Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7080117_CURRENT PERMIT_20080220
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ��lBOa�C7 YYYYMMDD C' Mr. Rickie Gray, Regional Manager Southern Equipment Company, Inc. PO Box 877 Greenville, NC 27835 Dear Mr. Gray: klAo Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality February 20, 2008 Subject: Permit No. SW7080117 Ready Mix Concrete Company — Bayboro Facility High Density Stormwater Project Pamlico County The Washington Regional Office received a complete Stormwater Management Permit Application for Ready Mix Concrete Company — Bayboro Facility, located at 2217 Cowell Loop Road, on February 20, 2008. Staff review of the plans and specifications has determined that the protect, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW7080117 dated February 20, 2008, for the construction of the subject project. This permit shall be effective from the date of issuance until February 20, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit and in the submitted application. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, of need additional information concerning this matter, please contact either Scott Vinson, or me at (252) 946-6481. Sincerely, )."-4 I Al Hod e Regional Supervisor Surface Water Protection Section AH/sav: C:\STORMWATER\PERMIT\SW7080117 cc: Michael Tolson, PE — H.C. Harris Engineering & Surveying Pamlico County Building Inspections jrmwater Permitting Unit, Central Office shington Regional Office Central Files Nn hCarolma aturatty North Carolina Division or Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: www.newatercivality.org 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SV 7080117 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Southern Equipment Company, Inc. Ready Mix Concrete Company- Bayboro Facility Pamlico County FOR THE construction, operation and maintenance of a wet detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwaterrules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 20, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls have been designed to handle the runoff from 109,910 square feet of impervious area. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans and permit. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. The runoff from all built -upon area within the permitted drainage areas of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SV 7080117 6. The following design criteria have been provided in the wet detention basin and must be maintained at design condition: a. Drainage Area, ft2: 220,864 b. Total Impervious Surfaces, ft2: 109,910 C. Design Storm, inches: 1.0 d. Pond Depth, feet: 5.50 (avg. 3.0') e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 0.50. g. Permanent Pool Surface Area, ft2: 12,525 h. Permanent Storage Volume, ft3: 35,770 i. Permitted Forebay Volume, ft3: 6,503 j. Temporary Storage Elevation, FMSL: 1.25 k. Temporary Storage Volume, ft3: 10,900 I. Controlling Orifice: 1.25" � pipe M. Receiving Stream/River Basin: UT of Racoon Creek / Neuse n. Stream Index Number: 27 — 150 — 5 o. Classification of Water Body: "SC; Sw, NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plans must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SV 7080117 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made.' 13. This permit shall be effective from the date of issuance until February 20, 2018. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Page 4 of 7 State Stormwater Management Systems Permit No. SW7080117 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from"complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the project. 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 20th day of February, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION XI_I------- for Coleen . Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7080117 Page 5 of 7 State Stormwater Management Systems Permit No. SW7080117 ipany — Bayboro Facility V 7080117 as a duly registered in the laving been authorized to observe (periodically/ weekly/ full time) the �Wl wu Ml LIVll vl UIG VI vjuV I . (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Pamlico County Building Inspections Page 7 of 7 W, il DW SE'ONLY �Q.0 . Date Received Fee Paid Permit Number State of North Carolina S WACK 1f3110S RECEIVED Department of Environment and Natural Resources Q Division of Water Quality & i v'Q— JAN 3 O 2008STORMWATER MANAGEMENT PERMIT APPLICATION FORM A This form may be photocopied for use as an original` OVl�Q-WARD I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Southern Equipment Company, Inc. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Fickle Gray - Regional Manager 3. Mailing Address for person listed in item 2 above: PO Box 47 City:, Phone: (252 ) 758-3332 Email: rickie.gray(a?rmcc.com State: NC Zip: 27835 Fax: (252 ) 758-3945 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ready Mixed Concrete Company - Bayboro Facility 5. Location of Project (street address): 221 7 Cowell Loon Road County:Pamlico 6. Directions to project (from nearest major intersection): From tlwy 55 in Bayboro bear left on 304 towards Vandemere (on Vandemere Road). Turn 2 miles on the left onto Cowell Loop Road. The Bite 15 approximately 112 mile down road on right in a Sharp curve. 7. Latitude:35. I G554 Longitude:-7G.74359 of project 8. Contact person who can answer questions about the project: Name:Michael D. T015on, P.E. Telephone Number: (252 ) 321-5G07 Email:mdtol5on aPhcham5.net II. PERMIT INFORMATION: Form SWU-101 Version 8.07 Page 1 of ■ 1. Specify whether project is (check one): ®New ❑Renewal ❑Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit 3. Specify the type of project (check one): and its issue date (if known) ' ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ®NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will 5heetflow into 5wale5 encaP5Ulating the Site and be conveyed via Swale to a wet detetion pond The wet detention pond will store the I " inch of runoff for a penod of 2-5 days by controlled release through an 2. Stormwater runoff from this project drains to the NeU5e River basin. 3. Total Site Area: 5.07 acres 4. Total Wetlands Area: 0.00 acres 5. 100' Wide Strip of Wetland Area: 0.00 acres (not applicable if no Wetlands exist on site) 6. Total Project Area**:5.07 acres 7. Project Built Upon Area:49.8 8. How many drainage areas does the project have? I 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Areal Drainage Area 2 Receiving Stream Name UT of Racoon Creek Stream Class & Index No. 5C, 1 1 N5W S j j� Drainage Area (so 220,8G4 Existing Impervious* Area (so 1,089 Proposed Impervious*Area (so 109,910 Impervious* Area (total) 49.8 Impervious* Surface Area -.. Drainage Area 1 "`., Drainage Area 2 On -site Buildings (so 4,221 On -site Streets (so 0 On -site Parking (so 105,G89 On -site Sidewalks (so 0 Other on -site (so 0 Off -site (so 0 Total (so: 109,910 * Impervious area is defined as the built upon area including, but not limited to, buildings, rands, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 8.07 Page 2 of 4 **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above derived? IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-13ioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 0. . VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htto://h2o.enr.state.nc.us/su/msi maos.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (54,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Michael D. Tol5on, P.E., H.C. Harris Jr. Engineenny and 5urveviny Mailing Address: 2 1 G N. Main Street Phone: (252 ) 32 1 -5GO7 Email: mdt0150n(a,hcharn5.net VIII. APPLICANT'S CERTIFICATION . State: NC Zip: 28590 Fax: (252 ) 32 1-G208 I, (print or hype mmne of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective coven will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. A /-- 30 -o$ Form SWU-101 Version 8.07 Page 4 of 4 Permit No. l t r? O (to be provided by DWD) ©FIR 02OF WATFgOG W � � NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number Rsady Michael D.To150n, P.l 252-321-5G07 1 /29/2007 1 II. DESIGN INFORMATION Site Characteristics Drainage area 220,8G4 fe Impervious area 109,910 fe %impervious 49.7G3G55 % Design rainfall depth 1 .0 in Storage Volume: Non -SR Waters Minimum volume required 9, 1 G9 ft' Volume provided 10,900 ft' Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft' Post -development 1-yr, 24-hr runoff ft' Minimum volume required ft' Volume provided _ ft' Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? N (Y or N) 1-yr, 24-hr rainfall depth 3.G in Rational C, pre -development 0.4 . (unitless) Rational C, post -development . O.G (unitless) Rainfall intensity: )-yr, 24-hr storm 3:7 in/hr Pre -development 1-yr, 24-hr peak flow 8.0 ft'/sec Post -development 1-yr, 24-hr peak Flow 1 1.9 ft'/sec Pre/Post 1-yr, 24-hr peak Flow control 3.9 ft'/sec Basin Elevations Basin bottom elevation -.5.00 It Sediment cleanout elevation - -4.00 It _ Bottom of shelf elevation 0.00 '. ft Permanent pool elevation 0.50 ft Top of shelf elevation 1 .00 ft Temporary pool elevation 1.25 . c It Volume and Surface Area Calculations SAIDA ratio 5.GO (unitless) Surface area at the bottom of shelf G988.00 ftz Volume at the bottom of shelf 2530G.00 ft' Permanent pool, surface area required 1 2;3G,5 f? Permanent pool, surface area provided 12,525 W Permanent pool volume 35,770 ft' Average depth for SAIDA tables 2.6555852 It Surface area at the top of shelf 15301 fe Volume at the top of shelf 50G 13 ft3 RECEIVED FEB 2 0 2008 DWQ PROJ # OK Minimum of 3 it required, Increase depth Forth SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) 111. DESIGN INFORMATION Forebay volume G,503 ft3 Forebay %of permanent pool volume 18 % OK Temporary pool, surface area provided '1 5,775 ftz Drawdown Calculations Treatment volume drawdown time 3.51 days OK Treatment volume discharge rate 0.03 ff3/s Pre -development 1 -yr, 24-hr discharge 8.08 _ft3/s OK Post -development 1-yr, 24-hr discharge 7.92 ff3/s OK Additional Information Diameter of orifice 1.25 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width IO ft OK Length of fiowpath to width ratio 3.5 :1 OK Length to width ratio 1 .5 :1 OK Trash rack for overflow & orifice? Y. (Y or N) OK Freeboard provided I fit OK Vegetated filter provided? 'N (Y or N) Design must be based on 90% TSS removal Recorded drainage easement provided? N (Y or N) Need a recorded drainage easement Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Valve In Bottom of Box Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. MD (� 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. �A oP 3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure vWth trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. R n fd [ ri3 3. Section view of the dry detention basin (1" = 20' or larger) shoving: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. AI� z 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. p 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. f�JL n n� 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. a 3 7. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. �Qy L 8. The supporting calculations. V 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. Form SW401-Wet Detention Basin-Rev.1 Part III. Required Items Checklist, Page 1 of 1 Permit Number: -5-W `?0T0/Z % RMCEIV E (tobe be provided by DWQ) et' Drainage Area Number: r,,, . ,, ,,Met Detention Basin Inspection and Maintenance Agreement JAN 3 0 2008 ®Iflf Q' � Iflr eep a maintenance record on this BMP. This maintenance record will be kept in a a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin 1&M-Rev.2 Permit Number: (to be provided by DWQ) Drainage Area BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads --4)_ feet in the main pond, the sediment shall be removed. When the permanent pool depth reads -i-2)- feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM Ulf in the blanks) Permanent Pool Elevation 0.50 1-21 Pe men Pool --------------- +-- Volume Sediment Removal Elevation L44) Volume (3) -ft Min. --------------- ----------------------------- ------ Sediment Bottom Elevation f� 1-ft r Storage Sedimet Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin I&M-Rev.2 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Ready Mixed Concrete Company - Bayboro Facility BMP drainage area number:I Print name:Rickie Gray Title:Regional Manager Address:PO Box 887, Greenville, North Carolina 27835 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, M:Q'IkN , P. 'Cel.son! , a Notary Public for the State of 1`40f'ru CAtrp[INA County of EMcow6C- , do hereby certify that Qzt wC- G zwy personally appeared before me this 30"4 day of -'),ANvmz-1 zoo$ , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, ••• G�PEL D. 0T 'I*, :' NoTARr 'o'�pVBLIG :°Uc SEAL My commission expires.! /0 6 Form SW401-Wet Detention Basin 1&M-Rev.2 ..:� RECEIVED FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT JAN 3 0 2008 EXPRESS PERMITTING OPTION No person may initiate any land -disturbing activity on one or more acres as covered by ther)AWWWkl R0 form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.) Part A. 1. Project Name: Ready Mixed Concrete Plant 2. Location of land -disturbing activity: County: Pamlico City or Township: Bavboro Highway/Street: Cowell Loop Road Latitude 35.15931 Longitude: 76.74355 3. Approximate date land -disturbing activity will commence: February 2008 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Commercial 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 5.12 ac 6. Amount of fee enclosed: $390.00. The Express Permitting application fee is a dual charge. The normal fee of $50.00 per acre (rounded up to the next acre) is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee is a fixed $2,000.00 (Example: 9 acres total is $2,450). 7. Has an erosion and sediment control plan been filed? Yes _No _ Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name Michael D. Tolson, PE E-mail Address mdtolson (a).hcharris. net Telephone (252) 321-5607 Cell # (252) 327-5455 Fax # (252) 321-6208 9. Landowner(s) of Record (attach accompanied page to list additional owners): Southern Equipment Company Name 3610 Bush St. Current Mailing Address Raleigh North Carolina 27609 City State Zip Telephone Fax Number 3610 Bush St. Current Street Address Raleigh North Carolina 27609 City State Zip 10a. Deed Book No. 501 Page No. 12 Provide a copy of the most current deed. 10b. Deed Book No. 501 Page No. 15 Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Southern Equipment Company Name E-mail Address PO Box 877 Current Mailing Address Greenville North Carolina 27835 City State Zip (252)758-3332 Telephone 669 N. Greene Street Current Street Address Greenville North Carolina 27835 City State Zip (252)758-3945 Fax Number 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address City State Telephone: E-mail Address Current Street Address Zip City Fax Number: State Zip (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name Current Mailing Address City State Zip Telephone: E-mail Address Current Street Address City State Zip Fax Number: (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: H.C. Harris Jr. Engineering & Surveying, P.A. mdtolson(a hcharris. net Engineering Firm or other consultant E-mail Address Michael D. Tolson, PE (252) 321-5607 (252) 321-6208 Individual contact person (type or print) Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in - fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there by any change in the information provided herein. name Title or Authority I, N-It ltAFG TD. `fOl4o&f a Notary Public of the County of r7DGEro wRb - State of North Carolina, hereby certify that Rickie Gray appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my ha5q%en6nv{irial seal, this 3D" day of January, 2008 ••.••` PEl D. ro�tot •,,......••• �s uAOTAP?y ; Notary My commission expires (I r to 8 ;� mac.,•• � Z•