HomeMy WebLinkAboutSW7070728_CURRENT PERMIT_20071001STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW'%DD
DOC TYPE
CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
C�,�v 7��D
YYYYM M DD
O�OF W ATFRQG
C r
October 1, 2007
Winfall Developers Inc.
Atm.: John W. Harris
P.O. BOX 14025
Norfolk, VA 23518
Subject:
Dear Mr. Harris:
w«.7KO
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleco H. Sullins, Director
Division of Water Quality
Stormwater Review SW7070728
Winfall Landing Subdivision
High Density Project
fiertford County
Fe rzd ,arts
The Washington Regional Office received a completed Stormwater Application for the subject project on July
30, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with
the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7070728 dated
October 1, 2007 to Winfall Developers Inc. for a wet detention pond to serve the Winfall Landing Subdivision,
located at the terminus of Major Street off Winfall Blvd. (SR 37), Winfall, NC.
This permit shall be effective from the date of issuance until October 1, 2017 and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance
requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems. The issuance of this permit does not resolve any
previous violations of the stormwater rules for construction without a permit.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes,
and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Ernest Odei-
Larbi or me at (252) 946-6481.
inter ly,
_t
AI dge, egl al Supe visor
Surface Water Protection Section
Washington Regional Office
ce: Robert J. Stewart, Jr., RE (8604 Caratoke Highway, Powells Point, NC 27966)
Hertford County Planninglhispection
Lxashington Regional Office
North Carolina Division of Water Quality Internet: wwwncwaterguality.org One
943 'Washington Square Mall Phone (252) 946-6481 NorthCarolina
Washington, NC 27889 Fax (252) 946-9215 Naturally
/, /ifturally
An Equal Opportunity/Affirmative Action Employer —50%Recycledll0% Post Consumer Paper K K �/
State Stormwater Management Systems
Permit No. SW7070728
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143. General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Winfall Developers Inc.
Hertford County
FOR THE
construction, operation and maintenance of stormwater management systems in compliance with the provisions of
15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management
plans and specifications and other supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit for a wet detention pond to serve the Winfall Landing Subdivision
located at terminus of Major Street off Winfall Blvd. (SR 37), Winfall, NC.
This permit shall be effective from the date of issuance until October 1, 2017 and shall be subject to the following
specified conditions and limitations:
DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application
and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page
3 of this permit, the Project Data Sheet.
3. A maximum of 327,874 square feet of built upon area is allowed on this 14.5 acre site.
4. All stormwater collection and treatment systems must be located in either dedicated common areas or
recorded easements. The final plats for the project will be recorded showing all such required easements, in
accordance with approved plans.
5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of
the permit.
State Stormwater Management Systems
Permit No. SW7070728
DIVISION OF WATER QUALITY
WET DETENTION POND - PROJECT DATA
Project Name:
Winfall Landing Subdivision
Permit Number:
SW7070728
Location:
Hertford County
Applicant:
Winfall Developers Inc
Mailing Address:
P.O BOX 14025
Norfolk, VA 23518
Application Date:
07/302007
Receiving Stream:
Perquimans river
Classification of Water Body:
SC
Total Site Area:
14.50 ac
Drainage area:
14.50 ac
Total Impervious allowed on site:
327,874 sf
Wet Pond Depth:
7 ft
Required Storage Volume:
27,394 cf
Provided Storage Volume:
31,671 cf
Required Surface Area:
12,580 sf
Provided Surface Area:
12,627 sf
Controlling Orifice:
2" diameter @ elevation 5 ft.
Temporary Storage Elevation
7 ft.
3
State Stormwater Management Systems
Permit No. SW7070728
6. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as
swales) shown on the approved plans as part of the stormwater management system without submitting a
revision to the permit and receiving approval from the Division.
The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size
b. Project name change
C. Transfer of ownership
d. Redesign or addition to the approved amount of built -upon area
e. Further subdivision of the project area.
In addition, the Director may determine that other revisions to the project should require a modification to the
permit.
8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
II. SCHEDULE OF COMPLIANCE
The permittee will comply with the following schedule for construction and maintenance of the stormwater
management system.
a. The stormwater management system shall be constructed in its entirety, vegetated and operational
for its intended use prior to the construction of any built -upon surfaces except roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be
repaired immediately.
2. The facilities must be properly maintained and operated at all times. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals.
3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency including, but not limited to:
a. Semiannual scheduled inspections (every 6 months)
b. Sediment removal
C. Mowing and revegetation of side slopes
d. Immediate repair of eroded areas
e. Maintenance of side slopes in accordance with approved plans and specifications
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel of
DWQ. The records will indicate the date, activity, name of person performing the work and what actions were
taken.
5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
6. Upon completion of construction and prior to operation of this permitted facility, a certification must be
received from an appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other supporting
documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall,
Washington, North Carolina, 27889, attention Division of Water Quality.
State Stormwater Management Systems
Permit No. SW7070728
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the
permit.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
accompanied by an application fee, documentation from the parties involved, and other supporting materials
as may be appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6(a) to 143-215.6(c).
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal),
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those as may be required by this Division, such as
the construction of additional or replacement stormwater management systems.
5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for
an extension along with appropriate application fee.
Permit issued this the 15' day of October 2007.
CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Coledn H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW7070728
State Stormwater Management Systems
Permit No. SW7070728
Winfall Landing Subdivision —High Density Project
Hertford County
Designer's Certification
I, , as a duly
Registered Professional Engineer
(periodically/weekly/full time)
the construction of the project,
for
in the State of North Carolina, having been authorized to observe
(Project)
(Project Owner)
hereby state that to the best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
Signature
SEAL
Registration Number
Date
Certification Requirements:
1. The drainage area to the system contains approximately the permitted acreage.
2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains to the
system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-circuiting of the system.
11. The permitted amounts of surface area and/or volume have been provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf, and a forebay.
15. The required system dimensions are provided per the approved plans.
Permit No. SW70 r70'72*
tm he provided w DIVQ)
State of North Carolina
Department of Eirvironnrent and Natural Resources^
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may ba photocopied for use as an w iginal
DWQ Stonuwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
1. PROJECT INFORMATION
Project Name: k%i � �ald LC?Ild /'A �CA(JhV/Si n
Contact Person: 0,fJ" J. C' E: • Phone Number: (7s-z ) 49/ P 3a4
For projects with multiple basins, specify which basin this work -sheet applies to: S(IIQI, &isit
elevations
Basin Bottom Elevation Z. i7 ft.
Permanent Pool Elevation 5.0 ft.
Temporary Pool Elevation -7- 0 ft
areas
Permanent Pool Surface Area 12AZ-7 sq. ft.
Drainage Area /�}, i _ ac.
Impervious'Area { _ac.
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
S A/DA 1
Diameter of Orifice
Design Rainfall
Design TSS Removal 2
�595 cu. ft
1, 6 4 i cu. ft
1.6. Cu. ft
(floor of the basin)
(elevation of the orifice)
(elevation of the discharge structure overflow)
(water surface area at the orifice elevation)
(on -site and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
(combined volume of main basin and farebay)
(volume detained above the permcuient pool)
(approximately 2017c of total volume)
(surface area to drainage area ratio from DIVQ table)
(2 to 5 dap temporary pool draw -down required)
(mininuon 85% required)
Form S\\'U-102 Rev 3.99 Page I of 4
Footnotes:
t when using the Division S—NMA tables, the correct SA/DA ralio for permanent pool sizing should Ile comtiuted bascd upon the _
achtal inipen ious % and permanent pool deptli. Linear interpolation should be employed to determine the correct value for non ---
standard table entries.-
2 In the 20 coastal counties. the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
IL REQUI ?,LD ITEMS CHECKLIST
The following checklist outlines design requirements per the Stortnwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stornvater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
%4
a.
/7`k b.
—iQ 5 C.
QtS d.
uE e.
TO 0 a '13 s
11,-4LA 0rYt-
�c
The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
The forebay volume is approximately equal to 2090 of the basin volume.
The temporary pool controls runoff from the design storm event.
The temporary pool draws down in 2 to 5 days.
If required, a 30-foot vegetative filter is provided at the outlet.(include non -erosive flow
calculations)
The basin length to %vidth ratio is greater than 3:1.
g. The basin side slopes above the permanent pool are no steeper than 3:1.
It. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
i. Vegetative cover above the permanent pool elevation is specified.
j. A trash rack or similar device is provided for both the overflow and orifice.
MILA • GN4Inl is A recorded drainage easement is provided for each basin including access to nearest right-
! M04 to fly of -way.
k� 1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
10. in. A mechanism is specified which will drain the basin for maintenance or an emergency.
Ill. VET DETENTION BASIN OPEItATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does Fa Noes not incorporate a vegetated filter at the outlet.
This sysleni (check one) 0 dous dous nut incorporate prclruatmuut other thau a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
_-Maintenanc'e activities shall be perforated as follows:
1. After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulatior, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs
within 2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect.and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to
maintain proper functioning.
4. Remove accumulated sediment from the wet detention basin systern semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed
of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality
(i.e. stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give'an accurate
depth reading and not readily penewate into accumulated sediments.
When the permanent pool depth reads -S feet in the main pond, the sediment shall be removed.
When the permanent pool depth reads S• .2,5 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
(fill in the blanks)
�0 Permanent Pool Elevation Jam,
SedimenARerToval 'v' e,- 75 b--Sediment Removal Elevation -� n• W 75%
Bot�i.•y %--------------------------------------------- --c --
Bottom Elevation - Z. tL 25 Io
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50110 of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment
through, the. emergency drain shall he minimized to the maximum extent practical.
Form SN'U-102 Rev 3.99 Page 3 of 4
7. All components of the .vet detention basin system shall be maintained in good working order.
I.ackno«ledge _,ind:agree'b3rm;L�sigrtature-be low that I atnrespoh-sible'for the performance of the seven ---
maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible part`.
Print name: I)An W. ,7rrts _
Title: Pre,sidanf
Address
Note: The legally responsible party should not be a homeownersmssociation unless more than 509� of the lots have been sold and
a resident of the subdivision has been named the president.
1, a�� a Notary Public or the State of
Count} of do hereby certify that
personally appeared before me this day of and acknowledge the due
execution of the forgoing wet detention basin mainten ce r uirements. Witness my hand and official seal,
SEAL
my commission expires
FormSWU-102 Rev199 Page4of4
I.
IV
V
SEP 2 6 2007
WINFALL LANDING- STORMWATER MANAGEMENT PLAN
WET DETENTION BASIN DESIGN NOTES AND CALCULATIONS)WQ_WAR®
REVISED 9/24/07
ENGINEER'S PROJECT NO. 936
Total tract area = 664,222 S.F. (15.25 AC)
Drainage Basin Area: Total = 632,179 S.F. (14.5 AC, canal area excluded)
Impervious Coverage = Total = 327,874 S.F./ 632,179 = 51.9 %
Required Storage Volume
A) Impervious Coverage = 51.9% (see attached calculations and application
form for coverage breakdown)
B) Unit Volume = Rv (using Schuler Equation)
Rv = 0.05+0.009 (51.9%) = 0.52 in/inch
Design storm event, 1" = 632,179 S.F. (1/12) (.52 in/inch) = 27,394 CF
Required Surface Area: 7.0' Deep for 90% TSS Removal
@ 51.9% Coverage = SA/DA= 1.99% (from interpolation)
SA = .0199 (632,179) = 12,580 S.F. Required
12,627 S.F. Provided
Pond Specifications As Designed:
A) Temporary Pool Volume
5.0' Contour = 12,627 SF
7.0' Contour = 19,044 SF
12,627 (2.0) + (19,044 - 12,627) (1.0.) = 25,254 + 6,417 = 31,671 CF
(approximately 116% of required volume, equates to 1.16" rainfall event)
B) Permanent Pool Volume
1) Main Basin: -2.0' Contour = 2,017 SF
4.0' Contour = 7,564 SF
5.0' Contour = 9,707 SF
2,017 (6.0) + ( 7,564 - 2,017) (3.0) = 12,102 + 16,641 = 28,743 CF
7,564 (1.0 ) + ( 9,707 - 7,564) (.5) = 7,564 + 1,072 = + 8,636 CF
37,379CF
2) Forebay: -2.0' Contour = 13 SF
4.0' Contour = 1,919 SF
5.0' Contour = 2,920 SF
13(6.0)+(1,919-13)(3.0)+1,919(1.0)+(2,920-1,919)(.5)=8,216C.F.
3) Total Permanent Pool Volume:
37,379 + 8,216 = 45,595 CF
4) Ratio of forebay to permanent pool:
8,216/45,595 = 18%
PERFORMANCE ENGINEERING
8604 CARATOKE HIGHWAY f
POWELLS POINT, NC 27968
,,,N�eNuh►�'�i
.�.a CARS, _•._
vGINE�:PQ�``�rq 2 f�d�
... I `..,
WINFALL LANDING- STORMWATER MANAGEMENT PLAN
WET DETENTION BASIN. DESIGN NOTES AND CALCULATIONS
REVISED 9/24/07
ENGINEER'S PROJECT NO. 936 page 2 of 2
VI. Drawdown Calculations
A) Design Criteria =
Drawdown Volume(use design volume) = 27,394 CF
Design for Drawdown in 2-5 Days
B) Required Flow Q (3.5 Days)
O = 27,394 CF
(3.5 Days)(24 hr/day)(3600 Sec/Hr) = 0.091 CFS
use orifice equation- Q= Cd x Ao x Sq. Rt. 2gh
try 2" orifice, A= 0.023 S.F., Q= (.62)(0.023)(SQ. RT. 2(32.2)(1.0')) = 0.114 CFS
t= 27,394 CF = 2.7862 days
(1 sec./O. 114 cf)(1 hr/3600 sec)(1 day/24 hrs.) ok, use 2" orifice
VIL Anti -floatation calculations for outfall structure
A) Weight of 12" pipe = 10#/ If, riser weight = 30#, Saturated soil weight = 47.6 pcf
B) Calculate buoyant force, Fb, on horizontal section of pipe, assume o.d. = 1.2'
Pipe area = 1.13 s.f., Fb = 1.13 cf/If x 62.4 #/cf = 70.5 #/If. Adjusting for 10#/If
pipe weight = 60.5 #/If. For saturated soil to provide adequate ballast required
depth of soil cover = 60.5 #/cf/47.6 #/cf = 1.27', say 1.3'. This condition occurs
at point 16' from riser.
C) Assume concrete foundation slab 3' x 3' and 18" thick. Calculate total Fb
from riser to outfall pipe 16' away:'
riser volume = 1.13 sf x 3' = 3.39 of
pipe volume = 1.13 sf x 16' = 18.1 cf
concrete -volume = 13.5 cf
Fb = (3.39 cf + 18.1 cf + 13.5 cf)(62.4 pcf) = 2,183 #
D) Calculate ballast: concrete weight 13.5 cf x 150 pef = 2,025#
pipe weight =(3' +16') x 10 #/If = 190# .
soil weight = .5(6'x 13' x 1.2')(47.6 ocf) = 223#
total ballast = 2,438# OK
r.c-" '. ; OFFICE USE-
' Date Received
Fee Paid
Permit Number
un n n 2007
1 ftlo
SW7 0707An
w,51`. ,,, SWACK 7/31/01
�, � State of Forth Carolina
' Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This forty; may be photocopied for use as an original
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
;:
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
`NOke' bl• Norris Prrr�lh nt
3. Mailing Address for person listed in item 2 above:
P.c�- i3nx 14dZ
City: 1' o I- �O1>L State:- VA Zip: 2,351 8
Telephone Number: (:I rJ ) �
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.)
5. Location of Project (street address):
i'ro er,t is ►ot-AJr J a l)i Yrn1ntic o f�Ad�n-(�si o BWd &
city: 1yJ a I I County: 0 d a U I rY\2 VN
6. Directions to project (from nearest major intersection):
7.
S. Contact person who can answer questions about the project:
Name:QobCA T. �+Q ra( I'r• P Telephone Number: ('2S2 I S3S�
II. PERMIT INFORMATION:
1. Specify whether project is (check one): _/_Nev.
Form SWU-101 Version 3.99 Page 1 of 4
Renewal Modification
0
2. If this application is being submitted as the result of a reriCwal or riiodifi6tion to an existing perm t, list the
existing permit number N � A and its issue date (if known) i t;
3. Specify the type of project check one):
Lowbensity High Density _Redevelop _General Perri -Lit _Other
4. Additional Project Requirements (check applicable blanks):
_LAMA Major ✓ Sed imentation/Erosion Control _404/401 Permit _NPDES Stormivater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-577-623-6745.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the pr,;ject .
S�Drmwa}¢� w%l( he tall<c.}ad vtp si-kc k., n ort lots Cn1�V2�tc1
. a �,;� mrr. M-A^nay +0 -nn _� CnJEc1 V�ILt—flQ�dn�l�h�St1�
2. Stormwater runoff from this project drains to the t sS U 01(7 r) River basin.
3. Total Project Area: ]'1 .5 acres
4. Project Built Upon Area: _5�- 9 %
5. How many drainage areas does the project have? ON 17
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Sasm Infomiatron
y :,Drainage Area 1�
xis "N"'ODYaKV mage
Receiving Stream Name
Prwuimars fl
Receiving Stream Class
J
Drainage Area
6'
Existing Impervious* Area
Proposed Im ervious'Area
22-
% Im ervious" Area (total)
I v, 9 a a
On -site Buildings -.'2 3 4, Q (p sF
On -site Streets ®� J
On -site Parking
On -site Sidewalks
Other on -site
Off -site
Total: ?:'Z 014 <- C Total:
Inm✓minve nr✓n is 4,fin✓d na fh✓ h)ilt unnn',r✓n inrlredin o. huh not Iimifad to huildino: rnode unrkina nr✓ne
sidewalks, gravel areas, etc.
e
Form S11'U-101 Version 3.99
Page 2 of 4
0
How was the off -site impervious area listed above derived
r
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit
number as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by stnuctures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
constnuction.
5. All permitted runoff from outparcels or future development shall be directed into the pennitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the
integrity and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the
status and availability of these forms.
,Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form S4VU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Paoe 3 of 4
VI. SUBMITTAL REQUIREMENTS _
Only complete application packages will be accepted and reviewed by the Division of water Quality (DIVQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DIVQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
• Original and one cop), of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
- Development/Project name
-Engineer and firm
-Legend
- North arrow
- Scale
- Revision number g date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Oe/'T J , JTieUdr I J r. Y, L- .
Mailing Address: RF,d4 C-c?Cr7 foka WWV'
City: POUIJP,11$ Point State: IJG Zip: Z r ' 6
Phone: (%SZ ) 491 P 3S4 Fax: ( z: 2 ) 441 o %l Z
VIII. APPLICANT'S CERTIFICATION
I, (print or type name ofperson listed in General Infornmtion, item 2) Jd h o, W. ! 1 a rr6S
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signatu
Date: '7 11 Jdc":'
Form SWU-101 Version 3.99 Page 4 of 4
«B»
In accordance with Title 15 NCAC 21-1.1000, the Coastal Stormwater Management Regulations, deed
restrictions and protective covenants are required for High Density Commercial Subdivisions where
lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility.
Deed restrictions and protective covenants are necessary to ensure that the development maintains a
built -upon area consistent with the design criteria used to size the stormwater control facility.
I, i nhr, �iJ . 1� �Y r 1S j- acknowledge, affirm and agree by my signature below, that
I will cause the following eed restrictions and covenants to be recorded prior to the sale of any lot
within the.projectknown-as SohJiyisk"
1. The following covenants are intended to ensure ongoing compliance with State Stormwater
Management Permit NumberS�N-jO as issued by the Division of Water Quality
under NCAC 2H.1000.
2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to
maintain compliance with the stormwater management permit.
3. These covenants are to run with the land and be binding on all persons and parties claiming
under them.
4. The covenants pertaining to stormwater may not be altered or rescinded without the express
written consent of the State of North Carolina, Division of Water Quality.
5. Alteration of the drainage as shown on the approved plan may not take place without the
concurrence of the Division of Water Quality.
6. The maximum allowable built -upon area per lot is square feet. (OR, if the
proposed built -upon area per lot will vary, please use the following format & language (in bold):
The maximum built -upon area per lot, in square feet, is as listed below: SBE ATTAcAM TA Buu911Io13.
Lot # BUA Lot # BUA Lot # BUA Lot # BUA
" E)CMBIT No- I
This allotted amount includes any built -upon area constructed within the lot property boundaries,
and that portion of the right-of-way between the front lot line and the edge of the pavement. -Built
upon area includes, but is not limited to, structures, asphalt, concrete, gravel, -brick, stone, slate,
coquina and parking areas, but does not include raised, open wood decking, or the water
surface of swimming pools.
7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be
accomplished through a variety of means including roof drain gutters which drain to the street,
grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff
and directing them into a component of the stormwater collection system. Lots that will naturally
drain into the system are not required to provide these additional measures.
8. The owner of each lot, whose ownership is not retained by the permittee, is required to submit a
separate stormwater permit application to the Division of Water Quality and receive a permit
prior to construction.
\Signature: Date: 2,P b 7_
I,dcr a Notary Public in the
State of County of
do hereby certify that _ o jn A. iiar r l S personally appeared
before me this the 20+h day of ,S YT1btX 20A�, and acknowledge
the due execution of the foregoing instrument. Witness my hand and official seal, RECEIVED
• SEAL
Signatu SEP 2 0 2007
My Commission expires 11 2q 2 pad N.YEA�F9
COUN
DWQ-WARO
\ L's
EXHIBIT NO. 1
WINFALL LANDING SUBDIVISION
THE TOWN OF WINFALL PEROUIMANS COUNTY NORTH CAROLINA
STORMWATER PERMIT NO. SW7070728 — RESTRICTIVE COVENANTS
The maximum built -upon area per lot, in square feet, is as listed below:
I. SINGLE FAMILY RESIDENTIAL
Type "A", lots 14,17-20, 24-28, ten lots total, 2,128 s.f. per lot
Type "B", lots 23, 30 & 38, three lots total, 3,106 s.f. per lot
Type "C", lots 1-12, 31-37, twenty lots total, 2,582 s.f. per lot
Type "D", lots 22 & 29, two lots total, 2,518 s.f. per lot
Type "E", lots 13, 15, 16 & 21, four lots total, 2,527 s.f. per, lot
Note: 5,164 s.f. of impervious coverage is reserved as a contingency for use within the
single family residential lots.
11. MULTI -FAMILY
Multi -family parcel #1- 8,418 s.f.
Multi -family parcel #2- 8,418 s.f.
Multi -family parcel #3- 14,023 s.f.
Multi —family contiguous parcels #5, #6 and #7- 41,432 s.f. combined total
III. COMMERCIAL
Commercial parcel #1- 70% coverage, 15,902 s.f.
Commercial parcel #2- 70% coverage, 29,397 s.f.