Loading...
HomeMy WebLinkAboutNC0023353_Performance Annual Report_20190101Town of White Lake Wastewater Report Fiscal Year 2019 The Town of White Lake has approximately 2500 sewer connections. Several of these connections are multiple connections for businesses, motels and campgrounds. The Town has performed several inspectionsandtests of the sewer system in an effort to locate needed repairs and have made simple point repairs to help eliminate inflow problems. The Town's engineering firm has designed plans to repair and/or replace outdated sewer lines during a sewer infrastructure rehab project. Construction is scheduled to begin early summer of 2020 and will be ongoing until mid - fall. The Town of White Lake provides wastewater services at an affordable cost while managing our program in a financially sustainable manner. We never lose site of the inevitable health and environmental cost of failing to insure that the Town's wastewater options have sufficient financial resources to protect the public. We are pleased to report that our wastewater treatment system is operating at maximum efficiency and minimum cost effectiveness; however, we had a noncompliance occurrence for a weekly fecal coliform violation on August 24, 2019. This occurrence'was quickly mitigated and the parameters for the month were within DEQ's limits. Questions or concerns should be directed to Tim Frush, Public Works Director at 910-862-4800. The Town of White Lake holds a public meeting the second Tuesday of each month at 7:00 pm in the Council Chambers at 1879 White Lake Dr., White Lake, NC.. File: Public Works -Sewer -Annual Wastewater Report -Wastewater Report-FY 2018