Loading...
HomeMy WebLinkAbout20060834 Ver 1_Approval Letter_20070118• O~OF W AT ~RpG Michael F. Easley, Governor William G. Ross Jr., Secretary ~-- North Carolina Department of Environment and Natural Resources ~ ~ p ~ Alan W. Klimek, P.E. Director Division of Water Quality January 18, 2007 DWQ Project # 06-0834 Dare County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Ms. Mary Kelly BKS Enterprises Corp. P.O.2103 Manteo, NC 27954 Subject Property: Holiday Shores -Lot 11 Pamlico Sound [030155, 30-22, SA, HQW] 303d Approval of 401 Water Quality Certification with Additional Conditions Dear Ms. Kelly: You have our approval, in accordance with the attached conditions and those listed below, to ,place fill within or otherwise impact 0.11 acres of wetland, to construct the proposed residence at the subject property, as described within your revised application dated January 5, 2007 and received by the N.C. Division of Water Quality (DWQ) on January 16, 2007. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3404 and 3402 (GC3404 and GC3402). The Certification(s) allows you to use Nationwide Permit(s) 14 and 18, respectively, when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or LAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. 401 OversighUExpressReuiew Unit 1650 Mail Service Center, Ralegh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931Intemet: htlp://h2o.enr.state.nc.us/ncwetlands ,'• ,~ ~r An Equal OpportunitylAffirmative Action Employer- 50% Recycled/10% Post Consumer Paper BKS Enterprises Corp. Page 2 of 4 January 18, 2007 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met, No other impacts are approved including incidental impacts: Amount A roved Units Reference 404/Wetland 0.11 acres) PCN age 8 of 13 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B 33 and GC 3402. 5. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, BKS Enterprises Corp. Page 3 of 4 January 18, 2007 water and buffer impact: These mechanisms shall be put in place prior to impacting any wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web .site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project; 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 7. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition'herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786. Sincerely, ./` Alan W. Klimek, P.E. AWK/ijm Enclosures: GC3404 and GC3402 Certificate of Completion BKS Enterprises Corp. Page 4 of 4 January 18, 2007 cc: Doug Huggett, DCM USACE Washington Regulatory Field Office Kyle Barnes, DWQ Washington Regional Office File Copy Central Files Mike Street, P.O. Box 769, Morehead City, NC 27557 Brian Rubino, Quible & Associates, P. C., P. O. Drawer 870, Kitty Hawk, NC 27949 Filename: 060775 Hol idayS horesLot7(Dare~01