Loading...
HomeMy WebLinkAboutSW7070906_HISTORICAL FILE_20070911STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWT DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS (HISTORICAL FILE (❑ COMPLIANCE EVALUATION INSPECTION DOC DATEJ(�r2��� YYYYMMDD North Carolina Secretary of State http://www. secretary.state.nc.uslcorporations/Corp.aspx4Pitemld=... CORPORATIONS Corporations Home Search By Corporate Name Search For New Corporation Search By Registered Agent Important Notice Corporations FAQ Homeowners' Association FAQ Tobacco Manufacturers Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE 8213 Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures CONTACT US Corporations Division Secretary of State's web site TOOLS Secretary of State Home Secretary of State Site Map Printable Page Date: 9/11/2007 Click here to: View Document Filings I m"Print apre-populated Annual Report Form I Annual Report Count I File an Annual Report I Corporation Names Name Name Type NC Earth Shakers, LLC Legal Limited Liability Company Information SOSID: 0765196 Status: Current -Active Date Formed: 2/7/2005 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Harrington, Phillip W. Registered 760 Pitts Chapel Road Office Address: Elizabeth City NC 27909 Registered 760 Pitts Chapel Road Mailing Address: Elizabeth City NC 27909 Principal Office 760 Pitts Chapel Road Address: Elizabeth City NC 27909 Principal Mailing 760 Pitts Chapel Road Address: Elizabeth City NC 27909 For questions or comments about the Secretary of State's web site, please send e-mail to Webmaster. 2 of 2 9/11/2007 12:10 PM Jr.. ' fit.) qi,i7 search Page 2 of 2 0- Construction F-i Maintenance 1� ri- Upsets LFinishj j-Cancel R/I n/')On'7 Consulting Engineers and Land Surveyors (252) 335-1888 Office 150 A US Highway 158 East, Camden, NC 27921 (252) 338-2913 Office (252)338-5552 Fax REGEO N Ett Qi1srP�iN414, '�!' ►Iii Transmittal DWQ_l6AR® Date September 7, 2007 Number of pages including cover sheet To Mr. Bill Moore Phone Dept. of Environment & Natural Resources Fax Water Quality Section 943 Washington Square Mall Washington NC 27889 From Hyman & Robey Phone (252)338-2913 PO Box 339 Fax (252)338-5552 Camden NC 27921 Subject Erosion & Sedimentation Control Plan Project # Ground Track Harbor Center 050962 Please call X For your review For your Approval As you requested for further and comment discussion As we For your Files For your use Other discussed lease cau the above number if this tax was received in error or if you do not receive all of this transmission. Message: Consulting Engineers and Land Surveyors 150 A US Highway 158 East, Camden, NC 27921 Transmittal (252) 335-1888 Office (252) 338-2913 Office (252)338-5552 Fax SEP 1*0 2007 DWQ-WARD Date 9/7/2007 Number of pages including cover sheet 2 To Bill Moore Phone Fax 331-1291 From Kimberly D. Hamby Project Manager Phone (252) 335-I888 Fax ax (252) 338-5552 Subject/ Project # 050962 Harbor Center Sent Via mail Enclosures Check in the amount of $85.00 Please call For your review For your Approval As you requested for further and comment discussion As we For your Files For your use X Other discussed Message: We received an email from Samir regarding the fee change after we had put this project together. We have attached a separate check for the difference. Thank you, Kim SOLUTIONS FROM THE GROUND UP September 7, 2007 Mr. Bill Moore Dept. of Environment and Natural Resources Water Quality Section 943 Washington Square Mall Washington, NC 27889 SEP 1 0 2007 Subject: Stormwater Management Permit Harbor Center Proj. # 050962 Dear Mr. Moore: Enclosed for your review and approval, please find the following items: Two (2) copies of the above referenced plans. The original and one (1) copy of the Stormwater Exemption Application and Wet Detention Basin Supplements. Two (2) copies of the project description and calculations. 4. Check in the amount of $420.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. Sincerely, Sean C. Robey, P.E. �. Kimberly D. amby Project Manager cc: file Earth Shakers, LLC PROJECT DESCRIPTION Harbor Center Elizabeth City Pasquotank County - North Carolina RECEIVED 1'.v :r•:�wiui Ir,. SEP 1 0 2007 DWQ-WAR® August 23, 2007 Earth Shakers, LLC owns a 1.65 acre tract on Nance Court. The tract is zoned GB (General Business). The lot is currently vacant and mostly cleared. Part of an existing pond with a wooded perimeter occupies the southeastern comer of the lot. At this time Earth Shakers is planning to build 9,340 sf of office space as well as related parking, drives and sidewalk improvements. Stormwater runoff from all of the impervious surfaces will be routed to the detention pond located to the southeast side of the site, adjacent to the existing pond. Drainage Area 1 contains 0.84 acres and includes all proposed impervious surfaces except the first 10-20' of the driveway. The buildings contribute 9,340 sf, the parking contains 3,092 sf of concrete and 13,470 sf of asphalt, and another 1,782 sf is covered by concrete sidewalks and dumpster pad. The total impervious area is 27,684 sf (0.64 Acres) or 75% of the drainage area. The detention pond for this drainage area was designed for 90% TSS removal. The pond discharges into the existing drainage ditch at the rear of the site. Drainage Area 2 contains the remainder of the site, 0.81 acres. The only impervious surface within this drainage area is less than 200 sf of asphalt at the entrance. The runoff from this area drains along the eastern property line along with the roadway drainage. Other areas within this drainage area include the existing pond and the perimeter of the site which will sheet flow into existing ditches around the site. A portion of the existing ditch located adjacent to the northern property line will be piped in to achieve acceptable slopes away from the parking and buildings. The City of Elizabeth City has a slormwaler ordinance that requires that post - development runoff be limited to pre -development levels based on a 10-year storm. Utilizing the rational method, the peak pre -development runoff from Drainage Area I has been determined to be 2 cfs. The. post -development runoff from Drainage Area 1 is 5 cfs. This runoff is routed through the detention pond which limits the discharge to 1.7 cfs. The runoff from the site is so minimal, all of the discharge from the pond during the 10 year storm will occur through the drawdown orifice. According to the Pasquotank County Soils Maps as prepared by USDA, Conservation Service, the soils on this site are Nimno. Most of this site has been f with sand as someone had prepared it for construction several years ago. A single lasso ' 'F�'OINEEP•�•• sFgN C. no$' � \z$� 111111\0\ boring was performed in the detention pond area by Sean C. Robey, PE and Kimberly Hamby on February 28, 2007. The soil boring was conducted with an AMS 2-3/4" diameter 6' long hand mud auger. From 0-30" was a coarse sand that is typical of fill material. At 30", the soil changed to a sandy loam. At 36" the soil was wet and coloration indicated that we had reached the seasonal high water table. The soil was too wet to stay in the auger below 42". The elevation at the bore location is approximately 8.00'; therefore, the seasonal high water table is estimated to be 5.0'. Topographical survey of an existing pond on the site indicated a permanent pool elevation of 5.23'. Our permanent pool elevation has been set at 5.00'. The high water table makes wet detention the most appropriate stormwater treatment method to use in this area. The pond will discharge to the existing ditch on the south side of the property. This ditch drains into Knobbs Creek. The disturbed area for this development will not exceed 1.35 acres. Limits of disturbance have been shown on the plans. SOIL BORING MAP HARBOR CENTER FEBRUARY 28,2007 6.91 6.87 7.30 .,,t -�., . • 7.81 5.19 / .. ._. 813 Zl+ 80REr LOCATION •8.95 7.,a � / r Z .8.95 •l36 • 8.45 • 9.04 �.% 8.22 • 7.31 6.63 Q� / _ :e EAL 18550 �i '• 'OINev. ����Qi1.gN C. RO%F i PERMANENT POOL DETENTION PONDS RECEIVED DESIGN OF POND u SAP 1�` 1� 20 07 Harbor Center 10 Yr, 24 Hr Storm DETENTION POND DWQ-WAR® Hyman & Robey, PC 150-A Hwy 158 East Camden, NC 27921 (252)-335-1888 08/23/07 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 10% 1.3 1.0 0.8 0.7 0.6 0.5 0.4 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 40% 4.5 4.0 3.5 3.1 2.8 2.5 2.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 2.7 60% 7.0 6.0 5.3 4.8 4.3 3.9 3.4 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 80% 9.4 8.0 7.0 6.4 5.7 5.2 4.6 90%D 10.7 9.0 7.9 7.2 6.5 5.9 5.2 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 WATERSHED AREA: 0.86 ACRES WATERSHED % IMPERVIOUS: 77 % 6.5 FT 0.3 1.0 1.3 1.8 2.3 2.9 3.4 4.0 4.6 5.1 Page 1 7.0 FT 0.2 0.9 I. 1.4 1.9 2.4 2.9 3.4 3.9 4.3 PERMANENT POOL ELEVATION: 5 FT DESIGN PERMANENT POOL DEPTH: 4 FT SAMA PERCENTAGE FACTOR: 7 % (MOM ABOVE TABLE - TAKEN MOM DESIGN OFSTORM WATER POND SURFACE AREA REQ-D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = LENGTH = Use these dimensions: VOLUME OF 1 " RAINFALL AREA OF ROOFS: AREA OF PARKING/CONCRETE: AREA OF GREEN AREAS: CONTROL FACILITIES WORKSHOP MANUAL - PENC 1988) 2622 SF 787 SF 29.5652 LF (BASED UPON MINIMUM SURFACE AREA) 88.6957 LF WIDTH 29.51 LF LENGTH 105 LF Normal Pool Elevation 0.22 AC 0.42 AC 0.22 AC 5 2406.69 CF VOL (CF)=[(ROOF•1.0)a(PARKING•.95)F(GRASS•0.2)1*43,560/12 STORAGE DEPTH FOR MINIMUM AREA = 0.78 FT ELEVATION OF I"RAINFALL = 5.78 t SEAL = 18550 '••.FNQINe'Z5 SPAN C. '1011111111[tO�\\ DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.01393 CFS Q(5 DAYS) = 0.00557 CFS I " RUNOFF STAGE 0.78 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT I" RUNOFF OUTLET DEVICE: 0.77182 INCH DIA HOLE DIAMETER OF HOLE TO USE: 0.875 INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.22307 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 5 cfs Tc = Time of Concentration = Calculation of Tp (Time to Peak) From SCS NEH 4, page 15-7 Eqn. 15.4 A=[Q/(Cd*SQRT(2gh))] * 144 Rad: SQRT(A/PI) Dia. =2*Rad. 10 min Lag Time (L) = (I^0.8*(S+1)^0.7)/(1900*Y^0.5) for Lin Hrs where: 1 = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (I000/CN)-10 = 1.76471 L= 0.07965 hrs From SCS NEH 4, page 16-7 Eqn. 16.7 Tp=D/2+L where: D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4, page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.02217 hrs Tp = 0.09073 hrs = 5.44397 min Volume under Hydrograph = 1.39 * Qp * Tp = 2270.13 Cubic Feet 275 1.76471 = 85 1.45 FAA C. 80e"ir Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs ---- ---------- cf --------- ------ 0.00 ------- 0.00 0.00 0 ------- 0.10 0.03 0.01 0 5 0.20 0.10 0.02 1 16 0.30 0.19 0.03 1 31 0.40 0.31 0.04 2 51 0.50 0.47 0.05 2 77 0.60 0.66 0.05 3 108 0.70 0.82 0.06 4 134 0.80 0.93 0.07 5 152 0.90 0.99 0.08 5 162 1.00 1.00 0.09 5 163 1.10 0.99 0.10 5 162 1.20 0.93 0.11 5 152 1.30 0.86 0.12 4 140 1.40 0.78 0.13 4 127 1.50 0.68 0.14 3 111 1.60 0.56 0.15 3 91 1.70 0.46 0.15 2 75 1.80 0.39 0.16 2 64 1.90 0.33 0.17 2 54 2.00 0.28 0.18 1 46 2.20 0.21 0.20 1 68 2.40 0.15 0.22 1 48 2.60 0.11 0.24 1 35 2.80 0.08 0.25 0 25 3.00 0.06 0.27 0 18 3.20 0.04 0.29 0 13 3.40 0.03 0.31 0 9 3.60 0.02 0.33 0 7 3.80 0.02 0.34 0 5 4.00 0.01 0.36 0 4 4.50 0.01 0.41 0 4 5.00 0.00 0.45 0 0 Volume under hydrograph = 2156 cf Based upon runoff volume = 2270.13 cf Depth req'd for minimum area = 0.7 STAGE STORAGE FUNCTION OF POND Page 4 (FOR RECTANGULER DETENTION POND ONLY) Pond Side Slope (M) _ Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s In Z Z est Elevation S Z sf cf cf ft 3099 0 0 0 Surface area at normal pool 5 3511 1652 1652 0.5 7.41 -0.69 0.50 5.5 3942 1863 3516 1 8.16 0.00 0.97 6 4390 2083 5599 1.5 8.63 0.41 1.45 6.5 4857 2312 7910 2 8.98 0.69 1.96 7 5341 2549 10460 2.5 9.26 0.92 2.50 7.5 5844 2796 13256 3 9.49 1.10 3.07 8 6364 3052 16308 3.5 9.70 1.25 3.68 8.5 6903 3317 19625 4 9.88 1.39 4.32 9 7459 3591 23215 4.5 10.05 1.50 4.99 9.5 8034 3873 27089 5 10.21 1.61 5.71 10 Regression Output: Constant 9.34346 Ks = S/ZAb = 3639.425 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 24 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) 5.73 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff HIn = 5 Number of Holes Hld = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 5.00 Elev Invert Barrel (ft) Barrel] Adjustment Factor Cdb = 0.60 Barrel orifice coeff 3 yi t6E 50 ri1 1AL B sFq�IC n flpe Elevation EMERGENCY WEIR Cw Ecr Lw Riser Hole (1) Riser Hole (2) 3 Weir coeff 5.83 Elev weir coeff (ft) I Weir Length (ft) Riser Hole Riser (3) (weir) 5.00 0.0 0.0 0.0 0.0 5.00 0.0 0.0 0.0 0.0 5.00 0.0 0.0 0.0 0.0 5.01 0.0 0.0 0.0 0.0 5.03 0.0 0.0 0.0 0.0 5.05 0.0 0.0 0.0 0.0 5.07 0.0 0.0 0.0 0.0 5.11 0.0 0.0 0.0 0.0 5.15 0.0 0.0 0.0 0.0 5.20 0.0 0.0 0.0 0.0 5.25 0.0 0.0 0.0 0.0 5.30 0.0 0.0 0.0 0.0 5.34 0.0 0.0 0.0 0.0 5.39 0.0 0.0 0.0 0.0 5.42 0.0 0.0 0.0 0.0 5.46 0.0 0.0 0.0 0.0 5.49 0.0 0.0 0.0 0.0 5.51 0.0 0.0 0.0 0.0 5.53 0.0 0.0 0.0 0.0 5.55 0.0 0.0 0.0 0.0 5.56 0.0 0.0 0.0 0.0 5.59 0.0 0.0 0.0 0.0 5.60 0.0 0.0 0.0 0.0 5.62 0.0 0.0 0.0 0.0 5.62 0.0 0.0 0.0 0.0 5.63 0.0 0.0 0.0 0.0 5.64 0.0 0.0 0.0 0.0 5.64 0.0 0.0 0.0 0.0 5.64 0.0 0.0 0.0 0.0 5.64 0.0 0.0 0.0 0.0 5.64 0.0 0.0 0.0 0.0 5.65 0.0 0.0 0.0 0.0 5.65 0.0 0.0 0.0 0.0 Riser Barrel Principal Emergcy (orifice) Spillway Weir 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.00 0.0 0.0 0.1 0.00 0.0 0.0 0.1 0.00 0.0 0.0 0.2 0.00 0.0 0.0 0.3 . 0.00 0.0 0.0 0.4 0.00 0.0 0.0 0.5 0.00 0.0 0.0 0.7 0.00 0.0 0.0 0.8 0.00 0.0 0.0 0.9 0.00 0.0 0.0 1.0 0.00 0.0 0.0 1.1 0.00 0.0 0.0 1.2 0.00 0.0 0.0 1.3 0.00 0.0 0.0 1.4 0.00 0.0 0.0 1.4 0.00 0.0 0.0 1.5 0.00 0.0 0.0 1.6 0.00 0.0 0.0 1.6 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 0.0 1.7 0.00 0.0 Page 5 v' SEAL 1V 1aho0 F'\'QINEE?r' /�FqN C Ros,�, po` Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 0 0 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.018 I 4.89957 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.027 1 21.2315 5.01 0.00 0.00 0.00 0.00 0.00 0.00 0.036 2 52,2621 5.03 0.00 0.00 0.00 0.00 0.01 0.00 0.045 2 102.891 5.05 0.00 0.00 0.00 0.00 0.03 0.00 0.054 3 179.651 5.07 0.00 0.00 0.00 0.00 0.07 0.00 0.064 4 287.441 5.11 0.00 0.00 0.00 0.00 0.12 0.00 0.073 5 421.363 5.15 0.00 0.00 0.00 0.00 0.20 0.00 0.082 5 573.25 5.20 0.00 0.00 0.00 0.00 0.30 0.00 0.091 5 734.936 5.25 0.00 0.00 0.00 0.00 0.42 0.00 0.100 5 898.255 5.30 0.00 0.00 0.00 0.00 0.54 0.00 0.109 5 1059.94 5.34 0.00 0.00 0.00 0.00 0.67 0.00 0.118 4 1211.83 5.39 0.00 0.00 0.00 0.00 0.80 0.06 0.127 4 1352.28 5.42 0.00 0.00 0.00 0.00 0.92 0.00 0.136 3 1479.67 5.46 0.00 0.00 0.00 0.00 1.04 0.00 0.145 3 1590.73 5.49 0.00 0.00 0.00 0.00 1.14 0.00 0.154 2 1682.19 5.51 0.00 0.00 0.00 0.00 1.23 0.00 0.163 2 1757.31 5.53 0.00 0.00 0.00 0.00 1.30 0.00 0.172 2 1821.01 5.55 0.00 0.00 0.00 0.00 1.36 0.00 0.181 1 1874.9 5.56 0.00 0.00 0.00 0.00 1.41 0.00 0.200 1 1966.36 5.59 0.00 0.00 0.00 0.00 1.50 0.00 0.218 1 2033.98 5.60 0.00 0.00 0.00 0.00 1.57 0.00 0.236 1 2081.99 5.62 0.00 0.00 0.00 0.00 1.62 0.00 0.254 0 2116.94 5.62 0.00 0.00 0.00 0.00 1.65 0.00 0.272 0 2142.09 5.63 0.00 0.00 0.00 0.00 1.68 0.00 0.290 0 2160.06 5.64 0.00 0.00 0.00 0.00 1.70 0.00 0.308 0 2173.12 5.64 0.00 0.00 0.00 0.00 1.71 0.00 0.327 0 2182.6 5.64 0.00 0.00 0.00 0.00 1.72 0.00 0.345 0 2189.45 5.64 0.00 0.00 0.00 0.00 1.73 0.00 0.363 0 2194.35 5.64 0.00 0.00 0.00 0.00 1.73 0.00 0.408 0 2203.34 5.65 0.00 0.00 0.00 0.00 1.74 0.00 0.454 0 2207.42 5.65 0.00 0.00 0.00 0.00 1.75 0.00 5.64793 = maximum stage elevation 0 = maximum discharge 9EAL 1811,4 s '.:......`.:.` ,�AN C. litos'�., Harbor Center Pasquotank County 10 yr STORM —s—INFLOW (cfs) 3 t �R { , pv+ .—OUTFLOW (cfs) r g ,' E-1.5 h 2 6 !4 r�(� p}sf. yn^l�q;.fs ilk �pipA .(j N�O�,a�� 1 •0.�TM J�N I kllitN b(�S i Q 6 F. �..g.�p.004.4ilW0:0 0.000 0.100 0.200 0.300 0.400 0.500 Time (hrs) 1 8:: J0 ?v �rtrE... ` SFq� IIc.I lVkO `\`,• POND VOLUME CALCULATIONS FOR S:Wyman & Pobey'051050962 - Earth Shakers, LLCIExce11050962 POND VOLUME CALCULATIONS (1 POND).xls POND CALCULATIONS AREA PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1' STORAGE Fz c � 2,237.00 862.00 566.00 159.00 116.00 2.00 3,903.00 5.00 1.00 3.33 5.83 VOLUME CALCULATIONS IF MAIN BASIN VOLUME 3,185.13 FOREBAY VOLUME 895.10 PERMANENT POOL VOLUME 4,080.23 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 21.94% TEMP. STORAGE VOLUME (1- RUNOFF) 2,905.83 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 2.49 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED 7/18/2007 4:47 PM [ ( 18550 �F4NII I C.Ro% 2.00 3.00 2.75 2.25 PAGE 1 OF 1