Loading...
HomeMy WebLinkAboutWQ0005555_Monitoring - 10-2021_20211122Monitoring Report Submittal Permit Number #* Name of Facility:* Month: * October Report Information wg0005555 Weyerhaeuser Company Year:* 2021 Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR Oct 2021 NDAR & NDMR.pdf 584.75KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address:* dennis.atkinson@weyerhaeuser.com Name of Submitter: * Dennis R. Atkinson Signature: Date of submittal: 11/22/2021 This will be filled in automatically Initial Review Reviewer: Lloyd, Chloe D Is the project number correct?* WQ0005555 Is the monitoring report accepted?* Yes No Regional Office* Winston-Salem Accepted Date: 12/3/2021 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT INDAR-11 Page 1 of 4 Permit No.: W00005555 Facility Name: Weyerhaeuser- Elkin, NC County: Surry Month: October Year: 2021 Did irrigation occur at this facility? ❑ YES ❑ NO Field Name: 01 Field Name: 02 Field Name: 03 Field Name: 04 Area (acres): 2.17 Area (acres): 2.17 Area (acres): 2.17 Area (acres): 2.17 Cover Crop: �P' Hay Cover Crop: Hay Cover Crop: Hay Cover Crop: Hay Hourly Rate (in): 0.25 Hourly Rate (in): 025 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (in): 20 Annual Rate (ln): 20 Annual Rate (in): 20 Annual Rate (in): 20 Weather Freeboard Field Irrigated? ❑ YEs ❑ No Field Irrigated? ❑ YES [' NO Field Irrigated? 0 YES ❑ NO Field Irrigated? ❑ YES ❑ NO a m z o U L� m E z° J9 n a m m L° i a m ma am �a ma m Ln m E_ a Q ce �a z ma E m i=� t rA a.� rov. C] �: E a� ac z I E 3-0 =� -j m o m E_ � 4 °n �a z m� E m r°� m a= a-0 oo E rn �''c z_ E �z to=e m E_ ��, oa �a s m & E m -b1 t w _ ;�v 0$ - E oo }`F z_ E �v wx° -j m y m E_ a o oa �a a m �; E m ►= = of y.c ;�a ao E co a =o g -j °F in ft ft Vaj min in in gal min in in gal min in in gal min in in 1 C 75 0 2.8 ®lam 2 C 83 0 2.8 11.169 60 0.19 0.19 3 PC 80 0 3.11 13.120 60 0.22 0.22 14,587 60 0.25 0.25 4 R 72 0.42 3.5 5 1 0.06 1 3.49 6 0.36 1 3.47 1 Z 7 0.97 1 3.451 Mill F- a 0.41 3.43 9 0.28 3.42 10 0.02 3.42 r 11 0 3.43 121 1 0 3.43 131 1 0 3.43 V_ 14 0 3.44 moo€ 15 0 3.45 -IN L- is 0 3.45 -MEL 17 0 3.46 18 0 3.47 19 0 3.48 20 0 3.49 21 0 3.5 �. 22 0.01 3.5 23 0 3.51 241 1 0 3.51 25 0 3.52 26 0 3.52 27 0 3.52 28 0 3.53 29 0.64 3.45 301 1 0.46 3.67 311 0 3.68 Monthly Loading: 12 Month Floating Total (in): 0 0.00 14.10 13.120 0.22 13.50 11,169 0.19 5,91 14.587 0 25 17.17 FORM' NDAR-1 08-11 mf'jN..nigrFIARr'.F APPI IC`_ATInM PFPrIPT fmnAP_i1. Pane 2 of 4 Permit No.: WQ0005555 Facility Name: Weyerhaeuser - Elkin, NC County: Surry Month: October Year: 2021 Did irrigation occur at this facility? El YES ❑ NO Field Name: 05 Field Name: 06 Field Name: 07 Field Name: 08 Area (acres): 1.3 Area (acres): 2.29 Area (acres): 2.01 Area (acres): 208 Cover Crop: Hay Cover Crop::. Hay Cover Crop: Hay Cover Crop: Hay i Hourly Rats (In): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (In): 20 Annual Rate (in): 20 Annual Rate (in): 20 Annual Rate (in): 20 Weather Freeboard Field Irrlgated? 0 YES No Field Irrigated? ❑ YEs No Field Irrigated? ❑ YEs 21 NO Field Irrigated? ❑ YEs j] No a 0 v 3 ? m ° a m O° E v, m °t a� u N m E o Q• a CL �a��i�=� m E i= a+ s,c �ro o$ E ao =z c E �$ Tc °$ m 9 E m �g o 0 as v m m E 1= - t °� 1 E ;� o o � E °� °-� c E �v x o 0 �_�, m y E a ° o a �a m E f= d° t m 3,° ;� O p � E m -E E x° a ��_j m o E m o a �a m m °� = }.e C]Cc J E o0 ° c x o 0 �_ °F in ft ft gal min In lin7 gal min in in gal min in in gal min In in 1 C 75 0 1 2.8 2 C 83 0 2.8 3.973 15 0.11 0.11 3 PC 80 0 3.11 4 R 72 0.42 3.5 mow 5 0.06 3.49 1cd� 61 1 0.36 3.47 T 0.97 3.45 8 0,41 3.43 9 0.28 3.42 10 0.02 3.42 _ 11 0 3.43 NOW 12 0 3.43 13 0 3.43 AL 14 0 3.44� 15 0 3.45 16 0 3.45 17 0 3.46 NNW 18 0 3.47 19 0 3.48 - 20 0 3.49 � Pr_ . 21 0 3.5 ; 22 0.01 3.5 23 0 3.51 24 0 3.51 25 0 3.52 V 26 0 3.52 27 0 3.52 28 0 3.53 29 0.64 3.45 ,� 30 0.46 13.68 3.67 �, t 31 0 S �, Monthly Loading: 12 Month Floating Total (in): 3.973 0;11 10.15 0 D.OD 12.30 �0 "?0!00.e1 7,50 fl 0 00 6.92 FORM- NCAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of 4 Permit No.; W00005555 Facility Name: Weyerhaeuser - Elkin, NC County: Surry Month: October Year: 2021 Did irrigation occur at this facility? L'j YES ❑ No Field Name: A Field Name: B Field Name: CN Field Name: CS Area (act): 2.8 Area (acres); 256 Area (acres): 1.96 Area (acres): 1.24 Cover Crop: Hay Cover Crop: Hay Cover Crop: Hay Cover Crop: Hay Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (in): 31.8 Annual Rate (in); 31.8 Annual Rate (in): 31.8 Annual Rate (in): 31.8 Weather Freeboard Field Irrigated? 0 YES ❑ No Field Irrigated? ❑ YES ❑ No Field Irrigated? ❑ YE5 0 No Field Irrigated? ❑ YES Q No o � co 3mm "umv a 44 M as a Ln R ma E e :h%mmmt > - c > % �= _ ° s �s�, i _ _fix .1 a a >a E m� = }, cm no arn �E-��ac =M,=a.a X$ °x in ft ft gat min in In gal min in in gat min Min In gal min in in 1 C 75 0 2.8 �t 2 C 83 0 2.8 5,584 60 0.07 0.07 E 3 PC 80 0 3.11 4 R 72 0.42 3.5 5 D.O6 3.49 Aw ilL _ i Imo, 61 1 0.36 3.47 M I11111111116-- --ow Mohr- 7 0.97 3.45 -1 a 0.41 3.43 9 0.28 3.42 i 10 0.021 3.42 11 0 3.43 121 1 0 3.43 13 0 3.43 14 0 3.44 15 0 3.45 16 0 3.45 17 0 3.46 1 1E 0 3.47 I� 19 0 3.48 20 0 3.49 New_ I_ 21 0 3.5 Ur I 22 0.01 3.5 -- miff yam_ AN- 23 0 3.51 �_ � 24 0 3.51 -M 11111111111111W Oro-, or 25 0 3.52 or W. 'm ML 26 0 3.52 w 271 0 1 3.52 w 281 1 0 3.53 29 0.64 3.45 30 0.46 3.67 31 0 3.68 Monthly Loading: 12 Month Floating iotal (in): 5,564 0.07 4.49 O O.DO 0.44 `01 0.00 1,18 0 D.00 0.70 FORM- NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 4 of 4 Did the application rates exceed the limits in Attachment B of your permit? Q Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? E) Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? 0Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? Ej Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? p Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification I ORC: Dennis R. Atkinson Certification No.- 15574 Grade: SI Phone Number: 336-526-6437 Has the ORC changed since the previous NDAR-1? ❑ yes E] No 9 Permittee Certification Pennittee: Weyerhaeuser Company Signing Official: Steve Kobelak Signing Official's Title: Mill Manager Phone Number: Permit Exp.: 8/31/25 W. /.s ,) Signature Date Signature L7at1 r By IN$ signature I certify that this report is ac urrate and complete to the best of my knowledge 1 certify, under penalty of law that this document and an attachments were prepared under my direction or supervision in accordance with a system designed to assure that an qualified personnel property gathered and evaluated the information submitted Based on my inquiry of Itre person or persons who manage the system, or thosr persons directly responsible for gathering the Information, the Information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware that [here are significant penalties for submit[Ing false Information, Including the possib4lity of fines and imprisonment for knowing vmlatrons Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page _1_ of_3_ Permit No.: WQ0005555 Facility Name: Weyerhaeuser - Elkin OSB Mill WWTF county: Surry Month: October Year: 2021 PPi: 001 Flow Measuring Point: ❑' Influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent F±) Effluent ❑ Groundwater Lowering ❑ Surface water Parameter Code —► 50060 00310 00916 00680 00940 01034 31616 71880 00927 71900 00610 00625 00620 00600 00340 00400 a m > tm a E U i 0 C m E� M N 0 3 o ri ua 0 M I ? v ro V m '_ Lo p nt a = o t E 3 E - roc m LL 0 t , m A m it LL E ? 2 rA co �' a ;' a N 0 E C m� Y Q +� "� 2 C '�� o° 12 z 0 V _ a 24-hr hrs GPD mg1L mg1L mg/L m L mgfL X100 mL mg/L mg/L mg1L mg1L mg/L mg1L mg1L mg/L su 1 0730 6 0 2 0 3 0 4 07.30 8 0 5 07.30 8 0 6 07:30 8 0 7 07:30 8 0 8 07:30 3 0 9 0 10 0 11 07:30 8 0 12 07:30 8 0 874 131 07:30 8 0 141 07:30 8 0 15 07,30 6 0 16 0 17 0 18 07:30 8 0 19 07; 30 9 7 463 872 20 07;30 10 0 21 07:30 8 0 22 0730 8 0 23 0 24 0 25 0730 8 0 26 07.30 8 0 8.74 27 07.30 0 3.832 28 07-30 8 3.528 29 0730 6 0 30 0 311 0 Average: 478 Daily Maximum: 7,463 8.74 Daily Minimum: 0 8.72 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: 28,800 Daily Limit: �_3 Sample Frequency: I Continuous 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year X Year 3 X Year 3 X Year Per Event FORM: NDMR 45-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page _2_of_3_ Permit No.: WQ0005555 Facility Name: Weyerhaeuser - Elkin OSB Mill WVVTF County: Surry Month: October Flow Measuring Point: influent [I Effluent [j No flow generated Parameter Monitoring Point. influent F±j Effluent Groundwater Lowering C1 Surface Water MIT". 0---��---------�- ' ' 0-_---------�--- ME". 0----��--------� m ' '---------------- ® 0 ' '---------------- - - - - - - - - - - - ----- FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page- 3-of-3- Sampling Person(s) 11 Certified Laboratories Name: Scott Miller Name: WayPoint Anaylical - Cert. No. 402 Name: Brody Edwards Name: PACE - Cert No. 40 & 633 Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? p compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space betow t" reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and desmibs the corrective action(s) taken. Attach additional sheets if necessary. Operator In Responsible Charge (ORC) Certification Permittee Certification ORC: Dennis R. Atkinson Permittee: Weyerhaeuser Co. Certification No.: 15574 Signing Official: Steve Kobelak Grade: SI Phone Number: 336-526-6437 Signing Official's Title: Mill Manger Has the ORC changed since the previous NDMR? ❑ Yes ❑ No Phone Number: 336-526-6456 Permit Expiration: 8/31/2025 Signature Date Signature Dad By this signature. I cerlify that Ibis report is accurrate and complete to the best of my knowledge I certify, under penalty of law. that this document and all attachments were prepared under my direction or supervision In aocordarice with a system designed to assure [hat all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the syslarn, or those persons directly responsible for gathering the information the information submitted Is. to the best of my knowledge and belief, We, accurate. and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 PRETREATMENT SAMPLING LOG Weyerhaeuser off Meter Calibration: Date 10/12/2021 Time 6:00 Sampler JJ 4 7 10 Temp °C 4.02 7.02 10.03 21.8 7.04 pH Buffer Verification PH sampling Sampling Location Spray Pond pH Sample Date _ 10/12/2021 Sampler Composite Begin Day _NIA I Time_ NIA End Day NIA NIA PH Grab Time 7:00 pH Analysis Time _ 7:10 PH Result 8.74 Temp °C 20.1 Notes: Signature: Jason Jo PRETREATMENT SAMPLING LOG Weyerhaeuser PH Meter Calibration: Date 10/19/2021 Time 6:00 Sampler JJ 4 7 10 Tem "C 4.03 7.02 10.02 21.9 7.03 pH Buffer Verification pH sampling Sampling Location Spray Pond pH Sample Date 10/19/2021 Sampler Composite Begin Day _NIA 1 Time_ NIA End Day NIA NIA pH Grab Time _ 7:00 pH Analysis Time _ 7:10 pH Result 8.72 Temp °C 20.8 Notes: Signature: Jason Jon PRETREATMENT SAMPLING LOG Weyerhaeuser off Meter Calibration: Date 10/26/2021 Time 6:00 Sampler JJ 4 7 10 Temp °C 4.03 7.03 10.03 21.6 7.03 pH Buffer Verification pH sampling Sampling Location Spray Pond pH Sample Date _ 10/26/2021 Sampler Composite Begin Day _N/A 1 Time_ N/A End Day N/A N/A pH Grab Time _ 7:00 pH Analysis Time _ 7:10 pH Result 8.74 Temp °C 20.1 Notes: Signature: Jason Jones f