Loading...
HomeMy WebLinkAboutNCS000122_COMPLIANCE_20110908STORMWATER-DIVISION-CODING-SHEET- PERMIT NO. NC,S�taa DOC TYPE ❑ FINAL PERMIT ❑ MONITORING INFO ❑ APPLICATION COMPLIANCE ❑ OTHER DOC DATE ❑ � 01 t aG1 OJ YYYYM M DD �. NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 8, 2011 Mr. Art Williams General Timber Inc. 625 Farmville Mine Road Sanford, NC 27330 Subject: Compliance Evaluation Inspection Stormwater Permit: NCS000122 General Timber Inc. Chatham County Dear Mr. Williams: On September 7, 2011, Thomas Ascenzo of the Raleigh Regional Office (RRO) conducted a compliance evaluation inspection (CEI) of your General Timber Company. The assistance from Greg M. Williams was appreciated, as it helped facilitate the inspection. The Basin -Wide Information Management System (BIMS) inspection report is attached. The following observations were made: Review of your Stormwater Pollution Prevention Plan Manual (SP3) revealed the following: • General Timber, Inc. is authorized to discharge stormwater from the facility located at 625 Farmville Mine Road, Sanford, NC in Chatham County. The runoff from this site enters the receiving waters designated as Georges Creek, a class C stream n the Cape Fear River Basin. • The plan contained a general location (USGS) map showing the outfall locations and drainage areas. • Narrative descriptions of practices such as best management summary, spill prevention response plan, good housekeeping plans were available. • Employee training is being conducted annually and documented as required. • Stormwater Qualitative monitoring sheets are filled out appropriately. 2. Qualitative Monitoring was conducted November 9, 2010, and April 24, 2011 along with Analytical Monitoring. O'Brien and Gere are the Environmental Consultants hired to conduct sampling and monitoring. 3. Employee Training was documented for May 13, 2010. 4. Overall site is clean and well maintained with no evident signs of pollutants. 5. Outfall #1 was observed to be not discharging at the time of inspection. Outfall #2 Stream had a slight turbid appearance due to recent rainfall. Please properly maintain access leading to Outfall points. Suggestion to add signage to clearly indicate outfall locations. 6. No spills were noted at the site in the past three years. Please add a sheet to the stormwater pollution prevention plan documenting absence of spill events. 7. This office recommends that you have one main SP3 notebook to eliminate researching and securing other books for the required (SP3) components. This will allow for materials to be availabl%for quick reference by staff. None rthCarolina p vucc[rru[y North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Customer Service Internet: v~v.ncvvaterquality.org 1628 Mail Service Center Raleigh, NO 27699-1628 FAX (919) 788-7159 877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper General Timber Inc.40 0 NCS000122 Page 2 of 2 Should you or your staff have any questions regarding this inspection or this letter, please do not hesitate to contact me at 919-791-4256 or you can na l me at tom.ascenzo(cvncdenr.gov. Sincerely, Thomas Ascenzo Environmental Specialist Surface Water Protection Attachment: Compliance Inspection Reports CC: Greg M.Williams-General Timber Inc 625 Farmville Road, Sanford, NC 27330 Central Files NCS000122 'Raleigh Regional Office SWP> Compliance Inspection Report Permit: NCS000122 Effective: 08/26/08 Expiration: 08/31/13 Owner: General Timber Inc . SOC: Effective: Expiration: Facility: General Timber Incorporated-Sr#2148 County: Chatham 625 Farmville Mine Rd Region: Raleigh Sanford NC 27330 Contact Person: William Art Williams Title: Phone: 919-774-6213 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/07/2011 Entry Time: 11:00 AM Primary Inspector: tom ascenzo Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ■ Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Exit Time: 12:00 PM Phone: 919-791-4200 Inspection Type: Compliance Evaluation Page:1 Permit: NCS000122 Owner - Facility: General Timber Inc Inspection Date: 09/07/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 re ,f Permit: NCS000122 Owner - Facility: General Timber Inc Inspection Date: 09/07/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ Cl ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ In ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ■ ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ Cl ❑ ❑ ' Has the Stormwater Pollution Prevention Plan been implemented? ■ ❑ ❑ ❑ Comment: Include a page with an indication that no spills have occurred within the three year period. Create one SP3 notebook for all the components of the plan. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: 11/12/2009/ unable to collect due to drought second sample Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ■ ❑ Comment: 4/24/2011, 11/9/2010 Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Page: 3 • Permit: NCS000122 Owner - Facility: General Timber Inc Inspection Date: 09/07/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Comment: Outfall #1 appears dry/ Outfall #2 slight turbidity due to recent rainfall. Page:4 ® AAA B�80fALA MR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director August 26, 2009 Mr. Art Williams General Timber Inc. 625 Farmville Mine Road Sanford, NC 27330 Subject: General Timber Inc: W-WA-L Natural Resources Stormwater Evaluation Inspection NPDES Permit No. NCS000122 Chatham County Dear Mr. Williams: Dee Freeman Secretary On August 13, 2009, Ms. Vicki Webb of the Raleigh Regional Office conducted a stormwater 1 t' eva ua on inspection of General Timber with the assistance of Greg Williams and yourself. All help was appreciated as it eased the inspection process. The following observations were made: General Timbers, Inc. is authorized to discharge stormwater from the facility located at: 625 Farmville Mine Road, Sanford, NC in Chatham County. The runoff from this site enters the receiving waters designated as Georges Creek, a class C stream in the Cape Fear River Basin. The permit expires August 31, 2013. 2. All components of the Stormwater Pollution Prevention Plan (SP3) were present including: detailed site map with labeled storm outfall, a list of potential contaminants, a spill and response plan, a narrative describing BMPs, and a contact list of whom to contact in an emergency. 3. Employee training records were on -site. This facility maintains good housekeeping practices. 4. Qualitative and quantitative inspection records were available for review and appeared complete. 5. Mr. Williams stated that the facility has not had any spills during the past three years. The plan requires you to keep a list. If no spills have occurred then document that on the list and keep on file. 6. The facility contains two stormwater outfalls. Both of the facility's stormwater outfalls were observed during the inspection. North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791-4200 Internet: w .nmaterquality.org 1628 Mail service Center Raleigh, NC 27699-1628 FAX (919) 78&7159 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10 % Post Consumer Paper NorthCarolina ✓Naturally Customer service 877-623-6748 #G�erieral'T nbe tl c, €z.��� �TVPDES+Pe`rtni[ No�AIGS000122 ,Chathatn.CountY-,�, I commend the facility for their efforts to correct the problems noted in the July 24, 2007 inspection. The overall condition of General Timber Inc. is compliant with Division standards. If you have any questions regarding the attached report or any of the findings, please contact Vicki Webb at: (919) 791- 4200 (or email: vicki.webbna ncmail.net ). Sincerely, i' Vicki Webb Environmental Specialist Cc: RRO files . Central Files Compliance Inspection Report Permit: NCS000122 Effective: 08/26/08 Expiration: 08/31/13 Owner: General Timber Inc SOC: Effective: Expiration: Facility: General Timber Incorporated-Sr#2148 County: Chatham 625 Farmville Mine Rd Region: Raleigh Sanford NC 27330 Contact Person: William Art Williams Title: Phone: 919-774-6213 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/13/2009 Entry Time: —09:00 AM Exit Time: 10:00 AM Primary Inspector: Vicki Webb p,z%JR` �-) Phone: Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stonnwater Discharge, Individual Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E Storm Water (See attachment summary) Inspection Type: Compliance Evaluation Page: 1 Permit: NCS000122 Owner- Facility: General Timber Inc Inspection Date: O8/13/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NGS000122 owner - Facility: General Timber Inc Inspection Date: 08/13/2009 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ®❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ■ ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ■ ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ■ ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ®❑ ❑ ❑ # Is the Plan reviewed and updated annually? ■ ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ®❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Employee training done 10/10/08. Plan was updated on Feb 20, 2009. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ■ ❑ ❑ ❑ Comment: sampled on 3/01/09 Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ■ ❑ Cl ❑ # Were all outfalls observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ■ ❑ ❑ ❑ Comment Page:3