Loading...
HomeMy WebLinkAboutNCG060148_DMR_20211025SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCG060000 Date submitted CERTIFICATE OF COVERAGE NO. NCG06 0 t 4 8_ SAMPLE COLLECTION YEAR 2021 FACILITY NAME Snyders-Lance Incorporated FACILITY ACTIVITIES INCLUDE (check all that apply): COUNTY Mecklenburg RECEIVED use/process meats ❑ use animal fats/byproducts PERSON COLLECTING SAMPLES Russell Everett DISCHARGING TO SALTWATERS? DYES ®NO LABORATORY PAR Laboratories, Inc. Lab Cert. # 20 t L 0 3 20 CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results Total event rainfall z0.19 or ❑ No discharge this period' Outfall No. Sample Collected, mo/dd/yr TSS, mg/L pH, Standard units COD, mg/L Oil and Grease, mg/L Fecal Collform', Colonies per 100 ml Enterococci', Colonies per 100 ml Benchmark - 100 or SO Within 6.0 - 9.0 12o 30 1000 Soo SDO-001 8/17/21 50 6.34 18 < 5.1 NA NA SDO-002 8/17/21 31 6.31 23 < 5.1 NA NA SDO-003 8/17/21 29 6.29 19 < 5.1 NA NA SDO-004 8/17/21 3 .35 5 5.2 NA NA SDO-005 8/17/21 7 .33 1 5.0 NA INA Only applies to facilities that use/process meats. `The total precipitation must be recorded using data from an on -site rain gauge. ' For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here. °See General permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor ail per month? ® yes ❑ no (if yes, complete Part B) Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new motor oil/month. Outfall No. Sample Collected, mo/dd/yr Oil and Grease, mg/L TSS, mg/L pH, Standard units New Motor Oil Usage, Annual average gal/mo Benchmark - 30 100 or 50 6.0 - 9.0 - SDO-005 8/17/21 < 5.0 27 6.33 1 Only applies to facilities that use/process meats. 1 The total precipitation must be recorded using data from an on -site rain gauge. ' For sampling periods with no discharge at any outfalls, you must still submit this discharge monitoring report with a checkmark here. °See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. SWU-249 Last Revised: October 19. 2012 Paee I of 2 *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES Q NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "Na Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Of (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.orp/web/wg/ws/su/npdessw#tab-4 SWU-249 Last Revised: October 18.2012 Page 2 of 2 SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCG060000 Date submitted CERTIFICATE OF COVERAGE NO. NCG06 0 1 4 8 FACILITY NAME Snyders-Lance Incorporated COUNTY Mecklenburg PERSON COLLECTING SAMPLES Russell Everett LABORATORY PAR Laboratories, Inc. Lab Cert. # 20 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2021 FACILITY ACTIVITIES INCLUDE (check all that apply): ❑ use/process meats ❑ use animal fats/byproducts DISCHARGING TO SALTWATERS? ❑YES ®NO PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Total event roinfal? 20.19 or r[ No discharge this period OutfallNo. Sample Collected, mo/dd/yr TSS, mg/L pH, Standard units COD, mg/L Oil and Grease, mg/L Fecal Coliform , Colonies per 100 ml 1 Enterococci , Colonies per 100 ml Benchmark - 100 or 50 Within 6.0 — 9.0 120 30 1000 Soo DO-006 8/17/21 7 .30 0 < 5.2 NA NA SDO-007 8/17/21 2 .36 0 < 5.1 NA NA SDO-008 8/17/21 3 .34 1-33 9 112 < 5.0 NA NA SDO-009 8/17/21 2 .32 1 < 5.1 NA NA SDO-010 8/17/21 3 < 5.1 NA NA 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on -site rain gauge. 3 For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here. 4See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than SS gallons of new motor oil per month? ® yes ❑ no Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new motor oil/month. Outfall No. Sample Collected, mo/dd/yr Oil and Grease, mg/L TSS, mg/L pH, Standard units New Motor Oil Usage, Annual average gal/mo Benchmark 30 100 or SO 6.0 — 9.0 - SDO-006 8/17/21 < 5.2 7 .30 SDO-007 8/17/21 < 5.1 2 .36 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on -site rain gauge. 3 For sampling periods with no discharge at any outfalls, you must still submit this discharge monitoring report with a checkmark here. 4See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. (if yes, complete Part B) SWU-249 Last Revised: October 18, 2012 Page I of 2 *FOR PART A AND PART B MONITORING RESULTS: * A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES Q NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES Q NO REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lob results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to tje best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false info mation, including the possibility of fines and imprisonment for knowing violations." l0,Z�.z( (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-249 Last Revised: October 18, 2012 Page 2 of 2 SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCG060000 Date submitted CERTIFICATE OF COVERAGE NO. NCG06 0 1 4 8 FACILITY NAME Snyders-Lance Incorporated ~ Y COUNTY Mecklenburg PERSON COLLECTING SAMPLES Russell Everett LABORATORY PAR Laboratories, Inc. Lab Cert. # 20 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2021 FACILITY ACTIVITIES INCLUDE (check all that apply): ❑ use/process meats ❑ use animal fats/byproducts DISCHARGING TO SALTWATERS? [—]YES ®NO PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Total event rainfall 20.19 or ❑ No discharge this period Outfall No. Sample Collected, mo/dd/yr TSS, mg/L pH, Standard units COD, mg/L Oil and Grease, mg/L Fecal Collform , Colonies per 100 ml Enterococci , Colonies per 100 ml Benchmark - 100 or SO Within 6.0 — 9.0 120 30 1000 S00 DO-011 8/17/21 26 6.28 18 5.2 NA NA 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on -site rain gauge. 3 For sampling periods with no discharge at any outfalls. You must still submit this discharge monitoring report with a checkmark here. °See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ® yes ❑ no Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > SS gal of new motor oil/month. Outfall No. Sample Collected, mo/dd/yr Oil and Grease, mg/L TSS, mg/L pH, Standard units New Motor Oil Usage, Annual average gal/mo Benchmark - 30 100 or 50 6.0 — 9.0 - 1 Only applies to facilities that use/process meats. 2The total precipitation must be recorded using data from an on -site rain gauge. 3 For sampling periods with no discharge at any outfalls, you must still submit this discharge monitoring report with a checkmark here. 4See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. (if yes, complete Part 8) SWU-249 Last Revised: October 18, 2012 Pavd- 1 of') *FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES Q NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to th best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false infotlnatiortk including the possibility of fines and imprisonment for knowing violations." Of (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-249 Last Revised: October 18, 2012 Pnnr 9 nr7 SDO-O( NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit.- hap,//oortalncdenrorg/web/wa/ws/su/nodessw#tab-4 Permit No.: N/�/_/_/_/_/_/_/—/ or Certificate of Coverage No.: Facility Name: anyue County: Meckli Inspector: Russe Date of Inspection: 081161, Time of Inspection: 1815 Total Event Precipitation (inches): 0_19 Phone No. Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) V Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter j interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. this sigiatµre, I certify that this report is accurate and complete to the best of my knowledge: - (mature-of�tt�or Designee) Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. S00-001 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin arkin , Describe the industrial activities that occur within the outfall drainage area: Employee p 9 truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Cloudy with a medium brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V/ 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 *V 3 4 5 7. Is there any foam in the stormwater discharge? Yes V 8. Is there an oil sheen in the stormwater discharge? Yes ve 9. Is there evidence of erosion or deposition at the outfall? Yes V 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-00, Q= NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit: hUp://portal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.:/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: lY/&/Sa/ 0 / 6/ 0 / 1 / 4 / 8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-558f1 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: 1825 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) Vr Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). —-------- ----- _... __.. Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional 0ffice - - — .- . ..-.-_-..-- - — By This signature, I gkrtifythat t� report is accurate and complete to the best of my knowledge: Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-002 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: y 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: y 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes *406 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes ie 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-00: ��A ��6, NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidanceonfillingout thisform,please visit., http://nortal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: kt/&/. Facility Name: or Certificate of Coverage No.: County: Mecklenburg Phone No. Inspector: Fmussen C Date of Inspection: 08/16/21 Time of Inspection: 18:35 Total Event Precipitation (inches): 0.19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) VYes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office_ - By this signatuKe,V certify that th�ort is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-003 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin ..: Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Cloudy with a medium brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V" 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 %t 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes V 9. Is there evidence of erosion or deposition at the outfall? Yes we 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-0( A�� NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http,1/portal ncdenr org/web/wo/ws/su /nndessw#tab-4 Permit No.: lY/�/—/—/—/—/—/—/—/ or Certificate of Coverage No.: 0 / 1 / 4 / 8/ Facility Name: Sn aer'S Lance incorporaiect County: Mecklenburg Phone No. Inspector: Russell t Date of Inspection: 08/16/21 Time of Inspection: 18:45 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) 9 Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office__ By ft signaitre certify thatthis report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-004 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes *44 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 JL/V-UU ��.;-n NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit., http://portal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.: iY/�/—/—/—/_/—/—/—/ or Certificate of Coverage No.: Facility Name: tinyaers Lance Incorporates County: Mecklenburg Phone No. I04-Fri4-.1;f;R l Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: 20:40 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event' or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,•if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter 1 interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. that this report is accurate and complete to the best of my knowledge: Page 1 of 2 Swill-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-005 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: V 2 3 4 5 S. Floating Solids: Choos. the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes *6 8. Is there an oil sheen in the stormwater discharge? Yes V 9. : Is there evidence of erosion or deposition at the outfall? Yes 0 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SUU-0t ��� Q � NCDENR Stormwater Discharge Outfall (SDO) (Qualitative Monitoring Report Forguidance on filling out this form, please visit: http,//portal.ncdenr.org/web/wg/ws/su/npdessw#tab-4 Permit No.: N/-C/. Facility Name: or Certificate of Coverage No.: N/&/_G/ 0 / 6/ 0 / 1 / 4 / 8/ County: Mecklenburg Phone No. 704-554-55Rn Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: 20:25 Total Event Precipitation (inches): 019 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) 9 Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). .................... _.. Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours j prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. this sigma LFertify that this report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-006 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Cloudy with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: y 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 V 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, orerosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 tiUu-ut NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: httR//12ortal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.: 13/�/—/_/_/—/—/—/—/ or Certificate of Coverage No.: Facility Name: 5nyaer'S Lance incorporaiec County: Mecklenburg Phone No. Inspector: nusseii c Date of Inspection: 08/16/21 Time of Inspection: 20:15 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) VYes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter j interval is representative for local storm events during the sampling period, and the permittee I obtains approval from the local DWQ Regional Office. By 4is signature{ Ilcgrtify that this report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall-No. SDO-007 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 V 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-00f NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit. bttp•//12ortal.ncdenr.org/web/wg/ws/su/ni2dessw#tab-4 PermitNo.: �1/�/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Sn rider's Lance Incorporated County: Mecklenburg Phone No. I04-.5.9;4-5F60 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: 20:10 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) 9 Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). --..— ----------- --- ....----- ............. Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. 1 certify that this report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Lase modified 10/25/2012 1. Outfall Description: Dutfall No. SDO-008 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes W/ 8. Is there an oil sheen in the stormwater discharge? Yes V 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-OC Z�y�r ' NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onfilling out thisform, please visit: http•//portalncdenrorg/web/wa/ws/su/nndessw#tab-4 Permit No.: IV/�/_/_/_/_/_/_/_/ or Certificate of Coverage No.: hL&I-G10 / 6/ 0 / 1 / 4 / 8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. I04-!;54-.r;r;Fn Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: ✓� �� Total Event Precipitation (inches): 019 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) g Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By Jkis signAuke, I certify that this report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-009 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facilitv. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: V 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes M/ 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-01 A'r^---M� NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onfilling out thisform, please visit., htto•//12ortalncdenrore/web/wa/ws/su/npdessw#tab-4 Permit No.:I3/�/—/_/—/—/—/—/—/ or Certificate of Coverage No.: Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 08/16/21 Time of Inspection: 19:45 Total Event Precipitation (inches): 0_19 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) V Yes ❑ No Please verify whether Qualitative Monitoring must he performed during a "representative storm event" or "measureahle storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter I interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By tis signature, I c4gify that this report is accurate and complete to the best of my knowledge: Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-010 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Cloudy with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: Ve 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 11i� 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. 1. Page 2 of 2 SWU-242, Last modified 10/25/2012 SDO-01 e&Mr +te NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out thisform, please visit., http•//portal.ncdencorg/web/wq/ws/su/npdessw#tab-4 Permit No.: jq/�/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N1/0/./ 0 / 6/ 0 / 1 / 4 // Facility Name: Snyder's Lance Incorporated County: _ Inspector: Mecklenburg Phone No. 704-Ss4-55sn Date of Inspection: 08/16/21 Time of Inspection: 19:25 Total Event Precipitation (inches): 0.19 Was this a "Representative Storm Event' or "Measureable Storm Event" as defined by the permit? (See information below.) 9 Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). -- -----. -- Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By tNs sigqatAre(tl certify that this report is accurate and complete to the best of my knowledge: Page 1 of 2 SWU-242, Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-011 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: S V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes We 8. Is there an oil sheen in the stormwater discharge? Yes lei? 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242; Last modified 10/25/2012