HomeMy WebLinkAboutNCC216371_ESC Approval Submitted_20211201ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Brevard College, Inc.
ATTN: Mr. Burke Ulrey
One Brevard College Drive
Brevard, NC 28712
NORTH CAROLINA
Environmental Quality
October 28, 2021
LETTER OF APPROVAL
RE: Project Name: BREVARD COLLEGE MAINTENANCE FACILITY
Acres Approved: 1.55
Project ID: TRANS-2022-001
County: Transylvania
City: Brevard
Address: Kings Creek Loop
River Basin: French Broad
Stream Classification: Kings Creek & Lambo Creek - Class C, Trout
Submitted By: Fusco Land Planning & Design, PLLC - Mr. Matthew Fusco, P.E.
Date Received by LQS: September 7, 2021
Date Revision Received: October 13, 2021
Plan Type: Commercial
Dear Mr. Ulrey,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval. This plan approval shall expire three (3) years following the
date of approval, if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required
(G.S. 113A-54.1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
D
� � North Carolina Department of Environmental Quality I Dlvlslon of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
N'OISIHCA;QJl`a4
Oepndm"tal Enw M M Omfit, /`� 828,296.4500
Letter of Approval
ATTN: Mr. Burke Ulrey
October 6, 2021
Page 2 of 3
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at
Paul.clark ncdenr. ov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerel ,
Fred Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval
ATTN: Mr. Burke Ulrey
October 6, 2021
Page 3 of 3
cc: Mr. Matthew Fusco, P.L.A. (matt@fuscola.com)
Mr. Landon Davidson, P.G. - NCDEQ-DWR (landon.davidson(@ncdenr. ov)
Ms. Kaylie Yankura - NCDEQ-DWR (kaylie.yankura@ncdenr.gov]
cc: Regional Office file