HomeMy WebLinkAbout20130990 Ver 1_Other Agency Comments_20131011 North Carolina Wildlife Resources Commission Gordon Myers, Executive Director Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh NC 27699-1721 Telephone: (919) 707-0020 · Fax: (919) 707-0028 TO: Lori Beckwith, NCDOT Regulatory Project Manager Asheville Regulatory Field Office, USACE FROM: Marla Chambers, Western NCDOT Project Coordinator Habitat Conservation Program, NCWRC DATE: October 11, 2013 SUBJECT: Review of NCDOT’s application for Section 404 and 401 permits to replace Bridge No. 204 over Bird Creek on SR 1319, Mitchell County, North Carolina. The North Carolina Department of Transportation (NCDOT) has submitted an application to obtain a Section 404 Permit from the U.S. Army Corps of Engineers (USACE) and a 401 Water Quality Certification from the NC Division of Water Resources (NCDWR). Staff biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the information provided. These comments are provided in accordance with the provisions of the National Environmental Policy Act (42 U.S.C. 4332(2)(c)), the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d) and the Clean Water Act of 1977 (33 U.S.C. 466 et seq.). The NCDOT proposes to replace Bridge No. 204 over Bird Creek on SR 1319 with a bottomless arch culvert measuring 25’ x 19’ x 5’. An on-site detour will be included, as it is on a dead end road. Permanent stream impacts total 10 linear feet (lf) for stream bank stabilization. Temporary impacts consist of 30 lf for the detour and 40 lf for dewatering. Bird Creek (Class C, Trout) supports Brown and Rainbow trout in the project area. A moratorium prohibiting in- stream work and land disturbance within the 25-foot trout buffer should apply from October 15 to April 15 to protect the egg and fry stages of the trout. We also recommend the use of NCDOT’s sediment and erosion control measures that include coir fiber logs, straw wattles, and PAM (optional), if practicable, to meet the Design Standards in Sensitive Watersheds. NCWRC can concur with the issuance of Section 404 and 401 permits provided that the following conditions are implemented: 1. In-stream work and land disturbance within the 25-foot wide buffer zone are prohibited during the trout spawning seasons of October 15 through April 15 to protect the egg and fry stages of trout. Bridge No. 204, SR 1319 Bird Creek, Mitchell Co. 2 October 11, 2013 2. Sediment and erosion control measures shall adhere to the Design Standards in Sensitive Watersheds and be strictly maintained until project completion. 3. Herbaceous vegetation shall be planted on all bare soil as soon as possible following the completion of permanent or temporary ground disturbing activities to provide appropriate long-term erosion control. 4. Tall fescue and straw mulch shall not be used in riparian areas. We encourage NCDOT to utilize onsite vegetation and materials for bank stabilization when practicable. Erosion control matting shall be used on steep slopes and for establishing permanent vegetation in riparian areas. The matting shall be well anchored with staples or wooden stakes and, whenever possible, include live stakes of native trees. Matting in riparian areas should not contain plastic mesh, which can entangle and trap small animals. 5. Stormwater should be directed to buffer areas or retention basins and should not be routed directly into the waterway. 6. The natural dimension, pattern, and profile of the waterway above and below the crossing should not be modified by widening the channel or changing the depth of the waterway. 7. Removal of vegetation in riparian areas should be minimized. Native trees and shrubs should be planted along the banks, as appropriate to the setting, to reestablish the riparian zone and to provide long-term erosion control. 8. Grading and backfilling should be minimized, and tree and shrub growth should be retained, if possible, to ensure long term availability of shoreline cover for fish and wildlife. 9. When practicable, riprap placed for bank stabilization should be limited to the banks below the high water mark, and vegetation should be used for stabilization above the high water elevation. 10. If concrete will be used during construction, work must be accomplished so that wet (uncured) concrete does not contact surface waters. This will lessen the chance of altering the water chemistry and causing a fish kill. 11. Discharging hydroseeding mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 12. Heavy equipment should be operated from the bank rather than in the channel whenever possible in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the waterway. All mechanized equipment operated near surface waters should be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids or other toxic materials. Bridge No. 204, SR 1319 Bird Creek, Mitchell Co. 3 October 11, 2013 Thank you for the opportunity to review and comment on this project. If you have any questions regarding these comments, please contact me at (704) 485-8291. cc: Amy Chapman, NCDWQ Roger Bryan, NCDOT