Loading...
HomeMy WebLinkAboutSW7070728_CURRENT PERMIT_20071001STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW'%DD DOC TYPE CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE C�,�v 7��D YYYYM M DD O�OF W ATFRQG C r October 1, 2007 Winfall Developers Inc. Atm.: John W. Harris P.O. BOX 14025 Norfolk, VA 23518 Subject: Dear Mr. Harris: w«.7KO Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleco H. Sullins, Director Division of Water Quality Stormwater Review SW7070728 Winfall Landing Subdivision High Density Project fiertford County Fe rzd ,arts The Washington Regional Office received a completed Stormwater Application for the subject project on July 30, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7070728 dated October 1, 2007 to Winfall Developers Inc. for a wet detention pond to serve the Winfall Landing Subdivision, located at the terminus of Major Street off Winfall Blvd. (SR 37), Winfall, NC. This permit shall be effective from the date of issuance until October 1, 2017 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The issuance of this permit does not resolve any previous violations of the stormwater rules for construction without a permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Ernest Odei- Larbi or me at (252) 946-6481. inter ly, _t AI dge, egl al Supe visor Surface Water Protection Section Washington Regional Office ce: Robert J. Stewart, Jr., RE (8604 Caratoke Highway, Powells Point, NC 27966) Hertford County Planninglhispection Lxashington Regional Office North Carolina Division of Water Quality Internet: wwwncwaterguality.org One 943 'Washington Square Mall Phone (252) 946-6481 NorthCarolina Washington, NC 27889 Fax (252) 946-9215 Naturally /, /ifturally An Equal Opportunity/Affirmative Action Employer —50%Recycledll0% Post Consumer Paper K K �/ State Stormwater Management Systems Permit No. SW7070728 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143. General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Winfall Developers Inc. Hertford County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet detention pond to serve the Winfall Landing Subdivision located at terminus of Major Street off Winfall Blvd. (SR 37), Winfall, NC. This permit shall be effective from the date of issuance until October 1, 2017 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. 3. A maximum of 327,874 square feet of built upon area is allowed on this 14.5 acre site. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with approved plans. 5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. State Stormwater Management Systems Permit No. SW7070728 DIVISION OF WATER QUALITY WET DETENTION POND - PROJECT DATA Project Name: Winfall Landing Subdivision Permit Number: SW7070728 Location: Hertford County Applicant: Winfall Developers Inc Mailing Address: P.O BOX 14025 Norfolk, VA 23518 Application Date: 07/302007 Receiving Stream: Perquimans river Classification of Water Body: SC Total Site Area: 14.50 ac Drainage area: 14.50 ac Total Impervious allowed on site: 327,874 sf Wet Pond Depth: 7 ft Required Storage Volume: 27,394 cf Provided Storage Volume: 31,671 cf Required Surface Area: 12,580 sf Provided Surface Area: 12,627 sf Controlling Orifice: 2" diameter @ elevation 5 ft. Temporary Storage Elevation 7 ft. 3 State Stormwater Management Systems Permit No. SW7070728 6. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. State Stormwater Management Systems Permit No. SW7070728 A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the permit. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for an extension along with appropriate application fee. Permit issued this the 15' day of October 2007. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coledn H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7070728 State Stormwater Management Systems Permit No. SW7070728 Winfall Landing Subdivision —High Density Project Hertford County Designer's Certification I, , as a duly Registered Professional Engineer (periodically/weekly/full time) the construction of the project, for in the State of North Carolina, having been authorized to observe (Project) (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature SEAL Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Permit No. SW70 r70'72* tm he provided w DIVQ) State of North Carolina Department of Eirvironnrent and Natural Resources^ Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may ba photocopied for use as an w iginal DWQ Stonuwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: k%i � �ald LC?Ild /'A �CA(JhV/Si n Contact Person: 0,fJ" J. C' E: • Phone Number: (7s-z ) 49/ P 3a4 For projects with multiple basins, specify which basin this work -sheet applies to: S(IIQI, &isit elevations Basin Bottom Elevation Z. i7 ft. Permanent Pool Elevation 5.0 ft. Temporary Pool Elevation -7- 0 ft areas Permanent Pool Surface Area 12AZ-7 sq. ft. Drainage Area /�}, i _ ac. Impervious'Area { _ac. volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters S A/DA 1 Diameter of Orifice Design Rainfall Design TSS Removal 2 �595 cu. ft 1, 6 4 i cu. ft 1.6. Cu. ft (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) (combined volume of main basin and farebay) (volume detained above the permcuient pool) (approximately 2017c of total volume) (surface area to drainage area ratio from DIVQ table) (2 to 5 dap temporary pool draw -down required) (mininuon 85% required) Form S\\'U-102 Rev 3.99 Page I of 4 Footnotes: t when using the Division S—NMA tables, the correct SA/DA ralio for permanent pool sizing should Ile comtiuted bascd upon the _ achtal inipen ious % and permanent pool deptli. Linear interpolation should be employed to determine the correct value for non --- standard table entries.- 2 In the 20 coastal counties. the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. IL REQUI ?,LD ITEMS CHECKLIST The following checklist outlines design requirements per the Stortnwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stornvater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials %4 a. /7`k b. —iQ 5 C. QtS d. uE e. TO 0 a '13 s 11,-4LA 0rYt- �c The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 2090 of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet.(include non -erosive flow calculations) The basin length to %vidth ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. MILA • GN4Inl is A recorded drainage easement is provided for each basin including access to nearest right- ! M04 to fly of -way. k� 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. 10. in. A mechanism is specified which will drain the basin for maintenance or an emergency. Ill. VET DETENTION BASIN OPEItATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does Fa Noes not incorporate a vegetated filter at the outlet. This sysleni (check one) 0 dous dous nut incorporate prclruatmuut other thau a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 _-Maintenanc'e activities shall be perforated as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulatior, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect.and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin systern semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give'an accurate depth reading and not readily penewate into accumulated sediments. When the permanent pool depth reads -S feet in the main pond, the sediment shall be removed. When the permanent pool depth reads S• .2,5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) �0 Permanent Pool Elevation Jam, SedimenARerToval 'v' e,- 75 b--Sediment Removal Elevation -� n• W 75% Bot�i.•y %--------------------------------------------- --c -- Bottom Elevation - Z. tL 25 Io FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50110 of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through, the. emergency drain shall he minimized to the maximum extent practical. Form SN'U-102 Rev 3.99 Page 3 of 4 7. All components of the .vet detention basin system shall be maintained in good working order. I.ackno«ledge _,ind:agree'b3rm;L�sigrtature-be low that I atnrespoh-sible'for the performance of the seven --- maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible part`. Print name: I)An W. ,7rrts _ Title: Pre,sidanf Address Note: The legally responsible party should not be a homeownersmssociation unless more than 509� of the lots have been sold and a resident of the subdivision has been named the president. 1, a�� a Notary Public or the State of Count} of do hereby certify that personally appeared before me this day of and acknowledge the due execution of the forgoing wet detention basin mainten ce r uirements. Witness my hand and official seal, SEAL my commission expires FormSWU-102 Rev199 Page4of4 I. IV V SEP 2 6 2007 WINFALL LANDING- STORMWATER MANAGEMENT PLAN WET DETENTION BASIN DESIGN NOTES AND CALCULATIONS)WQ_WAR® REVISED 9/24/07 ENGINEER'S PROJECT NO. 936 Total tract area = 664,222 S.F. (15.25 AC) Drainage Basin Area: Total = 632,179 S.F. (14.5 AC, canal area excluded) Impervious Coverage = Total = 327,874 S.F./ 632,179 = 51.9 % Required Storage Volume A) Impervious Coverage = 51.9% (see attached calculations and application form for coverage breakdown) B) Unit Volume = Rv (using Schuler Equation) Rv = 0.05+0.009 (51.9%) = 0.52 in/inch Design storm event, 1" = 632,179 S.F. (1/12) (.52 in/inch) = 27,394 CF Required Surface Area: 7.0' Deep for 90% TSS Removal @ 51.9% Coverage = SA/DA= 1.99% (from interpolation) SA = .0199 (632,179) = 12,580 S.F. Required 12,627 S.F. Provided Pond Specifications As Designed: A) Temporary Pool Volume 5.0' Contour = 12,627 SF 7.0' Contour = 19,044 SF 12,627 (2.0) + (19,044 - 12,627) (1.0.) = 25,254 + 6,417 = 31,671 CF (approximately 116% of required volume, equates to 1.16" rainfall event) B) Permanent Pool Volume 1) Main Basin: -2.0' Contour = 2,017 SF 4.0' Contour = 7,564 SF 5.0' Contour = 9,707 SF 2,017 (6.0) + ( 7,564 - 2,017) (3.0) = 12,102 + 16,641 = 28,743 CF 7,564 (1.0 ) + ( 9,707 - 7,564) (.5) = 7,564 + 1,072 = + 8,636 CF 37,379CF 2) Forebay: -2.0' Contour = 13 SF 4.0' Contour = 1,919 SF 5.0' Contour = 2,920 SF 13(6.0)+(1,919-13)(3.0)+1,919(1.0)+(2,920-1,919)(.5)=8,216C.F. 3) Total Permanent Pool Volume: 37,379 + 8,216 = 45,595 CF 4) Ratio of forebay to permanent pool: 8,216/45,595 = 18% PERFORMANCE ENGINEERING 8604 CARATOKE HIGHWAY f POWELLS POINT, NC 27968 ,,,N�eNuh►�'�i .�.a CARS, _•._ vGINE�:PQ�``�rq 2 f�d� ... I `.., WINFALL LANDING- STORMWATER MANAGEMENT PLAN WET DETENTION BASIN. DESIGN NOTES AND CALCULATIONS REVISED 9/24/07 ENGINEER'S PROJECT NO. 936 page 2 of 2 VI. Drawdown Calculations A) Design Criteria = Drawdown Volume(use design volume) = 27,394 CF Design for Drawdown in 2-5 Days B) Required Flow Q (3.5 Days) O = 27,394 CF (3.5 Days)(24 hr/day)(3600 Sec/Hr) = 0.091 CFS use orifice equation- Q= Cd x Ao x Sq. Rt. 2gh try 2" orifice, A= 0.023 S.F., Q= (.62)(0.023)(SQ. RT. 2(32.2)(1.0')) = 0.114 CFS t= 27,394 CF = 2.7862 days (1 sec./O. 114 cf)(1 hr/3600 sec)(1 day/24 hrs.) ok, use 2" orifice VIL Anti -floatation calculations for outfall structure A) Weight of 12" pipe = 10#/ If, riser weight = 30#, Saturated soil weight = 47.6 pcf B) Calculate buoyant force, Fb, on horizontal section of pipe, assume o.d. = 1.2' Pipe area = 1.13 s.f., Fb = 1.13 cf/If x 62.4 #/cf = 70.5 #/If. Adjusting for 10#/If pipe weight = 60.5 #/If. For saturated soil to provide adequate ballast required depth of soil cover = 60.5 #/cf/47.6 #/cf = 1.27', say 1.3'. This condition occurs at point 16' from riser. C) Assume concrete foundation slab 3' x 3' and 18" thick. Calculate total Fb from riser to outfall pipe 16' away:' riser volume = 1.13 sf x 3' = 3.39 of pipe volume = 1.13 sf x 16' = 18.1 cf concrete -volume = 13.5 cf Fb = (3.39 cf + 18.1 cf + 13.5 cf)(62.4 pcf) = 2,183 # D) Calculate ballast: concrete weight 13.5 cf x 150 pef = 2,025# pipe weight =(3' +16') x 10 #/If = 190# . soil weight = .5(6'x 13' x 1.2')(47.6 ocf) = 223# total ballast = 2,438# OK r.c-" '. ; OFFICE USE- ' Date Received Fee Paid Permit Number un n n 2007 1 ftlo SW7 0707An w,51`. ,,, SWACK 7/31/01 �, � State of Forth Carolina ' Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This forty; may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): ;: 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): `NOke' bl• Norris Prrr�lh nt 3. Mailing Address for person listed in item 2 above: P.c�- i3nx 14dZ City: 1' o I- �O1>L State:- VA Zip: 2,351 8 Telephone Number: (:I rJ ) � 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.) 5. Location of Project (street address): i'ro er,t is ►ot-AJr J a l)i Yrn1ntic o f�Ad�n-(�si o BWd & city: 1yJ a I I County: 0 d a U I rY\2 VN 6. Directions to project (from nearest major intersection): 7. S. Contact person who can answer questions about the project: Name:QobCA T. �+Q ra( I'r• P Telephone Number: ('2S2 I S3S� II. PERMIT INFORMATION: 1. Specify whether project is (check one): _/_Nev. Form SWU-101 Version 3.99 Page 1 of 4 Renewal Modification 0 2. If this application is being submitted as the result of a reriCwal or riiodifi6tion to an existing perm t, list the existing permit number N � A and its issue date (if known) i t; 3. Specify the type of project check one): Lowbensity High Density _Redevelop _General Perri -Lit _Other 4. Additional Project Requirements (check applicable blanks): _LAMA Major ✓ Sed imentation/Erosion Control _404/401 Permit _NPDES Stormivater Information on required state permits can be obtained by contacting the Customer Service Center at 1-577-623-6745. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the pr,;ject . S�Drmwa}¢� w%l( he tall<c.}ad vtp si-kc k., n ort lots Cn1�V2�tc1 . a �,;� mrr. M-A^nay +0 -nn _� CnJEc1 V�ILt—flQ�dn�l�h�St1� 2. Stormwater runoff from this project drains to the t sS U 01(7 r) River basin. 3. Total Project Area: ]'1 .5 acres 4. Project Built Upon Area: _5�- 9 % 5. How many drainage areas does the project have? ON 17 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Sasm Infomiatron y :,Drainage Area 1� xis "N"'ODYaKV mage Receiving Stream Name Prwuimars fl Receiving Stream Class J Drainage Area 6' Existing Impervious* Area Proposed Im ervious'Area 22- % Im ervious" Area (total) I v, 9 a a On -site Buildings -.'2 3 4, Q (p sF On -site Streets ®� J On -site Parking On -site Sidewalks Other on -site Off -site Total: ?:'Z 014 <- C Total: Inm✓minve nr✓n is 4,fin✓d na fh✓ h)ilt unnn',r✓n inrlredin o. huh not Iimifad to huildino: rnode unrkina nr✓ne sidewalks, gravel areas, etc. e Form S11'U-101 Version 3.99 Page 2 of 4 0 How was the off -site impervious area listed above derived r IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by stnuctures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to constnuction. 5. All permitted runoff from outparcels or future development shall be directed into the pennitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. ,Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form S4VU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Paoe 3 of 4 VI. SUBMITTAL REQUIREMENTS _ Only complete application packages will be accepted and reviewed by the Division of water Quality (DIVQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DIVQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one cop), of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/Project name -Engineer and firm -Legend - North arrow - Scale - Revision number g date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Oe/'T J , JTieUdr I J r. Y, L- . Mailing Address: RF,d4 C-c?Cr7 foka WWV' City: POUIJP,11$ Point State: IJG Zip: Z r ' 6 Phone: (%SZ ) 491 P 3S4 Fax: ( z: 2 ) 441 o %l Z VIII. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Infornmtion, item 2) Jd h o, W. ! 1 a rr6S certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. Signatu Date: '7 11 Jdc":' Form SWU-101 Version 3.99 Page 4 of 4 «B» In accordance with Title 15 NCAC 21-1.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Commercial Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a built -upon area consistent with the design criteria used to size the stormwater control facility. I, i nhr, �iJ . 1� �Y r 1S j- acknowledge, affirm and agree by my signature below, that I will cause the following eed restrictions and covenants to be recorded prior to the sale of any lot within the.projectknown-as SohJiyisk" 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit NumberS�N-jO as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is square feet. (OR, if the proposed built -upon area per lot will vary, please use the following format & language (in bold): The maximum built -upon area per lot, in square feet, is as listed below: SBE ATTAcAM TA Buu911Io13. Lot # BUA Lot # BUA Lot # BUA Lot # BUA " E)CMBIT No- I This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. -Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, -brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. 8. The owner of each lot, whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. \Signature: Date: 2,P b 7_ I,dcr a Notary Public in the State of County of do hereby certify that _ o jn A. iiar r l S personally appeared before me this the 20+h day of ,S YT1btX 20A�, and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, RECEIVED • SEAL Signatu SEP 2 0 2007 My Commission expires 11 2q 2 pad N.YEA�F9 COUN DWQ-WARO \ L's EXHIBIT NO. 1 WINFALL LANDING SUBDIVISION THE TOWN OF WINFALL PEROUIMANS COUNTY NORTH CAROLINA STORMWATER PERMIT NO. SW7070728 — RESTRICTIVE COVENANTS The maximum built -upon area per lot, in square feet, is as listed below: I. SINGLE FAMILY RESIDENTIAL Type "A", lots 14,17-20, 24-28, ten lots total, 2,128 s.f. per lot Type "B", lots 23, 30 & 38, three lots total, 3,106 s.f. per lot Type "C", lots 1-12, 31-37, twenty lots total, 2,582 s.f. per lot Type "D", lots 22 & 29, two lots total, 2,518 s.f. per lot Type "E", lots 13, 15, 16 & 21, four lots total, 2,527 s.f. per, lot Note: 5,164 s.f. of impervious coverage is reserved as a contingency for use within the single family residential lots. 11. MULTI -FAMILY Multi -family parcel #1- 8,418 s.f. Multi -family parcel #2- 8,418 s.f. Multi -family parcel #3- 14,023 s.f. Multi —family contiguous parcels #5, #6 and #7- 41,432 s.f. combined total III. COMMERCIAL Commercial parcel #1- 70% coverage, 15,902 s.f. Commercial parcel #2- 70% coverage, 29,397 s.f.