Loading...
HomeMy WebLinkAboutNCS000040_Renewal Application_20040707STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. N C S DOC)Cx4n DOC TYPE ❑ FINAL PERMIT ❑ MONITORING REPORTS (X APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ 2004C) lO7 YYYYMMDD It/ 7 NCS000040 I. NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director STAF.F—REVIE-W._AND_EYALUATION NPDES Stormwater Permit Dee Freeman Secretary Facility Name: Charlotte Pipe & Foundry Cc NPDES Permit Number: NCS000040 Facility Location: 1335 South Clarkson Street, Charlotte, NC (Mecklenburg County) Type of Activity: GRAY AND DUCTILE IRON FOUNDRIES SIC Code: 3321 Receiving Streams: See Figure 1 River Basin Catawba River Basin, Sub -basin 03-08-34 Stream Classification: C Proposed Permit Requirements: See attached draft permit. Monitoring Data: See Table 1 Response Requested by (Date): Central Office Staff Contact: Return to: Brian Lowther, (919) 807-6368 Special Issues: Issue Rating Scale: 1 easv to 10 hard Compliance history 6 Benchmark exceedance 7 Location (TiIMDL, T&E - species, etc 7 Other Challenees: • Missing data 6 Difficulty Rating: 26/40 Special Issues Explanation: Many analytical monitoring values are over the current benchmarks for Cr, Cu, Ph, Ni, Zn, TKN, COD and TSS. Description of Onsite Activities: • The CP&F facility is located at 1335 South Clarkson Street in Charlotte, NC. The facility is on approximately 35 acres and has numerous buildings. Total impervious area (parking lots, buildings, roadways, etc.) is estimated at 95 percent of the total site area. The facility has been operating as a pipe foundry since 1926 at this location and currently has 475 employees. Plant operations typically occur 24 hours a day, 5 clays a week. The facility is engaged in the manufacture of cast iron piping and fittings. The facility's SIC code is reported as 3321. The facility stores and distributes the following raw materials: cast iron scrap, coke, coal, limestone, quartz, sand, silicon, bentonite, petroleum -asphalt, gasoline and Page 1 of 9 NCS000040 diesel fuel. (Information from inspection report, 05/08/06) Documents Reviewed: • NPDES Stormwater Permit Application Materials • National Heritage Program (NHP) Threatened and Endangered Species Database • SPU File • Central Files • EPA Sector -Specific Permit, 2008 • 303(d) List, 2006 final 02004•Catawba-Basinwide-Plan History: • August 31, 1994: Date permit first issued. Analytical monitoring parameters included COD, TSS, Total Kjeldahl Nitrogen, Total Chromium, Total Copper, Total Recoverable Lead, Total Nickel, Total Zinc and Phenols. Samples were to be taken annually. • February 19, 1999: Permit renewal reminder letter. • December 3, 1999: Date permit re -issued. Analytical monitoring parameters included COD, TSS, Total Kjeldahl Nitrogen, Phenols, Total Copper, Total Recoverable Lead, Total Nickel, Total Zinc and Total Chromium. Samples were to be taken annually for the first three years and quarterly during the 41h year. • May 3, 2004: Permit renewal reminder letter. • July 7, 2004: Date permittee submitted renewal application. • April 5, 2006: Site visit by Mr. Donald Ceccarelli of the Mecklenburg County Water Quality Program (MCWQP). • May 8, 2006: Notice of Violation. Page 2 of 9 NCS000040 Figure 1: Map of Facility Ihar&te Pipe & Fcundry Co NCS000040 / ,W Stale 1, 24, 000 Charlotte Pipe & Foundry Co Lad Ride: 350 13' 28" N Long d de: 800 51' 42" W County:1% dIenburg Reca ping Stream: Irwin Credo Stream Cass: C Sub-badn: 03-08-34 (Catawba River B dn) Facility Loca tion Page 3 of 9 NCS000040 Central Office Review Summary: 1. Owner's Other Permits: • AFS — 371 1900626 NCG500117 RCRA NCD980247316 2. General Observations: • Outfalls: Stormwater runoff from the main manufacturing plant discharges via three stormwater outfalls (SW001, SW002, SW005) across I-77 and ultimately to Irwin Creek. Tow other outfalls (SW003, S W004)-have-been-identified-as-intermediate-outfalls-for-sampling-purposes. - SW001: This outfall drains approximately 7.2 acres of the southwestem portion of the facility that contains the wastewater treatment plant, fitting storage area, scrap iron storage area and the cupola bag houses. This outfall also drains several off -site properties up gradient of the CP&F facility. The drainage area is approximately 95% impervious. - SWO02: This outfall drains approximately 3.1 acres of the central portion of the facility, which contains the main raw material unloading area, machine shop, shell cure building, and cupola furnace building. The drainage area is approximately 95% impervious. - S WO03: This outfall is located up gradient of the facility and was historically used to sample off - site water that flowed onto the property for purposes of comparing influent stormwater samples at S WO03 to effluent stormwater samples at SW004. However, CP&F determined that S WO03 was not collecting the major portion of the influent stormwater and this is no longer sampling. - SWO04: This outfall drains approximately 11.1 acres of the western portion of the facility that contains the fueling station, fuel storage tanks, maintenance shop, bulk spent material storage area, pipe production building, pipe coating building, the hot dip coating area, and serves as the permitted discharge pipe for non -contact cooling water. This outfall also drains many offsite properties up gradient of the facility. The drainage area is approximately 95% impervious. -SW005: This outfall drains approximately 2.5 acres of the northwestern portion of the site, which contains the hot dip collectors and the fittings tar pit building. In addition stormwater from SWO04 flows into SWO05 at Clarkson Street. The drainage area is approximately 95 percent impervious. After the application was filed the facility purchased more property and there are now a total of seven outfalls now: 001 (35' 13'27", -80' 5 1'5 1 "), 002 (350 13'29", -800 51'49"), 002A (35° 13'23", -80° 51'42"), 004 (35° 13'27", -800 51'39"), 005 (35�0 13'29", -800 51'41 "), 006 (350 13'34", -800 51'45"), and 007 (35° 13'34", -800 51'39"). Impairment: Irwin Creek is on the 303(d) list for standard violations for turbidity and fecal coliform, as well as, having impaired biological integrity. Basinwide Plan recommendations include: Current Status and 2004 Recommendations The Irwin Creek site is showing a slight trend of lowered conductivity since the middle 1990s. There is a Fecal Coliform Bacteria Tl/IDL for Sugar Creek, Irwin Creek, Little Sugar,Creek and McAlpine Creek. The TMDL addresses all identifiable sources of fecal coliform pollution including, but not limited to, wastewater treatment plants, sanitary sewer overflows, stormwater runoff, failing septic systems, and background wildlife contributions. The TMDL study indicated that excluding stormwater runoff, the primary contributors of fecal coliform pollution in this watershed are point sources (WWTP, etc.) and direct input nonpoint sources (failing septic systems). 4. Threatened and Endangered: Based on the Natural Heritage Virtual Workroom there is one federally endangered species within 2 miles of the facility: Lasmigone decorata, Carolina Heelsplitter. More information was provided that showed the element occurrence ranking as X — Extirpated. The most recent survey date was 1987 indicating the Carolina Heelsplitter used to be located in Irwin Creek but no longer exists there. Page 4 of 9 Il t NCS000040 5. Location: Drains to a classified C stream. The inspection report indicated the site map needed to be updated. 6. Industrial Changes Since Previous Permit None provided in renewal application. 7. Analytical Monitoring Notes: Analytical monitoring parameters included COD, TSS, Total Kjeldahl Nitrogen, Phenols, Total Copper, Total Recoverable Lead, Total Nickel, Total Zinc and Total Chromium. Samples were to be taken annually for the first three years and quarterly during the 41h year. The application only included one sample for each ou{/dll. The samples had values over our current benchmarks for Cr, Cu, Pb, Ni, Zn, Phenol, COD and TSS. The data was missing information such as total rainfall, event duration, and estimated flow. Th is-industry-(S I G332-1)•is-covered-in-th e-EPA-Multi-S ector-General-Permit-under-S ubsector-F-2-lron-and Steel Foundries. The parameters recommended for monitoring include Total Aluminum, TSS, Total Copper, Total Iron, and Total Zinc. The inspection report indicated the facility uses more than 55 gallons of new motor oil and therefore should have done analytical monitoring under Part 11 Section D of the permit. CP&F personnel indicated that more than 55 gallons of new motor oil were used but no records of quantities have been kept. Oil and Grease was added to the monitorine because it is a potential pollutant onsite. Another set of values was start from at storm event on February 26, 2008. Many values are over the current benchmarks for Cr, Cu, Ph, Ni, Zn, TKN, COD and TSS. 8. Qualitative Monitoring Notes: No visual monitoring was provided. An inspection report was given instead. Page 5 of 9 NCS000040 Table 1: Analytical Monitoring Otltfall I Sample Date Total Flow (wol Pre4itation (in) Duration (hours) a Cu I Pb I Ni 17- TIQJ Pherol COD I TSS Benctrrark: 1 mg(L Berchnark: 0.007 ng'L Bench"rk: 0.03 mg'L Benctnerk: 026 n dL Berchrmrk: 0.067 mg'L Benchmark: 20 mg'L Benchinuk: 4.5 mg/L Bemhnark: 120mg/L Bench k: 100ng'L i SW-001 623/2004 -.. 0.1 W'099-# MW55VAA 0.033 HEq18 1.9 0.29 21 - j21Qt` - SW-002 6/24/2D04 0.15 �Q;12 '�0'81,i 0.056 2 ? 1.6 0.17 IlM22DAM R 25Q ' SW-002A C> 252004 f_ ¢rg5 F32Qi47# 1.5 0.09 90Qy„ 85Q SW-004 626/2004 0.27 (F42 l k13 0.18 � 2:5 3 8.5 1Z00 W5400 SW-005 6/27/2004 0.61 ;()7 :-0.42WA 0.016 ""' ' Q2 11.0 1.4 SN-001 2262008 ND r0;007 ` 0.0203 ND 0:a124i 0.99 0.02 226= 30 S V-002 2)26'2008 0.0182 c 14:h 0.0111 `0.`4'ld: 1.4 0.063 119 2g¢ M-002A 2/26r2008 11- 9:52 0.181 y1=7 12 1.8 143 i 96 Ei 2/262008 .` ` 0.0132 0 s 0.0199 0.00676.03` 0.92 0.023 36i i 109Y'2/2Fi/2008 ... 0.0143 O:Q461 0.14 0.0119 0$15,4: 1.90.032 �25�{ -'2,12126r2008 L�� 0.0128 Q A 95TV 0.0265 0.006 0;21 0.92 0.055 50 ,,, 126j,' j2/26/2008 0.0906 .N$'.I}` 07089U - 0.0345 0.� A5k`'r: 2.2 0.015 80 654 I Over Current Benchmark :.,-. Data Not Collected Page 6 of 9 NCS000040 Revised Permit Recommendations: Analytical Monitoring: 1. Maintain monitoring for COD, TSS, Total Kjeldahl Nitrogen, Phenols, Total Copper, Total Recoverable Lead, Total Nickel, Total Zinc and Total Chromium. Oil & Grease has been added to the monitoring. 2. pH has been added to the analytical monitoring requirements. 3. All analytical monitoring has been set to semi-annually during a representative storm event as defined in Part II Section B. The permittee must also document the total precipitation for each event. If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the six-month sampling period. Additionally, samples must be taken a minimum of 60 days apart, as specificd'in Table 2. 4. Benchmarks for analytical monitoring have been added to this draft permit. Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. If the sampling results are above a benchmark value, or outside of the benchmark range, for any parameter at any outfall then the facility shall follow the Tier I guidelines which require a facility inspection within two weeks and implementation of a mitigation plan within two months. If during the term of this permit, the sampling results are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge outfall two times in a row (consecutive), then the facility shall follow the Tier 2guidelines which require a repetition of the steps listed for "Fier 1 and also immediately institute monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. 5. The permittee is required to collect all of the analytical and qualitative monitoring samples during representative storm events as defined in Part II Section B. Qualitative monitoring is required regardless of representative outfall status. 6. The permittee is responsible for all monitoring until the renewal permit is issued. See Footnote 1 of Tables 1, 4, and 5. 7. The flow reporting requirement has been removed per DWQ revised strategy. (The total rainfall parameter is in this permit, however.) 8. Vehicle maintenance monitoring has been revised to semi-annually in order to coincide with analytical and qualitative monitoring. Other Proposed Changes to the Previous Permit: 1. Additional guidance is provided about the Site Plan requirements. The site map must now identify if the receiving stream is impaired and if it has a TMDL established. It must also describe potential pollutants in each outfall. The map requirements are stated more explicitly. And, the site plan must contain a list of significant spills that have occurred in the past three years and also must certify that the outfalls have been inspected to ensure that they do not contain non-stormwater discharges. Additional information is provided in Part II Section A. 2. Additional requirements for the Stormwater Management Plan have been specified in Part II Section A. More details regarding secondary containment are provided. 3. Additional requirements for the Stormwater Pollution Prevention Plan have been specified in Part II Section A. The plan must also be updated annually to include a list of significant spills and to certify that the outfalls do not contain non-stormwater discharges. 4. The facility must now implement a semi-annual Facility Inspection Program of the site's stormwater management controls as specified in Part II Section A. 5. Information regarding the No Exposure Exclusion has been added to this draft permit, If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CPR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Additional information is provided in Part I Section A. Page 7 of 9 NCS000040 Discussions with permittee: David Waggoner, 704-332-2647, 03/19/09 I. General description of industrial activities. Grey metal pipe foundry. Use recycled material. Melt iron and then cast pipes and fittings. 2. Have there been any changes in industrial activities since the application was submitted? Yes. Will be submitted in an email. 3. What is Outfall 002A? Outfall close to 002. There are seven outfalls now. 4. The inspection report for a 2006 visit indicated that the site map and SPPP needed to be updated. Has this been done? Can you send us the map? They have been updated. Will send a copy of the site map. 5. Do you have onsite vehicle maintenance? Yes. All maintenance is done inside. The area has French drains that go directly to the sewer system. Page 8 of 9 NCS000040 Recommendations: Based on the documents reviewed, the application information submitted on July 4, 2004 sufficient to issue an Individual Stormwater Permit. Prepared by (Signature) Date Stormwater Permitting Unit Supervisor &:: j oiao Date 3 D for Bradley Bennett Concurrence by Regional Offic�%%� Date RO Water Quality Supervisor /, L_ Date Regional Office Staff Comments (attach addirional pages as necessary) Page 9 of 9 Site inspection conducted on May 6, 2009 by Michael Parker. Facility contact: David Waggoner. Current NPDES SW permit expired in 2004. Area had received significant rainfall the evening prior to the site visit. Charlotte Pipe and Foundry (CP&F) is presently operating on a reduced schedule (3 — 4 days per week) due to depressed economic conditions. The site is located in a heavily commercial and industrialized area of downtown Charlotte. The SW drainage system at this site was installed back in the 1920's when the company located to this site. The existing SW drainage system not only serves CP&F, but also receives SW from other businesses and commercial property adjacent and upgradient to the CP&F site. Some of these off -site properties have been found to have significant soil and GW contamination, and on -going remediation activities are being conducted. Such being the case, the possibility exists that some of these contaminants may be entering the SW collection system that passes through the CP&F property via 1/I. CP&F personnel have not verified (through analytical testing) that upstream contaminants are entering their SW system, however, it was suggested during the site visit that additional testing be conducted of the upstream SW drainage system to ascertain the impacts (if any) these upgradient properties may be having on contaminant levels found in the SW sampling data collected by CP&F. Analytical testing reviewed during the site visit indicated that CP&F will have difficulty in complying with the benchmark levels proposed in the new SW permit based on testing conducted at the SW outfalls located at this site. If the current benchmark values noted in the draft permit are incorporated into the final permit, CP&F will likely be subject to Tier II and Tier III monitoring requirements during the first rainfall event. Such being the case, consideration should be given to either modifying the current benchmark values or consider the inclusion of a compliance schedule to allow CP&F to 'implement BMPs that may help reduce the off -site migration of pollutants. It should also be noted that CP&F plans a major site construction project in 2009, which will result in a substantial portion of the property covered under a metal roof. The area to be covered is suspected to be a significant source for pollutants found in CP&F SW sampling data. If a compliance schedule is incorporated into the renewed permit, the completion schedule of this project should be taken into consideration. Since the original renewal application was received in 2004, there has been additional property added to the CP&F site on both the north side and the east side. This additional property also includes SW outfalls that may have not been reflected in the original renewal application. It is suggested that an updated renewal application be provided including a revised site map that indicates the current property boundaries and existing SW outfalls. It is also recommended that use of SW outfall 004 be discontinued since it eventually flows through outfall 005, which is currently monitored and outfall 007 be eliminated as it does not receive SW from the industrial process/storage areas. Lasmigona decorata 3 http://nhpweb.enr.state.nc. usInNs/partner/forms/eo/eo_py_eo_info.phtnil?gid=3792&cmd=Up... Element Occurrence Information Element Occurrence ID Scientific Name Element Occurrence Number Common Name Most Recent Survey Date Date First Observed Date Last Observed Element Occurrence Rank Directions Element Occurrence Data Habitat Description Owner Name and Comments Protection Comments Management Comments Additional Comments 7236 Lasmigona decorata 3 Carolina Heelsplitter 1987 1880-PRE 1880-PRE X - Extirpated CTB/Irwin Creek P: The site is located in central Mecklenburg County and consists of Irwin Creek from its source to its confluence with Taggart Creek. This was the location of a syntype of L. decorata. Nine specimens are deposited in the Academy of Natural Sciences at Philadelphia. Small piedmont stream whose headwaters are located in the western part of Charlotte, NC. 1 of 1 3/25/2009 10:16 AM IRWIN CREEK Dxk Aspran Parking Warenome Gavel — . OUTFAL vavement SWDDT . wreeL _ Bln SWPO6 i A . IX ALL � swggs /v � l i l I oglFPu � \. I ASPNan l Ir/ I OUTFAL•L wmt I 1r % Bin It 1� l) &mra9e AsP1uK 'Ili l Lj Parking j Grareii r Cake 1 I L A�] °' UJ Slora9el / J � mck Trvck Parking p % _Tnt,k �G�B& Gavel i Parking whoa. so-.eL PaPkan Parking \ OIPCCTIONOFSl.FRa WA-RFLOL'J LOCI.ilO1J OG STORM WPTEq 01RGN,LS OUTFACE LATITUDE LONGITUDE j 001 35"13'2TN 80'S1'S1"W 002 35°13'29'N BO'S1'49"W 002A 35°13'23"N 80'S1'42"W ON 35°13'27"N 80°51'39"W i005 35'13'29"N 80"51'41"VJ 006 35`13'34"N 80*51'45'W OW 35°13'34"N 80'51'39"W AREA PERCENT (ACRES) IMPERVIOUS AREAL 575 90% AREA II 2.90 95% AREA III 3.33 85% AREA IV 10.23 95% AREA V 2.26 95% AREA VI 8.53 85% C AREA VII 12.06 -- 95% [OUTFAL_ I L POTENTIAL POLLUTANTS 001 METALS, CHEMICAL RESIDUES._OIL&GREASE 1 r� 002 METALS, CHEMICAL RESIDUES, OIL& GREASE D02A METALS, CHEMICAL RESIDUES OIL&GREASE 004 METALS, CHEMICAL RESIDUES OIL &GREASE E005 METALS, CHEMICAL RESIDUES, OIL &GREASE OCE METALS, CHEMICAL RESIDUES, OIL & GREASE ' MT CHEMICAL RESIDUES, OIL&GREASE ! G NCS000040 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE STORM WATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM U In compliance with the provisions of North Carolina/G;enera Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Charlotte Pipe-&/fomidry Company is hereby authorized to,,discharge ttonnwater from a facility located at ;hitrlofte Pipe & Foundry Co I 5`S01.1111 Clarkson Street A Charlotte, NC Mecklenburg County to receiving waters designated as It -win Creek, a class C stream in the Catawba River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI hereof. Note: Draft Permit Dates are Approximate This permit shall become effective July 1, 2009. This permit and the authorization to discharge shall expire at midnight on June 30, 2014. Signed this day .tune 12, 2009. for Coleen H. Sullins Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000040 PART Section A: Section B: Section C: PART II Section A: Section B: Section C: Section D: PART III TABLE OF CONTENTS INTRODUCTION Individual Permit Coverage Permitted Activities Locatior MONITORI DISCHARC Stormwt Analytic Qualitati On -Site PERMITTED STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section B: General Conditions 1. Individual Permit Expiration 2. Transfers t Pennit No. NCS000040 3. Signatory Requirements 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Permit Actions Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Faciliti Section D: Monitoring and Records I. Representative Sampling 2. Recording Results 3. Flow Measurement 4. Test Procedures 5. 6. 7. Representative Ouffall4 Records Retenhont� lnsnection and-Entry Section E: Reporting Requirements I. Discharge,Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Bypass 8. Twenty-four Flour Reporting 9. Other Noncompliance 10. Other Information PART IV LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS Permit No. NCS000040 PART I INTRODUCTION SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR § 122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Certification must submit aNo Exposure Certification NOI form,to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must reapply%for,thh j,Exposure Exclusion once every five (5) years. SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified stormwater to the surface adequately treated and m; permit. All stormwater di he permittee is authorized to discharge rr separate storm sewer system that has been the terms and conditions of this individual ance with the conditions of this permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater diseharge�or is covered by another permit, authorization, or approval The stormwater discharges allowed"by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. Part ll Page I of 10 Permit No. NCS000040 PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part 111, Standard Conditions, Section E, Paragraph 3 of this general permit. The Plan shall include, at a minimum, the following items: I ; Site Plan. The site plan shall provide a description of the potential pollutant sources which may be expected to"con stormwater discharges. The site plan shall contaih the fo. (a) A general location map (USGS qu equivalent map), showing the facil routes and surface waters, the nam stormwater outfall(s) discharges c storm sewer system, the namefoftl map al facility and the to contamination of y drafted iion in relation to transportation eceiving water(s) to which the ischarge is to a municipal separate ipality and the ultimate receiving waters, and accurate latitude and longitude of the point(s) of discharge. The general location -map (or alternatively the site map) shall identify whether each receiving water is impaired (on the state's 303(d) list of impaired waters) or is located in a watershed for which a TMDL has been established, and what the paramcter(s) of concern,are. North Carolina's 303(d•) List can be found here: http://h2o.enr.State�nc.us/tmdl/General_303d.htm#Downloads North Carolina TMDL documents can be found here: http://h2o.enr.state.nc.us/tmdl/TMDL list.htm#Final TMDLs. (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants which could be expected to be present in the stormwater discharge from each outfall. (c) A site map drawn to scale (including a distance legend) showing: the site property boundary, the stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads), site topography, all drainage features and structures, drainage areas for each outfall, direction of Plow in each drainage area, industrial activities occurring in each drainage area, buildings, existing BMPs, and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious. (d) A list of signi ficant spills or leaks of pollutants that have occurred at the facility during the three (3) previous years and any corrective actions taken to mitigate spill impacts. Part 11 Page 3 of 10 SECTION C: LOCATION MAP Permit No. NCS000040 NCS000040 MIP Scale 1:24,000 Charlotte Pipe & Foundry Co Lab bide: 350 13' 28" N Longitude: 800 51' 42" W County:Ivleddenburg Receving Stream: Irwin Creek Stream Class: C Sub -basin: 03-08-34 (Catawba River Bagn) �•v �tu�j�^�fjj MEN Facility Location Part 11 Page 2 of 10 Permit No. NCS000040 (e) Certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in accordance with the requirements found in Part 111, Standard Conditions, Section B, Paragraph 5. The permittee shall re -certify annually that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. 2. Stormwater Management Plan. The stormwater management plan shall contain a narrative description of the materials management practices employed which control or minimize the exposure of significant materials to stormwater, including structural and nonstructural measures. The stormwater management plan, at a minimum, shall incorporate the following: (a) Feasibility Study. A review of the t the methods of operations and/or stc exposure of materials and processes permittee shall prevent exposure of operations, and manufacturing or fu of exposure is not practical, the sto`r feasibility of diverting the stormwat contamination. feasibility of changing inate or reduce water- Wherever practical, the e areas, material handling rations. In areas where elimination tanagement plan shall document the away from areas of potential (b) Secondary Containment Requirements and Records. Secondary containment is required for: bulk s storage of liquid materials; storage in any amount of Section 313 of Title III of"the Superfund Amendments and Reauthorization Act (SARA) water priority 6hemicals; and storage in any amount of hazardous substances, in order to preventLeaks,aand spills from contaminating stormwater runoff. A table or summary of 11 such tanks and stored materials and their associated secondary containment areas shall be maintained. If the secondary containment devices are connected directly to stormwater conveyance systems, the connection shall be controlled by manually activated valves or other similar devices (which shall be secured closed with a locking mechanism), and any stormwater that accumulates in the containment area shall be at a minimum visually observed for color, foam, outfall staining, visible sheens and dry weather flow, prior to release of the accumulated stormwater. Accumulated stormwater shall be released if found to be uncontaminated by the material stored within the containment area. Records documenting the individual making the observation, the description of the accumulated stormwater, and the date and time of the release shall be kept for a period of five years. (c) BMP Summary. A listing of site structural and non-structural Best Management Practices (BMP) shall be provided. The installation and implementation of BMPs shall be based on the assessment of the potential for sources to contribute significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. The BMP Summary shall include a written record of the specific rationale for installation and implementation of the selected site BMPs. The BMP Summary shall be reviewed and updated annually. Part 11 Page 4 of 10 Permit No. NCS000040 3. Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or the team) responsible for implementing the SPRP shall be identified in a written list incorporated into the SPRP and signed and dated by each individual acknowledging their responsibilities for the plan. A responsible person shall be on -site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil Spill Prevention Control and Countermeasure plan (SPCC) may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. 4. Preventative Maintenance and Good Housekeeping�Prog am. A�preventative maintenance and good housekeeping prograshall, ee developed. The program shall list all stormwater control systems, stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activit 3,areas (including material storage areas, material handling areas, disposal areas, process areas, loading and unloading areas, and haul roads), all drainage features and structures, and existing structural BMPs. The program shall establish schedules of inspections, —maintenance, and housekeeping activities of stormwater control systems,�as well as facility equipment, facility areas, and facility systems that present a potential fo sr tormwater exposure or stormwater pollution. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the prog`am: Timely compliance with the established schedules for inspections, maintenance, housekeeping shall be recorded in writing and maintained in the SPPP. # )/V Employee Training. 'Training programs shall be developed and training provided at a minimum on an annual basis for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified, and their annual training shall be documented by the signature of each employee trained. 6. Responsible Party. The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position assignments provided. Plan Amendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to surface waters. All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include re -certification that the stormwater outfalls have been evaluated for the presence of non-stormwater discharges. Each annual update shall include a re-evaluation of the Part II Page 5 of 10 Permit No. NCS000040 effectiveness of the BMPs listed in the BMP Summary of the Stormwater Management Plan. The Director may notify the permittee when the Plan does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permitted shall submit a time schedule to the Director for modifying the Plan to meet minimum requirements. The permittee shall provide certification in writing'(in accordance with Part 111, Standard Conditions, Section B, Paragraph 5) to the Director that the changes have been made. 8,. Facility Inspections. Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule, once during the first half of the .year (January to June), and once during the second half (July to December), with at Ieast(60 days separating inspection i/ i dates (unless performed more frequently than semi-annually.)/These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring required in Part 11 B and C of this permit. U \\ 9. Implementation. The permittee shall imp shall include documentation of all meniti activities, and training provided to e nplc of actions taken to implement BMPs ass( vehicle maintenance activities. SucNoc five years and made available t\th\Dire immediately upon request'. 'the,Plan. Implementation of the Plan measurements, inspections, maintenance /Iincluding the log of the sampling data and A with the industrial activities, including ntation shall be kept on -site for a period of or the Director's authorized representative Part If Page 6 of 10 Permit No. NCS000040 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a representative storm event. The required monitoring will result in a minimum of ten analytical samplings being conducted over the term of the permit at each stornnvater discharge outfall (SDO). A representative storm event is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. Table 1. Analytical Monitoring Rego Discharge Characteristics Units Measurement Fre uenc I Sample Type2 Sample Location3 Chemical Oxygen Demand (COD) m /L semi annual 1 -1Total Grab SDO Suspended Solids (TSS) m /L14 semi annual Grab SDO Total K'eldahl Nitrogen TKN m /,L\\% _semi -annual Grab SDO Phenols m /L\ �/ semi-annual Grab SDO Total Recoverable Copper m /[[�'/ semi-annual Grab SDO Total Recoverable Lead mg/L semi-annual Grab SDO Total Recoverable Nickel t g/L semi-annual Grab SDO Total Recoverable Zinc m /L semi-annual Grab SDO Total Recoverable Chromium me/L semi-annual Grab SDO Oil and Grease m /L semi-annual Grab SDO H standard semi-annual Grab SDO Total Rainfall° inches semi-annual Rain Gauge Footnotes: Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the pond shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status has been granted. Part 11 Page 7 of 10 Permit No. NCS000040 4 For each sampled representative storm event the total precipitation must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified below in Table 2. A minimum of 60 days must separate Period 1 and Period 2 sample dates unless monthly monitoring has been instituted under a Tier Two response. Table 2. Monitoring Schedule Monitoring periodt'2 Sample Number Start End Year 1 — Period 1 1 July 1, 2009 December 31, 2009 Year 1 — Period 2 2 January 1, 2010 June 30, 2010 Year 2 —Period 1 3 July 1,,2010' December 31, 2001 Year 2 — Period 2 4 January,l?-201,1 �? ,tune 30, 2011 Year 3 — Period 1 5 July�l; 2011, ,� December 31, 2011 Year 3 — Period 2 6 Januaiy�l, 2012 June 30, 2012 Year 4 —Period 1 7 /July ,1;\20,12 December 31, 2012 Year 4 — Period 2 8 % January%i, 2013 June 30, 2013 Year 5 —Period 1 9 �� July 1, 2013 December 31, 2013 Year 5 — Period 2' XI �Ianuary 1, 2014 June 30, 2014 Footnotes: ' 1 Maintain semi-annual monitoring process. The applicant must continue semi-annual monitoring until the renewed pennifis issued " If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the six-month sampling period. The permittee shall report the analytical results from the first sample with valid results within the monitoring period. The permittee shall compare monitoring results to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. See below the descriptions of Tier One and Tier Two. Part II Page 8 of 10 Permit No. NCS000040 Table 3. Benchmark Values for Analvtical Monitorine Discharge Characteristics Units Benchmark Chemical Oxygen Demand (COD) mg/L 120 Total Suspended Solids (TSS) mg/L 100 Total Kjeldahl Nitrogen (TKN) mg/L 20 Phenols mg/L 4.5 Total Recoverable Copper mg/L 0.007 Total Recoverable Lead mg/L 0.03 Total Recoverable Nickel mg/L 0.26 Total Recoverable Zinc ma/L 1\0�067 Total Recoverable Chromium mg/L Oil and Grease m /L g 30� �^ pH 6-9 - 9 Tier One If: The first valid sampling results are above a benchmark value, or outside of the benchmark for anv narameter at anv outfall: Then: The permittee shall: 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedence. . 3. Identify potential, and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, or to bring concentrations to within the benchmark range. 4. Implement the selected actions within two months of the inspection. 5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were lemented. Part II Page 9 of l0 Permit No. NCS000040 Tier Two If: During the term of this permit, the first valid sampling results are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge outfall two times in a row Then: The permittee shall: I. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall conftnu l ntil three consecutive sample results are below the benchmark values, or within theibenchma k range, for all parameters at that outfall. �� I If no discharge occurs during the sampl monthly monitoring report indicating/"] 4. Maintain a record of the Tier Two,resm permittee is required to submit a Stormwater Pollution Prevention Plan. During the term of this perniit,-ifthe valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall on more than four occasions, the permittee shall notify the DWQ Regional Office Supervisor in writing within 30 days of receipt of the fourth analytical results. DWQ may, but is not limited to: • require that the permittee increase or decrease the monitoring frequency for the remainder of the permit; • require the permittee to install structural stormwater controls; • require the permittee to implement other stonmwater control measures; or • require that the permittee implement site modifications to qualify for the No Exposure . Exclusion. 1Note: Rearove laitanaae-below-if-a-TMDL-is-not-applicable:/ This site discharges to impaired waters experiencing problems with turbidity and fecal coliform, as well as, having impaired biological integrity. If a Total Maximum Daily Load (TMDL) is approved for this segment of Irwin Creek, the permittee may be required to monitor for the pollutant(s) of concern in the future and submit results to the Division of Water Quality. The Part 11 Page 10 of 10 Permit No. NCS000040 Division will consider the monitoring results in determining whether additional BMPs are needed to control the pollutant(s) of concern to the maximum extent practicable. If additional BMPs are needed to achieve the required level of control, the permittee will be required to (1) develop a strategy for implementing appropriate BMPs, and (2) submit a timetable for incorporation of those BMPs into the permitted Stormwater Pollution Prevention Plan. PartII Page 11 of 10 Permit No. NCS000040 SECTION C: QUALITATIVE MONITORING REQUIREMENTS Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified in Table 4, during the analytical monitoring event. [If analytical monitoring is not required, the permittee still must conduct semi- annual qualitative monitoring.] Qualitative monitoring is for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stormwater pollution. In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. This documentation will be maintained with the SPP,P? Table 4. Qualitative onitoring Requirements Discharge Characteristics Frequency] Monitoring Location2 Color semi-annual N SDO Odor semi-annual 1 SDO Clarity semi-annual / SDO Floating Solids semi`annual� SDO Suspended Solids semi-annual� SDO Foam semi annual SDO Oil Sheen / i semi-annual SDO Erosion or deposition at the `semi-annual SDO outfall Other obvious indicators semi-annual SD0 of stormwater Pollution Footnotes: Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. SECTION D: ON -SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS Facilities which have any vehicle maintenance activity occurring on -site which uses more than 55 gallons of new motor oil per month when averaged over the calendar year shall perform analytical monitoring as specified below in Table 5. This monitoring shall be performed at all Part 11 Page 12 of 10 Permit No. NCS000040 stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance areas, and in accordance with the schedule presented in Table 2 (Section B). All analytical monitoring shall be performed during a representative storm event. Table 5. Analytical Monitoring Requirements for On -Site Vehicle Maintenance Discharge Characteristics Units Measurement Frequency] Sample Type2 Sample Location; H standard semi-annual Grab SDO Oil and Grease In/1 semi-annual Grab SDO Total Suspended Solids m /l semi-annual Grab SDO Total Rainfall4 inches semi-annual //I Rain gauge New Motor Oil Usage gallons/month v semi�annua& I Estimate Footnotes: I Measurement Frequency: Twice per year during a reps permit is issued for this facility or until this permit is rt the permittee has submitted the appropriate paperwork permittee will be considered for a renewal application until the renewed permit is issued. See Table 2 for /scli permitting cycle. / 2 If the stormwater runoff is control pond shall be collected within the 3 Sample Location: Samples shall stormwater runoff from area(s) c 4 For each sampled reprt gauge reading must be cvent,�each year until either another ded. If at the end of this permitting cycle ;rmit before the submittal deadline, the oust continue semi-annual monitoring 'ing periods through the end of this ' detention pond a grab sample of the discharge from the discharge from the pond. teh stormwater discharge outfall (SDO) that discharges menance activities occur. the total precipitation must be recorded. An on -site or local rain Monitoring results shall be compared to the benchmark values in Table 6. The benchmark values in Table 6 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the perinittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs), as provided in Part 11 Section B. Table 6. Benchmark Values for Vehicle Maintenance Analytical Monitoring Discharge Characteristics Units Benchmark pH standard 6-9 Oil and Grease mg/L 30 Total Suspended Solids mg/L 100 Part II Page 13 of 10 Permit No. NCS000040 PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS SECTION A: COMPLIANCE AND LIABILITY Compliance Schedule The per nittee shall comply with Limitations and Controls specified for stonnwater discharges in accordance with the following schedule: Existing Facilities already operating but applying for permit coverage for the first time: The Slorntwater Pollution Prevention Plan shall be developed and implemented within 12 months of the effective date of the initial permit and updated thereafter on an annual. basis. Secondary containment, as specified in Part II, Section A, Paragraph 2(b) of this permit, shall be accomplished within.12 months of the effective date of the initial pennit issuance. - N� New Facilities applying for coverage for the first time applying for renewal under this permit: The Stormwat implemented prior to the beginning of discharges fron updated thereafter on an annual basis. Secondary eon' 2(b) of this permit shall be accomplished prior to4he4 industrial activity. �� J� 2. Duty to Comply .facilities previously permitted and Prevention Plan shall be developed and )n of the industrial activity and be specified in Part II, Section A, Paragraph discharges from the operation of the The perntittee must comply with all conditions of this individual permit. Any permit noncompliance constitutes a violation of the Clean Water Act -and is grounds for enforcement action; for permit termination, revocation and rei11 ssuance, orr modification; or denial of a permit upon renewal application. a. The penninee shall comply.with standards or prohibitions established under section 307(a) of the Clean Water Actt for toxic,pollutants within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified to incorporate the requirement. b. The Clean Water Act provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 per day for each violation. Any person who negligently violates any permit condition is subject to criminal penalties of $2,500 to 25,000 per day of violation, or imprisonment for not more than 1 year, or both. Any person who knowingly violates permit conditions is subject to criminal penalties of 55,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. Also, any person who violates a permit condition may be assessed an administrative penalty not to exceed $10,000 per violation with the maximum amount not to exceed $125,000. [Ref: Section 309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).] Under state law, a daily civil penalty of not more than ten thousand dollars ($10,000) per violation may be assessed against any person who violates or tails to act in accordance with the terms, conditions, or requirements of a permit. [Ref: NC General Statutes 143-215.6A]. d. Any person may be assessed an administrative penalty by the Director for violating section 301, 302, 306, 307, 308, 318 or 405 of the Act, or any permit condition or limitation implementing any of such sections in a permit issued under section 402 of the Act. Administrative penalties for Class I violations are not to exceed $10,000 per violation, with the maximum amount of any Class I penalty assessed not to exceed $25,000. Penalties for Class II violations are not to exceed Part III Page 1 of 8 Permit No. NCS000040 $ I0,000 per day for each day during which the violation continues, with the maximum amount of any Class 11 penalty not to exceed $125,000. 3. Duty to Mitigate 4. :a a Q The permittee shall take all reasonable steps to minimize or prevent any discharge in violation of this individual permit which has a reasonable likelihood of adversely affecting human health or the environment. Civil and Criminal Liability Except as provided in Part 111, Section C of this permit regarding bypassing of stormwater control facilities, nothing in this individual permit shall be construed to relieve the permittee from any responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6A, 143-215.6B, 143- 215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is responsible for consequential damages, such as fish kills, even though tesp he ronsibilliity for effective compliance may be temporarily suspended. /( ��\ \ Oil and Hazardous Substance Liability Nothing in this individual permit shall be the permittee from any responsibilities, li, to under NCGS 143-215.75 et seq. or Sect Property Rights C The issuance of this individual pe\dot property, or any exclusive privileges,nor personal rights, nor any infr�ingemen�t�I, F Severability ued-to preclude the institution of any legal action or relieve s %penalties/to which the permittee is or may be subject 1 of the,Federal Act, 33 USC 1321. convey any property rights in either real or personal it authorize any injury to private property or any invasion of I, State or local laws or regulations. The provisions of this individual permit are severable, and if any provision of this individual permit, or the application of any provision of this individual permit to any circumstances, is held invalid, the application of such provision to other circumstances, and the remainder of this individual permit, shall not be affected thereby. Duty to Provide Information The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating the permit issued pursuant to this individual permit or to determine compliance with this individual permit. The permittee shall also furnish to the Director upon request, copies of records required to be kept by this individual permit. Penalties for Tampering The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any monitoring device or method required to be maintained under this individual permit shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. If a conviction of a person is for a violation committed after a first conviction of such person under this paragraph, punishment is a fine of not more that $20,000 per day of violation, or by imprisonment of not more than 4 years, or both. Part I I I Page 2 of 8 Permit No. NCS000040 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this individual permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. SECTION li: GENERAL CONDITIONS Individual Permit Expiration The permittee is not authorized to discharge after the authorization to discharge beyond the expiration date, required by the agency authorized to issue permits no pernittee that has not requested renewal at least 180 d have a permit after the expiration and has not requeste be subjected to enforcement procedures as provided.it 2. Transfers This permit is not transferable to any Director may require modification or incorporate such other require nen[s,� It required to notify the Division'"t A 3. minatory Requirements 'date.' In order to receive automatic ttee�shall submit forms and fees as are 111 80 dys.pnor to the expiration date. Any to expiration, or any permittee that does not I at least 180 days prior to expiration, will 1'43-2153.6 and 33 USC 1251 ct. seq. t after notice to and approval by the Director. The td reissuance of the permit to change the name and essary under the Clean Water Act. The Permittee is event the permitted facility is sold or closed. All applications, reports,loror i� ation submitted to the Director shall be signed and certified. a. All applications to be covered under this individual permit shall be signed as follows: (1) In the case of a corporation: by a principal executive officer of at least the level of vice- president, or his duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge described in the permit application form originates; (2) In the case of a partnership or limited partnership: by a general partner; (3) In the case of a sole proprietorship: by the proprietor; (4) In the case ol'a municipal, state, or other public entity: by a principal executive officer, ranking elected official, or other duly authorized employee. b. All reports required by the individual permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if: (1) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant Part III Page 3 of 8 Permit No. NCS000040 4. manager, operator of a well or well field, superintendent, a position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director C. Any person signing a document under paragraphs a. or b. of this section shall make the following certification: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonmen[,for knowing.yiolations." The issuance of this individual permit does not prohibit the Director from reopening and modifying the individual permit, revoking and reissuing the individ�uabp�rmlt, or terminating the individual permit as allowed by the laws, rules, and regulations contained in/Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 21-1 .0100; and North Carolina General Statute 143-215.1 >revo �\�� Permit Actions The permit may be modifiedked'and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance/does not stay any individual permit condition. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this individual permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this individual permit. 2. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this individual permit. 3. Bypassing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and Part III Page 4 of 8 Permit No. NCS000040 b. There were no feasible alternatives to the bypass, such as the use of auxiliary control facilities, retention of stormwater or maintenance during normal periods of equipment downtime or dry weather. This condition is not satisfied if adequate backup controls should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and C. The permittee submitted notices as required under, Part 111, Section E of this permit. If the Director determines that it will meet the three conditions listed above, the Director may approve an anticipated bypass after considering its adverse effects. SECTION D: MONITORING AND RECORDS 2. 3. 4. Representative Sampling Samples collected and measurements taken, as requ nature of the permitted discharge. Analytical sampl event. Samples shall be taken on a day and time tht be taken before the discharge joins or is diluted by Monitoring points as specified in this permit shall n the Director. /-JJ/ Recording Results For each measurement, sai requirements of this indivi of the volume and aformed during a representative storm slit of the discharge. All samples shall e stream, body of water, or substance. without notification to and approval of nance activity performed or collected pursuant to the shall record the following information: a. The date, exact plzce, and lime of sampling, measurements, inspection or maintenance activity; b. The individual( )'who paned the sampling, measurements, inspection or maintenance activity; C. The date(s) analyses were performed; d. The individual(s) who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. Flow Measurements Where required, appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. Test Procedures Test procedures for the analysis of pollutants shall conform to the EMC regulations published pursuant to NCGS 143-215.63 et. seq, the Water and Air Quality Reporting Acts, and to regulations published pursuant to Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act, as Amended, and Regulation 40 CFR 136. Part II I Page 5 of 8 Permit No. NCS000040 To meet the intent of the monitoring required by this individual permit, all test procedures must produce minimum detection and reporting levels and all data generated must be reported down to the minimum detection or lower reporting level of the procedure. 5. Representative Outfall If a facility has multiple discharge locations with substantially identical stormwater discharges that are required to be sampled, the permittee may petition the Director for representative outfall status. If it is established that the stormwater discharges are substantially identical and the permittee is granted representative outfall status, then sampling requirements may be performed at a reduced number of outfalls. 6. Records Retention Visual monitoring shall be documented and records n Pollution Prevention Plan. Copies of analytical mom permittee shall retain records of all monitoring inforn records and all original strip chart recordings for cont reports required by this individual permit for a period measurement, report or application. This period may - Inspection and Entry facility along with the Stormwater ill alsosbe maintained on -site. The and maintenance lion, and copies of all 5 years from the date of the sample, id.by request of the Director at any time. The permittee shall allow the Director, or an authdrized'representative (including an authorized contractor acting as a representative of the Director) or intthe,case of a facility which discharges through a municipal separate storm sewer system, an authorized representative of a municipal operator or the separate storm sewer system receiving the discharge, upon,the presentation of credentials and other documents as may be required by law, to; a. Enter upon the permittec's piamises where a regulated facility or activity is located or conducted, or where records must -be kept under the conditions of this individual permit; b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this individual permit; C. Inspect at reasonable times any Facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this individual permit; and d. Sample or monitor at reasonable times, for the purposes of assuring individual permit compliance or as otherwise authorized by the Clean Water Act, any substances or parameters at any location. SECTION E: REPORTING REQUIREMENTS Discharge Monitoring Reports Samples analyzed in accordance with the terms of this permit shall be submitted to the Division on Discharge Monitoring Report (DMR) forms provided by the Director. Submittals shall be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. When no discharge has occurred from the facility during the report period, the permittee is required to submit a discharge monitoring report within 30 days of the end of the six-month sampling period, giving all required information and indicating "NO FLOW" as per NCAC T 15A 0213 .0506. Part I I I Page 6 of 8 Permit No. NCS000040 The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report (QMR) form provided by the Division, and shall retain the completed forms on site. Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do so. 2. Submitting Reports Duplicate signed copies of all reports required herein, shall be submitted to the following address: Division of Water Quality Surface Water Protection Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-16� 3. Availability of Reports //n Except for data determined to be confidential under NCGS 1.43 21�5.3(a)(2)or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance A th the terms shall be available for public inspection at the offices of the Division of Water Qualit"s'required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for idNCGS�143' 215.6B or in Section 309 of the Federal Act. 4. 5. G'1 Non-Stormwater Discharges If the storm event monitored discharge, the permittee shall discharge permit and provide Planned Chances lhis'individual permit coincides with a non-stormtwater all parameters as required under the non-stormwater th the Stormwater discharge monitoring report. The permittee shall give hotibe4o'ifie Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the individual permit or subject to notification requirements under 40 CFR Part 122.42 (a). Anticipated Noncompliance The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the individual permit requirements. Bypass Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. It. Unanticipated bypass. The pennittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. 8. Twenty-four I lour Reporting The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from PartIII Page 7 of 8 Permit No. NCS000040 9. on the time the permittee became aware of the circumstances. A written submission shall also be provided within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Director may waive the written report on a case -by -case basis if the oral report has been received within 24 hours. Other Noncompliance The permittee shall report all instances of noncompliance not monitoring reports are submitted. Other Information Where the penmittee becomes aware that it failed to individual permit or in any report to the Director, it 24 hour reporting at the time want facts in an application for an submit such facts or information. PartIll Page 8 of 8 NCS000040 PART IV LIMITATIONS REOPENER This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual permit; or b. Controls any pollutant not limited in the individual permit. The individual permit as modified or reissued under this paragraph Act then applicable. PART V ADMINISTERING A REQUI The permittee must pay the administering and by the Division. Failure to pay the fce,in.time this Division to initiate action to revoke the•ln Act See Clean Water Act. 2. Arithmetic Mean other requirements in the MONITORING FEE fee within 30 (thirty) days after being billed with 15A NCAC 2H .0105(b)(4) may cause PAI2TWI DEFINITIONS The arithmetic mean of any set of values is the summation of the individual values divided by the number of individual values. Allowable Non-Storntwater Discharges This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stormwaler conveyance system are: (a) All other discharges that are authorized by a non-stormwater NPDES permit. (b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (c) Discharges resulting from fire -fighting or fire -fighting training. Best Management Practices (BMPs) Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the form of a process, activity, or physical structure. Parts IV, V and VI Page I of 5 Permit No. NCS000040 Bypass A bypass is the known diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 6. Bulk Storaec of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Clean Water Act The Federal Water pollution Control Act, also known USC 1251, et. seq. 8. Division or DWQ The Division of Water Quality, Department 9. Director The Director of the Division 10. EMC The North Carolina 1 I. Grab Sample (CWA), as amended, 33 Resources. issuing authority. Commission. An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively monitored must be taken within the first 30 minutes of discharge. 12. Hazardous Substance Any substance designated under 40 CFR Part t 16 pursuant to Section 311 of the Clean Water Act. 13. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility. 14. Municipal Separate Storm Sewer System A stortwater collection system within an incorporated area of local self-government such as a city or town. 15. No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff. Part VI Page 2 of 5 Pages Permit No. NCS000040 NO 17 19 ]' 20. F1 22. 23 Industrial materials or activities include, but are not limited to, material handling equipment or activities, industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. DWQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a facility complies with the terms and conditions described in 40 CFR §122.26(g). Overburden Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations. Perntittec The owner or operator issued a permit pursuant to this individual permit. Point Source Discharge of Stormwater Any discernible, confined and discrete conveyance incldding4liuf not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure; from which stormwater is or may be discharged to waters of the state. % Representative Storm Event A storm event that measures greater than 0.1"ihche"s of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For exampl , if it rains,for�2 hours without producing any collectable discharge, and then stops, a sample may be collected if a.raih,pr`odu ing a discharge begins again within the next 10 hours. Representative Outfall Sr<t�� When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple out falls; the DWQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. Rinse Water Discharge The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters utilizing any type of detergent or cleaning agent. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25-year, 24-hour storm event. Section 313 Water Priority Chemical A chemical or chemical category which: a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; b. Is present at or above threshold levels at a facility subject to SARA Title III, Section 313 reporting requirements; and Part VI Page 3 of 5 Pages Permit No. NCS000040 24. 25 26. 27 28. 29. 30. That meets at least one of the following criteria: (1) Is listed in Appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols), or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 31 1(b)(2)(A) of the CWA at 40 CFR 1 16.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. Severe Property Damage Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe pro perty4damage �not mean economic loss �% caused by delays in production. 8 \ Significant Materials Includes, but is not limited to: raw materials; fuels; materials sudh as solvents, detergents, and plastic . pellets; finished materials such as metallic prodii J� ter ucts ,raw materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section 313 of Title `D of SARA;�fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the po{ent, ial to(be.released with stormwater discharges. Significant Spills �� Includes, but is not limited'to: ref///r///eleas\\\eiiisr f otl or hazardous substances in excess of reportable quantities under section 311 of the Clean Wateo/Act (Ref: 40 CFR 110.10 and CFR 117.21) or section 102 of CERCLA (Ref: 40 CFR 302�4)--/ Stormwater Runoff The (low of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. Stonnwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. Stonnwater Pollution Prevention Plan A comprehensive site -specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. Ten Year Design Storm The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control Planning and Design Manual. Part VI Page 4 of 5 Pages Permit No. NCS000040 31. 32. Total Flow The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. Total Maximum Daily Load (TMDL) A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed water quality assessment that provides the scientific foundation for amimplementation plan. The implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to restore and maintain water quality standards in all seasons Tlie Clean Walcr.Act, Section 303, establishes the water quality standards and TMDL programs. %� ��� 33. Toxic Pollutant 34. 35. 36. 37 Any pollutant listed as toxic under Section Upset Means an exceptional incider technology based permit efllt permitlee. An upset does not designed treatment or control maintenance, or careless orr Water Act. Intentional and temporary noncompliance with to of factors beyond the reasonable control of the cc to the extent caused by operational error, improperly treatment or control facilities, lack of preventive Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing operations. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 25-year, 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Part VI Page 5 of Pages NPDES yr/nno/day Inspection Type NCS000040 I11 12I 06/04/05 1 17 18ICI (ccnt.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) GENERAL: The Charlotte Pipe & Foundry Company (CP&F) facility is located at 1335 South Clarkson Street in Charlotte, North Carolina. The facility is located on approximately 35 acres of property and has numerous building structures that span several blocks just west of downtown Charlotte. Total impervious (parking lots, buildings, roadways, etc.) area of the site is estimated at 95 percent of the total site area. The facility has been operating as a pipe foundry since 1926 at this location and currently has 475 employees. Plant operations typically occur 24 hours a day, 5 days a week. The facility is engaged in the manufacture of cast iron piping and fittings. The facility's Standard Industrial Classification (SIC) Code is reportedly 3321 — Gray and Ductile Iron Foundries. The facility stores and distributes the following major raw materials: cast iron scrap, coke, coal, limestone, quartz, sand, silicon, bentonite, petroleum -asphalt, gasoline and diesel fuel. The Mecklenburg County Water Quality Program (MCWQP) has historically conducted NPDES inspections of the Charlotte Pipe & Foundry Company (CP&F). PERMIT: CP&F holds an individual NPDES Stormwater Permit, NCS000040. The permit became effective on January 1, 2000 and expired on December 31, 2004. CP&F has documentation that the Permit Coverage Renewal Application Form was completed and signed on June 20, 2004 (prior to the permit renewal deadline) and has phone logs documenting that the renewal application was received by the North Carolina Department of Environment and Natural Resources. CP&F continues to operate under the conditions of the expired permit. The permit authorizes the permittee to discharge stormwater associated with industrial activities, to the surface waters of the State or to the Municipal Separate Storm Sewer System, providing that the permittee treats, controls, limits and monitors the discharge as specified in the permit. RECORDS/REPORTS: CP&F provided the following documents to MCWQP for review: Stormwater Pollution Prevention Plan (SPPP), Spill Prevention, Control and Countermeasure Plan, facility drainage map, hazardous material inventory report, facility inspection records, and storm water analytical records. Compliance with the recordkeeping requirements of the permit and the SPPP is discussed under the Stormwater / Pollution Prevention section of the report. FACILITY SITE REVIEW: The facility is located in the Irwin Creek Watershed. Irwin Creek is a Class-C water in the Catawba River Basin. FACILITY SITE REVIEW (cont.). The outdoor operations observed during the inspection included the loading and unloading of bulk solid materials from rail -cars and trucks, storage of raw materials, storage of products and intermediate products, Page At 2 Permit: NCS000040 Inspection Date: 04/05/2006 Owner -Facility: Charlotte Pipe & Foundry Company Inspection Type: Compliance Evaluation bulk above ground storage tanks, truck fueling station, wastewater treatment operations, and general facility grounds. The following describes each of the stormwater outfalls listed in the SPPP for the facility: SWO01: This outfall drains approximately 7.2 acres of the southwestern portion of the facility that contains the wastewater treatment plant, fitting storage area, scrap iron storage area and the cupola bag houses. This outfall also drains several off -site properties up gradient of the CP&F facility. This drainage area is approximately 95 percent impervious. There was no discharge from this outfall at the time of the inspection. SWO02: This outfall drains approximately 3.1 acres of the central portion of the facility, which contains the main raw material unloading area, machine shop, shell cure building, and cupola furnace building. This drainage area is approximately 95 percent impervious. There was no discharge from this outfall at the time of the inspection. SWO03: This outfall is located up gradient of the facility and was historically used to sample off -site water that flowed onto the property for purposes of comparing influent stormwater samples (at SWO03) to effluent stormwater samples (SWO04) from the same storm drain system. However, CP&F determined that SWO03 was not collecting the major portion of the influent stormwater and thus is no longer used for sampling. SWO04: This outfall drains approximately 11.1 acres of the western portion of the facility which contains the fueling station, fuel storage tanks, maintenance shop, bulk spent material storage area, pipe production building, pipe coating building, the hot dip coating area, and serves as the permitted discharge pipe for non -contact cooling water. This outfall also drains several off -site properties up gradient of the CP&F facility. This drainage area is approximately 95 percent impervious. There was discharge from this outfall at the time of the inspection (most likely discharge of non -contact cooling water). SWO05: This outfall drains approximately 2.5 acres of the northwestern portion of the site, which contains the hot dip collectors and the fittings tar pit building. In addition, stormwater from SWO04 flows into SWO05 at Clarkson Street. This drainage area is approximately 95 percent impervious. There was discharge from this outfall at the time of the inspection (most likely discharge of non -contact cooling water from SWO04). From review of the outdoor operations during the facility inspection, the following items were noted: 1. Process water from metal slag pile discharging to the storm drain system: Wet process metal slag is conveyed outdoors to a storage pile. During the inspection, water from the slag pile was flowing into the storm drain system. This discharge of non-stormwater is not currently permitted under a separate NPDES permit and is not allowed by the Stormwater NPDES permit. FACILITY SITE REVIEW (cont.): 2. Compressor condensate discharging to the ground surface: A compressor located at one of the parcels along West Palmer Street (Tax Parcel ID 07325216) owned by CP&F that adjoins the manufacturing plant contains a condensate discharge line that discharges to the ground surface. This discharge of non-stormwater is not currently permitted under a separate NPDES permit and is not allowed by the . Stormwater NPDES permit. 3. Particulate matter from process operations on the ground surface: The facility handles large amounts of raw materials (such as sand, oxidized metal, limestone, etc) that create dust / particulate matter on the ground surface throughout the facility. In addition, some of the dust collecting equipment (baghouses, etc.) is located near storm drains and some of the collected material is discharging to the ground surface. During Page # 3 Permit: NCS000040 Owner - Facility: Charlotte Pipe & Foundry Company Inspection Date: 04/05/2006 Inspection Type: Compliance Evaluation rain events, this particulate matter is transported into the storm drain system and then into Irwin Creek. Facility personnel have recognized this potential issue and have instituted a street sweeper that runs 8 hrs / day during plant operation as a Best Management Practice (BMP) throughout the accessible areas of the plant. However, many outside areas of the plant are not accessible by the street sweeper. Some stormwater that collects in concrete lined foundations underneath process equipment is collected and treated in the wastewater pretreatment plant prior to discharge to the sanitary sewer system. Facility personnel have proposed to collect and treat additional stormwater from these areas in their wastewater pretreatment plant, but have been unable to gain the support of the pretreatment permitting agency, Charlotte -Mecklenburg Utility Department. EFFLUENT/RECEIVING WATERS This inspection was conducted during clear, dry weather conditions. The SPPP identified five (5) stormwater discharge outfalls (SW001 through SWO05) from the manufacturing facility. A minor discharge was observed at SWO05 during the inspection. The permittee identified the source of this discharge as non -contact cooling water being discharged under NPDES Permit No. NCG500117. The permittee indicated that this storm drainpipe also collects stormwater from industrial properties southeast of the property. The discharge was clear and the flow was estimated to be less than five (5) gallons per minute. MCWQP had noted and sampled this discharge during a stream walk on March 1, 2006. The laboratory results showed an unusually high concentration (18 mg/L) of fluoride. MCWQP inquired about the use of fluoride or fluorine -containing products at CP&F. During the inspection, CP&F health and safety staff reviewed the database of Material Safety Data Sheets (MSDSs) for all products in use that contain fluoride of fluorine and CP&F identified one product (a metal brazing flux) that contains potassium fluoride at 10 to 50 percent concentration. This material is reportedly used infrequently in small quantities in the maintenance shop for machine repair. CP&F personnel did note that the storm drain pipe drains other off -site areas that could be contributing to the flow. Stormwater runoff from the main manufacturing plant property discharges via three stormwater outfalls (SW001, SW002, and SWO05) across 1-77, and ultimately to Irwin Creek, which is a Class-C water in the Catawba River Basin. Please note that CP&F have identified two additional intermediate outfalls (SW003 and SW004) on their Site Plan for sampling purposes. EFFLUENT/RECEIVING WATERS (cont.): CP&F personnel have mapped the storm drain system from the main manufacturing plant and have labeled storm drains, piping and outfalls; however, the storm drain system on the adjoining parcels (along West Palmer Street, Post Street, and Summit Avenue) has not been mapped. These adjoining parcels appear to have significant materials exposed to stormwater (old core storage, material transfer areas, etc.) and should be evaluated and included as part of the SPPP and sampling regime. MCWQP collected grab samples from stormwater ouffalls SWO05 and SWO02 at the point of discharge into Irwin Creek on April 26, 2006. The sample temperature was recorded and the samples transported under ice to the Charlotte -Mecklenburg Utilities Laboratory at approximately 3:30 pm. Analytical results from the sampling will be sent under separate cover. SELF -MONITORING PROGRAM: The facility's permit (Part II Section C) requires that qualitative monitoring of stormwater outfalls be conducted twice per year. From review of records (July 2004 to March 2006), CP&F conducts monthly Page # 4 Permit: NCS000040 Owner- Facility: Charlotte Pipe & Foundry Company Inspection Date: 04/05/2006 Inspection Type: Compliance Evaluation inspections of significant materials storage areas and stormwater outfalls. Quantitative monitoring of each stormwater outfall is required (under Part II Section 8 of the permit) for various discharge characteristics annually during the first 3 years of the permit and quarterly the fourth year (2003). From review of the quantitative records, sampling was not conducted at all during the fourth year (2003) of the permit. CP&F personnel confirmed that sampling was not performed in 2003 due to lack of rainfall events. Quantitative sampling was performed in June 2004; however, the data was missing required information such as total rainfall, event duration, and estimated flow. No quantitative sampling was performed in 2005. Quantitative monitoring of each stormwater discharge outfall that discharges stormwater runoff from vehicle maintenance areas that use more than 55 gallons of new motor oil per month is required under Part II Section D of the permit. CP&F personnel indicated that more than 55 gallons of new motor oil per month is used at the facility, but no records of quantities have been kept. CP&F has not sampled any outfalls from their vehicle maintenance area. RATING: Unsatisfactory OPERATIONS & MAINTENANCE: The overall operation and maintenance strategy for this type of facility appears to be adequate with the exception of the accumulated particulate matter on the impervious areas throughout the grounds. During the inspection, liquid containers (tanks, drums, etc.) appeared to be in good condition with no sign of leaks, stains or corrosion. Large tanks were provided with secondary containment structures and the fuel island was covered with a canopy and surrounded by a blind trench drain to contain any small spills during material transfer. STORMWATER/POLLUTION PREVENTION: The permit requires the permittee to develop a Stormwater Pollution Prevention Plan, as detailed in Part II, Section A. Stormwater Pollution Prevention Plan. The permittee has developed a plan; however portions were either absent or inadequate, as detailed below. 1. Part II, Section A. 1. Site Plan. (a) — Discharge Point(s) Location. The permit requires accurate latitude and longitude coordinates for the point(s) of discharge. There were no specific coordinates for each outfall provided in the plan. 2. Part II, Section A. 1. Site Plan. (c) — Site Map. The permit requires the site map to be drawn to scale and show locations of all drainage structures. The site map provided was not to scale. Also, the storm drain system for the adjoining parcels (owned by CP&F) had not been mapped on the plan. 3. Part II, Section A. 1. Site Plan. (e) — Non-Stormwater Discharge Certification. The permit requires that certification of non-stormwater discharges be made and signed by the responsible party. A non -discharge certification form was in the plan, but had not been completed or signed. 4. Part II, Section A. 2. (b) — Secondary Containment Schedule. The SPCC plan identified numerous above ground petroleum storage tanks that meet the permit criteria for required secondary containment, however, secondary containment for bulk storage (single container greater Page # 5 Permit: NCS000040 Owner- Facility: Charlotte Pipe & Foundry Company Inspection Date: 04/05/2006 Inspection Type: Compliance Evaluation than 660 gallons in capacity or multiple containers the same location exceeding 1,320 gallons in capacity total) had not been evaluated for appropriate secondary containment. Secondary containment capacity should be provided to contain the largest single storage container in storage area plus enough freeboard to contain a 25-yr, 24-hr storm event. Additionally, there was no record of release of accumulated storm water from diked areas. The permittee indicated that accumulated stormwater is allowed to evaporate and has never been released. 5'. Part II, Section A. 5. Employee Training The permit requires the permittee to provide annual training and document the training for employees that have the potential to contaminate stormwater runoff. The permittee does not have training record Page # 6 tj _ �Aq®sq HCDE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 26, 2009 Individual NPDES Stormwater Permit Renewal Transmittal Cover Page To: Mooresville Regional Office Jomrr�& IV""D Subject: NPDES Stormwater Permit No. NCSO 0040 REU Charlotte, NC =WQtS (6 t1V* ��x c� ( y) 7 MAR 3 0 2009 Attachment Description ® Staff Report ® Draft Permit ® Renewal Application LCIYK irv'v{it5.! DWID-Surface Water Pro,eeflon Please provide comments on the draft permit and sign staff report if acceptable. rp Return to Brian Lowther at the Central Office by April 26, 2009. Brian Lowther Division of Water Quality Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Loudon: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone'. 919-807-63001 FAX: 919.807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Allirmad,e Action Employer NorthCarolina Naturally STORK WAT 1-R POLLUTION PREVENTION PLAN LDEVELOPMENT AND IMPLEMENTATION CERTIFICATION N. C. Division of Water Quality Stori,nivater and Gaienal-pe Facility Name: CHARLOTTE PIPE & FOUNDRY C Permit Number: NCS000040 Location Address: T , 1335 SOUTH CLARKSON STRE CHARLOTTE, NC 28208 LIU! County: I JUL 26 7, ' MECKLENBURG 1 , 0 rp 0 '1 iNi Ti � � d � D I 2004 777� "I certify, under penalty of law, that the Stormw at 4 were developed and implementeder Pollution Prevention Plan (SPPP)-docum­";� (hat qualified Personnel properly gather and eVaft ent anIJ all attachments under my direction or supervision in accordance with a system designed to assure evaluate the information required by the SPPP. Based On my inquiry of the person or persons who manage the system, or those Persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate, and complete" "I certify that the SPPP has been developed signed and retained at the facility location and the SPPP has been fully implemented at the named facility location ' permit." in accordance with the terms and conditions of the stormware, general am aware that there are significant penalties for falsifying information, including the Possibility of fines and imprisonment for knowing violations" Sign (according to Permit signatory requirements) and return this Certification. DO NOT SEND THE STORMWATER POLLUTION PREVENTION PLAN WITH THE CERTIFICATION. ------------- C — Signature ,,e -,-5, Print or type name of pei-soff'ilgrim.- above Date6 - 0C., —e, Title 7d-/ 3 3,z-,2& SPPf'Cenification 2/99 MONTHLY STORMWATER INSPECTION REPORT CHARLOTTE PIPE AND FOUNDRY C015IPANy j CHARLOTTE, NORTH CAROLINA Page 1 of 5 Date: Inspector: Weather Conditions (indicate any recent precipitation and current conditions, conduct inspection under dry weather condit: DIRECTIONS: Check areas below for the implementation ofBMPs as listed in Table 5-1. If the condition of an area is not acceptable, note why and list corrective actions to be taken. 1 - L Outdoor Liquid Storage Areas (check for condition of containers, secondary containment, evidence of spills, implementation of BMPs etc ) a. Unleaded Gasoline Storage Tank; G b. Diesel Storage Tank; H C. Water -based Coating Tank; L d. Kerosene Storage Tank; M e. Raw Wastewater Storage Tanks; S, T f. Waste Oil Storage Tank, U g. Outside Drum Storage Area; V, W h. Wastewater Treatment Tanks; AL i. Fitting Coating Vat; - AP---). 5-ft Pipe Coating Vat; AO %- 03 I A[ f Vr'Y 4 QD 15203-4 MONTHLY STORtMWATER INSPECTION REPORT CHARLOTTE PIPE AND FOUNDRY COMPANY CHARLOTTE, NORTH CAROLINA Page 2 of 5 Area Is 2. Outside Materials Storage Areas (Check housekeeping, sumps, catch -basins, presence of drums/containers, covers, signs of existing or Potential stormwater contamination, completion of BMPs) a. Spent Materials Storage Area; A b. Pig Iron Storage Area; D c. Scrap Iron Storage Area; E d. Scrap Iron Storage Area; F e. Coke Storage Hoppers; AA and Z f. Limestone Storage Hopper; Y g. Ferrosilicon Storage Hopper; X h. Coke Hopper Pit; AD is ' j. Slag Storage Area; AC k. Foundry Sand Storage Bins and Silo; B and C 1. Cement Silo; R b QD 1 i203-4 MONTHLY STORMWATER INSPECTION REPORT CHARLOTTE PIPE AND FOUNDRY COMPANY CHARLOTTE, NORTH CAROLINA Page 3 of 5 Area 3. Finished Materials Storage Area (Check for coating spillage on paved area or into catch -basins, corrosion, and presence of empty drums or other authorized materials) a. Fitting Storage Area; AR (garage) b. Fitting Storage Area; AS (rolocast) . C. Pipe Storage Area; AT d. Pipe Storage Area; AU e. Fittiq Storage Area; AV 4. Foraintenance Area; AM 5. Avaty of spill response and clean up equit a. OiStorage Area b. FoMaintenance Building c. Futation6. Obsoquip en torage, AW (Checkintegflow ersion s[metures and tarps,corroeaks n other signs potentialstormco tamina 'on) 6'—vq 6--6y y -oy Required t'o,Cor rs rg s iJ LL f QD 1520.3-4 MONTHLY STORMWATER INSPECTION REPORT CHARLOTTE PIPE AND FOUNDRY COMPANY CHARLOTTE, NORTH CAROLINA Page 4 of 5 Area ' IS 7. Bag Houses (Check for accumulation of Particulates on ground around structure, integrity of duct form rotary valve, etc.) a. Bag House; O (rolocast) b. Bag House; P (new foundry) e. Cupola Baghouse d. Bag House; Q (rattleroom) S. Finished Materials Con or Systems (Check for stained soil Mialt dripping to ground and integrity of a and cover.) a. fitting Conveyor System; AJ b. 5-Ft Pipe Conveyor System; AK 9. Empty Drum Storage Areas including and BC (Check to see that drums are capped, stored horizontally on wooden pallets.) 10. Slurry Spills (Check for spills of"whitish" colored liquid throughout site.) 11. Obsolete Steel M d Vore Storage; BJ (Verify material is s red in bins and does not accumulate more en ecessary.) QD 15=C3-4 MONTHLY STORMWATER INSPECTION REPORT CHARLOTTE PIPE AND FOUNDRY COMPANY CHARLOTTE, NORTH CAROLINA Page 5 of 5 Area ------------- y. Yes' Stormwater System (Check for accumulation of ~ debris, visible sheen, color, foam, outfall staining, dry weather flow, soil erosion, signs of pollutant dischar e. a. Outfall 001 (pipe yard) b. DUtfIII 002 (10- tarring) 9 13. a. Compressor condensate (various) w b. Pattern Shop welder cooling water c. Hydro[est water d. Hose Stations Fueling Station (1) (Check for signs of leaks, staining on concrete, flow diversion structure, Fc Mr; a mop - -r .-F.....0 rcqutrea for any conditions found not acceptable. 2• Description of potential pollutants and pollution prevention measures and control i Plan (S WP3) to be revised in accordance with inspections. in Stormwater Pollution CERTIFICATION: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on m in ui person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, Y 9 ry of the to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Signature Date QD 1520S-4 TABLE 3 -1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page i of 9 POTENTIAL STORMWATER777777777 POLLUTANT SOURCES „ BMPs 1. Spent Materials Storage Area, A Minimize run-on fromdjacent areas with diversion dikes, berms, etc.; ✓/ Provide curb around spent sand and baghouse dust storage area; ✓ Maintain covers on sludge roll -off boxes; Establish regular disposal schedule to minimize quantities stored on -site; and Vol Monthly housekeeping inspections. / 2. a) Foundry Sand Storage Bins, B; b) Foundry Wood Chip Cyclone Silo, Sweep sand from areas exposed to stormwater runoff daily; C and Monthly housekeeping inspections. 3. a) Pig Iron Storage Area, D; b) Scrap Iron Storage Area, E; Minimize run=on from adjacent areas with diversion c) Scrap Iron Storage Area, F structures such as curbing, berms, containment trenches, elevated d) Miscellaneous Raw Steel Storage, concrete pads or other equivalent measures; Including, AZ o bia t k e) Metal Parts and Grates Storage Evaluate alternatives for minimizing oil and grease in Area; BD these areas; and Inspect the storage areas monthly for good housekeeping. 4. a) Unleaded Gasoline Storage Tank, Install a lock on the containment drain valve to� G' prevent release of contaminated stormwater; b) Diesel Storage Tank, H Inspect storage tanks, containment structures, and Piping systems (pipes, pumps, flanges, couplings, hoses, and valves) monthly for failures or leaks and perform preventive maintenance as required; t/ Train affected employees on spill response and cleanup, proper filling and transfer procedures, and to avoid "topping off' of tanks; and Inspect rainwater in secondary containment, remove any oil, and document release of contaminated water to the storm sewers. 41 w: y s le f e v tOCla !� 31 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 2 of 9 POTENTIAL STORMWATER POLLUTANT SOURCES BMPs 5. Four -Pump Fueling Station, I Provide dry adsorbents to clean up fuel spills; ✓ Facility personnel to direct trucks while positioning to unload fuel; ✓ Provide drip pads to catch spills; / Minimize/eliminate run-on onto the fueling area by curbing the adjacent area; j3 , I t li Ca,1cP y F F1Cw d,�'rsiy.9�et, Inspect fueling area monthly to detect problems, before they occur and to verify good housekeeping and cleanup of spills; and I,/,, — Train employees on spill response and cleanup, ✓ proper fueling techniques, and to avoid "topping off, of tanks; 6. a) Asphalt Stge Tank, J; Install a lock on the containment d71eaks b) Mineral S it Storage Tank, K prevent release of contaminated std (] S� /� Inspect storage tanks, containment d u Sfac k- yw; piping systems (pipes, pumps, flans, hoses, and valves) monthly for failud perform preventive maintenance. 7. Water -Based Coating Storage Tank, L Provide secondary containment structure for the 1-4 4- 'o� ✓ ; _5.�storage tank; ,-o �u s h ` /{� Install a lock oncontainment drain valve to Tc.� /� 5 L L / f prevent release ntaminated stormwater, and t /4-k!- Fran cvnfz'Aole.t f ja 1��,`1j1N.f Inspect storage tanks, containment structures, and piping systems (pipes, pumps, flanges, couplings, ✓ ��eafi„rn hoses, and valves) monthly for failures or leaks and P lu f perform preventive maintenance. 32 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 3 of 9 POTENTIAL STORMWATER B,s POLLUTANTSOURCES 8. Kerosene Storage Tank, M Eliminate the tank or complete the following: Provide secondary containment for the storage tank; Install lock on the containment drain valve to prevent release of contaminated stormwater; and Inspect monthly for signs of leaks, corrosion, etc. and perform preventative maintenance. 9. Kerosene Stage Tank, N Eliminate the tank or complete the following: G b- ce le, PC Provide posts to prevent collisions with the tank; Install lock on the containment drain valve to prevent release of contaminated stormwater; and Inspect monthly for signs of leaks, corrosion, etc. and erform preventative maintenance. 10.. a) Bag House, O (Z) /Z , /> s / Sweep under structure weekly to prevent particulate b) Bag House, P r l e ma accumulation; and s/ c) Bag House, Q cict ec,1 } a .M L�11 p�r F4�u ton le,�sq � ,n3 tk"+t. ee kly d) Bag House, BF poia 13.y Insoblemsaandoto m NoLi�.PF�m, s. Hli v rift' ood house ee P fyg PgP practices arebein followed. s R Sweep azea to remove materials exposed tostormwater runoff; andI Ga Flcu:Ins P12.Raw ectareamonthl . Water Storage Tanks, S and T Plug the drain lines in the secondary containment structures to prevent contaminated stormwater from being discharged to the stormwater sewer; and L/ Install a sump and pump any accumulated stormwater into the -tams for treatment; and Inspect storage tanks, containment structures, and piping systems (pipes, pumps, flanges, couplings, hoses, and valves) monthly for failures or leaks and perform preventive maintenance. l enlucdd F/unc. s 33 "I 7hp of �n�5 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 4 of 9 POTENTIAL STORMWATER; . .,. BMPs ., .. POLLUTANT SOURCES 13. Waste Oil Storage Tank, U Install lock on the containment drain valve to prevent release of contaminated stormwater; and ✓ Inspect storage tanks, containment structures, and piping systems (pipes, pumps, flanges, couplings, hoses, and valves) monthly for failures or leaks and perform preventive maintenance. ;,/ 14. Drums Containing Material Cover all drum storage areas or store drums inside; a) Outside Drum Storage Area, V L* 9 5`7o c1 �•�� b)-Quu " "' Gas«•+ ahs. tC sere drums in vertical position, and install hand c) Facility -wide Drum Storage pumps to dispense chemicals; f Provide secondary containment or berms for all drums and containers; ✓ Utilize effective inventory control to reduce the volume of chemicals stored on -site; ✓ Dispose of all obsolete or unused oils and chemicals; M-o 4—A 1 y ? ,',, k N1.1 Prepare and train employees in dealing with spills and leaks properly, and use dry clean-up methods when possible; and Inspect all drums and containment structures monthly for leaks, spill, corrosion, dama e, etc. ✓ Drums Collect and dispose of all emptydrumsandOutside ty asphalt drum containers promptly; rage are r6' al&ie_Facility :Empty wide empty drum storage [16. Store empty drums capped and in horizontal position on wooden pallets; and Inspectmonthl . a) Coke Storage Hopper, X Discontinue drainage to the storm sewer, obtain b) Coke Storage Hopper, Y permit and permanently tie-in each sump to the c) Limestone Storage Hopper, Z sanitary sewer; — F_4 � n s,.,,, p +, e.E „) +r d) Ferrosilicon Storage Hopper, AA °` ' -�' f eai• ,¢,, } pJ�,rf e) Coke Hopper Pit, AD Prevent or divert run-on from adjacent areas with 7s.teFe curbs; / g) Materials Handling Conveyors Maintain good housekeeping; and 34 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 4 of 9 POTENTIAL STORM4VATER BMPs POLLUTANT SOURCES r Inspect equipment monthly for spill or leakage of fluids, oils, etc. 35 FINAL 8/95 0 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 5 of 9 POTENTIAL STORMWATER BMPs 3: POLLUTANTSOURCES 17 �`� r ti c` s r tswales, t coke from precipitation by covering if feasible: c7 h s� ie� t or divert run-on from adjacent areas with dikes or curbs; and Inspect area monthly for signs of stormwater run-on, integrity of tarps, etc. 18. Slag Storage Area, AC Evaluate alternative storage locatio s/p)ptions; and ✓ p:cKS Iw �' c, /0cc CA¢,fy Inspect area monthly to verify good housekeeping and integrity of curbing and drains. ✓ 19. 06 50/e_k 20. Wastewater Treatment Tanks (Inside Building), AL Prevent oil spray d of AK from becoming wind blown and from faliing onto the ground; and Ch s. k {e Inspect area monor signs of stormwater contamination froM bil and dripping. Inspect tanks, pumps, and piping systems monthly to signs of leaks and perform preventative maintenance. 36 FINAL 8/95 TABLE 3 -1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 6 of 9 POTENTIAL STORMWATER POLLUTANTeSOURCES BMPs 21. Forklift Maintenance Shop, AM, Q y rags, oil filters, air filters, batI Ei d degreasers properly;the recycling of waste material lvents, batteries); ✓ Drainoil filters before disposing or recycling; -�''"�nlEMrnfGc:i ,j 5 wh�c�h Sitc ct a Fu r : Promptly transfer used fluids to the proper container; do not leave full drip pans or other open containers around the shop. Empty and clean drip pans and S o r containers; •n C' Provide spill response equipment and adsorbent IA materials at a convenient location; ✓ S la �� w,-�i • G2 Inspect the maintenance area monthly for proper implementation of control measures; and In h a• h all d e ar fit'` e,,I s Train employees on spill response and cleanup methods and proper waste control a and disposal procedures. Continue to store all liquid chemicals/oils inside. 22' b) Pipe Coating Operation, AO Install curbing aroun l0-ft Pipe Coating vat to c) Fitting Coating Operation, AP prevent overflow ont and outside the building; Clean up stained soil and asphalt spills around building; Install drip pans or pads under the conveyors to collect drippings; and Sa n cf be. ,n s Inspect the coating operations quarterly for signs of leaks, spills, or potential stormwater contamination. 37 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 7 of 9 POTENTIAL STORMWATER BMPs POLLUTAIV I SOURCES ; fi 23. Vehicle Washing Area, AQ Use phosphate -free biodegradable detergents if `1 Du, lL�;nei, a e'l c./v 5ed feasible; ✓ '"'65 !, be. y Fir p/�,,/%;ie/,, cle;. Verify drain connection to sanitary sewer; and Inspect the vehicle wash area monthly for good housekeeping. 24. Equipment Stored Outside, AY, and Where possible, dispose of unused equipment various locations properly, or move indoors; / Minimize runoff coming into contact with old equipment with curbs; Inspect area monthly for leaks, corrosion, or signs of stormwater contamination. ✓ 25. Finished pipe and fitting storage Not a significant source, therefore no additional areas AR, AS, AT, AU, AV BMps. / 26. Obsolete equent stored outside, Where possible, di se of unused equipment AW and locations properly, or move,' oors; /vari f f ��r. Pr I y Minimize runoff co inwith to contact old equipment by const p'ng curbs, . Inspect area monthlyintegrity of tarps, leaks, corrosion, or siXOrmwater contamination. 91 FINAL 8/95 TABLE3-1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 8 of 9 POTENTIAL STORMWATER BMPs POLLUTANT SOUR 27. Improper connection of floor, sink, or Inspect and test all floor, sink, and process wastewater process wastewater drains drains from proper connection to process sewer or sanitary sewer and remove any improper connections to stormwater sewer or ditches; ✓ Seal the tops of stormwater catch -basins located inside buildings so that chemicals may not be poured into the stormwater sewer; and ,/ Stencil all stormwater inlets, catch basins and manholes to promote awareness: (i.e. "Stormwater only, discharges to Irwin Creek'). / 28. Compressor condensate discharges Install tote -bins to collect compressor condensate streams for transport to the oil removal process at wastewater treatment; and ;✓ Inspect all condensate discharges at the facility monthly to verify that none of these streams are ✓ discharged onto the ground or into catch -basins. 29. Pattern shop welder cooling water Permit and connect to sanitary sewer. / discharge 30. Hydrotest water Permit and connect to � or obtain a direct discharge permit. wu is l-rca t �- plea 11 31. Hose stations Permit and connect to sanitary sewer; a) Outside Wastewater Treatment b) Outside Cafeteria (BE) Post signs "Do not rinse outside"; and Train employees about outdoor rinse ban. 32. Ob�i�� �uspcfiP 39 FINAL 8/95 TABLE 3 -1 SELECTED BEST MANAGEMENT PRACTICES Charlotte Pipe & Foundry Charlotte, NC Page 9 of 9 POTENTIAL STORMWATER , BMPs POLLUTANT SOURCES 33. Obsolete steel mol)core storage, BJ Not a significant source; continue to store off the ground in wooden bins to minimize corrosion and 0 b; � 1B4-e prevent run-on. 34. Slurry spills Improve containment system of slurry on trucks; and 06e C/o s,A 4Lje 4-QdAC-5 4hau Train slurry truck drivers about spill prevention and response. 35. Hydraulic unit line burst, BL and Preventative maintenance of equipment; and other potential areas 1, ns l,! lacQ -,lrc n k r Afl t Train operators about spill prevention and response. 36. Small pil f outdoor sand storage, Construct berm to eliminate run-on. covered; obSJl P_ 37. Wood storage (for bin construction); Not a significant source, no additional BMPs required. BA 40 FINAL 8/95 TABLE 1. STORM WATER SAMPLING RESULTS - CHARLOTTE PIPE AND FOUNDRY COMPANY, INC. CHARLOTTE, NORTH CAROLINA Analytical Method: EPA 200.7 (ug/L) EPA 351.2 (mg/L) EPA 420.1 (ug/L) HACH 8000 (mg/L) SM2540D (mg/L) n 32 Storm E U Z N Y i4 c a c Drainage 6 o 76 Z r y a Datea L ' U O a iOutfall w SW-001 6232004 100 79 550 33 800 1.9 290 210 210 SW-002 6232004 150 120 810 56 1200 1.6 170 220 250 SW-002A 623/2004 1200 450 3200 320 4700 1.5 90 900 850 SW-004 6/232004 270 420 1300 180 2500 8.5 13000 1700 6,400 SW-005 6232004 61 70 120 16 200 <1.0 1400 400 500 ug/L = micrograms per liter mg/L = milligrams per liter A� �' n F 1r - `it` North Carolina Department of Environment and Natural I t Division of Water Quality i I Beverly Eaves, Perdue Coleen H. Sullins d� . -, `: Dee Preeman Governor Director Secretary MAY, 2 6 2009• May 20, 2009 Mr. David Waggoner Charlotte Pipe & Foundry Company PO Box35430 Charlotte, NC 28208 Subject: Draft NPDES Storm water Permit Permit No. NCS000040 Charlotte Pipe & Foundry Company Mecklenburg County Dear Mr. Waggoner: Enclosed with this letter is a copy of the draft Stormwater permit for your facility. Please review the draft very carefully to ensure thorough understanding of the conditions and requirements it contains. The draft permit contains the following significant changes from this facility's current permit: Analytical monitoringchanges: hanges 1. Analytical monitoring parameters, COD, TSS, Total KjeldahlNitrogen,.Phenols, Total Copper, Total Recoverable Lead, Total Nickel, Total Zinc and Total Chromium, have been maintained. in the permit. Oil & Grease and pH has been added to the permit based on the parameter being potential pollutants at the site. 2. All analytical monitoring has been set to semi-annually during a representative. storm event as defined in Part I1 Section B. The permittee must also document the total precipitation for each event. If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the six-month sampling period. -Additionally, samples must be taken a minimum of 60 days apart, as specified in Table 2. 3. Benchmarks for analytical monitoring have been added to this draft permit: Exceedances of benchmark values require the permittee to increase monitoring, increase management actions, increase record. keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. If the sampling results are above a benchmark value, or outside of the benchmark range, for ainy.paranneter at any outfall then the facilityshall follow the Tier 1 guidelines which require a facility inspection within two weeks and implementation of a mitigation plan within two months. If during the term of this permit, the sampling results are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge outfall two times in a row (consecutive), then the facility shall follow the Tier 2 guidelines which require a repetition of the steps listed for `Fier 1 and also immediately institute monthly monitoring for all parameters at every outfall, where a sampling result exceeded the benchmark 'value for two consecutive samples. 4. You are required to collect all of the analytical and qualitative monitoring.samplesduring representative storm events as defined in Part II Section B. Qualitative monitoring is required regardless of representative outfall status. 5. You are responsible for all monitoring until the renewal permit is issued. See Footnote 1 of Tables 1, 4, and 5. . Wetlands and Stormwater Branch. One 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Nori.hCarohna Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 1 FAX: 919-807-6494 1 Customer Sewioe:1-877-623-6748 lmemetw .ncwaterquality.org An Equal Opportunity l Affirmative Action Employer - Mr. illavid Waggoner Charlotte Pipe & Foundry Company Permit No. NCS000040 6. The flow reporting requirement has been removed per DWQ revised strategy. (The total rainfall parameter is in this permit, however.) 7. Vehicle maintenance monitoring has been revised to.semi-annually in order to coincide with analytical and qualitative monitoring. This requirement appears in all Individual Stormwater permits, however it only applies to facilities that do vehicle maintenance. If the facility begins vehicle maintenance during the permitted timeframe then the requirements shall apply. Other permit charges . 1. Additional guidance is provided about the Site Plan requirements. The site map must now identify if the receiving stream is impaired and if it has a TMDL established. It must also describe potential pollutants in each outfall. The map requirements are stated more explicitly. And, the site.plan must contain a list of significant spills that have occurred in.the past three years and also must certify that the outfalls have been inspected to ensure that they do not contain non-stormwaler.discharges. Additional information is provided in Part II Section A. 2. Additional requirements for the Stormwater Management Plan have been specified in Part II Section A. More details regarding secondary containment are provided. 3. Additional requirements for the Stormwater Pollution Prevention Plan have been specified in Part II Section -A. The plan must also be updated annually to include a list of significant spills and to certify that the outfalls do not contain non-stormwater discharges. 4. The facility must now implement a semi-annual Facility Inspection Program of the site's stormwater management controls as specified in Part II Section A. 5. Information regarding the No Exposure Exclusion has been added to this draft permit. If industrial , materials and activities are not exposed.to precipitation. or runoff as described in 40 CPR §122.26(g), the facility may qualify for a No Exposure Exclusion from.NPDES stormwater discharge permit requirements. Additional information is provided in Part I Section A. 6, Per the requirements of the Catawba Riparian Buffer Rule, all stormwater drainage from portions of . this site that have been constructed after June 30: 2001 must be discharged tl-rough a correctly designed level spreader or another device that meets diffuse flow requirements per 15A NCAC 2B .0243. Diffuse flow requirements are described in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http://l12o.enr:state.nc.us/su/bmp- forms.lihn Please submit any comments to me no later than thirty (30) days following your receipt of the draft. Comments should be sent to the address listed at the. bottom of this page. If no adverse comments are received from the public or from you, this permit will likely be issued in -about two months. If you have any questions or comments concerning this draft permit, contact nne at (919) 807-6368 or brian.lowther@ncdeiir.gov Sincerely, Brian Lowther Enviroinmental Engineer Stormwater Permitting Unit cc: 'Mooresville Regional Office Stormwater Permitting Unit Attachments: Draft Permit 2 ' NC®ENR North Carolina Department of Environment and u eFtsources" Division of Water Quality R `, r• yI Beverly Eaves Perdue Coleen H. Sullins Dee Free Do Governor Director Secretary Nr,fl 1 2 2009 March 10, 2009 Mr. David Waggoner Charlotte Pipe &Foundry Company PO Box 35430 Charlotte, NC 28208 DWQ-Stet fuV- 10r P;o,i t tlon Subject: NPDES Permit Renewal Application Charlotte Pipe & Foundry Company Permit Number NCS000040 Individual Stormwater Permit Mecklenburg County Dear Mr.- Waggoner: The Division of Water Quality's Stormwater Permitting Unit (SPU) acknowledges receipt of your renewal application for coverage under NPDES Permit Number NCS000040 on July 7, 2004. We apologize for the lengthy delay in responding to your submittal and are now making every effort to review your permit renewal as expeditiously as possible. Our Unit anticipates making significant progress on individual permits over the next six months to reduce our backlog. We are currently beginning our review of your renewal application. Please continue to comply with all conditions and monitoring requirements in your expired NPDES stormwater permit. As long as you have submitted a complete renewal request package and maintain compliance with those permit conditions, stormwater discharges from this facility are authorized by that permit until the Division issues a renewal permit or notifies you of an alternative action. No additional information is required at this time, but we may contact you in the future. Please notify us if any significant changes have taken place at this facility since you submitted the renewal package. If you have any questions about this matter, please contact me at (919) 807-6368, brian.lowther@ncmail.net. cc: Moo sville-Regional-Office StormwaterPennittingnnUnit iles Central Files Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 9 19-807-6494 1 Customer Service: 1-877-623-6748 Internet:w .ncwaterqualityrorg An Equal Opportunity 1 Affirmative Action Employer Sincerely, -t Brian Lowther Environmental Engineer Stormwater Permitting Unit One Not-thCarolina Naturally