HomeMy WebLinkAboutSW7070712_COMPLIANCE_20171213STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW 0) 70 7/
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATES
YYYYMMDD
emac,la/s/g !O .' I`iuYr4 (//i'i.-„ AG fny�woocQ M9r`o ')"�cJ
Compliance Inspection Report
Permit: �SW7070712 ,I Effective: 12/20/07 Expiration: 12/20/21
Project: Tanglewood Apartments,
Owner: Tanglewood Lake Apts LLC
County: Pasquotank Adress: Tanglewood Pkwy Parcel
Region: Washington
CitylState/Zip: Elizabeth City NC 27906
Contact Person: 5 L Nusbaum Title: Phone: 757-627-8611
Directions to Project:
north of Tanglewood parkway from intersect of Tanglewood Parkway and Halstead Blvd extended
Type of Project: State Stormwater - HD - Detention Pond
Dram Areas: 1 - (Knobbs Creek) (03-01-50) ( C:Sw)
On -Site Representative(s):
Related Permits:
Inspection Date: 12/13/2017 Entry Time: 01.30PM
Primary Inspector: William J Moore
J
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Stale Stormwater
® Facility Status: [ Compliant/ ❑ Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Exit Time: 02:OOPM
Phone: 252-946-6481 Ext.264
Inspection Type: Compliance Evaluation
page1
Permit: SW7070712 Owner - Project Tanglewood Lake Apts LLC
Inspection Date: 12/13/2017 Inspection Type Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Site inspection at Tanglewood Lake Apartments located near intersection of US17 Bypass & Halstead Blvd West of
Elizabeth City. Condo project with (3) wet ponds. BUA & wps appear to be complete & constructed according to plans
Dev & sw systems well maintained. Signed O&M and PE Cert in file
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? N ❑ ❑ ❑
Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑
Comment
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? N ❑ ❑ ❑
Are the inlets located per the approved plans? 0 ❑ ❑ ❑
Are the outlet structures located per the approved plans? M ❑ ❑ ❑
Comment'
Operation and Maintenance
Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements?
e ❑ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to
❑ ❑ ❑
DWQ upon request?
Comment:
page: 2