HomeMy WebLinkAboutNC0049867_NOV-2021-LV-0874 Response_20211202Strickland, Bev
From: clevelandclerk@clevelandnc.org
Sent: Thursday, December 2, 2021 1:38 PM
To: Basinger, Corey
Cc: Scheller, Roberto
Subject: [External] NOV Response-NOC-2021-LV-0874
Attachments: Response NOV-2021-LV-0874.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Please find attached the Town's response to the above violation. A hard -copy was mailed today.
Cathy Payne, CMC, CLGFO
Town Clerk/Finance Officer
Town of Cleveland
704-278-4777
clevelandclerk@clevelandnc.org
1
Town of Cleveland
302 East Main Street
Cleveland, NC 27013
{704)278-4777
December 1, 2021
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
NCDEQ-Mooresville Regional Office
610 East Center Ave., Suite 301
Mooresville, NC 28115
SUBJECT: Response to Notice of Violation & Intent To Assess Civil Penalty
Tracking Number: NOV-2021-LV-0874
Permit No. NC0049867 - Cleveland WWTP -Rowan County
Dear Mr. Basinger:
Limit Exceedance Violations: 1/9/21, 1/23/21, 1/30/21 and 1/31/21 - Effluent Coliform, Fecal
MF, MFC Broth, 44.5 C (31616) Weekly and Monthly Geometric Mean Exceeded. The monthly
average test results since February 13 have been between 10.8 to 52.2.
Over the last six months of 2020, we have had several problems exceeding the coliforxn, fecal
limits. This started with our new Wastewater Treatment Plant (WWTP) operator who felt that the
problem was due to having a chlorine contact chamber that was too small. After he left our
employment in February 2021, we discovered that the bypass valve was not being sometimes
closed all the way. The bypass valve was used to clean the contact chamber. The cleaning
procedure has been used since the WWTP has been in service. It was part of the design of the
WWTP. We certainly did not intend to leave it open or cracked.
The corrective action to prevent any further use of this contact chamber clean -out procedure is:
(1) Discontinue bypass usage and seal valve. (2) Install a temporary pump to be used to recycle
back to the oxidation ditch to clean the contact chamber. This would occur between 5 and 7 a.m.,
our lowest flow rate time. The cleaning should occur as needed, probably once per month_
(3) Proceed with installing a second chlorine contact chamber as soon as possible. See the
attached current engineering action.
Our objective is to operate the Cleveland WWTP within the quality limits and maintain close
follow through with environmental protection.
Patrick Phifer
Mayor
cc: Commissioner Gerald Osborne
enc
SENT VIA EMAIL — corev.basin,er()ncdenr.cov
SENT VIA EMAIL — roberto.scheller( ncdenr.gov
HARD COPY SENT FIRST CLASS MAIL
TOWN OF CLEVELAND
MONTHLY PROJECT STATUS REPORT
PROJECT DATE: REPORT NO.
Wastewater Treatment Plant Improvements. 10/08/21 NM=
PROJECT NO. PROJECT PHASE: PROJECT MANAGER: CLIENT CONTACT:
21.01125 Design Doug Chapman, PE Cathy Payne, Town Clerk
PROJECT SCOPE:
The scope of the project includes survey, design, permitting, bidding, and construction phase services
for construction of a new slO.jrin_e contact basin to parallel the existing basin and replacement of the
existing clarifier return sludge pumps
WORK THIS PERIOD: September 2021
Continue with final design and preparation of construction documents.
WORK ANTICIPATED FOR NEXT PERIOD: October 2021
Finalize construction documents and submit to NCDEQ for Quthorization to Construct.
ISSUES IMPACTING PROJECT COST:
ISSUES IMPACTING PROJECT SCHEDULE:
PROJECT BUDGET PROJECT SCHEDULE
Initial Probable Construction Estimate -- Authorization to Proceed Date IIIIIIIII
Contingency Amount Design
IMMEME Bidding/Award
Materials & Geotechnical Testing Budget MIIIIMMI Construction 111111.1
Legal and Administrative Costs
Changes or Additions to Project Cost
TOTAL PROJECT BUDGET 1111111 ESTIMATED COMPLETION DATE
Wastewater Treatment [mprovements.xlsx
Page 1 of 1