Loading...
HomeMy WebLinkAboutWQ0042995_Application (FTSE)_20211202Double D Engineering, PLLC Transmittal November 15, 2021 NCDEQ Division of Water Resources 225 Green Street Fayetteville, N.C. 28301 Attn: Trent Allen Ref: Legacy Lakes Phase 4, Sections 1-3 Sewer Permit Application Please find attached: Cover letter, sewer permit application, form, USGS map, street view map and If you have any questions or need any contact this office. DOUBLE D ENGINEERING, PLLC Lee Humphrey, Project Manager NOV 1 8 2021 VVOROS FAYETFEVILLE NFG!ONILO.FFICE downstream sewer evaluation, flow tracking the fee check. additional information, please feel free to 150 S. Page Street Southern Pines, NC 28387 Firm No. P-1275 PH: (910) 684-8646 Project Cover Letter Sewer Improvements to serve Legacy Lakes Phase 4, Sections 1-3 The new 8" gravity sewer mains to serve the Legacy Lakes Phase 4, Sections 1-3 Project will connect to a new Sewer Pump Station which will then pump to an existing 15" gravity sewer outfall belonging to the Town of Aberdeen located on the west side of U.S. Why 15-501. The new 8" gravity sewer main will extend 5373 If with 35 new 4' dia. manholes to serve the lots. The new Sewer Pump Station will be equipped with new 25 HP, 190 GPM @ 105.78 TDH pumps. The new 6" PVC Sewer Force Main shall extend 2,284 If. The Sewer Improvements to serve Legacy Lakes Phase 4, Sections 1-3 will serve 83 single family homes and townhomes @ 360 gpd/home for a total proposed flow of 29,880 gpd. The project will also consist of 28 duplexes @ 480 gpd/duplex for a total proposed flow of 13,440. The total proposed flow for the project is 43,320 gpd. Downstream Sewer Evaluation Moore County has built a hydraulic model of the entire existing Moore County Sewer System all the way back to the Moore County WWTP. Prior to issuing the Flow Acceptance Letter, Moore County did their own evaluation of the capacity of their downstream sewer and found they had adequate capacity in the existing sewer mains and at the WWTP to handle the additional flow. RECEIVED DEWAR WR.B!:> R NOV 1 8 2021 kYOROS FAYETTEVILI F-r;P,If)NA[ OFFICE Downstream Sewer Evaluation Sewer Improvements to serve Legacy Lakes Phas 4, Sections 1-3 8" Diameter PVC Pipe at 0.40% grade 83 Single Family Homes and Townhomes at 360/GPD = 39,960 GPD 28 Duplex's at 480 gpd = 13,440 GPD Total flow of 43,320 GPD 43,320 gpd times 2.5 Peak Factor = 108,300 GPD Current Average Daily Flow 162 Homes at 180 gpd x 2.5 peak factor =72,900 gpd. MODEL: Input Parameters Manning n for material Slope (ft/ft) Pipe diameter (in) Slope min. (8"-18" pipe) Slope min. (21"-36" pipe) Data 0.012 0.01 15 0.0015 FALSE Output Pipe Diameter (ft) 1.250 X-sex area (1/2-full) 0.613 Hydraulic Radius 0.313 Hydraulic Radius A 2/3 0.461 Slope A 1/2 0.100 Velocity (ft/s) 5.718 Flow (cfs) 3.507 Flow (gps) 26.234 Flow (gpd) 11/2 Pipe 2,266,582 Flow (gpd) 3/4 Pipe 3,399,873 Flow (gpd) Full Pipe 4,533,164 Existing Gravity Sewer has sufficent capacity to handle current and future flow. For the Downstream Sewer Pump Stations and Outfalls, Moore County Public Utilities has built a hydrualic model of their sewer system and inserts all proposed flow into their Hydraulic Model prior to issueing the flow acceptance letter. 0/01NR Nov 1 6 2021 fAYI_I EVIti pcoKi Ndi,l_OFFIGki )IDWR NOV 1 8 2021 WORDS ' Division of Water Resorith & U'EVILLF REGIONAL IR,' Tracking for Sewer Extension Applications (FTSE 10-18) State of North Carolina Department of Environmental Quality Division of Water Resources Entity Requesting Allocation: Town of Aberdeen Project Name for which flow is being requested: Legacy Lakes Phase 4, Sections 1-3 More than one FTSE may be required for a single project if the owner of the lf'fl'TP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Moore County Water Pollution Control Plant b. WWTP Facility Permit #: NC 0037508 All flows are in MGD c. WWTP facility's permitted flow 10.0000 d. Estimated obligated flow not yet tributary to the WWTP 0.65561 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 4.92000 0.04332 5.61893 56.1893 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Moore County Public Utilities Downstream Permit Number: WQCS00034 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Randy G. Gould, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacand treat tjji proposed new wastewater. igning Officia 1tle of Signing Official Date Page 2 of' 6 FTSE 10-18 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: & yF �V o be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Town of Aberdeen (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Harold Watts per 15A NCAC 02T .0106(b) Title: Public Works Director 4. Applicant's mailing address: PO Box 785. City: Aberdeen State: NC Zip: 27315- 5. Applicant's contact information: Phone number: (910) 994-7012 Email Address: Hwatts@townofaberdeen.net H. PROJECT INFORMATION: 1. Project name: Utility Improvements to serve Legacy Lakes Phase 4, Sections 1-3 2. Application/Project status: ❑ Privately -Owned Public Utility ❑ Other DEQ I[JWR NOV 1 8 2021 U VOROS FAYETTEVILLERFGIONILOFFRCE Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Moore 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.2502° 5. Parcel ID (if applicable): 847800593313 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: David T. Upchurch, PE Firm: Double D Engineering, PLLC Mailing address: 150 S. Page Street City: Southern Pines State: NC Zip: 28387- Phone number: (910) 684-8646 Email Address: Lee@doubledeng.com Longitude: -79.2506° License Number: 9570 IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Moore County Water Pollution Control Plant Permit Number: NC0037508 Owner Name: Moore County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): Town of Aberdeen FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes DNo ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ZN/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes DNo ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned 0 Retail (stores, centers, malls) ❑ Residential Leased 0 Retail with food preparation/service ❑ School / preschool / day care 0 Medical / dental / veterinary facilities ❑ Food and drink facilities 0 Church 0 Businesses / offices / factories ❑ Nursing Home ❑ Car Wash ❑ Hotel and/or Motels ❑ Swimming Pool /Clubhouse ❑ Swimming Pool/Filter Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) �Is there a Pretreatment Program in effect? ❑ Yes ® No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(fl? 0 Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow'•" No. of Units Flow Single Family Residence 360 gal/day 45 16200 GPD Townhomes 360 gal/day 38 13680 GPD Duplex's 480 gal/day 28 13440 GPD gal/ GPD gal/ GPD gal/ GPD Total 43,320 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 43320 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: 0 Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 5333 PVC 8 40 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 1 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.0526° Longitude: -79.2504° 3. Design flow of the pump station: .04332 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 190 gallons per minute at 105.78 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6 2124 PVC 6 160 DIP 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): Z Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) D. 15A NCAC 02T.0305(fj contains minimum separations that shall be provided for sewer systems: ZYes El No Setback Parameter* Separation Required 24 inches Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclahned water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g) see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per I5A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch ❑ Yes ®No 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ZYes No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, IAA V I O T. U Fc.Nlu Rc4 Fe (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): CAR ri 11.10•Ll 1, A eftgC J _ P -rtw- attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Date: t<// /d/C9(0- I FORM: FTA 04-16 Page 5 of 5 t:1JCi `J l'7.1„1 0 NipW`r? NOV 1 8 Z021 VV )R(:)0 FAYETTELOMETTAVkingi_seeeptlance for Sewer Extension Applications (FTSE 04-16) State of North Carolina Department of Environmental Quality Division of Water Resources Entity Requesting Allocation: Town of Aberdeen Project Name for which flow is being requested: Legacy Lakes Phase 4, Sections 1-3 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. CNC dwngt a. WWTP Facility Name: Moore County Water Pollution Control Plant b. WWTP Facility Permit #: NC0037508 All flows are in MGD c. WWTP facility's permitted flow 10.0000 d. Estimated obligated flow not yet tributary to the WWTP 0.54650 e. WWTP facility's actual avg. flow 4.40600 f. Total flow for this specific request 0.04332 g. Total actual and obligated flows to the facility 4.97014 h. Percent of permitted flow used 49.7447 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Moore Co. Water Pollution Control Plant Downstream Permit Number: unknown Page 1 of 6 FTSE 04-16 III. Certification Statement: I Ab?726 v t 75 certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am tho rooponsib}e party. Signature of this form indicates acceptance of this wastewater flow. Signing Cfial Signal re 11//anal Date Page 2 of 6 FTSE 04-16 https://ngmdb.usgs.govttopoview/viewer/#14/35.0953/-79.3969 /3J y (. ` /1 �' I Cr rt(l,i1)y,isr L, 3k1k F >+ ,,,� f'„d-tz � }'� Qt��• e `wl, ti ',..... t + id • k ° �� r i i) ' /r ry�V t 1 l� / C l am* 1 / l y..-, '/�` ,s half 4�r'tvt �f �ti� { rt�� C �'' kn• T�, - 1 0..:2-,� `=1y,< <. t� ;� 1 t r_ /S��% I X 1 f .�;l.t.li`� s 1 � >) ..,' x1Ui w., -/ f Af�,� ro ) bt tF , `Tf) II _„_)( 3 fi(( J+ tf . ...� 1 kky�•w� �2 ? <L1 r any a+, 1•r4`f + i t k 4Tr r \ i !''N C.t' ° t i w ,t' 44��� r 'i\'' rt v +a r!tit ti ...r il:f(�) %. I J r a tilt .. �. s ''-'��'')/�✓.lj�..i�r C r3 5 cAjr -Li A. ' t+� w".t S�r9�nlV met)s� t Ip 'r�F ter } C9 tl A 'Jj ra +{ft %� C 555 t• / }f j 7 fr l! / 1 /� H R\..+ `t i� �•�) { pK if IC6.0 1-1 �� } ri ,. .y,_711' + �1 ll ' [>(J 1�{��'�� I icio `ty ty{iy rr��.. tl , L�^ t*k }/t.�' \y(J A! \\ VA ,_:J [=:.tsENE)) Cl/DOIR Nov i82021 ` .YI_Th.::"{WuROS +G=R, t;ipNAI,OFFICE '3 as ❑enepop 0) o m co June 17, 2020 DECii+ liVVR NOV182021 Mr. Lee Humphrey Double D Engineering, PLLC WILMS 150 S. Page Street F aYE) IEViLLEREGIONAL.0FF10E Southern Pines, NC 28376 Re: Legacy Off -Site Sewer Hydraulic Analysis Lee, ter; *GINS 0:401 4RK A. (0-11-28 Digitally signed by Mark Lacy, P.E. Date: 2020.06.17 17:56:06 -04'00' We have completed a hydraulic analysis of the existing off -site 8-inch sewer main used to convey all wastewater from the Legacy development and the Academy of Moore County to the county outfall. The existing sewer main consists of approximately 6,500 If of 8-inch pipe that mostly operates by gravity. The line begins with a manhole at the discharge point of the existing 6-inch forcemain from Lift Station 10 on Kerr Lake Road. This line also conveys flow from the pump station serving the Academy of Moore County. The existing pumped flow is approximately 240 GPM. In addition to this flow, all wastewater from the Legacy Phase 2 pump station (210 GPM) and Legacy Phase 4 pump station (190 GPM) will also discharge at this location. As such, the potential instantaneous discharge to the line is expected to be 640 GPM. Based on the record drawings, the sewer line was installed on grade up to the point where it crosses the railroad. At this crossing, the line functions similar to an inverted siphon. The line includes two air vents that consist of an inline wye and vent pipe that is open to atmosphere. The vents do not include any provision to prevent an overflow if the line becomes blocked downstream or if capacity is exceeded. The hydraulic analysis indicates that there is not enough capacity for the existing and proposed flow with the current configuration since the vent pipes are open to atmosphere. The pipe profile and calculated hydraulic grade line are shown in the attached graph. Modifications are recommended to ensure adequate capacity is available without causing an overflow. An additional concern is the section of pipe crossing the railroad. During normal operation, velocity through this segment is expected to be relatively low, which will allow solids to settle. The steep slope at the exit of this section makes solids removal more difficult even at higher flow rates. In order to address the capacity and operational concerns, we recommend that the two existing vents be modified to include combination air valves. These would allow the line to vent while preventing an overflow. We also recommend the installation of a flushing connection upstream of the railroad to allow 140 Aqua -Shed Court, Aberdeen, North Carolina 28315 * PH: 910/420-1437 * FAX: 910/637-0096 License No. P-1095 Mr. Lee Humphrey Page 2 June 17, 2020 the line to be flushed or pigged periodically. The connection should include an in -line wye or tee, above grade connection for a bypass pump, and isolation valves. In addition, the inside drop at the connection to the county outfall should be inspected to confirm adequate thrust restraint is provided and improved as needed. In addition to the analysis of the off -site sewer, we have modeled the proposed pump stations to be installed for Phase 2 and Phase 4. The forcemain's from these stations will combine into a common 6- inch forcemain at the intersection of Legacy Lakes Way and Hwy 15-501 and continue to the discharge point at the beginning of the off -site sewer main. The recommended design operating point for each pump station is provided below. These operating points reflect simultaneous operation of both stations and are based on design information that you provided. Note that the total dynamic head (TDH) given is based on a Hazen Williams C-Factor of 120 for PVC piping and 100 for DI station piping. • Phase 2 Pump Station: 210 GPM @ 153' TDH • Phase 4 Pump Station: 190 GPM @ 138' TDH Please do not hesitate to contact me with any questions or if you need anything else, Sincerely, LKC ENGINEERING, PLLC Mark Lacy, P.E. LEI C:) Li C) c`, "lae1 Ls '. .a I ll o 0 0 I 0 0 0 0 0 I 0 0 0 0 0 0 0 0 m in m r+ m N m m m m m N N N 0 S m 0 0 0 0 0 0 Legacy Offsite Force Main