Loading...
HomeMy WebLinkAboutNCS000010_COMPLIANCE_20131205—T."--"---"STORMWATER-DIVISION-CODING-SHEET"— PERMIT NO. N LSC�C�c� 10 DOC TYPE ❑ FINAL PERMIT ❑ MONITORING INFO ❑ APPLICATION k'COMPLIANCE ❑ OTHER DOC DATE ❑ v5 YYYYM M DD a fW � C W= A V b �)133aa Nna 3Hw x Amman • • i t w ❑ Q 5 60 yHy�( ® Sa n • ❑ ❑° it. i • • Si 0 ° ❑ o� �° ° ❑t ; -- — ------ AOTDNDTK FASTENER i ❑ I❑❑ i I j i � �pY • C � Yv pp ❑ � O Yip 3 z � nF •- G j •490 Z --n ° JpNCS BODY SHpP `> - ' � • � Wit BpJNNGE°S ❑ ° y 2 U e'rt pW�y{S w I a' H H d y2 W ( I❑ �gy 5 a 0 �S B si ❑ ❑ • , •- p FA ❑ Q III • o E9i ❑ • e ❑ ❑ x o 0 Ll o ° 1b7`yt/Y4S I ❑ O ° 0 ❑ _ o ° e . �_�-1 ❑ ❑ P (il(ifTjfl o a �1 Lljl9JlAJ L w �. � ❑ 0 II ' t. rar; .+.a`•,a. rs °r,.a emu,. • .� �� e • :,. � � �..nT-.w.-� ire. .,*.� -: w.,a.n$u.. :, �J e 0 !:7 p W W W W N W W a W In W; a Q 2 W z w a Q Q W a 4 am 1C a a -19 � a a s a a J F .4 Q 0 0 ¢ 0 0 G b b ' J r. a' e° c c c rc a a W IL O i 0 b b b b b IO,� Z F �oOw € €; o a o ti W N S o W 194 UA 19Z G W .ua >a 0: W LU G O �LL W U a U. N W y S O_ LU W d i 0 CO OM _ PI co N Cfl co co e a CAI CO d' LO Z c g> 6 6S J L6 N W Z W LU Q' W a o L6 CIO r I North Carolina Department of Environment and Natural Resources Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 CERTIFIED MAIL: RETURN RECEIPT REQUESTED ARTICLE NUMBER: RE: Stormwater Discharge Outfall Monitoring Report Evonik Corporation 2401 Doyle Street Greensboro, NC 27406 Individual Permit Number NCS000010 Dear Sir: EvonlK INOU STRIUS December 5, 2013 Evonik Corporatlon 2401 Doyle Street Greensboro,NC 27406 w .evonik.conn Phone +I 336-333-7956 Fax +I 336-333-3740 Cell +I 336-207-2050 DI etec8ettinger®evanik.com As required by NPDES Individual Permit No. NCS000010, Evonik Corporation. (Evonik) is submitting the NPDES storm water report for the second half of 2013. On November 26, 2013, storm water samples from four outfalls (SDO 1 through SDO 4) were collected. In addition, storm water samples from offsite sources that flow into the Evonik storm water drainage system were also collected. Per Evonik's letter dated April 4, 2011 to Mr. Steve Tedder, Surface Water Protection — Winston-Salem Office, off -site sources significantly Impact the total iron and zinc concentrations from the Evonik property; therefore, samples from these off -site locations are routinely collected along with the outfall samples. As required by the NC NPDES permit, the Storm water Discharge Outfall (SDO) Monitoring Report (form SWU-242-112608) and the SDO Qualitative Monitoring Reports (SWU-246-112608) for each outfall are attached for your records. For offsite sources, only the SDO Qualitative Monitoring Reports (SWU-246- 112608) are included. A summary table including analytical results from Outfalls and off -site sources is also attached to document the background concentrations from offsite impacts. The SDO Qualitative Monitoring results indicate baseline exceedancos for zinc and iron in various outfalls. As stated above, analytical testing of off -site sources indicate significant impacts to the Evonik property; therefore, Evonik believes the exceedances are the result of naturally occurring background concentrations from off -site sources, and are not representative of Evonik industrial processes and operations. If you have any questions or need further information please call me at (336) 333-7956, our technical point of contact, Ken Meyer at (336) 333-3510, or our environmental consultant, Tony Rossano of Antea Group at (704) 543-3907. EvoniK INDUSTRIES Sincerely, Dieter Bettinger Site Manager, Greensboro Mr. Steve Tedder, Surface Water Protection North Carolina Department of Environment nd--_______ RECEIVED Natural Resources N.C. Dect. of ENR Division of Water Quality NOV 16 2010 585 Waughtown Street Winston-Salem Winston-Salem, NC 27107-2241 Regional Office CERTIFIED MAIL: RETURN RECEIPT REQUESTED ARTICLENUMBER: 70o7 /qfO coot oP ?j0 02,0S RE: Stormwater Permit Benchmark Value Increase Request Evonik Stockhausen, LLC 2401 Doyle Street Greensboro, NC 27406 Individual Permit Number NCS000010 Dear Mr. Tedder: ® Evon1K INDUSTRIES November 11, 2010 Evonik Stockhausen, LLC 2401 Doyle Street Creensboro,NC 27406 w .evonik.cam Phone +1 336-333-7956 Fa. +1 336-335-3740 Cell +1 336-207-2050 Oieter.Bettinger@evonik.com The purpose of this correspondence is to request that benchmark values as stated in Evonik's NPDES Permit be increased to allow for naturally occurring background concentrations exhibited by our site. Evonik Stockhausen, LLC (Evonik) located at 2401 Doyle Street in Greensboro, NC is permitted to discharge stormwater under Individual Permit number NCS000010, which became effective on February 1, 2010 and is scheduled to expire January 31, 2015. On March 12, 2010 Evonik initiated semi-annual monitoring per the requirements of the new permit. The new permit requires the analysis of additional discharge characteristics to include: pH, zinc, iron, nitrate+nitrite-N, acrylamide, and monitoring of total rainfall. Upon receipt of sample results for the first semi-annual monitoring under the new permit, a Tier I response was required due to exceedences of the benchmark values for total iron and zinc. During the course of the Tier I Response, a corrective action plan was generated and implemented. The implementation of the corrective action plan failed to identify the source of the elevated iron and zinc concentrations. At that time, it was suspected that the source of the iron and zinc was naturally occurring. A spring located on our property contributes significantly to the property's total runoff. In order to determine the contribution of this spring to our storm water discharge, a groundwater sample was collected directly from the spring on June 24, 2010 and analyzed for the same characteristics as required by our permit. The analytical results of the sample analyses are presented in the attached 2010 Analytical Results Summary Table. Evonik's second semi-annual monitoring results from samples collected on September 30, 2010 indicate the,exceedence of the benchmark values for iron and zinc. The samples were collected as soon as possible upon sufficient flow. Due to this being the second consecutive monitoring period whereby the results are above the benchmark values, a Tier 11 Response is required. As such, Evonik is required to ® EVom INDUSTRIES repeat the actions required in a Tier I Response, immediately institute monthly monitoring for all parameters at every outfall where the sampling results exceeded the benchmark values for two consecutive samples until such time as three consecutive sample results are below the benchmark values. Should the results continue to exceed the benchmark values on four occasions during the permit term, the permittee is required to notify NCDENR. Given the naturally occurring background concentrations of iron and zinc and the large discrepancy between them and the benchmark values, Evonik will be subject to monthly monitoring under the Tiered Response requirements. In light of the background contribution to our site's stormwater discharge, any additional monitoring requirements under the Tiered Response will place an undue burden on Evonik. In accordance with the provisions of our permit, Evonik will proceed with the Tiered Response requirements. However, we respectfully request that NCDENR review the information presented and work with the State offices regarding our request. If you have any questions or need further information please call me at (336) 333-7956, our technical point of contact, Ken Meyer at (336) 333-3510, or our environmental consultant, Tony Rossano of Delta Consultants at (704) 543-3907. Sincerely, 3 -,,L S , Q-�� Dieter Bettinger Site Manager, Greensboro 1 - y FIR NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director January 21, 2010 Mr. Ken Meyer, EHS Mgr. Evonik Stockhausen, +ne.lJ-c 2401 Doyle St. Greensboro, North Carolina 27406 Dee Freeman . Secretary Subject: Name Change NPDES Stormwater. Permit Permit NCS000010 Evonik Stockhausen, LLC Guilford County Dear Mr. Meyer: On January 21, 2010, Division personnel received your request to revise your NPDES individual stormwater permit to accurately include your new company and facility name of Evonik Stockhausen, LLC. Please find enclosed the revised pages of your permit affected by this change. The terms and conditions contained in the permit remain unchanged and in full effect. This revised permit is issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions, please contact me at 919-807-6365 or cory.larsen@ncdenr.gov. Sincerely, Cory rsen Environmental Engineer cc: DWQ Central Files Winston-Salem Regional Office, Corey Basinger Stormwater Permitting Unit Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6494 \ Customer Service: 1.877.623.6748 Internet: www.iicwaterquality.org An Equal Opporlunry \ Affirmative Action Employer None rth Carol i n a Nail ll� NCS000010 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, EVONIK STOCKHAUSEN,.LLC is hereby authorized to discharge stormwater from a facility located at Evonik Stockhausen, LLC 2401 Doyle Street Greensboro, NC Guilford County to receiving waters designated as Mile Run Creek, a class WS-V; NSW stream in the Cape Fear River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI hereof. This permit shall become effective February 1, 2010. This permit and the authorization to discharge shall expire at midnight on January 31, 2015. Signed this day January 8, 2010. f for Coleen H. Sullfns Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000010 TABLE OF CONTENTS PART I INTRODUCTION Section A: Individual Permit Coverage Section 13: Permitted Activities Section C: Location Map PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution PreventionPlan Section B: Analytical Monitoring Requirements Section C: Qualitative Monitoring Requirements Section D: On -Site Vehicle Maintenance Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability S. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section 13: General Conditions 1. Individual Permit Expiration 2. Transfers 3. Signatory Requirements I Permit No. NCS000010 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Pennit Actions Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Facilities .Section D: Monitoring and Records 1. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7.. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2.. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Spills 8. Bypass 9. Twenty-four Hour Reporting 10. Other Noncompliance 11. Other Information PART IV LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS I ':. Permit No. NCS0000(0 PART I INTRODUCTION SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR §122.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Certification must submit a No Exposure Certification NOI form to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must reapply for the No Exposure Exclusion once every five (5) years. SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina or separate storm sewer system that has been adequately treated and managed in accordance with the terms and conditions of this individual permit. All stormwater discharges shall be in accordance with the conditions of this permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. The stormwater discharges allowed by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree: Part t Page 1 of 2 Pennit No. NCS0000to PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES SECTION A: STORMWATER POLLUTION PREVENTION PLAN The Permittee shall develop a Stormwater Pollution Prevention Plan, herein after referred to as the Plan. This Plan shall be considered public information in accordance with Part III, Standard Conditions, Section E, Paragraph 3 of this individual pen -nit. The Plan shall include, at a minimum, the following items: Site Plan. The site plan shall provide a description of the physical facility and the potential pollutant sources which may be expected to contribute to contamination of stormwater discharges. The site plan shall contain the following: (a) A general location map (USGS quadrangle map or appropriately drafted equivalent map), showing the facility's location in relation to transportation routes and surface waters, the name of the receiving water(s) to which the stormwater outfall(s) discharges, or if the discharge is to a municipal separate storm sewer..; system, the name of the municipality and the ultimate receiving waters, and' accurate latitude and longitude of the point(s) of discharge. The general, location map (or alternatively the site map) shall identify whether each receiving water is impaired (on the state's 303(d) list of impaired waters) or is located in a watershed for which a TMDL has been established, and what the parameter(s) of concern are. (b) A narrative description of storage practices, loading and unloading activities, outdoor process areas, dust or particulate generating or control processes, and waste disposal practices. A narrative description of the potential pollutants which could be expected to be present in the stormwater discharge from each outfall. (c) A site map drawn to scale (including a distance legend) showing: the site property boundary, the stormwater discharge outfalls, all on -site and adjacent surface waters and wetlands, industrial activity areas (including storage of materials, disposal areas, process areas, loading and unloading areas, and haul roads), site topography, all drainage features and structures, drainage areas for each outfall, direction of flow in each drainage area, industrial activities occurring in each drainage area, buildings, existing BMPs, and impervious surfaces. The site map must indicate the percentage of each drainage area that is impervious. (d) A list of significant spills or leaks of pollutants that have occurred at the facility during the three (3) previous years and any corrective actions taken to mitigate spill impacts. (e) Certification that the stormwatcr outfalls have been evaluated for the presence of non-stormwater discharges. The certification statement will be signed in Part II Page 1 of 10 of/zl l 10 necerly [:ryes Perdue. GUCCmnr Dee Friaimn, Stireuin, Mwh Cu oliaa Deportment id Gnvironine it and Nulmal Risnrnccs Colcen H. Sullins' Dintitor Division ur water Quality SURFACE WATER PROTECTION SEC 1 id-% :' PERMIT.NAME%OWNERSHIP<CHANGEsRORM 1. Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N O S 11. Permit status pLiaL to requested change. a. Permit issued to (contpa'ny name): Eyonik Stockhausen, Inc. b. Person legally responsible for permit: Dieter n/a Bcttin ci First \It Last Site Manatuer Title 2401 Doyle St. Permit Bolder Mailing Address Greensboro NC 27406 City State Zip (336)333-7956 (336)333-3600 Phone Fax C. Facility name (clischarge): Eyonik Stockhausen, tile. d. Facility address: 2401 Dovle St. Address Greensboro NC 27406 City State 'Zip c. Facility contact person: Ken H. Meyer (336) 333-3510 First / MI / Last Phone Please provide the following for the requested change (revised permit). a. Request for cliangc is a result of: ❑ Change in ownership of the facility a Name change of the facility or owner Ifolher pleu.se explain b. Permit issued to (companyaiame): EN,onik Stockhausen, LLC c. Person legally responsible for pen»il: Dieter n/a Bettinuer First %I[ Last Site Manager Title 2401 Dovle St. Permit Holder Mailing Address Greensboro NC 27406 Cit%, State Zip (336)333-7956 dietei.bettingercuevonik.com Phone E-mail Address d. Facility name (discharge): Eyonik Stockhausen, L1..0 e. Facility address: 2401 Doyle St. _ Adch csc Greensboro NC 27406 City Stum Zip f. Facility contact person: Kenneth 1-1 Meyer first ,i\II Last (336) 333-3510 ken.mevergevonik.com Phone E-mail Address Revised 8/2008 PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 IV. Permit contact information (if different from the person legally responsible for the permit) Permit contact: Kenneth I Mcvcr First 1\111 Last LIIS Manger Tide 2401 Doyle St, Mailing Address Greensboro NC 27406 City State Zip (336)333-3510 kcn.mcvcrcicvonik.com I'honc E-mail Address V. Will the permitted facilih' continue to conduct the same industrial activities conducted prior to This ownership or name change'' Yes ❑ No (please explain) V1. Required Items: "1'IIIS APPLICATION \VILL 131, 12F,TURNED UNPROCI%SS1 D IF ITEMS ARE INCOD9PLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ❑ Legal documentation of the transfer of ownership (such as relevant pages o(a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the shoed Applicant's Certification is sufficient. PERM ITTEE CERTIFICATION (Permit holder prior to owncrship change): L ,attest that this application for a name/ownership charge has been ieviewcd and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be I eturned as incomplete. Signature Date APPLICANT CERTIFICATION I, Dieter Benninger, attest that this application for a nanmc/ownership change has been reviewed and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete 1 /20/2010 autnue Date PLEASE SEND THE COMPL E.TF, APPLICATION PACKAGE TO: Division of Water Qualitv Sill lace Water Protection Section 1617 \Mail Service Center Raleigh, North Carolina 27699-1617 Revised 712008 rf! J City of Greensboro North Carolina January 13, 2012 Ken Meyer, EHS Manager Evonik Industries 2401 Doyle Street Greensboro, NC 27406 RE: Industrial Compliance Inspection Inspection location: Evonik Industries 2401 Doyle Street SW Permit #: NCS000010 Dear Mr. Meyer: On January 12, 2012 the City of Greensboro Stormwater Management Division completed an industrial compliance inspection of the Evonik Industries. Local regulations permit an inspection of industrial facilities under authority granted by City of Greensboro Code of Ordinance Chapter 30, Article 12, Section 7.1 (C-5). This inspection consisted of two parts: a review of the facility files/records and an on -site facility inspection. The inspection was performed by Debbie Shoffner, and the following deficiencies/observations were noted during the inspection. Stormwater Pollution Prevention Plan/Spill Plan Review Site Maps and SWP3 ♦ No deficiencies observed. Spill Prevention and Response Plan ♦ Place a spill kit near the loading dock of building W-1. Verify with Ashland that spill kits are placed near their loading docks (and other pertinent areas). Monitoring ♦ No deficiencies observed. sao P.O. Box 3136 • Greensboro, NC 27402-3136 • www.greensboro-nc.gov • (336) 373-CITY (2489) • TTY # 333-6930 Employee Training ♦ No deficiencies observed. Site Inspection Preventative Maintenance/Good Housekeeping ♦ No deficiencies observed. Nun-Stormwater Discharges ♦ No deficiencies observed. It is recommended that Evonik Industries take appropriate actions to correct the noted deficiencies. if you have any questions concerning this inspection, please contact me at 336-373- 2741 or Debbie.Shoffner@greensboro-nc.gov. Sin�c�errelly�, Si Debbie Shoffner, Water Quality Specialist City of Greensboro, Water Resources Department cc: Peter Schneider, Water Quality Supervisor Mike Mickey, N.C. Dept. of Environment and Natural Resources Industrial Inspection File