Loading...
HomeMy WebLinkAbout20211742 Ver 1_Shoreline Stabilization_20211202Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * jonathan.travis@gmail.com Please provide an email address for payment and requests for more information here. Owner Information: Name: * Jonathan Travis Email: * jonathan.travis@gmail.com Phone Number: * (336)414-6670 (xxx)xxx-xxxx Mailing Address:* Street Address P.O. Box 1200 Address Line 2 City State / Province / Region Troutman NC Postal / Zip Code Country 28166 NC Is there an agent working on the project?* - Yes O No Agent/Consultant Information ................................................................................................... Name: * Company Affiliation: Email: * Phone Number:* Janice Estep CBC Stone & Recycling, LLC info@cbcstoneandrecycling.com (704)660-5111 (xxx)xxx-xxxx Mailing Address:* Street Address 638 Oakridge Farm Hwy Address Line 2 City Mooresville Postal / Zip Code 28115 A signed and dated copy of the Agent Authorization letter: Auth. Form.pdf 614.64KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Travis Shoreline State / Province / Region NC Country United States If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Property Address Lookup: * Street Address 228 Penicillin Point Address Line 2 City Troutman Postal / Zip Code 28166 Latitude: * 35.631579 State / Province / Region NC Country US Longitude: *-80.933583 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level Site Plan.pdf 1.06MB Buffer Form.pdf 1.08MB Please use the diagram at the link below: https:Hedocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Shoreline Pics.pdf 11.09MB 4. Location of the property (where work is to be conducted) Nearest Town: * Troutman County: * Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address: * Lot # Pt. 32 Lakeview Acres Include phase/lot number Directions to site: 610 E Center Ave Mooresville, NC 28115 Head south on Evergreen St toward E Center Ave 9s(197ft) Take NC-115 N, Cornelius Rd, Perth Rd and State Park Rd to Morrison Farm Rd 21 min (11.9 mi) Turn right onto E Center Ave 0.5 mi Turn right onto N Church St 0.2 mi Turn left onto E Iredell Ave 0.1 mi Turn right onto NC-115 N/N Broad St Continue to follow NC-115 N 2.1 mi Turn left onto Connector Rd 0.8 mi Continue onto Cornelius Rd 2.4 mi Turn right onto Judas Rd 1.2 mi Turn right onto Perth Rd 3.0 mi Turn left onto State Park Rd 1.4 mi Continue on Morrison Farm Rd. Drive to Penicillin Point 5 min (2.9 mi) Turn left onto Morrison Farm Rd 2.4 mi Turn right onto Penicillin Point 0.5 mi 228 Penicillin Point Troutman, NC 28166 Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: Residential Residential, undeveloped, etc. 6. Property Size 0.79 acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Demo existing block boat house. Structure is unsound. In area where boat house is to be removed, shape and slope shoreline, install matting and install class "B" rip rap to stabilize. From dock to point of property and around to side of property without dock, install a layer of class "B" rip rap to freshen existing stabilization. Install TN Crab Orchard steps in area where boat house will be removed. 8. How will the work be done?* ✓ From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 6' below (2,892 sf) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) I' above (482 sf) 10' x 50' access corridor (500 sf of temp. impact) square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Grass buffer, no trees removed, minimal disturbance to buffer Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Janice Estep Signature: Crr G�Q'F��Y Cy.�ww�Fmr.arni Submittal Date: 11/30/2021 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20211742 Version: * Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Alan Johnson: eads\adjohnson I Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received • Need Fee - send electronic notification • $240.00 $570.00 PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCEL ID: STREET ADDRESS: f- Please print: Property Owner: Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize (Contractor / Agent) (Name of consulting fih) -J to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than prope* above): -20 Telephone: 3& We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. A6thorized Signature Authorized Signature Date: — /0// 7 /2 ov p Date. 9 D.B 1091, Pg. 1861 ^��m �tj 3'a :.��a000 •y r Cb F pp cio�^ zmz3�Ybmoam t :cmi m ,a��'`•�,. �.,� mWAn2 C1`--1 'I zm� Km y 31 ,2 i°nm° RCO 0 0� ny , ry 1 a m of off pMe'p� mN az tip�p> �44 R rn °a -ot�"�a • g a o g �, o m \�\ o o �\ o �a$owp °O kQo'a a] ',i• �F n pint 9. t z� � d ro A O b O o s n e CO gaono �YQ Z cb RW �O Q 2Z22www \Oti�m b N P oa 0 �ol9 N 82 owa w W j SQo x n_ •°+ y3� ;o' kVni °�� 01 0 $ N V�yC f • Ito p.Pm W?� ;:::::�::::`•. a'o .>. 3' a�4 ex nn „ fn poi pox" v! m�wipimi ol�N � ..:;�k, .... �,•�`, o �. � � � 3�"0 fit° Ea$n� t cn y. m0000000� •.Q.. pa•.�.. g° n °"^>m >°a3a � 2 ° ey.:Xq Iw �_�'• n to c � °c�3 > o gp: ` 5 28 lov 2k 2f R co 0 z > z m IA 9 r A M➢C.�.t' , 'gyp, � � •. �' �ISO s . e �. . �, o -► 1 Z J Z Z o o rn � � O c n M o _ � �, =� z � 3 3 3 3? f N m C N N 0 O S R p N c 1 D > O > .S+ ° o 0 o o s " m ° p n o p 0 Z Z m — O Z o m c y O m 3 p n D 0 0 a `m N 00 z Z s a n z ° m a = ui W 0 ff a CL n to m 0 m N D 0 3 m � m z N 3, 3 3, 3 3, � � O- ° �• o � , - O iL s Zi O � N o'o df`pO <1 =y "� N o N 7 1 mo=�3m OD N on io a^ fD - 2 �2L3 N n c c m •» 'o < c U; =�`F.3 O 2-8 v Q o =G 6p o O N O I 2.a m o N m � ert O N i^ m a o _ 8- D 8 o m Z 00 Z O N fD O 00 CA < N m � fD �) O v N � 1 C 0 M. 00 3 !D N N Q` 7• Full Pond/ Norma. Water Level. Shoreline Lake (At Full Pond/Normal Water Level) 60CA+ Lvt)e V 5-e� I, "Ove x46A, ie 60u5 e. +c) remC Q Ed No + rues remo u eel 1f', r,'-'rnC l a, 5+v r bDance- �� }c� he done cn c�r�, Whec� bc�-} �Uv�e IS r2mov ed, Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ftJ *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: c ry X Povi, c. d 1;A Pt Ti 'g Al f -- C 1 6,6 County.r�r' / Owner: Print Contractor/agent: _ Print The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 028.0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of NoVfrcotion I, 'Ti3 �+ f hri✓+ '["r s� , ic hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: / U/ l 7 /3 �J % _ _r `. -•• .��-;^gyp; b - ,..�,. r r re ie .. � .�r �� � 5 �� +�, �,. S �y s ti.`g � �� .v gZ: ' * P gr - .. �. m t k ` � t1t f of