Loading...
HomeMy WebLinkAboutSW7080110_APPROVED PLANS_20080310STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW���J��[[� DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE������% YYYYMMDD A SUBMITTALS FIRST SUBMITTAL Owner: Atul Parmar 3455 Dr. M. L. King Jr. Blvd. New Bern, North Carolina 28562 (252)259-1575 Surveyor Brad L. Suitt & Assoc., P.A. 302 South Jimmies Creek Drive New Bern, North Carolina 28561 (252)635-3333 Landscape Architect: Tony M. Tate Landscape Architecture P.A. 5011 Southpark Drive, Ste. 200 Durham, North Carolina 27713 (919)484-8880 engineer: Blackburn Consulting Engineering 365E. Main Street Clayyton, North Carolina 27520 (919) 553-2900 08/02/07 NEW BERN, NORTH CAROLINA VICINITY MAP N.T.S. INDEX COVER SHEET EXISTING CONDITIONS & DEMO PLAN L-I SITEPLAN.................................................................. .L-2 LANDSCAPE PLAN ...................................................... .L-3 WET POND LANDSCAPE PLAN ............................ .......... L-3A SITE DETAILS ...................................................... .L-4 UTILTY PLAN ............................L-5 STORMWATER PLAN .................................................... .L-6 BMPDETAILS .................................... ........................... L-7 EROSION CQNTRM P.LA.N............................................ .L-8 EROSION CQNTRQ L DETASS................................. 0...... _L-9 �0� MUST J�o TF'� O �i 0 ¢Li o Zm Z � 7 y :1: "• l : I- j I� -C T 1 I ,ti r ■PI•(LM"IARY PL" - NDT IGR COIISTpICTR7N THIS NOTE WILL BE REMOVED UPON FINAL AP PROVAL GOVIRNMENTAL AGENCY APPROVING ■DO NOT END THIS SET OF PLANS UNTIL LABELED 'APP'w0V{p PA COrT11YCTR7Er TORY M. TATE LANDSCAPE ARCHITECTURE P.A. IS IN NO PART RESPONSIBLE FOR &D9 OR BID CHANGES. •OWNEPJDEVELAPIRMURVEYOR SHALL l.>BTAIN FINAL CONSTRucION DOCUMENTs FROM DESIGNER PRIOR TO CONSTMI(TION STAKNG. ■THE CLIENT SIIAIL BE FULLY RESPONSIELE FOR THE E%PLORATIOI AND IDENTIFICATION OF ALL SUB -SURFACE CQIDITIONS ON THE SITE AND SHALL PROVIDE MIT AND ALL INFORMATION TO THE DESIGN TEAS. ■THE CLIENT/DEVELOPER SHALL FULLY REVIEW AND UNDERSTND THE INFORMATION DEPICTED ON THESE PLANS ARO SHALL APPROVE THE RELEASE of THESE PLArE TO BE SENT OUT FOR CONSTRUCTION. ■T06 ORAYir16 Ty PBOP/RTY OP TONY M. TATE • LANDSCAPE I!C SCURE PA AND IS NOT TO UE REPRODUCED OR COPIED IN WHOLE OR IN PART WITHOUT FERMI9910N. MIT IS NOT TO BE USED ON ANY OTHER PRO ac s 4; Toffy-M Z2'ate ndseape A clfit&tae, PA 5011 Soutlgwk M.e, 200,D.bMNCM13 Tdgftft (919)4M- j0 F. (➢19W4.W1 9120.A7im0alyne de,M m,NCT130I md: 1mc z 0 C4 5 SCALE: NO SCALE DRAWN BY: KRM DATE: 8-2-07 C1 II M APPROVED NORTH CAROLINA ENVIRONMENTA MANAGEMENT COMMISSION DIVISION OF WATER OUALIT Datemf*'—f "' Stormwater Permit No. '5 W 06611 OF 10 SIGNAGE EXAMPLE A < <- t :ir SM ALL C T PTO WM AND RWMAT0 6 T '' RN r D Il)� U Gp R 700 i 5CALEt 1' - 40' TENT "SI TE" re.n .... n.mw .avr •.• ,�9np x�ayss�r � n9•m.w �Vm96o1.,mW. DUMPSTER WITH MASONRY SCREEN WALL 0 rn SITE DATA TOTAL AREA (127,195.2 S.F.) 2.92 ACRES PHASE 1 (77,101.2 S.F.)1.77 ACRES PHASE 2 (FUTURE) (50,094.0 S.F.)1.15 ACRES PROPOSED USE 4 STORY, 81 ROOM HOTEL BUILDING SIZE 119664 S.F. 4 STORY HEIGHT TO CORKS = ??? 449000 S.F. PARKING REQUIRED 86 SPACES PARKING PROVIDED 95 SPACES ZONING C-3, CORRIDOR OVERLAY: MLK BLVD, GELNBURNIE DENUDED AREA 1279195 S.F. EX. IMPERVIOUS (to be demolished) (63%) 801&44S.F. NEW IMPERVIOUS SURFACE AREA (10"I ; > (40%) 501Za$S.F. PERMITS REQUIRED: 1, NCDOT Driveway permit BUILDING 11,664 S.F. 2. Special Use Permit PARKING 35,2�SS.F. 3, All utility taps Sedimentation and Erosion Gantrat 4.5. SIDEWALK 25&44S.F. > Demolition 5. Demolition permit NET DECREASE IN IMPERVIOUS ( PNA`� 1 30,436SF 6. Sign permit FUTURE IMPERVIOUS (PHASE 2) $3,10(Z SF AREA DEVOTED TO PLANTINGS (58%) 699023 S.F. PHASE 1 SEEDED LAWN AND SHRUB BEDS) (29%)401623 S.F. PHASE 2 SEEDED (FUTURE TO BE DEVELOPED) 329286 S.F. (area of Phase H to be planted in future shall be at least 25%) NOTES: I. Boundary and field topographic information taken from file by Brad L. Suitt 4 Assoc. P.A. dated June lo, 2007. 2, Contractor shall verify the location of all existing utilities and shall be responsible for any damage resulting from his activities. Gall utility locator service 45 hours prior to digging. 1-500-632-4cl49 3. All construction shall conform to the City of New Bern standards and specifications. 4. All construction shall conform to all state and local standards, specifications and code regyirements. 5. Notify designer of any discrepancies. No changes may be made to the approved drawings without written permission from the issuing authority. 6. All dimensions are referenced from back -of -curb to back -of -curb. 7. All roof drains shall be tied to the nearest catch basin or as shown. 5. All handicapped spaces shall conform to the N.G. Building Code, Volume I-C, Accessibility Code. cl. Contractor shall provide positive drainage away from the structure in all locations. 10. Erosion control plans shall be approved prior to any grading on this site. 11. Building setbacks shall be verified by registered land surveyor prior to digging footings. 12. All buildings shall be taken from architectural drawings by Surapun Architects, 13. All exterior parking lot lighting shall be 400 watt metal halide, 30" sgyare shoebox fixtures on 4" sgyare, 30' tall steel pole. Contact local utility provider for lease options. 14. Irrigation meter, if not already existing, will be the responsibility of the irrigation contractor to order and install. 15. A Professional Engineer must inspect every fire line before cover. Call Professional Engineer 45 hours prior to installation for inspection. 16. All parking and drives shall be surfaced with G" cabc and 2" 1-2 asphalt. 30" concrete curb typical. 17. The site is located in zone X of the FEMA zones as per the July 2, 2004 study. 18. Provide electrical service to all sign locations. 19. Contractor shall obtain permit from the City of New Bern to tie into exist. storm sewer system. 20. No wetlands area present on this site. 21. All corridor standards for MLK Boulevard and Glenburnie Drive shall be met. 22.Refu5e service will be provided by City of New Bern, upon receipt of Certificate of Occupancy. 23.Third party approval EFTS/or show certification of contractor regyired. 24.Based on this approved plan at least 20% of the area must be planted. If the property is subdivided into ohoses. I t It. then the planted area fro each phase must be at least 25%. ate .tore. PA 501I SoudwA D.i.. Rkphm. (919)1& 3120-ArmWlyo. ..a. w R. z O �a N z H z � b Q � C 0 SCALE: 111=40 DATE: 08/02/07 SHEET L-2 OF 10 a -_ -G • G• • ., rig CC '� •sir. i �� v.rTasnT�as�staH��ars `:ime��T�- - • L tracer► � - � .,✓/JJ:A!?' ray' � i�w:4 .� 61001 if a -6111 �� I �� �{`�i�ifrbl'��fl►��i�/� ILL I i - : MOMS �`Re-aw��\•ii•�s v� �4 N FOR SITE LAND NET DETENTION POND PLANT LIST KEY QTY BOTANICAL NAME COMMON NAME SIZE ROOT W 5 Salix ni ra Black Willow 5-0 HT. B#B RB 4 Betula nigra River Birch 5--V HT. B*B SPB q Clethra ainifolia Sweet Pe perbush 36' HT. Cont. VI 21 Viburnum cassinoides Northern Wild Raisin "HT. Cont. BB 19 Cepholontus occidentalis Buttonbush 36" HT. Cont. IB 16 Ilex qlabra Inkberry 36" HT. Cont. MH 7 Hibiscus mosche-utos Marsh Hibiscus 18"-24" HT. Cont. BA 20 Berberis thunber ii Barberry 18"-24" HT. Cont. 1 275 Iris vie inica Southern Blue Flog Iris I Gal. Cont. SG 355 Panicum virgatum Switchgrass 4" POT Cont. SP 250 Scir us piinfIOIT15 Soft Stem Bulrush 4" POT Cont. PLANT SOURCES: ALL PLANT MATERIAL SHALL COME FROM LOCAL NURSERY STOCK. IF A SOURCE FOR A SPECIFIED PLANT CAN NOT BE LOCATED, LANDSCAPE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT FOR A SUITABLE SUBSTITUTION. BIORENTION PONDS PLANT LIST KEY QTY BOTANICAL NAME COMMON NAME SIZE ROOT BRI 25 Ceonothus americanus Jersey Tea 3 Gal. Cant BR2 73 Pennisetum alo curoides 'Hameln' Fountain Grass 3 Gat. Cant BR3 18 Fothergilla gardenii Dwarf Fother ilia 3 Gal. Cont. BR4 625 Hemerocollis Daylily I Gal. Cont. BR5 5 Quercus hellos Willow Oak 2 1/2" 1 BBB PLANT SOURCES: ALL PLANT MATERIAL SHALL COME FROM LOCAL NURSERY STOCK. IF A SOURCE FOR A SPECIFIED PLANT CAN NOT BE LOCATED, LANDSCAPE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT FOR A SUITABLE SUBSTITUTION. 44 - 85(BR4) IfA 45(BR4) -BR3 `�f 55(BR4) CD `rf 7- RI 5-BRI II-B 2 i-BR5 3-BR3 5 I 90(BR4) rep EXISTING INVERT: 40 NOTES: MAINTENANCE PROCEDURES: WET POND I. IMMEDIATELY OFTER THE WET DETENTION BA51N 15 ESTABLISHED, THE PLANTS ON THE AQUATIC SHELF AND THE PERIMETER BASIN SHALL BE WATERED TWICE WEEKLY, IF NEEDED, UNTIL THE PLANTS BECOME ESTABLISHED. INSPECT WEEKELY FOR A MINIMUM OF 6 WEEKS. 2. AFTER THE INITIAL FERTILIZATION AT THE TIME OF PLANTING, NO FURTHER FERTILIZATION SHA LL OCCUR FOR THE PLANTS ON THE AQUATIC SHELF. 3. STABLE GROUNDCOVER SHALL BE MAINTAINED IN THE DRAINAGE ARE TO REDUCE THE SEDIMENT LOAD TO THE NET DETENTION BASIN. OVER SEED ALL BARE SPOTS TO ENSURE A DENSE COVER. 4. I N BA51N MUST BE DRAINED O AN EMERGENCY O O PERFORM MAINTENANCE, F THE D FOR E ERGE Y R T PERF R TE E THE FLUSH OF THE SEDIMENT THROUGH THE EMERGENCY DRAIN SHOULD BE MINIMIZED TO THE MAXIMUM EXTENT POSSIBLE, 5. ONCE ESTABLISHED THE NET DETENTION POND SHALL BE INSPECTED ON A MONTHLY BASIS AND WITHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.5 INCHES. 6. RECORDS SHALL BE MAINTAINED OF ALL INSPECTIONS AND MAINTENANCE PROCEEDURES. THE RECORDS SHALL BE KEPT IN A KNOWN LOCATION AND MADE AVAILABLE UPON REQUEST. MAINTENANCE PROCEDURES: FLITER STRIP 1. INSPECT FILTER STRIP DURING AND AFTER MAJOR STORM EVENTS TO ENSURE PROPER DISTRIBUTION OF FLOWS AND SIGNS OF EROSION. 2. AFTER THE FIRST 1-2 YEARS, INSPECT THE FILTER STRIP ANNUALLY OR BI-ANNUALLY. 3. ROUTINE MAINTENANCE SHALL INCLUDE MOWING, TRIMMING AND REPLANTING AS NECESSARY. IF EXCESSIVE SEDIMENT BUILDS UP, IT MAY BE NECESSARY TO REGRADE AND RE -SEED. 4. IMMEDIATELY AFTER THE FILTER STRIP 15 PLANTED, ANY VEGETATION SHALL BE WATERED TWICE WEEKLY UNTIL ESTABLISHED. 5. ONCE A YEAR THE FILTER STRIP SHALL BE RE -SEEDED TO MAINTAIN A DENSE GROWTH FO VEGETATION.2-3 TIMES PER YEAR THE FILTER STRIP SHALL BE MOWED AND THE CLIPPINGS HARVESTED TO PROMOTE THE GROWTH OF THICK VEGETATION. TURF GRASS SHALL NOT BE CUT SHORTER THAN 3-5 INCHES AND MAY NOT BE ALLOWED TO GROW AS TALL AS 12". 6. ONCE PER YEAR THE FILTER STRIP SHALL BE AERATED IF NECESSARY. 7. ONCE PER YEAR THE SOIL pH SHALL BE TESTED AND LIME ADDED AS NEEDED. 8. ONCE ESTABLISHED THE FILTER STRIP SHALL BE INFECTED QUARTERLY AND WIHIN 24 HOURS AFTER EVERY STORM EVENT GREATER THAN 1.5 INCHES. Table 10-4 Inspection and Maintenance Provisions for Wet Detention Basins BMP Element Potentialproblems: How to remediate theproblem: The entire BMP Tres debris is present Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until It Is established. Provide lime and a one-time fertilizer appliculom Vegetation is too short or too Maintain vegetation at a height of approximately six inches. The inlet device: pipe or mwale The pipe is dogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem If original design depth for possible. Remove the sediment End sediment storage. dispose of it in a location where it will not cause Impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problem. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying, BMP element Potentiil trims: Now to remediate the problem The vegetated shelf hest professional practices Prune according to best professional slow that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is Weeds are present Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment passible. Remove the sediment and storage depth dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth ewers over Consult a professional to remove 50% of the area, and control the algal arowth. CAttails, pbragmites or other Remove the plants by wiping them Invasive plants cover 5D% of with pesticide (do not spray). the basil surface. The embankment Shrubs have started to grow Remove shrubs Immediately. on the embankment Bvideneeofmaskrator Use traps to remove muskrats and beaver activity is present. consult a professional to remove heavers. A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by An Make all needed repairs, appropriate professional shows that the embantmTent needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. Theouthalderviceisdamseged 1 Repair or lace the outlet device. The receivingwate: Brosion or outer signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet the 401 Oversight Unit at 919-733- 1786. I. THE TOP OF THE BERM AND THE EXTERIOR 51DE SLOPES SHALL BE SEEDED WTIH CENTIPEDE GRASS. 2. THE VEGETATIVE FILTER STRIP SHALL BE SEEDED WITH CENTIPEDE GRASS 3. NO TREES OR SHRUBS SHALL BE PLACED WITHIN 10 FEET OF INLET OR OUTLET PIPES, OR MAINMADE DRAINAGE STRUCTURES SUCH AS SPILLWAYS OR FLOW SPREADERS. 4. PLANTINGS SHALL NOT BE PLACED ON BERMS 5. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES AND SHALL BRING ANY DESCREPANCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT. 6. SEED SHALL BE APPLIED AT THE RATE SPECIFIED BY THE MANUFACTURER. IF PLANT ESTABLISHMENT CANNOT BE ACHEIVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILTY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTINGS AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. 7. ALL NEWLY PLANTED PLANT MATERIAL SHALL BE PROTECTED FROM INVASIVE WEEDS AND ANIMAL DAMAGE (STAKING, NETTING, ETC.) TO ENSURE PLANT SURVIVAL. 8. ALL STAKING SHALL BE REMOVED WITHIN 12 MONTHS TO PREVENT GIRDLING. q. ALL PLANTS SHALL HAVE A 2-YEAR WARRENTY. AT THE END OF THE IST YEAR AND AGAIN AT THE END OF THE 2-YEAR WARRENTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE SHALL BE REPLACED. 10. ANY SOIL AMENDMENTS SHOULD BE ADDED AT THE END OF THE SITE CONSTRUCTION PROCESS. THE BMP SHALL BE PLANTED AND MULCHED IMMEDIATELY AFTER AMENDING THE SOIL TO STABILZE THE SITE AS SOON AS POSSIBLE. II. SHALLOW WATER PLANTS ARE BEST PLANTED BETWEEN APRIL I AND JULY 15. AVOID WINTER PLANTINGS. ■DO NOT BID THIS SET OF PLANSmommD UNTIL IJtBELED LMVSCAPEE P.A r H tM10 PART ATI RESPONSIBLE FOR SIDS OR BID atANGES. d TO t Table 13-2 hispection and Maintenance Provisions for Filter Ships BMP element potentialproblem; How to remediate the probIenu The entire rdher strip system Trash/debris is present Remove the trash/debris. The flow splitter device (if applicable) The Bow Spitler device is do d. Unclog the conveyance and dispose of an sediment off -site. The How splitter device is damaged. Make any necessary repairs or replace if damage is too large for repair. The wale and the level tip The Swale is dogged with sediment Remove the sediment and dispose of it off -Site. The level lip is cracked, settled, undercut, eroded or Repair or replace lip, otherwise dams There is erosion around the Regrade the soil to create a berm end of the level spreader that shows stormwater ties bypassed it that is higher than the level lip, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the Swale or just downslope of the level Hip. The bypass channel Areas of bare soil and/or erosive gullies have formed, Regrade the soli If necessary to remove the gully, and then - reestablish vroper erosion control. Turf reinforcement ie damaged or ripap is rolling downhill. Study the site to see If a larger bypass channel is needed (enlarge if necessary). After this, reestablish the erosion control material. do not top tree hole darner w to 2• CaLtvIce bad else. greater thin 2•. 2' larger the bell 2 piece, rebforced rubber hose 12 ga gaNadred wre Wk. for defhctlm rx2•x9' treated Stake 2.12kG' temeq, backfa a G' byre, be ka n rah excavated matend Sad 5L max. orgeaw 4• ,itch m ,peCHfvid udattrbed sbR'ads settb d pletags nth ntw LAR TRH rumhove ramose reWor after i yand We fron � SMALL TRICE carefuy Ravi d devised roots and broaches 4' En. uAch Byer set top of root bd G•-B• above grads Preparo Satre b" not adnAmtly. 5nRJ5 Sam PLANTING PLANTING DETAE S GENERAL PLANTING NOTES 1. VERIFICATION Or TOTAL QUANTES A$ SHOWN ON THE PLANT LIST SMALL car THE RESPONSIBILITY Of THE PLANTNO CONTRACTOR. AND THE TOTAL QUANTES SMALL BE REQLRED ON THE PLANTING PLAN. 2. ALL TREES, SHRL DS. AND NDD14G PLANTS SHALL 00HPORM To THE ACCEPTED STANDARD ESTAIII BY THE APERIGAN ASSOCIATION Or HIRSERYM4N. 3. ALL 5AUCER5 SHALL BE 50AIRD WITH WATER AND NLCHED rPEDIaTELY roLLowHG PLANING. 4. SET TOP OF ROOT BALL 6•-B' ABOVE GRADE. PREPARE ENTIRE BED, NOT NSC DUALLY. 5. THE SQL Or ALL ROOT BALLS SHALL CONFORM TO AAN STANDARDS. G. FERTLQC ALL PLANTS WITH AGWORM FERTILIZER TABLETS OR EQUAL TO BE APPLIED AT MANIFACTURERS RECCOMENDED RATE. T. GAMIC, IF NECESSARY. SMALL BE REMOVED AFTER ONE GROWNG SEASON. a. ALL ROOT BALLS REMOVED FROM CONTAINERS SHALL W SCARVED PRIOR TO BACAT"G. 4 ALL TREES HAVE BEEN LOCATED WITH RESPECT TO PROPOSED OR EgSTNG FACLITES OR STRUCTUES. to. OWNERS SHALL MAINTAIN ALL PLANT BEDS AND PLANT MATERIAL N GOOD HEALTH. AND ANY DEAD. UNHEALTHY OR MISSING PLANTS SHALL BE REPLACED WITH LOCALLY ADAPTED VEGETATION EGE MCC. WHICH CONFORMS To THE NRAL PLANTING STANDARDS OF THE LANDSCAPE ORD1%. REPORT ANY DEWREPANCE5 TO THE PROJECT LANDSCAPE HUARCHITECT. 12. SLSSTTION5 OR ALTERATIONS SHALL NOT BE MADE WITHOUT PRIOR WRITTEN 14OTMATI Of THE PROJECT LANDSCAPE ARCHITECT. 13. ALL PLANT MATERIAL SMALL BE OF SPECETN OVNJTY. ol �tA UST LITY p9/1,,, o 0i O QW Zm D Z 7 y BPMYWMM iI i-80d-�L-1919 PRELIMINARY 20 io 0 20 ao' SCALED 1' = 20' NOT FOR CONSTRUCTION Indscape kclute'91'fture, PA $011 sxWWkDnvc9200. Dui .NC27?13 Tel 19 Pu 919 tl rgAr,. Nt Dr0t, < N 27 31Z6A'uan: lmer1pi McWe, NC 2130E smell; amJ�Kdam.oel 0 z_ W W W Z_ U z w z X Z Q U_ J i_ 00 in W Z�N� O fr1 en ,� UZN,LO Z M O O 0 WW C14 �I MU InLLo z O F-1 N �O N Z 1364 -- PO ,tiq] ^ iYi w � � w a HA U aM SCALE: V=20 DRAWN BY: KRM DATE: 08/02/07 SHEET Lauane3A OF 10 Storm Drainage Table Inlet DA Sum DA 0(25) Top Invert Culvert Length Slope Outlet 1 18.5 18" 18 0.00% n nnn/ 2 n 4 nA •I)• IA •A" AA AAAA/ f1•LL 0.28 0.28 2.1 22.00 18.5 15" 78 0.38% 5 5 0.18 0.46 3.4 22.00 18.2 15" 82 0.49% 6 6 0.21 1.69 12.1 22.00 17.8 24" 150 0.40% 6A 6A 0.00 1.69 12.1 22.00 17.2 24" 66 0.30% 12 7 0.35 0.35 2.5 22.00 18.0 15" 50 0.40% 6 8 0.67 0.67 2.5 22.00 18.3 15" 98 0.31% 6 9 0.17 0.17 1.2 20.50 18.0 15" 47 0.43% 10 10 0.19 0.36 3.0 20.70 17.8 15" 41 0.49% 11 11A 0.26 0.26 2.2 21.70 18.5 15" 96 0.94% 11 11 0.12 0.74 6.1 21.00 17.6 18" 38 3.68% Pond 12 0.26 2.69 12.8 20.00 17.0 30" 76 0.39% Existing Existing 21.99 16.5 36" LEGEND ■ DROP INLET © DROP INLET NUMBER X 233 SPOT ELEVATION DRAINAGE NOTES: 1) ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. 2) ALL ON -SITE STORM DRAINAGE 3) TOTAL LOT IS DISTURBED AND SHOWN. WILL BE PRIVATE. WILL BE SURROUNDED BY SILT FENCING AS 4) ALL ROOF DRAINAGE IS TO BE COLLECTED BY GUTTERS. DOWNSPOUTS TO BE PIPED TO INLETS 8 AND 10 FOR DISCHARGE TO WET DETENETION POND AS SHOWN ON PLAN. (50% OF ROOF EACH WAY) SEE SHEETS 7A & 7B FOR BMP DE -(A ILS CITY OF NEW BERN STORMWATER MANAGEMENT TOTAL SITE AREA = 127,120 SF AREA IN PHASE 1 = 77,007 SF EXISTING IMPERVIOUSNESS IN PHASE 1 = 44,392 SF PROPOSED IMPERVIOUSNESS IN PHASE 1 = 501202, SF PHASE 1 NET = 5, $ l(o SF INCREASE IN IMPERVIOUSNESS AREA IN PHASE 2 = 50,113 SF EXISTING IMPERVIOUSNESS IN PHASE 2 = 36,252 SF PROPOSED IMPERVIOUSNESS IN PHASE 2 = 33,612 SF PHASE 2 NET = 2,640 SF DECREASE IN IMPERVIOUSNESS DEMOLITION OF EXISTING BUILDING AND VEHICULAR AREAS AND CONSTRUCTION OF PROPOSED IMPROVEMENTS FOR PHASE 1 RESULT IN A NET REDUCTION OF IMPERVIOUSNESS OF 30) 496 SF. THEREFORE NO CITY STORMWATER MANAGEMENT IS REQUIRED FOR THE PROPOSED DEVELOPMENT. SINCE CITY STORMWATER MANAGEMENT IS ONLY REQUIRED WHEN IMPERVIOUSNESS IS INCREASED BY 1 /2 AC, PHASE 2 HAS AN ADDITIONAL SF OF IMPERVIOUSNESS AVAILABLE FOR FUTURE DEVELOPMENT BEFORE STORM WATER MANAGEMENT IS REQUIRED. THEREFORE, CITY OF NEW BERN STORMWATER MANAGEMENT IS NOT REQUIRED. HOWEVER, 1" OF RUNOFF FROM ALL IMPERVIOUS AREAS IS CAPTURED AND TREATED BY BIORETENTION OR WET DETENTION POND. TOTAL NITROGEN REDUCTION BY BMP'S IS 30%. STORMWATER PLAN BLACKBURN CONSULTING 305 EAST MAIN STREET CLAYTON, NC 27520 553-2900 553-7298(FAX) ENGINEERING SEAL 9496 J- 565 z 0 5 00 N � z z t/1 b A 0 0 0 to a � a Q M SCALE: 1"=40 DRAWN BY: KRM DATE: 08/02/07 SHEET L-6 OF 10 MAI I O WET DETENTION POND PLAN ; r. O s ` '6' � .i•1 k 20.5 bi � fro 10' WIDE k' N 89'30'33" W TATIVE 1. 7 rj 59.54' SHELF R •S N 44'01'08" W .17. 5 17. 5 5.82' -_- N 8737 24" W p 9a 16.71' s 8351 35" . . 3 1 . O of o� .. w O M(a J WET z PON. 0 �.... .... W �......... CP,zO N 89'S945 E R .) . . 1 W 20.03' EAST `J�.. . . . . . . . . . 0.44 'o �'.. . . . . . . O� c s �. 17.5. R6. _ 18 S 89'58'03" E 46� a', 31' 37.56' 5� �6. 10: 1 SLOPE SS �jss cp r v 'r I, • I, I.• •L•.•L A, . s) .16 ' I ' ' Via`•• all, • L�al . •.S a�n .4 � J Candlewood Suites N 0 TES: Stage Area Storage Table 1) A PUMP IS REQUIRED TO DRAIN WET Forebay Main Pool Storage above Sediment Storage D E TEN TI ON POND FOR SEDIMENT R EM O VA L Elev Area Storage Area Storage AND OTHER MAINTENANCE. 7.0 0 0 120 0 8.0 0 0 224 172 9.0 0 0 358 463 (Sediment Storage) 0 10.0 0 0 523 441 441 l o' 5' 0 10' 20' 1 1061 Q N - 8-BB 3-BA 5-VI- 100-1 - N -� 2-BB- 4- IB - WET DETENTION FL4NTING FL4N SEED ALL BER 1 AND EXTERIOR SIDE SLOPES N I TH CENTIPEDE GRASS 3-SPB 150-5 RB � \1 \I l r 5-IB -50-1 WERNMA I I.0 0 0 718 106 SCALE: 1" = to NOTES: 12.0 13.0 14.0 46 168 322 0 107 352 945 1202 1491 1893 2966 4313 1893 3073 4665 I. THE TOP OF THE BERM AND THE EXTERIOR SIDE SLOPES SHALL BE SEEDED WTIH. CENTIPEDE GRASS. 2. THE VEGETATIVE FILTER STRIP SHALL BE SEEDED WITH CENTIPEDE GRASS. 3. NO TREES OR 5HRUB5 SHALL BE PLACED WITHIN 10 FEET OF INLET OR OUTLET PIPES, OR MAINMADE DRAINAGE STRUCTURES SUCH AS SPILLWAYS OR FLOW SPREADERS. 15.0 17.0 17.0 508 977 977 767 2237 2237 1811 2547 2547 5964 10306 030 6731 9335 12542 WET DETENTION POND PLAN 4. PLANTINGS SHALL NOT BE PLACED ON BERMS 5. LANDSCAPE CONTRACTOR 15 RESPON51BLE FOR VERIFYING ALL PLANT QUANTITIES AND SHALL BRING TO THE ATTENTION E THE LANDSCAPE ARCHITECT. ANY SEED 6. SEED SHALL HE APPLIED AT THE RATE SPECIFIED BY THE MANUFACTURER. IF PLANT SHALL ESTABLISHMENT CANNOT BE ACHEIVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE 17.5 18.0 18.5 19.0 19.5 20.0 20.0 1151 1722 2769 3487 2790 3692 7080 7718 8238 8772 8772 11640 13260 14408 16747 19871 23570 27559 31812 31812 B L A C K B U R N C O N S U L TI N G E N GIN E E R I N G 305 EAST MAIN STREET C LA YTO N N C 5 O 5 5 3 - 2 9 0 0 5 5 3 - 7 2 9 8 (FAX) 5TORMWATER FACILTY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTINGS AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. 7. ALL NEWLY PLANTED PLANT MATERIAL SHALL BE PROTECTED FROM INVASIVE WEEDS AND ANIMAL DAMAGE (STAKING, NETTING, ETC.) TO ENSURE PLANT SURVIVAL. B. ALL STAKING SHALL BE REMOVED WITHIN 12 MONTHS TO PREVENT GIRDLING. q. ALL PLANTS SHALL HAVE A 2-YEAR WARRENTY. AT THE END OF THE I5T YEAR AND AGAIN AT THE END OF THE 2-YEAR WARRENTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE SHALL BE REPLACED. 10. ANY SOIL AMENDMENTS SHOULD BE ADDED AT THE END OF THE SITE CONSTRUCTION PROCESS. THE BMP SHALL BE PLANTED AND MULCHED IMMEDIATELY AFTER AMENDING THE SOIL TO 5TABILZE THE SITE AS SOON AS POSSIBLE, 11. SHALLOW WATER PLANTS ARE BEST PLANTED BETWEEN APRIL 1 AND JULY 15. AVOID WINTER PLANTINGS. 3-BA 5-VI =I9� � r5B- BA 7-IB N 00-SP -SPB I ii�z�lr► + I o WET DETENTION POND PLANT LIST KEY QTY BOTANIGAl LIeMc MM u W 5 501ix ni ra '11 ,1. Black Willow : ILz 5-6' HT. KVV I B*B RB 4 Betula nigra River Birch 5-6' HT, BEB 5PB Li Clethra ainifolia Sweet Pe rbush 36" HT. Cont. VI 21 Viburnum cassinoides Northern Wild Raisin 36" HT. Cont. BB 19 Gephalantus occidentalis Buttonbush 3ro" HT. Cont. IB 16 Ilex glabra Inkberr 36" HT. Cont. MN 7 Hibiscus M0sCheUt05 Marsh Hibiscus 18"-24" HT. Cont. BA 20 Berberis thunbergii Barberr 18' -24" HT. Cont. I 275 Iris vir inica Southern Blue Fla Iris I Gal. Cont. SG 355 Panicum virgatum Switchgrass 4" POT Cont• SP 250 Stir us un ns Soft Stem Bulrush 4" POT Cont. r"F IV I avvKc.co: ALL PLANT MATERIAL SHALL COME FROM LOCAL NURSERY STOCK. IF A SOURCE FOR A SPECIFIED PLANT CAN NOT BE LOCATED, LANDSCAPE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT FOR A SUITABLE SUBSTITUTION. 9a F 0 �536i1c� J �'y� O J- 565 19:1 z O SCALE: DRAWN BY: KRM DATE: 08/02/07 SHEET L-7A OF 10 EL 20.5 cp S 10' VEGETATED SHELF FROM EL 17.5 TO EL 18.5 ® 10: 1 SLOPE �EGETq - SyELF ED PLANTINGS PER LANDSCAPE PLAN (SHEET L-3A) PARKING LOT GRADING PER PLAN 3"(MIN) SHREDDED HARDWOOD MULCH FOREBA Y NORMAL POOL EL 18.0 BOTTOM EL 12 11 MAIN POOL 3' TEMP WATER QUALITY POOL EL 18.5 REINFORCED CONCRETE OUTLET STRUCTURE W/ 3 SIDE AT EL 18.5 AND BACK AT EL 20.5 2' INSIDE SIDE WIDTH AND 3' INSIDE FRONT & BA( W/ TRASH RACK CLEAN -OUT 4"PVC W/ TEE STUBBED INTO OUTLET STRUCTURE NORMAL POOL EL 18.0 4"PVC CAP W/ 1" DIA. EL 14.5 `� HOLE © EL 17.5 NCDOT DROP INLET #840.15 W/ GRATE EL 22 12" PONDING n i �J FOREBAY WEIR EL 17.5 TOP OF SEDIMENT STORAGE EL 9 BOTTOM EL 7 WET DETENTION PARKING LOT GRADING PER PLAN SHEET FLOW FROM PARKING LOT ON ALL SIDES WTIH NO CURB 8c GUTTER ROADWAY pRg7 r0 EXISTING NAGS CULVERT FROM OTHER BMP'S NOTE: SOIL MEDIA TO BE PLACED IN BIORETENTION CELLS SHALL BE SANDY LOAM WITH HOMOGENOUS MIX AS SPECIFIED IN DETAIL ABOVE. THE SOIL SHALL HAVE LOW PHOSPHORUS CONTENT. A CERTIFIED SOIL REPORT SHALL BE PROVIDED FROM A SOIL SCIENTIST CONFIRMING THAT THE P—INDEX IS BETWEEN 10 AND 30. BI❑-RETENTI❑N BASIN EETAI BIORETENTION # SUREFA CE AREA (EL 22) 4 903 SF 5 655 SF 6 743 SF 7 1163 SF 8 2604 SF POND DETAIL CONSTRUCTION SEQUENCE: 1) UPON COMPLETION OF SITE DEMOLITION, GRADE SITE. 2) AS DRAINAGE CULVERTS ARE INSTALLED CONSTRUCT BIORETENTION CELLS PER FOLLOWING. 3) EXCAVATE FULL DIMENSION AND DEPTH OF CELLS. 4) INSTALL DRAINAGE CULVERT AND FILL CELL WITH SPECIFIED PLANTING MEDIA. (OVERFILL CELL BY 6") 5) UPON STABILIZATION OF SITE, REMOVE ANY SILT AND EXCESS 6" OF MATERIAL. 6) INSTALL PLANTS AND 3" OF MULCH. SEE SHEET L-3A FOR PLANT SPECIFICATIONS 10' VEGETATED SHELF FROM EL 17.5 TO EL 18.5 10: 1 SLOPE INV 17.0 4'X5'Xl' CONCRETE FOOTING WELD FRONT BARS TO 1/4"X 1" STEEL BAR & BOLT TO BACK WALL WELD END I WELD FRONT BARS TO 1/4"X 1" STEEL BAR & BOLT TO FRONT WALL WELD SIDE BARS TO 1/4"X 1" STEEL BAR & BOLT TO SIDE WALL WET POND 30"RCP #5 REBAR @ 4" (EACH END) EXISTING CURB INLET IN GLENBURNIE ROAD T 1>:.,..,; ,.• EXISTING INV 16.7 36"RCP WELD FRONT BARS TO 1/4"X 1" STEEL BAR & BOLT TO BACK WALL i REBAR ® 4"O.C. WELD FRONT BARS TO 1/4"X 1" STEEL BAR & BOLT TO FRONT WALL TRASH RACK DETAIL N 0 TES: 1) A PUMP IS REQUIRED TO DRAIN WET DETENTION POND FOR SEDIMENT REMOVAL AND OTHER MAINTENANCE. BIVIP DETAILS BLACKBURN CONSULTING 305 EAST MAIN STREET CLAYTON, NC 27520 553-2900 553-7298(FAX) owl 1..�1 �,ee � Rp �486 \�7 a ItA ,'��quae.❑pP, ENGINEERING J- 565 T 3011 Swd�d Dn:l, 0.I IkkpEwe (919)aB4-0 Pu 1120.A 95mbd1ytt A�q Sdd email: mu.W�iaizm N lO N 00 N � z I4 z O ti O 04 a � a U dM SCALE: 1"=40 DRAWN BY: KRM DATE: 08/02/07 SHEET L - OF 10 APPR&''ED NORTH CAROIJNp EPt�'RONMEN' MANAGEMENT GOMMISS10N U,JVISION OF WATER C�_AJ- Date__ffift� �- � Stormwater Permit No Storm Drainage Table Inlet 1 DA Sum DA 0(25) Top - Invert 18.5 Culvert 18" Length 18 Slope 0,00% A AAl1, Outlet 2 If & A A AAA/ 1'1•a�L 4 0.28 0.28 2.1 22.00 18.5 15, 78 0.38% 5 5 0.18 0.46 3.4 22.00 18.2 15" 82 0.49% 6 6 0.21 1.69 12.1 22.00 17.8 24" 150 0.40% 6A 6A 0.00 1.69 12.1 22.00 17.2 240 66 0.30% 12 7 0.35 0.35 2.5 22.00 18.0 15" 50 0.40% 6 8 0.67 0.67 2.5 22.00 18.3 150 98 0.31% 6 9 0.17 0.17 1.2 20.50 18.0 15" 47 0.430A 10 10 0.19 0.36 3.0 20.70 17.8 150 41 0.49% 11 11A 0.26 0.26 2.2 21.70 18.5 150 96 0.94% 11 11 0.12 0.74 6.1 21.00 17.6 18" 38 3.68% Pond 12 0.26 2.69 12.8 20.00 17.0 30" 76 0.39% Existing Existing 21.99 16.5 36" LEGEND ■ DROP INLET © DROP INLET NUMBER x 23.3 SPOT ELEVATION DRAINAGE NOTES: 1) ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF NEW BERN STANDARDS AND SPECIFICATIONS. 2) ALL ON -SITE STORM DRAINAGE WILL BE PRIVATE. 3) TOTAL LOT IS DISTURBED AND WILL BE SURROUNDED BY SILT FENCING AS SH 0 WN. 4) ALL ROOF DRAINAGE IS TO BE COLLECTED BY GUTTERS. DOWNSPOUTS TO BE PIPED TO INLETS 8 AND 10 FOR DISCHARGE TO WET DETENETION POND AS SHOWN ON PLAN. (50% OF ROOF EACH WAY) SEE SHEETS BMP DEA TILS 7A & 7B FOR CITY OF NEW BERN STORMWATER MANAGEMENT TOTAL SITE AREA = 127,120 SF AREA IN PHASE 1 = 77,007 SF EXISTING IMPERVIOUSNESS IN PHASE 1 = 44,392 SF PROPOSED IMPERVIOUSNESS IN PHASE 1 = 52,125 SF PHASE 1 NET = 7,733 SF INCREASE IN IMPERVIOUSNESS AREA IN PHASE 2 = 50,113 SF EXISTING IMPERVIOUSNESS IN PHASE 2 = 36,252 SF PROPOSED IMPERVIOUSNESS IN PHASE 2 = 33,612 SF PHASE 2 NET = 2,640 SF DECREASE IN IMPERVIOUSNESS DEMOLITION OF EXISTING BUILDING AND VEHICULAR AREAS AND CONSTRUCTION OF PROPOSED IMPROVEMENTS FOR PHASE 1 RESULT IN A NET REDUCTION OF IMPERVIOUSNESS OF 20,535 SF. THEREFORE NO CITY STORMWATER MANAGEMENT IS REQUIRED FOR THE PROPOSED DEVELOPMENT. SINCE CITY STORMWATER MANAGEMENT IS ONLY REQUIRED WHEN IMPERVIOUSNESS IS INCREASED BY 1 /2 AC, PHASE 2 HAS AN ADDITIONAL 40,315 SF OF IMPERVIOUSNESS AVAILABLE FOR FUTURE DEVELOPMENT BEFORE STORM WATER MANAGEMENT IS REQUIRED. THEREFORE, CITY OF NEW BERN STORMWATER MANAGEMENT IS NOT REQUIRED. HOWEVER, 1" OF RUNOFF FROM ALL IMPERVIOUS AREAS IS CAPTURED AND TREATED BY BIORETENTION OR WET DETENTION POND. TOTAL NITROGEN REDUCTION BY BMP'S IS 30%. STORMWATER PLAN BLACKBURN CONSULTING 305 EAST MAIN STREET CLAYTON, NC 27520 553-2900 553-7298(FAX) ENGINEERING _ y3,oeasrss;,,e, ob 4 SEAC 0 9486 J- 5 6 5 T 10, Dmto NC 27713 Has (919N868881 Meham, NC 27302 N io 1n 00 V1 z z � A b 0 U aM SCALE: if,=_4o DRAWN BY: KRM DATE: 08/02/07 SHEET L-6 OF 10