Loading...
HomeMy WebLinkAbout20131264 Ver 1_Shoreline Stabilization_20131206071 UsfAA Js 3 wr>V A1vi r�7245,6 AAJ 2® 1 3 1 2 6 4 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide five (5) copies of this application and supporting information as well as a non - refundable application fee to the Division of Water Quality of $240.00 for impacts to lake bottom of less than 1 acre and $570.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: t Division of Water Quality 401 Oversight /Express Review Permitting 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information Owner/Applicant Information Name. V &N N-ro-V -K �►�SU 3�� Marling Address- -36:25 W (ULS IIA l LL- R_�i C-V An /K / 1J � 6A 3 D D 4-1 Telephone Number l 1'%��� ?' Fax Numbei: E -mail Address k �N A IJ�C I C �' � b t /'^ A I, <r L6 � 2 Agent Information (A signed and dated copy of the Agent Authoiization letter must be attached if the Agent has signatory authority for the owner /applicant ) Name: 060 WI!F2z"» 1113a Company Affiliation Marling Address Telephone Number E -mail Address- 594-WA-U— II. Project Information co RZ8- 2 zC. -7- 0'V 7 Fax Number: EZ F- 7y3 -- 6'Z 6 0 Zopa�e� �"� a e / < ear Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads Also provide a detailed site plan showing property boundalres and development plans in relation to sunoundrng properties You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. .aucLsrte plan must include a scale and north arrow The footprints of all burldrn a then facilities must be included I 1 Location County: 6 J Nearest Town Subdivision name or site address (include phase /lot number), Directions to site please include road numbers, landmarks, etc (This is not necessary if an adequate vicinity map is included) t/e 71,,V--E &SX4 R� 7'0 _ A -94104 R& 7-y'f2N124 -,E7— f'� -sT� L ,4k, �e_ ?O O^J i21641T. -TD ^0 Or- 121-6.+c, T f/n V S r 3 51 ytJg G.c�r ✓ L t . 2 Describe the existing land use or condition of the site at the time of this application '401"Ls M4- 3 Propeity size (acres) /, D t — 4 Nearest body of water (stream /river /sound /ocean /lake) 1_194rS N41A_r I"t ^ 5 Describe the purpose of the proposed work 7_0 6 List the type of equipment to be used to construct the project: 46 >0& 11 ?, 3..9 .dam4 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc ) below the normal pool lake level in square feet or acres. f%D S Q t7 8.a Amount of impact (including all clearing, back fill, excavation, rip lap, retaining walls, etc ) above the normal pool lake level and 50 feet land -ward in square feet or acres. , b SGi /4�T 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance)- Sd ME XkV_r.-o/ I/ /,Z-� h, J Apkcant /,�Qent's Signature Date (Agent's signature is valid only if an authorization letter fiom the applicant is provided ) m V S S )exj 3cr3 �v: irk Lev, � {- tfr���' �'�� ►�-►� 7' RAf+ I�A-�r Clear 1 Reset Remove Last Blue Marker Show Point from Latitude and Longitude Center Red Marker Use this if you know the latitude and longitude coordinates of a point and want to see where on the map the point is_ Get the Latitude and Longitude of a Point Use: + for N Lat or E Long - for S Lat or W Long. Example: +40.689060 - 74.044636 When you click on the map. move the marker or enter an Note: Your entry should not have any embedded spaces. address the latitude and longitude coordinates of the point are inserted in the boxes below Decimal Deg Latitude 35.185041 Latitude: 35 185041 Longitude: - 83.653657 Latitude: Longitude Degrees 355 -33 Minutes 11 39 Decimal Deg. Longitude - 83.653657 Show Point Example +34 40 50.12 for 34N 40' 50. , 2" Seconds Degrees Minutes Seconds 6.147 Latitude 13.1646 Longitude: Shov, Point http : / /itouchmap.com/latlong.html �•� DUKE 2 0 1 3 1 2. 6 4 Lake services .., ENERGY® Duke Energy EC12Q 1 526 South Church Street Charlotte, NC 28202 DUKE ENERGY NANTAHALA AREA (DENA) PRIVATE FACILITIES Mailing Address "USER AGREEMENT" LETTER EC12Q I PQ Box 1006 (You may use this letter and fill in the requested information. Please Print) +herlotte, NC 28201 -1006 Date // —,Z7 - /3 TQ Duke Energy c/o Lake Services- EC 12Q P. 0. Box 1,006 Charlotte, NC 28201 -1006 RE: (Lake Name) 11AV74- 4 1-4- (Street Address) Z5 WWy_A*a2 r12O6-0,4"L %V- (Subdivision / Lot #) wi Arl"7M+�& (Applicant's full name) /VA651W 1?,fJJ 41SSA)V hereby agrees to comply with all requirements and conditions set forth by Duke Energy's Lake Services' office, or any federal, state or local agencies pertaining to our Private Facilities application to construct a S.AO&A WL s7WX.*Z*Tr[ur - S4C4Wft -Gt- on Lake In addition, lfwe have read and agree to comply with Duke Energy's Shoreline Management Guidelines (SMG) and understand that written authorization must be obtained from Duke's Lake Services' office prior to beginning any activity /construction within the Protect boundary. The construction will be completed as described in the approved private facilities program application and within twelve (12) months from the date of approval by Lake Services. Failure to complete construction within the build -out period will require the applicant to file a new application within the then - current guidelines. The filing will include any applicable fees and security deposits. 11we attest to be the owner or lease holder of the tract of land immediately adjoining the Project boundary where the proposed facility is to be constructed. I/we understand the physical location on my /our lot in relation to the common property line with Duke Energy, the FERC Project boundary, and any deeded flood easements or required building setbacks. I/we understand that this lake was constructed as a working hydropower reservoir for the primariy purpose of producing cost - effective electric energy and that this remains as the lake's primary purpose. I /we understand that the lake and its associated hydropower station are operated by DENA under the terms of a license issued by the Federal Energy Regulatory Commission (FERC) and that there will be no change in hydro project operations as a result of the construction and/or use of any facilities that I /we may be allowed to place within the FERC Protect boundary or on DENA -owned property. Uwe understand that lake levels will rise and fail over time in response to weather events and hydro project operations. DP NA PRIVATE FACILITIES USERS AGREEMENT Final Rev 10/13/03 Page 1 of 5 www rliikaonPrw rnm I/we acknowledge that DENA provides no guarantee of any specific quantities (except those identified in the Low Inflow or Hydro Project Maintenance and Emergency Protocols) or quality of water in the lake I /we acknowledge that DENA does -rot guarantee that an approved facility will always have efficient water depth to be accessible by boat or for other water depth related recreation activities. I/we understand -that the structures to be installed are my /our property and I/we therefore agree to be =fully responsible for the permitted reservoir use including maintaining structures in good repair. If the facility is deemed unsafe by a Lake Services Representative, I /we agree to - repair or - remove the facility at -my /our own expense and within the specified timeframe. This responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. I/we understand that as an owner or lease holder of property directly adjacent to DENA's Project boundary I /we enjoy the same rights and privileges for general recreational use and enjoyment of the Project lands and waters as are afforded the general public. I /we understand that as an adjoining property owner I/we may, with proper written approval, be considered for expanded privileges as specified in the DENA SMG. Uwe understand that certain activities specified in the SMG are prohibited because of the DENA lakes small size, environmental concerns, boating capacity limitations, safety considerations and other reasons. Uwe understand that ownership /interest in a Common Use Facility eliminates the option for me /us to also have a separate facility on any other lot within the affected subdivision that Uwe own or lease I/we understand that Lake Services' approval of the requested reservoir use in no way constitutes assignment of an interest in real property (i.e. land rights). The approval is granted and maintained solely at Duke's discretion. I/we also understand that the permitted use may be revoked at any time by Duke Energy or its successors for any reason whatsoever. If the approval is revoked, Uwe agree to remove the facility at my /our own expense within the specified timeframe set by Lake Services. I /we specifically waive any claim for consequential damages arising out of or relating to this application, Duke's approval or denial of it, or Duke's subsequent revocation of approval, and Uwe specifically understand and acknowledge that, because Duke Energy can revoke the permitted use at any time, I /we are not entitled to reliance damages. Uwe understand that there will be $o change in hydro project operations as a result of construction and/or utilization of the permitted proposed structures. Uwe understand that the proposed structure will be used only for the purposes described in the information submitted to Lake Services and other appropriate governing bodies for approval. Uwe understand that this lake is open for use by the general public and that maintaining safe and lawful public use is one of the primary lake management objectives of DENA. Uwe understand that the use for which we are applying is a private use and it should not interfere with the general public's safe and lawful use of the lake Uwe understand lake use permit holders have the authority to prevent others from trespassing on the structures they have built. Uwe also understand that Uwe, however, do not have any authority to impede anyone from DP NA PRIVATE FACILITIES USERS AGREEMENT Final Rev 10/13/03 Page 2 of 6 pursuit of the lawful public recreation enjoyment of FERC Project lands and waters. Except as specified otherwise in the SMG or other DENA documents (e.g. Public Safety Plans), anyone may fish around/under structures built by others, may walk/wade /fish within the FERC Project boundary or any DENA -owned peripheral strip, boat in the lake's waters, etc. without having to get anyone's permission to do so. Boaters may not block ingress/egress to piers/docks Uwe understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife, and other natural resources Uwe understand that trees and vegetation growing within the Project boundary play an important role in the overall environmental condition of the lake. The ecological benefit the vegetation has on the fish and wildlife habitat supports a sound and healthy lake environment. Uwe also understand that unauthorized removal of shoreline vegetation (i.e. button bushes, willows, cattails, etc.) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use permitting requests and require me /us to re- establish the vegetation, if the disturbance is found to be in violation of the state or county watershed buffer regulations or Duke Energy Nantahala Area Vegetation Management Requirements Uwe agree to notify Lake Services when construction is completed During the construction period, the weather -proof "Duke Energy Approved Lake Use Activity" sign (to be provided by Lake Services) must be posted at the job site, visible from the water's edge Uwe agree to notify Lake Services if the property is sold and provide the name and address of the new owner. The new owner has 180 days following the date of closing on the property purchase to sign this agreement and its conditions. Uwe agree to fully disclose all information regarding the approved private facility to any prospective buyer/leaseholder of the property and any new owner /leaseholder. Uwe agree that Duke Energy Lake Services will be notified immediately of any sale /transfer of the property and the transfer of the permit to the new owner/leaseholder. Uwe agree that Duke Energy may enter into agreements with third parties permitting use of the Project property that promotes the overall recreational purposes of the Project. Uwe agree that this agreement confers no right to construct or maintain public and private beaches, marinas or campgrounds. Uwe agree that the adjacent Duke Energy Project property shall be used exclusively for non - commercial recreational purposes. Uwe agree not to rent, lease or otherwise allow third parties (except for temporary use by guests, family members, and renters of the residential property) to use any structures permitted to me /us by DENA. Uwe agree not to allow any use of the adjacent property and will exercise due care and diligence to prevent all other persons that are affiliated with my /our property (including invitees, family members, guests, etc.) to violate an applicable federal, state or local law or regulation. Examples include but are not limited to nudity, illegal discharge of firearms or fireworks, controlled substance abuse, public drunkenness, public urination or defecation, or other activities determined to be a nuisance by law enforcement officials. DP NA PRIVATE FACILMES USERS AGREEMENT Final Rev 10/13/03 Page 3 of 5 Uwe agree to exercise all care and due diligence to preserve and maintain the character of the DENA's adjacent property. Uwe agree to comply with the DENA Vegetation Management Requirements Uwe agree further to not allow sewage, including discharge from septic tanks (or similar facilities) or boat holding tanks, garbage, trash, or other waste material to be discharged or dumped into the reservoir, tributaries or adjacent property Uwe understand that as an adjoining property owner Uwe can make no change in land form of land within the FERC Project boundary or land owned by DENA, such as grading, excavation or filling without prior written approval by Lake Services Uwe agree that only floating piers /docks (unless otherwise authorized by DENA in writing) will be placed on the Project property and that no piers/docks or structures will be built on Project property without prior written authorization by DENA. Uwe agree for myself /ourselves, members of my /our family, guests and invitees that Uwe assume all risks of personal injury or property damage incident to my /our occupancy and use of the premises; including but not limited to any personal injury or property damage which may be sustained as a result of flood waters or in connection with the rise and fall of water in the reservoir as a result of floods or of the operation of Duke Energy's hydro electnc facilities. Uwe as the adjoining property owner further agree that Uwe will indemnify, protect, defend, and save harmless Duke Energy from any and all loss, cost, claims damages, expenses, judgments and causes of action for all injuries and damages sustained by the members of my /our family, guests, and invitees arising or claimed to have arisen in connection with their occupancy or use of the DENA - permitted facility(s). Uwe agree to comply with all FERC orders (as modified or interpreted by FERC), with all other applicable FERC Rules and Regulations imposed by Duke Energy, and with all rules or regulations imposed on Duke Energy by any governmental agency Uwe understand this user's agreement does not have an expiration date and is transferable to the next property owner provided the new owner signs a new agreement within 180 days following the date of closing on the property purchase. Uwe have included a check for the applicable filing fees and security deposits and copies of all other necessary permits. Uwe acknowledge that DENA has the right to charge reasonable user's fees for private use of its property and that failure to pay any applicable user's fees in a timely manner can result in the suspension or cancellation of any previously approved lake use permit. Uwe agree to maintain any prescribed mitigation activities that are required in order to gain approval for facility construction, as long as the facility exists Uwe agree that camping is only allowed in designated areas. Uwe recognize that Uwe have the continuing responsibility to ensure that the constructed structures are maintained in good repair, including, but not limited to maintenance of the dock and boat slips, and proper erosion control within the permit area and along the shoreline, and agree to take all reasonable steps necessary to meet this responsibility. Uwe agree to maintain all structures within the Project boundary on DENA -owned property in a sound condition and in a neat appearance and pay all costs for said maintenance. DP NA PRIVATE FACILITIES USERS AGREEMENT F1nW Rev 10/13/03 Page 4 of 5 Uwe agree that if any action is taken by Duke Energy to enforce any provision, covenant or agreement contained in this user agreement or DENA SMG or if Duke Energy is required to retain an attorney to enforce any provision, covenant or agreement contained in this user agreement or SMG (including, without limitation, the payment of fees due hereunder or the removal of an encroachment constructed in violation of this user agreement or SMG), then Duke Energy shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement; provided, however, that the undersigned shall be entitled to recover all of its reasonable costs associated with such an action, including but not limited to, attorneys' fees and court costs incurred in such action and/or enforcement if judged to not be in violation of any provision of the User Agreement or SMG. Uwe agree that Uwe have read and will abide by the DENA SMG published under separate cover. Uwe understand that Lake Services representatives may issue Stop Work Directives for any violations of the SMG or engagement in prohibited acts or activities on DENA property as specifically identified in the SMG I /we understand that persons found to be in violation will be subject to DENA sanctions which can include: 1) restoration of the impacted area at the person's expense; 2) loss of consideration of any future lake use permitting activities for up to five years for improper vegetation removal or until vegetation is satisfactorily re- established (even if there is a change in property ownership); 3) revocation of a previously issued permit and loss of consideration of any future lake use permitting activities and/or reinstatement of the revoked permit; 4) increases in fees; 5) modification or removal of non - complying structures; and/or 6) further legal action being taken by DENA. Sincerely, (Applicant's Name) 5 :3 W LN\)1 -t Ur t L.r} Lake Street Address City /State/Zip Code 12-4- 3 it - s4S L. Lake Phone Number (Designated Duke Energy Agent) DP NA PRIVATE FACILrrlES USERS AGREEMENT Page 5 of 5 t Applicant's Signature '3&35 Wic.Lj /tit LL Q> Home Street Address G-A City /State /Zip Cod -170— 40_3-_77,+Y Home Phone Number Date: /.;z /,? Date- Final Rev 10113/03 ` r, _ i •� �l +r' -' �.' i w , �. _ � .:= ' 3 v r s'G Nt� l