Loading...
HomeMy WebLinkAboutSW6210902_O&M Agreement/Plan_20211130Project Name: American Dream Baseball Field Project Location: Oakridge Duncan Road, Fuquay Varina, NC 27526 cotter Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & co, Infiltration Basin Quan*:l Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity - Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM fit: Low Density Present: O&M sheets will be Location(s)_F Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Locabon(s): Location(s): Locabon(s): Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: KerxiaN Grimsley Owner 1404 Weslyn Springs Way Fuguay Varina, NC 27526 (919) 621-2992 mrs hoo.com Signature: Date: t I, �,NR�� i LK rC� ah ry a Notary Public for the State of I / n County of do hereby certify that�� IT�iMSL<J`� personally appeared before me this day of N0VZ t1 r>g-p— and acknowledge the due execution of the Operapon!,�and ai�t7', Agr men . Witness my hand and official seal, ^ / �2u AM lie 104 NOTARY PUBLIC .y commission expires 11/22/2021 STORM-EZ Important maintenance procedires: The drainage area to fte vegetated corn ec ance or vegetated receiving area will be carefully managed to reduce the sedir ent load to the vegetated conveyance or vegetated receiving area After the initial fertilization to estadish the grass in the vegetated con eyanceor the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. rTh:ewlgetated conveyance a vegetated receiving areawil be inspected quarterly Records ofoperation and maintenancewfl be � in a et location and Wl► be available upon request hlspection activities shall be performed as follows. Any problems Mad are food shall be repaired iniredately. SCM element: Potential problem: Hawto rernedietethe preblem: Vegetation is too short a too Maintain grassed vegetation such that the svirale or vegetated area does not Vegetation �9 erode during the pe*Sow from the 14a yestorm TraWdebris is present_ Rerrnve the trasWdEh is_ Reg rade the soil if necessary to remove the gully, and then re -sod (or plant V etated receiving areas e9 g Areas of bare sine erns wth otter appropriate species) and water uantil established Provide lime and d. guSie hasetomed aone-time fertilizer application. Clogging has ocrured Clean out the outlet device Dispose of the sediment off -site. The outlet device (it applicaNe) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damag a have occurred at the outlet Repair the damage and improve the Sow dissipation structure. The receiving weer Discharges from the site are causing erosion or Contact the tonal NCDEQ Regional Office. sedimentation in the receivirig water_