HomeMy WebLinkAboutWQ0043000_Application (FTSE)_20211104State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FT.A 04-16 & SUPPORTING DOCUMENTATION
Application Number: \2,QO fro be eampleted by DWR)
All items must be completed or the aaulication will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: City of Durhani (company, municipality, HOA utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Donald F. Greeley, PE per I5A NCAC 02T.0106tbs
Title: Director of the Department of Water Management
4. Applicant's mailing address: 101 City Hall Plaza
City: Durham State: NC Zip: 27701
S. Applicant's contact information:
Phone number: (919) 560.4381 Email Address: don. reele odurhanmc. ov
IL PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
. Project name: Celeste Circle Lift Station and Force Main
2 Application/Project status: ® Proposed (New Permit) ❑ Existing Permil:Prolect
If a modification, provide the existing permit number: WQ00 and issued rate:
r new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Durham
4. Approximate Coordinates (Decimal Degrees): Latitude- 35.908703 Longitude:-788-992493'
5. Parcel ID (if applicable): 141826
(or Park:ei ID to closest downstream sewer)
Ill. CONSULTANT INFORMATION:
1. Professional Engineer: KriSta K. Paredes License Number: 044627
Firm: Freese and Nichols, Inc
Mailing address: 1017 Main Campus Drive, Suite 1200
City: Raleigh State: NC Zip: 27606-_
Phone number: (919) 463-7308 Email Address: krista,yaredeskfreese.coni
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION-
1. Facility Name: South Durham "later Reclarnination Facility Permit Number: NCO047597
Owncr Namc: City of Durham
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WNN'TF):
I. Permit Number(s): WQCS00005 Downstream (Receiving) Sewer Size: 15 inch
System Wide Collection System Permit Nunrbcr(s) (if 111121 icable?: WQCS00005
Owner Name(s): City of Durham
�C
cm
r_-J
ti
-ORM- [TA 04-16 Page I of5
M
Vl. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®NIA
2. If the Applicant is a Developer of lots lobe sold, has a VcveI2per'sQpgrational Attrecutent (FORM_ DFV1 been attached?
❑ Yes [-]No ®N/A
3. If the Applicant is a Floiite/ t v wirers•' Association I t e • tin reemcn�!21I M: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ® Retail (stores, centers, mails) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotcl andlor Motels
❑ School / preschool / day care ❑ Medical / dental l veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% htdustrial (See 15A NCAC 02T .0103 20
1, Is there a Preircatmertt Program in effect? ❑ Yes ❑ No
6. I Ia; a flaw reduction been approved under ISM, NCACO2T,QI14f f1? ❑ Yes ® No
i If vesprovide a copy of Flow reduction approval letter
7_ Summarize wastewater generated by project:
Establishment Type (see tl'I'.UI 14t1)1 Daily Design Flow'" Nu. of Linitsi Flow
gall GPD
gall GPD
gal/ I GPD
gal/ GPD
gakl GI'D
gal r' GPD
Total GPD
a See 15A NCACO2T .0114(b), {d it!ld (eli2} for caveats to wastewater design flow rates (i.e., minimum flow pel
dwellin& proposed unknown non-residential development uses; public access facilities located near high public use areas:
and residentia' property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4)
b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCACQT. 1.41 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data
fi Wastewater generated by project; 0 GPD (per L54 NCAC 02T 0114)
Do not include future flows or previously permitted allocations
If permitted now is zero, indicate rvhy:
® Pump Station or Gravity Sewer where flow will he permitted in sub,cgtzent permits that connect to this line
❑ Flow has already been allocated in Permit Number.
❑ Rehabditation or replacement of existing sewer with no new flow expected
❑ Other (Explain);
FORM: F`fA 04-I6 Page 2 of 5
Val, GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MD ' Cra%itx•Se►e¢rs ;
Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
10
64
DI
21
105
DI
r Section If & If I of the MDC for Permitting of Gravity Sewers contains information related to design criteria
Section [11 contains information related to minimum slopes for gravity sewcr(s)
L Oversizing lines to meet minimum slope requirement is not allowed and a violation of the ivIDC
Vlll. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & %IDC (Puny Stations/Force 3lainsl:
CWUPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
Pump station number or name: Celeste Circle Litt Station
2. Approximate Coordinates (Decimal Degrees): Laiitidc: 39,908703: Longitude:-78.992493-
3. Design flow of the pump station: 2 96 millions gallons per day (fine capacity)
4. Operational points) oftlie pump(s). gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches)
Length (feet)
iliaterial
8
829
DI
14
6,425
DI
6. Power reliability in accordance with 15A NCAC 02T .0305 h I :
® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13)_
Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
Must be permanent to facility
Or if tlic pump station has art average daily flow less than 15,000 gallons per day:
❑ Portable power sow-ce with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
JIB
❑ Portable pumping unit with plugged emergency punnp connection and telemetry • 15A NCAC 02T 0305(h)(1)(C):
It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS (02B .0200 & ISA \CAC 02T .0305(f)):
I. Does the project comply withall separations fuuttd in . t T_,03050) & (S) ® Yes ❑ No
I SA NCAC 02T-0305(1) contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
24 inches
Water mains vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines vertical - reclaimed over sewer)
18 inches
Reclaimed water lines horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells. WS-1 waters of Class I or
Class 11 impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
AnX building foundation
5 feet
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Draina e s stems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical)
36 inches
% I SA NCAC 02T-0305,(L, contains alternatives where separations in 02T.0305(f) cannot be achieved.
**Stream classifications can be identified using the Division's NC Surface W_ aler L'hixs ffrcations %vebnase
If noncompliance with O TT030 for (g), see Section X of this application
2. Does the project comply with separation requirenients for wetlands? (50 feet of separation) ® Yes [—]No ❑ NrA
See the Division's drafi separation requireinents for situations where separation cannot be meet
No variance is required if the alternative design criteria specified is utilized in design and construction
% As built documents should rel'crence the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCACO2B MOW ON-cs ❑ \o ❑ y-A
% This would include Trout Buffered Streams per 15A NCAC 213.020=
4. Does the project require coverage/authorization :order a 404 Nationwide or ® Yes ❑ No
individual permits or 401 Water Quality Certifications?
htformation can be obtained from the 40: & Buffer Pertuittine Branch
5- Does project comply with 15A N 'A 02T.0105j ()) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC 02T.0105(c)16), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent oil issuance of dependent permits (erosion and
sedimentation control plans, sturtnwater management plans, etc-).
6 Does this project include any sewer collection lines that are deemed "high. priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No ❑ NIA
If yes, include an attachment with details for each line, including type (aerial line, size, material, and location)
High priority lines shall he inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the perinitee's individual Systern-Wide Collection permit.
FORM' FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 156 ff_6 : 0?'I, the l4 ' vimum Desigo Crileria f r the Verinittinp of Pikinp Station&
anti force Mains tlatest vcrsio:i and the Gravity Scwcr A-linumuni Design Criteria&test vedsjoa) as applicable?
® Yes ❑ No
If No, complete and submit the Vatiance/Alternative Design Request application (VADC 10-14) and supporting documents for
review Approval of the request is required prior to submittal of the Fast Track Application and supportingdocurnents.
2- Professional Engineer's Certification:
1, Krista K. Paredes
(Professional Engineer's name from Application Item IIL1.)
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minfinurn Design Criteria for Gravi-.y Sewers (latest version,), acid the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE In accordance with General Statutes 143-215,6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package sliall be guilty of a Class 2 misdemeanor, which may
include a tine not to exceed S 10,000, as well as civil penalties up to S25,000 per violation.
......,
North Carolina Professional Engineers seal, signature, and date: �`\0(o CAI;?0�
3. Applicant's Certification per 15A NCAC 021' .0106(b)-
SEAL —_
= 044627
&�� 'Z
2021.10.26'�'l'314:41-04'00'
attest that this application for
(Signature Authority's name (, title from Application Item 1.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/orcriminal prosecution. I will make no claim against (lie Division of Water Resources should a condition
of (his permit be violated- I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE - In accordance with General Statutes 143-215.6A and 143-215-6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed S10,000 as we.] as civil penalties up to $25.000 per violation.
Signature:wDate:
FORM: FTA 04-16 Page 5 of
State of [forth Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: City of Durham
Project Name for which flow is being requested: Celeste Circle Lift Station & Force Main
More than one FTSE inay be required far a single project ifrhe owner ofthe WWTP is not responsible far all purrep
stations alang the route of (lie proposed wastewaterflow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: South Durham Water Reclamation Facility
b. WWTP Facility Permit #: NC0047597
All flows are in AIGD
c. WWTP facility's permitted flow 20
d. Estimated obligated flow not yet tributary to the WWTP 3.91
c. WWTP facility's actual avg. flow 8.8
f. Total flow for this specific request 1.96
g. Total actual and obligated flows to the facility 13.35
h. Percent of permitted flow used 66.8
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the GVWTP:
(A)
Design
Puntp
Pump
Average
Station
Station
Firni Daily Floe"
(Na rneor
Pennit
Capacuy,* (Finn .:pf).
Number)
No.
ilvIGD NIGD
None
(B)
(C)
(D)=(B+C) (E)-(A-D)
Obligated,
Appror
Not Yet
TotalCutrcnt
elide+nt
Tributary
Flow Pitts
Avg. Daily
Daily Flow,
obligated Available
Flcku, NIGD
MGD
Flow Capacity**,
* The Firm Capacity (design flow) of any pumpstation is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pt) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): S. Durham Water Reclamation Facilit
Downstream Permit Number: NC0047597
Page 1 of 6
FTSE 10-18
111. Certification Statement:
-�&7 certify to the best of my knowledge that the addition of
the volume of wastewaterto be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and 1I plus all attached planning assessment addendums for which i
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing
Title of Signing Official
Page 2 of b
FTSE 10-18
J
November 04, 2021
North Carolina Department of Environmental Quality
Raleigh Regional Office
Water 800 Barrett ty ion t Drive Ne'Dept ofFoV.
Raleigh, NC 27609 ►lr A` menr
rod
�V 0 a/ pualrry
Re: City of Durham 4 421
Celeste Circle Long Term Lift Station and Force Main Improvements'?,fe -
Fast Track Sewer System Extension Application (FTA 04-16) gh Regional
To Whom it May Concern:
Ofr
On behalf of the City of Durham, and in accordance with 15A NCAC subchapter 02T and the Division of
Water Resources Minimum Design Criteria, please find enclosed the following documents associated
with the proposed Celeste Circle Lift Station and Force Main Projects:
Fast Track Sewer System Extension Application
Figure 1— USGS Topographic Map of Project Area
Figure 2 — Aerial Map of Project Area
Due to potential growth and development in the Durham area, the Celeste Circle Lift Station and Force
Main projects are proposed to construct and improve sanitary sewer services for commercial, industrial,
and residential users providing the additional capacity necessary to meet anticipated demands. A new
lift station facility will be designed and constructed at 103 Crossland Drive to replace the existing Celeste
Circle lift station. The new lift station will have a firm capacity of 2.96 MGD. The Project involves the
demolition of the existing structure and utilities located on the proposed lift station site,
decommissioning of the existing lift station located at 6000 George King Rd, and abandonment of the
existing force main and gravity sewer downstream of the connection point, and any incidentals required
for the completion of the work. The flow is transmitted via the Celeste Circle Force Main (CCFM) by a
newly rerouted 6,425 linear foot 14-inch force main and discharging to a manhole near the South
Durham Water Reclamation Facility.
Due to the unknown nature of future developments that will be served by the proposed Celeste Circle
Lift Station and Force Main projects, we are submitting this permit application as a zero -flow permit
(authorization to construct only). Please feel free to contact me at (919) 463-7308 if you have any
questions or require additional information. I can also be reached at krista.uaredesfreese.com.
Sincerely,
Krista Paredes, P.E.
Freese & Nichols, Inc.
TOPOGRAPHIC MAP
FIGURE 1
Celeste Circle Lift Station
1017 Main Campus Dr 0 0.15 0.3
and Force Main
FREESE Raleigh, NC 27606
9101KNICHOLS1miles
Durham, NC
gig-m-sm
- +
��nr. �r „� aim - .' .� ' �,• �"`*��,�� -�� '•G,�\6i Y +���r�
•51; � 4
AL
ps M.-
•y �h -'� �5 � to :�,�� -rys. ,ipt��+� � 1 ��� • � � � t.<i1 � -ash �y�`r . i,1
•yX''q,
deg
y'r a'r •• - r FALCOPiBRIDGE.g�•
bing
1017 Main Campus Dr, Suite 1200 - Raleigh, North Carolina 27606 • 919-582-5859 - fax 919 582-5851 wwwAN!se.[om
PROJECT:
DRM19746 DATE:
Celeste Circle Long Term Lift Station and
Force Main Design Improvements
TO:
North Carolina Department of Environmental Quality
Raleigh Regional Office
Water Quality Section
ADDRESS:
3800 Barrett Drive
Raleigh, NC 27609
PHONE NO.:
919 791-4200
FROM:
Krista Paredes, PE
WE ARE SENDING YOU THE FOLLOWING ITEMS:
November 04, 2021
Nc Dept ofEnvrron
m NOV eota! Quality
°4 ?021
Raleigh Regional
pffioe
• Two copies of the Fast Track Sewer System Extension Application and supporting documents.
c, Fast Track Sewer System Extension Application
o Figure 1— USGS Topographic Map of Project Area
o Figure 2 - Aerial Map of Project Area
• Application Fee of $480.00
Attached I under separate cover via:
Delivery Service and Tracking No.
I✓ Hand Delivery r- Email F' Other
THESE ITEMS ARE TRANSMITTED FOR YOUR:
r- Use Review and Comment
WO Approval Distribution to Parties
IT Records Other:
REMARKS:
F- Information
f— Response
Please call me at 919-463-7308 or email me at krista.paredes@freese.com if you have any questions.