using the Bentley Pondpack program to release the pre 2-year and pre 10-year storm events. This detention facility is designed to pass the 50-year storm event. See the project Q Summary below. Discharge channels were improved with a 5:1 sideslope. For the delineation of the pre and post -development drainage areas, refer to the pre -development drainage area map and post -development drainage area map contained within these calculations. OVERALL SITE DRAINAGE SUMMARY 5 YEAR PRE-Q DISCHARGES: Area 1 = 41.47 cfs Area 2 = 12.77 cfs ------------ 54.24 cfs 5 YEAR POST-Q DISCHARGES: Channel 1 = 21.27 cfs Channel 2 = 26.03 cfs Channel 3 = 3.23 cfs Channel 4 = 3.31 cfs 53.84 cfs WET DETENTION POND 1 DESIGN SUMMARY: • 2007 NCDENR BMP design manual used • Water Quality Volume (NCDENR Simple Method used) • Water Quality First Flush (1.5" Runoff) • Water Quality Treatment Provided (85% TSS) • Req'd. WQ surface area = 12,061 SF (34,622 SF provided) • Detention criteria used (2 year and 10 year pre-Q) • Emergency criteria used (Pass 50 year storm) • Req'd. Temp. pool drawdown time (2 - 5 days) • Actual Temp. pool drawdown time = 75.76 hrs • 1.5" Drawdown Orifice used • Freeboard Req'd. = 12" above Temp. Pool • Freeboard Provided = 25.2 inches above Temp. Pool • Top of Pond Elev. = 8.60 • Permanent Pool Elev. = 5.0 • SA/DA Depth = 3.00 feet (min. req'd.) • Permanent Pool Average Depth = 3.36 feet • Percentage Forebay Volume = 19.90% Wet Detention Pond 1 Summary: - (SCS Computer MethodHAESTAD - Method Used*: (Area 2)P®NDPACK `. • ) Pre (cfs) Post (cfs) Routed (cfs) Pond Elevation 2 yr W 'I ` .m offis3S _ ' 16 26� . d ,2C P - 0 33 .. 6:60 10 yr .._ -IN 1- '3 04 7 U2 �. 50 yr - ;.,` - : 41 fi " .°- ,- ` ..N 14�0475 POND DISCHARGE SUMMARY: • 2 - 18" RCP @ 0.42 % used Capacity flow = 11.61 cfs • Discharge flow = 10.04 cfs Also see Channel Calculations in this report River Road Soccer Complex Elizabeth City, North Carolina Storm Water Management Report 1-23-08 Revised 04-07-08 0 I�JF® SOLUTIONS 2 3 2 0 W. Morehead Street Charlotte, NC 28208 Landscape Architecture Site Planning Civil Engineering wv7v .tesolutlonspa.com Telephone-704-521-9880 Faoimtle-704-521-8955 SS Project No. 3017 .....n. I- I.. n.... k\\ CARo SEAL Wb- PAU 4. n.�'1.1 111 y WET DETENTION BASIN # 1 PROJECT NAME River Road Sports Complex BY J Wehling PROJECT NUMBER 3017 ' DATE 3/2/2008 REV. 4/2/2008 THE WET DETENTION BASIN IS DESIGNED IN ACCORDANCE WITH THE CHARLOTTE/ MECKLENBURG LAND DEVELOPMENT REQUIREMENTS AND NCDENR'S 'STORMWATER BEST MANAGEMENT PRACTICES MANUAL", SECTION 10, DATED JULY 2007, REVISED OCTOBER 2007. PERMANENT WATER QUALITY POOL CALCULATE PERCENT OF IMPERVIOUS AREA DRAINING INTO POND PERVIOUS AREA= 1.90 IMPERVIOUS AREA=244 ., TOTAL DRAINAGE AREA= 4.34 PERCENT IMPERVIOUS= 56.22% ASSUME AVG. DEPTH OF PERMANENT POOL, D = 3.00 It (AVG. DEPTH SHOULD BE 3' TO 6' ) USING TABLE 10.4, DETERMINE THE REQUIRED SURFACE AREA TO DRAINAGE AREA RATIO (SA/DA) FOR THE PERCENT IMPERVIOUS AND THE PERMANENT POOL DEPTH. (90 % TSS CHART) TABLE 10.3 %IMP. PERMANENT POOL DEPTH R COVER 30 3.5 4.0 4.5 5.0 6.0 7.0 10 1 30 1.00 0.80 070 060 0.40 0.20 20 240 2.00 1.80 1 70 150 1.20 090 30 3.50 3.00 2.70 2.50 220 1 60 1 10 40 450 4.00 3.50 3.10 280 2.10 1.40 50 5.60 5.00 430 390 350 2.70 1.90 60 700 6.00 530 480 430 3.40 2.40 70 8A 0 7.00 600 5.50 5.00 3.90 2 90 80 9A0 800 7.00 6.40 570 460 3.40 90 10 70 900 790 7.20 650 5.20 3.90 100 12 00 1 10.00 1 880 1 8.10 730 5.80 4.30 Imp Gov VOL ABOVE PERM POOL (cf) Below 5000 5.00 Interpolated SA/DA 5622 X X= 562 Above 60.60 6.00 REQUIRED SURFACE AREA OF PERM. POOL = SA/DA x DRAINAGE AREA =024 ac = 10,629 sf BASIN STAGE/ STORAGE. DWG SCALE. 1"= 1 ELEV. I PLANIMETER READING AREA (sf) AVG. AREA (sf) VOL (cf) ACCUM. VOL (cf.) Main Bay and Foreba ''-1 --.3350, 3350 3350 3350 0 0 0 - 4360 _ 4360 3855 3855 3855 -1 697V 6971 5161 10321 10321 "• 2 - " .`8583 - 8583 7777 7777 10098 3 .10309 10309 9446 9446 27544 '4 ''12149 12149 11229 11229 38773 15681 15681 13915 13915 52688 '..6 ': ".- _ '19510- - 19610 17646 1 17646 70334 7" - -22410 :• = 22410 21010 21010 91344 8 - 24439 •` 24439 23425 23425 114768 1 1544. - 1544 1544 0 0 2'. _,: a•' - -�2033 ,r -- 2033 1789 1789 1789 3':-"."'. '="2579^•;".".-"'L-. 2579 2306 2306 4095 4 -3182.. 3182 2881 2881 6975 '5'- ''� :3841 3841 3512 3512 10487 SET ELEVATION OF PERM. POOL = 5.00: • " ACTUAL SURFACE AREA OF PERM. POOL= 15,681 sf ACTUAL SURFACE AREA GREATER THAN REQUIRED, THEREFORE OKAY MINIMUM PERM. POOL DEPTH = 3.00.ft (MINIMUM DEPTH ALLOWED =T) MAXIMUM PERM POOL DEPTH = 6.00 ft. (MAXIMUM DEPTH ALLOWED =9`) VOLUME IN PERMANENT POOL= 52.688 cf VOLUME IN FOREBAY= 10,487 cf AREA OF PERMANENT POOL= 15,681 sf AVERAGE DEPTH OF POOL= 3.3611 Must be between 311 and Eft PERCENTAGE OF TOTAL VOLUME IN FOREBAY 1990% 3017 WETDETBASIN 04-07-08 As Page 1 PROJECT NAME. River Road Sports Complex BY: J Wehling PROJECT NUMBER3017 DATE 3/2/2008 TEMPORARY WATER QUALITY POOL DETERMINE THE RUNOFF COEFFICIENT FOR THE FIRST 1.0 INCH OF RAINFALL: R,= 0 05+0.009 (1) WHERE: R„= RUNOFF COEFF. R,= 0.56 inln 1= 5622% IMPERVIOUS DETERMINE THE VOLUME TO BE CONTROLLED THE FIRST 1.0 INCH OF RAINFALL, VOLUME= DESIGN RAINFALL x Rv x DRAINAGE AREA WHERE DESIGN RAINFALL=1.0" VOLUME= 0.20 ac ft Rv= 0 56 in/in VOLUME= 8,756 cf DRAIN AREA= 4 34 ac DETERMINE THE ELEVATION OF THE 1 0" RAINFALL' ELEV VOL ABOVE PERM POOL (cf) ELEVATION OF THE PERM POOL= 500 5.00 0 VOLUME OF THE PERM. POOL= 52,688 cf X 8756 X= 5 50 _ 6.00, 17646 ELEVATION OF THE TEMP POOL= 5.50 (Min Req'd) DEPTH OF TEMP. POOL (Z)= 0.50 ft DETERMINE THE REQUIRED DRAIN SIZE TO DRAIN THE TEMP.POOL IN 2-5 DAYS (48- 120 hrs) ASSUME 2.0 In, 0 DRAIN INV EL= 5.00 CL EL.= 5 08 DRAWDOwN ZONE HEAD Q I TIME BEGIN. EL END EL, ft cis hrs 0.17 002 9989 IUTAL IIMt IUUHAIN II,MI'YUUL= tiv.uvnrs WHERE: HEAD =AVG. HT. ABOVE CL OF OPENING Q= Cd x A x (2gH)o s Cd= 0.59 A= DRAIN AREA (sl) TIME= VOL/ Q ANTIFLOTATION BLOCK. SQUARE VOL OF DISPLACED WATER= RISER HEIGHT x RISER AREA =ZxAREA WHERE: Z= 5,50 = 197 86 cf 6.0 it long 6 0 ft wide D= 36 00 it WEIGHT OF DISPLACED WATER= VOL x 62 4 Ib/cf = 12,347 lb. WEIGHT OF CONCRETE REQUIRED= 1.1 x WE DISPLACED WATER = 13.581 Ib REQUIRED THICKNESS OF CONC BLOCK = WEIGHT/ (LENGTH)(WIDTH)(150-6241b/cf) BLOCKSIZE THICKNESS 6.50 at 3.67 ft 8.00 sf 2.42 ft 9.00 $1 1.91 It 10 00 sf 1.55 ft 12 00 sf 1.08 ft 12.50 sf 0 99 ft USE 10.00 It SQUARE BLOCK, 19 in THICK (Use min. 12") NOTE: Since rectangular structure, use 14LF x 9LF block 3017 WETDETBASIN 04-07-08 As Page 2 PROJECT NAME River Road Sports Complex BY J. Wehling PROJECT NUMBER 3017 DATE 3/2/2008 REV. 4/2/2008 WET DETENTION BASIN # 1 SUMMARY Assumes flow over weir is less than 12" deep. TEMP. POOL EL: 5.50 NORMAL POOL EL = 5 00 TEMP. POOL DRAIN / SHELF @ EL 4 50 EMERG. DRAIN SHELF @ EL 5 50 3017 WETDETBASIN 04-07-08 As Page